Loading...
HomeMy WebLinkAboutStaff Report 2401-2556CITY OF PALO ALTO CITY COUNCIL Special Meeting Monday, February 05, 2024 Council Chambers & Hybrid 5:30 PM     Agenda Item     11.SECOND READING: Adoption of an Ordinance Authorizing the Improvements to the Palo Alto Baylands as Part of the Horizontal Levee Pilot Project and Approval of a Cooperative Agreement with the Association of Bay Area Governments to Construct the Horizontal Levee Pilot Project (WQ‐22001); CEQA – exempt under Section 15133 (FIRST READING: January 22, 2024 PASSED 7‐0) City Council Staff Report Report Type: CONSENT CALENDAR Lead Department: City Clerk Meeting Date: February 5, 2024 Report #:2401-2556 TITLE SECOND READING: Adoption of an Ordinance Authorizing the Improvements to the Palo Alto Baylands as Part of the Horizontal Levee Pilot Project and Approval of a Cooperative Agreement with the Association of Bay Area Governments to Construct the Horizontal Levee Pilot Project (WQ‐22001); CEQA – exempt under Section 15133 (FIRST READING: January 22, 2024 PASSED 7- 0) BACKGROUND This was heard by the City Council on January 22, 2024 for a first reading and was approved 7-0. No changes were made to the ordinance; it is now before you for a second reading. ATTACHMENTS Attachment A: Park Improvement Ordinance for Horizontal Levee Pilot Project Improvements APPROVED BY: Mahealani Ah Yun, City Clerk *NOT YET APPROVED* ORDINANCE NO. _____ Ordinance of The Council of The City of Palo Alto Approving a Plan for Improvements to the Palo Alto Baylands as part of the Horizontal Levee Pilot Project The Council of the City of Palo Alto does ORDAIN as follows: SECTION 1. Findings. The City Council finds and declares that: Article VIII of the Charter of the City of Palo Alto and Section 22.08.005 of the Palo Alto(a) Municipal Code (PAMC) require that, before any substantial building, construction, reconstruction or development is commenced or approved, upon or with respect to any land held by the City for park purposes, the Council shall first cause to be prepared and by ordinance approve and adopt a plan therefor. (b)The Horizontal Levee Pilot Project (Project) is part of the Marsh Front Trail (Trail). The Project site is located in the City’s Baylands, which is dedicated parkland (See PAMC § 22.08.020 et seq.) Based on the current habitat quality of the Project site, the location has been identified as in need of enhancements to better provide refugia for many species including the endangered Salt Marsh Harvest Mouse. (c)The City of Palo Alto intends to authorize the construction of a horizontal levee pilot system that will enhance habitat, maintain public access, provide educational opportunities, provide regionally-beneficial information on nature-based sea level rise adaptation options, and beneficially reuse treated wastewater. (d)The Plan of improvements shall comprise, as follows: (1) The Project will construct a horizontal levee along Harbor Marsh and install along Embarcadero and Harbor Roads an underground treated wastewater pipeline for irrigation of the horizontal levee. The horizontal levee will be planted with various native plants to restore diverse transitional habitats including freshwater marsh, wet meadow, and riparian scrub. The Project will re-align a portion of the Trail as required to accommodate the horizontal levee and reconnect habitats. The Project will install educational signage and provide opportunities for public participation in community science activities such as photo-point monitoring of habitat restoration and water quality testing. (2)The Project will require temporary rerouting of a portion of the Marsh Front Trail and temporary traffic restrictions to a portion of Harbor Road to accommodate construction. 1 0004_20240124_ca29 *NOT YET APPROVED* (e)The Project described above and as otherwise depicted in the attached exhibit is consistent with recreation and conservation purposes (f)The Council desires to approve the Plans for the Project described above and as depicted in Exhibit "A". SECTION 2. The Council hereby approves the Plan for construction of the Horizontal Levee Pilot Project as described in this Ordinance. SECTION 3. City of Palo Alto is the Lead Agency for the Project under the California Environmental Quality Act (CEQA) and finds that the Project is categorically exempt under CEQA Section 15333, Class 33 for small habitat restoration projects. SECTION 4. This ordinance shall be effective on the thirty-first day after the date of its adoption. INTRODUCED: PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: ____________________________ City Clerk ____________________________ Mayor APPROVED AS TO FORM:APPROVED: ____________________________ Chief Assistant City Attorney ____________________________ City Manager ____________________________ Director of Community Services 2 0004_20240124_ca29 EXHIBIT A Palo Alto Airport Harbor MarshPalo Alto RWQCP Byxbee Park Project Boundary 0 650 1,300 Feet Palo Alto Horizontal Levee Pilot Project. D201801306 Figure 1SOURCE: USGS 7.5' Topographic Quadrangle (Mountain View, CA); ESA 2022 Project Location EXHIBIT A Palo Alto Airport Install pump in effluent junction box and connect to new effluent line H a r b o r M a r s h Palo Alto RWQCP 0 100 200 Byxbee ParkFeet Project Boundary Project Component Horizontal Levee Area Access Effluent Line in Roadway Equipment Staging Area Contractor Parking Area Palo Alto Horizontal Levee Pilot Project. D201801306 Figure 2SOURCE: ESRI 2021; ESA 2022 Project Components EXHIBIT A Harbor Marsh Palo Alto RWQCP Legend Project Boundary Major Contour 2' Minor Contour 0.5' Existing Overhead Power Lines Demo Abandoned W4 Line Demo 18-Inch Storm Drain Preserve 18-Inch Storm Drain Existing Renzel Marsh Intake Structure k Riparian Bufferkkùù ù Riparian Scrub (Transition)Remove Existing Trail Preserve 18-Inch Renzel Marsh Pipeline Seasonal Wet MeadowBrackish Marsh (Clear & Grub, No Grading) Subsurface Treatment ZoneNew 18-Inch Culvert Freshwater Marsh Upland (Levee and Staging Area Seeding)New 4-Inch Effluent Line New Distribution Lateral New Distribution Trench Freshwater Swale Relocated Marsh Front Trail Perennial Wet Meadow, , ,à 0 30 60ààFeet Palo Alto Horizontal Levee Pilot Project. D201801306 Figure 3SOURCE: ESRI 2021; ESA 2022 Draft Horizontal Levee Plan EXHIBIT A 25 20 15 10 5 25 20 15 10 5 HARBOR ROAD HABITAT SLOPE ~68' TO 93' 30'12' BERMSWALE TREATMENT AREA 8'3' THICK DISTRIBUTION TRENCH SEE FIGURE 5 HORIZONTAL LEVEE DESIGN GRADE, TYPTRAIL EL 12'EXISTING GRADE, TYP APPROX. (E) EDGE OF MARSH @ EL 8'3 1 2' THICK 151 EL 10' 30EL 13'1 1 EL EL1129'8'MATCH GRADE EL 7'±1 1 1 2 1 ~15 1 ~10COARSE MATERIAL (NOTE 4) SAND FILTER (NOTE 3) OVER EXCAVATE & PLACE 1' LAYER OF COARSEBERM KEYWAY EFFLUENT LINE (N) FENCE, TYP 1' THICK SUBSURFACE NATIVE MATERIAL TREATMENT LAYER, TYP (NOTE 2) 0 00+00 0+50 1+00 1+50 2+00 2+26 STATION TYPICAL SECTION - RIDGES/HIGH & WIDEA -PROFILE C L : 1" 10 H 25 20 15 10 5 25 HARBOR ROAD HABITAT SLOPE ~68' TO 93' 30'12'SWALE TREATMENT AREABERM 8' TRAIL 20 15 10 5 HORIZONTAL LEVEE DESIGN GRADE, TYP APPROX. (E) EDGE OF MARSH @ EL 8'EL 11.5' 3 TOP OF BANK (BEYOND)2' THICK 151EL 13'EL 9.5' EL 9'1 1 1 1 CONFORM TO (E) TIDAL CHANNEL 2 15 1EXISTING GRADE, TYP 1 2011 1 FINE MATERIAL (NOTE 4)15 BASE SWALE/ DEPRESSIONBERM KEYWAY SAND FILTER (NOTE 3) (N) FENCE, TYP 1' THICK SUBSURFACE OVER EXCAVATE & PLACE 1' EFFLUENT LINE SEE MECHANICAL PLANS TREATMENT LAYER, TYP (NOTE 2)LAYER OF FINE NATIVE MATERIAL0 0 -2 0+00 -2 2+110+50 1+00 STATION 1+50 2+00 TYPICAL SECTION - SWALES & DEPRESSIONSB -PROFILE NOTES 1. SEGREGATE FINE AND COARSE MATERIAL ENCOUNTERED DURING EXCAVATION OF SITE TO SUBGRADE. DURING FILL OPERATIONS, PLACE COARSE MATERIAL ON THE RIDGES AND FINE MATERIALS IN THE SWALES. 4. COARSE AND FINE MATERIAL INCLUDES A BLEND OF NATIVE MATERIAL WITH COMPOSTED WOOD FINES. 5. FUTURE FLOOD CONTROL LEVEE MAY OR MAY NOT BE CONSTRUCTED, BUT THIS LAYOUT PLANS FOR ITS POTENTIAL SPACE SHOULD IT BE CONSTRUCTED.2. SUBSURFACE TREATMENT LAYER COMPRISED OF A BLEND OF DRAIN ROCK AND COMPOSTED WOOD CHIPS.6. ALL ELEVATIONS ARE ON NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88). 3. SAND FILTER COMPRISED OF A BLEND OF SAND AND WOOD CHIPS. Palo Alto Horizontal Levee Pilot Project . D201801306 Figure 4 Draft EXHIBIT A NEW TRAIL ~4.5' (VARIES)~0.5' SOIL CAP QUICK4 EQUALIZER 24 LOW PROFILE INFILTRATOR, OR APPROVED EQUAL FILTER FABRIC 1.5'± SOIL WITH COMPOSTED WOOD FINES DISTRIBUTION LATERAL, TYP DISTRIBUTION BOX 1.0' TREATMENT LAYER 0.5' SAND AND WOOD CHIPS FILTER FABRICEFFLUENT SUPPLY LINE DRAIN ROCK & COMPOSTED WOOD CHIPS DISTRIBUTION CONNECTION AND TREATMENT ZONE MATERIAL 2 1 0 2 4 1"=2' SECTION SCALE: 1" = 2'SCALE FEET Palo Alto Horizontal Levee Pilot Project . D201801306 Figure 5 Draft