Loading...
HomeMy WebLinkAboutStaff Report 2411-3783CITY OF PALO ALTO CITY COUNCIL Special Meeting Monday, February 03, 2025 Council Chambers & Hybrid 5:30 PM     Agenda Item     4.Approval of Construction Contract No. C25191929 with Alex Kushner General Inc. in the Amount Not-to-Exceed $390,000 for the Temporary Fire Station 4 as part of the Fire Station 4 Replacement Capital Improvement Program project (PE-18004) and Authorization for the City Manager or Their Designee to Negotiate and Execute Change Orders for Related Additional but Unforeseen Work that May Develop During the Project Up to a Not-to-Exceed Amount of $39,000; CEQA Status – Exempt Under Section 15303 City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Public Works Meeting Date: February 3, 2025 Report #:2411-3783 TITLE Approval of Construction Contract No. C25191929 with Alex Kushner General Inc. in the Amount Not-to-Exceed $390,000 for the Temporary Fire Station 4 as part of the Fire Station 4 Replacement Capital Improvement Program project (PE-18004) and Authorization for the City Manager or Their Designee to Negotiate and Execute Change Orders for Related Additional but Unforeseen Work that May Develop During the Project Up to a Not-to-Exceed Amount of $39,000; CEQA Status – Exempt Under Section 15303 RECOMMENDATION Staff recommends that the Council: 1.Approve and authorize the City Manager or their designee to execute Construction Contract No. C25191929 with Alex Kushner General Inc., in the amount of $390,000 for construction of the Temporary Fire Station 4 as part of the Fire Station 4 Replacement Capital Improvement Program project (PE-18004); and 2.Authorize the City Manager or their designee to negotiate and execute one or more change orders to the contract with Alex Kushner General Inc., for related additional but unforeseen work which may develop during the project, the total value of which shall not exceed $39,000. BACKGROUND In June 2014, City Council approved the 2014 Council Infrastructure Plan, which included the replacement of Fire Station 4, located at 3600 Middlefield Road, with a new station that will serve the immediate and future needs of the Fire Department. In May 2022, the City contracted with Brown Reynolds Watford Architects to provide Architectural Design Services for the Fire Station 4 Replacement project1. During the construction of the new Fire Station 4, the station will be temporarily relocated for 24 months to the Cubberley Community Center, at 4000 Middlefield Road, to ensure continued emergency response to the neighborhoods served by Fire Station 4. 1 City Council, May 23, 2022; Agenda Item #2; SR #11691, https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=81678 In March 2024, Council authorized the City Manager to execute a Purchase Order with Mobile Modular Management Corporation in an amount not to exceed $244,850 to provide and install a Modular Building at the Cubberley Community Center, under a two-year lease agreement to serve as a temporary Fire Station 4 facility2. ANALYSIS Staff recommends approval of Contract No. C251919293 for site preparation work to install the leased modular building; installation of a carport and equipment structure; and required utility connections. Solicitation Process An Invitation for Bids for the Construction of the Temporary Fire Station 4 Project was posted on OpenGov, the City’s eProcurement platform. The bidding period was 23 calendar days. Bids were received from three contractors on November 21, 2024. Table 1: Summary of invitation for Bids Project Bid Name/Number Construction of Temporary Fire Station 4 Project/IFB# 191929 Proposed Length of Project 91 Calendar Days Total Days to Respond to Bid 23 Mandatory Pre-Bid Meeting November 6, 2024 Number of Companies at Pre-Bid Meeting 12 Number of Bids Received 3 Base Bid Price Range $390,000 - $774,000 Public Link to Solicitation https://procurement.opengov.com/portal/palo- alto-ca/projects/126269 Staff reviewed the three bids and found all three of them responsive. The bids ranged from a low of $390,000 to a high of $774,000 and from 35% below to 29% above the engineer’s estimate of $599,089. The bid summary is included as Attachment A. Staff reviewed all bids submitted and recommends the lump sum base bid of $390,000 submitted by Alex Kushner General Inc. be accepted, and that Alex Kushner General Inc. be declared the lowest responsible bidder. A change order amount of $39,000, equal to 10% of the 2 City Council, March 4, 2024; Consent Calendar #2; SR#2311-2277 https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=82718 3 Alex Kushner Construction Contract for Construction of Temporary Fire Station No. 4 Project C25191929; alex- kushner_c25191929_cc_staff-report_1.pdf total construction contract amount, is requested for related additional, unforeseen work which may develop during the project, implemented via City-approved Change Order. FISCAL/RESOURCE IMPACT STAKEHOLDER ENGAGEMENT ENVIRONMENTAL REVIEW ATTACHMENTS APPROVED BY: