HomeMy WebLinkAboutStaff Report 2504-4462CITY OF PALO ALTO CITY COUNCIL Monday, June 02, 2025 Council Chambers & Hybrid 5:30 PM     Agenda Item     10.Approval of Construction Contract No. C25193583 with Stronger Building Services in the Not-to-Exceed Amount of $440,250 for the Lucie Stern Community Center Theater Roof Underlayment Replacement Project as part of the Roofing Replacement Program, Capital Improvement Program PF-00006 and Authorization for the City Manager or Their Designee to Negotiate and Execute Change Orders for Related Additional but Unforeseen Work that May Develop During the Project Up to a Not-to-Exceed Amount of $44,025; CEQA status - Exempt under CEQA Guideline Sections 15301 and 15302 City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Public Works Meeting Date: June 2, 2025 Report #:2504-4462 TITLE Approval of Construction Contract No. C25193583 with Stronger Building Services in the Not-to- Exceed Amount of $440,250 for the Lucie Stern Community Center Theater Roof Underlayment Replacement Project as part of the Roofing Replacement Program, Capital Improvement Program PF-00006 and Authorization for the City Manager or Their Designee to Negotiate and Execute Change Orders for Related Additional but Unforeseen Work that May Develop During the Project Up to a Not-to-Exceed Amount of $44,025; CEQA status - Exempt under CEQA Guideline Sections 15301 and 15302 RECOMMENDATION Staff recommends that the City Council: 1. Approve and authorize the City Manager or their designee to execute construction contract number No. C25193583 with Stronger Building Services in the amount of $440,250 for the Lucie Stern Community Center Roof Underlayment Replacement Project, part of the Roofing Replacement project (PF-00006); and 2. Authorize the City Manager or their designee to negotiate and execute one or more change orders to the contract with Stronger Building Services for related, additional but unforeseen work which may develop during the contract period, the total value of which shall not exceed $44,025. BACKGROUND The existing Lucie Stern Community Theater roof (which is adjacent to Lucie Stern Community Center) has been in service since the building’s original construction in 1934. While the Spanish clay tiles remain in good condition, the underlayment has reached the end of its life and has required multiple repairs over the years in various locations. To prevent further water intrusion and potential structural damage to the building, staff has determined that a full replacement of the roof underlayment is necessary. Lucie Stern Community Center roof underlayment replacement was completed in 2023.1 ANALYSIS Scope Overview The project includes the removal and reinstallation of the existing Spanish clay tile roofing. The existing gutters will be removed, with the copper gutters salvaged for reuse. The old underlayment will be removed and properly disposed of. Any dry rot discovered on the roof surface or fascia boards will be repaired. A new underlayment system will be installed, followed by the reinstallation of the rain gutter system. The original Spanish clay tiles will be reinstalled, supplemented by new matching tiles to replace those that are broken or damaged during removal. All fascia boards, along with any new exposed eave boards, will be repainted to ensure a uniform appearance. Bid Process On February 19, 2025, a notice inviting formal bids for the Lucie Stern Community Theater Roof Underlayment Replacement Project was posted on the OpenGov Procurement website. The bidding period was 30 days. Bids were received from six qualified contractors on March 20, 2025, as listed on the attached Bid Summary (Attachment A). Summary of Bid Process Bid Name/Number Lucie Stern Community Theater Roof Underlayment Replacement Project/IFB #193583 Proposed Length of Contract In Days 75 Total Days to Respond to Bid 30 Number of Bids Received 6 Bid Price Range $440,250 to $1,200,800 Staff has reviewed the submitted bids and recommends that the bid of $440,250 submitted by Stronger Building Services be accepted and that Stronger Building Services be declared the lowest responsible bidder. The low bid is 48.2% below the engineer’s estimate of $850,000. A total of six bids were received, ranging from $440,250 to $1,195,800. The engineer’s estimate falls near the median of all submitted bids, reflecting a reasonable expectation of market pricing. The award of contract includes the base bid. The change order amount of $44,025 (which equals 10% of the total contract value) is requested for related additional but 1 City Council, August 14, 2023, Agenda Item #4; SR #2306-1707, https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=82490 unforeseen work which may develop during the contract term. Staff confirmed with the Contractor's State License Board that the contractor has an active license on file. Staff also confirmed with the California Department of Industrial Relations (DIR) that the contractor has an active DIR registration. Staff recommends approval of the construction contract. 2 FISCAL/RESOURCE IMPACT Funding for the Lucie Stern Community Theater Roof Underlayment Replacement Project contract is available in the Fiscal Year 2025 Adopted Capital Improvement Fund Roofing Replacement project (PF-00006). The reduced cost of the project due to the lower than anticipated construction bid will be considered as staff evaluates capital budget expense reductions in light of the FY 2026 budget discussions. STAKEHOLDER ENGAGEMENT The Lucie Stern Community Theater Roof Underlayment Replacement Project was coordinated with the Community Services staff working at the Community Center. Coordination was also done with the theater groups. Theater shows are in the evenings so this project will not impact performances. Notices will be placed at the Community Center and Community Theater announcing this upcoming project. ENVIRONMENTAL REVIEW This contract is categorically exempt from the California Environmental Quality Act (CEQA) under Sections 15301 and 15302 of the CEQA guidelines as an alteration to an existing facility and no further environmental review is necessary. ATTACHMENTS Attachment A: IFB #193583 Bid Summary APPROVED BY: Brad Eggleston, Director Public Works/City Engineer 2 Stronger Building Services Construction Contract LSCC Phase II Roof Underlayment Replacement Project C25193583; https://www.paloalto.gov/files/assets/public/v/1/public-works/public-services/contracts/c25193583- lscc-roof-underlay-final-contract-updated.pdf Bid Summary Lucie Stern Community Center Phase 2 Roof Underlayment Replacement Project IFB193583 Vendor Name Bid Amount Stronger Building Services $440,250.00 Enterprise Roofing Service $567,820.00 Andy’s Roofing Company, Inc. $630,300.00 Alcal Specialty Contracting, Inc. $919,981.200 Waterproofing Associates $1,093,848.00 Best Contracting Services, Inc. $1,195,800.00