HomeMy WebLinkAboutStaff Report 2503-4438 City Council
Staff Report
From: City Manager
Report Type: CONSENT CALENDAR
Lead Department: Administrative Services
Meeting Date: June 2, 2025
Report #:2503-4438
TITLE
Approval of and Authorization of City Manager or their Designee to Execute an Exchange
Agreement with Midpeninsula Regional Open Space District for Replacement of Overhead
Utility Facilities with Underground Facilities and Exchange and Transfer Real Property Interests
within Monte Bello Open Space Preserve and Rancho San Antonio Open Space Preserve,
Assessor’s Parcel Numbers 351-25-014, 351-06-025, 351-09-002, and 351-12-069; CEQA Status
– Exempt Under CEQA Guidelines Section 15302
RECOMMENDATION
Staff recommends that Council:
1. Approve and authorize the City Manager or their designee to execute the Exchange
Agreement and License Agreement;
2. Approve and authorize the City Manager or their designee to execute the Underground
Utility Easement and Quitclaim Deed following the completion of the undergrounding
project; and
3. Authorize the City Manager or their designee to execute necessary amendments,
notices, approvals, or documents relating to the above agreements.
BACKGROUND
Devastating California wildfires have prompted electric utilities throughout the state to identify
areas within their jurisdiction that are susceptible to power-line ignited wildfires and to take
steps to prevent their occurrence. Utilities Department Project # EL-210011 proposes to rebuild
the approximately 11 miles of overhead line to mitigate the possibility of a wildfire due to
overhead electric lines. This includes converting the overhead lines to underground along
Montebello Road within property owned by the Midpeninsula Regional Open Space District at
1 City of Palo Alto Fiscal Year 2026 Proposed Capital Budget, Pages 424 – 426,
https://www.paloalto.gov/files/assets/public/v/1/administrative-services/city-budgets/fy-2026-city-
budget/proposed/fy-2026-proposed-capital-budget-book.pdf
Monte Bello Open Space Preserve and Rancho San Antonio Open Space Preserve (Attachment A
– Exhibit A).
ANALYSIS
FISCAL/RESOURCE IMPACT
STAKEHOLDER ENGAGEMENT
ENVIRONMENTAL REVIEW
ATTACHMENTS
APPROVED BY:
Page 1 of 7
EXCHANGE AGREEMENT
BETWEEN CITY OF PALO ALTO AND MIDPENINSULA REGIONAL OPEN SPACE
DISTRICT
This exchange agreement (hereinafter, "Agreement") is made as of
(“Effective Date”) by and between the Midpeninsula Regional Open Space District, a California
special district (hereinafter "District"), and City of Palo Alto, a California chartered municipal
corporation (hereinafter “City”), each of whom may be referred to individually as a “Party” and
collectively as the “Parties.”
RECITALS
WHEREAS, the District is the owner of certain real property situated in the unincorporated
County of Santa Clara, State of California, within Monte Bello Open Space Preserve and Rancho
San Antonio Open Space Preserve, Assessor’s Parcel Numbers 351-25-014, 351-06-025, 351-09-
002 and 351-12-069, as depicted in Exhibit A attached hereto and incorporated herein by this
reference (the “District Property”); and
WHEREAS, the City holds right-of-way and utility easements for electric distribution lines
across the District Property, as assigned by Pacific Gas and Electric Company from Louis Oneal,
Inc. (“Easement 1”), Bertha Hayes (“Easement 2”), and George Morell (“Easement 3”), which are
attached hereto as Exhibit B and incorporated herein by this reference (collectively, the “Existing
Utility Easements”); and
WHEREAS, the City has determined that its utility service territory west of Interstate
280, including the District Property, has an elevated risk of wildfire and therefore seeks to
perform a project to convert its overhead utility facilities to underground utility facilities along
Montebello Road within the District Property (the “Project”); and
WHEREAS, the City has prepared a plan depicting: (1) the new underground electric
distribution and fiber optic communications lines, fixtures and other appurtenances under, across
and along Montebello Road as it crosses District Property, and (2) the existing overhead electric
utility facilities, lines, poles, fixtures and other appurtenances on the District Property, which
plan is attached hereto as Exhibit C and incorporated herein by reference (“Alignment Plan”);
and
WHEREAS, the District and City desire to exchange and transfer certain real property
interests as set forth in this Agreement; and
WHEREAS, District has determined that said exchange of interests in real property is of
equal or greater value to the public and, said exchange has been determined to be in accordance
with the District’s enabling legislation set out at Section 5540.5 of the Public Resources Code of
the State of California;
NOW, THEREFORE, the parties mutually agree as follows:
1.INCORPORATION OF RECITALS.
Page 2 of 7
The above Recitals and the exhibits attached to this Agreement are hereby incorporated
herein and made a part hereof.
2.EXCHANGE AGREEMENT.
The District and City agree to the following exchange of real property interests, to be
effective as of the Closing (defined below):
a.Grant of Underground Utility Easements from District to City: District hereby agrees
to grant an easement and right of way for the City to construct, maintain, repair,
replace and upgrade underground utility facilities and appurtenances thereto under,
across and along Montebello Road as it crosses the District Property, in the form of
easement agreement set forth in Exhibit D attached hereto and incorporated herein by
reference (“Underground Utility Easement”).
b.Abandonment of Existing Utility Easements: City hereby agrees to quitclaim to
District all right, title and interest in the Existing Utility Easements and any other
rights to overhead utility facilities on District Property, including any rights of way in
connection therewith, in the form of quitclaim deed set forth in Exhibit E attached
hereto and incorporated herein by reference (“Quitclaim Deed”).
3.LICENSE AGREEMENT.
To allow the City to commence its undergrounding project prior to Closing, the District
and City shall execute a license agreement in the form attached hereto as Exhibit F and
incorporated herein by reference (“License Agreement”). The District’s acceptance of the
Project in accordance with the License Agreement is a condition precedent to Closing.
4.TERM and CLOSING.
This Agreement shall commence on the Effective Date and shall terminate on the date of
the Closing. The closing date (“Closing”) shall be the recordation date of the
Underground Utility Easement and Quitclaim Deed in Santa Clara County. Following
City’s preparation of a legal description and plat map of the Underground Utility
Easement by a licensed surveyor, City shall promptly deliver executed copies of the
Underground Utility Easement and Quitclaim Deed to District for recording. Within ten
(10)business days of the Effective Date, City shall deliver an executed copy of the
License Agreement to District. Closing shall occur after the satisfaction of all the
following conditions:
a.City shall have completed the installation and commissioning of the underground
utility facilities;
b.City shall have decommissioned, removed and disposed of existing overhead utility
facilities, lines, poles and related fixtures on the District Property as specified in the
License Agreement;
c.City shall have repaired and restored any portion of the District Property damaged or
disturbed in carrying out the Project as specified in the License Agreement;
Page 3 of 7
d.District shall have provided written acceptance of the Project, which shall not be
unreasonably withheld; and
e.Following District’s acceptance of the Project, City shall have prepared a legal
description and plat map of the Underground Utility Easement by a licensed surveyor
and provided it to the District for its approval, which approval shall not be
unreasonably withheld. Following District’s approval of the legal description and plat
map, City shall deliver the plat map and legal description to District to include as part
of the recorded Underground Utility Easement.
Within ten (10) business days following completion of the Project and the Parties’ mutual
agreement that the above conditions to Closing have been satisfied, the District shall
execute and concurrently record the Underground Utility Easement and Quitclaim Deed
in Santa Clara County.
5.REPRESENTATIONS AND WARRANTIES.
For the purpose of consummating this exchange of interests in real property contemplated
herein, each party represents and warrants to the other party, each of which is material,
are being relied upon by the Parties, and shall survive the recording of the property rights
being exchanged and conveyed herein.
a.Authority. The Parties have the full right, power and authority to enter into this
Agreement and to perform the transactions contemplated hereunder.
b.Valid and Binding Agreements. This Agreement and all other documents delivered
by the Parties have been or will be duly authorized and executed and delivered by the
Parties as legal, valid and binding obligations of the Parties to complete this exchange
and conveyance of real property.
6.PAYMENT OF COSTS AND FEES. District shall pay any required recording costs and
fees for the Underground Utility Easement and Quitclaim Deed. City shall pay the costs
of preparing the legal description and plat map. Each Party shall be responsible for any
other costs it incurs in performing this Agreement, unless specified herein to the contrary
or otherwise agreed by the Parties in writing.
7."AS-IS” CONVEYANCE. All Parties are acquiring the respective real property interests
on an “As-Is” basis, without warranties, express or implied, regarding the physical
condition of the properties to be exchanged. All Parties shall rely on their own
inspections of the respective property interests.
8.MISCELLANEOUS PROVISIONS.
a.Choice of Law. The laws of the State of California, regardless of any choice of law
principles, shall govern the validity of this Agreement, the construction of its terms
and the interpretation of the rights and duties of the Parties.
Page 4 of 7
b.Amendment. The Parties hereto may by mutual written agreement amend this
Agreement in any respect.
c.Rights Cumulative. Each and all of the various rights, powers and remedies of the
Parties shall be considered to be cumulative with and in addition to any other rights,
powers and remedies which the Parties may have at law or in equity in the event of
the breach of any of the terms of this Agreement. The exercise or partial exercise of
any right, power or remedy shall neither constitute the exclusive election thereof nor
the waiver of any other right, power or remedy available to such Party.
d.Notice. Whenever any Party hereto desires or is required to give any notice, demand,
or request with respect to this Agreement, each such communication shall be in
writing and shall be deemed to have been validly served, given or delivered at the
time stated below if deposited in the United States mail, registered or certified and
return receipt requested, with proper postage prepaid, or if delivered by Federal
Express or other private messenger, courier or other delivery service and addressed as
indicated as follows:
City: City of Palo Alto
Attn: Utilities Department, Electric Engineering
250 Hamilton Avenue
Palo Alto, CA 94301
TEL: (650) 329-2161
With a copy to:
City of Palo Alto
Attn: Real Property Manager
250 Hamilton Avenue
Palo Alto, CA 94301
District: Midpeninsula Regional Open Space District
Attn: Real Property Manager
5050 El Camino Real
Los Altos, CA 94022-1404
TEL: (650) 691-1200
Service of any such communication made only by mail shall be deemed complete on
the date of actual delivery as indicated by the addressee’s registry or certification
receipt or at the expiration of the third (3rd) business day after the date of mailing,
whichever is earlier in time. Either Party hereto may from time to time, by notice in
writing served upon the other as aforesaid, designate a different mailing address or a
different person to whom such notices or demands are thereafter to be addressed or
delivered. Nothing contained in this Agreement shall excuse either Party from giving
oral notice to the other when prompt notification is appropriate, but any oral notice
given shall not satisfy the requirements provided in this Section.
Page 5 of 7
e.Severability. If any of the provisions of this Agreement are held to be void or
unenforceable by or as a result of a determination of any court of competent
jurisdiction, the decision of which is binding upon the parties, the Parties agree that
such determination shall not result in the nullity or unenforceability of the remaining
portions of this Agreement. The Parties further agree to replace such void or
unenforceable provisions, which will achieve, to the extent possible, the economic,
business, and other purposes of the void or unenforceable provisions.
f.Counterparts. This Agreement may be executed in separate counterparts, each of
which shall be deemed as an original, and when executed, separately or together, shall
constitute a single original instrument, effective in the same manner as if the parties
had executed one and the same instrument. In the event of any disparity between the
counterparts produced, the recorded counterpart shall be controlling.
g.Waiver. No waiver of any term, provision or condition of this Agreement, whether
by conduct or otherwise, in any one or more instances, shall be deemed to be, or be
construed as, a further or continuing waiver of any such term, provision or condition
or as a waiver of any other term, provision or condition of this Agreement.
h.Entire Agreement. This Agreement, including its recitals and exhibits, is intended by
the Parties to be the final expression of their agreement; it embodies the entire
agreement and understanding between the Parties hereto; it constitutes a complete and
exclusive statement of the terms and conditions thereof, and it supersedes any and all
prior correspondence, conversations, negotiations, agreements or understandings
relating to the same subject matter.
i.Time of the Essence. Time is of the essence of each provision of this Agreement in
which time is an element.
j.Survival. All covenants of District or City which are expressly intended hereunder to
be performed in whole or in part after the Closing, and all representations and
warranties by either Party to the other, shall survive the Closing and be binding upon
and inure to the benefit of the respective Parties hereto and their respective heirs,
successors and permitted assigns.
k.Terms Run with the Land. The terms, covenants and conditions set out in this
Agreement shall run with the land and be binding upon and inure to the benefit of the
successors and assigns of the Parties hereto pursuant to California Civil Code Section
1468.
l.Assignment. Except as expressly permitted herein, neither Party to this Agreement
shall assign its rights or obligations under this Agreement to any third party without
the prior written approval of the other Party.
m.Further Documents and Acts. Each of the Parties hereto agrees to execute and deliver
such further documents and perform such other acts as may be reasonably necessary
or appropriate to consummate and carry into effect the transactions described and
contemplated under this Agreement.
Page 6 of 7
n.Captions. Captions are provided herein for convenience only and they form no part
of this Agreement and are not to serve as a basis for interpretation or construction of
this Agreement, nor as evidence of the intention of the Parties hereto.
o.Pronouns and Gender. In this Agreement, if it be appropriate, the use of the singular
shall include the plural, and the plural shall include the singular, and the use of any
gender shall include all other genders as appropriate.
Space intentionally left blank
Pa
t
h
:
G
:
\
P
r
o
j
e
c
t
s
\
a
_
D
i
s
t
r
i
c
t
w
i
d
e
\
E
a
s
e
m
e
n
t
s
\
E
a
s
e
m
e
n
t
s
.
a
p
r
x
Cr
e
a
t
e
d
B
y
:
a
c
o
s
t
a
n
z
a
While the District strives to use the best available digital data, these data do not represent a legal survey and are merely a graphic illustration of geographic features.
Midpeninsula Regional
Open Space District
(Midpen)
4/3/2025
0 0.250.125
Miles
I
Proposed underground utility easement
(MROSD to grant to City of Palo Alto)
Other protected lands
Private property
Midpen preserves
Exhibit A - Project Area Map
!#
R A N C H O S A N
A N T O N I O O P E N
S P A C E P R E S E R V E
M O N T E B E L L O
O P E N S P A C E
P R E S E R V E
IndianCreek
Adobe
Creek
Steven
sCreek
West
F
ork
A
dobe
C
r
e
e
k
MontebelloRoa
d
Bella Vista Tr
a
i
l
IndianCreek Trail
PageMillTrail Ad
o
b
eCreekTrail
Black M
ountainTrail
SkidRoad Trail
Quarry Trail
Old RanchTrail
CanyonTrail
Adobe
C
reek T
r
ail
Adobe Creek Trail
Steven
s Creek NatureTrail
Black
Mountain
2,812'
22
0
0
20
0
0
18
0
0
2600
2400
2200
2000
200
0
180
0
2000
1800
2800
2800 2400
2000
2000
20
0
0
180
0
1600
20
0
0
20
0
0
35125014
3510900235106025
35112069
HIDDEN VILLA
!
!
!!
!
!
!
!
!
!
!
Area of detail
FOOTHILLS
LA HONDA
CREEK
LONG RIDGE
SARATOGA
GAP
THORNEWOOD
WINDY HILL
RANCHO SAN
ANTONIOCOAL CREEK
LOS TRANCOS
MONTE
BELLORUSSIAN RIDGE
ÄÆ35
ÄÆ84
ÄÆ9
ÄÆ280
Los Altos
Existing overhead utility easement
(City of Palo Alto to vacate)
Trail
Unpaved all-season road
Unpaved seasonal road
Paved roadCounty parcel
NOTE: The easements shown are graphical
visualizations only; it is not an assessed interest.
For surveyed location of easements, reference
Cross Lands Surveying Inc. Project NO. 22-146
dated 3/15/2024.
Existing overhead electrical line
&
&
Easement 1
&
&
Easement 2
&
&
Easement 3
Exhibit B - Existing Utility Easements
1260
MONTE BEL
L
O
R
O
A
D
3
2-1
/
0
A
L
F8A
E
L
F
772
749
8
55'50'
677
0
50'
676
8
50'
676
9
50'
677
1
45'
677
2
10
646
1
F
P
P
P
PP
P
PP
P
P
P
P
S
TX
P
A
D
54
"
x
6
0
"
P
PPPP
P
600'
700'
12'
60'
F
PB40409
3'X5'
FIBER BOX
30"X48"
PP
P
P
P
P
P
PP
P
P
P
P
P
P
P
13
5
'
P
P
P
P
P
P
P
P
P
P
P
P
P 55
0
'
PB40416
3'X5'
FIBER BOX
30"X48"
LB30070
LB VAULT - 3'X5'
LB PAD - 4'X6'
500
'
500
'
16
17
18
19
20
F
FIBER BOX
30"X48"
Public
Utility
Easement
20' Wide
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP # SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
5 10
LOCATION 17 - LB30070
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30070
1 - 4' X 6' LOAD BREAK PAD 30070
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 18 - PB40406
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40406
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 19 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 20 - PB40409
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40409
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 16 & 17
~550' - 2-3.63" PRIMARY CONDUIT FROM NEW
PB 40416 TO NEW LB 30070
~550' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 17 & 18
~275' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB30070 TO NEW PB 40406
~275' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 18 & 19
~10' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40406 TO NEW XFMR PAD
BETWEEN LOCATION 19 & 19A
~60' - 1-3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO EXISTING JUNCTION
BOX
BETWEEN LOCATION 17 & 20
~700' - 2-3.63" PRIMARY CONDUIT FROM NEW
LB 30070 TO NEW PB 40409
~700' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
Exhibit C - City Alignment Plans
MONTE BEL
L
O
R
O
A
D
2-
#
6
C
O
P
P
E
R
W
E
L
D
2-#
6
C
O
P
P
E
R
W
E
L
D
50'
677
1
45'
677
2
50'
677
3
45'
677
4
F
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
PP
P
P
P
P
PB40403
3'X5'
PB40405
3'X5'
60
0
'
600'
600'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
F
PB40404
3'X5'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P
P
P
F
PB40409
3'X5'
FIBER BOX
30"X48"
PP
P
P
P
P
P
P
20
21
22
23
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
6 10
LOCATION 20 - PB40409
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40409
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 21 - PB40405
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40405
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 22 - PB40404
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40404
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 23 - PB40403
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40403
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 20 & 21
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40409 TO NEW PB 40405
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 21 & 22
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40405 TO NEW PB 40404
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 22 & 23
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40404 TO NEW PB 40403
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
MON
T
E
B
E
L
L
O
R
O
A
D
MO
N
T
E
B
E
L
L
O
R
O
A
D
2-#
6
C
O
P
P
E
R
W
E
L
D
2-#
6
C
O
P
P
E
R
W
E
L
D
45'
677
4
45'
677
5
45'
677
6
40'
677
7
45'
677
8
45'
677
9
40'
678
1
45'
678
0
45'
678
4
F
F
P
P
F
P
P
P
P
P
P
P
P
F
PPP
P
PPPP
P
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PB40399
3'X5'
PB40400
3'X5'
PB40401
3'X5'
PB40402
3'X5'
PB40403
3'X5'
600'
600
'
600'
60
0
'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
FIBER BOX
30"X48"
FIBER BOX
30"X48"
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
600'
23
24
25
26
27
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
7 10
LOCATION 24 - PB40402
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40402
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 25 - PB40401
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40401
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 26 - PB40400
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40400
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 24 & 25
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40402 TO NEW PB 40401
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 25 & 26
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40401 TO NEW PB 40400
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 26 & 27
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40400 TO NEW PB 40399
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
3
#2 TRI
2-#6 CO
P
P
E
R
W
E
L
D
2-#6 C
O
P
P
E
R
W
E
L
D
45'
679
4
40'
679
6
45'
678
0
45'
678
4
45'
678
5
POL
E
SER
V
I
C
E
40'
678
7
35'
679
3
30'
678
9
50'
678
8
45'
679
1
10
646
7
15
450
3
F
P
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
F
SS
TX P
A
D
54"X
6
0
"
PB40395
3'X5'
PB40396
3'X5'
PB40399
3'X5'
LB30060
LB VAULT - 3'X5'
LB PAD - 4'X6'
380'
95'
575'600'85
'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
25'
FIBER BOX
30"X48"
PB40397
3'X5'
S
S
S
S
S
S
S
S
S
S
S
S
S
S
585
'
10'
2 - 3.63"
P
P
P
P
P
PPPPPPP
P
P
P
600'
F
P
P
P
P
P
P
P
P
PFIBER BOX
30"X48"
BOX
24"X36"
27
28
29
30
30A
30B
30C
31
32
33
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
8 10
LOCATION 27 - PB40399
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40399
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 28 - LB30060
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3'
X 5' LOAD BREAK PAD 30060
1 - 3' X 5' LOAD BREAK PAD 30060
LOCATION 29 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 30
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 30B - PB40397
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40397
WITH FULL TRAFFIC COVER
LOCATION 31
INSTALL
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 32 - PB40396
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40396
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 26 & 27
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40400 TO NEW PB 40399
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 27 & 28
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40399 TO NEW LB 30060
BETWEEN LOCATION 28 & 29
~25' - 1 -3.63" PRIMARY CONDUIT FROM NEW
LB 30060 TO NEW XFMR PAD
BETWEEN LOCATION 29 & 30
~10' - 4-3.63" SECONDARY CONDUIT FROM
NEW 54" X 60" XFMR PAD TO NEW 24" X 36"
JUNCTION BOX
BETWEEN LOCATION 30 & 30A
~95' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24" X 36" JUNCTION BOX TO EXISTING
JUNCTION BOX
BETWEEN LOCATION 30 & 30B
~585' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24" X 36" JUNCTION BOX TO NEW PB
40397
BETWEEN LOCATION 30B & 30C
~6' - 1 - 3.63" SECONDARY CONDUIT FROM
PB 40397 TO NEW 3" RISER
BETWEEN LOCATION 30 & 32
~400'- 1-3.63" PRIMARY CONDUIT FROM NEW
LB 30060 TO NEW PB 40396
BETWEEN LOCATION 27 & 31
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 31 & 32
~400' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 32 & 33
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40396 TO NEW PB 40395
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
****NOTE****
THE SCOPE OF WORK BETWEEN LOCATION
30, 30B, & 30C MAY BE REMOVED AS OPEN
SPACE MAY NOT NEED CPAU ELECTRIC
SERVICE
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
2-#6 C
O
P
P
E
R
W
E
L
D
45'
679
7
F
F
PB40395
3'X5'
600'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P P P
P
P
P
P
PPPPPPP
600'
33
34
17
1
9
17
2
1
17
2
3
17
2
5MO
N
T
E
B
E
L
L
O
R
O
A
D
N48
PB1061 2-#4 ACSR
TRI2-#4
A
C
S
R
F6A
ELF
773
679
8
45'
40'
679
9
P
P
P
P
P
P
P
P
P
P
P
P
40'
680
0
F
TX PAD
54"X60"
LB30059
LB VAULT - 3'X5'
LB PAD - 4'X6'
125
'
125'
FIBER BOX
30"X48"
5'
P
P
P
P
35
36
37
37A
S
S
S
S
125'
PB40394
3'X5'
FIBER BOX
30"X48"
5'
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
9 10
LOCATION 33 - PB40395
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40395
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 34 - PB40394
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40394
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 35 - LB30059
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30059
1 - 4' X 6' LOAD BREAK PAD 30059
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 36 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 37
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 37A
INSTALL
1 - 3" RISER
LOCATION 37B
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 37C
INSTALL
1 - 3" RISER
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 33 & 34
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40395 TO NEW PB 40394
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 34 & 35
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40394 TO NEW LB 30059
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 35 & 36
~5' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB 30059 TO NEW XFMR PAD
BETWEEN LOCATION 36 & 37
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 SECONDARY
BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW 24X36 SECONDARY BOX
BETWEEN LOCATION 37 & 37A
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6799
BETWEEN LOCATION 37 & 37B
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
BETWEEN LOCATION 37B & 37C
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6800
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
17
4
1
17
5
7
17
2
3
17
2
5
17
2
7
17
2
9
2-#4 ACSR
TRI2-#4
A
C
S
R
OPEN
W
I
R
E
2-#4
A
C
S
R
2-#4 AC
S
R
3
3-
#
2
S
T
R
C
U
35'
680
1
35'
680
2
35'
680
3
35'
680
4
40'
680
5
40'
6806
25
774
7
25
7599
SET
A
T
T
A
P
"
B
"
37.5
780
5
97.5
%
PPPPPPPP
P
P
P
P
P
P
40'
680
0
S
S
SF
F
TX PAD
54"X60"
PB40391
3'X5'
PB40392
3'X5'
BOX
24"X36"
600
'
175'
600'
FIBER BOX
30"X48"
FIBER BO
X
30"X48"
TX PAD
54"X60"
7'
25'
5'
15'
P
P
P
P
P
P
P
P
P
P
P
P
P
P
F
PB40408
3'X5'
FIBER BO
X
30"X48"
PPP
P
P
P
375'
37
38
39
40
41
41A
41B
42
37B
S
S125'
42B
5'
37C
15'
42A
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXT LEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
10 10
LOCATION 36 - TX PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 37
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 37A
INSTALL
1 - 3" RISER
LOCATION 37B
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 37C
INSTALL
1 - 3" RISER
LOCATION 38 - PB40408
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40408
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 39 - PB40392
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40392
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 40 - PB40391
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40391
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 41 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 41A
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 41B - POLE 6805
INSTALL
1 - 3" RISER
LOCATION 42
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 42A - EXISTING
JUNCTION BOX
LOCATION 42B - POLE 6806
INSTALL
1 - 3" RISER
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 35 & 36
~5' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB 30059 TO NEW TX PAD
BETWEEN LOCATION 36 & 37
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW TX PAD TO NEW 24X36 SECONDARY
BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW 24X36 SECONDARY BOX
BETWEEN LOCATION 37 & 37A
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6799
BETWEEN LOCATION 37 & 37B
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
BETWEEN LOCATION 37B & 37C
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6800
BETWEEN LOCATION 35 & 38
~270' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB30059 TO NEW PB 40408
~270' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 38 & 39
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40408 TO NEW PB 40392
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 39 & 40
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40392 TO NEW PB 40391
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 40 & 41
~15' - 1 -3.63" PRIMARY CONDUIT FROM NEW
PB 40391 TO NEW XFMR PAD
BETWEEN LOCATION 41 & 41A
~25' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 JUNCTION
BOX
BETWEEN LOCATION 41A & 41B
~5' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW JUNCTION BOX TO NEW 3" RISER
BETWEEN LOCATION 41 & 42
~105' - 1 -3.63" PRIMARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 JUNCTION
BOX
~105' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW 24X36 JUNCTION BOX
BETWEEN LOCATION 42 & 42A
~15' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW 24X36 JUNCTION BOX TO EXISTING
JUNCTION BOX
BETWEEN LOCATION 42A & 42A
~5' - 1 - 3" RISER FROM NEW 24X36
JUNCTION BOX TO EXISTING POLE
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
RECORDING REQUESTED BY
AND WHEN RECORDED RETURNED TO:
City of Palo Alto
250 Hamilton Avenue
Palo Alto, California 94301
Attn: Real Estate Division
Space above this line for recorder’s use only
NO TRANSFER TAX DUE DULY RECORDED WITHOUT FEE
PUBLIC AGENCY ACQUIRING TITLE, Pursuant to Government Code
CALIFORNIA REVENUE AND TAXATION Sections 6103, 27383 & 27388
CODE SECTION 11922.
Underground Utility Easement
This Underground Utility Easement (“Agreement”), dated , 2025
(“Effective Date”), is made and entered into, by, and between CITY OF PALO ALTO, a
California chartered municipal corporation (“City”), and MIDPENINSULA REGIONAL OPEN
SPACE DISTRICT, a Public District formed pursuant to Article 3 of Chapter 3 of Division 5 of
the California Public Resources Code (“District”). City and District are sometimes referred to in
this Agreement singularly as a “Party” and together as “Parties.”
RECITALS
WHEREAS, the District is the owner of the real property situated in unincorporated
Santa Clara County known as Assessor’s Parcel Numbers 351-25-014, 351-06-025, 351-09-002
and 351-12-069 ("District Property"), as part of District’s Monte Bello Open Space Preserve and
Rancho San Antonio Open Space Preserve, copies of which Deeds are attached hereto as Exhibit
A and incorporated herein by reference; and
WHEREAS, the City holds three right-of-way and utility easements for overhead electric
transmission lines across District Property, as assigned by Pacific Gas and Electric Company
(“Existing Utility Easements”), copies of which Deeds are attached hereto as Exhibit B and
incorporated herein by reference; and
WHEREAS, the City has been directed by the California Public Utilities Commission
(“CPUC”) to identify areas within their jurisdiction that are susceptible to power-line ignited
wildfires; and
WHEREAS, the City determined that their service territory west of Interstate 280,
including the District Property, has an elevated risk of wildfire due to being in the Palo Alto
foothills and wind, and therefore seeks to convert their overhead electric lines to underground
lines along Montebello Road within District Property; and
WHEREAS, the City wishes to convert its existing overhead utility lines and facilities to
underground electric and communications lines and facilities along Montebello Road within
District Property via three existing easements (Santa Clara County Document Number 228900,
Exhibit D - Form of Underground Utility Easement
Page 2
Volume 1053, Page 538; Document Number 227988, Volume 1048, Page 567; and Document
Number 227989, Volume 1048, Page 562); and
WHEREAS, the District, in exchange for City quitclaiming all rights to maintain
overhead utility facilities on District Property, is willing to grant City this Underground Utility
Easement;
NOW, THEREFORE, in consideration of the foregoing recitals and the mutual promises
and covenants herein contained, the City and District hereto agree as follows:
1. Grant of Underground Utility Easement.
(a) Easement Scope and Description. District hereby grants to City a perpetual,
non-exclusive utility easement for the installation, operation, repair, replacement, upgrading, and
maintenance of a subsurface conduit system for electric lines and communications transmission
lines and associated subsurface and above ground cables, conduits, ducts, manholes, equipment
and appurtenances used for transmitting and distributing electric energy and information
(collectively, “Underground Utility System”) under, across and along Montebello Road as it
crosses District Property (the “Underground Utility Easement”). A legal description and plat map
of the Underground Utility Easement is included in Exhibit C attached hereto and incorporated by
this reference. The Underground Utility Easement shall include the right of ingress and egress over
Montebello Road and Black Mountain Trail on the District Property for purposes related to the
City’s use of the Underground Utility Easement. The Underground Utility Easement is intended
solely to serve District Property, and therefore, is not offered for, and shall not be dedicated to,
public use.
(b) Term. The term of the Underground Utility Easement shall commence on
the Effective Date and shall be perpetual.
(c) Use Restrictions. Use of the Underground Utility Easement by City shall
be limited to construction, reconstruction, installation, operation, repair, replacement, upgrading,
and maintenance of the Underground Utility System. The City shall use the Underground Utility
Easement in accordance with the following:
(i) No at-grade or above-grade structures shall be installed pursuant to
the Underground Utility Easement except for poles, pads, equipment cabinets, vaults and bollards
that are appurtenant to the Underground Utility System.
(ii) All subsurface utilities shall be enclosed in a conduit system, which
shall be installed with a minimum cover of twenty-four (24) inches below grade at all locations on
the District Property, regardless of mechanical protection. Exceptions to the minimum cover
requirement are allowed only where cables and conductors rise for terminations or splices or where
access is otherwise required by applicable law.
(iii) No other utilities shall be co-located in the Underground Utility
Easement and City shall not have the right to apportion rights under the Underground Utility
Easement to any other utility or service provider.
Page 3
(iv) City shall restore District Property promptly following City’s
performance of any work pursuant to the Underground Utility Easement to the condition the
property was in immediately prior to City’s work, or to an equivalent condition subject to the
District’s reasonable approval. City may not close, obstruct or otherwise interfere with use of
Montebello Road or Black Mountain Trail without the District’s prior written approval.
(d) Repair and Maintenance.
(i) City shall be solely responsible, at its sole cost and expense, for
constructing, reconstructing, installing, operating, repairing and maintaining the Underground
Utility System in accordance with the City of Palo Alto Utilities’ Rules and Regulations, which
may include the addition of erosion control measures surrounding utility equipment. In addition,
City shall be solely responsible for maintaining the Underground Utility System in a safe condition
and free of hazardous conditions. Any maintenance activities shall be conducted by City so as to
minimize impacts to District Property.
(ii) District shall not plant any trees or bushes, or erect, construct or
install any fence, wall, irrigation or any other type of permanent structure, or private utilities,
within, over, across or upon the Underground Utility Easement without first obtaining the City’s
written consent, which shall not be unreasonably withheld. District shall maintain Montebello
Road and Black Mountain Trail as unpaved, all-season roads.
(e) Non-Exclusive Use. The Underground Utility Easement shall be non-
exclusive, and District may make use of the Underground Utility Easement area provided that such
use does not unreasonably interfere with City’s use of the Underground Utility Easement or its
intended purposes as permitted under this Agreement.
2. Representation and Warranties. District represents and warrants to City that District has
good and marketable title to the District Property, and there are no matters affecting title to the
District Property that adversely affect the Underground Utility Easement or the rights granted
under this Agreement.
3. Requirements of Law. City shall comply with all present and future laws, rules, orders,
ordinances, regulations, statutes, requirements, codes, and executive orders (collectively, “Laws”)
of all governmental authorities now existing or hereafter created affecting the Underground Utility
Easement granted herein or uses thereof.
4. Mechanic’s Liens. City shall hold harmless, indemnify and defend District from and
against any mechanic’s or other liens arising from City’s work, including any liabilities, costs,
losses, damages, expenses, causes of action, claims or judgments (including court costs and
reasonable attorneys’ fees) on account of such mechanic’s or other liens.
5. As-Is Conveyance. City agrees and acknowledges that District makes no representations
or warranties as to the condition of the area contained within the Underground Utility Easement
or its suitability for City’s purposes. Neither District nor anyone acting for or on behalf of District
has made any representation, statement, warranty or promise to City concerning the physical
aspects or condition of the Underground Utility Easement including, without limitation, conditions
of the soil, land use restrictions, existence or non-existence of “Hazardous Materials” or suitability
Page 4
for the purpose for which City plans on using the Underground Utility Easement. City specifically
acknowledges that it is entering into this Agreement with respect to the “As-Is” physical condition
and “As-Is” state of repair of the Underground Utility Easement. For purposes of this Agreement,
“Hazardous Materials” includes, without limitation, any flammable materials, explosive,
hazardous or toxic substances, or related materials defined in the Comprehensive Environmental
Response, Compensation and Liability Act of 1980, as now or hereafter amended (42 U.S.C.
Section 9601, et seq.), the Hazardous Materials Transportation Act, as now or hereafter amended
(49 U.S.C. Sections 1801, et seq.), the Resource Conservation and Recovery Act (42 U.S.C.
Sections 9601, et seq.), and in the regulations promulgated pursuant thereto, or any other similar
federal, state or local government law, ordinance, rule or regulation. However, District shall be
solely and completely responsible for responding to and complying with any administrative notice,
order, request or demand, or third party claim or demand, relating to potential or actual Hazardous
Materials contamination on, in, or under the Underground Utility Easement, including all costs of
remediation and clean up, except to the extent such contamination was caused by City or City’s
invitees.
6. Insurance. City, at City’s sole expense, shall maintain and keep in force during the term
of the Underground Utility Easement a policy of general liability insurance against claims for
bodily injury, personal injury, death and/or property damage arising from City’s use of the
Underground Utility Easement, or from any occurrence in, on, about, or related to the
Underground Utility Easement, with limits which shall not be less than Two Million Dollars
($2,000,000.00) per occurrence. District shall be named as an additional insured on such policy.
Upon District’s request, City shall promptly furnish to District an endorsement evidencing such
insurance coverage. City shall require any contractors performing work on District Property to
maintain insurance satisfying the above requirements. The District acknowledges that City’s
insurance requirements may be satisfied in whole or in part by adequately funded self-insurance
programs or self-insured retentions that have been pre-approved by the District. City agrees to
furnish a certificate of its contractor(s)’s insurance to District, and evidence of any self-insurance
program for City coverage, naming District as an additional insured upon District’s request. All
such liability insurance shall insure performance by City of the indemnity provisions hereof, and
the policy shall contain a cross-liability endorsement. No such policy of insurance shall be
cancelable or subject to reduction of coverage or other modification except after thirty (30) days
prior written notice. The limits of said insurance shall in no event be deemed to limit the liability
of City hereunder.
7. Indemnity. Each Party (the “Indemnitor”) shall indemnify, defend, and hold harmless the
other Party (“Indemnitee”) and its officers, employees, agents, administrators, successors, and
assigns, from and against any and all claims made or threatened by any third party and all related
losses, expenses, damages, costs and liabilities, including reasonable attorneys' fees and expenses
incurred in investigation or defense, to the extent the foregoing arise out of or relate to any error,
negligent act, omission or willful misconduct by the Indemnitor, its employees, agents, contractors,
subcontractors or invitees.
The Indemnitee shall promptly notify the Indemnitor once it is aware of a potential action and
shall cooperate with the Indemnitor in all reasonable respects in connection with the defense of
any such action at the expense of the Indemnitor. The Indemnitor may, upon written notice to the
Indemnitee, undertake to conduct all proceedings or negotiations in connection with the action,
Page 5
assume the defense thereof, including settlement negotiations in connection with the action, and
will be responsible for the costs of such defense, negotiations and proceedings. The Indemnitor
will have sole control of the defense and settlement of any claims for which it provides
indemnification hereunder, provided that the Indemnitor will not enter into any settlement of
such claim without the prior approval of the Indemnitee, which approval will not be
unreasonably withheld, delayed, or conditioned. The Indemnitee shall have the right to retain
separate counsel and participate in the defense of the action or claim at its own expense.
8. No Liability. City waives all claims against District for damage to property, including the
Underground Utility System and any Alterations thereto, and any equipment or machinery, and/or
injury or death to persons occurring in, on, or about the Underground Utility Easement, from any
cause arising at any time, except as may be caused by the District’s negligence or willful
misconduct.
9. Notice. All notices, demands, consents, requests, approvals, disapprovals, designations or
other communications (all of the foregoing hereinafter referred to as “notice”) that any Party hereto
gives to any other Party shall be in writing and shall be deemed to have been properly given if (a)
served personally, or (b) mailed, when deposited with the United States Postal Service within the
boundaries of the continental United States for registered or certified delivery, return receipt
requested, with postage prepaid, or (c) sent by overnight courier, postage prepaid, in each case
addressed to the applicable recipient as follows:
If to City: City of Palo Alto
Attn: Utilities Department, Electric Engineering
250 Hamilton Avenue
Palo Alto, CA 94301
Telephone: (650) 329-2161
With a copy to:
City of Palo Alto
Attn: Real Property Manager
250 Hamilton Avenue
Palo Alto, CA 94301
If to District: Midpeninsula Regional Open Space District
Attn: Real Property Manager
5050 El Camino Real
Los Altos, CA 94022-1404
Telephone: (650) 691-1200
12. Subordination. The Underground Utility Easement shall be superior to any and all deeds
of trusts, mortgages, liens, ground leases, licenses, covenants or encumbrances recorded after the
recordation of this Agreement that affect the District’s Property, and this Agreement shall survive
the foreclosure or termination of any such instrument or interest.
Page 6
13. Authority. The District and City, respectfully, represent and warrant that each has the
power and authority to execute and carry out the terms and provisions of this agreement.
12. No Partnership. Nothing contained in this Agreement shall be construed as making District
and City joint venturers or partners.
13. Miscellaneous
(a) Mediation of Disputes.
(i) Consultation and Resolution Process. In the event either party believes
the other party to this Agreement has failed to comply with its terms, or wishes to propose an
amendment to this Agreement to address any term or condition herein, or to discuss any operational
issues concerning the Underground Utility Easement, the parties agree to meet and confer within
thirty (30) days of receipt of a written request for consultation delivered to the other party as set
out in Section 9 herein.
(ii) If the consultation process set out in Subsection (a) (i) fails to resolve
any dispute arising out of or relating to this Agreement or the performance or breach thereof, the
parties agree to participate in good faith in non-binding mediation in order to resolve their dispute
prior to pursuing any available legal remedies.
(b) Captions. The captions of this Agreement are inserted only as a matter of
convenience and for reference. They do not define, limit or describe the scope or intent of this
Agreement and they shall not affect the interpretation hereof.
(c) Exhibits. Each of the Exhibits referenced in this Agreement is attached
hereto and incorporated herein.
(d) Amendment. This Agreement may be amended only by an instrument in
writing executed by the Parties hereto or by their successors and assigns.
(e) Time. Time is of the essence of this Agreement.
(f) Written Consent Required. Whenever a Party is requested to consent or to
approve of any matter with respect to which its consent or approval is required by this Agreement,
such consent or approval shall be given in writing.
(g) Further Assurances. The Parties shall execute such further documents and
instruments as may reasonably be required from time to time by the other Party to effectuate and
carry out the provisions hereof and to take such further actions as may reasonably be required to
give the terms hereof full force and effect for the benefit of the Parties.
(h) Terms Run with the Land. The easements, terms, covenants and conditions
contained herein shall run with the land and be binding upon and inure to the benefit of the
successors and assigns of the Parties hereto pursuant to California Civil Code Section 1468.
Page 7
(i) Severability. If any provision of this Agreement shall to any extent be
invalid or unenforceable, the remainder of this Agreement (or the application of such provision to
persons or circumstances other than those in respect of which it is invalid or unenforceable) shall
not be affected thereby, and each provision of this Agreement, unless specifically conditioned
upon such invalid or unenforceable provision, shall be valid and enforceable to the fullest extent
permitted by law.
(j) Governing Law. This Agreement shall be construed and governed in
accordance with the laws of the State of California.
(k) Counterparts. This Agreement may be executed in counterparts, each of
which shall constitute an original, and all of which together shall constitute one and the same
instrument.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the date first
written above.
CITY:
CITY OF PALO ALTO, a California
chartered municipal corporation
By: _____________________________
City Manager or designee
Date: __________________________
APPROVED AS TO FORM:
By:
City Attorney or designee
DISTRICT:
MIDPENINSULA REGIONAL OPEN SPACE
DISTRICT, a Public District formed pursuant to
Section 3 of Chapter 3 of Division 5 of the
California Public Resources Code
By:
Ana M. Ruiz, General Manager
Date: ______________________________
APPROVED AS TO FORM:
By:
Hilary Stevenson, General Counsel
ATTEST:
By: _____________________________
Maria Soria, District Clerk
Exhibit A - District Property
r
K 27PAGE 501L
Order No. 1003 -87 9 r..
Escrow No. 1 ° 95794Sg
Loan No.
REC FEE ` Recorded at tt;a Raquest of
First Americv Title Gi1arar:ty Co.
WHEN RECORDED MAIL TO: RMF
MICRO 8:00
iYli.dpeninsula Regional Open Space District JAN 2 51988 A.M.
Old Mill Office Ctr. , Bldg. C, Suite 1 5 LIEN NOT
201 San Antonio Circle LAURIE KAN-, Recorder
Mountain view, Ca. 94040 Sh1PF Santa Clara County,Official Records
Attn: Sandy Voorhees PCOR
SPACE ABOVE THIS LINE FOR RECORDER'S USE
FULL RECONVEYANCE
FIRST AMERICAN TITLE INSURANCE COMPANY, a Corporation, Trustee under the Deed of Trust executed by
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT (a Public Districts
Trustor, and recorded__ember 2, 1977 as Document No. 5860350 in Book D31 6
page_ ___ R8 of Official Records in the Office of the County Recorder of Santa Clara
County, California, having been requested in writing by the holder of the obligation secured by said Deed of Trust,to
reconvey the estate granted to Trustee under said Deed of Trust, does hereby reconvey to the person or persons legally
entitled thereto, without warranty, all the estate, title and interest acquired by Trustee under said Deed of Trust.
DESCRIPTION "As described in said Deed of Trust."
IN WITNESS WHEREOF, said FIRST AMERICAN TITLE INSURANCE COMPANY, Trustee, hascaused itscorporate
name and seal to be hereto affixed by its Assistant Secretary,thereunto duly authorized.
Dated: December 31, 1987 ...
sss/// (
iE INSu FIRST AMERICAN TITLE INSURANCE COMPANY
a" I11Por(l0 itCi1
Sept.24, K02 By J 0. Turner
c% Assistant Secretary
STATE OF CALIFORNIA C L!FOR'•b'
COUNTY OF San Mateo
On--_ December 31, 1987 before me,
the undersigned, a Notary Public in and for said State, personally
appeared Jay 0. Turner
personally known to me to be the person who executed the within instru-
ment as Assistant Secretary,on behalf of First American Title
Insurance7NOIARY
111
Company,the corporation therein named,and acknowledged to me that Y DUNCAN
PU6UC-CALIFORNIA
such corporation executed the within instrument as Trustee. CiPAL OFFICE IN
WITNESS my and
officiaZ,4
SAN MATEO COUNTY
my Commiewon E Was"./.19N
Signature,--/
This area for official seal)
N 426125 1323(7/82)
Order-No.
Escrow No. 1-4084
Loan No.
i
WHEN RECORDED MAIL TO:
Alyce Lee Burns
SPACE ABOVE THIS LINE FOR RECORDER'S USE
DEED OF TRUST WITH ASSIGNMENT OF RENTS
SHORT FORM)
This DEED OF TRUST, made November 21 , 1977 between
MIDPENINSULA REGIONAL OPEN SPACE DISTRICT (a Public District) herein called TRUSTOR,
whose address is 375 Di stet Circle, Suite D-1 Los Altos, California 94022
Number and Street) City)State)
FIRST AMERICAN TITLE INSURANCE COMPANY, a California corporation, herein called TRUSTEE, and
ALYCE LEE BURNS, A MARRIED WOMAN
herein called BENEFICIARY,
WITNESSETH: That Trustor grants to Trustee in Trust, with Power of Sale, that property in the
County of Santa Clara State of California, described as:
SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF FOR LEGAL DESCRIPTION
I
I
i
Together with the rents,issues and profits thereof,subject, however,to the right, power and authority hereinafter given to and conferred upon Beneficiary to
collect and apply such rents,issues and profits.
1 ,600,000.00ForthePurposeofSecuring(1)payment of the sum of$ with interest thereon according to the terms of a promissory note or
notes of even date herewith made by Truster, payable to order of Beneficiary, and extensions or renewals thereof, and (2) the performance of each
agreement of Trustor incorporated by reference or contained herein (3) Payment of additional sums and interest thereon which may hereafter be loaned to
Truster, or his successors or assigns,when evidenced by a promissory note or notes reciting that they are secured by this Deed of Trust.
To protect the security of this Deed of Trust, and with respect to the property above described, Trustor expressly makes each and all of the agreements,
and adopts and agrees to perform and be bound by each and all of the terms and provisions set forth in subdivision A, and it is mutually agreed that each
and all of the terms and provisions set forth in subdivision B of the fictitious deed of trust recorded in Orange County August 17, 1964, and in all other
counties August 18, 1964, in the book and at the page of Official Records in the office of the county recorder of the county where said property is heated,noted below opposite the name of such county,namely:
COUNTY BOOK PAGE COUNTY BOOK PAGE COUNTY BOOK PAGE COUNTY BOOK PAGE
Alameda 1288 556 Kings 858 713 Placer 1028 379 Sierra 38 187Alpine313031Lake437110Plumas1661307Siskiyou506762Amador133438Lassen192367Riverside3778347Solano1287621Butte1330513LosAngelesT•3878 874 Sacramento 5039 124 Sonoma 2067 427Calaveras185338Madera911136SanBenito300405Stanistaus197056Colusa323391Marin1849122SanBernardino621376$ Sutter 655 585ContraCosta46841Mariposa90453SanFranciscoA•804 596 Tehama 457 183DelNorte101549Mendocino66799SanJoaquin2855283TrinityToe595ElDorado704635Merced1660753SanLuisObispo1311137Tulare2530108Fresno5052623Modoc19193SanMateo4778175Tuolumne177160Glenn46976Mono69302SantaBarbara2065881Ventura2607237Humboldt80183Monterey357239SantaClara6626664Yolo76916Imperial1189701Napa704742SantaCruz1638607Yuba398693inyo165672Nevada36394ShastaBoo633
Kern 3756 690 Orange 7182 18 San Diego SERIES 5 Book 1964,Page 149774
shalt inure to and bind the parties hereto, with respect to the property above described. Said agreements, terms and provisions contained in said subdivision
A and B,(identical in all counties,and printed on the reverse side hereof)are by the within reference thereto, incorporated herein and made a part of this DeedofTrustforallpurposesasfullyasifsetforthatlengthherein, and Beneficiary may charge for a statement regarding the obligation secured hereby, providedthechargetherefordoesnotexceedthemaximumallowedbylaw.
The undersigned Trustor, requests that a copy of any notice of default and any notice of sale hereunder be mailed to him at his address hereinbefore set forth.
STATE OF CALIFORNIA,
Signature of Trustor
COUNTY ss.
On—__.._ -__— before me, the MIDPENINSULA REGIONAL OPEN SPACE DISTRICT
undersigned, a Notary Public in and for said State, personally appeared
i
President, Wcard of Direct `
known to me
to be the person_.—whose name_.__ subscribed to the within
T
instrument and acknowledged that executed the some.
WITNFSS my hund and official seal.
Signature
i
1
Name (Typed or Printed)
This area for official notarial seal) 115$(11I681 '
EXHIBIT "A"
PARCEL ONE A
The Northwest 1/4 of Section 14 ; the North 1/2 of the Southeast 1/4 of
Section 15 ; all that portion of the Fractional Northwest 1/4 of Section 15 ,
lying Easterly and Southerly of the center line of the Page Mill Road , and al
that portion of the South 1/2 of the Northeast 1/4 of Section 15 , lyingEasterlyandSoutherlyofthecf,nter line of Page Mill Road ; all in Township7 , South Range 3 West, Mount Diablo Base and Meridian.
EXCEPTING THEREFROM all that portion thereof included within the Noun(-}s
of the County of San Mateo, State of California.
ALSO EXCEPTING THEREFROM all that portion of the South 1/2 of the
Northeast 1/4 of Section 15 lying Easterly and Southerly of the centerline
of Page Mill Road and lying East of a line drawn due South from the intersec
of the centerline of Page Mill Road with the division line between the CountyofSantaClaraandtheCountyofSanMateo; said division line beingdesignatedas "South 810 15 ' East" between "Station 64 and Station 6510 , all
being shown on that certain Record of Survey recorded July 18 , 19512 in Book
32 of Maps , page 33 .
PARCEL 01,1E B
Beginning at the Quarter Section corner on the center of Section 151
Township 7 South, Range 3 West , M.D.M. , and running thence: along, the Quarter
Section line running East and West throug;ht the center of said Section 15North89030' West 23. 58 chains to a stake marked D.M. 13 standi.r.g at the intersection of said Quarter Section line with a picket fence from which
stake the Quarter Section corner between Sections 15 and 16 , bears Nort:.89 1/2' West 17. 27 chains said .stake D.H. 13 being the Northwesterly cornerofthat79acretract , more or less deeded to Lambert Dornberger by DeeddatedSeptember7 , 1886 and recorded in Book 88 of Deeds , page 67 in the
office of the County Recorder of Santa Clara County, California runningthencealongthesaidpicketfence, and the Westerly line of said 79 acre tra-South 42 1/40 East 9. 67 chains to a 6" x 6" fence post marked D-i-i 12 , andSouth171/20 East 4. 80 chains to an elderberry tree marked D-M 11 standingattheendofsaidpicketfence; thence running along the East side of a4
ravine South 22 3/40 East 2.43 chains, South 14 3/4' West 1. 65 chains to aleaninglaurel30inchesindiametermarkedD-1-1 9 , South 6 1/20 East 1. 22
chains , South 44 3/41 East 2. 85 chains to Station D.M. 7 , South 71 3/40 East1.15 chains to a live oak tree marked D-M 6 , South 18 1/41 East 1. 27 chains,to a white oak marked D-M 5 , South 161 East 2. 80 chains , South 18 1/1 0 East11. 30 chairs , South 30 1/1;0 East 3. 80 chains , South 391 East 1. 20 chains ,South 1 p -,1 1 2 l.w t 1.29 chains to the cent er of StevensCreek• thence upont}le center of said Creek, South 121 West 2. 31 chains South 5 1/110vca..s t1. 20 chains to Station; South 17 1/41 Hest at 0. 70 chains to a point fromwhichtheQuarterSectioncornerbetweenSection15and22 , Township 7 Soj; LL-Rang;ct 3 t,est , bears North 83 3/40 East 5. 80 chains at 1. 72 chains -to Statior ,South 10" East 2 . 00 chain:: South 36 3/40 West 1. 95 chain: to station near.the confluence of two ravines forming Stevens Creek; thence up the center
Cont'd on next page)
I
i
1 A
2
s f the Southerly ravine , South 12 3/40 East 1.40 chains South 25 1/4cl t2. 30 chains South 28 1/40 Easto1.15 chains South 22 3 4 East 1. 20 chains ,South 9 1/40 East 1. 80 chains , South 34 1/40 East 1. 90 chains, South 20 1/40East1. 80 chains , South 14 3/41 West 1.73 chains South 63 3/40 West 2.40chains , South 50 3/40 West 2. 87 chains , South 41 3/40 West 1.23 chains to theconfluenceoftworavines , South 46 3/41 East 0. 90 chains to station in roadtoDornbergerfromwhichStationapineoaktreeS" in diameter bears North821120 ,East 0. 50 chains, thence continuing along the Westerly line of theaforementioned79acretractSouth2* East 4.96 chains, South 80 East 2. 53chainstoatanoak8" in diameter mar'ced D.M.D M. 4 Sou th 22 We ststtoai 4 . 00 chainspineptree6feetindiametermarkedD.M. 3 - thence lea vingn the tle ster 1lineoftheaforementioned79acretractandrunningNorth78017 ' East11. 72 chains to a stake marked D. 3 standing at the most Southerly cornerthefen ofccaroundundanoldorchardthencealong1ngthefenceontheSoutherlysideofsaidorchardandtheprolongationofsaidfence, North 61t0 55 ' East 7. 82
chains to a stake marked D.4 standing in a fence running Nor thwestwest an dSoutheast , thence North 540 05' East 11. 88 3/4 chains to a fence Post mar ke dD. 5 standing at the corner of two fences, thence North 300 11' East 9 . 20chains , cross ravine at 10.47 chains , a leaning madrone loll in diameter at12. 57 chains a redwood tree 8 feet in diameter at 15. 42 chains a madrone tree4feetindiameterat18. 38 chains a tan oak tree 4 feet in diameter and at23. 24 chains to station in the center of the Stevens Creek from which Stationa2" x 3" stake marked W.P. bears South 300 11' West 20 links and from whichstakeatanoak12" in diameter bears South 18 1/20 West 0.15 chains and aleaningtanoak9" in diameter bears South 83 1/41 West 0. 28 chains, runningthencealongthecenteroftheStevensCreek, Southeasterly the followingcoursesanddistances: ' South 550 30 ' East 1. 75 chains North 600 56 ' East1. 95 chains , South 300 56 ' Fast 2 . 00 chains , South 480 36 ' East 1. 39 chainsNorth84009 ' East 1. 81 chains , South 90 38 ' East 1. 07 chains , South 880 oil 'East 1.49 chains, South 660 45 ' East 1.23 chains South 210 54 ' East 2. 73chains , South 58' 24 ' East 2. 23 chains , South 590 40 ' .East 3. 07 chains , South50' 59 ' Fast 1. 31 chains , South 4l' 49' East 3. 35 chains , South 830 19'East 2 . 8S chains , South 410 40' East 1. 87 chains, South 58' 24 ' East 1. 70chains , South 42° 43' East 1. 25 chains , South 740 15 ' East 2. 41 chains -to theEastlineoftheWestone-half of the Northwest Quarter of Sec. 23. T. 75. 1' .3tW- , M.D.M. thence along said East line North 00 35' West 14 . 56 chains to t`iQNortheastcorneroftheWestone-half of the Northwest Quarter of Sec. 23 ,T. 7S , R. 3W. , M.D.M, ; thence along the section line running between Sections14and23 , T. 7S. , R. 31-1. , M.D.M. , East 39. 65 chains to the Southwest cornerOfthat80acretractdeededtoArthurJ. Bond by Deed dated April li , 189S andrecordedinBook177ofDeeds , page 390 in the office of the County Y:ecor:lzrofSantaClaraCounty, California; thence along the Westerly line of said80acretract , 2lorth 30 35' East 40. 51 chains to the Northwest corner ofsaid80acretractintheQuarterSectionlinerunning; East and tWest throughthe-.center of Section 14. T. 7S. , R. 3tW. , M.D.M. , thence along the Quart rSectionlinerunningEastandWestthroughthecenterofsaidSectiont
jl
t 1WesttotheQuarterSectioncornerontheWestlineofsaidSectionIt, , then-c.alon; the ;best line of said Section 14 , Southerly 20. 15 chains to a tF" x 4"stake standing at the Northeast corner of the South one-half of the Sout] _as
II Quarter of Section 15 T. 7S, , R. 3W. , t-S.D-2'i. , thcncn- along the North lin zioftheSouthone--half of the Southeast quarter of Section 15 , Piortti 880 30 ,
I
Cont 'd on next pa,r,)
West 40. 80 chains to the Northwest corner of the South one--half of the
Southeast Quarter of said Section 15; thence along the Quarter Section line
running North and South through the center of said Section 15 , North 20
East 18 . 1S chains to the place of beginning, being Parts of Sectio ns 14 15
22 and 23 , T. 7S. , R. 3W. , M.D.M.
EXCEPTING THEREFROM that portion thereof conveyed by Sada Coe Robinson
to John If. Richey by Deed dated March 13 , 1950 and recorded April 26 ,
1950 in Book 1967 of Official Records , page 406 and more particularly
described as follows:
Beginning at the point of intersection of the Southerly line of the
Skyline Boulevard, as the same existed in January 1950 , with the Westerlylineofhe5t + 4. 89 acre parcel of land conveyed by Bertha A. Hayes to Sada
Coe Robinson by Deed dated January 14 , 1946, and recorded January 17 , 19463,in Book 1266 of Official Records, page 531, Santa Clara County Records ,
thence from said point of beginning Southerly along said Westerly line of
the 454. 89 acre parcel above referred to, to the most Southerly corner
thereof at a pine tree 6 feet in diameter marked D.M. 3 , thence Northeasterly
along the Southerly line of the said 454.89 acre parcel to the intersection
thereof with the said Southerly line of the Skyline Boulevard; thence
Westerly along said line to the point of beginning, being a portion of the
North 1/2 of Section 22 , Township 7 South, Range 3 West, M.D.B. 6M.
ALSO -the right of way from the lands and premises above described to the
County Road , reserved in the Deed from Lambert Dornberger to Frances Mayer,
dated June 25 , 1875 and recorded July 29 , 1875 in Book 36 of Deeds , page
506 , Santa Clara County Records.
ALSO the right to take , appropriate and use the water of a certain springysituatedontheNorthwestQuarterofSection22 , Township 7 , South, Range
3 West M. D.M. , and Northerly from the above mentioned Madrone Tree marked
D.M. 2 , said spring being the same heretofore used by Lambert Dornberger;
also the right to lay down, keep and maintain suitable and proper pipes to
conduct said water and to make , erect, keep and maintain there at all
necessary and suitable improvement for collecting, storing and using said
water and also the right of way for egress and ingress to and from said spring 'over , upon and across the land of Frances Mayer. Also the right of way over
the travelled road leading from the Page Mill Road to the premises of Lambert
Dornberger; all as reserved in the deed from Lambert Dornberger to Frances
Mayer, dated September 7 , 1886 and recorded December 18 , 1886 in Book 87 of
Deeds , page 202, Santa Clara County Records.
PARCEL ONE C
All that portion of the South 1/2 of the Northeast 1/4 of Section 15 ,
Township 7 South , Range 3 West , lying Easterly and Southerly of thr_ centerline.
of Page Mill Road and lying East of a line drawn due South from the intersecti
of the center line of Page Mill Road with the division line between the County
Cont 'd on next page)
Of Santa Clara and the County of San Mateo saiddesignatedas "South 810 15 ' Ea3t" between"Station
v641
and
on 1S tationine n65" allbein€;' shown on that certain Record of Survey recorded July 18 , 1951inBoot: 32 of Maps , page 33.
EXCEPTING THEREFROM the following described parcel of land:
A portion of the ri or thwest 1/21/11 of Section 15 , Township 7 South ,oRange 3o West,SM.DJB.6M. ,
t 1A of h
and
abeingst
more particularly described as follows :
Beginning at an iron pipe in the center line of Page Hill Road, (40. 00feetwide) on the North line of the South 1/2 of the Northeast 1/4 of saidSection15: thence along said North ling , South 89° 10' 07" Eastsfeettttoaniron 1041. 62pipepeontheEasterlylineofaYprivateroadd (20.n width) 00doh) known as Montebello feetntebelloRoad; then ce along said Easterly line withfollowingcoursesanddistances:hLances. Southerly aloe theYh artherightthetangentR c of , curve togntofwhichbearsSouth24° 32 ' 08" East having aradiusof170feetthroughtiaocentrestg1angleeof74. 05 feet to an iron pipe; thence South ao 251 57' 27 an are distance
0 25 19 Westest 193 . 74anironpipeatthebeginningofacurve; thence along the arc ofeatcurvetotheleft , having a -radius of 440 feet; through a central angle of 11°49 ' 15" an arc distance of 90. 78 feet to an iron pipe at a point ofcurvature; thence along the arc of a compound curve to the left, havingpaunaradiusof50feet , through a central angle of 97° 34' 30" an arc distanceOf85. 15 feet to an iron pipe; thence North 710 01' 34" East 50. 28 feet toanironpipeatthebeginningofacurve, thence along the arc of a curvetotheright, having a radius of 80. 00 feet , through a central angle of88036 ' 55" an arc distance of 123. 73 feet to an iron pipe; thence South 20021' 34" East 41. 75 feet to an iron pipe at the beginning of a curve; thencealongthearcofacurvetothelefthavingaradius -of 205 . 00 feet; throughacentralangleof25037 ' loll an arc distance of 91. 66 feet to an iron pip:;,thence South 450 58 ' 41" East 45. 38 feet to an iron pipe at the beginningofacurve; thence along the arc of a curve to the right , having a radiuf185. 00 feet , through a central angle of 22' 49 ' 15" an arc distance of
s o
73. 69 feet to an iron Pipe; thence South 231 09' 26" East 141.68 feet to anironpipe ; thence leaving said Easterly line of Montebello Road North 89°10 ' 07" West 1698. 75 feet to an iron pipe in the center line ofRoad; -thence along said centerline with the following courses andali,tances:North 400 21 ' 34" East 116. 35 feet to a 3/4 inch iron pipe; North 200 54 ' 34"East 179. 86 feet to a 3/4 inch iron pipe; North 13° 34 ' Otf" Ea;feet to a 3/4 inch iron pipe
t 230. 02
Point of beginning.
P P" and North 6 54 ' 43" East 273. 98 feet -to the
ALSO EXCEPTING FROM above mentioned Parcels No. 1 and 11o. 3 thef0110'4ing described property as conveyed in the Final Juc1 merecordedNovember13 , 1964 , in Book 6740 of Official Records ,
toC 'rnnatiar:
described as follows : pge 287
Cont'd on next page)
4 r
5
Beginning at an iron pipe in the center line of Page Mill Road marking-;
es 270 acre tract of land conveyedcornerofthatcertain22mostWesterlycrnYthetY
r et al dated March 18 1963 andJ. e J .Harry Be rbAliceLem. Burns to HY Y Y
recorded June 20 , 1963 in Book 6071 of official Records , page 412 , Records
O i Tt ,
a r County, California; thence North 88 5D 27 East along theof __:-it Clara u t Y>
Southerly line of said Tract of land 1327. 57 feet to the true point of
gbeSinnin • thence from said true point of beginning North 88' 50' 27" East
o r o
361. 43 feet; thence South 12 36 47 East 8 feet ; thence South 47
t ^n o r 'S140 . 00 fEu725336Westfeet ; thenceeeSouthT700feet; thence533atest11.
North 270 06' 24" West 263. 00 feet to the true point of beginning, and being
a portion of Section 15 , Township 7 South, Range. 3 West , M.D.B.EM.
ALSO EXCEPTIUG FROM all the lands hereinabove described so much
thereof as lies within the following described parcel of land:
Beginning at the center of Section 15 , Township 7 South, Range 3
West , M.D. B. EM. , thence Westerly along the Quarter Section line through
the center of said Section 15 , North 890 30' West 1556 .28 feet more or less
to a stake marked "D.M.13" , standing at the intersection of said Quarter
Section line with a picket fence from which stake the Quarter Section
corner between Sections 15 and 16 , bears North 891 30' West 1556. 28 feet
pore or less , said stake "D.M.13" being the Northwesterly corner of that
tract of land deeded to Lambert Dornbarger by Deed dated September 7 , 1886
and recorded in Book 88 of Deeds , page 67 in the office of the County Recordei
of Santa Clara County, California, said point being the TRUE P0114T OF
BEGINNING , thence from said TRUE POINT OF BEGINNING Westerly along said
Quarter Section line running through the center of said Section 15 North
890 30 ' West to the division line between San Mateo County and Santa Clara
County ; thence Northerly and Easterly along said county division line ,
1636 feet more or less, to the center line of Page' Mill Road ; thence
Easterly along the centerline of Page Mill Road, 1230 feet more. or less ,
to said County division line; thence Easterly along said County Division
line to a point lying 350 feet East of a line running North and South
through the center of said Section 15 ; thence Southerly along a line, parallel
with a North and South section line through the center of Section 15 , said
line being 350 feet East of the center of Section 15 , to the Northerly
Right of Way line of Skyline Boulevard; thence along the Northerly Right ofnk1. g y
Way line of Skyline Boulevard Westerly to the Westerly line of the 45ii . 8C_+
acre parcel of land conveyed by Bertha A. Hayes to Sada Coe Robinson by
Deed dated January 14 , 1946 , and recorded January 17 , 1946 in Book 1266
of Official Records , page 531 , Santa Clara County Records ; thence Northerly
tlozig : id Westerly line of the 454. 89 acre parcel of land to the TRUE: POINIT
OF BEGINNING
I
10
15 14
160 00 AC.)
170.00 Ac r
4/
1 3.60AC`
Fa'CFv ryo.v
CIfiY SF V'.LO AL'J•
3
1
13
13693 A
MONTEaEJ r P.9RCfL ' C 1
e J AC)c T
C240.. oo AC)l
471.55 AC TOTAL
8
f6+AC. TOTAL
s
F
ti
2Yy -Y-lsf-u)s
Y 7> f
l
17
cik
L 20.73 AC.
Is
I
t co
vE. i
r
FORM OF ACKNOWLEDGEMENT
State of California
ss:
County of Santa Clara )
On this the 22 day of November lg 77-
before me, Stanley R. Norton personally appeared
the undersigned officers Daniel Wendin, President
Harry A. Turner , and Nonette Hanko Katherine M. Duffy
Edward Shelley Richard Bishop Barbara Green
r
Directors of the Midpeninsula Regional Open
4
Space District, known to me to be the persons described in the
foregoing instrument, and acknowledged that they executed the
same in the capacity therein stated and for the purposes therein
contained.
In witness whereof I hereunto set my hand and official seal.
k,
Notar Public
f NOTA2Y F
r'r SAt TA CL Y1978 y}
rY
Sh r a Ave., Palo Alto, CA 94306
Ill
FORM OF ACKNOWLEDGEMENT
State of California
ss:
County of Santa Clara
On this the 22 day of November 19 77 ,
before me, Stanley R. Norton personally appeared
the undersigned officer Daniel Wendin, President
Director of the Midpeninsula Regional Open Space District, known
to me to be the persons described in the foregoing instrument, and
acknowledged that they executed the same in the capacity therein
stated and for the purposes therein contained.
In witness whereof I hereunto set my hand and official seal .
SSS
STf NLEY 2. i 7'd ? Notar Public
NOTARY FL'5UC - :,_,i;;:: p`•alA
SANTA CLALA COU'iTYcorrm: ir ...ta "" 19731(
4306407ShermanAve., Palo Alto, CA 9
Page 1 of 2Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991516 DEQ 02-27-1981
Page 2 of 2Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991516 DEQ 02-27-1981
Page 1 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981
Page 2 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981
Page 3 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981
Page 1 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981
Page 2 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981
Page 3 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981
Page 1 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981
Page 2 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981
Page 3 of 3Non-Order Search
Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981
Exhibit B - Existing Utility Easements
EXHIBIT C
Underground Utility Easement Legal Description & Plat Map
WHEN RECORDED MAIL TO:
Midpeninsula Regional Open Space District
Attn: Real Property Department
5050 El Camino Real
Los Altos, CA 94022
Recording Requested By:
City of Palo Alto, Attn: Utilities Department
250 Hamilton Avenue, Palo Alto, CA 94301
NO TRANSFER TAX DUE
Public agency relinquishing any
interest previously recorded on
August 14, 1941 (Volume 1053, Page
538 & Volume 1048, Page 567) and
August 26, 1941 (Volume 1048, Page
562)
QUITCLAIM DEED
DULY RECORDED WITHOUT FEE
Pursuant to Government Code
Sections 6103, 27383 & 27388
APNs 351-25-014, 351-06-025, 351-09-002 and 351-12-069
For Valuable Consideration, receipt of which is hereby acknowledged, CITY OF PALO ALTO, a California
chartered municipal corporation, does
Hereby REMISE, RELEASE AND QUITCLAIM to MIDPENINSULA REGIONAL OPEN SPACE
DISTRICT, a Public District formed pursuant to Article 3 of Chapter 3 of Division 5 of the California Public
Resources Code,
Any and all of its right, title and interest to erect, maintain and use overhead electrical and communications
facilities, including poles, wires, guys, anchors, crossarms, hardware, braces and other fixtures, facilities or
appliances, along with any rights of way therefore, including the following three (3) easements assigned in the
Assignment from Pacific Gas and Electric Company to City of Palo Alto, Official Records of Santa Clara
County, recorded on September 19, 1966, Book 7509, Page 170:
Grantor Date Recording
Louis Oneal, Inc. August 14, 1941 Volume 1053 of O.R., Page 538
Bertha A. Hayes August 14, 1941 Volume 1048 of O.R., Page 567
George F. Morell and
wife
August 26, 1941 Volume 1048 of O.R., Page 562
Being more particularly described in Exhibit “A” as attached hereto and incorporated by this reference.
City of Palo Alto
__________________________________
City Manager or Designee
Exhibit E - Form of Quitclaim Deed
Exhibit A
Page 1
CITY OF PALO ALTO ACCESS AND UTILITY LICENSE AGREEMENT
This License Agreement (“License”) is made and entered into this day of
, 2025 (“Agreement Date”) by and between Midpeninsula
Regional Open Space District, a California special district, hereinafter called “District,”
and City of Palo Alto, a California chartered municipal corporation, hereinafter called
“Licensee” or “City.” District and Licensee are sometimes referred to herein individually
as a “Party” and collectively as the “Parties.”
RECITALS
WHEREAS, District is the owner of certain real property situated along Montebello Road
at Monte Bello and Rancho San Antonio Open Space Preserves in the County of Santa
Clara, State of California, known as Santa Clara County Assessor’s Parcel Numbers 351-
25-014, 351-06-025, 351-09-002 and 351-12-069, shown on Exhibit A, attached hereto
and incorporated herein by this reference (“District Property”); and
WHEREAS, Licensee holds right-of-way and utility easements for electric transmission
lines across District Property, as assigned by Pacific Gas and Electric Company from
Louis Oneal, Inc., Bertha Hayes, and George Morell (collectively, “Existing Utility
Easements”), in the locations generally depicted on Exhibit A; and
WHEREAS, Licensee wishes to convert its existing overhead electric lines and facilities
to underground electric and communications lines and facilities along Montebello Road
within District Property (the “Project”), which lines and facilities are generally shown on
Exhibit B, attached hereto and incorporated herein by this reference; and
WHEREAS, the Project will take place on District Property in the designated areas (the
“License Area”) shown on the construction plans, specifications and best management
practices approved by the City and District (collectively “Construction Plans”), which
Construction Plans are attached hereto as Exhibit C, and incorporated herein by this
reference; and
WHEREAS, Licensee and District are, in addition to this License, entering into an
Exchange Agreement wherein the District will grant a new easement for Licensee’s
underground utility facilities in exchange for Licensee quitclaiming to District its rights
to maintain overhead utility facilities on the District Property (“Exchange”); and
WHEREAS, Licensee and District desire to enter into this License to allow Licensee to
commence work on the Project on District Property prior to the Exchange;
NOW THEREFORE, District and Licensee agree:
1)Incorporation. The above Recitals and the exhibits attached to this License are
hereby incorporated herein and made a part hereof.
Exhibit F - Form of License Agreement
Page 2
2) License Area. District hereby grants to Licensee and its agents, consultants,
contractors, subcontractors and employees a revocable, non-exclusive license to use
those certain portions of District Property designated as the “License Area” on
Exhibit C, subject to the terms and conditions contained herein. No other portion of
the District Property shall be used by Licensee without the District’s prior written
consent.
3) Term. This License shall become effective as of the Agreement Date and, unless
earlier terminated pursuant hereto, shall expire on December 31, 2025 or upon closing
of the Exchange, whichever comes first. Upon mutual agreement of the Parties, the
term of this License may be extended in the event that the Project is not yet complete.
4) Use. The Licensee must use the License Area in strict accordance with this License.
a) Project Description. The Project includes the following general categories of
work on the District Property (the “Work”): (1) installing and commissioning
underground electrical and fiber optic communications lines and related
facilities under, across and along Montebello Road via a boring construction
method, where practicable, as it crosses District Property; (2)
decommissioning, removal and disposal of all existing overhead electrical and
communications lines, poles, and related fixtures and facilities currently
installed on District Property; and (3) repairing and restoring the License Area
to the condition that existed upon the Agreement Date, or as otherwise agreed
upon in Construction Plans or this License, and to the extent damaged by
Licensee, any portion of District Property outside the License Area.
b) Licensee Responsibility for Project. Licensee agrees that it will, with respect
to the District, be solely responsible for all aspects of the Project and for the
acts and omissions of its agents, consultants, contractors, subcontractors,
employees and invitees and for persons directly or indirectly employed by
them.
c) Project Work. Licensee must perform the Work in accordance with the
Construction Plans, unless the District pre-approves any changes in writing.
District will designate individuals with authority to approve such changes
promptly to avoid work delays. If there is any impact to District Property
outside the License Area, the Licensee must provide a detailed proposal to
District identifying the extent and duration of the impact and the Licensee’s
proposed plan to restore impacted District Property to its original condition or
better prior to expiration of the License. The Licensee’s proposal is subject to
the District’s prior written approval, which approval shall not be unreasonably
withheld, delayed, or conditioned.
d) Compliance with Laws. The License Area shall not be used for any other
purpose without District's prior written consent. Licensee shall not use the
License Area or permit anything to be done in or about the License Area
which will in any way conflict with any statute, ordinance, rule, regulation, or
other statement of lawful governmental authority now in force or which may
hereafter be promulgated (collectively “Regulations”), and shall at its own
Page 3
expense abide by and comply with any and all such Regulations regulating the
use of the License Area. Such Regulations shall be deemed to include the
then-current “Ordinance for Use of Midpeninsula Regional Open Space
District Lands,” which is incorporated into the License by this reference.
e) Protection of District Property. District and City have conducted a site visit to
identify District Property, improvements, or resources that may be affected by
the Work. The Parties acknowledge, however, that not all portions of District
Property that may be affected by the Work can be identified before the Project
commences. Licensee is solely responsible for any damage to the License
Area or other portions of District Property caused by Licensee or its agents,
consultants, contractors, subcontractors, employees and invitees. Licensee
shall protect District Property and improvements or resources from damage or
loss, including vegetation, pathways, roadways, structures and utilities not
designated for removal or alteration. Unless specified otherwise in the
Construction Plans or through approved changes, Licensee shall repair or
provide replacement for any such damage or loss to the District’s reasonable
satisfaction, all at no cost to District. When Licensee is working in or around
existing vegetation, Licensee shall take adequate measures to preserve and
protect all vegetation that is to remain. Particular care must be taken not to
debark trees, break limbs, or damage root systems.
f) Project Completion. When the Project is complete, Licensee shall request
from District a final inspection of the Work. District shall make the final
inspection within ten (10) calendar days of the request. If District determines
that the Work has been completed in accordance with this License, District
will accept the Project in writing. Upon acceptance, Licensee shall be relieved
of maintaining and protecting the License Area. District’s acceptance shall not
be unreasonably withheld, delayed, or conditioned. If District determines that
the Work is not complete or in accordance with this License, Licensee shall be
notified in writing of deficiencies and Licensee shall again initiate the
procedure for final inspection after all such deficiencies are corrected.
Concurrently with District’s acceptance of the Work, Licensee shall provide
District with a copy of the “as-built” drawings showing the installed location
of the underground facilities for District’s reference.
5) Maintenance and Repair. Licensee acknowledges that it has inspected the License
Area, and Licensee accepts the License Area “as is” in the condition existing at
commencement hereof. Licensee recognizes that the District Property is open to the
public for recreational uses and that Licensee’s work must be performed in such a
manner as to accommodate public use on the District Property.
a) Licensee, at Licensee’s sole expense, shall maintain the License Area in a safe
and sanitary condition, and good working order and repair, and shall keep the
License Area free from trash and other debris for the duration of the Project. Site
inspections of the License Area may be conducted by District to ensure that the
License Area is properly maintained, but Licensee shall be responsible for
initiating, maintaining and supervising all safety precautions and programs on the
Page 4
Project. If the District determines that the License Area is not being maintained in
accordance with this section, or if District notices any other issues that represent a
breach of the License or threat to District Property or the public health, safety or
welfare, District may suspend the Work and take actions necessary to remedy the
issue. District shall not assume Licensee's responsibilities by such actions and
does not thereby release Licensee from its obligations under this License. At the
end of each workday, Licensee shall make the worksite safe for recreational use
or shall provide the District with at least 24 hours’ advance written notice if the
worksite cannot be made safe for recreational use; provided, however, that such
notice shall not release Licensee from its obligation to maintain the License Area
in a safe condition.
b) Licensee shall not obstruct roads or trails that are to remain open during
construction and shall allow unencumbered access through Preserve gate
entrances. Licensee shall not close or obstruct driveways, trails, or other public
passageways without District’s permission. In the event that any road or trail
needs to be closed in association with the Project, Licensee shall give District five
(5) days’ written notice so that District may post the closure notice.
6) Alterations. Licensee shall not make or permit to be made any alterations, additions
or improvements (“Alterations”) to or of the License Area, except those set forth in
the Construction Plans, without the prior written consent of District.
7) Liens. Licensee shall keep the License Area free from any liens arising out of any
work performed, materials furnished or obligations incurred by Licensee in
connection with the Project.
8) Surrender of License Area. At least fifteen (15) days prior to the expiration or
termination of the License, Licensee, at its sole cost and expense, shall: (1) remove all
equipment, materials, tools or other personal property from the License Area; and (2)
restore the License Area to the condition that existed upon the Agreement Date and
repair any other portion of District Property disturbed or damaged by Licensee, as
required by this License.
9) Waiver of Claims and Indemnification.
a) Licensee waives all claims against District for damage to property, including the
Work and any Alterations thereto, and any equipment or machinery, and/or injury
or death to persons occurring in, on, or about the District Property, from any
cause arising at any time, except as may be caused by the District’s negligence or
willful misconduct.
b) Each Party (the “Indemnitor”) shall indemnify, defend, and hold harmless the
other Party (“Indemnitee”) and its officers, employees, agents, administrators,
successors, and assigns, from and against any and all claims made or threatened
by any third party and all related losses, expenses, damages, costs and liabilities,
including reasonable attorneys' fees and expenses incurred in investigation or
defense, to the extent the foregoing arise out of or relate to any error, negligent
Page 5
act, omission or willful misconduct by the Indemnitor, its employees, agents,
contractors, subcontractors or invitees.
c) The Indemnitee shall promptly notify the Indemnitor once it is aware of a
potential action and shall cooperate with the Indemnitor in all reasonable respects
in connection with the defense of any such action at the expense of the
Indemnitor. The Indemnitor may, upon written notice to the Indemnitee,
undertake to conduct all proceedings or negotiations in connection with the
action, assume the defense thereof, including settlement negotiations in
connection with the action, and will be responsible for the costs of such defense,
negotiations and proceedings. The Indemnitor will have sole control of the
defense and settlement of any claims for which it provides indemnification
hereunder, provided that the Indemnitor will not enter into any settlement of such
claim without the prior approval of the Indemnitee, which approval will not be
unreasonably withheld, delayed, or conditioned. The Indemnitee shall have the
right to retain separate counsel and participate in the defense of the action or
claim at its own expense.
10) Insurance.
a) Licensee, at Licensee’s sole expense, shall maintain and keep in force during the
term of this License a policy of general liability insurance against claims for
bodily injury, personal injury, death and/or property damage arising from
Licensee’s use of the License Area, or from any occurrence in, on, about, or
related to the License Area with limits which shall not be less than Two Million
Dollars ($2,000,000.00) per occurrence. District shall be named as an additional
insured on such policy. Upon District’s request, City shall promptly furnish to
District an endorsement evidencing such insurance coverage. Licensee shall
require any contractors performing work on District Property to maintain
insurance satisfying the above requirements. The District acknowledges that
Licensee’s insurance requirements may be satisfied in whole or in part by
adequately funded self-insurance programs or self-insured retentions that have
been pre-approved by the District. Licensee agrees to furnish a certificate of its
contractor(s)’s insurance to District, and evidence of any self-insurance program
for Licensee coverage, naming District as an additional insured upon District’s
request. All such liability insurance shall insure performance by Licensee of the
indemnity provisions hereof, and the policy shall contain a cross-liability
endorsement. No such policy of insurance shall be cancelable or subject to
reduction of coverage or other modification except after thirty (30) days prior
written notice. The limits of said insurance shall in no event be deemed to limit
the liability of Licensee hereunder.
b) District shall have no obligation to insure against any loss to Licensee’s
Improvements, fixtures, machinery, equipment, or other personal property in or
about the License Area occurring from any cause whatsoever, and Licensee shall
have no interest in the proceeds of any insurance carried by District.
11) Default.
Page 6
a) The occurrence of any of the following shall constitute a material default of this
License by Licensee:
(i) The abandonment of the License Area by Licensee; or
(ii) After District provides Licensee written notice of a failure by Licensee to
observe and perform any provision of this License to be observed or
performed by Licensee, Licensee fails to cure such failure within fifteen (15)
calendar days. If the failure cannot be cured within fifteen (15) calendar days,
Licensee will not be in default of this License Agreement if Licensee
commences performance of such cure within such fifteen (15) calendar day
period and thereafter diligently prosecutes the same to completion.
b) In the event of any such material default by Licensee, and in addition to any other
remedies available to District at law or in equity, this License and all rights of the
Licensee hereunder shall be terminated upon delivery by District of notice of such
termination to Licensee. Upon such termination, District may recover from
Licensee any amount necessary to compensate District for all the detriment
proximately caused by Licensee’s failure to perform Licensee’s obligations under
this License or which in the ordinary course of things would be likely to result
therefrom, including but not limited to all expenses incurred by District in
connection with demolishing structures or removing facilities and debris, and
removing any other property left by Licensee, on District Property.
c) In addition to the remedies provided above, in the event Licensee shall fail to
perform any obligation to be performed by Licensee under this License, District
may, but shall not be obligated to do so, perform or pay the same or cause the
same to be performed or paid, and Licensee shall promptly upon demand by
District therefore, reimburse to District all costs reasonably incurred by District in
connection therewith.
12) Entry by District. District shall, at any and all reasonable times, have the right to enter
onto the License Area to inspect the same, to post notices of non-responsibility, and
to alter, improve or repair the License Area; provided, however, that District agrees
not to alter, improve or repair areas under active construction without first obtaining
Licensee’s written approval, which shall not be unreasonably withheld, conditioned
or delayed, unless waiting for Licensee’s approval may result in unsafe conditions at
the worksite. Licensee hereby waives any claim for damages for any loss of
occupancy or quiet enjoyment of the License Area occasioned thereby.
13) Waiver. The waiver by District of any breach of any term, covenant, or condition
herein contained shall not be deemed to be a waiver of such term, covenant, or
condition or any subsequent breach of the same or any other term, covenant, or
condition hereof.
14) A copy of this License Agreement shall be available on site at all times.
Page 7
15) Notices. All notices, statements, demands, requests, approvals, or consents
(collectively “notices”) given hereunder by either party to the other shall be made in
writing and shall be served personally or by first class mail, certified or return receipt
requested, postage prepaid, and addressed to the parties as follows:
District: Midpeninsula Regional Open Space District
Attn: Real Property Manager
5050 El Camino Real
Los Altos, CA 94022
(650) 691-1200 (telephone)
(650) 691-0485 (fax)
Licensee: City of Palo Alto
Attn: Utilities Electric Engineering
250 Hamilton Avenue
Palo Alto, CA 94301
(650) 329-2161
With a copy to
City of Palo Alto
Attn: Real Property Manager
250 Hamilton Avenue
Palo Alto, CA 94301
or to such other address as either party may have furnished to the other as a place for
the service of notice. Any notice so served by mail shall be deemed to have been
delivered three (3) days after the date posted.
16) No Property Interest. City shall not acquire any interest or estate in District’s property
pursuant to this License. City has elected to commence the Project at its risk and only
the Exchange will provide City with permanent rights to maintain the underground
utility facilities on District Property.
17) Entire Agreement. This License along with any exhibits and attachments constitutes
the entire agreement and between the Parties with respect to the matters herein. Any
and all prior oral or written agreements by and between the Parties and their agents or
representatives relative to the matters herein are superseded entirely by this License.
This License shall not be construed more strongly against either Party regardless of
who is responsible for its preparation.
18) Parties Not Agents or Partners. Notwithstanding anything to the contrary in this
License, neither Party shall be deemed an agent for the other Party under this License
and the Parties shall not be deemed partners on the Project.
Page 8
19) General.
a) This License contains all of the terms, covenants, and conditions agreed to by
District and Licensee, and this License may not be modified orally or in any
manner other than by an agreement in writing signed by all of the Parties to this
License or their respective successors in interest.
b) When the context of this License requires, the masculine gender includes the
feminine, a corporation, or a partnership, and the singular number includes the
plural.
c) The captions of this License are for convenience only and are not a part of this
License and do not in any way limit or amplify the terms and provisions of this
License.
d) This License shall be governed and construed in accordance with the laws of the
State of California with venue in the County of Santa Clara.
e) Time is of the essence as to all of the provisions of this License as to which time
of performance is a factor.
f) All terms, conditions or obligations in this License which by their nature are to be
performed or observed following expiration or termination of this Agreement
shall survive.
g) Neither Party may assign any part of this License without the other’s prior written
consent.
Space intentionally left blank
Page 9
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed
by their duly authorized officers to be effective as of the date of final execution by
District in accordance with the terms hereof.
DISTRICT: LICENSEE:
MIDPENINSULA REGIONAL OPEN CITY OF PALO ALTO
SPACE DISTRICT
Ana M. Ruiz, General Manager City Manager or designee
Date Date
ATTEST: APPROVED AS TO FORM:
Maria Soria, District Clerk City Attorney or designee
Date:
APPROVED AS TO FORM:
Hilary Stevenson, General Counsel
Attachments
Exhibit A – Site Map
Exhibit B – Alignment Plan
Exhibit C – Construction Plans
Pa
t
h
:
G
:
\
P
r
o
j
e
c
t
s
\
a
_
D
i
s
t
r
i
c
t
w
i
d
e
\
E
a
s
e
m
e
n
t
s
\
E
a
s
e
m
e
n
t
s
.
a
p
r
x
Cr
e
a
t
e
d
B
y
:
a
c
o
s
t
a
n
z
a
While the District strives to use the best available digital data, these data do not represent a legal survey and are merely a graphic illustration of geographic features.
Midpeninsula Regional
Open Space District
(Midpen)
4/3/2025
0 0.250.125
Miles
I
Proposed underground utility easement
(MROSD to grant to City of Palo Alto)
Other protected lands
Private property
Midpen preserves
Exhibit A - Site Map
!#
R A N C H O S A N
A N T O N I O O P E N
S P A C E P R E S E R V E
M O N T E B E L L O
O P E N S P A C E
P R E S E R V E
Ind
ian
Creek
Ad
obe
Creek
Steven
sCreek
West
F
ork
A
dobe
C
r
e
e
k
Montebello
Ro
a
d
Bella Vista Tr
a
i
l
IndianCreek Trail
PageMill Tr
a
il Ad
o
b
eCreekTrail
Black M
oun
tainTrail
SkidRoad Trail
Quarry Trail
Old RanchTrail
CanyonTrail
Adobe
C
reek
T
r
a
i
l
Adobe Creek Trail
Steven
s Creek NatureTrail
Black
Mountain
2,812'
22
0
0
20
0
0
18
0
0
2600
2400
2200
2000
200
0
180
0
2000
1800
2800
2800 2400
2000
2000
20
0
0
180
0
1600
20
0
0
20
0
0
35125014
3510900235106025
35112069
HIDDEN VILLA
!
!
!!
!
!
!
!
!
!
!
Area of detail
FOOTHILLS
LA HONDA
CREEK
LONG RIDGE
SARATOGA
GAP
THORNEWOOD
WINDY HILL
RANCHO SAN
ANTONIOCOAL CREEK
LOS TRANCOS
MONTE
BELLORUSSIAN RIDGE
ÄÆ35
ÄÆ84
ÄÆ9
ÄÆ280
Los Altos
Existing overhead utility easement
(City of Palo Alto to vacate)
Trail
Unpaved all-season road
Unpaved seasonal road
Paved roadCounty parcel
NOTE: The easements shown are graphical
visualizations only; it is not an assessed interest.
For surveyed location of easements, reference
Cross Lands Surveying Inc. Project NO. 22-146
dated 3/15/2024.
Existing overhead electrical line
&
&
Easement 1
&
&
Easement 2
&
&
Easement 3
1260
MONTE BEL
L
O
R
O
A
D
3
2-1
/
0
A
L
F8A
E
L
F
772
749
8
55'50'
677
0
50'
676
8
50'
676
9
50'
677
1
45'
677
2
10
646
1
F
P
P
P
PP
P
PP
P
P
P
P
S
TX
P
A
D
54
"
x
6
0
"
P
PPPP
P
600'
700'
12'
60'
F
PB40409
3'X5'
FIBER BOX
30"X48"
PP
P
P
P
P
P
PP
P
P
P
P
P
P
P
13
5
'
P
P
P
P
P
P
P
P
P
P
P
P
P 55
0
'
PB40416
3'X5'
FIBER BOX
30"X48"
LB30070
LB VAULT - 3'X5'
LB PAD - 4'X6'
500
'
500
'
16
17
18
19
20
F
FIBER BOX
30"X48"
Public
Utility
Easement
20' Wide
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP # SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
5 10
LOCATION 17 - LB30070
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30070
1 - 4' X 6' LOAD BREAK PAD 30070
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 18 - PB40406
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40406
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 19 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 20 - PB40409
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40409
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 16 & 17
~550' - 2-3.63" PRIMARY CONDUIT FROM NEW
PB 40416 TO NEW LB 30070
~550' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 17 & 18
~275' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB30070 TO NEW PB 40406
~275' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 18 & 19
~10' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40406 TO NEW XFMR PAD
BETWEEN LOCATION 19 & 19A
~60' - 1-3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO EXISTING JUNCTION
BOX
BETWEEN LOCATION 17 & 20
~700' - 2-3.63" PRIMARY CONDUIT FROM NEW
LB 30070 TO NEW PB 40409
~700' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
Exhibit B - Alignment Plan
MONTE BEL
L
O
R
O
A
D
2-
#
6
C
O
P
P
E
R
W
E
L
D
2-#
6
C
O
P
P
E
R
W
E
L
D
50'
677
1
45'
677
2
50'
677
3
45'
677
4
F
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
PP
P
P
P
P
PB40403
3'X5'
PB40405
3'X5'
60
0
'
600'
600'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
F
PB40404
3'X5'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P
P
P
F
PB40409
3'X5'
FIBER BOX
30"X48"
PP
P
P
P
P
P
P
20
21
22
23
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
6 10
LOCATION 20 - PB40409
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40409
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 21 - PB40405
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40405
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 22 - PB40404
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40404
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 23 - PB40403
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40403
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 20 & 21
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40409 TO NEW PB 40405
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 21 & 22
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40405 TO NEW PB 40404
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 22 & 23
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40404 TO NEW PB 40403
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
MON
T
E
B
E
L
L
O
R
O
A
D
MO
N
T
E
B
E
L
L
O
R
O
A
D
2-#
6
C
O
P
P
E
R
W
E
L
D
2-#
6
C
O
P
P
E
R
W
E
L
D
45'
677
4
45'
677
5
45'
677
6
40'
677
7
45'
677
8
45'
677
9
40'
678
1
45'
678
0
45'
678
4
F
F
P
P
F
P
P
P
P
P
P
P
P
F
PPP
P
PPPP
P
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PB40399
3'X5'
PB40400
3'X5'
PB40401
3'X5'
PB40402
3'X5'
PB40403
3'X5'
600'
600
'
600'
60
0
'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
FIBER BOX
30"X48"
FIBER BOX
30"X48"
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
600'
23
24
25
26
27
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
7 10
LOCATION 24 - PB40402
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40402
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 25 - PB40401
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40401
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 26 - PB40400
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40400
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 24 & 25
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40402 TO NEW PB 40401
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 25 & 26
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40401 TO NEW PB 40400
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 26 & 27
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40400 TO NEW PB 40399
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
3
#2 TRI
2-#6 CO
P
P
E
R
W
E
L
D
2-#6 C
O
P
P
E
R
W
E
L
D
45'
679
4
40'
679
6
45'
678
0
45'
678
4
45'
678
5
POL
E
SER
V
I
C
E
40'
678
7
35'
679
3
30'
678
9
50'
678
8
45'
679
1
10
646
7
15
450
3
F
P
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
F
SS
TX P
A
D
54"X
6
0
"
PB40395
3'X5'
PB40396
3'X5'
PB40399
3'X5'
LB30060
LB VAULT - 3'X5'
LB PAD - 4'X6'
380'
95'
575'600'85
'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
25'
FIBER BOX
30"X48"
PB40397
3'X5'
S
S
S
S
S
S
S
S
S
S
S
S
S
S
585
'
10'
2 - 3.63"
P
P
P
P
P
PPPPPPP
P
P
P
600'
F
P
P
P
P
P
P
P
P
PFIBER BOX
30"X48"
BOX
24"X36"
27
28
29
30
30A
30B
30C
31
32
33
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
8 10
LOCATION 27 - PB40399
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40399
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 28 - LB30060
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3'
X 5' LOAD BREAK PAD 30060
1 - 3' X 5' LOAD BREAK PAD 30060
LOCATION 29 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 30
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 30B - PB40397
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40397
WITH FULL TRAFFIC COVER
LOCATION 31
INSTALL
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 32 - PB40396
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40396
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 26 & 27
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40400 TO NEW PB 40399
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 27 & 28
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40399 TO NEW LB 30060
BETWEEN LOCATION 28 & 29
~25' - 1 -3.63" PRIMARY CONDUIT FROM NEW
LB 30060 TO NEW XFMR PAD
BETWEEN LOCATION 29 & 30
~10' - 4-3.63" SECONDARY CONDUIT FROM
NEW 54" X 60" XFMR PAD TO NEW 24" X 36"
JUNCTION BOX
BETWEEN LOCATION 30 & 30A
~95' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24" X 36" JUNCTION BOX TO EXISTING
JUNCTION BOX
BETWEEN LOCATION 30 & 30B
~585' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24" X 36" JUNCTION BOX TO NEW PB
40397
BETWEEN LOCATION 30B & 30C
~6' - 1 - 3.63" SECONDARY CONDUIT FROM
PB 40397 TO NEW 3" RISER
BETWEEN LOCATION 30 & 32
~400'- 1-3.63" PRIMARY CONDUIT FROM NEW
LB 30060 TO NEW PB 40396
BETWEEN LOCATION 27 & 31
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 31 & 32
~400' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 32 & 33
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40396 TO NEW PB 40395
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
****NOTE****
THE SCOPE OF WORK BETWEEN LOCATION
30, 30B, & 30C MAY BE REMOVED AS OPEN
SPACE MAY NOT NEED CPAU ELECTRIC
SERVICE
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
2-#6 C
O
P
P
E
R
W
E
L
D
45'
679
7
F
F
PB40395
3'X5'
600'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P P P
P
P
P
P
PPPPPPP
600'
33
34
17
1
9
17
2
1
17
2
3
17
2
5MO
N
T
E
B
E
L
L
O
R
O
A
D
N48
PB1061 2-#4 ACSR
TRI2-#4
A
C
S
R
F6A
ELF
773
679
8
45'
40'
679
9
P
P
P
P
P
P
P
P
P
P
P
P
40'
680
0
F
TX PAD
54"X60"
LB30059
LB VAULT - 3'X5'
LB PAD - 4'X6'
125
'
125'
FIBER BOX
30"X48"
5'
P
P
P
P
35
36
37
37A
S
S
S
S
125'
PB40394
3'X5'
FIBER BOX
30"X48"
5'
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXTLEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
9 10
LOCATION 33 - PB40395
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40395
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 34 - PB40394
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40394
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 35 - LB30059
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30059
1 - 4' X 6' LOAD BREAK PAD 30059
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 36 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 37
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 37A
INSTALL
1 - 3" RISER
LOCATION 37B
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 37C
INSTALL
1 - 3" RISER
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 33 & 34
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40395 TO NEW PB 40394
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 34 & 35
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40394 TO NEW LB 30059
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 35 & 36
~5' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB 30059 TO NEW XFMR PAD
BETWEEN LOCATION 36 & 37
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 SECONDARY
BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW 24X36 SECONDARY BOX
BETWEEN LOCATION 37 & 37A
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6799
BETWEEN LOCATION 37 & 37B
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
BETWEEN LOCATION 37B & 37C
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6800
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
17
4
1
17
5
7
17
2
3
17
2
5
17
2
7
17
2
9
2-#4 ACSR
TRI2-#4
A
C
S
R
OPEN
W
I
R
E
2-#4
A
C
S
R
2-#4 AC
S
R
3
3-
#
2
S
T
R
C
U
35'
680
1
35'
680
2
35'
680
3
35'
680
4
40'
680
5
40'
6806
25
774
7
25
7599
SET
A
T
T
A
P
"
B
"
37.5
780
5
97.5
%
PPPPPPPP
P
P
P
P
P
P
40'
680
0
S
S
SF
F
TX PAD
54"X60"
PB40391
3'X5'
PB40392
3'X5'
BOX
24"X36"
600
'
175'
600'
FIBER BOX
30"X48"
FIBER BO
X
30"X48"
TX PAD
54"X60"
7'
25'
5'
15'
P
P
P
P
P
P
P
P
P
P
P
P
P
P
F
PB40408
3'X5'
FIBER BO
X
30"X48"
PPP
P
P
P
375'
37
38
39
40
41
41A
41B
42
37B
S
S125'
42B
5'
37C
15'
42A
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
MP NEXT LEVEL SUBSTRUCTURE
P.VALATH
P.VALATH
P.VALATH
V.RIOS
NTS
----HV-20
10 10
LOCATION 36 - TX PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 37
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 37A
INSTALL
1 - 3" RISER
LOCATION 37B
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 37C
INSTALL
1 - 3" RISER
LOCATION 38 - PB40408
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40408
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 39 - PB40392
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40392
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 40 - PB40391
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40391
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 41 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 41A
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 41B - POLE 6805
INSTALL
1 - 3" RISER
LOCATION 42
INSTALL
1 - 24" X 36" JUNCTION BOX
LOCATION 42A - EXISTING
JUNCTION BOX
LOCATION 42B - POLE 6806
INSTALL
1 - 3" RISER
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 35 & 36
~5' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB 30059 TO NEW TX PAD
BETWEEN LOCATION 36 & 37
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW TX PAD TO NEW 24X36 SECONDARY
BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW 24X36 SECONDARY BOX
BETWEEN LOCATION 37 & 37A
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6799
BETWEEN LOCATION 37 & 37B
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
BETWEEN LOCATION 37B & 37C
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6800
BETWEEN LOCATION 35 & 38
~270' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB30059 TO NEW PB 40408
~270' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 38 & 39
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40408 TO NEW PB 40392
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 39 & 40
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40392 TO NEW PB 40391
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 40 & 41
~15' - 1 -3.63" PRIMARY CONDUIT FROM NEW
PB 40391 TO NEW XFMR PAD
BETWEEN LOCATION 41 & 41A
~25' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 JUNCTION
BOX
BETWEEN LOCATION 41A & 41B
~5' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW JUNCTION BOX TO NEW 3" RISER
BETWEEN LOCATION 41 & 42
~105' - 1 -3.63" PRIMARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 JUNCTION
BOX
~105' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW 24X36 JUNCTION BOX
BETWEEN LOCATION 42 & 42A
~15' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW 24X36 JUNCTION BOX TO EXISTING
JUNCTION BOX
BETWEEN LOCATION 42A & 42A
~5' - 1 - 3" RISER FROM NEW 24X36
JUNCTION BOX TO EXISTING POLE
LEGEND
-RED- NEW, INSTALL ELECTRICAL
-MAGENTA- NEW, INSTALL FIBER
-GREEN - REMOVE
-BLACK-EXISTING
NO WORK TO BE DONE PAST LOCATION 19 UNTIL
APPROVAL FROM CPAU ENGINEERING FOR
EASEMENT RELOCATION. DRAWINGS INCLUDED
FOR REFERENCE ONLY
DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C
Brandon Grossman
Brandon Grossman
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP # SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
TITLE SHEET
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
1 27
26
F
Exhibit C - Construction Plans
P
P
P
P
P
P
P
50'
6768
50'
6769
F
S
TX PAD
54" x60"
PPPPPPP
P
5'
30'
P
P
P
13
5
'
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P P P
55
0
'
PB40396
3'X5'
FIBER BOX
30"X48"
LB30070
LB VAULT - 3'X5'
LB PAD - 4'X6'
500
'
500
'
16
17
18
19
FFIBER BOX
30"X48"
Public
Utility
Easement
20' Wide
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
2 27
WORK DONE PREVIOUSLY TO
LOCATION 17, 18, AND 19. FURTHER
WORK REQUIRES EASEMENT FROM
MID-PENINSULA OPEN SPACE.
THESE DRAWINGS ARE
OVERLAYED ON THE MOST RECENT
SURVEY OF THE AREA DATED
3.15.2024. THIS DRAWING PACKAGE
HAS REMOVED PREVIOUSLY
FINISHED WORK FROM SCOPE.
THIS PHASE OF THE PROJECT
WILL BEGIN FROM LOCATION 17
AND END AT LOCATION 42A.
LOCATION 16 - PB40396
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40396
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 17 - LB30070
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30070
1 - 4' X 6' LOAD BREAK PAD 30070
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 18 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 19 - STUB OUT
INSTALL
INSTALL CONDUIT TO EXISTING VAULT NEAR
POLE
STUB OUT CONDUIT OUTSIDE OF
RESERVOIR GATE
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 16 & 17
~550' - 2-3.63" PRIMARY CONDUIT FROM NEW
PB 40416 TO NEW LB 30070
~550' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 17 & 18
~5' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40406 TO NEW XFMR PAD
BETWEEN LOCATION 18 & 19
~30' - 1-3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO EXISTING JUNCTION
BOX
~60' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO STUB OUT
BETWEEN LOCATION 17 & 20
~700' - 2-3.63" PRIMARY CONDUIT FROM NEW
LB 30070 TO NEW PB 40409
~700' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
1260
MONTE BELLO ROAD
50'
6769
S
TX PAD
54" x60"
PPPPPPP
P
700'
5'
30'
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
13
5
'
P
P
P P P P
LB30070
LB VAULT - 3'X5'
LB PAD - 4'X6'
17
18
19
FFIBER BOX
30"X48"
MATCHLINE A MATCHLINE A
PROPOSED
BORE PIT 2
PROPOSED
BORE PIT 1
TEMPORARY
STAGING
AREA 1
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
3 27
WORK DONE PREVIOUSLY TO
LOCATION 17, 18, AND 19. FURTHER
WORK REQUIRES EASEMENT FROM
MID-PENINSULA OPEN SPACE.
THESE DRAWINGS ARE
OVERLAYED ON THE MOST RECENT
SURVEY OF THE AREA DATED
3.15.2024. THIS DRAWING PACKAGE
HAS REMOVED PREVIOUSLY
FINISHED WORK FROM SCOPE.
THIS PHASE OF THE PROJECT
WILL BEGIN FROM LOCATION 17
AND END AT LOCATION 42A.
LOCATION 17 - LB30070
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30070
1 - 4' X 6' LOAD BREAK PAD 30070
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 18 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 19 - STUB OUT
INSTALL
INSTALL CONDUIT TO EXISTING VAULT NEAR
POLE
STUB OUT CONDUIT OUTSIDE OF
RESERVOIR GATE
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 16 & 17
~550' - 2-3.63" PRIMARY CONDUIT FROM NEW
PB 40416 TO NEW LB 30070
~550' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 17 & 18
~5' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40406 TO NEW XFMR PAD
BETWEEN LOCATION 18 & 19
~30' - 1-3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO EXISTING JUNCTION
BOX
~60' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO STUB OUT
BETWEEN LOCATION 17 & 20
~700' - 2-3.63" PRIMARY CONDUIT FROM NEW
LB 30070 TO NEW PB 40409
~700' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
MONTE BELLO ROAD
50'
6771
45'
6772
F
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
PP
P
P
P
P
P
P
P
PPP
PB40405
3'X5'
600'
FIBER BOX
30"X48"
P
P
P
P
P
F
PB40409
3'X5'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
20
21
MATCHLINE A MATCHLINE A
MATCHLINE B
MATCHLINE B
PROPOSED
BORE PIT 3
PROPOSED
BORE PIT 2
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
4 27
LOCATION 20 - PB40409
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40409
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 21 - PB40405
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40405
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 17 & 20
~700' - 2-3.63" PRIMARY CONDUIT FROM NEW
LB 30070 TO NEW PB 40409
~700' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 20 & 21
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40409 TO NEW PB 40405
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
50'
6773
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
60
0
'
600'
F PB40404
3'X5'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
22
MATCHLINE B
MATCHLINE B
MATCHLINE C
MATCHLINE C
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 4
AND 5
PROPOSED
BORE PIT 4
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
5 27
LOCATION 22 - PB40404
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40404
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 21 & 22
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40405 TO NEW PB 40404
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 22 & 23
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40404 TO NEW PB 40403
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
45'
6774
45'
6775
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PB40403
3'X5'
60
0
'
FIBER BOX
30"X48"
23
MATCHLINE C
MATCHLINE C
MATCHLINE D
MATCHLINE D
PROPOSED
BORE PIT 5
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 4
AND 5
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
6 27
LOCATION 23 - PB40403
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40403
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 22 & 23
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40404 TO NEW PB 40403
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 23 & 24
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40403 TO NEW PB 40402
~600' - 1- 3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
MO
N
T
E
B
E
L
L
O
R
O
A
D
45'
6776
PP
P
P
P
P
P
P
PPPPPPPPP
P
P
P
P
P
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PB40402
3'X5'
600
'
600'
FIBER BOX
30"X48"
24
MATCHLINE D
MATCHLINE D
MATCHLINE E MATCHLINE E
PROPOSED
BORE PIT 6
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
7 27
LOCATION 24 - PB40402
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40402
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 24 & 25
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40402 TO NEW PB 40401
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 25 & 26
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40401 TO NEW PB 40400
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
MON
T
E
B
E
L
L
O
R
O
A
D
40'
6777
45'
6778
45'
6779
F
F
P
P
P
P
P
PPPPPPP
PB40400
3'X5'
PB40401
3'X5'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
600
'
25
26
MATCHLINE E MATCHLINE E
MATCHLINE F
MATCHLINE F
PROPOSED
BORE PIT 8
PROPOSED
BORE PIT 7
TEMPORARY
STAGING
AREA 2
PROPOSED
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 8
AND 9
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
8 27
LOCATION 25 - PB40401
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40401
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 26 - PB40400
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40400
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 24 & 25
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40402 TO NEW PB 40401
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 25 & 26
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40401 TO NEW PB 40400
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 26 & 27
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40400 TO NEW PB 40399
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
45'
6779
40'
6781
45'
6780
F
P
P
P
P
P
P
P
PP
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PB40399
3'X5'
600'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
27
MATCHLINE F
MATCHLINE F
MATCHLINE G
PROPOSED
BORE PIT 9
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 8
AND 9
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 8
AND 9
PROPOSED
BORE PIT 8
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
9 27
LOCATION 27 - PB40399
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40399
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 26 & 27
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40400 TO NEW PB 40399
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 27 & 28
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40399 TO NEW LB 30060
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
40'
6787
30'
6789
50'
6788
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
TX PAD
54"X60"
PB40396
3'X5'
LB30060
LB VAULT - 3'X5'
LB PAD - 4'X6'
450'
95'
575'
600'
FIBER BOX
30"X48"
2 - 3.63"
P
PPPPP
P
P
P
P
P
P
P
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
FIBER BOX
30"X48"
SECONDARY
BOX
24"X36"
28
29
30
31
32
3RD PARTY
SERVICE POLE
MATCHLINE G MATCHLINE G
MATCHLINE H MATCHLINE H
S
S
S
40'
20'
POLE 6789 AND 3RD
PARTY SERVICE
POLE INTENDING TO
REMAIN. WILL BE
OWNED BY 3RD
PARTY
PROPOSED
BORE PIT 11
PROPOSED
BORE PIT 10
TEMPORARY
STAGING
AREA 3
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT
EXTENSION FOR
PROPOSED
EQUIPMENT 20'X40'
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
PROPOSED EASEMENT
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
10 27
LOCATION 28 - LB30060
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3'
X 5' LOAD BREAK PAD 30060
1 - 3' X 5' LOAD BREAK PAD 30060
3 - BOLLARDS
LOCATION 29 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 30 - SECONDARY BOX
NO SUBSTRUCTURE WORK TO BE
PERFORMED. BOX MAY REQUIRE
REPLACEMENT.
LOCATION 31 - FIBER BOX
INSTALL
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 32 - PB40396
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40396
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 27 & 28
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40399 TO NEW LB 30060
BETWEEN LOCATION 28 & 29
~25' - 1 -3.63" PRIMARY CONDUIT FROM NEW
LB 30060 TO NEW XFMR PAD
BETWEEN LOCATION 29 & 30
~30' - 1-3.63" SECONDARY CONDUIT FROM
NEW 54" X 60" XFMR PAD TO EXISTING
SECONDARY BOX
BETWEEN LOCATION 28 & 32
~450'- 1-3.63" PRIMARY CONDUIT FROM NEW
LB 30060 TO NEW PB 40396
BETWEEN LOCATION 27 & 31
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 31 & 32
~450' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 32 & 33
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40396 TO NEW PB 40395
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
****NOTE****
THE SCOPE OF WORK TO BRING POWER TO
PUMP NEAR "BACKPACK CAMP" IS
REMOVED. POLE LINE TO BE ENTIRELY
REMOVED TO THAT PUMP.
PROPOSED EASEMENT DIMENSION TO BE
20'X40' AS SHOWN ON PLAN. FIELD
CONDITIONS MAY DICTATE AN ALIGNMENT
ADJUSTMENT
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
F
PB40395
3'X5'
600'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PPPPPPPPPP
600'
33
MATCHLINE H MATCHLINE H
MATCHLINE I MATCHLINE I
PROPOSED
BORE PIT 13
PROPOSED
BORE PIT 12
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
11 27
LOCATION 33 - PB40395
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40395
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 32 & 33
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40396 TO NEW PB 40395
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 33 & 34
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40395 TO NEW PB 40394
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
45'
6797
F
P
P P P P P P P
P
34
17
1
9
17
2
1
17
2
3
17
2
5MO
N
T
E
B
E
L
L
O
R
O
A
D
6798
45'
40'
6799
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
40'
6800
F
TX PAD
54"X60"
LB30059
LB VAULT - 3'X5'
LB PAD - 4'X6'
12
5
'
FIBER BOX
30"X48"
5'
P
P
P
P
P
P
P
P
P
P
P
P
P
P
375'
35
36
37
37A
37B
S
S
S
S
S
S
S
S
S
S
S
S
125'
PB40394
3'X5'
FIBER BOX
30"X48"
5'
5'
37C
MATCHLINE I MATCHLINE I
MATCHLINE J MATCHLINE J
40'
20'
10' WIDE
EASEMENT
EASEMENT EXTENSION
FOR PROPOSED
EQUIPMENT 20'X40'
POLE 6799 AND 6800
POLE INTENDING TO
REMAIN. CO-OWNED
BY CPAU AND AT&T,
EXISTING ELECTRIC
SERVICE DROPS TO
BUILDINGS ON SITE
PROPOSED
BORE PIT 16
PROPOSED
BORE PIT 15
PROPOSED
BORE PIT 14
TEMPORARY
STAGING
AREA 4
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
12 27
LOCATION 34 - PB40394
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40394
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 35 - LB30059
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4'
X 6' LOAD BREAK PAD 30059
1 - 4' X 6' LOAD BREAK PAD 30059
3 - BOLLARDS
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 36 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
LOCATION 37 - SECONDARY BOX
INSTALL
1 - 24" X 36" SECONDARY BOX
LOCATION 37A - POLE 6799
INSTALL
1 - 3" RISER
LOCATION 37B - SECONDARY
INSTALL
1 - 24" X 36" SECONDARY BOX
LOCATION 37C - POLE 6800
INSTALL
1 - 3" RISER
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 33 & 34
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40395 TO NEW PB 40394
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 34 & 35
~600' - 1-3.63" PRIMARY CONDUIT FROM NEW
PB 40394 TO NEW LB 30059
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 35 & 36
~5' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB 30059 TO NEW XFMR PAD
BETWEEN LOCATION 36 & 37
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 SECONDARY
BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW 24X36 SECONDARY BOX
BETWEEN LOCATION 37 & 37A
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6799
BETWEEN LOCATION 37 & 37B
~125' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
~125' - 1-3.63" FIBER CONDUIT FROM NEW
24X36 SECONDARY BOX TO NEW 24X36
SECONDARY BOX
BETWEEN LOCATION 37B & 37C
~5' - 1-3.63" SECONDARY CONDUIT FROM
NEW 24X36 SECONDARY BOX TO POLE 6800
BETWEEN LOCATION 35 & 38
~375' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB30059 TO NEW PB 40408
~375' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
17
2
7
17
2
9
35'
6801
35'
6802
35'
6803
35'
6804
P
P
P
P
P
P
P
P
P
P
P
P
F
PB40392
3'X5'
600
'
600'
FIBER BOX
30"X48"
P P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
F
PB40408
3'X5'
FIBER BOX
30"X48"
PPPP
P
38
39
MATCHLINE J
MATCHLINE K MATCHLINE K
POLE 6799 AND 6800
POLE INTENDING TO
PROPOSED
BORE PIT 18
PROPOSED
BORE PIT 17
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
13 27
LOCATION 38 - PB40408
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40408
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 39 - PB40392
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40392
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 35 & 38
~375' - 1-3.63" PRIMARY CONDUIT FROM NEW
LB30059 TO NEW PB 40408
~375' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 38 & 39
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40408 TO NEW PB 40392
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 39 & 40
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40392 TO NEW PB 40391
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
17
4
1
17
5
7
3
3-
#
2
S
T
R
C
U
40'
6805
40'
6806
PPPPPPPPPPPPPP
P
P
P
S
S
S
S
S
S
SF
PB40391
3'X5'
SECONDARY
BOX
24"X36"
150'
FIBER BOX
30"X48"
S S S S S S S
TX PAD
54"X60"
7'
P
5'
40
4141A
41B
42
42
15'
P 42
MATCHLINE K MATCHLINE K
20'
20'
EASEMENT EXTENSION
FOR PROPOSED
EQUIPMENT 20'X20'
POLE 6805 AND 6806
POLE INTENDING TO
REMAIN. OWNED BY
CPAU, EXISTING
ELECTRIC SERVICE
DROPS TO
BUILDINGS ON SITE
150'
PROPOSED
BORE PIT 19
PROPOSED
BORE PIT 20
SECONDARY
BOX
24"X36"
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
FOR PROPOSED
EQUIPMENT 20'X20'
EASEMENT EXTENSION
FOR PROPOSED
EQUIPMENT 20'X20'
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
SUBSTRUCTURE
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
14 27
LOCATION 40 - PB40391
INSTALL
1 - 3' X 5' CPA3546 PRIMARY VAULT #40391
WITH FULL TRAFFIC COVER
1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE
FIBER BOX WITH FULL TRAFFIC TOP
LOCATION 41 - XFMR PAD
INSTALL
1 - 54" X 60" XFMR PAD
3 - BOLLARDS
LOCATION 41A - SECONDARY BOX
INSTALL
1 - 24" X 36" SECONDARY BOX
LOCATION 41B - POLE 6805
INSTALL
1 - 3" RISER
LOCATION 42 - SECONDARY BOX
INSTALL
1 - 24" X 36" SECONDARY BOX (INSTALL
OUTSIDE FENCE)
LOCATION 42A - EXISTING
JUNCTION BOX
LOCATION 42B - POLE 6806
INSTALL
1 - 3" RISER
CPAU CONDUIT INSTALLATION
BETWEEN LOCATION 39 & 40
~600' - 1 -3.63" PRIMARY CONDUIT FROM
NEW PB 40392 TO NEW PB 40391
~600' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW FIBER BOX
BETWEEN LOCATION 40 & 41
~15' - 1 -3.63" PRIMARY CONDUIT FROM NEW
PB 40391 TO NEW XFMR PAD
BETWEEN LOCATION 41 & 41A
~25' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 JUNCTION
BOX
BETWEEN LOCATION 41A & 41B
~5' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW JUNCTION BOX TO NEW 3" RISER
BETWEEN LOCATION 41 & 42
~105' - 1 -3.63" PRIMARY CONDUIT FROM
NEW XFMR PAD TO NEW 24X36 JUNCTION
BOX
BETWEEN LOCATION 40 & 42
~105' - 1-3.63" FIBER CONDUIT FROM NEW
FIBER BOX TO NEW 24X36 JUNCTION BOX
BETWEEN LOCATION 42 & 42A
~15' - 1 - 3.63" SECONDARY CONDUIT FROM
NEW 24X36 JUNCTION BOX TO EXISTING
JUNCTION BOX
BETWEEN LOCATION 42A & 42A
~5' - 1 - 3" RISER FROM NEW 24X36
JUNCTION BOX TO EXISTING POLE
CONSTRUCTION NOTES:
1.ALL OPEN EXCAVATIONS REQUIRE
TRENCH PLATES AND PROPER
DELINEATIONS AT THE END OF
EVERY DAY.
2.COMPACT AND BACKFILL ANY
OPEN EXCAVATION PER CITY OF
PALO ALTO STANDARD
DT-SS-U-1003 NOTE 8. BACKFILL IN
UNIMPROVED AREAS
3.SEE APPENDIX FOR DETAILS
REGARDING BEST MANAGEMENT
PRACTICES (BMP).
PA
C
B
E
L
L
M
E
T
E
R
4X4PB11
8
6
2-#6 COPPERWELD & 1-
#
6
B
C
U
1/0
A
L
T
R
I
50'
6767
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
4201
3-#2
A
L
P
R
I
50'
6768
15
0
12
0
/
2
0
8
Y
60
2
4
F
P
P
P
P
P
P
P
P
P
55
0
'
PB40396
3'X5'
FIBER BOX
30"X48"
500
'
500
'
Public
Utility
Easement
20' Wide
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
15 27
LOCATION 1
CPAU POLE 6767
REMOVE
3 - 8' CROSSARMS
1 - 10' CROSSARMS
4 - BELLS
6 - D.E. INSULATORS
6 - CUTOUTS
3 - FUSES
TOP WOOD POLE
LOCATION 2
CPAU POLE 6768
REMOVE
1 - 50' WOOD POLE
2 - 8' CROSSARMS
4 - BELLS
CPAU CABLE REMOVAL
BETWEEN LOCATION 1 & 2
~630' - 3-1/0 AL WIRE FROM POLE 6767 TO
POLE 6768
BETWEEN LOCATION 2 & 3
~350' - 3-1/0 AL WIRE FROM POLE 6768 TO
POLE 6769
1
2
1260
MONTE BELLO ROAD
50'
6769
S
TX PAD
54" x60"
PPPPPPP
P
700'
5'
30'
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
13
5
'
P
P
P P P P
LB30070
LB VAULT - 3'X5'
LB PAD - 4'X6'
FFIBER BOX
30"X48"
MATCHLINE A MATCHLINE A
PROPOSED
BORE PIT 2
PROPOSED
BORE PIT 1
TEMPORARY
STAGING
AREA 1
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
16 27
LOCATION 3
CPAU POLE 6769
REMOVE
1 - 50' WOOD POLE
4 - 8' CROSSARMS
2 - FUSES
16 - D.E. INSULATORS
4 - CUTOUTS
1 - GUY ANCHORS
CPAU CABLE REMOVAL
BETWEEN LOCATION 2 & 3
~350' - 3-1/0 AL WIRE FROM POLE 6768 TO
POLE 6769
BETWEEN LOCATION 3 & 4
~460' - 3-1/0 AL WIRE FROM POLE 6769 TO
POLE 6771
3
MONTE BELLO ROAD
50'
6771
45'
6772
F
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
PP
P
P
P
P
P
P
P
PPP
PB40405
3'X5'
600'
FIBER BOX
30"X48"
P
P
P
P
P
F
PB40409
3'X5'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
MATCHLINE A MATCHLINE A
MATCHLINE B
MATCHLINE B
PROPOSED
BORE PIT 3
PROPOSED
BORE PIT 2
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
17 27
LOCATION 4
CPAU POLE 6771
REMOVE
1- 50' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
LOCATION 5
CPAU POLE 6772
REMOVE
1 - 45' WOOD POLE
2 - 8' CROSSARMS
4 - BELLS
1 - GUY ANCHORS
CPAU CABLE REMOVAL
BETWEEN LOCATION 3 & 4
~460' - 3-1/0 AL WIRE FROM POLE 6769 TO
POLE 6771
BETWEEN LOCATION 4 & 5
~340' - 3-1/0 AL WIRE FROM POLE 6771 TO
POLE 6772
BETWEEN LOCATION 5 & 6
~700' - 3-1/0 AL WIRE FROM POLE 6772 TO
POLE 6773
4
5
50'
6773
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
60
0
'
600'
F PB40404
3'X5'
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
MATCHLINE B
MATCHLINE B
MATCHLINE C
MATCHLINE C
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 4
AND 5
PROPOSED
BORE PIT 4
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
18 27
LOCATION 6
CPAU POLE 6773
REMOVE
1 - 50' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
1 - GUY ANCHORS
CPAU CABLE REMOVAL
BETWEEN LOCATION 5 & 6
~700' - 3-1/0 AL WIRE FROM POLE 6772 TO
POLE 6773
BETWEEN LOCATION 6 & 7
~350' - 3-1/0 AL WIRE FROM POLE 6773 TO
POLE 6774
6
45'
6774
45'
6775
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PB40403
3'X5'
60
0
'
FIBER BOX
30"X48"
MATCHLINE C
MATCHLINE C
MATCHLINE D
MATCHLINE D
PROPOSED
BORE PIT 5
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 4
AND 5
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
19 27
LOCATION 7
CPAU POLE 6774
REMOVE
1 - 45' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
LOCATION 8
CPAU POLE 6775
REMOVE
1 - 45' WOOD POLE
2 - 8' CROSSARMS
4 - BELLS
1 - GUY ANCHORS
CPAU CABLE REMOVAL
BETWEEN LOCATION 6 & 7
~350' - 3-1/0 AL WIRE FROM POLE 6773 TO
POLE 6774
BETWEEN LOCATION 7 & 8
~500' - 3-1/0 AL WIRE FROM POLE 6774 TO
POLE 6775
BETWEEN LOCATION 8 & 9
~520' - 3-1/0 AL WIRE FROM POLE 6775 TO
POLE 6776
7
8
MO
N
T
E
B
E
L
L
O
R
O
A
D
45'
6776
PP
P
P
P
P
P
P
PPPPPPPPP
P
P
P
P
P
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PB40402
3'X5'
600
'
600'
FIBER BOX
30"X48"
MATCHLINE D
MATCHLINE D
MATCHLINE E MATCHLINE E
PROPOSED
BORE PIT 6
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
20 27
LOCATION 9
CPAU POLE 6776
REMOVE
1 - 45' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
CPAU CABLE REMOVAL
BETWEEN LOCATION 8 & 9
~520' - 3-1/0 AL WIRE FROM POLE 6775 TO
POLE 6776
BETWEEN LOCATION 9 & 10
~440' - 3-1/0 AL WIRE FROM POLE 6776 TO
POLE 6777
9
MON
T
E
B
E
L
L
O
R
O
A
D
40'
6777
45'
6778
45'
6779
F
F
P
P
P
P
P
PPPPPPP
PB40400
3'X5'
PB40401
3'X5'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
600
'
MATCHLINE E MATCHLINE E
MATCHLINE F
MATCHLINE F
PROPOSED
BORE PIT 8
PROPOSED
BORE PIT 7
TEMPORARY
STAGING
AREA 2
PROPOSED
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 8
AND 9
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
21 27
LOCATION 10
CPAU POLE 6777
REMOVE
1 - 40' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
LOCATION 11
CPAU POLE 6778
REMOVE
1 - 45' WOOD POLE
2 - 8' CROSSARMS
4 - BELLS
1 - GUY ANCHORS
LOCATION 12
CPAU POLE 6779
REMOVE
1 - 45' WOOD POLE
2 - 8' CROSSARMS
4 - BELLS
2 - GUY ANCHORS
CPAU CABLE REMOVAL
BETWEEN LOCATION 9 & 10
~440' - 3-1/0 AL WIRE FROM POLE 6776 TO
POLE 6777
BETWEEN LOCATION 10 & 11
~410' - 3-1/0 AL WIRE FROM POLE 6777 TO
POLE 6778
BETWEEN LOCATION 11 & 12
~260' - 3-1/0 AL WIRE FROM POLE 6778 TO
POLE 6779
BETWEEN LOCATION 12 & 13
~350' - 3-1/0 AL WIRE FROM POLE 6779 TO
POLE 6780
10
11
12
45'
6779
40'
6781
45'
6780
F
P
P
P
P
P
P
P
PP
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PB40399
3'X5'
600'
FIBER BOX
30"X48"
FIBER BOX
30"X48"
MATCHLINE F
MATCHLINE F
MATCHLINE G
PROPOSED
BORE PIT 9
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 8
AND 9
OPEN TRENCH
REQUIRED
BETWEEN
PROPOSED
BORE PIT 8
AND 9
PROPOSED
BORE PIT 8
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
22 27
LOCATION 13
CPAU POLE 6780
REMOVE
1- 45' WOOD POLE
2 - 8' CROSSARMS
4 - D.E. INSULATORS
4 - BELLS
3 - GUY ANCHORS
LOCATION 14
CPAU POLE 6781
REMOVE
1 - 40' WOOD POLE
4 - BELLS
4 - 8' CROSSARMS
4 - D.E. INSULATORS
3 - GUY ANCHORS
CPAU CABLE REMOVAL
BETWEEN LOCATION 12 & 13
~350' - 3-1/0 AL WIRE FROM POLE 6779 TO
POLE 6780
BETWEEN LOCATION 13 & 14
~185' - 3-1/0 AL WIRE FROM POLE 6780 TO
POLE 6781
BETWEEN LOCATION 14 & 15
~230' - 3-1/0 AL WIRE FROM POLE 6781 TO
POLE 6784
12
13
14
45'
6780
45'
6784
45'
6785
40'
6787
30'
6789
50'
6788
45'
6791
F
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
PP
P
P
P
P
P
P
P
P
TX PAD
54"X60"
PB40399
3'X5'
LB30060
LB VAULT - 3'X5'
LB PAD - 4'X6'
95'
575'
600'
FIBER BOX
30"X48"
2 - 3.63"
P
F
P
P
P
P
P
FIBER BOX
30"X48"
SECONDARY
BOX
24"X36"
3RD PARTY
SERVICE POLE
MATCHLINE G MATCHLINE G
S
S
S
40'
20'
POLE 6789 AND 3RD
PARTY SERVICE
POLE INTENDING TO
REMAIN. WILL BE
OWNED BY 3RD
PARTY
PROPOSED
BORE PIT 10
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT
EXTENSION FOR
PROPOSED
EQUIPMENT 20'X40'
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
23 27
LOCATION 15
CPAU POLE 6784
REMOVE
1 - 45' WOOD POLE
4 - BELLS
2 - 8' CROSSARMS
4 - D.E. INSULATORS
2 - GUY ANCHORS
LOCATION 16
CPAU POLE 6785
REMOVE
1 - 45' WOOD POLE
4 - BELLS
2 - 8' CROSSARMS
4 - D.E. INSULATORS
1 - GUY ANCHORS
LOCATION 17
CPAU POLE 6787
REMOVE
1 - TOP 40' WOOD POLE
1 - 10 KVA PT TX 6467
2 - 8' CROSSARMS
2 - D.E. INSULATORS
4 - BELLS
2 - CUTOUTS
2 - FUSES
LOCATION 18
CPAU POLE 6789
REMOVE
1 - RISER
TOP WOOD POLE. POLE TO BE
RELINQUISHED TO AT&T
LOCATION 19
THIRD PARTY OWNED SERVICE POLE
NO WORK PROPOSED TO THIS POLE AS IT IS
OWNED BY THIRD PARTY
LOCATION 20
CPAU POLE 6788
REMOVE
1 - 50' WOOD POLE
4 - 8' CROSSARMS
2 - D.E. INSULATORS
5 - BELLS
2 - GUY ANCHORS
LOCATION 21
CPAU POLE 6791
REMOVE
1 - 45' WOOD POLE
4 - 8' CROSSARMS
4 - BELLS
2 - GUY ANCHORS
CPAU CABLE REMOVAL
BETWEEN LOCATION 14 & 15
~230' - 3-1/0 AL WIRE FROM POLE 6781 TO
POLE 6784
BETWEEN LOCATION 15 & 16
~230' - 3-1/0 AL WIRE FROM POLE 6784 TO
POLE 6785
BETWEEN LOCATION 16 & 17
~260' - 3-1/0 AL WIRE FROM POLE 6785 TO
POLE 6787
BETWEEN LOCATION 17 & 18
~100' - 1-1/0 AL TRIPLEX WIRE FROM POLE
6787 TO POLE 6789
BETWEEN LOCATION 17 & 20
~80' - 3-1/0 AL WIRE FROM POLE 6787 TO
POLE 6788
BETWEEN LOCATION 20 & 21
~280' - 3-1/0 AL WIRE FROM POLE 6788 TO
POLE 6791
13
14
15
16
17
18
19
20
21
45'
6794
40'
6796
POLE
SERVICE
35'
6793
45'
6791
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
24 27
LOCATION 22
CPAU POLE 6794
REMOVE
1 - TOP 45' WOOD POLE
1 - 15 KVA PT TX 4503
4 - 8' CROSSARMS
6 - BELLS
2 - GUY ANCHORS
3 - D.E. INSULATORS
2 - CUTOUTS
2 - FUSES
LOCATION 23
CPAU POLE 6793
REMOVE
1 - 35' WOOD POLE
1 - GUY ANCHOR
LOCATION 24
CPAU SERVICE POLE
REMOVE
1 - 35' WOOD POLE
1 - RISER
1 - METER
THE SCOPE OF WORK TO BRING POWER TO
PUMP NEAR "BACKPACK CAMP" IS
REMOVED. POLE LINE TO BE ENTIRELY
REMOVED TO THAT PUMP. DISCONNECT
METER AND PEDS.
LOCATION 25
CPAU POLE 6796
REMOVE
1 - 40' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
CPAU CABLE REMOVAL
BETWEEN LOCATION 21 & 22
~200' - 3-1/0 AL WIRE FROM POLE 6791 TO
POLE 6794
BETWEEN LOCATION 22 & 23
~150' - 1-1/0 AL TRIPLEX WIRE FROM POLE
6794 TO POLE 6793
BETWEEN LOCATION 23 & 24
~120' - 1-1/0 AL TRIPLEX WIRE FROM POLE
6793 TO SERVICE POLE
BETWEEN LOCATION 22 & 25
~430' - 3-1/0 AL WIRE FROM POLE 6794 TO
POLE 6796
BETWEEN LOCATION 25 & 26
~815' - 3-1/0 AL WIRE FROM POLE 6796 TO
POLE 6797
21
22
23
24
25
45'
6797
F
P
P P P P P P P
P
17
1
9
17
2
1
17
2
3
17
2
5MO
N
T
E
B
E
L
L
O
R
O
A
D
6798
45'
40'
6799
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
40'
6800
F
TX PAD
54"X60"
LB30059
LB VAULT - 3'X5'
LB PAD - 4'X6'
12
5
'
FIBER BOX
30"X48"
5'
P
P
P
P
P
P
P
P
P
P
P
P
P
P
375'
S
S
S
S
S
S
S
S
S
S
S
S
125'
PB40394
3'X5'
FIBER BOX
30"X48"
5'
5'
MATCHLINE I MATCHLINE I
MATCHLINE J MATCHLINE J
40'
20'
10' WIDE
EASEMENT
EASEMENT EXTENSION
FOR PROPOSED
EQUIPMENT 20'X40'
POLE 6799 AND 6800
POLE INTENDING TO
REMAIN. CO-OWNED
BY CPAU AND AT&T,
EXISTING ELECTRIC
SERVICE DROPS TO
BUILDINGS ON SITE
PROPOSED
BORE PIT 16
PROPOSED
BORE PIT 15
PROPOSED
BORE PIT 14
TEMPORARY
STAGING
AREA 4
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
25 27
LOCATION 26
CPAU POLE 6797
REMOVE
1 - 45' WOOD POLE
2 - BELLS
1 - 8' CROSSARMS
1 - GUY ANCHOR
LOCATION 27
CPAU POLE 6798
REMOVE
1- 45' WOOD POLE
2 - 8' CROSSARMS
4 - CUTOUTS
2 - FUSES
2 - BELLS
8 - D.E. INSULATORS
2 - GUY ANCHOR
LOCATION 28
CPAU POLE 6799
REMOVE
3 - 8' CROSSARMS
4 - BELLS
5 - D.E. INSULATORS
2 - GUY ANCHOR
TOP WOOD POLE, LEAVE SECONDARY
SERVICE DROP TO STRUCTURES. POLE
WILL BE INCLUDED IN EASEMENT TRANSFER
UNTIL ALL SERVICES ATTACHED TO POLE
ARE UNDERGROUNDED.
LOCATION 29
CPAU POLE 6800
REMOVE
1 - 8' CROSSARMS
2 - BELLS
2 - D.E. INSULATORS
2 - GUY ANCHOR
1 - 37.5 KVA PT TX 7805
2 - CUTOUTS
2 - FUSES
TOP WOOD POLE, LEAVE SECONDARY
SERVICE DROP TO STRUCTURES. POLE
WILL BE INCLUDED IN EASEMENT TRANSFER
UNTIL ALL SERVICES ATTACHED TO POLE
ARE UNDERGROUNDED.
CPAU CABLE REMOVAL
BETWEEN LOCATION 25 & 26
~815' - 3-1/0 AL WIRE FROM POLE 6796 TO
POLE 6797
BETWEEN LOCATION 26 & 27
~400' - 3-1/0 AL WIRE FROM POLE 6797 TO
POLE 6798
BETWEEN LOCATION 27 & 28
~150' - 3-1/0 AL WIRE FROM POLE 6798 TO
POLE 6799
BETWEEN LOCATION 28 & 29
~180' - 3-1/0 AL WIRE FROM POLE 6799 TO
POLE 6800
BETWEEN LOCATION 28 & 30
~290' - 3-1/0 AL WIRE FROM POLE 6799 TO
POLE 6801
26
27
28
29
17
2
7
17
2
9
35'
6801
35'
6802
35'
6803
35'
6804
P
P
P
P
P
P
P
P
P
P
P
P
F
PB40392
3'X5'
600
'
600'
FIBER BOX
30"X48"
P P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
F
PB40408
3'X5'
FIBER BOX
30"X48"
PPPP
P
MATCHLINE J
MATCHLINE K MATCHLINE K
POLE 6799 AND 6800
POLE INTENDING TO
PROPOSED
BORE PIT 18
PROPOSED
BORE PIT 17
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EXCLUSION MEASURE
AT TRAIL JUNCTIONS
REQUIRED
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
26 27
LOCATION 30
CPAU POLE 6801
REMOVE
1- 35' WOOD POLE
2 - 8' CROSSARMS
4 - BELLS
1 - GUY ANCHOR
LOCATION 31
CPAU POLE 6802
REMOVE
1- 35' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
1 - GUY ANCHOR
LOCATION 32
CPAU POLE 6803
REMOVE
1- 35' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
1 - GUY ANCHOR
LOCATION 33
CPAU POLE 6804
REMOVE
1- 35' WOOD POLE
1 - 8' CROSSARMS
2 - BELLS
4 - D.E. INSULATORS
1 - GUY ANCHOR
CPAU CABLE REMOVAL
BETWEEN LOCATION 28 & 30
~290' - 3-1/0 AL WIRE FROM POLE 6799 TO
POLE 6801
BETWEEN LOCATION 30 & 31
~225' - 3-1/0 AL WIRE FROM POLE 6801 TO
POLE 6802
BETWEEN LOCATION 31 & 32
~250' - 3-1/0 AL WIRE FROM POLE 6802 TO
POLE 6803
BETWEEN LOCATION 32 & 33
~300' - 3-1/0 AL WIRE FROM POLE 6803 TO
POLE 6804
BETWEEN LOCATION 33 & 34
~270' - 3-1/0 AL WIRE FROM POLE 6804 TO
POLE 6805
30
31
32
33
17
4
1
17
5
7
3
3-
#
2
S
T
R
C
U
40'
6805
40'
6806
PPPPPPPPPPPPPP
P
P
P
S
S
S
S
S
S
SF
PB40391
3'X5'
SECONDARY
BOX
24"X36"
150'
FIBER BOX
30"X48"
S S S S S S S
TX PAD
54"X60"
7'
P
5'
15'
P
MATCHLINE K MATCHLINE K
20'
20'
EASEMENT EXTENSION
FOR PROPOSED
EQUIPMENT 20'X20'
POLE 6805 AND 6806
POLE INTENDING TO
REMAIN. OWNED BY
CPAU, EXISTING
ELECTRIC SERVICE
DROPS TO
BUILDINGS ON SITE
150'
PROPOSED
BORE PIT 19
PROPOSED
BORE PIT 20
SECONDARY
BOX
24"X36"
EASEMENT EXTENSION
TO ENCOMPASS
ELECTRIC AND FIBER
VAULTS 9' WIDE (TYP.)
EASEMENT EXTENSION
FOR PROPOSED
EQUIPMENT 20'X20'
EASEMENT EXTENSION
FOR PROPOSED
EQUIPMENT 20'X20'
PROPOSED EASEMENT
6' WIDE (TYP.)
UTILITIES, ELECTRIC ENGINEERING
City of Palo Alto
APPROVED
SR. ENGINEER / MANAGER
ENGR.
CHKD.
DRWN
CKT #MAP #SCALE
DATE APPR.
SHEET
W.O.# / DRAWING #
OF
DESCRIPTION
California 40027598
FOOTHILL FIRE MITIGATION PROJECT
PHASE 4
REMOVAL
B. GROSSMAN
P.VALATH
P.VALATH
B. GROSSMAN
NTS
----HV-20
27 27
34
35
LOCATION 34
CPAU POLE 6805
REMOVE
1 - 8' CROSSARMS
2 - BELLS
1 - GUY ANCHOR
1 - 25 KVA PT TX 7747
2 - CUTOUTS
2 - FUSES
TOP WOOD POLE, LEAVE SECONDARY
SERVICE DROP TO STRUCTURES. POLE
WILL BE INCLUDED IN EASEMENT TRANSFER
UNTIL ALL SERVICES ATTACHED TO POLE
ARE UNDERGROUNDED.
LOCATION 35
CPAU POLE 6806
REMOVE
2 - 8' CROSSARMS
2 - BELLS
2 - GUY ANCHORS
2 - D.E. INSULATORS
1 - 25 KVA PT TX 7599
2 - CUTOUTS
2 - FUSES
TOP WOOD POLE, LEAVE SECONDARY
SERVICE DROP TO STRUCTURES. POLE
WILL BE INCLUDED IN EASEMENT TRANSFER
UNTIL ALL SERVICES ATTACHED TO POLE
ARE UNDERGROUNDED.
CPAU CABLE REMOVAL
BETWEEN LOCATION 33 & 34
~270' - 3-1/0 AL WIRE FROM POLE 6804 TO
POLE 6805
BETWEEN LOCATION 34 & 35
~310' - 3-1/0 AL WIRE FROM POLE 6805 TO
POLE 6806
Best Management Practices for On-Site Handling of Spoils:
1. Designated Storage Areas:
o Establish clearly marked, stable areas for spoil storage that are located away
from sensitive environments like water bodies, wetlands, or steep slopes.
o Use temporary barriers, such as silt fences, wattles, or berms, to prevent
spoil migration due to rain or wind.
o Regularly inspect storage areas for runoff issues and address them promptly
with drainage systems or sediment traps.
2. Segregation of Spoils:
o Separate spoils by type (e.g., soil, rock, demolition debris) for efficient reuse
or recycling later.
o Keep contaminated or hazardous materials isolated from clean spoils to
prevent cross-contamination.
o Hazardous Materials (as defined by the EPA) shall be stored with a method
for secondary containment in the event of a leak or spill. Secondary
containment may take the form of a larger container that can sufficiently
hold the contents of a spill.
3. Accessibility and Safety:
o Ensure spoil storage areas are accessible for easy loading and unloading
while maintaining a safe distance from active construction zones.
o Provide workers with personal protective equipment (PPE) and training on
safe spoil handling techniques.
4. Disposal of Spoils:
o Larger spoils (such as cut conduit or broken boring rods) may be temporarily
stored in designated areas identified by the AHJ. These spoils should be
removed from these temporary areas at the end of every working week
(typically Friday unless there is a holiday than the day before).
Best Management Practices (BMP) Procedure for Underground Electric Distribution
Projects
Techniques Used: Horizontal Directional Drilling (HDD) & Open Trenching
1. Horizontal Directional Drilling (HDD) Best Practices
• Drilling Path Design & Bore Planning
o Utilize GPS tracking and hydraulic calculations to plan bore paths and ensure
accurate drill trajectories.
o Avoid congested utility corridors and environmentally sensitive areas.
• Drill Fluid Management & Environmental Controls
o Implement fluid containment measures, such vacuum recovery systems
(Vac-Truck).
• Pullback & Conduit Installation
o Conduct pre-pullback inspections to ensure the borehole is properly
conditioned for conduit installation.
o Use HDPE or reinforced PVC conduit rated for underground electrical
distribution.
• Post-Drill Verification & Testing
o Perform integrity testing on installed conduits (Mandrel-test).
2. Open Trenching Best Practices
• Excavation & Utility Coordination
o Use soft digging techniques (hydro excavation or vacuum excavation) to
expose existing utilities safely.
o Employ trench shoring methods, such as trench boxes or sloping, to prevent
collapses.
• Cable Placement & Bedding Material
o Ensure cables are placed at the correct depth per utility standards (typically
30 inches minimum below grade).
o Utilize clean sand or crushed stone as bedding material to protect conduit
and cables.
• Backfilling & Surface Restoration
o Use controlled compaction methods to prevent future settlement and
ground disturbances.
o Restore pavement, landscaping, or sidewalks to their original condition,
ensuring compliance with municipal standards.
3. Weather, Environmental & Sustainability Considerations
• Erosion & Sediment Control
o Use silt fences and sediment traps to prevent runo3 from trenching areas.
• Drilling Waste Management
o Dispose of excess drilling fluids responsibly and avoid contamination of
stormwater systems.
• Wildlife Protections
o Maintain bu3er zones around protected environmental areas.
o Utilize construction tree wrap on any trees in proximity to the trench.
• Weather Consideration
o In the event of heavy rain or other weather that would make construction
infeasible, crews to make best e3ort to prepare the worksite for the weather
and pause construction until safe to resume work.
o In the event of a red flag warning in the Foothills area, all construction to
cease and resume once the warning has lifted. Activities such as plating
open trenches, cleaning up trash, or other “housekeeping” are permitted.
4. Post-Construction & Quality Assurance
• Documentation & Reporting
o Submit as-built drawings and project completion reports for regulatory
compliance.
o Maintain detailed records of cable installations, drill logs, and trenching
activities.
Discovery of Human Remains or Burial Items:
The following actions must be taken immediately upon the discovery of human remains:
• Stop immediately and contact the County Coroner.
• The coroner has two working days to examine human remains after being notified by
the responsible person. If the remains are Native American, the Coroner has 24
hours to notify the Native American Heritage Commission.
• The Native American Heritage Commission will immediately notify the person it
believes to be the most likely descendent of the deceased Native American.
• The most likely descendent has 48 hours to make recommendations to the owner,
or representative, for the treatment or disposition, with proper dignity, of the human
remains and grave goods.
If the descendent does not make recommendations within 48 hours the owner shall reinter
the remains in an area of the property secure from further disturbance, or:
• If the landowner does not accept the descendant’s recommendations, the owner or
the descendent may request mediation by the Native American Heritage
Commission.
• Discuss and confer means the meaningful and timely discussion with careful
consideration of the views of each party’s cultural values and, where feasible,
seeking agreement.
• If mediation fails, the landowner shall reinter the human remains with appropriate
dignity on the property in a location not subject to future subsurface disturbance.
Primary Electric Vault Spec
Alhambra A-1252 Cover,
see following sheet
3x5 Vault Lid:
3x5 Loadbreak Lid:
Vault Examples
70
"
6"12"12"
12
"
12
"
37"46"
94
"
113"
70
"
12"
12
"
12
"
46"
94
"
55
"
12
"
12"
55
"
12
"
12
"
37"
12"
3"
79
"
17
6
"
113"
43"
NTSNTS
LoadBreak and Transformer
Equipment Examples
Temporary Staging Area
Layout
30'
50'
Temporary staging area to serve
as a location to park the bore rig
and vacuum trailer, store conduit
reels, store spoils, and stage a
port-a-potty. Likely area to be
30'x50', this may be variable
depending on current equipment in
use.
Cones to be placed
on boundaries of
staging area with
caution tape wrapped
at the tops
Biodegradable
Wattles typ.
Port-a Potty
with wattles
for secondary
containment.
Location may
vary.
Any food waste to be
stored in trash bags
and taken off-site for
disposal.
Any earthen material
to require secondary
containment.
STANDARD
INSTALLATION TYPES
Existing Conduit
Plow
Directional Bore
STANDARD COLORS
F
E
A
T
U
R
E
S
SMOOTHWALL
• Manufactured from flexible HDPE, makes gradual bends without
special equipment
• Continuous lengths reduce joining costs
• Excellent low temperature properties, allows installation in cold
climates
• Outstanding long term cable protection from shifting ground, rock and
root impingement
• Provides a permanent pathway, simpifies future cable repairs or
replacement
UV
UV
SIZE RANGE AVAILABLE
0.5"
0.75"
1.0"
1.25"
1.5"
2.0"
2.5"
3.0"
4.0"
5.0"
6.0"
8.0"
10.0"
12.0"
WALL TYPES
SDR-9
SDR-11
SDR-13.5
SDR-15.5
SDR-17
SCH-40
SCH-80
SIDR-9
SIDR-11
STANDARD
FOOTAGE MARKINGS Sequential foot or meter markings. Custom print streams available.
SPECIFICATIONS All Smoothwall conduit dimensions meets or exceeds one or more of the following:
ASTM F-2160, ASTM D-3350, ASTM D-2239, ASTM D-3485, NEMA TC-7, UL 651, UL 1990, Bellcore GR-356.
OPTIONS
SILICORE is co-extruded with the tough HDPE jacket creating a super, slick permanent lining. SILICORE lined
ducts allow for higher speed cable jetting and longer cable pulls.
PREINSTALLED TAPE Factory pre-installed Bull-Line™ Pull Tape with EVEN-LOAD™, ensures extra slack at any
access point throughout the reel. Available 500lb–6,000lb tensile strength or locatable.
UL LISTING AVAILABLE from ½"–6" for SDR 13.5, SCH 40 and SCH 80.
EXTERNAL STRIPES can be added from our standard color offering to facilitate visual identification.
UV PROTECTANT available for aerial/lashed placement.
+1 800 847 7661
WWW.DURALINE.COM
UV
UV
DL.SMOOTHWALL.9.2020
WA
L
L
T
Y
P
E
PIPE SIZE ½"¾"1" 1¼"1½"2"2 ½"
NOM OD (IN)0.840 1.050 1.315 1.660 1.900 2.375 2.875
OD TOLERENCE +/–0.004 0.005 0.007 0.008 0.010 0.012 0.014
BEND RADIUS (IN) SUPPORTED 8 10 13 17 19 24 29
BEND RADIUS (IN) UNSUPPORTED 16 20 26 34 38 48 58
SD
R
-
9
MIN. WALL (IN)0.093 0.117 0.146 0.184 0.211 0.264 0.319
WALL TOLERANCE +0.020 0.020 0.020 0.022 0.025 0.032 0.038
AVG ID (IN)0.634 0.796 1.003 1.270 1.453 1.815 2.199
MIN ID (IN)0.614 0.776 0.983 1.248 1.428 1.783 2.161
WEIGHT (#/FT)0.098 0.152 0.234 0.370 0.485 0.759 1.110
SWPS (LBS)525 821 1,288 ,052 2,688 4,200 6,155
SD
R
-
1
1
MIN. WALL (IN)0.076 0.095 0.120 0.151 0.173 0.216 0.261
WALL TOLERANCE +0.020 0.020 0.020 0.020 0.021 0.026 0.031
AVG ID (IN)0.668 0.840 1.055 1.338 1.533 1.917 2.322
MIN ID (IN)0.648 0.820 1.035 1.318 1.512 1.891 2.291
WEIGHT (#/FT)0.084 0.128 0.199 0.312 0.408 0.636 0.930
SWPS (LBS)440 687 1078 1717 2249 3515 5151
SD
R
-
1
3
.
5
MIN. WALL (IN)0.062 0.078 0.097 0.123 0.141 0.176 0.213
WALL TOLERANCE +0.020 0.020 0.020 0.020 0.020 0.021 0.026
AVG ID (IN)0.696 0.874 1.101 1.394 1.598 2.002 2.423
MIN ID (IN)0.676 0.854 1.081 1.374 1.578 1.981 2.397
WEIGHT (#/FT)0.072 0.110 0.167 0.263 0.342 0.528 0.775
SWPS (LBS)365 570 894 1425 1867 2917 4274
SD
R
-
1
5
.
5
MIN. WALL (IN)0.062 0.068 0.084 0.107 0.123 0.153 0.185
WALL TOLERANCE +0.018 0.020 0.020 0.020 0.020 0.020 0.022
AVG ID (IN)0.698 0.894 1.127 1.426 1.634 2.049 2.483
MIN ID (IN)0.680 0.874 1.107 1.406 1.614 2.029 2.461
WEIGHT (#/FT)0.071 0.098 0.149 0.234 0.304 0.467 0.680
SWPS (LBS)792 1,234 1,607 2,466 3,592
SD
R
-
1
7
MIN. WALL (IN)0.062 0.077 0.098 0.112 0.140 0.169
WALL TOLERANCE +0.020 0.020 0.020 0.020 0.020 0.020
AVG ID (IN)0.906 1.141 1.444 1.656 2.075 2.517
MIN ID (IN)0.886 1.121 1.424 1.636 2.055 2.497
WEIGHT (#/FT)0.091 0.138 0.217 0.281 0.432 0.625
SWPS (LBS)460 722 1150 1507 2355 3450
SMOOTHWALL (SDR) TECHNICAL SPECIFICATIONS (SIZES 3"-12" NEXT PAGE)
(SIZES 3"-12: NEXT PAGE)
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV
WA
L
L
T
Y
P
E
PIPE SIZE 3"4"5"6"8"10"12"
NOM OD (IN)3.500 4.500 5.563 6.625 8.625 10.750 12.750
OD TOLERENCE +/–0.018 0.023 0.028 0.033 0.043 0.054 0.064
BEND RADIUS (IN) SUPPORTED 39 50 61 73 155 194 230
BEND RADIUS (IN) UNSUPPORTED 78 100 122 146 233 290 344
SD
R
-
9
MIN. WALL (IN)0.389 0.500 0.618 0.736 0.958 1.194 1.417
WALL TOLERANCE +0.047 0.060 0.074 0.088 0.115 0.143 0.170
AVG ID (IN)2.675 3.440 4.253 5.065 6.593 8.219 9.746
MIN ID (IN)2.628 3.380 4.179 4.977 6.479 8.076 9.576
WEIGHT (#/FT)1.648 2.723 4.161 5.901 10.001 15.534 21.866
SWPS (LBS)9,122 15,080 23,045 32,684 55,397 8,6057 121,056
SD
R
-
1
1
MIN. WALL (IN)0.318 0.409 0.506 0.602 0.784 0.977 1.159
WALL TOLERANCE +0.038 0.049 0.061 0.072 0.094 0.117 0.139
AVG ID (IN)2.826 3.633 4.490 5.349 6.963 8.679 10.293
MIN ID (IN)2.788 3.584 4.429 5.277 6.869 8.562 10.154
WEIGHT (#/FT)1.380 2.282 3.490 4.944 8.383 13.019 18.319
SWPS (LBS)7633 12618 19284 27349 46355 72010 101297
SD
R
-
1
3
.
5
MIN. WALL (IN)0.259 0.333 0.412 0.491 0.639 0.796 0.944
WALL TOLERANCE +0.031 0.040 0.049 0.059 0.077 0.096 0.113
AVG ID (IN)2.951 3.794 4.690 5.584 7.270 9.062 10.749
MIN ID (IN)2.920 3.754 4.641 5.525 7.193 8.966 10.636
WEIGHT (#/FT)1.146 1.895 2.896 4.112 6.969 10.821 15.214
SWPS (LBS)6335 10472 16004 22697 38470 59762 84067
SD
R
-
1
5
.
5
MIN. WALL (IN)0.226 0.290 0.359 0.427
WALL TOLERANCE +0.027 0.035 0.043 0.051
AVG ID (IN)3.021 3.885 4.802 5.720
MIN ID (IN)2.994 3.850 4.759 5.669
WEIGHT (#/FT)1.011 1.669 2.552 3.615
SWPS (LBS)5,342 8,814 13,483 19,123
SD
R
-
1
7
MIN. WALL (IN)0.206 0.265 0.327 0.390
WALL TOLERANCE +0.025 0.032 0.039 0.047
AVG ID (IN)3.063 3.938 4.870 5.798
MIN ID (IN)3.038 3.906 4.831 5.751
WEIGHT (#/FT)0.928 1.534 2.339 3.324
SWPS (LBS)5114 8453 12918 18321
SMOOTHWALL (SDR) TECHNICAL SPECIFICATIONS (SIZES ½"-2½" PREVIOUS PAGE)
(SIZES ½"-2½" PREVIOUS PAGE)
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV
WA
L
L
T
Y
P
E
PIPE SIZE ½"¾"1" 1¼"1½"2"2 ½"
NOM OD (IN)0.840 1.050 1.315 1.660 1.900 2.375 2.875
OD TOLERENCE +/–0.004 0.005 0.007 0.008 0.010 0.012 0.014
BEND RADIUS (IN) SUPPORTED 8 10 13 17 19 24 29
BEND RADIUS (IN) UNSUPPORTED 16 20 26 34 38 48 58
SC
H
-
4
0
MIN. WALL (IN)0.109 0.113 0.133 0.140 0.145 0.154 0.203
WALL TOLERANCE +0.020 0.020 0.020 0.020 0.020 0.020 0.024
MIN ID (IN)0.582 0.784 1.009 1.340 1.570 2.027 2.421
AVG ID (IN)0.602 0.804 1.029 1.360 1.590 2.047 2.445
WEIGHT (#/FT)0.111 0.148 0.217 0.293 0.350 0.469 0.740
SWPS (LBS)601 798 1340 1604 1919 2579 4090
SC
H
-
8
0
MIN. WALL (IN)0.147 0.154 0.179 0.191 0.200 0.218 0.276
WALL TOLERANCE +0.020 0.020 0.021 0.023 0.024 0.026 0.033
MIN ID (IN)0.506 0.702 0.915 1.232 1.452 1.887 2.257
AVG ID (IN)0.526 0.722 0.936 1.255 1.476 1.913 2.290
WEIGHT (#/FT)0.139 0.188 0.276 0.382 0.463 0.641 0.978
SWPS (LBS)768 1040 1533 2116 2564 2545 5409
SMOOTHWALL SDR & SCHEDULE NOTES
1. Bend Radius
½" through 2 ½" Supported Bend Radius 10 times the OD Unsupported Bend Radius 20 times the OD
3" through 6" Supported Bend Radius 11 times the OD Unsupported Bend Radius 22 times the OD
8" through 16" Supported Bend Radius 18 times the OD Unsupported Bend Radius 27 times the OD
2. During cable placement, large sweeping bends are recommended over tighter bends.
Pre-formed sweeps are recommended for conduit sizes 8" through 16" diameters.
3. SWPS (Safe Working Pull Strength) is calculated using a 25% safety factor with the minimum resin tensile strength
of 3,000 psi, the average OD and average wall thickness.
SMOOTHWALL (SCH) TECHNICAL SPECIFICATIONS (SIZES 3"-12" NEXT PAGE)
(SIZES 3"-12: NEXT PAGE)
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV
WA
L
L
T
Y
P
E
PIPE SIZE 3"4"5"6"8"10"12"
NOM OD (IN)3.500 4.500 5.563 6.625 8.625 10.750 12.750
OD TOLERENCE +/–0.018 0.023 0.028 0.033 0.043 0.054 0.064
BEND RADIUS (IN) SUPPORTED 39 50 61 73 155 194 230
BEND RADIUS (IN) UNSUPPORTED 78 100 122 146 233 290 344
SC
H
-
4
0
MIN. WALL (IN)0.216 0.237 0.258 0.280 0.322 0.365 0.406
WALL TOLERANCE +0.026 0.028 0.031 0.034 0.039 0.044 0.049
MIN ID (IN)3.016 3.970 4.985 5.997 7.903 9.932 11.840
AVG ID (IN)3.042 3.998 5.016 6.031 7.942 9.976 11.889
WEIGHT (#/FT)0.969 1.380 1.872 2.432 3.661 5.215 6.846
SWPS (LBS)5348 7618 10320 13395 20158 28580
SC
H
-
8
0
MIN. WALL (IN)0.300 0.337 0.375 0.432
WALL TOLERANCE +0.036 0.040 0.045 0.052
MIN ID (IN)2.828 3.746 4.723 5.657
AVG ID (IN)2.864 3.786 4.768 5.709
WEIGHT (#/FT)1.310 1.914 2.657 3.656
SWPS (LBS)7238 10578 14669 20172
SMOOTHWALL (SCH) TECHNICAL SPECIFICATIONS (SIZES ½"-2½" PREVIOUS PAGE)
(SIZES ½"-2½" PREVIOUS PAGE)
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV
WA
L
L
T
Y
P
E
PIPE SIZE ½"¾"1" 1 ¼"1 ½"2"2 ½"3"4"6"
MIN ID (IN)0.622 0.824 1.049 1.380 1.610 2.067 2.469 3.068 4.026 6.065
ID TOLERENCE +0.010 0.010 0.010 0.010 0.015 0.015 0.015 0.015 0.020 0.020
ID TOLERENCE –0.010 0.015 0.020 0.020 0.020 0.020 0.020 0.030 0.020 0.035
BEND RADIUS (IN) SUPPORTED 8 10 13 17 19 24 29 39 50 73
BEND RADIUS (IN) UNSUPPORTED 16 20 26 34 38 48 58 78 100 146
SI
D
R
-
9
MIN. WALL (IN)0.069 0.092 0.117 0.153 0.230
WALL TOLERANCE +0.020 0.020 0.020 0.020 0.028
AVG OD (IN)0.780 1.026 1.298 1.701 2.553
WEIGHT (#/FT)0.072 0.122 0.192 0.324 0.729
SWPS (LBS)445 760 1471 1652 4535
SI
D
R
-
1
1
.
5
MIN. WALL (IN)0.060 0.072 0.091 0.120 0.140 0.180 0.215 0.267 0.350 0.527
WALL TOLERANCE +0.020 0.020 0.020 0.020 0.020 0.022 0.026 0.032 0.042 0.063
AVG OD (IN)0.762 0.986 1.246 1.635 1.908 2.447 2.919 3.627 4.768 7.175
WEIGHT (#/FT)0.063 0.096 0.150 0.253 0.341 0.558 0.792 1.225 2.111 4.782
SWPS (LBS)390 597 891 1,549 2,123 3,468 4,934 7,627 13,119 29,750
SMOOTHWALL SIDR NOTES:
1. Bend Radius ½” through 2 ½”
Supported Bend Radius 10 times the OD Unsupported Bend Radius 20 times the OD 3” through 6”
Supported Bend Radius 11 times the OD Unsupported Bend Radius 22 times the OD 8” through 16”
Supported Bend Radius 18 times the OD Unsupported Bend Radius 27 times the OD
2. During cable placement, large sweeping bends are recommended over tighter bends.
Pre-formed sweeps are recommended for conduit sizes 8” through 16” diameters.
3. SWPS (Safe Working Pull Strength) is calculated using a 25% safety factor with the minimum resin tensile strength of 3,000 psi,
the average OD and average wall thickness.
4. Internal or external ribs are in addition to the average wall and for determining OD and ID dimensions.
The average rib height to be added is 0.020”
5. Add 0.016 #/ft for ribbed products 1 1/2” and less. For 2” and larger, add 0.025 #/ft
SMOOTHWALL (SIDR) TECHNICAL SPECIFICATIONS
+1 800 847 7661
WWW.DURALINE.COM
DL.SMOOTHWALL.9.2020
UV
UV
AT
SN
S
I
L
EC
E OFOFLACI
U
Exp._____
R
ER
S
T
ADED
L
MO
D
.C
N
O
INA
R
R
YEV
L.S. 6766KRISTINA
ER