Loading...
HomeMy WebLinkAboutStaff Report 2309-19977.Approval of Second Amendment to Tenant Work Letter for the Roth Building at 300 Homer Avenue between the City of Palo Alto and the Palo Alto History Museum; CEQA Status--Not a Project. City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Administrative Services Meeting Date: November 13, 2023 Report #:2309-1997 TITLE Approval of Second Amendment to Tenant Work Letter for the Roth Building at 300 Homer Avenue between the City of Palo Alto and the Palo Alto History Museum; CEQA Status--Not a Project. RECOMMENDATION Staff recommends that the City Council approve and authorize the City Manager, or their designee, to execute the Second Amendment to Tenant Work Letter by and between the City of Palo Alto and Palo Alto History Museum to memorialize the current project schedule and funding information. BACKGROUND In December 2022, Council approved a 40-year lease with the Palo Alto History Museum for use of the Roth Building located at 300 Homer Avenue1. The lease contemplated construction of various tenant improvements, with additional details and obligations to be documented in a “mutually agreeable Tenant Work Letter.” At the April 17, 2023 meeting, the Council approved the Tenant Work Letter2. The Tenant Work Letter was fully executed on April 20, 2023, and the Palo Alto History Museum (the Museum) subsequently assumed responsibility for the property. The Tenant Work Letter was amended and approved by the Council on September 5, 2023 to revise certain insurance requirements for Palo Alto History Museum and its general contractor, Vance Brown, Inc.3 Now, updates are necessary to Attachments A and B of the Tenant Work Letter and require approval by the Council. 1 CMR 15017 Approval of Lease for the Roth Building (300 Homer Ave.) https://cityofpaloalto.primegov.com/Public/CompiledDocument?meetingTemplateId=8715&compileOutputType= 1 2 CMR 2303-1108 Approval of Tenant Work Letter for Lease of 300 Homer Avenue Roth Building https://cityofpaloalto.primegov.com/meeting/document/1853.pdf?name=Item%2013%20Staff%20Report 3 CMR 2308-1885 Approval of First Amendment to Tenant Work Letter for the Roth Building at 300 Homer Avenue https://cityofpaloalto.primegov.com/meeting/document/2863.pdf?name=Item%204%20Staff%20Report Attachment A of the Tenant Work Letter is being updated to reflect the final Guaranteed Maximum Price (GMP) for the Construction Contract and to adjust the amount of the Museum Contribution commensurate with any adjustment to the GMP. Attachment B is being revised and updated to ensure the Project Schedule reflects the most current as-planned schedule available. ANALYSIS Attachment A details the Parties’ respective funding commitments for construction on the Project. Prior to execution of the Tenant Work Letter, the Museum estimated the cost to construct the project based on the construction contract’s GMP of $11,513,075 and $335,750 in soft costs (such as permit and utility fees) for a total of $11,848,825. The Tenant Work Letter expressly acknowledged the need for a project funding update to reflect the final GMP, with revised funding commitments to be adopted by the City and Museum. The contract sum within the construction contract, dated May 22, 2023, was updated to $12,756,281 with $372,011 in soft costs for a total of $13,128,292. The increase amount is attributed to rising cost over that time and updated pricing provided by subcontractors. There have been a few change orders since the execution of the construction contract, including $246,694 for window retrofit work and $38,855 for delays, but those amounts will reportedly be absorbed by the contingency that was previously budgeted at $1,159,662. The Museum’s funding commitment has increased from $1,828,825 to $3,108,292, based on information provided by the Museum on May 18, 2023. Funds to be used from the approved $3 million HUD Grant will need to be increased from $978,825 to $2,258,292 to cover the $1,279,467 increase in costs as stipulated in the current terms of the TWL (Section 4.4). Similarly, the Tenant Work Letter requires the parties to revise and update the project schedule to reflect the planned schedule for construction. Attachment B constitutes the planned schedule for construction of the Project, dated September 9, 2023. Construction was originally expected to start in July 2023, but commenced on September 11, 2023 after Council’s approval of the First Amendment which ensured the Museum had the required insurance coverage for construction, a pre-construction requirement, and substantial completion is currently expected by December 30, 2024. FISCAL/RESOURCE IMPACT Approval of the Second Amendment will not result in any fiscal/resource impact to the City. The City’s contribution to the project remains at $10,020,000 as shown in Table 1 below. As noted in the Tenant Work Letter, the Museum was approved for a $3 million HUD Grant. The HUD Funds component of the Museum Contribution has increased by $1,279,467, from $978,825 to $2,258,292 and these funds will flow through the Museum’s financials, not the City’s. The Museum intends to retain the remainder of the grant for the Museum buildout, but under the terms of the Tenant Work Letter will commit those funds to the Rehabilitation Project should there be further cost increases. Table 1: Roth Building Rehabilitation Project (PF-23001) Funding Sources Original TWL April 2023 Revised TWL Sept. 2023 Museum Contribution Donations $850,000 $850,000 HUD Funds $978,825 $2,258,292 Total Museum Contributions $1,828,825 $3,108,292 City Contribution TDRs & General Fund Contributions $4,900,000 $4,900,000 SUMC $2,000,000 $2,000,000 County Grants $653,000 $653,000 CC Impact Fees $1,650,000 $1,650,000 Park Impact Fees $350,000 $350,000 Library Impact Fees $300,000 $300,000 Permit Reimbursement $100,000 $100,000 Perf. Bond Offset $67,000 $67,000 Total City Contributions $10,020,000 $10,020,000 Total Project Funding $11,848,825 $13,128,292 STAKEHOLDER ENGAGEMENT Staff continues to work closely with Museum representatives to administer the terms of the Lease and Tenant Work Letter. ENVIRONMENTAL REVIEW Council action on this item is not a project as defined by the California Environmental Quality Act (CEQA) because amending the attachments of the Tenant Work Letter is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. CEQA Guidelines section 15378(b)(5). ATTACHMENTS Attachment A: Second Amendment to Tenant Work Letter APPROVED BY: Kiely Nose, Assistant City Manager Lead Staff: David Ramberg, Assistant Director; Sunny Tong, Real Property Manager SECOND AMENDMENT TO TENANT WORK LETTER THIS SECOND AMENDMENT TO TENANT WORK LETTER (this “Second Amendment”) is entered into as of _______________ (“Execution Date”) by and between CITY OF PALO (“City”) and PALO ALTO HISTORY MUSEUM (“Museum”). RECITALS A. WHEREAS, City and Museum are parties to that certain Tenant Work Letter dated as of April 20, 2023 as amended by that certain First Amendment to Tenant Work Letter dated September 6, 2023; and B. WHEREAS, City and Museum desire to further modify and amend the Tenant Work Letter only in the respects and on the conditions hereinafter stated. AGREEMENT NOW, THEREFORE, City and Museum, in consideration of the mutual promises contained herein and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, and intending to be legally bound, agree as follows: 1. Definitions. For purposes of this Second Amendment, capitalized terms shall have the meanings ascribed to them in the Tenant Work Letter unless otherwise defined herein. 2. Attachment A. Attachment A of the Tenant Work Letter is hereby deleted and replaced with the Attachment A attached hereto. 3. Attachment B. Attachment B of the Tenant Work Letter is hereby deleted and replaced with the Attachment B attached hereto. 4. Effect of Second Amendment. Except as modified by this Second Amendment, the Tenant Work Letter and all the covenants, agreements, terms, provisions and conditions thereof shall remain in full force and effect and are hereby ratified and affirmed. In the event of any conflict between the terms contained in this Second Amendment and the Tenant Work Letter, the terms herein contained shall supersede and control the obligations and liabilities of the parties. 5. Counterparts and PDF Signatures. This Second Amendment may be executed in one or more counterparts, each of which, when taken together, shall constitute one and the same document. A portable document format (PDF) signature using Docusign on this Second Amendment shall be equivalent to, and have the same force and effect as, an original signature. [Signature page follows] IN WITNESS WHEREOF, the parties have executed this Second Amendment as of the day hereinabove first written. CITY: CITY OF PALO ALTO, a California chartered municipal corporation By: ______________________________ Name: ___________________________ Title: ____________________________ Date: ____________________________ Approved as to Form: By: ______________________________ Name: ___________________________ Title: ____________________________ Date: ____________________________ MUSEUM: PALO ALTO HISTORY MUSEUM By: ______________________________ Name: ___________________________ Title: ____________________________ Date: ____________________________ ATTACHMENT A PROJECT FUNDING This Attachment A details the Parties’ respective funding commitments for construction of the Project, based on the estimated Construction Cost set forth in Recital F, which is subject to amendment prior to commencement of Project construction. Pursuant to Section 5.4, this Attachment A will be amended based on the final GMP, as a condition precedent to commencement of Project construction. 1. Museum Contribution. The Museum is contributing $3,108,292.00 to pay for certain hard and soft costs for the construction of the Project as further specified in Section 4.3, which is comprised of the following: A. The Museum will contribute $372,011.00 to pay for all construction phase soft costs, including, without limitation, all permit and utility fees that are not expressly waived or reimbursed by the City and the premiums for the Builder’s Risk insurance for the Project. B. The Museum will contribute $2,736,281.00, based on the difference between the City Contribution and the estimated amount of the GMP as of the Effective Date. The Museum Contribution shall be funded by pledged and received donations in the amount of $850,000.00 (the “Museum Donations”) and, to the extent available and subject to Section 4.3 of the Tenant Work Letter, funds from the HUD Grant in the amount of $2,258,292.00 (the “HUD Funds”). Notwithstanding the foregoing, the amounts set forth herein are subject to amendment pursuant to Section 5.4 to reflect the final GMP and commensurate adjustments to the final amount of the Museum Contribution as a condition precedent to commencement of Project construction. 2. City Contribution. The City Contribution is comprised of the following contributions and reimbursements for construction of the Project, for a total City Contribution of $10,020,000, provided the Museum meets its funding obligations and timely complies with the conditions for Project commencement set forth in this Tenant Work Letter: A. The City will contribute $4,900,000.00 from transferable development rights and City general funds. B. The City will contribute $2,000,000.00 from Stanford University Medical Center development agreement funds. C. The City will contribute $653,000.00 from funds received pursuant to the County Grant Agreements, which is to be allocated solely for the improvements specified in the County Grant Agreements, and conditioned upon the Museum’s compliance with the terms and conditions of the County Grant Agreements, as may be further specified in the Lease. D. The City will contribute $1,650,000.00 from Community Center Impact Fees, toward construction cost for the community room facilities in the Building, provided those facilities are available for public community center use as further specified in the Lease. E. The City will contribute $350,000.00 from Park Impact Fees toward construction costs for the restroom facilities on the northeast side of the Building, provided those facilities are available as the public restrooms serving Heritage Park as further specified in the Lease. F. The City will contribute $300,000.00 from Library Impact Fees toward construction costs for the City Archive Room, provided the City Archive Room is available and accessible for City archives as further specified in the Lease. G. The City will reimburse the Museum in the amount of $100,000.00 for permit fees previously assessed for the Project. H. The City will contribute $67,000.00 to offset the cost for the General Contractor’s procurement of a payment bond and a performance bond. ATTACHMENT B PROJECT SCHEDULE Pursuant to Section 6.6 of the Tenant Work Letter, the attached schedule, dated ________, constitutes the planned schedule for construction of the Project. Activity Name Duration (Days)Start Date Finish Date % Complete Predecess ors Successors Critical Free Float June July August September October November December January February March April May June July August September October November December 2023 2024 June July August September October November December January February March April May June July August September October November December Design/Permit Process 352.00 6/24/21 11/22/22 100% Design Development (Complete)0.00 6/24/21 6/24/21 100%3 No 0.00 Permit Drawings (Complete)0.00 6/24/21 6/24/21 100%2 4, 5 No 0.00 City Review & Response (Complete)0.00 6/24/21 6/24/21 100%3 5, 6 No 0.00 Negociation of Lease Agreement (Complete)0.00 6/24/21 6/24/21 100%3, 4 85 No 0.00 Permit Ready to Pick Up (Complete)0.00 6/24/21 6/24/21 100%4 7 No 0.00 Notice to Proceed per Section 4 in the O/C Agreement 5.00 11/15/22 11/21/22 100%68, 10, 11, 12, 13, 14, 15, 16, 18, 19, 20, 22, 24, 25, 26, 86No0.00 Issue Permit (Complete)0.00 11/22/22 11/22/22 100%7 36, 85 No 0.00 Deferred City/County/OSHA Submittals 236.00 6/1/23 4/25/24 29% Fire Sprinklers (BFP)40.00 8/15/23 10/9/23 75%7 97, 204, 205 No 0.00 Underground Fire Service (Seton)40.00 6/1/23 7/26/23 100%7 96 No 0.00 Fire Alarm System (TLE/Code Red)40.00 8/15/23 10/9/23 25%7 204, 205 No 165.00 Trellis (SVG)40.00 9/1/23 10/26/23 0%7 171 No 140.00 Site Signage/Monument Sign (by Owner)40.00 3/1/24 4/25/24 0%7 33, 186 No 0.00 Cafe Awning (by Owner)40.00 3/1/24 4/25/24 0%7 186 No 80.00 Exterior Wall Mural (by Owner)40.00 3/1/24 4/25/24 0%7 186 No 80.00 Primary Project Procurement Items 284.00 7/17/23 8/15/24 69% Structural Steel/Misc. Metal Items 30.00 7/17/23 8/25/23 100%7 200 No 0.00 Elevator 30.00 7/17/23 8/25/23 100%7 220 No 0.00 Main Switch Gear 215.00 7/17/23 5/10/24 100%7 92FS-40.00, 219 No 0.00 Helical Piers 90.00 7/17/23 11/17/23 100% Submittal/Approval 15.00 7/17/23 8/4/23 100%7 23 No 0.00 Procure Piers for Installation 75.00 8/7/23 11/17/23 100%22 109 No 0.00 Exterior Glazing Items 30.00 7/17/23 8/25/23 50%7 163 No 160.00 Exterior Stone/Precast Sills 30.00 7/17/23 8/25/23 25%7 163 No 160.00 HVAC Equipment 30.00 7/17/23 8/25/23 100%7 200 No 0.00 Custom Light Fixtures 77.00 8/31/23 12/15/23 1% Select Lighting Consultant 1.00 8/31/23 8/31/23 100%29 No 0.00 Submittal Review Round #1 10.00 9/11/23 9/22/23 0%28 30 No 0.00 Revise and Resubmit Submittal 5.00 9/25/23 9/29/23 0%29 31 No 0.00 Submittal Review Round #2 10.00 10/2/23 10/13/23 0%30 32 No 0.00 Fabricate/Deliver Fixtures 45.00 10/16/23 12/15/23 0%31 204, 205 No 116.00 Signage/Monument Sign 80.00 4/26/24 8/15/24 0%14 186, 187 No 0.00 Construction 381.00 7/17/23 12/30/24 7% Mobilization/Make Ready Work 51.00 7/17/23 9/25/23 50% Install Site Fencing 1.00 7/17/23 7/17/23 100%837, 38, 39, 40, 47, 56, 60No 0.00 Install site signage 1.00 7/18/23 7/18/23 100%36 45 No 0.00 Cut & Cap Irrigation at South 2.00 7/18/23 7/19/23 100%36 44 No 0.00 Install Erosion Control 1.00 7/18/23 7/18/23 100%36 43, 45 No 0.00 Demo & Salvage Wood Benches (Scope?)1.00 9/1/23 9/1/23 0%36 41 No 346.00 Tree Protection 3.00 7/19/23 7/21/23 100%40 42 No 0.00 Demo Trees 2.00 9/1/23 9/4/23 100%41 44 No 0.00 Geo Fabric, AB @ Laydown Area - Delay #2 3.00 9/13/23 9/15/23 0%39 44 No 0.00 Clear & Grub Site 4.00 9/18/23 9/21/23 0%38, 42, 43 45 No 0.00 Install Stabilized Entrance 2.00 9/22/23 9/25/23 0%37, 39, 44 47 No 0.00 Demolition 83.00 8/7/23 11/29/23 16% Layout/Mark for Demolition 6.00 9/26/23 10/3/23 0%36, 45 48, 54, 58, 102 No 0.00 Protect Entrys, Medallions and Approve 5.00 9/25/23 9/29/23 100%47 49, 50, 51 No 0.00 Construct Entry Tunnel 2.00 10/2/23 10/3/23 100%48 57 No 0.00 Install Visqueen at interior of Courtyard windows 2.00 8/21/23 8/22/23 100%48 No 0.00 Protect (E) Flexwood 1.00 10/2/23 10/2/23 0%48 52, 53 No 325.00 Protect (E) Fixtures to Remain 2.00 8/22/23 8/23/23 100%51 53 No 0.00 Salvage (E) Interior Items 4.00 8/24/23 8/29/23 100%51, 52 55 No 0.00 Layout MEPS Penetration 3.00 10/6/23 10/10/23 0%47, 58 57 No 0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 VANCE BROWN, INC. 2585 E. BAYSHORE ROAD PALO ALTO, CA 94303 PALO ALTO HISTORY MUSEUM 300 HOMER AVENUE PALO ALTO, CA 94301 CONSTRUCTION PROGRESS UPDATE September 9, 2023 REVISION 6 Activity Name Duration (Days)Start Date Finish Date % Complete Predecess ors Successors Critical Free Float June July August September October November December January February March April May June July August September October November December 2023 2024 June July August September October November December January February March April May June July August September October November December Protection of Stair #1 - Delay #2 1.00 9/18/23 9/18/23 0%53 61 No 43.00 Pre- Asbestos / Hazmat Remediation Meeting 1.00 8/7/23 8/7/23 100%36 57 No 0.00 Asbestos / Hazmat Remediation 25.00 10/11/23 11/14/23 0%49, 54, 56 59, 71 No 0.00 Cut & Cap Utilities at Building 2.00 10/4/23 10/5/23 0%47 54 No 0.00 Certify Haz Mat Remediation 2.00 11/15/23 11/16/23 0%57 61, 62, 65, 68, 69, 77No 0.00 RelocateTemp Electrical - Delay #2 2.00 9/18/23 9/19/23 0%36 63 No 0.00 Demo Interior Fixtues, Built-Ins per Plans 2.00 11/17/23 11/20/23 0%55, 59 64, 67 No 0.00 Remove Tile Roof 5.00 11/17/23 11/23/23 0%59 66, 69, 74 No 0.00 Cut Openings @ E line 2.00 9/20/23 9/21/23 0%60 65 No 40.00 Demo Interior Walls per Plans 5.00 11/21/23 11/27/23 0%61 199 No 120.00 Sawcut (N) Ext Openings 1.00 11/17/23 11/17/23 0%59, 63 128 No 6.00 Store Roof Tiles Onsite 1.00 11/24/23 11/24/23 0%62 69 No 0.00 Demo (E) Plaster for Wall Tile Ins 2.00 11/21/23 11/22/23 0%61 171 No 121.00 Demo (E) Slab for Helical Piers 1.00 11/17/23 11/17/23 0%59 72, 76, 109 No 0.00 Strip Roof Underlayment 1.00 11/27/23 11/27/23 0%59, 62, 66 70, 73, 80 No 0.00 Remove Balcony Decking 1.00 11/28/23 11/28/23 0%69 152 No 14.00 Demo Ceiling Core Areas 3.00 11/15/23 11/17/23 0%57 78, 79 No 0.00 Excavate for Helical Piers 1.00 11/20/23 11/20/23 0%68 109 No 1.00 Remove, Reconfigure Roof Flashing 1.00 11/28/23 11/28/23 0%69 149 No 6.00 Demo Roof Parapet 1 Line D-E 2.00 11/24/23 11/27/23 0%62 75 No 0.00 Demo Stucco @ Roof Wall Intersection 2.00 11/28/23 11/29/23 0%74 150 No 9.00 Sawcut (E) Foundation for (N) Piers 2.00 11/20/23 11/21/23 0%68 109 No 0.00 Layout Demo Roof Demo 2nd Floor 2.00 11/17/23 11/20/23 0%59 80 No 5.00 Expose 2nd Floor Joists @ Arcade (9/S3.0)2.00 11/20/23 11/21/23 0%71 139 No 4.00 Temp Support Roof for Shotcrete Walls 2.00 11/20/23 11/21/23 0%71 81, 127 No 0.00 Cut Roof Openings 2.00 11/28/23 11/29/23 0%69, 77 146 No 65.00 Cut / Break (E) Beam for Shotcrete Wall 2.00 11/22/23 11/23/23 0%79 82 No 0.00 Sawcut, Demo 2nd Floor Slab 2.00 11/24/23 11/27/23 0%81 83 No 0.00 Demo On Site Sidewalks per Plans 1.00 11/28/23 11/28/23 0%82 89 No 56.00 On/Off Site Utilities (Excludes Gas Services)185.00 7/17/23 3/29/24 20% Submit all Materials to PAPW 1.00 7/17/23 7/17/23 100%5, 8 86 No 0.00 Street Permit from PAPW (By CoPA)10.00 9/1/23 9/14/23 100%7, 85 87 No 0.00 Mark Offsite Utilities (By CoPA)1.00 9/15/23 9/15/23 0%86 88, 96 No 0.00 Install Offsite Utilities (By CoPA)15.00 9/18/23 10/6/23 0%87 89 No 93.00 Install (N) SD outlet (after removal of laydown)5.00 2/15/24 2/21/24 0%83, 88, 193 90, 196 No 0.00 Inspect SD outlet 1.00 2/22/24 2/22/24 0%89 91 No 0.00 Test Compaction 1.00 2/23/24 2/23/24 0%90 No 221.00 Stake (N) Transformer, Secondary Vault, Secondary Conduits 1.00 3/18/24 3/18/24 0%20FS-40.00 93, 94 No 0.00 (N) Elect Conduits to Switch, Vault, Xfrmr 5.00 3/21/24 3/27/24 0%92 95 No 0.00 Vault, Pads for Primary, Secondary 5.00 3/19/24 3/25/24 0%92 95 No 2.00 Pull Wires Site Elec to Main 2.00 3/28/24 3/29/24 0%93, 94 199 No 31.00 Stake Onsite Water, FL, SS, BFP's to POC 1.00 9/18/23 9/18/23 0%11, 87 97 No 15.00 Install Onsite Water, FL, SS, BFP's 3.00 10/10/23 10/12/23 0%10, 96 98 No 0.00 Inspect Onsite Water, FL, SS, BFP's 1.00 10/13/23 10/13/23 0%97 99 No 0.00 Backfill Onsite Water, FL, SS 1.00 10/16/23 10/16/23 0%98 100 No 0.00 Certify BFP's 1.00 10/17/23 10/17/23 0%99 No 314.00 Foundations 83.00 10/4/23 1/26/24 0% Layout 18" Piers 1.00 10/4/23 10/4/23 0%47 103, 105 No 0.00 Excavate for WP @ Addition on Line E 3.00 10/5/23 10/9/23 0%102 104 No 0.00 Install WP @ Addition on Line E 5.00 10/10/23 10/16/23 0%103 117 No 50.00 Dill 18" Piers 5.00 10/5/23 10/11/23 0%102 106 No 0.00 Install Rebar Cages @ Piers 3.00 10/12/23 10/16/23 0%105 107 No 0.00 Inspect Pier Rebar 1.00 10/17/23 10/17/23 0%106 108 No 0.00 Pour Pier Concrete 1.00 10/18/23 10/18/23 0%107 113 No 36.00 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 VANCE BROWN, INC. 2585 E. BAYSHORE ROAD PALO ALTO, CA 94303 PALO ALTO HISTORY MUSEUM 300 HOMER AVENUE PALO ALTO, CA 94301 CONSTRUCTION PROGRESS UPDATE September 9, 2023 REVISION 6 Activity Name Duration (Days)Start Date Finish Date % Complete Predecess ors Successors Critical Free Float June July August September October November December January February March April May June July August September October November December 2023 2024 June July August September October November December January February March April May June July August September October November December Install Helical Piers (mini piles)5.00 11/22/23 11/28/23 0%23, 68, 72, 76 110 No 0.00 Test Helical Piers 1.00 11/29/23 11/29/23 0%109 111 No 0.00 Install Epoxy Dowels @ (E) Walls 5.00 11/30/23 12/6/23 0%110 112 No 0.00 Test Epoxy Dowels 1.00 12/7/23 12/7/23 0%111 113 No 0.00 Install Rebar @ Pier Caps 3.00 12/8/23 12/12/23 0%108, 112 114 No 0.00 Form Pier Caps 3.00 12/13/23 12/15/23 0%113 115 No 0.00 Pour Pier Caps 1.00 12/18/23 12/18/23 0%114 116 No 0.00 Excavate GB's, AB @ SOG 5.00 12/19/23 12/25/23 0%115 117, 120 No 0.00 Form GB's, SOG, Stairs 5.00 12/26/23 1/1/24 0%104, 116 118, 119, 120 No 0.00 Rebar @ GB's, SOG, Stairs 5.00 1/2/24 1/8/24 0%117 120 No 0.00 Install AB's & Hardy Frame Anchors 2.00 1/2/24 1/3/24 0%117 121 No 4.00 Inspect Rebar @ GB's, SOG, Stairs 1.00 1/9/24 1/9/24 0%116, 117, 118 121 No 0.00 Pour GB's & SOG (Pour #1)1.00 1/10/24 1/10/24 0%119, 120 122 No 0.00 Pour GB's & SOG (Pour #2)1.00 1/11/24 1/11/24 0%121 123 No 0.00 Ex for HC Ramp, Edge, Pads, Decks 3.00 1/12/24 1/16/24 0%122 124 No 0.00 FRP HC Ramp Landings 4.00 1/17/24 1/22/24 0%123 125 No 0.00 FRP Ext Landings, Deck Supports, Pads 4.00 1/23/24 1/26/24 0%124 177, 178, 203 No 0.00 Structual Work 96.00 11/22/23 4/3/24 0% Cut Out Rafters for Shotcrete Walls 4.00 11/22/23 11/27/23 0%79 128, 139 No 0.00 Shotcrete Wall, Soffit Forms B Line 5.00 11/28/23 12/4/23 0%65, 127 129 No 0.00 Rebar @ 8" Shotcrete Wall 5.00 12/5/23 12/11/23 0%128 130 No 0.00 Form Infill Walls 4.00 12/12/23 12/15/23 0%129 131 No 0.00 AB's Embeds @ Shotcrete Walls 2.00 12/18/23 12/19/23 0%130 132 No 0.00 Rebar @ Infills 5.00 12/20/23 12/26/23 0%131 133 No 0.00 Inspect Shotcrete Walls 1.00 12/27/23 12/27/23 0%132 134, 135 No 0.00 Shotcrete Wall Infills 3.00 12/28/23 1/1/24 0%133 136, 140 No 0.00 Embeds on Site for Structural 1.00 12/28/23 12/28/23 0%133 136 No 2.00 Mobilize Framer 1.00 1/2/24 1/2/24 0%134, 135 137 No 0.00 Frame Basement Walls 5.00 1/3/24 1/9/24 0%136 138, 141 No 0.00 Basement Rough-In 5.00 1/10/24 1/16/24 0%137 206 No 111.00 Structure @ Low Sloped Roof 7.00 11/28/23 12/6/23 0%78, 127 141, 149 No 0.00 Layout for FC's, Duct & Plumbing 2.00 1/2/24 1/3/24 0%134 142, 143 No 7.00 Shore 2nd Fl Ceiling Joists for Shafts 3.00 1/10/24 1/12/24 0%137, 139 142 No 0.00 Structural @ 1st Floor Ceiling @ Arcade 7.00 1/15/24 1/23/24 0%140, 141 143 No 0.00 2nd Floor Framing Walls & Shafts 15.00 1/24/24 2/13/24 0%140, 142 144, 145 No 0.00 Frame 1st Floor Walls 5.00 2/14/24 2/20/24 0%143 145 No 0.00 2nd Floor Roof Structure 6.00 2/21/24 2/28/24 0%143, 144 146 No 0.00 Hight Roof Structure 10.00 2/29/24 3/13/24 0%80, 145 147, 158 No 0.00 Frame Addition 15.00 3/14/24 4/3/24 0%146 162 No 0.00 Exterior 214.00 12/7/23 10/1/24 0% Low Sloped Roof Flashing, Gutters & Downspouts 4.00 12/7/23 12/12/23 0%73, 139 150 No 0.00 Underlayment @ Low Sloped Roofs 2.00 12/13/23 12/14/23 0%75, 149 151 No 0.00 Install Copper Tile, Seal 2.00 12/15/23 12/18/23 0%150 152 No 0.00 Waterproof Ext Balconies 3.00 12/19/23 12/21/23 0%70, 151 153 No 0.00 Test Waterproofing @ Balconies 1.00 12/22/23 12/22/23 0%152 154 No 0.00 Flash Elevator/Stair #2 2.00 12/25/23 12/26/23 0%153 155, 157 No 0.00 Stucco @ Lift / Stair 7.00 12/27/23 1/4/24 0%154 156 No 0.00 Install Roof Level Guardrail 5.00 1/5/24 1/11/24 0%155 172 No 163.00 Repair Flat Roof 4.00 12/27/23 1/1/24 0%154 172 No 171.00 Upper Sloped Roof Flashing, Gutters Downspouts 4.00 3/14/24 3/19/24 0%146 159, 165 No 0.00 Underlayment @ Upper Sloped Roof 3.00 3/20/24 3/22/24 0%158 160 No 0.00 Install Copper Tile System 5.00 3/25/24 3/29/24 0%159 161 No 0.00 Load Tile for Roof 1.00 4/1/24 4/1/24 0%160 164 No 0.00 Scaffold Exterior for Addition 2.00 4/4/24 4/5/24 0%147 163 No 0.00 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 VANCE BROWN, INC. 2585 E. BAYSHORE ROAD PALO ALTO, CA 94303 PALO ALTO HISTORY MUSEUM 300 HOMER AVENUE PALO ALTO, CA 94301 CONSTRUCTION PROGRESS UPDATE September 9, 2023 REVISION 6 Activity Name Duration (Days)Start Date Finish Date % Complete Predecess ors Successors Critical Free Float June July August September October November December January February March April May June July August September October November December 2023 2024 June July August September October November December January February March April May June July August September October November December Install (N) Exterior Doors 4.00 4/8/24 4/11/24 0%24, 25, 162 167, 175 No 0.00 Install Roof Tiles 30.00 4/2/24 5/13/24 0%161168, 199, 200, 207, 245No 0.00 Flash (E) Openings 5.00 3/20/24 3/26/24 0%158 166, 167 No 0.00 Install Precast Sills/Caps 5.00 3/27/24 4/2/24 0%165 167 No 7.00 Install (N) Exterior Windows 10.00 4/12/24 4/25/24 0%163, 165, 166 169, 175 No 0.00 Perform Window Retrofit Scope 30.00 5/14/24 6/24/24 0%164 172 No 46.00 Water Test Openings 5.00 4/26/24 5/2/24 0%167 170 No 0.00 Flashing @ Ext Stucco 5.00 5/3/24 5/9/24 0%169 171 No 0.00 Install Lath, Plaster @ Addition 30.00 5/10/24 6/20/24 0%13, 67, 170 172 No 48.00 Paint Exterior 10.00 8/28/24 9/10/24 0%156, 157, 168, 171, 188174, 237, 240, 241, 248No 0.00 Install Exterior Lights 2.00 2/12/24 2/13/24 0%181 240 No 165.00 Install Trelis 10.00 9/11/24 9/24/24 0%172 175, 240 No 0.00 Install Balcony Tile 5.00 9/25/24 10/1/24 0%163, 167, 174 240 No 0.00 Site Work 167.00 1/29/24 9/18/24 0% Sleeve for Irrigation 2.00 1/29/24 1/30/24 0%125 179 No 0.00 Demo (E) Concrete @ Courtyard 2.00 1/29/24 1/30/24 0%125 179, 180 No 0.00 Pour Back Sidewalks/Install Bike Racks 2.00 1/31/24 2/1/24 0%177, 178 182 No 6.00 Demo, Salvage Bricks @ Courtyard 4.00 1/31/24 2/5/24 0%178 181 No 0.00 Rough Grade, AB/DG, Pavers, Brick 4.00 2/6/24 2/9/24 0%180 173, 182, 186, 193 No 0.00 Install Irrigation 4.00 2/12/24 2/15/24 0%179, 181 183 No 0.00 Grade, Geo Fabric @ Pavers 2.00 2/16/24 2/19/24 0%182 184 No 0.00 New Brick Pavers / Sailer Course 6.00 2/20/24 2/27/24 0%183 185 No 0.00 Reinstall Pavers / Header Course 3.00 2/28/24 3/1/24 0%184 186 No 119.00 Fine Grade Site 3.00 8/16/24 8/20/24 0%14, 15, 16, 33, 181, 185187, 188, 189, 190 No 0.00 Install Monument Signage (by Owner)3.00 8/21/24 8/23/24 0%33, 186 196 No 7.00 Install Exterior Guardrails 5.00 8/21/24 8/27/24 0%186 172 No 0.00 Install Bike Racks 2.00 8/21/24 8/22/24 0%186 197 No 18.00 Trex Header Board 3.00 8/21/24 8/23/24 0%186 191 No 0.00 Install Site Concrete 3.00 8/26/24 8/28/24 0%190 192 No 0.00 Install Riverstone @ Tree #1 2.00 8/29/24 8/30/24 0%191 194 No 0.00 Remove AB and Rumble Plates @ Laydown 3.00 2/12/24 2/14/24 0%181 89, 195 No 0.00 Amend Soils 2.00 9/2/24 9/3/24 0%192 196 No 0.00 Replace Irrigation & Planting @ Laydown 4.00 2/15/24 2/20/24 0%193 196, 233 No 127.00 Landscape Planting 10.00 9/4/24 9/17/24 0%89, 187, 194, 195 197 No 0.00 Start 60 day Warranty Period 0.00 9/18/24 9/18/24 0%189, 196 248 No 73.00 Interior 189.00 1/29/24 10/17/24 0% 1st Floor Frame Interior Walls 10.00 5/14/24 5/27/24 0%64, 95, 164201, 202, 204, 208 No 0.00 Install Stair #2 10.00 5/14/24 5/27/24 0%18, 26, 164 214 No 38.00 Install Backing Rails, Lobby, TA's 4.00 5/28/24 5/31/24 0%199 209 No 14.00 Frame 2nd Floor Walls and Shafts 10.00 5/28/24 6/10/24 0%199 205, 208 No 0.00 Set CU Unit 1.00 1/29/24 1/29/24 0%125 204 No 85.00 MEPS 1st Floor Walls & Ceilings 7.00 5/28/24 6/5/24 0%10, 12, 32, 199, 203 205 No 3.00 MEPS 2nd Floor Walls & Ceilings 7.00 6/11/24 6/19/24 0%10, 12, 32, 202, 204 206 No 0.00 Inspect Walls 1.00 6/20/24 6/20/24 0%138, 205 209, 210 No 0.00 Insulate Roof 3.00 5/14/24 5/16/24 0%164 210 No 25.00 Insulate Walls 5.00 6/11/24 6/17/24 0%199, 202 209, 210 No 3.00 Rock 1st Floor 7.00 6/21/24 7/1/24 0%201, 206, 208 211, 222 No 0.00 Rock 2nd Floor 6.00 6/21/24 6/28/24 0%206, 207, 208 211, 222 No 1.00 Screw Inspection 1.00 7/2/24 7/2/24 0%209, 210 212, 213 No 0.00 Tape 1st Floor / Repair Plaster 10.00 7/3/24 7/16/24 0%211 214, 217 No 2.00 Tape 2nd Floor Walls / Shafts / Repair Plaster 12.00 7/3/24 7/18/24 0%211 214, 217, 220 No 0.00 Prime and Paint Walls 10.00 7/19/24 8/1/24 0%200, 212, 213215, 216, 217, 218, 223, 225, 231No 0.00 Install Acoustic Ceiling Grid 5.00 8/2/24 8/8/24 0%214 216 No 0.00 Install Light Fixtures Through Out 5.00 8/9/24 8/15/24 0%214, 215 244 No 50.00 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 VANCE BROWN, INC. 2585 E. BAYSHORE ROAD PALO ALTO, CA 94303 PALO ALTO HISTORY MUSEUM 300 HOMER AVENUE PALO ALTO, CA 94301 CONSTRUCTION PROGRESS UPDATE September 9, 2023 REVISION 6 Activity Name Duration (Days)Start Date Finish Date % Complete Predecess ors Successors Critical Free Float June July August September October November December January February March April May June July August September October November December 2023 2024 June July August September October November December January February March April May June July August September October November December CT and QT @ Baths 10.00 8/2/24 8/15/24 0%212, 213, 214 224 No 0.00 Cove Fixtures @ Lobby, Theater, Exhibits 10.00 8/2/24 8/15/24 0%214 235 No 15.00 Install new Electrical Main Switch Gear/City Inspection/Energize 45.00 5/13/24 7/12/24 0%20 220, 227 No 4.00 Rehabilitate (E) Elevator 50.00 7/19/24 9/26/24 0%19, 213, 219 221 No 0.00 Schedule/Inspect Elevator Installation 15.00 9/27/24 10/17/24 0%220, 231 243 No 0.00 Install (N) Doors and Frames 10.00 7/2/24 7/15/24 0%209, 210 235 No 38.00 Install Laminates, Trim 102 and 103 6.00 8/2/24 8/9/24 0%214 227, 229 No 0.00 Install (N) Bath & Janitor Partitions, Fixtures 4.00 8/16/24 8/21/24 0%217 235 No 11.00 Install Wood Paneling @ 105, 111 5.00 8/2/24 8/8/24 0%214 226, 227 No 0.00 Finishes @ Paneling Trim 5.00 8/9/24 8/15/24 0%225 227, 230 No 0.00 Complete Trim Out of MEPS 10.00 8/16/24 8/29/24 0%219, 223, 225, 226228, 235 No 0.00 MEPS Commisioning 5.00 8/30/24 9/5/24 0%227 242 No 5.00 Install Wood Base 1st Flr 5.00 8/12/24 8/16/24 0%223 235 No 14.00 Repair Flexwood & Trim 5.00 8/16/24 8/22/24 0%226 234 No 0.00 Floor Finishes 10.00 8/2/24 8/15/24 0%214 221, 232, 233, 243 No 0.00 Install Wood Base at 2nd Flr 5.00 8/16/24 8/22/24 0%231 235 No 10.00 Install Doors and Hardware All Floors 15.00 8/16/24 9/5/24 0%195, 231 235 No 0.00 Finishes @ Flexwood Trim 5.00 8/23/24 8/29/24 0%230 235 No 5.00 Paint Final Interior Items & Complete Touch Up 5.00 9/6/24 9/12/24 0%218, 222, 224, 227, 229, 232, 233, 234242 No 0.00 Punchlish/Final Inspection/Substantial Completion 165.00 5/14/24 12/30/24 34% Removel of Entry Tunnel and Exterior Frescoe/Mural Protection 3.00 9/11/24 9/13/24 0%172 238, 239, 248 No 0.00 Touch Up @ Exterior Frescoe/Mural Protection 5.00 9/16/24 9/20/24 0%237 240 No 7.00 Refurbish Entrance Arcade Lights (Total of 3)3.00 9/16/24 9/18/24 0%237 240 No 9.00 Exterior Punchlist 10.00 10/2/24 10/15/24 0%172, 173, 174, 175, 238, 239248 No 53.00 Site Punchlist 15.00 9/11/24 10/1/24 0%172 248 No 63.00 Interior Punchlist 15.00 9/13/24 10/3/24 0%228, 235 248 No 61.00 State Elevator Inspection IF Required 5.00 10/18/24 10/24/24 0%221, 231 244, 246, 248 No 0.00 Planning, Fire & Building Inspection Sign Off 8.00 10/25/24 11/5/24 0%216, 243 246, 248 No 38.00 Weather Delays 10.00 5/14/24 5/27/24 0%164 248 No 154.00 Delay #1 - Mobilization Delays (8 days)8.00 11/6/24 11/15/24 100%243, 244 247, 248 No 0.00 Delay #2 - Builder's Risk Insurance Delay (30 days)30.00 11/18/24 12/27/24 100%246 248 No 0.00 Substantial Completion (December 30, 2024)1.00 12/30/24 12/30/24 0%172, 197, 237, 240, 241, 242, 243, 244, 245, 246, 247Yes -0.00 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 VANCE BROWN, INC. 2585 E. BAYSHORE ROAD PALO ALTO, CA 94303 PALO ALTO HISTORY MUSEUM 300 HOMER AVENUE PALO ALTO, CA 94301 CONSTRUCTION PROGRESS UPDATE September 9, 2023 REVISION 6