Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Staff Report 2412-3929
CITY OF PALO ALTO CITY COUNCIL Special Meeting Monday, January 13, 2025 Council Chambers & Hybrid 5:30 PM Agenda Item 9.SECOND READING: Adoption of an Ordinance Approving a Plan for Park Improvements at the City’s Baylands for Santa Clara Valley Water District's Palo Alto Flood Basin Tide Gate Structure Phase 1: Seismic: Retrofit and Rehabilitation Project; Approval of Addendum to the Mitigated Negative Declaration for the Project Prepared by Santa Clara Valley Water District (SCH # 2020090237). (FIRST READING: December 9, 2024 PASSED 7-0) City Council Staff Report Report Type: CONSENT CALENDAR Lead Department: City Clerk Meeting Date: January 13, 2025 Report #:2412-3929 TITLE SECOND READING: Adoption of an Ordinance Approving a Plan for Park Improvements at the City’s Baylands for Santa Clara Valley Water District's Palo Alto Flood Basin Tide Gate Structure Phase 1: Seismic: Retrofit and Rehabilitation Project; Approval of Addendum to the Mitigated Negative Declaration for the Project Prepared by Santa Clara Valley Water District (SCH # 2020090237). (FIRST READING: December 9, 2024 PASSED 7-0) BACKGROUND The City Council heard this item on December 9, 2024 for a first reading and approved it on a 7- 0 vote. No changes were made to the ordinance, and it is not before the City Council for a second reading. ATTACHMENTS Attachment A - Ordinance Approving a Plan for Park's Improvements at City's Baylands APPROVED BY: Mahealani Ah Yun, City Clerk Attachment A *NOT YET APPROVED* 1 122_20241121_ts24 ORDINANCE NO. _____ Ordinance of The Council of The City of Palo Alto Approving a Plan for Park Improvements at the City’s Baylands: Authorizing the Santa Clara Valley Water District’s Palo Alto Flood Basin Tide Gate Structure Phase 1: Seismic Retrofit and Rehabilitation Project The Council of the City of Palo Alto does ORDAIN as follows: SECTION 1. Findings and Improvements. The City Council finds and declares that: (a) Article VIII of the Charter of the City of Palo Alto and Section 22.08.005 of the Palo Alto Municipal Code (PAMC) require that, before any substantial building, construction, reconstruction or development is commenced or approved, upon or with respect to any land held by the City for park purposes, the Council shall first cause to be prepared and by ordinance approve and adopt a plan therefor. (b) The Palo Alto Flood Basin Tide Gate Structure (Structure) is part of the Adobe Creek Loop Trail (Trail). The Structure is located in the City’s Baylands, which is dedicated parkland (See PAMC § 22.08.020 et seq.) (c) The City of Palo Alto intends to authorize Santa Clara Valley Water District (Valley Water) to perform a seismic retrofit and rehabilitation of the 1957-built Structure. The retrofit intends to reduce seismic vulnerabilities and the rehabilitation aims to extend the existing Structure’s service life. Based on the Conditional Structural Assessment of the existing Structure and reduced functionality, the Structure is planned to be seismically retrofitted and rehabilitated. (d) The plan of improvements (Plan) shall comprise, as follows: (1) The Project will install a deep foundation system on each end of the existing Structure consisting of two reinforced concrete piles topped with a rectangular- shaped reinforced concrete pile cap. The pile cap contains steel dowels to positively connect the deep foundation system to the side of the existing Structure. Select plan sheets showing the in-progress design are attached as Exhibit “A”. (2) The Project will repair large cracks and spalls in the concrete surface of the existing structure and then apply a Polyester Polymer Concrete (PPC) overlay for added protection. Select plan sheets showing the in-progress design are attached as Exhibit “A”. (3) The Project will replace the existing 42” tall fence with a new 48” tall fence. Select plan sheets showing the in-progress design are attached as Exhibit “A”. Attachment A *NOT YET APPROVED* 2 122_20241121_ts24 (4) The Project will create improved maintenance access from the deck to the flood basin with ladders and an opening in the trash rack. Select plan sheets showing the in-progress design are attached as Exhibit “A”. (5) The Project will require temporary closures to portions of the Trail to accommodate construction of the seismic retrofit and rehabilitation work. A diagram illustrating anticipated Trail closures is attached as Exhibit “B”. If the seismic retrofit and rehabilitation work to the Structure is not constructed, future degradation of the existing Structure will occur and would eventually require closure of the Trail for an unknown duration of time. (e) The Project described above and as otherwise depicted in the attached exhibits is consistent with “park, playground, recreation or conservation purposes” as required under PAMC section 22.08.020 et seq. (f) The City Council desires to approve the Plan for the Project described above and as depicted in Exhibit "A" and Exhibit “B”. SECTION 2. The City Council hereby approves the Plan for construction of the Palo Alto Flood Basin Tide Gate Structure Phase 1: Seismic Retrofit and Rehabilitation Project as described in this Ordinance. SECTION 3. Valley Water is the Lead Agency for the Project under the California Environmental Quality Act (CEQA). Valley Water performed an Initial Study and determined that a Mitigated Negative Declaration (MND) is the appropriate level of review for the previous Project scope of a Structure replacement. A resolution adopting the Final MND (Resolution) was signed by Valley Water’s Board on April 27, 2021. Since the work for the Seismic Retrofit and Rehabilitation Project is smaller in scope and has less impacts, an addendum to the Final MND has been completed stating that the modifications to the original Structure replacement project will not result in new significant impacts or increase the severity of the already disclosed impacts. On October 22, 2024, Valley Water’s Board considered the addendum to the Final MND and approved the Modified Palo Alto Tide Gate Replacement Project. The CEQA documents are available online from the project website: https://www.valleywater.org/pafbtidegates. The City Council finds that the City of Palo Alto is a responsible agency under CEQA for the Project and certifies that it has reviewed and considered the information contained in Valley Water’s MND as updated by the addendum. Valley Water will apply for new regulatory permits or amend the existing regulatory permits from six resource agencies and will be working with the resource agencies for updated mitigation requirements and permit conditions. Attachment A *NOT YET APPROVED* 3 122_20241121_ts24 SECTION 4. This ordinance shall be effective on the thirty-first day after the date of its adoption. INTRODUCED: PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: ____________________________ ____________________________ City Clerk Mayor APPROVED AS TO FORM: APPROVED: ____________________________ ____________________________ Assistant City Attorney City Manager ____________________________ Director of Community Services EXHIBIT A PAGE 1 OF 4 EXHIBIT A EXHIBIT A PAGE 2 OF 4 EXHIBIT A EXHIBIT A PAGE 3 OF 4 EXHIBIT A EXHIBIT A PAGE 4 OF 4 EXHIBIT A EXHIBIT B PAGE 1 OF 2 5000 ft N ➤➤ N Image © 2024 AirbusImage © 2024 Airbus Byxbee Park Parking Lot PROJECT LOCATION Palo Alto Airport Palo Alto Flood Basin HW Y 1 0 1 Sa n A n t o n i o R d ±0.8 MILES TRAIL SEGMENTS CLOSED FOR 5 MONTHS (SEPTEMBER 2025 TO JANUARY 2026) OTHER TRAIL ROUTES & DETOUR OPEN ALL THE TIME Existing Tide Gate Structure FLAGGERS WILL BE PRESENT DURING HEAVY EQUIPMENT MOBILIZATION/DEMOBILIZATION ⚑ ⚑ ⚑ FLAGGERS WILL BE PRESENT DURING HEAVY EQUIPMENT MOBILIZATION/DEMOBILIZATION ⚑ ⚑ Coast Casey Pump Station ⚑ Emb a r c a d e r o R d E B a y s h o r e R d Fab e r P l Ad o b e C r e e k Loo p T r a i l Bay Trail TRAIL CLOSURE SIGN SIZE 4’ x 4’ 48” x 48” 5’ x 3” Construction Sign for Palo Alto Flood Basin Project EXHIBIT B PAGE 2 OF 2