Agenda Item
10.Approval of General Service Contract No. C26194766 with Securitas Technology
Corporation, Utilizing Sourcewell Cooperative Agreement No. 121024-SCS, to Procure
Fire Alarm Systems Monitoring, Inspection, Testing, Repair, and Related Services for a
Period of Four Years in the Not-To-Exceed Amount of $404,646; CEQA Status – Not a
Project
City Council
Staff Report
From: City Manager
Report Type: CONSENT CALENDAR
Lead Department: Public Works
Meeting Date: August 18, 2025
Report #:2505-4636
TITLE
Approval of General Service Contract No. C26194766 with Securitas Technology Corporation,
Utilizing Sourcewell Cooperative Agreement No. 121024-SCS, to Procure Fire Alarm Systems
Monitoring, Inspection, Testing, Repair, and Related Services for a Period of Four Years in the
Not-To-Exceed Amount of $404,646; CEQA Status – Not a Project
RECOMMENDATION
Staff recommends that Council approve and authorize the City Manager or their designee to
execute Contract No. C26194766 with Securitas Technology Corporation for fire alarm systems
monitoring, inspection, testing, repair, and related services for a four-year contract term in the
not-to-exceed amount of $404,646, which includes $276,000 for monitoring, inspection, and
testing services and $128,646 for repairs, upgrades, and parts due to misuse, vandalism, and
other unforeseen circumstances not covered by the maintenance agreement.
BACKGROUND
There are twenty-eight City facilities with fire alarm systems. The National Fire Protection
Association (NFPA) requires monitoring, inspection, and testing of all the City’s fire alarm
systems. Securitas Technology Corporation currently provides 24/7/365 fire alarm system
monitoring, inspection, testing, and repair services for the City’s 28 facilities. In the early 1990s,
fire alarm services for the City were provided by Honeywell, who provided and installed some
of the City’s fire alarm panels that are still in use today. In 2005, Stanley Security acquired
Honeywell’s fire alarm division, including their monitoring centers, Honeywell trained
technicians, and Original Equipment Manufacturer (OEM) parts supply chain. This allowed for
uninterrupted service for the City’s fire alarm systems. In 2022, Stanley Security was purchased
by Securitas Technology Corporation. The City has continued to receive uninterrupted fire
alarm services from Securitas Technology Corporation. Previous contract renewals have been
accomplished by using a Sole Source Exemption from Competitive Solicitation because of
proprietary fire alarm panels and the excessive costs of reprogramming all fire alarm panels to a
new Central Station monitoring company.
ANALYSIS
Procurement Process
The four-year Pricing Sheet (Attachment A) is issued pursuant to Sourcewell Cooperative
Purchasing Agreement # 121024, dated March 19, 2025. The scope of work includes 24/7/365
monitoring and annual fire alarm system inspection and testing for all 28 City facilities. The
scope of work also includes additional services, which include repairs, upgrades, and parts
replacement due to vandalism, and other unforeseen circumstances not covered by the
maintenance agreement.
Per Palo Alto Municipal code 2.30.360(j), the City can take advantage of cooperative purchasing
agreements provided: (i) the services are solicited using methods substantially similar to those
required under the Municipal Code, as determined by the Procurement Officer; and (ii) the
contract is consistent with the requirements under the Municipal Code. Sourcewell provides
discounts for government entities purchasing fire alarm monitoring, testing, and repair service.
The cooperative purchasing agreement contract was competitively solicited and publicly
awarded through the cooperating purchasing organizations and the purchase orders are
consistent with the requirements of the Municipal Code. Cooperative purchasing programs
allow government organizations to use a single solicitation with the best value and favorable
terms and conditions. Using a new contractor, rather than taking advantage of the Sourcewell
agreement, would require reprogramming all the fire alarm panels to a new Central Monitoring
Center at an estimated cost of $2,000 to $3,000 per panel.
Cost Comparison to Prior Contract
The last three-year Purchase Order with Stanley Security Solutions totaled $142,181 and ended
on February 10, 2023. The new four-year Sourcewell contract amount with Securitas
Technologies is higher as new City buildings, such as the Public Safety Building, City Hall, Fire
Station 3, Junior Museum and Zoo, and Sherman Garage have been added to the new contract.
Prevailing wage rates are now included in the new contract as well which contributes to the
increased cost. This new contract also includes an increase in Additional Services funding due
to the aging fire alarm systems. A required semi-annual inspection was added at each location
as well as part of the new contract, which is also a factor in the increased cost.
FISCAL/RESOURCE IMPACT
Funding for Year 1 of this contract is included in the Fiscal Year 2026 Adopted Operating
budgets for the Public Works Department, and Office of Transportation in the University
Avenue and California Avenue Parking District Funds1. Appropriations for subsequent contract
years will be determined through the annual budget development process and are subject to
1 Securitas General Services Contract for Fire Alarm Maintenance C26194766;
https://www.paloalto.gov/files/assets/public/v/1/public-works/public-
services/contracts/c26194840_sercuritas_4-yr_maint_halfexec.pdf
Council approval. The following table shows the breakdown of the annual cost per department
as well as the total cost of the contract:
Term Annual Cost PWD OOT
Year 1 $ 96,721 $ 80,278 $ 16,443
Year 2 $ 99,623 $ 82,687 $ 16,936
Year 3 $ 102,612 $ 85,168 $ 17,444
Year 4 $ 105,690 $ 87,723 $ 17,967
Total $404,646 $335,856 $68,790
STAKEHOLDER ENGAGEMENT
Staff and the public will be notified if testing or repair work will be disruptive to their use of
workspaces or parking facilities.
ENVIRONMENTAL REVIEW
This contract is categorically exempt from the California Environmental Quality Act (CEQA)
under Sections 15301 of the CEQA guidelines as maintenance to an existing facility and no
further environmental review is necessary.
ATTACHMENTS
Attachment A: Securitas - Sourcewell Four-Year Pricing Sheet for Fire Alarm Systems
Monitoring, Inspection, Testing, and Repair
APPROVED BY:
Brad Eggleston, Director Public Works/City Engineer
3800 Tabs Drive, Uniontown, OH 44683
Sourcewell Four-Year Pricing Sheet
Project Title: Fire Alarm Systems Monitoring, Inspection, Testing, and Repair Services under Sourcewell awarded
contract # 121024-SCS
To: City of Palo Alto Facilities Management – Attention Dennis Huebner
Contract Term: August 4, 2025, through August 3, 2029
Contract Year 1 (*terms to state that the rates will escalate at 3% each year during this contract term)
Building & Address Fire Alarm Devices Monitoring
Annual Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
1.Downtown Library
270 Forest Avenue
Smoke detectors – 35
Duct smoke detector – 1
Manual pulls – 11
Horn/strobes – 6
Strobes – 12
$264.00 $0.00 $1,392.00 $1,656.00
2.Lot R Parking Garage
528 High Street
Water Flow – 4
Smoke detectors – 5
Control valves – 6
Manual pulls – 5
Horn/strobes – 4
Horn – 1
Backflow switches – 2
$264.00 $388.80 $972.00 $1,624.80
Building & Address Fire Alarm Devices Monitoring
Annual Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
3.Lot S/L Parking Garage
445 Bryant Street
Combined with the
Downtown Community
Center
445 Bryant Street
Water Flow – 7
Smoke detectors – 7
Control valves – 7
Manual pulls – 7
Horn/strobes – 7
Backflow switches – 2
Sump Pumps – 3
$744.00 $388.80 $1,392.00 $2,524.80
4.Lot J Parking Garage
520 Webster Street
Water Flow – 1
Smoke detectors – 2
Heat detectors – 7
Manual pulls – 1
Bell – 1
$264.00 $388.80 $492.00 $1,144.80
5.Ted Thompson Parking
Garage
275 Cambridge Ave
Water Flow – 1
Smoke detectors – 1
Control valves – 2
Manual pulls – 1
Horn/strobes – 1
$264.00 $388.80 $492.00 $1,144.80
6.Sherman Parking
Garage
350 Sherman Ave
Water Flow – 19
Smoke detectors – 19
Heat detectors – 8
Duct smoke detectors – 8
Control valves – 6
Manual pulls – 14
Horn/strobes – 85
$552.00 $561.60 $4,176.00 $5,289.60
7.Golf Course
1875 Embarcadero Rd
Water Flow – 1
Smoke detectors – 2
Control valves – 1
Manual pulls – 10
Horn/strobes – 1
Backflow switches – 2
$264.00 $388.80 $708.00 $1,360.80
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
8.Utilities Control Center
3241 East Bayshore Rd
Water Flow – 1
Smoke detectors – 8
Control valves – 1
Manual pulls – 3
Horn/strobes – 4
Bell – 3
$264.00 $388.80 $708.00 $1,360.80
9.Municipal Service
Center Building A
3201 East Bayshore Rd
Water Flow – 2
Smoke detectors – 1
Control valves – 2
Manual pulls – 3
Horn/strobes – 12
$264.00 $388.80 $972.00 $1,624.80
10.Municipal Service
Center Building B
3201 East Bayshore Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 5
Horn/strobes – 12
Strobes – 14
$264.00 $388.80 $972.00 $1,624.80
11.Municipal Service
Center Building C
3201 East Bayshore Rd
Water Flow – 2
Smoke detectors – 2
Control valves – 2
Manual pulls – 10
Horn/strobes – 62
$264.00 $388.80 $2,784.00 $3,436.80
12.Baylands Interpretive
Center
2775 Embarcadero Rd
Water Flow – 1
Control valves – 1
Bell – 1
$264.00 $388.80 $492.00 $1,144.80
13.Lucie Stern Community
Center
1305 Middlefield Rd
Water Flow – 1
Smoke detectors – 1
Manual pulls – 12
Horn/strobes – 13
Strobes - 18
Duct smoke detectors – 5
$264.00 $388.80 $1,392.00 $2,044.80
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
14.Lucie Stern Community
Theatre and Scene
Shop
1305 Middlefield Rd
Water Flow – 2
Smoke detectors – 1
Control valves – 2
Manual pulls – 20
Horn/strobes – 17
$264.00 $388.80 $972.00 $1,624.80
15.Lucie Stern Children’s
Theatre
1305 Middlefield Rd
Water Flow – 1
Smoke detectors – 5
Control valves – 2
Manual pulls – 10
Horn/strobes – 35
$264.00 $388.80 $1,392.00 $2,044.80
16.Jr. Museum & Zoo
1451 Middlefield Rd
Water Flow – 1
Smoke detectors – 1
Duct smoke detectors – 4
Control valves – 1
Manual pulls – 3
Strobes – 3
Horn/strobes – 46
Bell – 1
Backflow switches – 1
PIV – 1
$552.00 $388.80 $1,392.00 $2,332.80
17.Children’s Library
1276 Harriett Street
Water Flow – 1
Smoke detectors – 1
Manual pulls – 5
Horn/strobes – 10
Bell – 1
Backflow switches – 2
$552.00 $388.80 $708.00 $1,648.80
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
18.Fire Station 3
799 Embarcadero Rd
Water Flow – 1
Smoke detectors – 8
Heat detectors – 2
Carbon monoxide detectors – 5
Control valves – 1
Manual pulls – 4
Horn/strobes – 1
Bell – 1
OS&Y switches - 1
$264.00 $388.80 $708.00 $1,360.80
19.Art Center
1313 Newell Rd
Water Flow – 1
Smoke detectors – 12
Control valves – 1
Manual pulls – 8
Horn/strobes – 19
Strobes – 22
$264.00 $388.80 $1,392.00 $2,044.80
20.Rinconada Library
1213 Newell Street
Water Flow – 1
Smoke detectors – 14
Duct smoke detector - 1
Control valves – 4
Manual pulls – 12
Horn/strobes – 17
Strobes – 39
$264.00 $388.80 $2,784.00 $3,436.80
21.Pets In Need – Main
Buildings
3281 East Bayshore Rd
Smoke detectors – 6
Manual pulls –
Horn/strobes – 1
Bell – 1
$264.00 $0.00 $492.00 $756.00
22.Pets In Need – Modular
Building
3281 East Bayshore Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 1
Horn/strobes – 1
Backflow switches – 2
$552.00 $388.80 $492.00 $1,432.80
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
23.College Terrace Library
2300 Wellesley St
Water Flow – 2
Smoke detectors – 11
Control valves – 3
Manual pulls – 5
Horn/strobes – 7
Strobes - 7
Backflow switches – 2
$264.00 $388.80 $972.00 $1,624.80
24.Fire Station 8
3300 Page Mill Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 1
Horn/strobes – 1
$552.00 $388.80 $492.00 $1,432.80
25.Mitchell Park Library
and Community Center
3700 Middlefield Ave
Water Flow – 4
Smoke detectors – 47
Heat detectors – 2
Duct smoke detectors – 50
Control valves – 6
Manual pulls – 40
Horn/strobes – 44
Strobes – 75
Bells – 3
Backflow switches – 2
PIV switch – 2
OSY - 1
$264.00 $388.80 $5,568.00 $6,220.80
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
26.Downtown Community
Center
445 Bryant Street
*COMBINED WITH Lot
S/L Parking Garage
445 Bryant Street
Water Flow – 1
Smoke detectors – 17
Heat detector – 1
Manual pulls – 6
Horn/strobes – 10
Smoke Duct Detectors - 3
$0.00 $0.00 $0.00 $0.00
27.Civic Center
250 Hamilton Avenue
$552.00 $561.60 $5,568.00 $6,681.60
28.Public Safety Building
250 Sherman Avenue
$552.00 $561.60 $5,568.00 $6,681.60
1.Total Annual Cost for Fire Alarm Monitoring Annual Inspections (Year One)$65,306.40
2.Repairs Budget: Straight Time Hourly Rate ___$205.00_____ x 150 Hours =$30,750.00 year 1
3.Payment and Performance Bond (Year One)$664.62
4. Grand Total for Year 1 $96,721.02
Year 1 Hourly Rates
Straight Time Prevailing Wage = $205.00
Overtime Prevailing Wage = $305.00
* Securitas may charge the City of Palo Alto for parts and materials required for Services 15% of the direct
purchase price. This will be applicable for any necessary equipment (including rental equipment).
Contract Year 2 (*terms to state that the rates will escalate at 3% each year during this contract term)
Building & Address Fire Alarm Devices Monitoring
Annual Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
1.Downtown Library
270 Forest Avenue
Smoke detectors – 35
Duct smoke detector – 1
Manual pulls – 11
Horn/strobes – 6
Strobes – 12
$271.92 $0.00 $1,4336.76 $1,705.68
2.Lot R Parking Garage
528 High Street
Water Flow – 4
Smoke detectors – 5
Control valves – 6
Manual pulls – 5
Horn/strobes – 4
Horn – 1
Backflow switches – 2
$271.92 $400.46 $1,001.16 $1,673.54
Building & Address Fire Alarm Devices Monitoring
Annual Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
3.Lot S/L Parking Garage
445 Bryant Street
Combined with the
Downtown Community
Center
445 Bryant Street
Water Flow – 7
Smoke detectors – 7
Control valves – 7
Manual pulls – 7
Horn/strobes – 7
Backflow switches – 2
Sump Pumps – 3
$766.32 $400.46 $1,433.76 $2,600.54
4.Lot J Parking Garage
520 Webster Street
Water Flow – 1
Smoke detectors – 2
Heat detectors – 7
Manual pulls – 1
Bell – 1
$271.92 $400.46 $506.76 $1,179.14
5.Ted Thompson Parking
Garage
275 Cambridge Ave
Water Flow – 1
Smoke detectors – 1
Control valves – 2
Manual pulls – 1
Horn/strobes – 1
$271.92 $400.46 $506.76 $1,179.14
6.Sherman Parking
Garage
350 Sherman Ave
Water Flow – 19
Smoke detectors – 19
Heat detectors – 8
Duct smoke detectors – 8
Control valves – 6
Manual pulls – 14
Horn/strobes – 85
$568.56 $578.45 $4,301.28 $5,448.29
7.Golf Course
1875 Embarcadero Rd
Water Flow – 1
Smoke detectors – 2
Control valves – 1
Manual pulls – 10
Horn/strobes – 1
Backflow switches – 2
$271.92 $400.46 $729.24 $1,401.62
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
8.Utilities Control Center
3241 East Bayshore Rd
Water Flow – 1
Smoke detectors – 8
Control valves – 1
Manual pulls – 3
Horn/strobes – 4
Bell – 3
$271.92 $400.46 $729.24 $1,401.62
9.Municipal Service
Center Building A
3201 East Bayshore Rd
Water Flow – 2
Smoke detectors – 1
Control valves – 2
Manual pulls – 3
Horn/strobes – 12
$271.92 $400.46 $1,001.16 $1,673.54
10.Municipal Service
Center Building B
3201 East Bayshore Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 5
Horn/strobes – 12
Strobes – 14
$271.92 $400.46 $1,001.16 $1,673.54
11.Municipal Service
Center Building C
3201 East Bayshore Rd
Water Flow – 2
Smoke detectors – 2
Control valves – 2
Manual pulls – 10
Horn/strobes – 62
$271.92 $400.46 $2,867.52 $3,539.90
12.Baylands Interpretive
Center
2775 Embarcadero Rd
Water Flow – 1
Control valves – 1
Bell – 1
$271.92 $400.46 $506.76 $1,179.14
13.Lucie Stern Community
Center
1305 Middlefield Rd
Water Flow – 1
Smoke detectors – 1
Manual pulls – 12
Horn/strobes – 13
Strobes - 18
Duct smoke detectors – 5
$271.92 $400.46 $1,433.76 $2,106.14
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
14.Lucie Stern Community
Theatre and Scene
Shop
1305 Middlefield Rd
Water Flow – 2
Smoke detectors – 1
Control valves – 2
Manual pulls – 20
Horn/strobes – 17
$271.92 $400.46 $1,001.16 $1,673.54
15.Lucie Stern Children’s
Theatre
1305 Middlefield Rd
Water Flow – 1
Smoke detectors – 5
Control valves – 2
Manual pulls – 10
Horn/strobes – 35
$271.92 $400.46 $1,433.76 $2,106.14
16.Jr. Museum & Zoo
1451 Middlefield Rd
Water Flow – 1
Smoke detectors – 1
Duct smoke detectors – 4
Control valves – 1
Manual pulls – 3
Strobes – 3
Horn/strobes – 46
Bell – 1
Backflow switches – 1
PIV – 1
$568.56 $400.46 $1,433.76 $2,402.78
17.Children’s Library
1276 Harriett Street
Water Flow – 1
Smoke detectors – 1
Manual pulls – 5
Horn/strobes – 10
Bell – 1
Backflow switches – 2
$568.56 $400.46 $729.24 $1,698.26
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
18.Fire Station 3
799 Embarcadero Rd
Water Flow – 1
Smoke detectors – 8
Heat detectors – 2
Carbon monoxide detectors – 5
Control valves – 1
Manual pulls – 4
Horn/strobes – 1
Bell – 1
OS&Y switches - 1
$271.92 $400.46 $729.24 $1,401.62
19.Art Center
1313 Newell Rd
Water Flow – 1
Smoke detectors – 12
Control valves – 1
Manual pulls – 8
Horn/strobes – 19
Strobes – 22
$271.92 $400.46 $1,433.76 $2,106.14
20.Rinconada Library
1213 Newell Street
Water Flow – 1
Smoke detectors – 14
Duct smoke detector - 1
Control valves – 4
Manual pulls – 12
Horn/strobes – 17
Strobes – 39
$271.92 $400.46 $2,867.52 $3,539.90
21.Pets In Need – Main
Buildings
3281 East Bayshore Rd
Smoke detectors – 6
Manual pulls –
Horn/strobes – 1
Bell – 1
$271.92 $0.00 $506.76 $778.68
22.Pets In Need – Modular
Building
3281 East Bayshore Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 1
Horn/strobes – 1
Backflow switches – 2
$568.56 $400.46 $506.76 $1,475.78
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
23.College Terrace Library
2300 Wellesley St
Water Flow – 2
Smoke detectors – 11
Control valves – 3
Manual pulls – 5
Horn/strobes – 7
Strobes - 7
Backflow switches – 2
$271.92 $400.46 $1,001.16 $1,673.54
24.Fire Station 8
3300 Page Mill Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 1
Horn/strobes – 1
$568.56 $400.46 $506.76 $1,475.78
25.Mitchell Park Library
and Community Center
3700 Middlefield Ave
Water Flow – 4
Smoke detectors – 47
Heat detectors – 2
Duct smoke detectors – 50
Control valves – 6
Manual pulls – 40
Horn/strobes – 44
Strobes – 75
Bells – 3
Backflow switches – 2
PIV switch – 2
OSY - 1
$271.92 $400.46 $5,735.04 $6,407.42
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
26.Downtown Community
Center
445 Bryant Street
*COMBINED WITH Lot
S/L Parking Garage
445 Bryant Street
Water Flow – 1
Smoke detectors – 17
Heat detector – 1
Manual pulls – 6
Horn/strobes – 10
Smoke Duct Detectors - 3
$0.00 $0.00 $0.00 $0.00
27.Civic Center
250 Hamilton Avenue
$568.56 $578.45 $5,735.04 $6,882.05
28.Public Safety Building
250 Sherman Avenue
$568.56 $578.45 $5,735.04 $6,882.05
1.Total Annual Cost for Fire Alarm Monitoring Annual Inspections (Year Two)$67,265.51
2.Repairs Budget: Straight Time Hourly Rate ___$211.15_____ x 150 Hours =$31,672.50 year 2
3.Payment and Performance Bond (Year Two)$685.38
4. Grand Total for Year 2 $99,623.39
Year 2 Hourly Rates
Straight Time Prevailing Wage = $211.15
Overtime Prevailing Wage = $314.15
* Securitas may charge the City of Palo Alto for parts and materials required for Services 15% of the direct
purchase price. This will be applicable for any necessary equipment (including rental equipment).
Contract Year 3 (*terms to state that the rates will escalate at 3% each year during this contract term)
Building & Address Fire Alarm Devices Monitoring
Annual Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
1.Downtown Library
270 Forest Avenue
Smoke detectors – 35
Duct smoke detector – 1
Manual pulls – 11
Horn/strobes – 6
Strobes – 12
$280.08 $0.00 $1,476.77 $1,756.85
2.Lot R Parking Garage
528 High Street
Water Flow – 4
Smoke detectors – 5
Control valves – 6
Manual pulls – 5
Horn/strobes – 4
Horn – 1
Backflow switches – 2
$280.08 $412.48 $1,031.19 $1,723.75
Building & Address Fire Alarm Devices Monitoring
Annual Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
3.Lot S/L Parking Garage
445 Bryant Street
Combined with the
Downtown Community
Center
445 Bryant Street
Water Flow – 7
Smoke detectors – 7
Control valves – 7
Manual pulls – 7
Horn/strobes – 7
Backflow switches – 2
Sump Pumps – 3
$789.31 $412.48 $1,476.77 $2,678.56
4.Lot J Parking Garage
520 Webster Street
Water Flow – 1
Smoke detectors – 2
Heat detectors – 7
Manual pulls – 1
Bell – 1
$280.08 $412.48 $521.96 $1,214.52
5.Ted Thompson Parking
Garage
275 Cambridge Ave
Water Flow – 1
Smoke detectors – 1
Control valves – 2
Manual pulls – 1
Horn/strobes – 1
$280.08 $412.48 $1,214.52 $1,214.52
6.Sherman Parking
Garage
350 Sherman Ave
Water Flow – 19
Smoke detectors – 19
Heat detectors – 8
Duct smoke detectors – 8
Control valves – 6
Manual pulls – 14
Horn/strobes – 85
$585.62 $595.80 $4,430.32 $5,611.74
7.Golf Course
1875 Embarcadero Rd
Water Flow – 1
Smoke detectors – 2
Control valves – 1
Manual pulls – 10
Horn/strobes – 1
Backflow switches – 2
$280.08 $412.48 $751.12 $1,443.67
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
8.Utilities Control Center
3241 East Bayshore Rd
Water Flow – 1
Smoke detectors – 8
Control valves – 1
Manual pulls – 3
Horn/strobes – 4
Bell – 3
$280.08 $412.48 $751.12 $1,443.67
9.Municipal Service
Center Building A
3201 East Bayshore Rd
Water Flow – 2
Smoke detectors – 1
Control valves – 2
Manual pulls – 3
Horn/strobes – 12
$280.08 $412.48 $1,031.19 $1,723.75
10.Municipal Service
Center Building B
3201 East Bayshore Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 5
Horn/strobes – 12
Strobes – 14
$280.08 $412.48 $1,031.19 $1,723.75
11.Municipal Service
Center Building C
3201 East Bayshore Rd
Water Flow – 2
Smoke detectors – 2
Control valves – 2
Manual pulls – 10
Horn/strobes – 62
$280.08 $412.48 $2,953.55 $3,646.10
12.Baylands Interpretive
Center
2775 Embarcadero Rd
Water Flow – 1
Control valves – 1
Bell – 1
$280.08 $412.48 $521.96 $1,214.52
13.Lucie Stern Community
Center
1305 Middlefield Rd
Water Flow – 1
Smoke detectors – 1
Manual pulls – 12
Horn/strobes – 13
Strobes - 18
Duct smoke detectors – 5
$280.08 $412.48 $1,476.77 $2,169.33
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
14.Lucie Stern Community
Theatre and Scene
Shop
1305 Middlefield Rd
Water Flow – 2
Smoke detectors – 1
Control valves – 2
Manual pulls – 20
Horn/strobes – 17
$280.08 $412.48 $1,031.19 $1,723.75
15.Lucie Stern Children’s
Theatre
1305 Middlefield Rd
Water Flow – 1
Smoke detectors – 5
Control valves – 2
Manual pulls – 10
Horn/strobes – 35
$280.08 $412.48 $1,476.77 $2,169.33
16.Jr. Museum & Zoo
1451 Middlefield Rd
Water Flow – 1
Smoke detectors – 1
Duct smoke detectors – 4
Control valves – 1
Manual pulls – 3
Strobes – 3
Horn/strobes – 46
Bell – 1
Backflow switches – 1
PIV – 1
$585.62 $412.48 $1,476.77 $2,474.87
17.Children’s Library
1276 Harriett Street
Water Flow – 1
Smoke detectors – 1
Manual pulls – 5
Horn/strobes – 10
Bell – 1
Backflow switches – 2
$585.62 $412.48 $751.12 $1,749.21
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
18.Fire Station 3
799 Embarcadero Rd
Water Flow – 1
Smoke detectors – 8
Heat detectors – 2
Carbon monoxide detectors – 5
Control valves – 1
Manual pulls – 4
Horn/strobes – 1
Bell – 1
OS&Y switches - 1
$280.08 $412.48 $751.12 $1,443.67
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
19.Art Center
1313 Newell Rd
Water Flow – 1
Smoke detectors – 12
Control valves – 1
Manual pulls – 8
Horn/strobes – 19
Strobes – 22
$280.08 $412.48 $1,476.77 $2,169.33
20.Rinconada Library
1213 Newell Street
Water Flow – 1
Smoke detectors – 14
Duct smoke detector - 1
Control valves – 4
Manual pulls – 12
Horn/strobes – 17
Strobes – 39
$280.08 $412.48 $2,953.55 $3,646.10
21.Pets In Need – Main
Buildings
3281 East Bayshore Rd
Smoke detectors – 6
Manual pulls –
Horn/strobes – 1
Bell – 1
$280.08 $0.00 $521.96 $802.04
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
22.Pets In Need – Modular
Building
3281 East Bayshore Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 1
Horn/strobes – 1
Backflow switches – 2
$585.62 $412.48 $521.96 $1,520.06
23.College Terrace Library
2300 Wellesley St
Water Flow – 2
Smoke detectors – 11
Control valves – 3
Manual pulls – 5
Horn/strobes – 7
Strobes - 7
Backflow switches – 2
$280.08 $412.48 $1,031.19 $1,723.75
24.Fire Station 8
3300 Page Mill Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 1
Horn/strobes – 1
$585.62 $412.48 $521.96 $1,520.06
25.Mitchell Park Library
and Community Center
3700 Middlefield Ave
Water Flow – 4
Smoke detectors – 47
Heat detectors – 2
Duct smoke detectors – 50
Control valves – 6
Manual pulls – 40
Horn/strobes – 44
Strobes – 75
Bells – 3
Backflow switches – 2
PIV switch – 2
OSY - 1
$280.08 $412.48 $5,907.09 $6,599.65
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
26.Downtown Community
Center
445 Bryant Street
*COMBINED WITH Lot
S/L Parking Garage
445 Bryant Street
Water Flow – 1
Smoke detectors – 17
Heat detector – 1
Manual pulls – 6
Horn/strobes – 10
Smoke Duct Detectors - 3
$0.00 $0.00 $0.00 $0.00
27.Civic Center
250 Hamilton Avenue
$585.62 $595.80 $5,907.09 $7,088.51
28.Public Safety Building
250 Sherman Avenue
$585.62 $595.80 $5,907.09 7,088.51
1.Total Annual Cost for Fire Alarm Monitoring Annual Inspections (Year Three)$69,283.57
2.Repairs Budget: Straight Time Hourly Rate ___$217.48_____ x 150 Hours =$32,622.00 year 3
3.Payment and Performance Bond (Year Three)$706.15
4. Grand Total for Year 3 $102,611.72
Year 3 Hourly Rates
Straight Time Prevailing Wage = $217.48
Overtime Prevailing Wage = $323.57
* Securitas may charge the City of Palo Alto for parts and materials required for Services 15% of the direct
purchase price. This will be applicable for any necessary equipment (including rental equipment).
Contract Year 4 (*terms to state that the rates will escalate at 3% each year during this contract term)
Building & Address Fire Alarm Devices Monitoring
Annual Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
1.Downtown Library
270 Forest Avenue
Smoke detectors – 35
Duct smoke detector – 1
Manual pulls – 11
Horn/strobes – 6
Strobes – 12
$288.48 $0.00 $1,521.08 $1,809.56
2.Lot R Parking Garage
528 High Street
Water Flow – 4
Smoke detectors – 5
Control valves – 6
Manual pulls – 5
Horn/strobes – 4
Horn – 1
Backflow switches – 2
$288.48 $424.85 $1,062.13 $1,775.46
Building & Address Fire Alarm Devices Monitoring
Annual Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
3.Lot S/L Parking Garage
445 Bryant Street
Combined with the
Downtown Community
Center
445 Bryant Street
Water Flow – 7
Smoke detectors – 7
Control valves – 7
Manual pulls – 7
Horn/strobes – 7
Backflow switches – 2
Sump Pumps – 3
$812.99 $424.85 $1,521.08 $2,758.92
4.Lot J Parking Garage
520 Webster Street
Water Flow – 1
Smoke detectors – 2
Heat detectors – 7
Manual pulls – 1
Bell – 1
$288.48 $424.85 $537.62 $1,250.95
5.Ted Thompson Parking
Garage
275 Cambridge Ave
Water Flow – 1
Smoke detectors – 1
Control valves – 2
Manual pulls – 1
Horn/strobes – 1
$288.48 $424.85 $537.62 $1,250.95
6.Sherman Parking
Garage
350 Sherman Ave
Water Flow – 19
Smoke detectors – 19
Heat detectors – 8
Duct smoke detectors – 8
Control valves – 6
Manual pulls – 14
Horn/strobes – 85
$603.19 $613.68 $4,563.23 $5,780.09
7.Golf Course
1875 Embarcadero Rd
Water Flow – 1
Smoke detectors – 2
Control valves – 1
Manual pulls – 10
Horn/strobes – 1
Backflow switches – 2
$288.48 $424.85 $773.65 $1,486.98
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
8.Utilities Control Center
3241 East Bayshore Rd
Water Flow – 1
Smoke detectors – 8
Control valves – 1
Manual pulls – 3
Horn/strobes – 4
Bell – 3
$288.48 $424.85 $773.65 $1,486.98
9.Municipal Service
Center Building A
3201 East Bayshore Rd
Water Flow – 2
Smoke detectors – 1
Control valves – 2
Manual pulls – 3
Horn/strobes – 12
$288.48 $424.85 $1,062.13 $1,775.46
10.Municipal Service
Center Building B
3201 East Bayshore Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 5
Horn/strobes – 12
Strobes – 14
$288.48 $424.85 $1,062.13 $1,775.46
11.Municipal Service
Center Building C
3201 East Bayshore Rd
Water Flow – 2
Smoke detectors – 2
Control valves – 2
Manual pulls – 10
Horn/strobes – 62
$288.48 $424.85 $3,042.15 $3,755.48
12.Baylands Interpretive
Center
2775 Embarcadero Rd
Water Flow – 1
Control valves – 1
Bell – 1
$288.48 $424.85 $537.62 $1,250.95
13.Lucie Stern Community
Center
1305 Middlefield Rd
Water Flow – 1
Smoke detectors – 1
Manual pulls – 12
Horn/strobes – 13
Strobes - 18
Duct smoke detectors – 5
$288.48 $424.85 $1,521.08 $2,234.41
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
14.Lucie Stern Community
Theatre and Scene
Shop
1305 Middlefield Rd
Water Flow – 2
Smoke detectors – 1
Control valves – 2
Manual pulls – 20
Horn/strobes – 17
$288.48 $424.85 $1,062.13 $1,775.46
15.Lucie Stern Children’s
Theatre
1305 Middlefield Rd
Water Flow – 1
Smoke detectors – 5
Control valves – 2
Manual pulls – 10
Horn/strobes – 35
$288.48 $424.85 $1,521.08 $2,234.41
16.Jr. Museum & Zoo
1451 Middlefield Rd
Water Flow – 1
Smoke detectors – 1
Duct smoke detectors – 4
Control valves – 1
Manual pulls – 3
Strobes – 3
Horn/strobes – 46
Bell – 1
Backflow switches – 1
PIV – 1
$603.19 $424.85 $1,521.08 $2,549.11
17.Children’s Library
1276 Harriett Street
Water Flow – 1
Smoke detectors – 1
Manual pulls – 5
Horn/strobes – 10
Bell – 1
Backflow switches – 2
$603.19 $424.85 $773.65 $1,801.69
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
18.Fire Station 3
799 Embarcadero Rd
Water Flow – 1
Smoke detectors – 8
Heat detectors – 2
Carbon monoxide detectors – 5
Control valves – 1
Manual pulls – 4
Horn/strobes – 1
Bell – 1
OS&Y switches - 1
$288.48 $424.85 $773.65 $1,486.98
19.Art Center
1313 Newell Rd
Water Flow – 1
Smoke detectors – 12
Control valves – 1
Manual pulls – 8
Horn/strobes – 19
Strobes – 22
$288.48 $424.85 $1,521.08 $2,234.41
20.Rinconada Library
1213 Newell Street
Water Flow – 1
Smoke detectors – 14
Duct smoke detector - 1
Control valves – 4
Manual pulls – 12
Horn/strobes – 17
Strobes – 39
$288.48 $424.85 $3,042.15 $3,755.48
21.Pets In Need – Main
Buildings
3281 East Bayshore Rd
Smoke detectors – 6
Manual pulls –
Horn/strobes – 1
Bell – 1
$288.48 $0.00 $537.62 $826.10
22.Pets In Need – Modular
Building
3281 East Bayshore Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 1
Horn/strobes – 1
Backflow switches – 2
$603.19 $424.85 $537.62 $1,565.66
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
23.College Terrace Library
2300 Wellesley St
Water Flow – 2
Smoke detectors – 11
Control valves – 3
Manual pulls – 5
Horn/strobes – 7
Strobes - 7
Backflow switches – 2
$288.48 $424.85 $1,062.13 $1,775.46
24.Fire Station 8
3300 Page Mill Rd
Water Flow – 1
Smoke detectors – 1
Control valves – 1
Manual pulls – 1
Horn/strobes – 1
$603.19 $424.85 $537.62 $1,565.66
25.Mitchell Park Library
and Community Center
3700 Middlefield Ave
Water Flow – 4
Smoke detectors – 47
Heat detectors – 2
Duct smoke detectors – 50
Control valves – 6
Manual pulls – 40
Horn/strobes – 44
Strobes – 75
Bells – 3
Backflow switches – 2
PIV switch – 2
OSY - 1
$288.48 $424.85 $6,084.30 $6,797.64
Building & Address Fire Alarm Devices Monitoring
Annual
Costs
Waterflow
Semi-
annual
Inspection
Costs
Annual
Inspection
Costs
Total Annual
Costs
26.Downtown Community
Center
445 Bryant Street
*COMBINED WITH Lot
S/L Parking Garage
445 Bryant Street
Water Flow – 1
Smoke detectors – 17
Heat detector – 1
Manual pulls – 6
Horn/strobes – 10
Smoke Duct Detectors - 3
$0.00 $0.00 $0.00 $0.00
27.Civic Center
250 Hamilton Avenue
$603.19 $613.68 $6,084.30 $7,301.16
28.Public Safety Building
250 Sherman Avenue
$603.19 $613.68 $6,084.30 $7,301.16
1.Total Annual Cost for Fire Alarm Monitoring Annual Inspections (Year Four)$71,362.03
2.Repairs Budget: Straight Time Hourly Rate ___$224.01_____ x 150 Hours =$33,601.50 year 4
3.Payment and Performance Bond (Year Four)$726.92
4. Grand Total for Year 4 $105,690.45
Year 4 Hourly Rates
Straight Time Prevailing Wage = $224.01
Overtime Prevailing Wage = $333.28
* Securitas may charge the City of Palo Alto for parts and materials required for Services 15% of the direct
purchase price. This will be applicable for any necessary equipment (including rental equipment).
Cost Summary for Four-Year Contract
1.Grand Total for Year One $96,721.02
2. Grand Total for Year Two $99,623.39
3.Grand Total for Year Three $102,611.72
4.Grand Total for Year Four $105,690.45
5.Grand Total for All Four Contract Years $404,646.58
Attachment 1
City of Palo Alto Specific Scope of Work Requirements
Scope of Work:
1. Provide 24/7/365 monitoring of all fire alarm systems.
2. Provide semi-annual inspections and testing for all fire alarm systems.
3. Provide annual inspections and testing for all fire alarm systems.
4. Provide deficiencies repairs for all fire alarm systems.
5. Provide as needed repair services throughout the year for all fire alarm systems.
Details of Work Performed:
1. All inspections, testing, and repair services will be done in accordance with the 2025 Edition of NFPA-72 chapter 14.
2. Contractor will use the standard NFPA inspection forms.
3. No fire alarm systems are UL certified.
4. Email copies of all competed inspections and testing forms within three business days to Dennis Huebner at
dennis.huebner@cityofpaloalto.org and Joshua Rivas at Joshua.Rivas@cityofpaloalto.org.
5. Email proposals for deficiencies within five business days to Dennis Huebner, dennis.huebner@cityofpaloalto.org.
6. Contractor will have a 24/7 emergency service call number.
7. Contractor will respond to service calls within one business day.
8. Preferred billing frequency will be quarterly. Invoices will be separated per location. Preferred method of invoicing will
be to divide the total annual costs for monitoring and inspection and testing per location by four equal payments.
Email all invoices to Joshua Rivas at Joshua.Rivas@cityofpaloalto.org and Dennis Huebner at
dennis.huebner@cityofpaloalto.org.
Buildings Included in Scope of Work
Building Address
1.Downtown Library 270 Forest Avenue
2.Parking Garage
Lot R 528 High Street
3.Parking Garage
Lot S/L *COMBINED WITH #26 445 Bryant Street
4.Parking Garage
Lot J 520 Webster Street
5.Ted Thompson Parking Garage 275 Cambridge Ave
6.Sherman Ave. Parking Garage 350 Sherman Ave
7.Golf Course 1875 Embarcadero Rd
8.Utilities Control Center 3241 East Bayshore Rd
9.Municipal Service Center Building A 3201 East Bayshore Rd
10.Municipal Service Center Building B 3201 East Bayshore Rd
11.Municipal Service Center Building C 3201 East Bayshore Rd
12.Baylands Interpretive Center 2775 Embarcadero Rd
13.Lucie Stern Community Center 1305 Middlefield Rd
14.Lucie Stern Community Theatre and Scene Shop 1305 Middlefield Rd
15.Lucie Stern Children’s Theatre 1305 Middlefield Rd
16.Jr. Museum & Zoo 1451 Middlefield Rd
17.Children’s Library 1276 Harriett Street
18.Fire Station 3 799 Embarcadero Rd
19.Art Center 1313 Newell Rd
20.Rinconada Library 1213 Newell Street
21.Pets In Need – Main Buildings 3281 East Bayshore Rd
22.Pets In Need – Modular Building 3281 East Bayshore Rd
23.College Terrace Library 2300 Wellesley St
24.Fire Station 8 3300 Page Mill Rd
25.Mitchell Park Library and Community Center 3700 Middlefield Ave
26.Downtown Community Center *COMBINED WITH #3 445 Bryant Street
27 Civic Center 250 Hamilton Avenue
28 Public Safety Building 250 Sherman Avenue
Scheduling:
1.Inspections will occur every three months and will be done within the first two weeks of each inspection month. The
inspection months will be February, May, August, and November. Below, the buildings have been divided into two
groups. During the first inspection the contractor will perform an Annual Fire Alarm Inspection for all buildings in
Group 1. During the second inspection the contractor will perform an Annual Fire Alarm Inspection for all buildings in
Group 2. During the third inspection the contractor will perform a Semi-Annual Fire Alarm Inspection for all buildings in
Group 1. During the fourth inspection contractor will perform a Semi-annual Fire Alarm Inspection for all buildings in
Group 2.
Group 1
1.Downtown Library
2.Parking Garage
Lot R
3.Parking Garage
Lot S/L
26.Downtown Community
Center
4.Parking Garage
Lot J
5.Ted Thompson
Parking Garage
6.Sherman Ave. Parking
Garage
7.Golf Course
8.Utilities Control Center
9.Municipal Service
Center Building A
10.Municipal Service
Center Building B
11.Municipal Service
Center Building C
12.Baylands Interpretive
Center
27.Civic Center
Group 2
13.Lucie Stern
Community Center
14.Lucie Stern
Community Theatre
and Scene Shop
15.Lucie Stern Children’s
Theatre
16.Jr. Museum & Zoo
17.Children’s Library
18.Fire Station 3
19.Art Center
20.Rinconada Library
21.Pets In Need – Main
Buildings
22.Pets In Need –
Modular Building
23.College Terrace
Library
24.Fire Station 8
25.Mitchell Park Library
and Community
Center
28.Public Safety Building
2. The contractor will schedule all inspections one week prior to the start of the inspection date with the Facilities Management
Division.
Notifications:
1. When required to do so by a Municipal Code, contractor will notify the local fire authority having jurisdiction in advance
of the work start date.
2. Contractor will also notify the local Fire Communications Center and any applicable Central Office Alarm company
when conducting system testing and/or repairs.
3. Facilities Management is responsible for notification of all occupants of the property subject to inspection and testing.
Deficiencies and Corrections:
1. Contractor will note deficiencies found during the inspections on the inspection sheet.
2. Minor repairs of less than $500 (labor and materials per system) do not need prior approval of Facilities Management
and should be done immediately.
3. Send a proposal for repairs exceeding $500 to Facilities Management within five business days after inspection.
Designated City Representatives:
1. All communications and interface, including written correspondence by the Contractor, will be with Facilities
Management in the Public Works Department 3201 East Bayshore Road, Palo Alto, CA 94303
2. Project Managers: Dennis Huebner. Phone: (650) 496-6970. Email: dennis.huebner@cityofpaloalto.org
Maurice Ruyter. Phone: (650) 496-6915. Email: Maurice.ruyter@cityofpaloalto.org
Bonds Required
Within ten (10) business days of issuance of the Notice of Award, Contractor shall furnish City a Performance Surety
Bond, and Payment Surety Bond. Both bonds will be in the amount of 100% of the Contract Sum.
Utilities
The Contractor may have access to the normal use of building utilities in the performance of the work.
Storage of Materials and Equipment
Contractor is solely responsible for the storage of all equipment and materials.
Waste Disposal
Contractor will be responsible for all hauling and waste disposal. Hazardous materials and other materials shall be
disposed of according to all codes, laws and regulations. Contractor will comply with all City recycling
requirements. Contractor will not use any City trash containers for disposal of any material connected with this
project.