Loading...
HomeMy WebLinkAboutStaff Report 2503-4438 City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Administrative Services Meeting Date: June 2, 2025 Report #:2503-4438 TITLE Approval of and Authorization of City Manager or their Designee to Execute an Exchange Agreement with Midpeninsula Regional Open Space District for Replacement of Overhead Utility Facilities with Underground Facilities and Exchange and Transfer Real Property Interests within Monte Bello Open Space Preserve and Rancho San Antonio Open Space Preserve, Assessor’s Parcel Numbers 351-25-014, 351-06-025, 351-09-002, and 351-12-069; CEQA Status – Exempt Under CEQA Guidelines Section 15302 RECOMMENDATION Staff recommends that Council: 1. Approve and authorize the City Manager or their designee to execute the Exchange Agreement and License Agreement; 2. Approve and authorize the City Manager or their designee to execute the Underground Utility Easement and Quitclaim Deed following the completion of the undergrounding project; and 3. Authorize the City Manager or their designee to execute necessary amendments, notices, approvals, or documents relating to the above agreements. BACKGROUND Devastating California wildfires have prompted electric utilities throughout the state to identify areas within their jurisdiction that are susceptible to power-line ignited wildfires and to take steps to prevent their occurrence. Utilities Department Project # EL-210011 proposes to rebuild the approximately 11 miles of overhead line to mitigate the possibility of a wildfire due to overhead electric lines. This includes converting the overhead lines to underground along Montebello Road within property owned by the Midpeninsula Regional Open Space District at 1 City of Palo Alto Fiscal Year 2026 Proposed Capital Budget, Pages 424 – 426, https://www.paloalto.gov/files/assets/public/v/1/administrative-services/city-budgets/fy-2026-city- budget/proposed/fy-2026-proposed-capital-budget-book.pdf Monte Bello Open Space Preserve and Rancho San Antonio Open Space Preserve (Attachment A – Exhibit A). ANALYSIS FISCAL/RESOURCE IMPACT STAKEHOLDER ENGAGEMENT ENVIRONMENTAL REVIEW ATTACHMENTS APPROVED BY: Page 1 of 7 EXCHANGE AGREEMENT BETWEEN CITY OF PALO ALTO AND MIDPENINSULA REGIONAL OPEN SPACE DISTRICT This exchange agreement (hereinafter, "Agreement") is made as of (“Effective Date”) by and between the Midpeninsula Regional Open Space District, a California special district (hereinafter "District"), and City of Palo Alto, a California chartered municipal corporation (hereinafter “City”), each of whom may be referred to individually as a “Party” and collectively as the “Parties.” RECITALS WHEREAS, the District is the owner of certain real property situated in the unincorporated County of Santa Clara, State of California, within Monte Bello Open Space Preserve and Rancho San Antonio Open Space Preserve, Assessor’s Parcel Numbers 351-25-014, 351-06-025, 351-09- 002 and 351-12-069, as depicted in Exhibit A attached hereto and incorporated herein by this reference (the “District Property”); and WHEREAS, the City holds right-of-way and utility easements for electric distribution lines across the District Property, as assigned by Pacific Gas and Electric Company from Louis Oneal, Inc. (“Easement 1”), Bertha Hayes (“Easement 2”), and George Morell (“Easement 3”), which are attached hereto as Exhibit B and incorporated herein by this reference (collectively, the “Existing Utility Easements”); and WHEREAS, the City has determined that its utility service territory west of Interstate 280, including the District Property, has an elevated risk of wildfire and therefore seeks to perform a project to convert its overhead utility facilities to underground utility facilities along Montebello Road within the District Property (the “Project”); and WHEREAS, the City has prepared a plan depicting: (1) the new underground electric distribution and fiber optic communications lines, fixtures and other appurtenances under, across and along Montebello Road as it crosses District Property, and (2) the existing overhead electric utility facilities, lines, poles, fixtures and other appurtenances on the District Property, which plan is attached hereto as Exhibit C and incorporated herein by reference (“Alignment Plan”); and WHEREAS, the District and City desire to exchange and transfer certain real property interests as set forth in this Agreement; and WHEREAS, District has determined that said exchange of interests in real property is of equal or greater value to the public and, said exchange has been determined to be in accordance with the District’s enabling legislation set out at Section 5540.5 of the Public Resources Code of the State of California; NOW, THEREFORE, the parties mutually agree as follows: 1.INCORPORATION OF RECITALS. Page 2 of 7 The above Recitals and the exhibits attached to this Agreement are hereby incorporated herein and made a part hereof. 2.EXCHANGE AGREEMENT. The District and City agree to the following exchange of real property interests, to be effective as of the Closing (defined below): a.Grant of Underground Utility Easements from District to City: District hereby agrees to grant an easement and right of way for the City to construct, maintain, repair, replace and upgrade underground utility facilities and appurtenances thereto under, across and along Montebello Road as it crosses the District Property, in the form of easement agreement set forth in Exhibit D attached hereto and incorporated herein by reference (“Underground Utility Easement”). b.Abandonment of Existing Utility Easements: City hereby agrees to quitclaim to District all right, title and interest in the Existing Utility Easements and any other rights to overhead utility facilities on District Property, including any rights of way in connection therewith, in the form of quitclaim deed set forth in Exhibit E attached hereto and incorporated herein by reference (“Quitclaim Deed”). 3.LICENSE AGREEMENT. To allow the City to commence its undergrounding project prior to Closing, the District and City shall execute a license agreement in the form attached hereto as Exhibit F and incorporated herein by reference (“License Agreement”). The District’s acceptance of the Project in accordance with the License Agreement is a condition precedent to Closing. 4.TERM and CLOSING. This Agreement shall commence on the Effective Date and shall terminate on the date of the Closing. The closing date (“Closing”) shall be the recordation date of the Underground Utility Easement and Quitclaim Deed in Santa Clara County. Following City’s preparation of a legal description and plat map of the Underground Utility Easement by a licensed surveyor, City shall promptly deliver executed copies of the Underground Utility Easement and Quitclaim Deed to District for recording. Within ten (10)business days of the Effective Date, City shall deliver an executed copy of the License Agreement to District. Closing shall occur after the satisfaction of all the following conditions: a.City shall have completed the installation and commissioning of the underground utility facilities; b.City shall have decommissioned, removed and disposed of existing overhead utility facilities, lines, poles and related fixtures on the District Property as specified in the License Agreement; c.City shall have repaired and restored any portion of the District Property damaged or disturbed in carrying out the Project as specified in the License Agreement; Page 3 of 7 d.District shall have provided written acceptance of the Project, which shall not be unreasonably withheld; and e.Following District’s acceptance of the Project, City shall have prepared a legal description and plat map of the Underground Utility Easement by a licensed surveyor and provided it to the District for its approval, which approval shall not be unreasonably withheld. Following District’s approval of the legal description and plat map, City shall deliver the plat map and legal description to District to include as part of the recorded Underground Utility Easement. Within ten (10) business days following completion of the Project and the Parties’ mutual agreement that the above conditions to Closing have been satisfied, the District shall execute and concurrently record the Underground Utility Easement and Quitclaim Deed in Santa Clara County. 5.REPRESENTATIONS AND WARRANTIES. For the purpose of consummating this exchange of interests in real property contemplated herein, each party represents and warrants to the other party, each of which is material, are being relied upon by the Parties, and shall survive the recording of the property rights being exchanged and conveyed herein. a.Authority. The Parties have the full right, power and authority to enter into this Agreement and to perform the transactions contemplated hereunder. b.Valid and Binding Agreements. This Agreement and all other documents delivered by the Parties have been or will be duly authorized and executed and delivered by the Parties as legal, valid and binding obligations of the Parties to complete this exchange and conveyance of real property. 6.PAYMENT OF COSTS AND FEES. District shall pay any required recording costs and fees for the Underground Utility Easement and Quitclaim Deed. City shall pay the costs of preparing the legal description and plat map. Each Party shall be responsible for any other costs it incurs in performing this Agreement, unless specified herein to the contrary or otherwise agreed by the Parties in writing. 7."AS-IS” CONVEYANCE. All Parties are acquiring the respective real property interests on an “As-Is” basis, without warranties, express or implied, regarding the physical condition of the properties to be exchanged. All Parties shall rely on their own inspections of the respective property interests. 8.MISCELLANEOUS PROVISIONS. a.Choice of Law. The laws of the State of California, regardless of any choice of law principles, shall govern the validity of this Agreement, the construction of its terms and the interpretation of the rights and duties of the Parties. Page 4 of 7 b.Amendment. The Parties hereto may by mutual written agreement amend this Agreement in any respect. c.Rights Cumulative. Each and all of the various rights, powers and remedies of the Parties shall be considered to be cumulative with and in addition to any other rights, powers and remedies which the Parties may have at law or in equity in the event of the breach of any of the terms of this Agreement. The exercise or partial exercise of any right, power or remedy shall neither constitute the exclusive election thereof nor the waiver of any other right, power or remedy available to such Party. d.Notice. Whenever any Party hereto desires or is required to give any notice, demand, or request with respect to this Agreement, each such communication shall be in writing and shall be deemed to have been validly served, given or delivered at the time stated below if deposited in the United States mail, registered or certified and return receipt requested, with proper postage prepaid, or if delivered by Federal Express or other private messenger, courier or other delivery service and addressed as indicated as follows: City: City of Palo Alto Attn: Utilities Department, Electric Engineering 250 Hamilton Avenue Palo Alto, CA 94301 TEL: (650) 329-2161 With a copy to: City of Palo Alto Attn: Real Property Manager 250 Hamilton Avenue Palo Alto, CA 94301 District: Midpeninsula Regional Open Space District Attn: Real Property Manager 5050 El Camino Real Los Altos, CA 94022-1404 TEL: (650) 691-1200 Service of any such communication made only by mail shall be deemed complete on the date of actual delivery as indicated by the addressee’s registry or certification receipt or at the expiration of the third (3rd) business day after the date of mailing, whichever is earlier in time. Either Party hereto may from time to time, by notice in writing served upon the other as aforesaid, designate a different mailing address or a different person to whom such notices or demands are thereafter to be addressed or delivered. Nothing contained in this Agreement shall excuse either Party from giving oral notice to the other when prompt notification is appropriate, but any oral notice given shall not satisfy the requirements provided in this Section. Page 5 of 7 e.Severability. If any of the provisions of this Agreement are held to be void or unenforceable by or as a result of a determination of any court of competent jurisdiction, the decision of which is binding upon the parties, the Parties agree that such determination shall not result in the nullity or unenforceability of the remaining portions of this Agreement. The Parties further agree to replace such void or unenforceable provisions, which will achieve, to the extent possible, the economic, business, and other purposes of the void or unenforceable provisions. f.Counterparts. This Agreement may be executed in separate counterparts, each of which shall be deemed as an original, and when executed, separately or together, shall constitute a single original instrument, effective in the same manner as if the parties had executed one and the same instrument. In the event of any disparity between the counterparts produced, the recorded counterpart shall be controlling. g.Waiver. No waiver of any term, provision or condition of this Agreement, whether by conduct or otherwise, in any one or more instances, shall be deemed to be, or be construed as, a further or continuing waiver of any such term, provision or condition or as a waiver of any other term, provision or condition of this Agreement. h.Entire Agreement. This Agreement, including its recitals and exhibits, is intended by the Parties to be the final expression of their agreement; it embodies the entire agreement and understanding between the Parties hereto; it constitutes a complete and exclusive statement of the terms and conditions thereof, and it supersedes any and all prior correspondence, conversations, negotiations, agreements or understandings relating to the same subject matter. i.Time of the Essence. Time is of the essence of each provision of this Agreement in which time is an element. j.Survival. All covenants of District or City which are expressly intended hereunder to be performed in whole or in part after the Closing, and all representations and warranties by either Party to the other, shall survive the Closing and be binding upon and inure to the benefit of the respective Parties hereto and their respective heirs, successors and permitted assigns. k.Terms Run with the Land. The terms, covenants and conditions set out in this Agreement shall run with the land and be binding upon and inure to the benefit of the successors and assigns of the Parties hereto pursuant to California Civil Code Section 1468. l.Assignment. Except as expressly permitted herein, neither Party to this Agreement shall assign its rights or obligations under this Agreement to any third party without the prior written approval of the other Party. m.Further Documents and Acts. Each of the Parties hereto agrees to execute and deliver such further documents and perform such other acts as may be reasonably necessary or appropriate to consummate and carry into effect the transactions described and contemplated under this Agreement. Page 6 of 7 n.Captions. Captions are provided herein for convenience only and they form no part of this Agreement and are not to serve as a basis for interpretation or construction of this Agreement, nor as evidence of the intention of the Parties hereto. o.Pronouns and Gender. In this Agreement, if it be appropriate, the use of the singular shall include the plural, and the plural shall include the singular, and the use of any gender shall include all other genders as appropriate. Space intentionally left blank Pa t h : G : \ P r o j e c t s \ a _ D i s t r i c t w i d e \ E a s e m e n t s \ E a s e m e n t s . a p r x Cr e a t e d B y : a c o s t a n z a While the District strives to use the best available digital data, these data do not represent a legal survey and are merely a graphic illustration of geographic features. Midpeninsula Regional Open Space District (Midpen) 4/3/2025 0 0.250.125 Miles I Proposed underground utility easement (MROSD to grant to City of Palo Alto) Other protected lands Private property Midpen preserves Exhibit A - Project Area Map !# R A N C H O S A N A N T O N I O O P E N S P A C E P R E S E R V E M O N T E B E L L O O P E N S P A C E P R E S E R V E IndianCreek Adobe Creek Steven sCreek West F ork A dobe C r e e k MontebelloRoa d Bella Vista Tr a i l IndianCreek Trail PageMillTrail Ad o b eCreekTrail Black M ountainTrail SkidRoad Trail Quarry Trail Old RanchTrail CanyonTrail Adobe C reek T r ail Adobe Creek Trail Steven s Creek NatureTrail Black Mountain 2,812' 22 0 0 20 0 0 18 0 0 2600 2400 2200 2000 200 0 180 0 2000 1800 2800 2800 2400 2000 2000 20 0 0 180 0 1600 20 0 0 20 0 0 35125014 3510900235106025 35112069 HIDDEN VILLA ! ! !! ! ! ! ! ! ! ! Area of detail FOOTHILLS LA HONDA CREEK LONG RIDGE SARATOGA GAP THORNEWOOD WINDY HILL RANCHO SAN ANTONIOCOAL CREEK LOS TRANCOS MONTE BELLORUSSIAN RIDGE ÄÆ35 ÄÆ84 ÄÆ9 ÄÆ280 Los Altos Existing overhead utility easement (City of Palo Alto to vacate) Trail Unpaved all-season road Unpaved seasonal road Paved roadCounty parcel NOTE: The easements shown are graphical visualizations only; it is not an assessed interest. For surveyed location of easements, reference Cross Lands Surveying Inc. Project NO. 22-146 dated 3/15/2024. Existing overhead electrical line & & Easement 1 & & Easement 2 & & Easement 3 Exhibit B - Existing Utility Easements 1260 MONTE BEL L O R O A D 3 2-1 / 0 A L F8A E L F 772 749 8 55'50' 677 0 50' 676 8 50' 676 9 50' 677 1 45' 677 2 10 646 1 F P P P PP P PP P P P P S TX P A D 54 " x 6 0 " P PPPP P 600' 700' 12' 60' F PB40409 3'X5' FIBER BOX 30"X48" PP P P P P P PP P P P P P P P 13 5 ' P P P P P P P P P P P P P 55 0 ' PB40416 3'X5' FIBER BOX 30"X48" LB30070 LB VAULT - 3'X5' LB PAD - 4'X6' 500 ' 500 ' 16 17 18 19 20 F FIBER BOX 30"X48" Public Utility Easement 20' Wide UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP # SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 5 10 LOCATION 17 - LB30070 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4' X 6' LOAD BREAK PAD 30070 1 - 4' X 6' LOAD BREAK PAD 30070 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 18 - PB40406 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40406 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 19 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 20 - PB40409 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40409 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 16 & 17 ~550' - 2-3.63" PRIMARY CONDUIT FROM NEW PB 40416 TO NEW LB 30070 ~550' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 17 & 18 ~275' - 1-3.63" PRIMARY CONDUIT FROM NEW LB30070 TO NEW PB 40406 ~275' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 18 & 19 ~10' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40406 TO NEW XFMR PAD BETWEEN LOCATION 19 & 19A ~60' - 1-3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO EXISTING JUNCTION BOX BETWEEN LOCATION 17 & 20 ~700' - 2-3.63" PRIMARY CONDUIT FROM NEW LB 30070 TO NEW PB 40409 ~700' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman Exhibit C - City Alignment Plans MONTE BEL L O R O A D 2- # 6 C O P P E R W E L D 2-# 6 C O P P E R W E L D 50' 677 1 45' 677 2 50' 677 3 45' 677 4 F F P P P P P P P P P P P P P P P P P P P P PP P PP P P P P PB40403 3'X5' PB40405 3'X5' 60 0 ' 600' 600' FIBER BOX 30"X48" FIBER BOX 30"X48" F PB40404 3'X5' FIBER BOX 30"X48" P P P P P P P P P P P P P P F PB40409 3'X5' FIBER BOX 30"X48" PP P P P P P P 20 21 22 23 UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 6 10 LOCATION 20 - PB40409 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40409 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 21 - PB40405 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40405 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 22 - PB40404 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40404 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 23 - PB40403 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40403 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 20 & 21 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40409 TO NEW PB 40405 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 21 & 22 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40405 TO NEW PB 40404 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 22 & 23 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40404 TO NEW PB 40403 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman MON T E B E L L O R O A D MO N T E B E L L O R O A D 2-# 6 C O P P E R W E L D 2-# 6 C O P P E R W E L D 45' 677 4 45' 677 5 45' 677 6 40' 677 7 45' 677 8 45' 677 9 40' 678 1 45' 678 0 45' 678 4 F F P P F P P P P P P P P F PPP P PPPP P F P P P P P P P P P P P P P P P P PB40399 3'X5' PB40400 3'X5' PB40401 3'X5' PB40402 3'X5' PB40403 3'X5' 600' 600 ' 600' 60 0 ' FIBER BOX 30"X48" FIBER BOX 30"X48" FIBER BOX 30"X48" FIBER BOX 30"X48" FIBER BOX 30"X48" P P P P P P P P P 600' 23 24 25 26 27 UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 7 10 LOCATION 24 - PB40402 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40402 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 25 - PB40401 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40401 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 26 - PB40400 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40400 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 24 & 25 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40402 TO NEW PB 40401 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 25 & 26 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40401 TO NEW PB 40400 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 26 & 27 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40400 TO NEW PB 40399 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman 3 #2 TRI 2-#6 CO P P E R W E L D 2-#6 C O P P E R W E L D 45' 679 4 40' 679 6 45' 678 0 45' 678 4 45' 678 5 POL E SER V I C E 40' 678 7 35' 679 3 30' 678 9 50' 678 8 45' 679 1 10 646 7 15 450 3 F P F P P P P P P P P P P P P P P P P P P P P F SS TX P A D 54"X 6 0 " PB40395 3'X5' PB40396 3'X5' PB40399 3'X5' LB30060 LB VAULT - 3'X5' LB PAD - 4'X6' 380' 95' 575'600'85 ' FIBER BOX 30"X48" FIBER BOX 30"X48" 25' FIBER BOX 30"X48" PB40397 3'X5' S S S S S S S S S S S S S S 585 ' 10' 2 - 3.63" P P P P P PPPPPPP P P P 600' F P P P P P P P P PFIBER BOX 30"X48" BOX 24"X36" 27 28 29 30 30A 30B 30C 31 32 33 UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 8 10 LOCATION 27 - PB40399 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40399 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 28 - LB30060 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3' X 5' LOAD BREAK PAD 30060 1 - 3' X 5' LOAD BREAK PAD 30060 LOCATION 29 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 30 INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 30B - PB40397 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40397 WITH FULL TRAFFIC COVER LOCATION 31 INSTALL 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 32 - PB40396 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40396 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 26 & 27 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40400 TO NEW PB 40399 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 27 & 28 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40399 TO NEW LB 30060 BETWEEN LOCATION 28 & 29 ~25' - 1 -3.63" PRIMARY CONDUIT FROM NEW LB 30060 TO NEW XFMR PAD BETWEEN LOCATION 29 & 30 ~10' - 4-3.63" SECONDARY CONDUIT FROM NEW 54" X 60" XFMR PAD TO NEW 24" X 36" JUNCTION BOX BETWEEN LOCATION 30 & 30A ~95' - 1-3.63" SECONDARY CONDUIT FROM NEW 24" X 36" JUNCTION BOX TO EXISTING JUNCTION BOX BETWEEN LOCATION 30 & 30B ~585' - 1-3.63" SECONDARY CONDUIT FROM NEW 24" X 36" JUNCTION BOX TO NEW PB 40397 BETWEEN LOCATION 30B & 30C ~6' - 1 - 3.63" SECONDARY CONDUIT FROM PB 40397 TO NEW 3" RISER BETWEEN LOCATION 30 & 32 ~400'- 1-3.63" PRIMARY CONDUIT FROM NEW LB 30060 TO NEW PB 40396 BETWEEN LOCATION 27 & 31 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 31 & 32 ~400' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 32 & 33 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40396 TO NEW PB 40395 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX ****NOTE**** THE SCOPE OF WORK BETWEEN LOCATION 30, 30B, & 30C MAY BE REMOVED AS OPEN SPACE MAY NOT NEED CPAU ELECTRIC SERVICE LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman 2-#6 C O P P E R W E L D 45' 679 7 F F PB40395 3'X5' 600' FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P PPPPPPP 600' 33 34 17 1 9 17 2 1 17 2 3 17 2 5MO N T E B E L L O R O A D N48 PB1061 2-#4 ACSR TRI2-#4 A C S R F6A ELF 773 679 8 45' 40' 679 9 P P P P P P P P P P P P 40' 680 0 F TX PAD 54"X60" LB30059 LB VAULT - 3'X5' LB PAD - 4'X6' 125 ' 125' FIBER BOX 30"X48" 5' P P P P 35 36 37 37A S S S S 125' PB40394 3'X5' FIBER BOX 30"X48" 5' UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 9 10 LOCATION 33 - PB40395 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40395 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 34 - PB40394 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40394 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 35 - LB30059 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4' X 6' LOAD BREAK PAD 30059 1 - 4' X 6' LOAD BREAK PAD 30059 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 36 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 37 INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 37A INSTALL 1 - 3" RISER LOCATION 37B INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 37C INSTALL 1 - 3" RISER CPAU CONDUIT INSTALLATION BETWEEN LOCATION 33 & 34 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40395 TO NEW PB 40394 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 34 & 35 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40394 TO NEW LB 30059 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 35 & 36 ~5' - 1-3.63" PRIMARY CONDUIT FROM NEW LB 30059 TO NEW XFMR PAD BETWEEN LOCATION 36 & 37 ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37 & 37A ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6799 BETWEEN LOCATION 37 & 37B ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37B & 37C ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6800 LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman 17 4 1 17 5 7 17 2 3 17 2 5 17 2 7 17 2 9 2-#4 ACSR TRI2-#4 A C S R OPEN W I R E 2-#4 A C S R 2-#4 AC S R 3 3- # 2 S T R C U 35' 680 1 35' 680 2 35' 680 3 35' 680 4 40' 680 5 40' 6806 25 774 7 25 7599 SET A T T A P " B " 37.5 780 5 97.5 % PPPPPPPP P P P P P P 40' 680 0 S S SF F TX PAD 54"X60" PB40391 3'X5' PB40392 3'X5' BOX 24"X36" 600 ' 175' 600' FIBER BOX 30"X48" FIBER BO X 30"X48" TX PAD 54"X60" 7' 25' 5' 15' P P P P P P P P P P P P P P F PB40408 3'X5' FIBER BO X 30"X48" PPP P P P 375' 37 38 39 40 41 41A 41B 42 37B S S125' 42B 5' 37C 15' 42A UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXT LEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 10 10 LOCATION 36 - TX PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 37 INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 37A INSTALL 1 - 3" RISER LOCATION 37B INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 37C INSTALL 1 - 3" RISER LOCATION 38 - PB40408 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40408 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 39 - PB40392 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40392 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 40 - PB40391 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40391 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 41 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 41A INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 41B - POLE 6805 INSTALL 1 - 3" RISER LOCATION 42 INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 42A - EXISTING JUNCTION BOX LOCATION 42B - POLE 6806 INSTALL 1 - 3" RISER CPAU CONDUIT INSTALLATION BETWEEN LOCATION 35 & 36 ~5' - 1-3.63" PRIMARY CONDUIT FROM NEW LB 30059 TO NEW TX PAD BETWEEN LOCATION 36 & 37 ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW TX PAD TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37 & 37A ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6799 BETWEEN LOCATION 37 & 37B ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37B & 37C ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6800 BETWEEN LOCATION 35 & 38 ~270' - 1-3.63" PRIMARY CONDUIT FROM NEW LB30059 TO NEW PB 40408 ~270' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 38 & 39 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40408 TO NEW PB 40392 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 39 & 40 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40392 TO NEW PB 40391 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 40 & 41 ~15' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40391 TO NEW XFMR PAD BETWEEN LOCATION 41 & 41A ~25' - 1 - 3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 JUNCTION BOX BETWEEN LOCATION 41A & 41B ~5' - 1 - 3.63" SECONDARY CONDUIT FROM NEW JUNCTION BOX TO NEW 3" RISER BETWEEN LOCATION 41 & 42 ~105' - 1 -3.63" PRIMARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 JUNCTION BOX ~105' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW 24X36 JUNCTION BOX BETWEEN LOCATION 42 & 42A ~15' - 1 - 3.63" SECONDARY CONDUIT FROM NEW 24X36 JUNCTION BOX TO EXISTING JUNCTION BOX BETWEEN LOCATION 42A & 42A ~5' - 1 - 3" RISER FROM NEW 24X36 JUNCTION BOX TO EXISTING POLE LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman RECORDING REQUESTED BY AND WHEN RECORDED RETURNED TO: City of Palo Alto 250 Hamilton Avenue Palo Alto, California 94301 Attn: Real Estate Division Space above this line for recorder’s use only NO TRANSFER TAX DUE DULY RECORDED WITHOUT FEE PUBLIC AGENCY ACQUIRING TITLE, Pursuant to Government Code CALIFORNIA REVENUE AND TAXATION Sections 6103, 27383 & 27388 CODE SECTION 11922. Underground Utility Easement This Underground Utility Easement (“Agreement”), dated , 2025 (“Effective Date”), is made and entered into, by, and between CITY OF PALO ALTO, a California chartered municipal corporation (“City”), and MIDPENINSULA REGIONAL OPEN SPACE DISTRICT, a Public District formed pursuant to Article 3 of Chapter 3 of Division 5 of the California Public Resources Code (“District”). City and District are sometimes referred to in this Agreement singularly as a “Party” and together as “Parties.” RECITALS WHEREAS, the District is the owner of the real property situated in unincorporated Santa Clara County known as Assessor’s Parcel Numbers 351-25-014, 351-06-025, 351-09-002 and 351-12-069 ("District Property"), as part of District’s Monte Bello Open Space Preserve and Rancho San Antonio Open Space Preserve, copies of which Deeds are attached hereto as Exhibit A and incorporated herein by reference; and WHEREAS, the City holds three right-of-way and utility easements for overhead electric transmission lines across District Property, as assigned by Pacific Gas and Electric Company (“Existing Utility Easements”), copies of which Deeds are attached hereto as Exhibit B and incorporated herein by reference; and WHEREAS, the City has been directed by the California Public Utilities Commission (“CPUC”) to identify areas within their jurisdiction that are susceptible to power-line ignited wildfires; and WHEREAS, the City determined that their service territory west of Interstate 280, including the District Property, has an elevated risk of wildfire due to being in the Palo Alto foothills and wind, and therefore seeks to convert their overhead electric lines to underground lines along Montebello Road within District Property; and WHEREAS, the City wishes to convert its existing overhead utility lines and facilities to underground electric and communications lines and facilities along Montebello Road within District Property via three existing easements (Santa Clara County Document Number 228900, Exhibit D - Form of Underground Utility Easement Page 2 Volume 1053, Page 538; Document Number 227988, Volume 1048, Page 567; and Document Number 227989, Volume 1048, Page 562); and WHEREAS, the District, in exchange for City quitclaiming all rights to maintain overhead utility facilities on District Property, is willing to grant City this Underground Utility Easement; NOW, THEREFORE, in consideration of the foregoing recitals and the mutual promises and covenants herein contained, the City and District hereto agree as follows: 1. Grant of Underground Utility Easement. (a) Easement Scope and Description. District hereby grants to City a perpetual, non-exclusive utility easement for the installation, operation, repair, replacement, upgrading, and maintenance of a subsurface conduit system for electric lines and communications transmission lines and associated subsurface and above ground cables, conduits, ducts, manholes, equipment and appurtenances used for transmitting and distributing electric energy and information (collectively, “Underground Utility System”) under, across and along Montebello Road as it crosses District Property (the “Underground Utility Easement”). A legal description and plat map of the Underground Utility Easement is included in Exhibit C attached hereto and incorporated by this reference. The Underground Utility Easement shall include the right of ingress and egress over Montebello Road and Black Mountain Trail on the District Property for purposes related to the City’s use of the Underground Utility Easement. The Underground Utility Easement is intended solely to serve District Property, and therefore, is not offered for, and shall not be dedicated to, public use. (b) Term. The term of the Underground Utility Easement shall commence on the Effective Date and shall be perpetual. (c) Use Restrictions. Use of the Underground Utility Easement by City shall be limited to construction, reconstruction, installation, operation, repair, replacement, upgrading, and maintenance of the Underground Utility System. The City shall use the Underground Utility Easement in accordance with the following: (i) No at-grade or above-grade structures shall be installed pursuant to the Underground Utility Easement except for poles, pads, equipment cabinets, vaults and bollards that are appurtenant to the Underground Utility System. (ii) All subsurface utilities shall be enclosed in a conduit system, which shall be installed with a minimum cover of twenty-four (24) inches below grade at all locations on the District Property, regardless of mechanical protection. Exceptions to the minimum cover requirement are allowed only where cables and conductors rise for terminations or splices or where access is otherwise required by applicable law. (iii) No other utilities shall be co-located in the Underground Utility Easement and City shall not have the right to apportion rights under the Underground Utility Easement to any other utility or service provider. Page 3 (iv) City shall restore District Property promptly following City’s performance of any work pursuant to the Underground Utility Easement to the condition the property was in immediately prior to City’s work, or to an equivalent condition subject to the District’s reasonable approval. City may not close, obstruct or otherwise interfere with use of Montebello Road or Black Mountain Trail without the District’s prior written approval. (d) Repair and Maintenance. (i) City shall be solely responsible, at its sole cost and expense, for constructing, reconstructing, installing, operating, repairing and maintaining the Underground Utility System in accordance with the City of Palo Alto Utilities’ Rules and Regulations, which may include the addition of erosion control measures surrounding utility equipment. In addition, City shall be solely responsible for maintaining the Underground Utility System in a safe condition and free of hazardous conditions. Any maintenance activities shall be conducted by City so as to minimize impacts to District Property. (ii) District shall not plant any trees or bushes, or erect, construct or install any fence, wall, irrigation or any other type of permanent structure, or private utilities, within, over, across or upon the Underground Utility Easement without first obtaining the City’s written consent, which shall not be unreasonably withheld. District shall maintain Montebello Road and Black Mountain Trail as unpaved, all-season roads. (e) Non-Exclusive Use. The Underground Utility Easement shall be non- exclusive, and District may make use of the Underground Utility Easement area provided that such use does not unreasonably interfere with City’s use of the Underground Utility Easement or its intended purposes as permitted under this Agreement. 2. Representation and Warranties. District represents and warrants to City that District has good and marketable title to the District Property, and there are no matters affecting title to the District Property that adversely affect the Underground Utility Easement or the rights granted under this Agreement. 3. Requirements of Law. City shall comply with all present and future laws, rules, orders, ordinances, regulations, statutes, requirements, codes, and executive orders (collectively, “Laws”) of all governmental authorities now existing or hereafter created affecting the Underground Utility Easement granted herein or uses thereof. 4. Mechanic’s Liens. City shall hold harmless, indemnify and defend District from and against any mechanic’s or other liens arising from City’s work, including any liabilities, costs, losses, damages, expenses, causes of action, claims or judgments (including court costs and reasonable attorneys’ fees) on account of such mechanic’s or other liens. 5. As-Is Conveyance. City agrees and acknowledges that District makes no representations or warranties as to the condition of the area contained within the Underground Utility Easement or its suitability for City’s purposes. Neither District nor anyone acting for or on behalf of District has made any representation, statement, warranty or promise to City concerning the physical aspects or condition of the Underground Utility Easement including, without limitation, conditions of the soil, land use restrictions, existence or non-existence of “Hazardous Materials” or suitability Page 4 for the purpose for which City plans on using the Underground Utility Easement. City specifically acknowledges that it is entering into this Agreement with respect to the “As-Is” physical condition and “As-Is” state of repair of the Underground Utility Easement. For purposes of this Agreement, “Hazardous Materials” includes, without limitation, any flammable materials, explosive, hazardous or toxic substances, or related materials defined in the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as now or hereafter amended (42 U.S.C. Section 9601, et seq.), the Hazardous Materials Transportation Act, as now or hereafter amended (49 U.S.C. Sections 1801, et seq.), the Resource Conservation and Recovery Act (42 U.S.C. Sections 9601, et seq.), and in the regulations promulgated pursuant thereto, or any other similar federal, state or local government law, ordinance, rule or regulation. However, District shall be solely and completely responsible for responding to and complying with any administrative notice, order, request or demand, or third party claim or demand, relating to potential or actual Hazardous Materials contamination on, in, or under the Underground Utility Easement, including all costs of remediation and clean up, except to the extent such contamination was caused by City or City’s invitees. 6. Insurance. City, at City’s sole expense, shall maintain and keep in force during the term of the Underground Utility Easement a policy of general liability insurance against claims for bodily injury, personal injury, death and/or property damage arising from City’s use of the Underground Utility Easement, or from any occurrence in, on, about, or related to the Underground Utility Easement, with limits which shall not be less than Two Million Dollars ($2,000,000.00) per occurrence. District shall be named as an additional insured on such policy. Upon District’s request, City shall promptly furnish to District an endorsement evidencing such insurance coverage. City shall require any contractors performing work on District Property to maintain insurance satisfying the above requirements. The District acknowledges that City’s insurance requirements may be satisfied in whole or in part by adequately funded self-insurance programs or self-insured retentions that have been pre-approved by the District. City agrees to furnish a certificate of its contractor(s)’s insurance to District, and evidence of any self-insurance program for City coverage, naming District as an additional insured upon District’s request. All such liability insurance shall insure performance by City of the indemnity provisions hereof, and the policy shall contain a cross-liability endorsement. No such policy of insurance shall be cancelable or subject to reduction of coverage or other modification except after thirty (30) days prior written notice. The limits of said insurance shall in no event be deemed to limit the liability of City hereunder. 7. Indemnity. Each Party (the “Indemnitor”) shall indemnify, defend, and hold harmless the other Party (“Indemnitee”) and its officers, employees, agents, administrators, successors, and assigns, from and against any and all claims made or threatened by any third party and all related losses, expenses, damages, costs and liabilities, including reasonable attorneys' fees and expenses incurred in investigation or defense, to the extent the foregoing arise out of or relate to any error, negligent act, omission or willful misconduct by the Indemnitor, its employees, agents, contractors, subcontractors or invitees. The Indemnitee shall promptly notify the Indemnitor once it is aware of a potential action and shall cooperate with the Indemnitor in all reasonable respects in connection with the defense of any such action at the expense of the Indemnitor. The Indemnitor may, upon written notice to the Indemnitee, undertake to conduct all proceedings or negotiations in connection with the action, Page 5 assume the defense thereof, including settlement negotiations in connection with the action, and will be responsible for the costs of such defense, negotiations and proceedings. The Indemnitor will have sole control of the defense and settlement of any claims for which it provides indemnification hereunder, provided that the Indemnitor will not enter into any settlement of such claim without the prior approval of the Indemnitee, which approval will not be unreasonably withheld, delayed, or conditioned. The Indemnitee shall have the right to retain separate counsel and participate in the defense of the action or claim at its own expense. 8. No Liability. City waives all claims against District for damage to property, including the Underground Utility System and any Alterations thereto, and any equipment or machinery, and/or injury or death to persons occurring in, on, or about the Underground Utility Easement, from any cause arising at any time, except as may be caused by the District’s negligence or willful misconduct. 9. Notice. All notices, demands, consents, requests, approvals, disapprovals, designations or other communications (all of the foregoing hereinafter referred to as “notice”) that any Party hereto gives to any other Party shall be in writing and shall be deemed to have been properly given if (a) served personally, or (b) mailed, when deposited with the United States Postal Service within the boundaries of the continental United States for registered or certified delivery, return receipt requested, with postage prepaid, or (c) sent by overnight courier, postage prepaid, in each case addressed to the applicable recipient as follows: If to City: City of Palo Alto Attn: Utilities Department, Electric Engineering 250 Hamilton Avenue Palo Alto, CA 94301 Telephone: (650) 329-2161 With a copy to: City of Palo Alto Attn: Real Property Manager 250 Hamilton Avenue Palo Alto, CA 94301 If to District: Midpeninsula Regional Open Space District Attn: Real Property Manager 5050 El Camino Real Los Altos, CA 94022-1404 Telephone: (650) 691-1200 12. Subordination. The Underground Utility Easement shall be superior to any and all deeds of trusts, mortgages, liens, ground leases, licenses, covenants or encumbrances recorded after the recordation of this Agreement that affect the District’s Property, and this Agreement shall survive the foreclosure or termination of any such instrument or interest. Page 6 13. Authority. The District and City, respectfully, represent and warrant that each has the power and authority to execute and carry out the terms and provisions of this agreement. 12. No Partnership. Nothing contained in this Agreement shall be construed as making District and City joint venturers or partners. 13. Miscellaneous (a) Mediation of Disputes. (i) Consultation and Resolution Process. In the event either party believes the other party to this Agreement has failed to comply with its terms, or wishes to propose an amendment to this Agreement to address any term or condition herein, or to discuss any operational issues concerning the Underground Utility Easement, the parties agree to meet and confer within thirty (30) days of receipt of a written request for consultation delivered to the other party as set out in Section 9 herein. (ii) If the consultation process set out in Subsection (a) (i) fails to resolve any dispute arising out of or relating to this Agreement or the performance or breach thereof, the parties agree to participate in good faith in non-binding mediation in order to resolve their dispute prior to pursuing any available legal remedies. (b) Captions. The captions of this Agreement are inserted only as a matter of convenience and for reference. They do not define, limit or describe the scope or intent of this Agreement and they shall not affect the interpretation hereof. (c) Exhibits. Each of the Exhibits referenced in this Agreement is attached hereto and incorporated herein. (d) Amendment. This Agreement may be amended only by an instrument in writing executed by the Parties hereto or by their successors and assigns. (e) Time. Time is of the essence of this Agreement. (f) Written Consent Required. Whenever a Party is requested to consent or to approve of any matter with respect to which its consent or approval is required by this Agreement, such consent or approval shall be given in writing. (g) Further Assurances. The Parties shall execute such further documents and instruments as may reasonably be required from time to time by the other Party to effectuate and carry out the provisions hereof and to take such further actions as may reasonably be required to give the terms hereof full force and effect for the benefit of the Parties. (h) Terms Run with the Land. The easements, terms, covenants and conditions contained herein shall run with the land and be binding upon and inure to the benefit of the successors and assigns of the Parties hereto pursuant to California Civil Code Section 1468. Page 7 (i) Severability. If any provision of this Agreement shall to any extent be invalid or unenforceable, the remainder of this Agreement (or the application of such provision to persons or circumstances other than those in respect of which it is invalid or unenforceable) shall not be affected thereby, and each provision of this Agreement, unless specifically conditioned upon such invalid or unenforceable provision, shall be valid and enforceable to the fullest extent permitted by law. (j) Governing Law. This Agreement shall be construed and governed in accordance with the laws of the State of California. (k) Counterparts. This Agreement may be executed in counterparts, each of which shall constitute an original, and all of which together shall constitute one and the same instrument. IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the date first written above. CITY: CITY OF PALO ALTO, a California chartered municipal corporation By: _____________________________ City Manager or designee Date: __________________________ APPROVED AS TO FORM: By: City Attorney or designee DISTRICT: MIDPENINSULA REGIONAL OPEN SPACE DISTRICT, a Public District formed pursuant to Section 3 of Chapter 3 of Division 5 of the California Public Resources Code By: Ana M. Ruiz, General Manager Date: ______________________________ APPROVED AS TO FORM: By: Hilary Stevenson, General Counsel ATTEST: By: _____________________________ Maria Soria, District Clerk Exhibit A - District Property r K 27PAGE 501L Order No. 1003 -87 9 r.. Escrow No. 1 ° 95794Sg Loan No. REC FEE ` Recorded at tt;a Raquest of First Americv Title Gi1arar:ty Co. WHEN RECORDED MAIL TO: RMF MICRO 8:00 iYli.dpeninsula Regional Open Space District JAN 2 51988 A.M. Old Mill Office Ctr. , Bldg. C, Suite 1 5 LIEN NOT 201 San Antonio Circle LAURIE KAN-, Recorder Mountain view, Ca. 94040 Sh1PF Santa Clara County,Official Records Attn: Sandy Voorhees PCOR SPACE ABOVE THIS LINE FOR RECORDER'S USE FULL RECONVEYANCE FIRST AMERICAN TITLE INSURANCE COMPANY, a Corporation, Trustee under the Deed of Trust executed by MIDPENINSULA REGIONAL OPEN SPACE DISTRICT (a Public Districts Trustor, and recorded__ember 2, 1977 as Document No. 5860350 in Book D31 6 page_ ___ R8 of Official Records in the Office of the County Recorder of Santa Clara County, California, having been requested in writing by the holder of the obligation secured by said Deed of Trust,to reconvey the estate granted to Trustee under said Deed of Trust, does hereby reconvey to the person or persons legally entitled thereto, without warranty, all the estate, title and interest acquired by Trustee under said Deed of Trust. DESCRIPTION "As described in said Deed of Trust." IN WITNESS WHEREOF, said FIRST AMERICAN TITLE INSURANCE COMPANY, Trustee, hascaused itscorporate name and seal to be hereto affixed by its Assistant Secretary,thereunto duly authorized. Dated: December 31, 1987 ... sss/// ( iE INSu FIRST AMERICAN TITLE INSURANCE COMPANY a" I11Por(l0 itCi1 Sept.24, K02 By J 0. Turner c% Assistant Secretary STATE OF CALIFORNIA C L!FOR'•b' COUNTY OF San Mateo On--_ December 31, 1987 before me, the undersigned, a Notary Public in and for said State, personally appeared Jay 0. Turner personally known to me to be the person who executed the within instru- ment as Assistant Secretary,on behalf of First American Title Insurance7NOIARY 111 Company,the corporation therein named,and acknowledged to me that Y DUNCAN PU6UC-CALIFORNIA such corporation executed the within instrument as Trustee. CiPAL OFFICE IN WITNESS my and officiaZ,4 SAN MATEO COUNTY my Commiewon E Was"./.19N Signature,--/ This area for official seal) N 426125 1323(7/82) Order-No. Escrow No. 1-4084 Loan No. i WHEN RECORDED MAIL TO: Alyce Lee Burns SPACE ABOVE THIS LINE FOR RECORDER'S USE DEED OF TRUST WITH ASSIGNMENT OF RENTS SHORT FORM) This DEED OF TRUST, made November 21 , 1977 between MIDPENINSULA REGIONAL OPEN SPACE DISTRICT (a Public District) herein called TRUSTOR, whose address is 375 Di stet Circle, Suite D-1 Los Altos, California 94022 Number and Street) City)State) FIRST AMERICAN TITLE INSURANCE COMPANY, a California corporation, herein called TRUSTEE, and ALYCE LEE BURNS, A MARRIED WOMAN herein called BENEFICIARY, WITNESSETH: That Trustor grants to Trustee in Trust, with Power of Sale, that property in the County of Santa Clara State of California, described as: SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF FOR LEGAL DESCRIPTION I I i Together with the rents,issues and profits thereof,subject, however,to the right, power and authority hereinafter given to and conferred upon Beneficiary to collect and apply such rents,issues and profits. 1 ,600,000.00ForthePurposeofSecuring(1)payment of the sum of$ with interest thereon according to the terms of a promissory note or notes of even date herewith made by Truster, payable to order of Beneficiary, and extensions or renewals thereof, and (2) the performance of each agreement of Trustor incorporated by reference or contained herein (3) Payment of additional sums and interest thereon which may hereafter be loaned to Truster, or his successors or assigns,when evidenced by a promissory note or notes reciting that they are secured by this Deed of Trust. To protect the security of this Deed of Trust, and with respect to the property above described, Trustor expressly makes each and all of the agreements, and adopts and agrees to perform and be bound by each and all of the terms and provisions set forth in subdivision A, and it is mutually agreed that each and all of the terms and provisions set forth in subdivision B of the fictitious deed of trust recorded in Orange County August 17, 1964, and in all other counties August 18, 1964, in the book and at the page of Official Records in the office of the county recorder of the county where said property is heated,noted below opposite the name of such county,namely: COUNTY BOOK PAGE COUNTY BOOK PAGE COUNTY BOOK PAGE COUNTY BOOK PAGE Alameda 1288 556 Kings 858 713 Placer 1028 379 Sierra 38 187Alpine313031Lake437110Plumas1661307Siskiyou506762Amador133438Lassen192367Riverside3778347Solano1287621Butte1330513LosAngelesT•3878 874 Sacramento 5039 124 Sonoma 2067 427Calaveras185338Madera911136SanBenito300405Stanistaus197056Colusa323391Marin1849122SanBernardino621376$ Sutter 655 585ContraCosta46841Mariposa90453SanFranciscoA•804 596 Tehama 457 183DelNorte101549Mendocino66799SanJoaquin2855283TrinityToe595ElDorado704635Merced1660753SanLuisObispo1311137Tulare2530108Fresno5052623Modoc19193SanMateo4778175Tuolumne177160Glenn46976Mono69302SantaBarbara2065881Ventura2607237Humboldt80183Monterey357239SantaClara6626664Yolo76916Imperial1189701Napa704742SantaCruz1638607Yuba398693inyo165672Nevada36394ShastaBoo633 Kern 3756 690 Orange 7182 18 San Diego SERIES 5 Book 1964,Page 149774 shalt inure to and bind the parties hereto, with respect to the property above described. Said agreements, terms and provisions contained in said subdivision A and B,(identical in all counties,and printed on the reverse side hereof)are by the within reference thereto, incorporated herein and made a part of this DeedofTrustforallpurposesasfullyasifsetforthatlengthherein, and Beneficiary may charge for a statement regarding the obligation secured hereby, providedthechargetherefordoesnotexceedthemaximumallowedbylaw. The undersigned Trustor, requests that a copy of any notice of default and any notice of sale hereunder be mailed to him at his address hereinbefore set forth. STATE OF CALIFORNIA, Signature of Trustor COUNTY ss. On—__.._ -__— before me, the MIDPENINSULA REGIONAL OPEN SPACE DISTRICT undersigned, a Notary Public in and for said State, personally appeared i President, Wcard of Direct ` known to me to be the person_.—whose name_.__ subscribed to the within T instrument and acknowledged that executed the some. WITNFSS my hund and official seal. Signature i 1 Name (Typed or Printed) This area for official notarial seal) 115$(11I681 ' EXHIBIT "A" PARCEL ONE A The Northwest 1/4 of Section 14 ; the North 1/2 of the Southeast 1/4 of Section 15 ; all that portion of the Fractional Northwest 1/4 of Section 15 , lying Easterly and Southerly of the center line of the Page Mill Road , and al that portion of the South 1/2 of the Northeast 1/4 of Section 15 , lyingEasterlyandSoutherlyofthecf,nter line of Page Mill Road ; all in Township7 , South Range 3 West, Mount Diablo Base and Meridian. EXCEPTING THEREFROM all that portion thereof included within the Noun(-}s of the County of San Mateo, State of California. ALSO EXCEPTING THEREFROM all that portion of the South 1/2 of the Northeast 1/4 of Section 15 lying Easterly and Southerly of the centerline of Page Mill Road and lying East of a line drawn due South from the intersec of the centerline of Page Mill Road with the division line between the CountyofSantaClaraandtheCountyofSanMateo; said division line beingdesignatedas "South 810 15 ' East" between "Station 64 and Station 6510 , all being shown on that certain Record of Survey recorded July 18 , 19512 in Book 32 of Maps , page 33 . PARCEL 01,1E B Beginning at the Quarter Section corner on the center of Section 151 Township 7 South, Range 3 West , M.D.M. , and running thence: along, the Quarter Section line running East and West throug;ht the center of said Section 15North89030' West 23. 58 chains to a stake marked D.M. 13 standi.r.g at the intersection of said Quarter Section line with a picket fence from which stake the Quarter Section corner between Sections 15 and 16 , bears Nort:.89 1/2' West 17. 27 chains said .stake D.H. 13 being the Northwesterly cornerofthat79acretract , more or less deeded to Lambert Dornberger by DeeddatedSeptember7 , 1886 and recorded in Book 88 of Deeds , page 67 in the office of the County Recorder of Santa Clara County, California runningthencealongthesaidpicketfence, and the Westerly line of said 79 acre tra-South 42 1/40 East 9. 67 chains to a 6" x 6" fence post marked D-i-i 12 , andSouth171/20 East 4. 80 chains to an elderberry tree marked D-M 11 standingattheendofsaidpicketfence; thence running along the East side of a4 ravine South 22 3/40 East 2.43 chains, South 14 3/4' West 1. 65 chains to aleaninglaurel30inchesindiametermarkedD-1-1 9 , South 6 1/20 East 1. 22 chains , South 44 3/41 East 2. 85 chains to Station D.M. 7 , South 71 3/40 East1.15 chains to a live oak tree marked D-M 6 , South 18 1/41 East 1. 27 chains,to a white oak marked D-M 5 , South 161 East 2. 80 chains , South 18 1/1 0 East11. 30 chairs , South 30 1/1;0 East 3. 80 chains , South 391 East 1. 20 chains ,South 1 p -,1 1 2 l.w t 1.29 chains to the cent er of StevensCreek• thence upont}le center of said Creek, South 121 West 2. 31 chains South 5 1/110vca..s t1. 20 chains to Station; South 17 1/41 Hest at 0. 70 chains to a point fromwhichtheQuarterSectioncornerbetweenSection15and22 , Township 7 Soj; LL-Rang;ct 3 t,est , bears North 83 3/40 East 5. 80 chains at 1. 72 chains -to Statior ,South 10" East 2 . 00 chain:: South 36 3/40 West 1. 95 chain: to station near.the confluence of two ravines forming Stevens Creek; thence up the center Cont'd on next page) I i 1 A 2 s f the Southerly ravine , South 12 3/40 East 1.40 chains South 25 1/4cl t2. 30 chains South 28 1/40 Easto1.15 chains South 22 3 4 East 1. 20 chains ,South 9 1/40 East 1. 80 chains , South 34 1/40 East 1. 90 chains, South 20 1/40East1. 80 chains , South 14 3/41 West 1.73 chains South 63 3/40 West 2.40chains , South 50 3/40 West 2. 87 chains , South 41 3/40 West 1.23 chains to theconfluenceoftworavines , South 46 3/41 East 0. 90 chains to station in roadtoDornbergerfromwhichStationapineoaktreeS" in diameter bears North821120 ,East 0. 50 chains, thence continuing along the Westerly line of theaforementioned79acretractSouth2* East 4.96 chains, South 80 East 2. 53chainstoatanoak8" in diameter mar'ced D.M.D M. 4 Sou th 22 We ststtoai 4 . 00 chainspineptree6feetindiametermarkedD.M. 3 - thence lea vingn the tle ster 1lineoftheaforementioned79acretractandrunningNorth78017 ' East11. 72 chains to a stake marked D. 3 standing at the most Southerly cornerthefen ofccaroundundanoldorchardthencealong1ngthefenceontheSoutherlysideofsaidorchardandtheprolongationofsaidfence, North 61t0 55 ' East 7. 82 chains to a stake marked D.4 standing in a fence running Nor thwestwest an dSoutheast , thence North 540 05' East 11. 88 3/4 chains to a fence Post mar ke dD. 5 standing at the corner of two fences, thence North 300 11' East 9 . 20chains , cross ravine at 10.47 chains , a leaning madrone loll in diameter at12. 57 chains a redwood tree 8 feet in diameter at 15. 42 chains a madrone tree4feetindiameterat18. 38 chains a tan oak tree 4 feet in diameter and at23. 24 chains to station in the center of the Stevens Creek from which Stationa2" x 3" stake marked W.P. bears South 300 11' West 20 links and from whichstakeatanoak12" in diameter bears South 18 1/20 West 0.15 chains and aleaningtanoak9" in diameter bears South 83 1/41 West 0. 28 chains, runningthencealongthecenteroftheStevensCreek, Southeasterly the followingcoursesanddistances: ' South 550 30 ' East 1. 75 chains North 600 56 ' East1. 95 chains , South 300 56 ' Fast 2 . 00 chains , South 480 36 ' East 1. 39 chainsNorth84009 ' East 1. 81 chains , South 90 38 ' East 1. 07 chains , South 880 oil 'East 1.49 chains, South 660 45 ' East 1.23 chains South 210 54 ' East 2. 73chains , South 58' 24 ' East 2. 23 chains , South 590 40 ' .East 3. 07 chains , South50' 59 ' Fast 1. 31 chains , South 4l' 49' East 3. 35 chains , South 830 19'East 2 . 8S chains , South 410 40' East 1. 87 chains, South 58' 24 ' East 1. 70chains , South 42° 43' East 1. 25 chains , South 740 15 ' East 2. 41 chains -to theEastlineoftheWestone-half of the Northwest Quarter of Sec. 23. T. 75. 1' .3tW- , M.D.M. thence along said East line North 00 35' West 14 . 56 chains to t`iQNortheastcorneroftheWestone-half of the Northwest Quarter of Sec. 23 ,T. 7S , R. 3W. , M.D.M, ; thence along the section line running between Sections14and23 , T. 7S. , R. 31-1. , M.D.M. , East 39. 65 chains to the Southwest cornerOfthat80acretractdeededtoArthurJ. Bond by Deed dated April li , 189S andrecordedinBook177ofDeeds , page 390 in the office of the County Y:ecor:lzrofSantaClaraCounty, California; thence along the Westerly line of said80acretract , 2lorth 30 35' East 40. 51 chains to the Northwest corner ofsaid80acretractintheQuarterSectionlinerunning; East and tWest throughthe-.center of Section 14. T. 7S. , R. 3tW. , M.D.M. , thence along the Quart rSectionlinerunningEastandWestthroughthecenterofsaidSectiont jl t 1WesttotheQuarterSectioncornerontheWestlineofsaidSectionIt, , then-c.alon; the ;best line of said Section 14 , Southerly 20. 15 chains to a tF" x 4"stake standing at the Northeast corner of the South one-half of the Sout] _as II Quarter of Section 15 T. 7S, , R. 3W. , t-S.D-2'i. , thcncn- along the North lin zioftheSouthone--half of the Southeast quarter of Section 15 , Piortti 880 30 , I Cont 'd on next pa,r,) West 40. 80 chains to the Northwest corner of the South one--half of the Southeast Quarter of said Section 15; thence along the Quarter Section line running North and South through the center of said Section 15 , North 20 East 18 . 1S chains to the place of beginning, being Parts of Sectio ns 14 15 22 and 23 , T. 7S. , R. 3W. , M.D.M. EXCEPTING THEREFROM that portion thereof conveyed by Sada Coe Robinson to John If. Richey by Deed dated March 13 , 1950 and recorded April 26 , 1950 in Book 1967 of Official Records , page 406 and more particularly described as follows: Beginning at the point of intersection of the Southerly line of the Skyline Boulevard, as the same existed in January 1950 , with the Westerlylineofhe5t + 4. 89 acre parcel of land conveyed by Bertha A. Hayes to Sada Coe Robinson by Deed dated January 14 , 1946, and recorded January 17 , 19463,in Book 1266 of Official Records, page 531, Santa Clara County Records , thence from said point of beginning Southerly along said Westerly line of the 454. 89 acre parcel above referred to, to the most Southerly corner thereof at a pine tree 6 feet in diameter marked D.M. 3 , thence Northeasterly along the Southerly line of the said 454.89 acre parcel to the intersection thereof with the said Southerly line of the Skyline Boulevard; thence Westerly along said line to the point of beginning, being a portion of the North 1/2 of Section 22 , Township 7 South, Range 3 West, M.D.B. 6M. ALSO -the right of way from the lands and premises above described to the County Road , reserved in the Deed from Lambert Dornberger to Frances Mayer, dated June 25 , 1875 and recorded July 29 , 1875 in Book 36 of Deeds , page 506 , Santa Clara County Records. ALSO the right to take , appropriate and use the water of a certain springysituatedontheNorthwestQuarterofSection22 , Township 7 , South, Range 3 West M. D.M. , and Northerly from the above mentioned Madrone Tree marked D.M. 2 , said spring being the same heretofore used by Lambert Dornberger; also the right to lay down, keep and maintain suitable and proper pipes to conduct said water and to make , erect, keep and maintain there at all necessary and suitable improvement for collecting, storing and using said water and also the right of way for egress and ingress to and from said spring 'over , upon and across the land of Frances Mayer. Also the right of way over the travelled road leading from the Page Mill Road to the premises of Lambert Dornberger; all as reserved in the deed from Lambert Dornberger to Frances Mayer, dated September 7 , 1886 and recorded December 18 , 1886 in Book 87 of Deeds , page 202, Santa Clara County Records. PARCEL ONE C All that portion of the South 1/2 of the Northeast 1/4 of Section 15 , Township 7 South , Range 3 West , lying Easterly and Southerly of thr_ centerline. of Page Mill Road and lying East of a line drawn due South from the intersecti of the center line of Page Mill Road with the division line between the County Cont 'd on next page) Of Santa Clara and the County of San Mateo saiddesignatedas "South 810 15 ' Ea3t" between"Station v641 and on 1S tationine n65" allbein€;' shown on that certain Record of Survey recorded July 18 , 1951inBoot: 32 of Maps , page 33. EXCEPTING THEREFROM the following described parcel of land: A portion of the ri or thwest 1/21/11 of Section 15 , Township 7 South ,oRange 3o West,SM.DJB.6M. , t 1A of h and abeingst more particularly described as follows : Beginning at an iron pipe in the center line of Page Hill Road, (40. 00feetwide) on the North line of the South 1/2 of the Northeast 1/4 of saidSection15: thence along said North ling , South 89° 10' 07" Eastsfeettttoaniron 1041. 62pipepeontheEasterlylineofaYprivateroadd (20.n width) 00doh) known as Montebello feetntebelloRoad; then ce along said Easterly line withfollowingcoursesanddistances:hLances. Southerly aloe theYh artherightthetangentR c of , curve togntofwhichbearsSouth24° 32 ' 08" East having aradiusof170feetthroughtiaocentrestg1angleeof74. 05 feet to an iron pipe; thence South ao 251 57' 27 an are distance 0 25 19 Westest 193 . 74anironpipeatthebeginningofacurve; thence along the arc ofeatcurvetotheleft , having a -radius of 440 feet; through a central angle of 11°49 ' 15" an arc distance of 90. 78 feet to an iron pipe at a point ofcurvature; thence along the arc of a compound curve to the left, havingpaunaradiusof50feet , through a central angle of 97° 34' 30" an arc distanceOf85. 15 feet to an iron pipe; thence North 710 01' 34" East 50. 28 feet toanironpipeatthebeginningofacurve, thence along the arc of a curvetotheright, having a radius of 80. 00 feet , through a central angle of88036 ' 55" an arc distance of 123. 73 feet to an iron pipe; thence South 20021' 34" East 41. 75 feet to an iron pipe at the beginning of a curve; thencealongthearcofacurvetothelefthavingaradius -of 205 . 00 feet; throughacentralangleof25037 ' loll an arc distance of 91. 66 feet to an iron pip:;,thence South 450 58 ' 41" East 45. 38 feet to an iron pipe at the beginningofacurve; thence along the arc of a curve to the right , having a radiuf185. 00 feet , through a central angle of 22' 49 ' 15" an arc distance of s o 73. 69 feet to an iron Pipe; thence South 231 09' 26" East 141.68 feet to anironpipe ; thence leaving said Easterly line of Montebello Road North 89°10 ' 07" West 1698. 75 feet to an iron pipe in the center line ofRoad; -thence along said centerline with the following courses andali,tances:North 400 21 ' 34" East 116. 35 feet to a 3/4 inch iron pipe; North 200 54 ' 34"East 179. 86 feet to a 3/4 inch iron pipe; North 13° 34 ' Otf" Ea;feet to a 3/4 inch iron pipe t 230. 02 Point of beginning. P P" and North 6 54 ' 43" East 273. 98 feet -to the ALSO EXCEPTING FROM above mentioned Parcels No. 1 and 11o. 3 thef0110'4ing described property as conveyed in the Final Juc1 merecordedNovember13 , 1964 , in Book 6740 of Official Records , toC 'rnnatiar: described as follows : pge 287 Cont'd on next page) 4 r 5 Beginning at an iron pipe in the center line of Page Mill Road marking-; es 270 acre tract of land conveyedcornerofthatcertain22mostWesterlycrnYthetY r et al dated March 18 1963 andJ. e J .Harry Be rbAliceLem. Burns to HY Y Y recorded June 20 , 1963 in Book 6071 of official Records , page 412 , Records O i Tt , a r County, California; thence North 88 5D 27 East along theof __:-it Clara u t Y> Southerly line of said Tract of land 1327. 57 feet to the true point of gbeSinnin • thence from said true point of beginning North 88' 50' 27" East o r o 361. 43 feet; thence South 12 36 47 East 8 feet ; thence South 47 t ^n o r 'S140 . 00 fEu725336Westfeet ; thenceeeSouthT700feet; thence533atest11. North 270 06' 24" West 263. 00 feet to the true point of beginning, and being a portion of Section 15 , Township 7 South, Range. 3 West , M.D.B.EM. ALSO EXCEPTIUG FROM all the lands hereinabove described so much thereof as lies within the following described parcel of land: Beginning at the center of Section 15 , Township 7 South, Range 3 West , M.D. B. EM. , thence Westerly along the Quarter Section line through the center of said Section 15 , North 890 30' West 1556 .28 feet more or less to a stake marked "D.M.13" , standing at the intersection of said Quarter Section line with a picket fence from which stake the Quarter Section corner between Sections 15 and 16 , bears North 891 30' West 1556. 28 feet pore or less , said stake "D.M.13" being the Northwesterly corner of that tract of land deeded to Lambert Dornbarger by Deed dated September 7 , 1886 and recorded in Book 88 of Deeds , page 67 in the office of the County Recordei of Santa Clara County, California, said point being the TRUE P0114T OF BEGINNING , thence from said TRUE POINT OF BEGINNING Westerly along said Quarter Section line running through the center of said Section 15 North 890 30 ' West to the division line between San Mateo County and Santa Clara County ; thence Northerly and Easterly along said county division line , 1636 feet more or less, to the center line of Page' Mill Road ; thence Easterly along the centerline of Page Mill Road, 1230 feet more. or less , to said County division line; thence Easterly along said County Division line to a point lying 350 feet East of a line running North and South through the center of said Section 15 ; thence Southerly along a line, parallel with a North and South section line through the center of Section 15 , said line being 350 feet East of the center of Section 15 , to the Northerly Right of Way line of Skyline Boulevard; thence along the Northerly Right ofnk1. g y Way line of Skyline Boulevard Westerly to the Westerly line of the 45ii . 8C_+ acre parcel of land conveyed by Bertha A. Hayes to Sada Coe Robinson by Deed dated January 14 , 1946 , and recorded January 17 , 1946 in Book 1266 of Official Records , page 531 , Santa Clara County Records ; thence Northerly tlozig : id Westerly line of the 454. 89 acre parcel of land to the TRUE: POINIT OF BEGINNING I 10 15 14 160 00 AC.) 170.00 Ac r 4/ 1 3.60AC` Fa'CFv ryo.v CIfiY SF V'.LO AL'J• 3 1 13 13693 A MONTEaEJ r P.9RCfL ' C 1 e J AC)c T C240.. oo AC)l 471.55 AC TOTAL 8 f6+AC. TOTAL s F ti 2Yy -Y-lsf-u)s Y 7> f l 17 cik L 20.73 AC. Is I t co vE. i r FORM OF ACKNOWLEDGEMENT State of California ss: County of Santa Clara ) On this the 22 day of November lg 77- before me, Stanley R. Norton personally appeared the undersigned officers Daniel Wendin, President Harry A. Turner , and Nonette Hanko Katherine M. Duffy Edward Shelley Richard Bishop Barbara Green r Directors of the Midpeninsula Regional Open 4 Space District, known to me to be the persons described in the foregoing instrument, and acknowledged that they executed the same in the capacity therein stated and for the purposes therein contained. In witness whereof I hereunto set my hand and official seal. k, Notar Public f NOTA2Y F r'r SAt TA CL Y1978 y} rY Sh r a Ave., Palo Alto, CA 94306 Ill FORM OF ACKNOWLEDGEMENT State of California ss: County of Santa Clara On this the 22 day of November 19 77 , before me, Stanley R. Norton personally appeared the undersigned officer Daniel Wendin, President Director of the Midpeninsula Regional Open Space District, known to me to be the persons described in the foregoing instrument, and acknowledged that they executed the same in the capacity therein stated and for the purposes therein contained. In witness whereof I hereunto set my hand and official seal . SSS STf NLEY 2. i 7'd ? Notar Public NOTARY FL'5UC - :,_,i;;:: p`•alA SANTA CLALA COU'iTYcorrm: ir ...ta "" 19731( 4306407ShermanAve., Palo Alto, CA 9 Page 1 of 2Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991516 DEQ 02-27-1981 Page 2 of 2Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991516 DEQ 02-27-1981 Page 1 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981 Page 2 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981 Page 3 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991517 DED 02-27-1981 Page 1 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981 Page 2 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981 Page 3 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991518 DED 02-27-1981 Page 1 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981 Page 2 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981 Page 3 of 3Non-Order Search Requested By: cbirk, Printed: 1/14/2025 7:09 PM6991519 DED 02-27-1981 Exhibit B - Existing Utility Easements EXHIBIT C Underground Utility Easement Legal Description & Plat Map WHEN RECORDED MAIL TO: Midpeninsula Regional Open Space District Attn: Real Property Department 5050 El Camino Real Los Altos, CA 94022 Recording Requested By: City of Palo Alto, Attn: Utilities Department 250 Hamilton Avenue, Palo Alto, CA 94301 NO TRANSFER TAX DUE Public agency relinquishing any interest previously recorded on August 14, 1941 (Volume 1053, Page 538 & Volume 1048, Page 567) and August 26, 1941 (Volume 1048, Page 562) QUITCLAIM DEED DULY RECORDED WITHOUT FEE Pursuant to Government Code Sections 6103, 27383 & 27388 APNs 351-25-014, 351-06-025, 351-09-002 and 351-12-069 For Valuable Consideration, receipt of which is hereby acknowledged, CITY OF PALO ALTO, a California chartered municipal corporation, does Hereby REMISE, RELEASE AND QUITCLAIM to MIDPENINSULA REGIONAL OPEN SPACE DISTRICT, a Public District formed pursuant to Article 3 of Chapter 3 of Division 5 of the California Public Resources Code, Any and all of its right, title and interest to erect, maintain and use overhead electrical and communications facilities, including poles, wires, guys, anchors, crossarms, hardware, braces and other fixtures, facilities or appliances, along with any rights of way therefore, including the following three (3) easements assigned in the Assignment from Pacific Gas and Electric Company to City of Palo Alto, Official Records of Santa Clara County, recorded on September 19, 1966, Book 7509, Page 170: Grantor Date Recording Louis Oneal, Inc. August 14, 1941 Volume 1053 of O.R., Page 538 Bertha A. Hayes August 14, 1941 Volume 1048 of O.R., Page 567 George F. Morell and wife August 26, 1941 Volume 1048 of O.R., Page 562 Being more particularly described in Exhibit “A” as attached hereto and incorporated by this reference. City of Palo Alto __________________________________ City Manager or Designee Exhibit E - Form of Quitclaim Deed Exhibit A Page 1 CITY OF PALO ALTO ACCESS AND UTILITY LICENSE AGREEMENT This License Agreement (“License”) is made and entered into this day of , 2025 (“Agreement Date”) by and between Midpeninsula Regional Open Space District, a California special district, hereinafter called “District,” and City of Palo Alto, a California chartered municipal corporation, hereinafter called “Licensee” or “City.” District and Licensee are sometimes referred to herein individually as a “Party” and collectively as the “Parties.” RECITALS WHEREAS, District is the owner of certain real property situated along Montebello Road at Monte Bello and Rancho San Antonio Open Space Preserves in the County of Santa Clara, State of California, known as Santa Clara County Assessor’s Parcel Numbers 351- 25-014, 351-06-025, 351-09-002 and 351-12-069, shown on Exhibit A, attached hereto and incorporated herein by this reference (“District Property”); and WHEREAS, Licensee holds right-of-way and utility easements for electric transmission lines across District Property, as assigned by Pacific Gas and Electric Company from Louis Oneal, Inc., Bertha Hayes, and George Morell (collectively, “Existing Utility Easements”), in the locations generally depicted on Exhibit A; and WHEREAS, Licensee wishes to convert its existing overhead electric lines and facilities to underground electric and communications lines and facilities along Montebello Road within District Property (the “Project”), which lines and facilities are generally shown on Exhibit B, attached hereto and incorporated herein by this reference; and WHEREAS, the Project will take place on District Property in the designated areas (the “License Area”) shown on the construction plans, specifications and best management practices approved by the City and District (collectively “Construction Plans”), which Construction Plans are attached hereto as Exhibit C, and incorporated herein by this reference; and WHEREAS, Licensee and District are, in addition to this License, entering into an Exchange Agreement wherein the District will grant a new easement for Licensee’s underground utility facilities in exchange for Licensee quitclaiming to District its rights to maintain overhead utility facilities on the District Property (“Exchange”); and WHEREAS, Licensee and District desire to enter into this License to allow Licensee to commence work on the Project on District Property prior to the Exchange; NOW THEREFORE, District and Licensee agree: 1)Incorporation. The above Recitals and the exhibits attached to this License are hereby incorporated herein and made a part hereof. Exhibit F - Form of License Agreement Page 2 2) License Area. District hereby grants to Licensee and its agents, consultants, contractors, subcontractors and employees a revocable, non-exclusive license to use those certain portions of District Property designated as the “License Area” on Exhibit C, subject to the terms and conditions contained herein. No other portion of the District Property shall be used by Licensee without the District’s prior written consent. 3) Term. This License shall become effective as of the Agreement Date and, unless earlier terminated pursuant hereto, shall expire on December 31, 2025 or upon closing of the Exchange, whichever comes first. Upon mutual agreement of the Parties, the term of this License may be extended in the event that the Project is not yet complete. 4) Use. The Licensee must use the License Area in strict accordance with this License. a) Project Description. The Project includes the following general categories of work on the District Property (the “Work”): (1) installing and commissioning underground electrical and fiber optic communications lines and related facilities under, across and along Montebello Road via a boring construction method, where practicable, as it crosses District Property; (2) decommissioning, removal and disposal of all existing overhead electrical and communications lines, poles, and related fixtures and facilities currently installed on District Property; and (3) repairing and restoring the License Area to the condition that existed upon the Agreement Date, or as otherwise agreed upon in Construction Plans or this License, and to the extent damaged by Licensee, any portion of District Property outside the License Area. b) Licensee Responsibility for Project. Licensee agrees that it will, with respect to the District, be solely responsible for all aspects of the Project and for the acts and omissions of its agents, consultants, contractors, subcontractors, employees and invitees and for persons directly or indirectly employed by them. c) Project Work. Licensee must perform the Work in accordance with the Construction Plans, unless the District pre-approves any changes in writing. District will designate individuals with authority to approve such changes promptly to avoid work delays. If there is any impact to District Property outside the License Area, the Licensee must provide a detailed proposal to District identifying the extent and duration of the impact and the Licensee’s proposed plan to restore impacted District Property to its original condition or better prior to expiration of the License. The Licensee’s proposal is subject to the District’s prior written approval, which approval shall not be unreasonably withheld, delayed, or conditioned. d) Compliance with Laws. The License Area shall not be used for any other purpose without District's prior written consent. Licensee shall not use the License Area or permit anything to be done in or about the License Area which will in any way conflict with any statute, ordinance, rule, regulation, or other statement of lawful governmental authority now in force or which may hereafter be promulgated (collectively “Regulations”), and shall at its own Page 3 expense abide by and comply with any and all such Regulations regulating the use of the License Area. Such Regulations shall be deemed to include the then-current “Ordinance for Use of Midpeninsula Regional Open Space District Lands,” which is incorporated into the License by this reference. e) Protection of District Property. District and City have conducted a site visit to identify District Property, improvements, or resources that may be affected by the Work. The Parties acknowledge, however, that not all portions of District Property that may be affected by the Work can be identified before the Project commences. Licensee is solely responsible for any damage to the License Area or other portions of District Property caused by Licensee or its agents, consultants, contractors, subcontractors, employees and invitees. Licensee shall protect District Property and improvements or resources from damage or loss, including vegetation, pathways, roadways, structures and utilities not designated for removal or alteration. Unless specified otherwise in the Construction Plans or through approved changes, Licensee shall repair or provide replacement for any such damage or loss to the District’s reasonable satisfaction, all at no cost to District. When Licensee is working in or around existing vegetation, Licensee shall take adequate measures to preserve and protect all vegetation that is to remain. Particular care must be taken not to debark trees, break limbs, or damage root systems. f) Project Completion. When the Project is complete, Licensee shall request from District a final inspection of the Work. District shall make the final inspection within ten (10) calendar days of the request. If District determines that the Work has been completed in accordance with this License, District will accept the Project in writing. Upon acceptance, Licensee shall be relieved of maintaining and protecting the License Area. District’s acceptance shall not be unreasonably withheld, delayed, or conditioned. If District determines that the Work is not complete or in accordance with this License, Licensee shall be notified in writing of deficiencies and Licensee shall again initiate the procedure for final inspection after all such deficiencies are corrected. Concurrently with District’s acceptance of the Work, Licensee shall provide District with a copy of the “as-built” drawings showing the installed location of the underground facilities for District’s reference. 5) Maintenance and Repair. Licensee acknowledges that it has inspected the License Area, and Licensee accepts the License Area “as is” in the condition existing at commencement hereof. Licensee recognizes that the District Property is open to the public for recreational uses and that Licensee’s work must be performed in such a manner as to accommodate public use on the District Property. a) Licensee, at Licensee’s sole expense, shall maintain the License Area in a safe and sanitary condition, and good working order and repair, and shall keep the License Area free from trash and other debris for the duration of the Project. Site inspections of the License Area may be conducted by District to ensure that the License Area is properly maintained, but Licensee shall be responsible for initiating, maintaining and supervising all safety precautions and programs on the Page 4 Project. If the District determines that the License Area is not being maintained in accordance with this section, or if District notices any other issues that represent a breach of the License or threat to District Property or the public health, safety or welfare, District may suspend the Work and take actions necessary to remedy the issue. District shall not assume Licensee's responsibilities by such actions and does not thereby release Licensee from its obligations under this License. At the end of each workday, Licensee shall make the worksite safe for recreational use or shall provide the District with at least 24 hours’ advance written notice if the worksite cannot be made safe for recreational use; provided, however, that such notice shall not release Licensee from its obligation to maintain the License Area in a safe condition. b) Licensee shall not obstruct roads or trails that are to remain open during construction and shall allow unencumbered access through Preserve gate entrances. Licensee shall not close or obstruct driveways, trails, or other public passageways without District’s permission. In the event that any road or trail needs to be closed in association with the Project, Licensee shall give District five (5) days’ written notice so that District may post the closure notice. 6) Alterations. Licensee shall not make or permit to be made any alterations, additions or improvements (“Alterations”) to or of the License Area, except those set forth in the Construction Plans, without the prior written consent of District. 7) Liens. Licensee shall keep the License Area free from any liens arising out of any work performed, materials furnished or obligations incurred by Licensee in connection with the Project. 8) Surrender of License Area. At least fifteen (15) days prior to the expiration or termination of the License, Licensee, at its sole cost and expense, shall: (1) remove all equipment, materials, tools or other personal property from the License Area; and (2) restore the License Area to the condition that existed upon the Agreement Date and repair any other portion of District Property disturbed or damaged by Licensee, as required by this License. 9) Waiver of Claims and Indemnification. a) Licensee waives all claims against District for damage to property, including the Work and any Alterations thereto, and any equipment or machinery, and/or injury or death to persons occurring in, on, or about the District Property, from any cause arising at any time, except as may be caused by the District’s negligence or willful misconduct. b) Each Party (the “Indemnitor”) shall indemnify, defend, and hold harmless the other Party (“Indemnitee”) and its officers, employees, agents, administrators, successors, and assigns, from and against any and all claims made or threatened by any third party and all related losses, expenses, damages, costs and liabilities, including reasonable attorneys' fees and expenses incurred in investigation or defense, to the extent the foregoing arise out of or relate to any error, negligent Page 5 act, omission or willful misconduct by the Indemnitor, its employees, agents, contractors, subcontractors or invitees. c) The Indemnitee shall promptly notify the Indemnitor once it is aware of a potential action and shall cooperate with the Indemnitor in all reasonable respects in connection with the defense of any such action at the expense of the Indemnitor. The Indemnitor may, upon written notice to the Indemnitee, undertake to conduct all proceedings or negotiations in connection with the action, assume the defense thereof, including settlement negotiations in connection with the action, and will be responsible for the costs of such defense, negotiations and proceedings. The Indemnitor will have sole control of the defense and settlement of any claims for which it provides indemnification hereunder, provided that the Indemnitor will not enter into any settlement of such claim without the prior approval of the Indemnitee, which approval will not be unreasonably withheld, delayed, or conditioned. The Indemnitee shall have the right to retain separate counsel and participate in the defense of the action or claim at its own expense. 10) Insurance. a) Licensee, at Licensee’s sole expense, shall maintain and keep in force during the term of this License a policy of general liability insurance against claims for bodily injury, personal injury, death and/or property damage arising from Licensee’s use of the License Area, or from any occurrence in, on, about, or related to the License Area with limits which shall not be less than Two Million Dollars ($2,000,000.00) per occurrence. District shall be named as an additional insured on such policy. Upon District’s request, City shall promptly furnish to District an endorsement evidencing such insurance coverage. Licensee shall require any contractors performing work on District Property to maintain insurance satisfying the above requirements. The District acknowledges that Licensee’s insurance requirements may be satisfied in whole or in part by adequately funded self-insurance programs or self-insured retentions that have been pre-approved by the District. Licensee agrees to furnish a certificate of its contractor(s)’s insurance to District, and evidence of any self-insurance program for Licensee coverage, naming District as an additional insured upon District’s request. All such liability insurance shall insure performance by Licensee of the indemnity provisions hereof, and the policy shall contain a cross-liability endorsement. No such policy of insurance shall be cancelable or subject to reduction of coverage or other modification except after thirty (30) days prior written notice. The limits of said insurance shall in no event be deemed to limit the liability of Licensee hereunder. b) District shall have no obligation to insure against any loss to Licensee’s Improvements, fixtures, machinery, equipment, or other personal property in or about the License Area occurring from any cause whatsoever, and Licensee shall have no interest in the proceeds of any insurance carried by District. 11) Default. Page 6 a) The occurrence of any of the following shall constitute a material default of this License by Licensee: (i) The abandonment of the License Area by Licensee; or (ii) After District provides Licensee written notice of a failure by Licensee to observe and perform any provision of this License to be observed or performed by Licensee, Licensee fails to cure such failure within fifteen (15) calendar days. If the failure cannot be cured within fifteen (15) calendar days, Licensee will not be in default of this License Agreement if Licensee commences performance of such cure within such fifteen (15) calendar day period and thereafter diligently prosecutes the same to completion. b) In the event of any such material default by Licensee, and in addition to any other remedies available to District at law or in equity, this License and all rights of the Licensee hereunder shall be terminated upon delivery by District of notice of such termination to Licensee. Upon such termination, District may recover from Licensee any amount necessary to compensate District for all the detriment proximately caused by Licensee’s failure to perform Licensee’s obligations under this License or which in the ordinary course of things would be likely to result therefrom, including but not limited to all expenses incurred by District in connection with demolishing structures or removing facilities and debris, and removing any other property left by Licensee, on District Property. c) In addition to the remedies provided above, in the event Licensee shall fail to perform any obligation to be performed by Licensee under this License, District may, but shall not be obligated to do so, perform or pay the same or cause the same to be performed or paid, and Licensee shall promptly upon demand by District therefore, reimburse to District all costs reasonably incurred by District in connection therewith. 12) Entry by District. District shall, at any and all reasonable times, have the right to enter onto the License Area to inspect the same, to post notices of non-responsibility, and to alter, improve or repair the License Area; provided, however, that District agrees not to alter, improve or repair areas under active construction without first obtaining Licensee’s written approval, which shall not be unreasonably withheld, conditioned or delayed, unless waiting for Licensee’s approval may result in unsafe conditions at the worksite. Licensee hereby waives any claim for damages for any loss of occupancy or quiet enjoyment of the License Area occasioned thereby. 13) Waiver. The waiver by District of any breach of any term, covenant, or condition herein contained shall not be deemed to be a waiver of such term, covenant, or condition or any subsequent breach of the same or any other term, covenant, or condition hereof. 14) A copy of this License Agreement shall be available on site at all times. Page 7 15) Notices. All notices, statements, demands, requests, approvals, or consents (collectively “notices”) given hereunder by either party to the other shall be made in writing and shall be served personally or by first class mail, certified or return receipt requested, postage prepaid, and addressed to the parties as follows: District: Midpeninsula Regional Open Space District Attn: Real Property Manager 5050 El Camino Real Los Altos, CA 94022 (650) 691-1200 (telephone) (650) 691-0485 (fax) Licensee: City of Palo Alto Attn: Utilities Electric Engineering 250 Hamilton Avenue Palo Alto, CA 94301 (650) 329-2161 With a copy to City of Palo Alto Attn: Real Property Manager 250 Hamilton Avenue Palo Alto, CA 94301 or to such other address as either party may have furnished to the other as a place for the service of notice. Any notice so served by mail shall be deemed to have been delivered three (3) days after the date posted. 16) No Property Interest. City shall not acquire any interest or estate in District’s property pursuant to this License. City has elected to commence the Project at its risk and only the Exchange will provide City with permanent rights to maintain the underground utility facilities on District Property. 17) Entire Agreement. This License along with any exhibits and attachments constitutes the entire agreement and between the Parties with respect to the matters herein. Any and all prior oral or written agreements by and between the Parties and their agents or representatives relative to the matters herein are superseded entirely by this License. This License shall not be construed more strongly against either Party regardless of who is responsible for its preparation. 18) Parties Not Agents or Partners. Notwithstanding anything to the contrary in this License, neither Party shall be deemed an agent for the other Party under this License and the Parties shall not be deemed partners on the Project. Page 8 19) General. a) This License contains all of the terms, covenants, and conditions agreed to by District and Licensee, and this License may not be modified orally or in any manner other than by an agreement in writing signed by all of the Parties to this License or their respective successors in interest. b) When the context of this License requires, the masculine gender includes the feminine, a corporation, or a partnership, and the singular number includes the plural. c) The captions of this License are for convenience only and are not a part of this License and do not in any way limit or amplify the terms and provisions of this License. d) This License shall be governed and construed in accordance with the laws of the State of California with venue in the County of Santa Clara. e) Time is of the essence as to all of the provisions of this License as to which time of performance is a factor. f) All terms, conditions or obligations in this License which by their nature are to be performed or observed following expiration or termination of this Agreement shall survive. g) Neither Party may assign any part of this License without the other’s prior written consent. Space intentionally left blank Page 9 IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed by their duly authorized officers to be effective as of the date of final execution by District in accordance with the terms hereof. DISTRICT: LICENSEE: MIDPENINSULA REGIONAL OPEN CITY OF PALO ALTO SPACE DISTRICT Ana M. Ruiz, General Manager City Manager or designee Date Date ATTEST: APPROVED AS TO FORM: Maria Soria, District Clerk City Attorney or designee Date: APPROVED AS TO FORM: Hilary Stevenson, General Counsel Attachments Exhibit A – Site Map Exhibit B – Alignment Plan Exhibit C – Construction Plans Pa t h : G : \ P r o j e c t s \ a _ D i s t r i c t w i d e \ E a s e m e n t s \ E a s e m e n t s . a p r x Cr e a t e d B y : a c o s t a n z a While the District strives to use the best available digital data, these data do not represent a legal survey and are merely a graphic illustration of geographic features. Midpeninsula Regional Open Space District (Midpen) 4/3/2025 0 0.250.125 Miles I Proposed underground utility easement (MROSD to grant to City of Palo Alto) Other protected lands Private property Midpen preserves Exhibit A - Site Map !# R A N C H O S A N A N T O N I O O P E N S P A C E P R E S E R V E M O N T E B E L L O O P E N S P A C E P R E S E R V E Ind ian Creek Ad obe Creek Steven sCreek West F ork A dobe C r e e k Montebello Ro a d Bella Vista Tr a i l IndianCreek Trail PageMill Tr a il Ad o b eCreekTrail Black M oun tainTrail SkidRoad Trail Quarry Trail Old RanchTrail CanyonTrail Adobe C reek T r a i l Adobe Creek Trail Steven s Creek NatureTrail Black Mountain 2,812' 22 0 0 20 0 0 18 0 0 2600 2400 2200 2000 200 0 180 0 2000 1800 2800 2800 2400 2000 2000 20 0 0 180 0 1600 20 0 0 20 0 0 35125014 3510900235106025 35112069 HIDDEN VILLA ! ! !! ! ! ! ! ! ! ! Area of detail FOOTHILLS LA HONDA CREEK LONG RIDGE SARATOGA GAP THORNEWOOD WINDY HILL RANCHO SAN ANTONIOCOAL CREEK LOS TRANCOS MONTE BELLORUSSIAN RIDGE ÄÆ35 ÄÆ84 ÄÆ9 ÄÆ280 Los Altos Existing overhead utility easement (City of Palo Alto to vacate) Trail Unpaved all-season road Unpaved seasonal road Paved roadCounty parcel NOTE: The easements shown are graphical visualizations only; it is not an assessed interest. For surveyed location of easements, reference Cross Lands Surveying Inc. Project NO. 22-146 dated 3/15/2024. Existing overhead electrical line & & Easement 1 & & Easement 2 & & Easement 3 1260 MONTE BEL L O R O A D 3 2-1 / 0 A L F8A E L F 772 749 8 55'50' 677 0 50' 676 8 50' 676 9 50' 677 1 45' 677 2 10 646 1 F P P P PP P PP P P P P S TX P A D 54 " x 6 0 " P PPPP P 600' 700' 12' 60' F PB40409 3'X5' FIBER BOX 30"X48" PP P P P P P PP P P P P P P P 13 5 ' P P P P P P P P P P P P P 55 0 ' PB40416 3'X5' FIBER BOX 30"X48" LB30070 LB VAULT - 3'X5' LB PAD - 4'X6' 500 ' 500 ' 16 17 18 19 20 F FIBER BOX 30"X48" Public Utility Easement 20' Wide UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP # SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 5 10 LOCATION 17 - LB30070 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4' X 6' LOAD BREAK PAD 30070 1 - 4' X 6' LOAD BREAK PAD 30070 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 18 - PB40406 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40406 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 19 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 20 - PB40409 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40409 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 16 & 17 ~550' - 2-3.63" PRIMARY CONDUIT FROM NEW PB 40416 TO NEW LB 30070 ~550' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 17 & 18 ~275' - 1-3.63" PRIMARY CONDUIT FROM NEW LB30070 TO NEW PB 40406 ~275' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 18 & 19 ~10' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40406 TO NEW XFMR PAD BETWEEN LOCATION 19 & 19A ~60' - 1-3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO EXISTING JUNCTION BOX BETWEEN LOCATION 17 & 20 ~700' - 2-3.63" PRIMARY CONDUIT FROM NEW LB 30070 TO NEW PB 40409 ~700' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman Exhibit B - Alignment Plan MONTE BEL L O R O A D 2- # 6 C O P P E R W E L D 2-# 6 C O P P E R W E L D 50' 677 1 45' 677 2 50' 677 3 45' 677 4 F F P P P P P P P P P P P P P P P P P P P P PP P PP P P P P PB40403 3'X5' PB40405 3'X5' 60 0 ' 600' 600' FIBER BOX 30"X48" FIBER BOX 30"X48" F PB40404 3'X5' FIBER BOX 30"X48" P P P P P P P P P P P P P P F PB40409 3'X5' FIBER BOX 30"X48" PP P P P P P P 20 21 22 23 UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 6 10 LOCATION 20 - PB40409 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40409 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 21 - PB40405 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40405 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 22 - PB40404 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40404 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 23 - PB40403 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40403 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 20 & 21 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40409 TO NEW PB 40405 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 21 & 22 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40405 TO NEW PB 40404 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 22 & 23 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40404 TO NEW PB 40403 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman MON T E B E L L O R O A D MO N T E B E L L O R O A D 2-# 6 C O P P E R W E L D 2-# 6 C O P P E R W E L D 45' 677 4 45' 677 5 45' 677 6 40' 677 7 45' 677 8 45' 677 9 40' 678 1 45' 678 0 45' 678 4 F F P P F P P P P P P P P F PPP P PPPP P F P P P P P P P P P P P P P P P P PB40399 3'X5' PB40400 3'X5' PB40401 3'X5' PB40402 3'X5' PB40403 3'X5' 600' 600 ' 600' 60 0 ' FIBER BOX 30"X48" FIBER BOX 30"X48" FIBER BOX 30"X48" FIBER BOX 30"X48" FIBER BOX 30"X48" P P P P P P P P P 600' 23 24 25 26 27 UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 7 10 LOCATION 24 - PB40402 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40402 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 25 - PB40401 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40401 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 26 - PB40400 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40400 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 24 & 25 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40402 TO NEW PB 40401 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 25 & 26 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40401 TO NEW PB 40400 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 26 & 27 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40400 TO NEW PB 40399 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman 3 #2 TRI 2-#6 CO P P E R W E L D 2-#6 C O P P E R W E L D 45' 679 4 40' 679 6 45' 678 0 45' 678 4 45' 678 5 POL E SER V I C E 40' 678 7 35' 679 3 30' 678 9 50' 678 8 45' 679 1 10 646 7 15 450 3 F P F P P P P P P P P P P P P P P P P P P P P F SS TX P A D 54"X 6 0 " PB40395 3'X5' PB40396 3'X5' PB40399 3'X5' LB30060 LB VAULT - 3'X5' LB PAD - 4'X6' 380' 95' 575'600'85 ' FIBER BOX 30"X48" FIBER BOX 30"X48" 25' FIBER BOX 30"X48" PB40397 3'X5' S S S S S S S S S S S S S S 585 ' 10' 2 - 3.63" P P P P P PPPPPPP P P P 600' F P P P P P P P P PFIBER BOX 30"X48" BOX 24"X36" 27 28 29 30 30A 30B 30C 31 32 33 UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 8 10 LOCATION 27 - PB40399 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40399 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 28 - LB30060 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3' X 5' LOAD BREAK PAD 30060 1 - 3' X 5' LOAD BREAK PAD 30060 LOCATION 29 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 30 INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 30B - PB40397 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40397 WITH FULL TRAFFIC COVER LOCATION 31 INSTALL 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 32 - PB40396 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40396 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 26 & 27 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40400 TO NEW PB 40399 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 27 & 28 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40399 TO NEW LB 30060 BETWEEN LOCATION 28 & 29 ~25' - 1 -3.63" PRIMARY CONDUIT FROM NEW LB 30060 TO NEW XFMR PAD BETWEEN LOCATION 29 & 30 ~10' - 4-3.63" SECONDARY CONDUIT FROM NEW 54" X 60" XFMR PAD TO NEW 24" X 36" JUNCTION BOX BETWEEN LOCATION 30 & 30A ~95' - 1-3.63" SECONDARY CONDUIT FROM NEW 24" X 36" JUNCTION BOX TO EXISTING JUNCTION BOX BETWEEN LOCATION 30 & 30B ~585' - 1-3.63" SECONDARY CONDUIT FROM NEW 24" X 36" JUNCTION BOX TO NEW PB 40397 BETWEEN LOCATION 30B & 30C ~6' - 1 - 3.63" SECONDARY CONDUIT FROM PB 40397 TO NEW 3" RISER BETWEEN LOCATION 30 & 32 ~400'- 1-3.63" PRIMARY CONDUIT FROM NEW LB 30060 TO NEW PB 40396 BETWEEN LOCATION 27 & 31 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 31 & 32 ~400' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 32 & 33 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40396 TO NEW PB 40395 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX ****NOTE**** THE SCOPE OF WORK BETWEEN LOCATION 30, 30B, & 30C MAY BE REMOVED AS OPEN SPACE MAY NOT NEED CPAU ELECTRIC SERVICE LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman 2-#6 C O P P E R W E L D 45' 679 7 F F PB40395 3'X5' 600' FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P PPPPPPP 600' 33 34 17 1 9 17 2 1 17 2 3 17 2 5MO N T E B E L L O R O A D N48 PB1061 2-#4 ACSR TRI2-#4 A C S R F6A ELF 773 679 8 45' 40' 679 9 P P P P P P P P P P P P 40' 680 0 F TX PAD 54"X60" LB30059 LB VAULT - 3'X5' LB PAD - 4'X6' 125 ' 125' FIBER BOX 30"X48" 5' P P P P 35 36 37 37A S S S S 125' PB40394 3'X5' FIBER BOX 30"X48" 5' UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXTLEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 9 10 LOCATION 33 - PB40395 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40395 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 34 - PB40394 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40394 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 35 - LB30059 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4' X 6' LOAD BREAK PAD 30059 1 - 4' X 6' LOAD BREAK PAD 30059 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 36 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 37 INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 37A INSTALL 1 - 3" RISER LOCATION 37B INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 37C INSTALL 1 - 3" RISER CPAU CONDUIT INSTALLATION BETWEEN LOCATION 33 & 34 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40395 TO NEW PB 40394 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 34 & 35 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40394 TO NEW LB 30059 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 35 & 36 ~5' - 1-3.63" PRIMARY CONDUIT FROM NEW LB 30059 TO NEW XFMR PAD BETWEEN LOCATION 36 & 37 ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37 & 37A ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6799 BETWEEN LOCATION 37 & 37B ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37B & 37C ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6800 LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman 17 4 1 17 5 7 17 2 3 17 2 5 17 2 7 17 2 9 2-#4 ACSR TRI2-#4 A C S R OPEN W I R E 2-#4 A C S R 2-#4 AC S R 3 3- # 2 S T R C U 35' 680 1 35' 680 2 35' 680 3 35' 680 4 40' 680 5 40' 6806 25 774 7 25 7599 SET A T T A P " B " 37.5 780 5 97.5 % PPPPPPPP P P P P P P 40' 680 0 S S SF F TX PAD 54"X60" PB40391 3'X5' PB40392 3'X5' BOX 24"X36" 600 ' 175' 600' FIBER BOX 30"X48" FIBER BO X 30"X48" TX PAD 54"X60" 7' 25' 5' 15' P P P P P P P P P P P P P P F PB40408 3'X5' FIBER BO X 30"X48" PPP P P P 375' 37 38 39 40 41 41A 41B 42 37B S S125' 42B 5' 37C 15' 42A UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 MP NEXT LEVEL SUBSTRUCTURE P.VALATH P.VALATH P.VALATH V.RIOS NTS ----HV-20 10 10 LOCATION 36 - TX PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 37 INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 37A INSTALL 1 - 3" RISER LOCATION 37B INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 37C INSTALL 1 - 3" RISER LOCATION 38 - PB40408 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40408 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 39 - PB40392 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40392 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 40 - PB40391 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40391 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 41 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 41A INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 41B - POLE 6805 INSTALL 1 - 3" RISER LOCATION 42 INSTALL 1 - 24" X 36" JUNCTION BOX LOCATION 42A - EXISTING JUNCTION BOX LOCATION 42B - POLE 6806 INSTALL 1 - 3" RISER CPAU CONDUIT INSTALLATION BETWEEN LOCATION 35 & 36 ~5' - 1-3.63" PRIMARY CONDUIT FROM NEW LB 30059 TO NEW TX PAD BETWEEN LOCATION 36 & 37 ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW TX PAD TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37 & 37A ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6799 BETWEEN LOCATION 37 & 37B ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37B & 37C ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6800 BETWEEN LOCATION 35 & 38 ~270' - 1-3.63" PRIMARY CONDUIT FROM NEW LB30059 TO NEW PB 40408 ~270' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 38 & 39 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40408 TO NEW PB 40392 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 39 & 40 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40392 TO NEW PB 40391 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 40 & 41 ~15' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40391 TO NEW XFMR PAD BETWEEN LOCATION 41 & 41A ~25' - 1 - 3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 JUNCTION BOX BETWEEN LOCATION 41A & 41B ~5' - 1 - 3.63" SECONDARY CONDUIT FROM NEW JUNCTION BOX TO NEW 3" RISER BETWEEN LOCATION 41 & 42 ~105' - 1 -3.63" PRIMARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 JUNCTION BOX ~105' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW 24X36 JUNCTION BOX BETWEEN LOCATION 42 & 42A ~15' - 1 - 3.63" SECONDARY CONDUIT FROM NEW 24X36 JUNCTION BOX TO EXISTING JUNCTION BOX BETWEEN LOCATION 42A & 42A ~5' - 1 - 3" RISER FROM NEW 24X36 JUNCTION BOX TO EXISTING POLE LEGEND -RED- NEW, INSTALL ELECTRICAL -MAGENTA- NEW, INSTALL FIBER -GREEN - REMOVE -BLACK-EXISTING NO WORK TO BE DONE PAST LOCATION 19 UNTIL APPROVAL FROM CPAU ENGINEERING FOR EASEMENT RELOCATION. DRAWINGS INCLUDED FOR REFERENCE ONLY DocuSign Envelope ID: 822AE64D-A845-49B3-A4F1-2BB7D6CEC90C Brandon Grossman Brandon Grossman UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP # SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 TITLE SHEET B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 1 27 26 F Exhibit C - Construction Plans P P P P P P P 50' 6768 50' 6769 F S TX PAD 54" x60" PPPPPPP P 5' 30' P P P 13 5 ' P P P P P P P P P P P P P P P P P P P P P P P 55 0 ' PB40396 3'X5' FIBER BOX 30"X48" LB30070 LB VAULT - 3'X5' LB PAD - 4'X6' 500 ' 500 ' 16 17 18 19 FFIBER BOX 30"X48" Public Utility Easement 20' Wide UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 2 27 WORK DONE PREVIOUSLY TO LOCATION 17, 18, AND 19. FURTHER WORK REQUIRES EASEMENT FROM MID-PENINSULA OPEN SPACE. THESE DRAWINGS ARE OVERLAYED ON THE MOST RECENT SURVEY OF THE AREA DATED 3.15.2024. THIS DRAWING PACKAGE HAS REMOVED PREVIOUSLY FINISHED WORK FROM SCOPE. THIS PHASE OF THE PROJECT WILL BEGIN FROM LOCATION 17 AND END AT LOCATION 42A. LOCATION 16 - PB40396 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40396 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 17 - LB30070 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4' X 6' LOAD BREAK PAD 30070 1 - 4' X 6' LOAD BREAK PAD 30070 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 18 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 19 - STUB OUT INSTALL INSTALL CONDUIT TO EXISTING VAULT NEAR POLE STUB OUT CONDUIT OUTSIDE OF RESERVOIR GATE CPAU CONDUIT INSTALLATION BETWEEN LOCATION 16 & 17 ~550' - 2-3.63" PRIMARY CONDUIT FROM NEW PB 40416 TO NEW LB 30070 ~550' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 17 & 18 ~5' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40406 TO NEW XFMR PAD BETWEEN LOCATION 18 & 19 ~30' - 1-3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO EXISTING JUNCTION BOX ~60' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO STUB OUT BETWEEN LOCATION 17 & 20 ~700' - 2-3.63" PRIMARY CONDUIT FROM NEW LB 30070 TO NEW PB 40409 ~700' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). 1260 MONTE BELLO ROAD 50' 6769 S TX PAD 54" x60" PPPPPPP P 700' 5' 30' P P P P P P P P P P P PP P P P P P P P P P P P P P P P P P 13 5 ' P P P P P P LB30070 LB VAULT - 3'X5' LB PAD - 4'X6' 17 18 19 FFIBER BOX 30"X48" MATCHLINE A MATCHLINE A PROPOSED BORE PIT 2 PROPOSED BORE PIT 1 TEMPORARY STAGING AREA 1 PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 3 27 WORK DONE PREVIOUSLY TO LOCATION 17, 18, AND 19. FURTHER WORK REQUIRES EASEMENT FROM MID-PENINSULA OPEN SPACE. THESE DRAWINGS ARE OVERLAYED ON THE MOST RECENT SURVEY OF THE AREA DATED 3.15.2024. THIS DRAWING PACKAGE HAS REMOVED PREVIOUSLY FINISHED WORK FROM SCOPE. THIS PHASE OF THE PROJECT WILL BEGIN FROM LOCATION 17 AND END AT LOCATION 42A. LOCATION 17 - LB30070 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4' X 6' LOAD BREAK PAD 30070 1 - 4' X 6' LOAD BREAK PAD 30070 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 18 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 19 - STUB OUT INSTALL INSTALL CONDUIT TO EXISTING VAULT NEAR POLE STUB OUT CONDUIT OUTSIDE OF RESERVOIR GATE CPAU CONDUIT INSTALLATION BETWEEN LOCATION 16 & 17 ~550' - 2-3.63" PRIMARY CONDUIT FROM NEW PB 40416 TO NEW LB 30070 ~550' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 17 & 18 ~5' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40406 TO NEW XFMR PAD BETWEEN LOCATION 18 & 19 ~30' - 1-3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO EXISTING JUNCTION BOX ~60' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO STUB OUT BETWEEN LOCATION 17 & 20 ~700' - 2-3.63" PRIMARY CONDUIT FROM NEW LB 30070 TO NEW PB 40409 ~700' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). MONTE BELLO ROAD 50' 6771 45' 6772 F P P P P P P P P P P P P PP P P P PP P P P P P P P PPP PB40405 3'X5' 600' FIBER BOX 30"X48" P P P P P F PB40409 3'X5' FIBER BOX 30"X48" P P P P P P P 20 21 MATCHLINE A MATCHLINE A MATCHLINE B MATCHLINE B PROPOSED BORE PIT 3 PROPOSED BORE PIT 2 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 4 27 LOCATION 20 - PB40409 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40409 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 21 - PB40405 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40405 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 17 & 20 ~700' - 2-3.63" PRIMARY CONDUIT FROM NEW LB 30070 TO NEW PB 40409 ~700' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 20 & 21 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40409 TO NEW PB 40405 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). 50' 6773 P P P P P P P P P P P P P P P 60 0 ' 600' F PB40404 3'X5' FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P P P P P P P 22 MATCHLINE B MATCHLINE B MATCHLINE C MATCHLINE C OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 4 AND 5 PROPOSED BORE PIT 4 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 5 27 LOCATION 22 - PB40404 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40404 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 21 & 22 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40405 TO NEW PB 40404 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 22 & 23 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40404 TO NEW PB 40403 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). 45' 6774 45' 6775 F P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P PB40403 3'X5' 60 0 ' FIBER BOX 30"X48" 23 MATCHLINE C MATCHLINE C MATCHLINE D MATCHLINE D PROPOSED BORE PIT 5 OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 4 AND 5 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 6 27 LOCATION 23 - PB40403 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40403 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 22 & 23 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40404 TO NEW PB 40403 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 23 & 24 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40403 TO NEW PB 40402 ~600' - 1- 3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). MO N T E B E L L O R O A D 45' 6776 PP P P P P P P PPPPPPPPP P P P P P F P P P P P P P P P P P P P P P P P PB40402 3'X5' 600 ' 600' FIBER BOX 30"X48" 24 MATCHLINE D MATCHLINE D MATCHLINE E MATCHLINE E PROPOSED BORE PIT 6 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 7 27 LOCATION 24 - PB40402 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40402 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 24 & 25 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40402 TO NEW PB 40401 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 25 & 26 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40401 TO NEW PB 40400 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). MON T E B E L L O R O A D 40' 6777 45' 6778 45' 6779 F F P P P P P PPPPPPP PB40400 3'X5' PB40401 3'X5' FIBER BOX 30"X48" FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P P P P P P P P P P 600 ' 25 26 MATCHLINE E MATCHLINE E MATCHLINE F MATCHLINE F PROPOSED BORE PIT 8 PROPOSED BORE PIT 7 TEMPORARY STAGING AREA 2 PROPOSED OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 8 AND 9 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 8 27 LOCATION 25 - PB40401 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40401 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 26 - PB40400 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40400 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 24 & 25 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40402 TO NEW PB 40401 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 25 & 26 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40401 TO NEW PB 40400 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 26 & 27 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40400 TO NEW PB 40399 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). 45' 6779 40' 6781 45' 6780 F P P P P P P P PP PP P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P PB40399 3'X5' 600' FIBER BOX 30"X48" FIBER BOX 30"X48" 27 MATCHLINE F MATCHLINE F MATCHLINE G PROPOSED BORE PIT 9 OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 8 AND 9 OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 8 AND 9 PROPOSED BORE PIT 8 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 9 27 LOCATION 27 - PB40399 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40399 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 26 & 27 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40400 TO NEW PB 40399 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 27 & 28 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40399 TO NEW LB 30060 CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). 40' 6787 30' 6789 50' 6788 F P P P P P P P P P P P P P P P P P TX PAD 54"X60" PB40396 3'X5' LB30060 LB VAULT - 3'X5' LB PAD - 4'X6' 450' 95' 575' 600' FIBER BOX 30"X48" 2 - 3.63" P PPPPP P P P P P P P F P P P P P P P P P P P P P P P P P P P P FIBER BOX 30"X48" SECONDARY BOX 24"X36" 28 29 30 31 32 3RD PARTY SERVICE POLE MATCHLINE G MATCHLINE G MATCHLINE H MATCHLINE H S S S 40' 20' POLE 6789 AND 3RD PARTY SERVICE POLE INTENDING TO REMAIN. WILL BE OWNED BY 3RD PARTY PROPOSED BORE PIT 11 PROPOSED BORE PIT 10 TEMPORARY STAGING AREA 3 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X40' EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) PROPOSED EASEMENT PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 10 27 LOCATION 28 - LB30060 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 3' X 5' LOAD BREAK PAD 30060 1 - 3' X 5' LOAD BREAK PAD 30060 3 - BOLLARDS LOCATION 29 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 30 - SECONDARY BOX NO SUBSTRUCTURE WORK TO BE PERFORMED. BOX MAY REQUIRE REPLACEMENT. LOCATION 31 - FIBER BOX INSTALL 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 32 - PB40396 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40396 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 27 & 28 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40399 TO NEW LB 30060 BETWEEN LOCATION 28 & 29 ~25' - 1 -3.63" PRIMARY CONDUIT FROM NEW LB 30060 TO NEW XFMR PAD BETWEEN LOCATION 29 & 30 ~30' - 1-3.63" SECONDARY CONDUIT FROM NEW 54" X 60" XFMR PAD TO EXISTING SECONDARY BOX BETWEEN LOCATION 28 & 32 ~450'- 1-3.63" PRIMARY CONDUIT FROM NEW LB 30060 TO NEW PB 40396 BETWEEN LOCATION 27 & 31 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 31 & 32 ~450' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 32 & 33 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40396 TO NEW PB 40395 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX ****NOTE**** THE SCOPE OF WORK TO BRING POWER TO PUMP NEAR "BACKPACK CAMP" IS REMOVED. POLE LINE TO BE ENTIRELY REMOVED TO THAT PUMP. PROPOSED EASEMENT DIMENSION TO BE 20'X40' AS SHOWN ON PLAN. FIELD CONDITIONS MAY DICTATE AN ALIGNMENT ADJUSTMENT CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). F PB40395 3'X5' 600' FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P P P P P P P P P P P PPPPPPPPPP 600' 33 MATCHLINE H MATCHLINE H MATCHLINE I MATCHLINE I PROPOSED BORE PIT 13 PROPOSED BORE PIT 12 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 11 27 LOCATION 33 - PB40395 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40395 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 32 & 33 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40396 TO NEW PB 40395 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 33 & 34 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40395 TO NEW PB 40394 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). 45' 6797 F P P P P P P P P P 34 17 1 9 17 2 1 17 2 3 17 2 5MO N T E B E L L O R O A D 6798 45' 40' 6799 PP P P P P P P P P P P P P P P P P P P P P P P P P P P 40' 6800 F TX PAD 54"X60" LB30059 LB VAULT - 3'X5' LB PAD - 4'X6' 12 5 ' FIBER BOX 30"X48" 5' P P P P P P P P P P P P P P 375' 35 36 37 37A 37B S S S S S S S S S S S S 125' PB40394 3'X5' FIBER BOX 30"X48" 5' 5' 37C MATCHLINE I MATCHLINE I MATCHLINE J MATCHLINE J 40' 20' 10' WIDE EASEMENT EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X40' POLE 6799 AND 6800 POLE INTENDING TO REMAIN. CO-OWNED BY CPAU AND AT&T, EXISTING ELECTRIC SERVICE DROPS TO BUILDINGS ON SITE PROPOSED BORE PIT 16 PROPOSED BORE PIT 15 PROPOSED BORE PIT 14 TEMPORARY STAGING AREA 4 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 12 27 LOCATION 34 - PB40394 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40394 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 35 - LB30059 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT UNDER 4' X 6' LOAD BREAK PAD 30059 1 - 4' X 6' LOAD BREAK PAD 30059 3 - BOLLARDS 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 36 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD LOCATION 37 - SECONDARY BOX INSTALL 1 - 24" X 36" SECONDARY BOX LOCATION 37A - POLE 6799 INSTALL 1 - 3" RISER LOCATION 37B - SECONDARY INSTALL 1 - 24" X 36" SECONDARY BOX LOCATION 37C - POLE 6800 INSTALL 1 - 3" RISER CPAU CONDUIT INSTALLATION BETWEEN LOCATION 33 & 34 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40395 TO NEW PB 40394 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 34 & 35 ~600' - 1-3.63" PRIMARY CONDUIT FROM NEW PB 40394 TO NEW LB 30059 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 35 & 36 ~5' - 1-3.63" PRIMARY CONDUIT FROM NEW LB 30059 TO NEW XFMR PAD BETWEEN LOCATION 36 & 37 ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37 & 37A ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6799 BETWEEN LOCATION 37 & 37B ~125' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX ~125' - 1-3.63" FIBER CONDUIT FROM NEW 24X36 SECONDARY BOX TO NEW 24X36 SECONDARY BOX BETWEEN LOCATION 37B & 37C ~5' - 1-3.63" SECONDARY CONDUIT FROM NEW 24X36 SECONDARY BOX TO POLE 6800 BETWEEN LOCATION 35 & 38 ~375' - 1-3.63" PRIMARY CONDUIT FROM NEW LB30059 TO NEW PB 40408 ~375' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). 17 2 7 17 2 9 35' 6801 35' 6802 35' 6803 35' 6804 P P P P P P P P P P P P F PB40392 3'X5' 600 ' 600' FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P P P P P P P P P P P F PB40408 3'X5' FIBER BOX 30"X48" PPPP P 38 39 MATCHLINE J MATCHLINE K MATCHLINE K POLE 6799 AND 6800 POLE INTENDING TO PROPOSED BORE PIT 18 PROPOSED BORE PIT 17 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 13 27 LOCATION 38 - PB40408 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40408 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 39 - PB40392 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40392 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP CPAU CONDUIT INSTALLATION BETWEEN LOCATION 35 & 38 ~375' - 1-3.63" PRIMARY CONDUIT FROM NEW LB30059 TO NEW PB 40408 ~375' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 38 & 39 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40408 TO NEW PB 40392 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 39 & 40 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40392 TO NEW PB 40391 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). 17 4 1 17 5 7 3 3- # 2 S T R C U 40' 6805 40' 6806 PPPPPPPPPPPPPP P P P S S S S S S SF PB40391 3'X5' SECONDARY BOX 24"X36" 150' FIBER BOX 30"X48" S S S S S S S TX PAD 54"X60" 7' P 5' 40 4141A 41B 42 42 15' P 42 MATCHLINE K MATCHLINE K 20' 20' EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X20' POLE 6805 AND 6806 POLE INTENDING TO REMAIN. OWNED BY CPAU, EXISTING ELECTRIC SERVICE DROPS TO BUILDINGS ON SITE 150' PROPOSED BORE PIT 19 PROPOSED BORE PIT 20 SECONDARY BOX 24"X36" EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X20' EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X20' PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 SUBSTRUCTURE B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 14 27 LOCATION 40 - PB40391 INSTALL 1 - 3' X 5' CPA3546 PRIMARY VAULT #40391 WITH FULL TRAFFIC COVER 1 - 30" X 48" PG3048 OR SIMILAR INNER SIZE FIBER BOX WITH FULL TRAFFIC TOP LOCATION 41 - XFMR PAD INSTALL 1 - 54" X 60" XFMR PAD 3 - BOLLARDS LOCATION 41A - SECONDARY BOX INSTALL 1 - 24" X 36" SECONDARY BOX LOCATION 41B - POLE 6805 INSTALL 1 - 3" RISER LOCATION 42 - SECONDARY BOX INSTALL 1 - 24" X 36" SECONDARY BOX (INSTALL OUTSIDE FENCE) LOCATION 42A - EXISTING JUNCTION BOX LOCATION 42B - POLE 6806 INSTALL 1 - 3" RISER CPAU CONDUIT INSTALLATION BETWEEN LOCATION 39 & 40 ~600' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40392 TO NEW PB 40391 ~600' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW FIBER BOX BETWEEN LOCATION 40 & 41 ~15' - 1 -3.63" PRIMARY CONDUIT FROM NEW PB 40391 TO NEW XFMR PAD BETWEEN LOCATION 41 & 41A ~25' - 1 - 3.63" SECONDARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 JUNCTION BOX BETWEEN LOCATION 41A & 41B ~5' - 1 - 3.63" SECONDARY CONDUIT FROM NEW JUNCTION BOX TO NEW 3" RISER BETWEEN LOCATION 41 & 42 ~105' - 1 -3.63" PRIMARY CONDUIT FROM NEW XFMR PAD TO NEW 24X36 JUNCTION BOX BETWEEN LOCATION 40 & 42 ~105' - 1-3.63" FIBER CONDUIT FROM NEW FIBER BOX TO NEW 24X36 JUNCTION BOX BETWEEN LOCATION 42 & 42A ~15' - 1 - 3.63" SECONDARY CONDUIT FROM NEW 24X36 JUNCTION BOX TO EXISTING JUNCTION BOX BETWEEN LOCATION 42A & 42A ~5' - 1 - 3" RISER FROM NEW 24X36 JUNCTION BOX TO EXISTING POLE CONSTRUCTION NOTES: 1.ALL OPEN EXCAVATIONS REQUIRE TRENCH PLATES AND PROPER DELINEATIONS AT THE END OF EVERY DAY. 2.COMPACT AND BACKFILL ANY OPEN EXCAVATION PER CITY OF PALO ALTO STANDARD DT-SS-U-1003 NOTE 8. BACKFILL IN UNIMPROVED AREAS 3.SEE APPENDIX FOR DETAILS REGARDING BEST MANAGEMENT PRACTICES (BMP). PA C B E L L M E T E R 4X4PB11 8 6 2-#6 COPPERWELD & 1- # 6 B C U 1/0 A L T R I 50' 6767 P P P P P P P P P P P P P P P P P P P P P P P 4201 3-#2 A L P R I 50' 6768 15 0 12 0 / 2 0 8 Y 60 2 4 F P P P P P P P P P 55 0 ' PB40396 3'X5' FIBER BOX 30"X48" 500 ' 500 ' Public Utility Easement 20' Wide UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 15 27 LOCATION 1 CPAU POLE 6767 REMOVE 3 - 8' CROSSARMS 1 - 10' CROSSARMS 4 - BELLS 6 - D.E. INSULATORS 6 - CUTOUTS 3 - FUSES TOP WOOD POLE LOCATION 2 CPAU POLE 6768 REMOVE 1 - 50' WOOD POLE 2 - 8' CROSSARMS 4 - BELLS CPAU CABLE REMOVAL BETWEEN LOCATION 1 & 2 ~630' - 3-1/0 AL WIRE FROM POLE 6767 TO POLE 6768 BETWEEN LOCATION 2 & 3 ~350' - 3-1/0 AL WIRE FROM POLE 6768 TO POLE 6769 1 2 1260 MONTE BELLO ROAD 50' 6769 S TX PAD 54" x60" PPPPPPP P 700' 5' 30' P P P P P P P P P P P PP P P P P P P P P P P P P P P P P P 13 5 ' P P P P P P LB30070 LB VAULT - 3'X5' LB PAD - 4'X6' FFIBER BOX 30"X48" MATCHLINE A MATCHLINE A PROPOSED BORE PIT 2 PROPOSED BORE PIT 1 TEMPORARY STAGING AREA 1 PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 16 27 LOCATION 3 CPAU POLE 6769 REMOVE 1 - 50' WOOD POLE 4 - 8' CROSSARMS 2 - FUSES 16 - D.E. INSULATORS 4 - CUTOUTS 1 - GUY ANCHORS CPAU CABLE REMOVAL BETWEEN LOCATION 2 & 3 ~350' - 3-1/0 AL WIRE FROM POLE 6768 TO POLE 6769 BETWEEN LOCATION 3 & 4 ~460' - 3-1/0 AL WIRE FROM POLE 6769 TO POLE 6771 3 MONTE BELLO ROAD 50' 6771 45' 6772 F P P P P P P P P P P P P PP P P P PP P P P P P P P PPP PB40405 3'X5' 600' FIBER BOX 30"X48" P P P P P F PB40409 3'X5' FIBER BOX 30"X48" P P P P P P P MATCHLINE A MATCHLINE A MATCHLINE B MATCHLINE B PROPOSED BORE PIT 3 PROPOSED BORE PIT 2 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 17 27 LOCATION 4 CPAU POLE 6771 REMOVE 1- 50' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS LOCATION 5 CPAU POLE 6772 REMOVE 1 - 45' WOOD POLE 2 - 8' CROSSARMS 4 - BELLS 1 - GUY ANCHORS CPAU CABLE REMOVAL BETWEEN LOCATION 3 & 4 ~460' - 3-1/0 AL WIRE FROM POLE 6769 TO POLE 6771 BETWEEN LOCATION 4 & 5 ~340' - 3-1/0 AL WIRE FROM POLE 6771 TO POLE 6772 BETWEEN LOCATION 5 & 6 ~700' - 3-1/0 AL WIRE FROM POLE 6772 TO POLE 6773 4 5 50' 6773 P P P P P P P P P P P P P P P 60 0 ' 600' F PB40404 3'X5' FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P P P P P P P MATCHLINE B MATCHLINE B MATCHLINE C MATCHLINE C OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 4 AND 5 PROPOSED BORE PIT 4 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 18 27 LOCATION 6 CPAU POLE 6773 REMOVE 1 - 50' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS 1 - GUY ANCHORS CPAU CABLE REMOVAL BETWEEN LOCATION 5 & 6 ~700' - 3-1/0 AL WIRE FROM POLE 6772 TO POLE 6773 BETWEEN LOCATION 6 & 7 ~350' - 3-1/0 AL WIRE FROM POLE 6773 TO POLE 6774 6 45' 6774 45' 6775 F P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P PB40403 3'X5' 60 0 ' FIBER BOX 30"X48" MATCHLINE C MATCHLINE C MATCHLINE D MATCHLINE D PROPOSED BORE PIT 5 OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 4 AND 5 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 19 27 LOCATION 7 CPAU POLE 6774 REMOVE 1 - 45' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS LOCATION 8 CPAU POLE 6775 REMOVE 1 - 45' WOOD POLE 2 - 8' CROSSARMS 4 - BELLS 1 - GUY ANCHORS CPAU CABLE REMOVAL BETWEEN LOCATION 6 & 7 ~350' - 3-1/0 AL WIRE FROM POLE 6773 TO POLE 6774 BETWEEN LOCATION 7 & 8 ~500' - 3-1/0 AL WIRE FROM POLE 6774 TO POLE 6775 BETWEEN LOCATION 8 & 9 ~520' - 3-1/0 AL WIRE FROM POLE 6775 TO POLE 6776 7 8 MO N T E B E L L O R O A D 45' 6776 PP P P P P P P PPPPPPPPP P P P P P F P P P P P P P P P P P P P P P P P PB40402 3'X5' 600 ' 600' FIBER BOX 30"X48" MATCHLINE D MATCHLINE D MATCHLINE E MATCHLINE E PROPOSED BORE PIT 6 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 20 27 LOCATION 9 CPAU POLE 6776 REMOVE 1 - 45' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS CPAU CABLE REMOVAL BETWEEN LOCATION 8 & 9 ~520' - 3-1/0 AL WIRE FROM POLE 6775 TO POLE 6776 BETWEEN LOCATION 9 & 10 ~440' - 3-1/0 AL WIRE FROM POLE 6776 TO POLE 6777 9 MON T E B E L L O R O A D 40' 6777 45' 6778 45' 6779 F F P P P P P PPPPPPP PB40400 3'X5' PB40401 3'X5' FIBER BOX 30"X48" FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P P P P P P P P P P 600 ' MATCHLINE E MATCHLINE E MATCHLINE F MATCHLINE F PROPOSED BORE PIT 8 PROPOSED BORE PIT 7 TEMPORARY STAGING AREA 2 PROPOSED OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 8 AND 9 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 21 27 LOCATION 10 CPAU POLE 6777 REMOVE 1 - 40' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS LOCATION 11 CPAU POLE 6778 REMOVE 1 - 45' WOOD POLE 2 - 8' CROSSARMS 4 - BELLS 1 - GUY ANCHORS LOCATION 12 CPAU POLE 6779 REMOVE 1 - 45' WOOD POLE 2 - 8' CROSSARMS 4 - BELLS 2 - GUY ANCHORS CPAU CABLE REMOVAL BETWEEN LOCATION 9 & 10 ~440' - 3-1/0 AL WIRE FROM POLE 6776 TO POLE 6777 BETWEEN LOCATION 10 & 11 ~410' - 3-1/0 AL WIRE FROM POLE 6777 TO POLE 6778 BETWEEN LOCATION 11 & 12 ~260' - 3-1/0 AL WIRE FROM POLE 6778 TO POLE 6779 BETWEEN LOCATION 12 & 13 ~350' - 3-1/0 AL WIRE FROM POLE 6779 TO POLE 6780 10 11 12 45' 6779 40' 6781 45' 6780 F P P P P P P P PP PP P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P P PB40399 3'X5' 600' FIBER BOX 30"X48" FIBER BOX 30"X48" MATCHLINE F MATCHLINE F MATCHLINE G PROPOSED BORE PIT 9 OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 8 AND 9 OPEN TRENCH REQUIRED BETWEEN PROPOSED BORE PIT 8 AND 9 PROPOSED BORE PIT 8 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 22 27 LOCATION 13 CPAU POLE 6780 REMOVE 1- 45' WOOD POLE 2 - 8' CROSSARMS 4 - D.E. INSULATORS 4 - BELLS 3 - GUY ANCHORS LOCATION 14 CPAU POLE 6781 REMOVE 1 - 40' WOOD POLE 4 - BELLS 4 - 8' CROSSARMS 4 - D.E. INSULATORS 3 - GUY ANCHORS CPAU CABLE REMOVAL BETWEEN LOCATION 12 & 13 ~350' - 3-1/0 AL WIRE FROM POLE 6779 TO POLE 6780 BETWEEN LOCATION 13 & 14 ~185' - 3-1/0 AL WIRE FROM POLE 6780 TO POLE 6781 BETWEEN LOCATION 14 & 15 ~230' - 3-1/0 AL WIRE FROM POLE 6781 TO POLE 6784 12 13 14 45' 6780 45' 6784 45' 6785 40' 6787 30' 6789 50' 6788 45' 6791 F P P P P P P P P P P P P P P P P P P P P P P P PP PP P P P P P P P P TX PAD 54"X60" PB40399 3'X5' LB30060 LB VAULT - 3'X5' LB PAD - 4'X6' 95' 575' 600' FIBER BOX 30"X48" 2 - 3.63" P F P P P P P FIBER BOX 30"X48" SECONDARY BOX 24"X36" 3RD PARTY SERVICE POLE MATCHLINE G MATCHLINE G S S S 40' 20' POLE 6789 AND 3RD PARTY SERVICE POLE INTENDING TO REMAIN. WILL BE OWNED BY 3RD PARTY PROPOSED BORE PIT 10 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X40' EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 23 27 LOCATION 15 CPAU POLE 6784 REMOVE 1 - 45' WOOD POLE 4 - BELLS 2 - 8' CROSSARMS 4 - D.E. INSULATORS 2 - GUY ANCHORS LOCATION 16 CPAU POLE 6785 REMOVE 1 - 45' WOOD POLE 4 - BELLS 2 - 8' CROSSARMS 4 - D.E. INSULATORS 1 - GUY ANCHORS LOCATION 17 CPAU POLE 6787 REMOVE 1 - TOP 40' WOOD POLE 1 - 10 KVA PT TX 6467 2 - 8' CROSSARMS 2 - D.E. INSULATORS 4 - BELLS 2 - CUTOUTS 2 - FUSES LOCATION 18 CPAU POLE 6789 REMOVE 1 - RISER TOP WOOD POLE. POLE TO BE RELINQUISHED TO AT&T LOCATION 19 THIRD PARTY OWNED SERVICE POLE NO WORK PROPOSED TO THIS POLE AS IT IS OWNED BY THIRD PARTY LOCATION 20 CPAU POLE 6788 REMOVE 1 - 50' WOOD POLE 4 - 8' CROSSARMS 2 - D.E. INSULATORS 5 - BELLS 2 - GUY ANCHORS LOCATION 21 CPAU POLE 6791 REMOVE 1 - 45' WOOD POLE 4 - 8' CROSSARMS 4 - BELLS 2 - GUY ANCHORS CPAU CABLE REMOVAL BETWEEN LOCATION 14 & 15 ~230' - 3-1/0 AL WIRE FROM POLE 6781 TO POLE 6784 BETWEEN LOCATION 15 & 16 ~230' - 3-1/0 AL WIRE FROM POLE 6784 TO POLE 6785 BETWEEN LOCATION 16 & 17 ~260' - 3-1/0 AL WIRE FROM POLE 6785 TO POLE 6787 BETWEEN LOCATION 17 & 18 ~100' - 1-1/0 AL TRIPLEX WIRE FROM POLE 6787 TO POLE 6789 BETWEEN LOCATION 17 & 20 ~80' - 3-1/0 AL WIRE FROM POLE 6787 TO POLE 6788 BETWEEN LOCATION 20 & 21 ~280' - 3-1/0 AL WIRE FROM POLE 6788 TO POLE 6791 13 14 15 16 17 18 19 20 21 45' 6794 40' 6796 POLE SERVICE 35' 6793 45' 6791 UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 24 27 LOCATION 22 CPAU POLE 6794 REMOVE 1 - TOP 45' WOOD POLE 1 - 15 KVA PT TX 4503 4 - 8' CROSSARMS 6 - BELLS 2 - GUY ANCHORS 3 - D.E. INSULATORS 2 - CUTOUTS 2 - FUSES LOCATION 23 CPAU POLE 6793 REMOVE 1 - 35' WOOD POLE 1 - GUY ANCHOR LOCATION 24 CPAU SERVICE POLE REMOVE 1 - 35' WOOD POLE 1 - RISER 1 - METER THE SCOPE OF WORK TO BRING POWER TO PUMP NEAR "BACKPACK CAMP" IS REMOVED. POLE LINE TO BE ENTIRELY REMOVED TO THAT PUMP. DISCONNECT METER AND PEDS. LOCATION 25 CPAU POLE 6796 REMOVE 1 - 40' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS CPAU CABLE REMOVAL BETWEEN LOCATION 21 & 22 ~200' - 3-1/0 AL WIRE FROM POLE 6791 TO POLE 6794 BETWEEN LOCATION 22 & 23 ~150' - 1-1/0 AL TRIPLEX WIRE FROM POLE 6794 TO POLE 6793 BETWEEN LOCATION 23 & 24 ~120' - 1-1/0 AL TRIPLEX WIRE FROM POLE 6793 TO SERVICE POLE BETWEEN LOCATION 22 & 25 ~430' - 3-1/0 AL WIRE FROM POLE 6794 TO POLE 6796 BETWEEN LOCATION 25 & 26 ~815' - 3-1/0 AL WIRE FROM POLE 6796 TO POLE 6797 21 22 23 24 25 45' 6797 F P P P P P P P P P 17 1 9 17 2 1 17 2 3 17 2 5MO N T E B E L L O R O A D 6798 45' 40' 6799 PP P P P P P P P P P P P P P P P P P P P P P P P P P P 40' 6800 F TX PAD 54"X60" LB30059 LB VAULT - 3'X5' LB PAD - 4'X6' 12 5 ' FIBER BOX 30"X48" 5' P P P P P P P P P P P P P P 375' S S S S S S S S S S S S 125' PB40394 3'X5' FIBER BOX 30"X48" 5' 5' MATCHLINE I MATCHLINE I MATCHLINE J MATCHLINE J 40' 20' 10' WIDE EASEMENT EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X40' POLE 6799 AND 6800 POLE INTENDING TO REMAIN. CO-OWNED BY CPAU AND AT&T, EXISTING ELECTRIC SERVICE DROPS TO BUILDINGS ON SITE PROPOSED BORE PIT 16 PROPOSED BORE PIT 15 PROPOSED BORE PIT 14 TEMPORARY STAGING AREA 4 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 25 27 LOCATION 26 CPAU POLE 6797 REMOVE 1 - 45' WOOD POLE 2 - BELLS 1 - 8' CROSSARMS 1 - GUY ANCHOR LOCATION 27 CPAU POLE 6798 REMOVE 1- 45' WOOD POLE 2 - 8' CROSSARMS 4 - CUTOUTS 2 - FUSES 2 - BELLS 8 - D.E. INSULATORS 2 - GUY ANCHOR LOCATION 28 CPAU POLE 6799 REMOVE 3 - 8' CROSSARMS 4 - BELLS 5 - D.E. INSULATORS 2 - GUY ANCHOR TOP WOOD POLE, LEAVE SECONDARY SERVICE DROP TO STRUCTURES. POLE WILL BE INCLUDED IN EASEMENT TRANSFER UNTIL ALL SERVICES ATTACHED TO POLE ARE UNDERGROUNDED. LOCATION 29 CPAU POLE 6800 REMOVE 1 - 8' CROSSARMS 2 - BELLS 2 - D.E. INSULATORS 2 - GUY ANCHOR 1 - 37.5 KVA PT TX 7805 2 - CUTOUTS 2 - FUSES TOP WOOD POLE, LEAVE SECONDARY SERVICE DROP TO STRUCTURES. POLE WILL BE INCLUDED IN EASEMENT TRANSFER UNTIL ALL SERVICES ATTACHED TO POLE ARE UNDERGROUNDED. CPAU CABLE REMOVAL BETWEEN LOCATION 25 & 26 ~815' - 3-1/0 AL WIRE FROM POLE 6796 TO POLE 6797 BETWEEN LOCATION 26 & 27 ~400' - 3-1/0 AL WIRE FROM POLE 6797 TO POLE 6798 BETWEEN LOCATION 27 & 28 ~150' - 3-1/0 AL WIRE FROM POLE 6798 TO POLE 6799 BETWEEN LOCATION 28 & 29 ~180' - 3-1/0 AL WIRE FROM POLE 6799 TO POLE 6800 BETWEEN LOCATION 28 & 30 ~290' - 3-1/0 AL WIRE FROM POLE 6799 TO POLE 6801 26 27 28 29 17 2 7 17 2 9 35' 6801 35' 6802 35' 6803 35' 6804 P P P P P P P P P P P P F PB40392 3'X5' 600 ' 600' FIBER BOX 30"X48" P P P P P P P P P P P P P P P P P P P P P P P P P P P P F PB40408 3'X5' FIBER BOX 30"X48" PPPP P MATCHLINE J MATCHLINE K MATCHLINE K POLE 6799 AND 6800 POLE INTENDING TO PROPOSED BORE PIT 18 PROPOSED BORE PIT 17 EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EXCLUSION MEASURE AT TRAIL JUNCTIONS REQUIRED PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 26 27 LOCATION 30 CPAU POLE 6801 REMOVE 1- 35' WOOD POLE 2 - 8' CROSSARMS 4 - BELLS 1 - GUY ANCHOR LOCATION 31 CPAU POLE 6802 REMOVE 1- 35' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS 1 - GUY ANCHOR LOCATION 32 CPAU POLE 6803 REMOVE 1- 35' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS 1 - GUY ANCHOR LOCATION 33 CPAU POLE 6804 REMOVE 1- 35' WOOD POLE 1 - 8' CROSSARMS 2 - BELLS 4 - D.E. INSULATORS 1 - GUY ANCHOR CPAU CABLE REMOVAL BETWEEN LOCATION 28 & 30 ~290' - 3-1/0 AL WIRE FROM POLE 6799 TO POLE 6801 BETWEEN LOCATION 30 & 31 ~225' - 3-1/0 AL WIRE FROM POLE 6801 TO POLE 6802 BETWEEN LOCATION 31 & 32 ~250' - 3-1/0 AL WIRE FROM POLE 6802 TO POLE 6803 BETWEEN LOCATION 32 & 33 ~300' - 3-1/0 AL WIRE FROM POLE 6803 TO POLE 6804 BETWEEN LOCATION 33 & 34 ~270' - 3-1/0 AL WIRE FROM POLE 6804 TO POLE 6805 30 31 32 33 17 4 1 17 5 7 3 3- # 2 S T R C U 40' 6805 40' 6806 PPPPPPPPPPPPPP P P P S S S S S S SF PB40391 3'X5' SECONDARY BOX 24"X36" 150' FIBER BOX 30"X48" S S S S S S S TX PAD 54"X60" 7' P 5' 15' P MATCHLINE K MATCHLINE K 20' 20' EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X20' POLE 6805 AND 6806 POLE INTENDING TO REMAIN. OWNED BY CPAU, EXISTING ELECTRIC SERVICE DROPS TO BUILDINGS ON SITE 150' PROPOSED BORE PIT 19 PROPOSED BORE PIT 20 SECONDARY BOX 24"X36" EASEMENT EXTENSION TO ENCOMPASS ELECTRIC AND FIBER VAULTS 9' WIDE (TYP.) EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X20' EASEMENT EXTENSION FOR PROPOSED EQUIPMENT 20'X20' PROPOSED EASEMENT 6' WIDE (TYP.) UTILITIES, ELECTRIC ENGINEERING City of Palo Alto APPROVED SR. ENGINEER / MANAGER ENGR. CHKD. DRWN CKT #MAP #SCALE DATE APPR. SHEET W.O.# / DRAWING # OF DESCRIPTION California 40027598 FOOTHILL FIRE MITIGATION PROJECT PHASE 4 REMOVAL B. GROSSMAN P.VALATH P.VALATH B. GROSSMAN NTS ----HV-20 27 27 34 35 LOCATION 34 CPAU POLE 6805 REMOVE 1 - 8' CROSSARMS 2 - BELLS 1 - GUY ANCHOR 1 - 25 KVA PT TX 7747 2 - CUTOUTS 2 - FUSES TOP WOOD POLE, LEAVE SECONDARY SERVICE DROP TO STRUCTURES. POLE WILL BE INCLUDED IN EASEMENT TRANSFER UNTIL ALL SERVICES ATTACHED TO POLE ARE UNDERGROUNDED. LOCATION 35 CPAU POLE 6806 REMOVE 2 - 8' CROSSARMS 2 - BELLS 2 - GUY ANCHORS 2 - D.E. INSULATORS 1 - 25 KVA PT TX 7599 2 - CUTOUTS 2 - FUSES TOP WOOD POLE, LEAVE SECONDARY SERVICE DROP TO STRUCTURES. POLE WILL BE INCLUDED IN EASEMENT TRANSFER UNTIL ALL SERVICES ATTACHED TO POLE ARE UNDERGROUNDED. CPAU CABLE REMOVAL BETWEEN LOCATION 33 & 34 ~270' - 3-1/0 AL WIRE FROM POLE 6804 TO POLE 6805 BETWEEN LOCATION 34 & 35 ~310' - 3-1/0 AL WIRE FROM POLE 6805 TO POLE 6806 Best Management Practices for On-Site Handling of Spoils: 1. Designated Storage Areas: o Establish clearly marked, stable areas for spoil storage that are located away from sensitive environments like water bodies, wetlands, or steep slopes. o Use temporary barriers, such as silt fences, wattles, or berms, to prevent spoil migration due to rain or wind. o Regularly inspect storage areas for runoff issues and address them promptly with drainage systems or sediment traps. 2. Segregation of Spoils: o Separate spoils by type (e.g., soil, rock, demolition debris) for efficient reuse or recycling later. o Keep contaminated or hazardous materials isolated from clean spoils to prevent cross-contamination. o Hazardous Materials (as defined by the EPA) shall be stored with a method for secondary containment in the event of a leak or spill. Secondary containment may take the form of a larger container that can sufficiently hold the contents of a spill. 3. Accessibility and Safety: o Ensure spoil storage areas are accessible for easy loading and unloading while maintaining a safe distance from active construction zones. o Provide workers with personal protective equipment (PPE) and training on safe spoil handling techniques. 4. Disposal of Spoils: o Larger spoils (such as cut conduit or broken boring rods) may be temporarily stored in designated areas identified by the AHJ. These spoils should be removed from these temporary areas at the end of every working week (typically Friday unless there is a holiday than the day before). Best Management Practices (BMP) Procedure for Underground Electric Distribution Projects Techniques Used: Horizontal Directional Drilling (HDD) & Open Trenching 1. Horizontal Directional Drilling (HDD) Best Practices • Drilling Path Design & Bore Planning o Utilize GPS tracking and hydraulic calculations to plan bore paths and ensure accurate drill trajectories. o Avoid congested utility corridors and environmentally sensitive areas. • Drill Fluid Management & Environmental Controls o Implement fluid containment measures, such vacuum recovery systems (Vac-Truck). • Pullback & Conduit Installation o Conduct pre-pullback inspections to ensure the borehole is properly conditioned for conduit installation. o Use HDPE or reinforced PVC conduit rated for underground electrical distribution. • Post-Drill Verification & Testing o Perform integrity testing on installed conduits (Mandrel-test). 2. Open Trenching Best Practices • Excavation & Utility Coordination o Use soft digging techniques (hydro excavation or vacuum excavation) to expose existing utilities safely. o Employ trench shoring methods, such as trench boxes or sloping, to prevent collapses. • Cable Placement & Bedding Material o Ensure cables are placed at the correct depth per utility standards (typically 30 inches minimum below grade). o Utilize clean sand or crushed stone as bedding material to protect conduit and cables. • Backfilling & Surface Restoration o Use controlled compaction methods to prevent future settlement and ground disturbances. o Restore pavement, landscaping, or sidewalks to their original condition, ensuring compliance with municipal standards. 3. Weather, Environmental & Sustainability Considerations • Erosion & Sediment Control o Use silt fences and sediment traps to prevent runo3 from trenching areas. • Drilling Waste Management o Dispose of excess drilling fluids responsibly and avoid contamination of stormwater systems. • Wildlife Protections o Maintain bu3er zones around protected environmental areas. o Utilize construction tree wrap on any trees in proximity to the trench. • Weather Consideration o In the event of heavy rain or other weather that would make construction infeasible, crews to make best e3ort to prepare the worksite for the weather and pause construction until safe to resume work. o In the event of a red flag warning in the Foothills area, all construction to cease and resume once the warning has lifted. Activities such as plating open trenches, cleaning up trash, or other “housekeeping” are permitted. 4. Post-Construction & Quality Assurance • Documentation & Reporting o Submit as-built drawings and project completion reports for regulatory compliance. o Maintain detailed records of cable installations, drill logs, and trenching activities. Discovery of Human Remains or Burial Items: The following actions must be taken immediately upon the discovery of human remains: • Stop immediately and contact the County Coroner. • The coroner has two working days to examine human remains after being notified by the responsible person. If the remains are Native American, the Coroner has 24 hours to notify the Native American Heritage Commission. • The Native American Heritage Commission will immediately notify the person it believes to be the most likely descendent of the deceased Native American. • The most likely descendent has 48 hours to make recommendations to the owner, or representative, for the treatment or disposition, with proper dignity, of the human remains and grave goods. If the descendent does not make recommendations within 48 hours the owner shall reinter the remains in an area of the property secure from further disturbance, or: • If the landowner does not accept the descendant’s recommendations, the owner or the descendent may request mediation by the Native American Heritage Commission. • Discuss and confer means the meaningful and timely discussion with careful consideration of the views of each party’s cultural values and, where feasible, seeking agreement. • If mediation fails, the landowner shall reinter the human remains with appropriate dignity on the property in a location not subject to future subsurface disturbance. Primary Electric Vault Spec Alhambra A-1252 Cover, see following sheet 3x5 Vault Lid: 3x5 Loadbreak Lid: Vault Examples 70 " 6"12"12" 12 " 12 " 37"46" 94 " 113" 70 " 12" 12 " 12 " 46" 94 " 55 " 12 " 12" 55 " 12 " 12 " 37" 12" 3" 79 " 17 6 " 113" 43" NTSNTS LoadBreak and Transformer Equipment Examples Temporary Staging Area Layout 30' 50' Temporary staging area to serve as a location to park the bore rig and vacuum trailer, store conduit reels, store spoils, and stage a port-a-potty. Likely area to be 30'x50', this may be variable depending on current equipment in use. Cones to be placed on boundaries of staging area with caution tape wrapped at the tops Biodegradable Wattles typ. Port-a Potty with wattles for secondary containment. Location may vary. Any food waste to be stored in trash bags and taken off-site for disposal. Any earthen material to require secondary containment. STANDARD INSTALLATION TYPES Existing Conduit Plow Directional Bore STANDARD COLORS F E A T U R E S SMOOTHWALL • Manufactured from flexible HDPE, makes gradual bends without special equipment • Continuous lengths reduce joining costs • Excellent low temperature properties, allows installation in cold climates • Outstanding long term cable protection from shifting ground, rock and root impingement • Provides a permanent pathway, simpifies future cable repairs or replacement UV UV SIZE RANGE AVAILABLE 0.5" 0.75" 1.0" 1.25" 1.5" 2.0" 2.5" 3.0" 4.0" 5.0" 6.0" 8.0" 10.0" 12.0" WALL TYPES SDR-9 SDR-11 SDR-13.5 SDR-15.5 SDR-17 SCH-40 SCH-80 SIDR-9 SIDR-11 STANDARD FOOTAGE MARKINGS Sequential foot or meter markings. Custom print streams available. SPECIFICATIONS All Smoothwall conduit dimensions meets or exceeds one or more of the following: ASTM F-2160, ASTM D-3350, ASTM D-2239, ASTM D-3485, NEMA TC-7, UL 651, UL 1990, Bellcore GR-356. OPTIONS SILICORE is co-extruded with the tough HDPE jacket creating a super, slick permanent lining. SILICORE lined ducts allow for higher speed cable jetting and longer cable pulls. PREINSTALLED TAPE Factory pre-installed Bull-Line™ Pull Tape with EVEN-LOAD™, ensures extra slack at any access point throughout the reel. Available 500lb–6,000lb tensile strength or locatable. UL LISTING AVAILABLE from ½"–6" for SDR 13.5, SCH 40 and SCH 80. EXTERNAL STRIPES can be added from our standard color offering to facilitate visual identification. UV PROTECTANT available for aerial/lashed placement. +1 800 847 7661 WWW.DURALINE.COM UV UV DL.SMOOTHWALL.9.2020 WA L L T Y P E PIPE SIZE ½"¾"1" 1¼"1½"2"2 ½" NOM OD (IN)0.840 1.050 1.315 1.660 1.900 2.375 2.875 OD TOLERENCE +/–0.004 0.005 0.007 0.008 0.010 0.012 0.014 BEND RADIUS (IN) SUPPORTED 8 10 13 17 19 24 29 BEND RADIUS (IN) UNSUPPORTED 16 20 26 34 38 48 58 SD R - 9 MIN. WALL (IN)0.093 0.117 0.146 0.184 0.211 0.264 0.319 WALL TOLERANCE +0.020 0.020 0.020 0.022 0.025 0.032 0.038 AVG ID (IN)0.634 0.796 1.003 1.270 1.453 1.815 2.199 MIN ID (IN)0.614 0.776 0.983 1.248 1.428 1.783 2.161 WEIGHT (#/FT)0.098 0.152 0.234 0.370 0.485 0.759 1.110 SWPS (LBS)525 821 1,288 ,052 2,688 4,200 6,155 SD R - 1 1 MIN. WALL (IN)0.076 0.095 0.120 0.151 0.173 0.216 0.261 WALL TOLERANCE +0.020 0.020 0.020 0.020 0.021 0.026 0.031 AVG ID (IN)0.668 0.840 1.055 1.338 1.533 1.917 2.322 MIN ID (IN)0.648 0.820 1.035 1.318 1.512 1.891 2.291 WEIGHT (#/FT)0.084 0.128 0.199 0.312 0.408 0.636 0.930 SWPS (LBS)440 687 1078 1717 2249 3515 5151 SD R - 1 3 . 5 MIN. WALL (IN)0.062 0.078 0.097 0.123 0.141 0.176 0.213 WALL TOLERANCE +0.020 0.020 0.020 0.020 0.020 0.021 0.026 AVG ID (IN)0.696 0.874 1.101 1.394 1.598 2.002 2.423 MIN ID (IN)0.676 0.854 1.081 1.374 1.578 1.981 2.397 WEIGHT (#/FT)0.072 0.110 0.167 0.263 0.342 0.528 0.775 SWPS (LBS)365 570 894 1425 1867 2917 4274 SD R - 1 5 . 5 MIN. WALL (IN)0.062 0.068 0.084 0.107 0.123 0.153 0.185 WALL TOLERANCE +0.018 0.020 0.020 0.020 0.020 0.020 0.022 AVG ID (IN)0.698 0.894 1.127 1.426 1.634 2.049 2.483 MIN ID (IN)0.680 0.874 1.107 1.406 1.614 2.029 2.461 WEIGHT (#/FT)0.071 0.098 0.149 0.234 0.304 0.467 0.680 SWPS (LBS)792 1,234 1,607 2,466 3,592 SD R - 1 7 MIN. WALL (IN)0.062 0.077 0.098 0.112 0.140 0.169 WALL TOLERANCE +0.020 0.020 0.020 0.020 0.020 0.020 AVG ID (IN)0.906 1.141 1.444 1.656 2.075 2.517 MIN ID (IN)0.886 1.121 1.424 1.636 2.055 2.497 WEIGHT (#/FT)0.091 0.138 0.217 0.281 0.432 0.625 SWPS (LBS)460 722 1150 1507 2355 3450 SMOOTHWALL (SDR) TECHNICAL SPECIFICATIONS (SIZES 3"-12" NEXT PAGE) (SIZES 3"-12: NEXT PAGE) +1 800 847 7661 WWW.DURALINE.COM DL.SMOOTHWALL.9.2020 UV UV WA L L T Y P E PIPE SIZE 3"4"5"6"8"10"12" NOM OD (IN)3.500 4.500 5.563 6.625 8.625 10.750 12.750 OD TOLERENCE +/–0.018 0.023 0.028 0.033 0.043 0.054 0.064 BEND RADIUS (IN) SUPPORTED 39 50 61 73 155 194 230 BEND RADIUS (IN) UNSUPPORTED 78 100 122 146 233 290 344 SD R - 9 MIN. WALL (IN)0.389 0.500 0.618 0.736 0.958 1.194 1.417 WALL TOLERANCE +0.047 0.060 0.074 0.088 0.115 0.143 0.170 AVG ID (IN)2.675 3.440 4.253 5.065 6.593 8.219 9.746 MIN ID (IN)2.628 3.380 4.179 4.977 6.479 8.076 9.576 WEIGHT (#/FT)1.648 2.723 4.161 5.901 10.001 15.534 21.866 SWPS (LBS)9,122 15,080 23,045 32,684 55,397 8,6057 121,056 SD R - 1 1 MIN. WALL (IN)0.318 0.409 0.506 0.602 0.784 0.977 1.159 WALL TOLERANCE +0.038 0.049 0.061 0.072 0.094 0.117 0.139 AVG ID (IN)2.826 3.633 4.490 5.349 6.963 8.679 10.293 MIN ID (IN)2.788 3.584 4.429 5.277 6.869 8.562 10.154 WEIGHT (#/FT)1.380 2.282 3.490 4.944 8.383 13.019 18.319 SWPS (LBS)7633 12618 19284 27349 46355 72010 101297 SD R - 1 3 . 5 MIN. WALL (IN)0.259 0.333 0.412 0.491 0.639 0.796 0.944 WALL TOLERANCE +0.031 0.040 0.049 0.059 0.077 0.096 0.113 AVG ID (IN)2.951 3.794 4.690 5.584 7.270 9.062 10.749 MIN ID (IN)2.920 3.754 4.641 5.525 7.193 8.966 10.636 WEIGHT (#/FT)1.146 1.895 2.896 4.112 6.969 10.821 15.214 SWPS (LBS)6335 10472 16004 22697 38470 59762 84067 SD R - 1 5 . 5 MIN. WALL (IN)0.226 0.290 0.359 0.427 WALL TOLERANCE +0.027 0.035 0.043 0.051 AVG ID (IN)3.021 3.885 4.802 5.720 MIN ID (IN)2.994 3.850 4.759 5.669 WEIGHT (#/FT)1.011 1.669 2.552 3.615 SWPS (LBS)5,342 8,814 13,483 19,123 SD R - 1 7 MIN. WALL (IN)0.206 0.265 0.327 0.390 WALL TOLERANCE +0.025 0.032 0.039 0.047 AVG ID (IN)3.063 3.938 4.870 5.798 MIN ID (IN)3.038 3.906 4.831 5.751 WEIGHT (#/FT)0.928 1.534 2.339 3.324 SWPS (LBS)5114 8453 12918 18321 SMOOTHWALL (SDR) TECHNICAL SPECIFICATIONS (SIZES ½"-2½" PREVIOUS PAGE) (SIZES ½"-2½" PREVIOUS PAGE) +1 800 847 7661 WWW.DURALINE.COM DL.SMOOTHWALL.9.2020 UV UV WA L L T Y P E PIPE SIZE ½"¾"1" 1¼"1½"2"2 ½" NOM OD (IN)0.840 1.050 1.315 1.660 1.900 2.375 2.875 OD TOLERENCE +/–0.004 0.005 0.007 0.008 0.010 0.012 0.014 BEND RADIUS (IN) SUPPORTED 8 10 13 17 19 24 29 BEND RADIUS (IN) UNSUPPORTED 16 20 26 34 38 48 58 SC H - 4 0 MIN. WALL (IN)0.109 0.113 0.133 0.140 0.145 0.154 0.203 WALL TOLERANCE +0.020 0.020 0.020 0.020 0.020 0.020 0.024 MIN ID (IN)0.582 0.784 1.009 1.340 1.570 2.027 2.421 AVG ID (IN)0.602 0.804 1.029 1.360 1.590 2.047 2.445 WEIGHT (#/FT)0.111 0.148 0.217 0.293 0.350 0.469 0.740 SWPS (LBS)601 798 1340 1604 1919 2579 4090 SC H - 8 0 MIN. WALL (IN)0.147 0.154 0.179 0.191 0.200 0.218 0.276 WALL TOLERANCE +0.020 0.020 0.021 0.023 0.024 0.026 0.033 MIN ID (IN)0.506 0.702 0.915 1.232 1.452 1.887 2.257 AVG ID (IN)0.526 0.722 0.936 1.255 1.476 1.913 2.290 WEIGHT (#/FT)0.139 0.188 0.276 0.382 0.463 0.641 0.978 SWPS (LBS)768 1040 1533 2116 2564 2545 5409 SMOOTHWALL SDR & SCHEDULE NOTES 1. Bend Radius ½" through 2 ½" Supported Bend Radius 10 times the OD Unsupported Bend Radius 20 times the OD 3" through 6" Supported Bend Radius 11 times the OD Unsupported Bend Radius 22 times the OD 8" through 16" Supported Bend Radius 18 times the OD Unsupported Bend Radius 27 times the OD 2. During cable placement, large sweeping bends are recommended over tighter bends. Pre-formed sweeps are recommended for conduit sizes 8" through 16" diameters. 3. SWPS (Safe Working Pull Strength) is calculated using a 25% safety factor with the minimum resin tensile strength of 3,000 psi, the average OD and average wall thickness. SMOOTHWALL (SCH) TECHNICAL SPECIFICATIONS (SIZES 3"-12" NEXT PAGE) (SIZES 3"-12: NEXT PAGE) +1 800 847 7661 WWW.DURALINE.COM DL.SMOOTHWALL.9.2020 UV UV WA L L T Y P E PIPE SIZE 3"4"5"6"8"10"12" NOM OD (IN)3.500 4.500 5.563 6.625 8.625 10.750 12.750 OD TOLERENCE +/–0.018 0.023 0.028 0.033 0.043 0.054 0.064 BEND RADIUS (IN) SUPPORTED 39 50 61 73 155 194 230 BEND RADIUS (IN) UNSUPPORTED 78 100 122 146 233 290 344 SC H - 4 0 MIN. WALL (IN)0.216 0.237 0.258 0.280 0.322 0.365 0.406 WALL TOLERANCE +0.026 0.028 0.031 0.034 0.039 0.044 0.049 MIN ID (IN)3.016 3.970 4.985 5.997 7.903 9.932 11.840 AVG ID (IN)3.042 3.998 5.016 6.031 7.942 9.976 11.889 WEIGHT (#/FT)0.969 1.380 1.872 2.432 3.661 5.215 6.846 SWPS (LBS)5348 7618 10320 13395 20158 28580 SC H - 8 0 MIN. WALL (IN)0.300 0.337 0.375 0.432 WALL TOLERANCE +0.036 0.040 0.045 0.052 MIN ID (IN)2.828 3.746 4.723 5.657 AVG ID (IN)2.864 3.786 4.768 5.709 WEIGHT (#/FT)1.310 1.914 2.657 3.656 SWPS (LBS)7238 10578 14669 20172 SMOOTHWALL (SCH) TECHNICAL SPECIFICATIONS (SIZES ½"-2½" PREVIOUS PAGE) (SIZES ½"-2½" PREVIOUS PAGE) +1 800 847 7661 WWW.DURALINE.COM DL.SMOOTHWALL.9.2020 UV UV WA L L T Y P E PIPE SIZE ½"¾"1" 1 ¼"1 ½"2"2 ½"3"4"6" MIN ID (IN)0.622 0.824 1.049 1.380 1.610 2.067 2.469 3.068 4.026 6.065 ID TOLERENCE +0.010 0.010 0.010 0.010 0.015 0.015 0.015 0.015 0.020 0.020 ID TOLERENCE –0.010 0.015 0.020 0.020 0.020 0.020 0.020 0.030 0.020 0.035 BEND RADIUS (IN) SUPPORTED 8 10 13 17 19 24 29 39 50 73 BEND RADIUS (IN) UNSUPPORTED 16 20 26 34 38 48 58 78 100 146 SI D R - 9 MIN. WALL (IN)0.069 0.092 0.117 0.153 0.230 WALL TOLERANCE +0.020 0.020 0.020 0.020 0.028 AVG OD (IN)0.780 1.026 1.298 1.701 2.553 WEIGHT (#/FT)0.072 0.122 0.192 0.324 0.729 SWPS (LBS)445 760 1471 1652 4535 SI D R - 1 1 . 5 MIN. WALL (IN)0.060 0.072 0.091 0.120 0.140 0.180 0.215 0.267 0.350 0.527 WALL TOLERANCE +0.020 0.020 0.020 0.020 0.020 0.022 0.026 0.032 0.042 0.063 AVG OD (IN)0.762 0.986 1.246 1.635 1.908 2.447 2.919 3.627 4.768 7.175 WEIGHT (#/FT)0.063 0.096 0.150 0.253 0.341 0.558 0.792 1.225 2.111 4.782 SWPS (LBS)390 597 891 1,549 2,123 3,468 4,934 7,627 13,119 29,750 SMOOTHWALL SIDR NOTES: 1. Bend Radius ½” through 2 ½” Supported Bend Radius 10 times the OD Unsupported Bend Radius 20 times the OD 3” through 6” Supported Bend Radius 11 times the OD Unsupported Bend Radius 22 times the OD 8” through 16” Supported Bend Radius 18 times the OD Unsupported Bend Radius 27 times the OD 2. During cable placement, large sweeping bends are recommended over tighter bends. Pre-formed sweeps are recommended for conduit sizes 8” through 16” diameters. 3. SWPS (Safe Working Pull Strength) is calculated using a 25% safety factor with the minimum resin tensile strength of 3,000 psi, the average OD and average wall thickness. 4. Internal or external ribs are in addition to the average wall and for determining OD and ID dimensions. The average rib height to be added is 0.020” 5. Add 0.016 #/ft for ribbed products 1 1/2” and less. For 2” and larger, add 0.025 #/ft SMOOTHWALL (SIDR) TECHNICAL SPECIFICATIONS +1 800 847 7661 WWW.DURALINE.COM DL.SMOOTHWALL.9.2020 UV UV AT SN S I L EC E OFOFLACI U Exp._____ R ER S T ADED L MO D .C N O INA R R YEV L.S. 6766KRISTINA ER