HomeMy WebLinkAboutStaff Report 2305-1406CITY OF PALO ALTO
CITY COUNCIL
Special Meeting
Monday, August 07, 2023
Council Chambers & Hybrid
5:30 PM
Agenda Item
9.Approve Amendment No. 1 to Contract C21181034 with Rincon Consultants, Inc. for the
Continued Work on the Housing Element Update, and Approval of a FY 2024 Budget
Amendment in the General Fund for the Reappropriation of funds from FY 2023 to FY
2024. Environmental Review: Agreements are not subject to CEQA.
2
1
3
7
City Council
Staff Report
From: City Manager
Report Type: CONSENT CALENDAR
Lead Department: Planning and Development Services
Meeting Date: August 7, 2023
Report #:2305-1406
TITLE
Approve Amendment No. 1 to Contract C21181034 with Rincon Consultants, Inc. for the
Continued Work on the Housing Element Update, and Approval of a FY 2024 Budget Amendment
in the General Fund for the Reappropriation of funds from FY 2023 to FY 2024. Environmental
Review: Agreements are not subject to CEQA.
RECOMMENDATION
Staff recommends that Council:
1. Approve and authorize the City Manager or his designee to execute Amendment No. 1 to
Contract C21181034 with Rincon Consultants, Inc. (Attachment A), amending the scope
of services, increasing maximum compensation in the amount of $168,776 for a total not
to exceed amount of $796,769.
2. Amend the FY 2024 Budget Appropriation for the General Fund by (2/3 approval needed):
a. Increasing the contract expense appropriation in the Planning and Development
Services Department by $168,776; and
b. Decreasing the Budget Stabilization Reserve by $168,776.
EXECUTIVE SUMMARY
Staff is requesting an amendment to Contract C21181034 with Rincon Consultants, Inc. On April
12, 2021, the City Council approved a $627,993 contract with Rincon Consultants, Inc. to prepare
the City’s 2023-31 Housing Element1. The proposed amendment increases the scope of work and
contract capacity for additional unanticipated work.
The amendment would be for additional expenses for:
•Extra public and City meetings;
•Responding to additional State requirements;
1 April 12, 2021 Staff Report: https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-
reports/reports/city-manager-reports-cmrs/year-archive/2021/id-11928.pdf
2
1
3
7
•Accelerated adoption schedule;
•Additional Housing Element review; and
•A potential 3rd round of Housing and Community Development HCD review.
The attached contract amendment identifies specific tasks, deliverables and timelines to
complete the project. Funding approved in FY 2023 for this work is recommended to be
reappropriated early to FY 2024 to award the contract without impacting other work planned for
FY 2024.
BACKGROUND
Since 1969, the State has required all local jurisdictions to adequately plan to meet the housing
needs of everyone in the community. Each jurisdiction must update their Housing Element every
eight years. The 5th cycle planning period of 2015-23 recently expired. The City is in the process
of updating its Housing Element for the 6th cycle planning period of 2023-31. The deadline to
have a compliant Housing Element was January 31, 2023.
The procurement process for the initial contract began on November 30, 2020 when a request
for formal proposals (RFP) was posted on PlanetBids Vendor Portal. The solicitation period was
held for 24 days, with proposals due on December 23, 2020. The City received two proposals,
which were evaluated by Planning and Development Services and the City Attorney’s Office.
Specific focus was placed on each firm’s expertise of the housing element process, environmental
review and understanding of Palo Alto specific concerns. One round of interviews was conducted
and Rincon Consultants, Inc. (Rincon) was subsequently selected.
On April 12, 2021, the City Council approved the original contract with Rincon Consultants, Inc.
to prepare the City’s 2023-31 Housing Element2. The amount of the contract, including all sub-
consultants, was set at a “not to exceed” of $627,994. Funding was provided from the City
general fund and other State grants. This contract amendment was unable to be processed in FY
2023 due to negotiations with Rincon, department workload priorities, timing of contract
administration and year-end citywide financial closing processes; therefore, the funding for this
contract amendment needs to be reappropriated to FY 2024 in order to allow the work to
continue without impacting other work planned in FY 2024.
ANALYSIS
With a significant number of new requirements implemented for 6th cycle Housing Elements, the
preparation of the 2023-31 Housing Element has been more complex and elaborate than any
2
April 12, 2021 Staff Report: https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-
reports/reports/city-manager-reports-cmrs/year-archive/2021/id-11928.pdf
2
1
3
7
previous Housing Element. The amendment will allow for the continuity of work and expansion
of scope to include the following:
Extra Public and Staff Meetings
Rincon began working with staff and the Housing Element Working Group in May 2022. In
preparing for the Working Group meetings, staff needed longer meetings with Rincon than was
budgeted. Also, it was planned to have one Working Group meeting a month. However, some
months had two Working Group meetings.
Additional HCD Requirements
During the update process, the State implemented additional Housing Element requirements,
primarily requiring a 30-day public review and considering all public comments prior to HCD
submittal. This required additional Rincon resources. At time of contract execution, this
requirement was not in place therefore not in the scope of work or budget.
Aggressive Adoption Schedule
Once the HCD comments were received by the City, the City elected to have a compacted
schedule for response to HCD comments. This required Rincon to allocate additional staff and
other resources to meet the City’s aggressive adoption schedule.
Additional HCD Review
Understanding that HCD was intensely scrutinizing Housing Elements, staff elected for an
additional round of consultant review in order to minimize HCD comments. This additional round
of review was not accounted for in the original scope. Additionally, based on HCD trends, Rincon
and staff anticipate the potential need for a 3rd round of HCD review of the City Housing Element.
Therefore, the amendment also includes the estimated costs of a 3rd review.
FISCAL/RESOURCE IMPACT
Funding of $168,776 for this contract amendment was included in the FY 2023 operating budget
in the General Fund. Ordinarily, the funds would be reappropriated as part of the standard
process for reappropriations since the contract amendment was not able to be finalized before
the close of FY 2023. The annual reappropriation memorandum is anticipated to be presented to
Council in October 2023. Given the timeliness and urgency of this contract, the budgetary actions
described in the recommendation section of this report constitute an “early reappropriation”.
Funding of $168,776 is recommended to be reappropriated from FY 2023 to FY 2024, a technical
realignment between fiscal years, as part of this memorandum to support work related to this
contract and minimize impacts to other work planned in FY 2024.
2
1
3
7
STAKEHOLDER ENGAGEMENT
City staff have updated City Council, commissioners and the community at public meetings where
the Housing Element was discussed, including the compressed timeline for completion.
ENVIRONMENTAL REVIEW
Approval of this contract amendment is not a project under California Environmental Quality Act
(CEQA) as defined in CEQA Guidelines, section 15378, because it has no potential for resulting in
either a direct or reasonably foreseeable indirect physical change in the environment. The City
approved an Addendum to the Comprehensive Plan Final Environmental Impact Report (2017)
for the Housing Element update and associated tasks.
ATTACHMENTS
Attachment A: Rincon Contract, C21181034 Amendment No.1
APPROVED BY:
Jonathan Lait, Planning and Development Services Director
Vers.: Aug. 5, 2019
Page 1 of 31
AMENDMENT NO. 1 TO CONTRACT NO. C21181034
BETWEEN THE CITY OF PALO ALTO AND
RINCON CONSULTANTS, INC.
This Amendment No. 1 (this “Amendment”) to Contract No. C21181034 (the “Contract”
as defined below) is entered into as of June 6, 2023, by and between the CITY OF PALO ALTO, a
California chartered municipal corporation (“CITY”), and RINCON CONSULTANTS, INC., a
California corporation, located at 180 N. Ashwood Avenue, Ventura, CA 93003 (“CONSULTANT”).
CITY and CONSULTANT are referred to collectively as the “Parties” in this Amendment.
R E C I T A L S
A. The Contract (as defined below) was entered into by and between the Parties
hereto for the provision of Housing Element Update, associated rezoning actions and required
California Environmental Quality Act (CEQA) review, as detailed therein.
B. The Parties now wish to amend the Contract in order to increase compensation
by One Hundred Sixty Eight Thousand and Seven Hundred Seventy Six Dollars ($168,776) for
adding Scope of Services including Additional Services; changing total compensation value from
Six Hundred Twenty Seven Thousand Nine Hundred Ninety Three Dollars ($627,993) to
maximum total value of Seven Hundred Ninety Six Thousand and Seven Hundred Sixty Nine
Dollars ($796,769).
NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions
of this Amendment, the Parties agree:
SECTION 1. Definitions. The following definitions shall apply to this Amendment:
a. Contract. The term “Contract” shall mean Contract No. C21181034
between CONSULTANT and CITY, dated April 5, 2021.
b. Other Terms. Capitalized terms used and not defined in this Amendment
shall have the meanings assigned to such terms in the Contract.
SECTION 2. Section 4 “NOT TO EXCEED COMPENSATION” of the Contract is hereby
amended to read as follows:
“The compensation to be paid to CONSULTANT for performance of the Services shall be
based on the compensation structure detailed in Exhibit C, entitled “COMPENSATION,” including
any reimbursable expenses specified therein, and the maximum total compensation shall not
exceed Six Hundred Seventy Six Thousand and Seven Hundred Sixty Dollars ($676,760) . The
hourly schedule of rates, if applicable, is set out in Exhibit C-1, entitled “SCHEDULE OF RATES.”
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 2 of 31
Any work performed or expenses incurred for which payment would result in a total exceeding
the maximum compensation set forth in this Section 4 shall be at no cost to the CITY.
Optional Additional Services Provision (This provision applies only if checked and a
not-to-exceed compensation amount for Additional Services is allocated below under this Section
4.)
In addition to the not-to-exceed compensation specified above, CITY has set aside the
not-to-exceed compensation amount of One Hundred Four Thousand Six Hundred Sixty-Five
Dollars ($104,665.00) as a Twenty Percent (20%) of total cost contingency for the performance
of Additional Services (as defined below) in the original contract. As part of Amendment No. 1,
CITY is adding Fifteen Thousand Three Hundred Forty-Three ($15,343). The total compensation
for performance of the Services, Additional Services and any reimbursable expenses specified in
Exhibit C, shall not exceed One Hundred Twenty Thousand and Eight Dollars ($120,008) as
detailed in Exhibit C.
“Additional Services” means any work that is determined by CITY to be necessary for the
proper completion of the Project, but which is not included within the Scope of Services described
at Exhibit A. CITY may elect to, but is not required to, authorize Additional Services up to the
maximum amount of compensation set forth for Additional Services in this Section 4.
CONSULTANT shall provide Additional Services only by advanced, written authorization from CITY
as detailed in this Section. Additional Services, if any, shall be authorized by CITY with a Task
Order assigned and authorized by CITY’s Project Manager, as identified in Section 13 (Project
Management). Each Task Order shall be in substantially the same form as Exhibit A-1, entitled
“PROFESSIONAL SERVICES TASK ORDER”. Each Task Order shall contain a specific scope of
services, schedule of performance and maximum compensation amount, in accordance with the
provisions of this Agreement. Compensation for Additional Services shall be specified by CITY in
the Task Order, based on whichever is lowest: the compensation structure set forth in Exhibit C,
the hourly rates set forth in Exhibit C-1, or a negotiated lump sum.
To accept a Task Order, CONSULTANT shall sign the Task Order and return it to CITY’s
Project Manager within the time specified by the Project Manager, and upon authorization by
CITY (defined as counter-signature by the CITY Project Manager), the fully executed Task Order
shall become part of this Agreement. The cumulative total compensation to CONSULTANT for all
Task Orders authorized under this Agreement shall not exceed the amount of compensation set
forth for Additional Services in this Section 4. CONSULTANT shall only be compensated for
Additional Services performed under an authorized Task Order and only up to the maximum
amount of compensation set forth for Additional Services in this Section 4. Performance of and
payment for any Additional Services are subject to all requirements and restrictions in this
Agreement.”
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 3 of 31
SECTION3. The following exhibit(s) to the Contract is/are hereby amended or added, as
indicated below, to read as set forth in the attachment(s) to this Amendment, which is/are
hereby incorporated in full into this Amendment and into the Contract by this reference:
a. Exhibit “A” entitled “SCOPE OF SERVICES”, AMENDED, REPLACES
PREVIOUS.
b. Exhibit “B” entitled “SCHEDULE OF PERFORMANCES”, AMENDED,
REPLACES PREVIOUS.
c. Exhibit “C” entitled “COMPENSATION”, AMENDED, REPLACES PREVIOUS.
d. Exhibit “C-1” entitled “SCHEDULE OF RATES”, AMENDED, REPLACES
PREVIOUS.
SECTION4. Legal Effect. Except as modified by this Amendment, all other provisions of
the Contract, including any exhibits thereto, shall remain in full force and effect.
SECTION5. Incorporation of Recitals. The recitals set forth above are terms of this
Amendment and are fully incorporated herein by this reference.
(SIGNATURE BLOCK FOLLOWS ON THE NEXT PAGE.)
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 4 of 31
SIGNATURES OF THE PARTIES
IN WITNESS WHEREOF, the Parties have by their duly authorized representatives
executed this Amendment effective as of the date first above written.
CITY OF PALO ALTO
City Manager
APPROVED AS TO FORM:
City Attorney or Designee
(Contract over $25k)
RINCON CONSULTANTS, INC.
Officer 1
By:
Name:
Title:
Officer 2 (Required for Corp. or LLC)
By:
Name:
Title:
Attachments:
EXHIBIT A: SCOPE OF SERVICES, AMENDMENT. NO. 1 (AMENDED, REPLACES PREVIOUS)
EXHIBIT B: SCHEDULE OF PERFORMANCE, AMENDMENT NO. 1 (AMENDED, REPLACES
PREVIOUS)
EXHIBIT C: COMPENSATION, AMENDMENT NO. 1 (AMENDED, REPLACES PREVIOUS)
EXHIBIT C-1: SCHEDULE OF RATES, AMENDMENT NO. 1 (AMENDED, REPLACES
PREVIOUS)
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Richard Daulton
Principal/Secretary
Abe Leider
Principal
Vers.: Aug. 5, 2019
Page 5 of 31
EXHIBIT A
SCOPE OF SERVICES, AMENDMENT NO. 1
(AMENDED, REPLACES PREVIOUS)
CONSULTANT shall provide the Services detailed in this Exhibit A, entitled “SCOPE OF
SERVICES”.
A. Community Engagement Plan
Task A.1 Kickoff Meeting and Community Engagement Plan Kick Off Meeting
Upon authorization to proceed, Rincon will facilitate a kickoff meeting and city tour, if desired,
with City of Palo Alto staff. The purpose of the kickoff meeting is to discuss data needs and initial
community issues and opportunities, set project expectations, and explain our proposed
approach to the various components of the work program. The kickoff meeting is envisioned as
a two-hour event followed by a citywide tour, if desired.
Following the kickoff meeting, and conducted in a way deemed safe per COVID-19 conditions at
the time of project initiation, the Rincon/VTA team and City Staff will tour the city in individual
vehicles to explore key underutilized, vacant, and opportunity areas of focus as part of the
Housing Element Update. The citywide tour is envisioned as a half-day (four hours) event, with
COVID-compliant procedures if the team leaves the vehicles at any time during the tour.
Community Engagement Plan
Through our work in Palo Alto and updating Housing Elements for other cities, Rincon
understands that public engagement will be at the forefront during the Housing Element Update.
We strive to reach all community members using a variety of virtual and non-virtual methods
through the languages they are most comfortable using, and work closely with local community
groups, organizations, staff, and officials who know Palo Alto best. The Rincon/VTA team will kick
COVID-19 and Community Engagement
Due to the ongoing COVID-19 pandemic, we realize that the form of community
engagement and participation such as public meetings, workshops, and community events is
currently limited. Our team has become experienced at creating innovative, COVID-
compliant outreach strategies that meet the needs of each specific community. We are
currently working on several projects that have transitioned to Zoom or Microsoft Teams
virtual platforms for public meetings and interviews with great success. We have also re-
imagined how to solicit community feedback, transitioning several large outreach events to
completely virtual platforms. These have included interactive online exercises, educational
and informational videos, GIS participatory mapping techniques, live webinars with Q&A
sessions, and visual preference surveys.
Once in-person meetings are allowed, we can abide by County Public Health Guidelines and
facilitate small group meetings. These could take place over two days and adhere to social
distancing requirements. We will work with City staff to finalize our approach to facilitating
community outreach and are dedicated to ensuring an inclusive process for all.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 6 of 31
off the community engagement effort by developing a Community Engagement Plan to educate,
inform, and gain meaningful input from a broad and diverse range of groups and populations in
Palo Alto. Community engagement will focus on the community at-large, directly affected
stakeholders including property owners, businesses, residents and interest groups, and civic
decision-makers. This effort will be designed to effectively build collaborative interest and
identify common values and goals in the project direction, given the diverse group of local
stakeholders, and to bring new participants into the conversation.
Deliverable
Community Engagement Plan
Task A.2 Community Workshops and Working Group Meetings Community Workshops
The Rincon/VTA team will assist City staff in preparing for and conducting up to five community
workshops to discuss the Housing Element Update at key points in the process. Two public
workshops will be hosted near the beginning of the project initiation to introduce the community
to the Housing Element update process and its goals and to inform the public how to be involved
throughout the project. The remaining three public engagement workshops will be organized
around themes. This approach targets notification efforts to specific stakeholder groups
interested in the specific themes and helps alleviate any fatigue or schedule conflicts that
stakeholders and community members may feel with in-person participation. In light of the
ongoing COVID-19 health crisis, HCD has stated that it is acceptable for much of the public
engagement to occur online, although multiple engagement opportunities are anticipated. The
Rincon/VTA team has therefore budgeted for participation in virtual workshops. The Rincon/VTA
team will prepare all materials for the workshops and will serve as workshop facilitators.
Deliverables
Materials and presentations for up to five Community Workshops, including PowerPoint
presentations.
Working Group Meetings
The Rincon/VTA team will facilitate a citizen/stakeholder working group to help gather
community input during the Housing Element update process. At least one Rincon team member
will attend and contribute to up to 15 working group meetings beginning in mid-2021 and
continuing through fall of 2022. We will work with the City and working group to create each
meeting’s agenda and we will maintain meeting minutes with roll call, discussion topics, and
action items documented for each meeting. Meeting minutes will be provided to the City Project
Team within two business days following each meeting. Additional responsibilities will include:
Facilitating all HEAC meetings; Ms. Acosta will serve as the lead facilitator and primary point
of contact for all working group communication and questions, with Brenna Weatherby and
Veronica Tam attending as needed;
Developing agendas with City Project Team and distributing agendas to members before
each meeting;
Preparing required memos and staff reports for each meeting;
Preparing materials, e.g. PowerPoint presentations, handouts, etc., needed for each
working group meeting;
Delivering presentations to the working group;
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 7 of 31
Maintaining the working group roster and contact information; and
Coordinating with the City Project Team to invite community groups (e.g., HOAs, service
organizations, developers, business organizations) to participate in relevant working group
meetings, as applicable.
Deliverables
Materials (varied) for Working Group meetings
Task A.3 Public Meetings
The Rincon/VTA team has budgeted for participation in six public meetings on the project. The
Rincon/VTA team anticipates two Planning and Transportation Commission and four City Council
meetings. We anticipate these meetings will be a combination of study sessions and public
hearings to inform decisionmakers about the housing element process, discuss site selection
strategies and challenges, and to present the Draft and Final Housing Element and CEQA review
findings and recommendations.
The RFP acknowledges the potential for additional City subcommittee meetings. Rincon/VTA
team attendance at these meetings will be billed on a time and materials basis at current rates,
as shown in our cost sheet and rates. The cost of our attendance at subcommittee meetings will
vary depending on the level of consultant team involvement and the topic at hand. A per meeting
cost is anticipated to range from $1,200 to $2,500.
Deliverables
Materials/presentations for Public Hearings, including PowerPoint presentations and
printed exhibits. We have assumed $2,000 for printing costs associated with these materials,
which will not be billed in the event of virtual public hearings.
Task A.4 Other Outreach
Webpage Development and Maintenance
As part of the Community Engagement Strategy, the Rincon/VTA team will collaborate with the
City Project Team to provide content for an interactive, informational webpage for the Housing
Element Update and online public input survey. The webpage will enable community members
and stakeholders to participate in an online survey, offer suggestions, exchange ideas, and learn
about city-wide housing issues.
Stakeholder Email List
The Rincon/VTA team will assist the City in maintaining a tracking matrix to be created and
updated by City staff throughout the project to document interested parties, affected audiences,
and areas of community interest. Rincon will collect points of contact, mailing addresses, and
emails of groups and agencies likely to be interested or affected by the Housing Element Update
at public events and online engagement platforms for the City to include in the matrix and in the
mailing list.
Neighborhood and Pop-Up Outreach
Rincon will participate up to three neighborhood or “pop-up events”, COVID-19 considerations
allowing. These events will “piggyback” on standing events or meetings, such Farmers Market
events, back-to- school nights, sport league opening days, or cultural celebrations. Locations will
be focused on gaining discussion and participation from areas or members of the community
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 8 of 31
who commonly have engagement or equity concerns such as LGBTQ+, underserved communities,
and environmental justice communities.
Roadshow Material
Rincon can prepare one set of “roadshow” materials that can be used by City staff and partner
organizations at neighborhood meetings or pop-up outreach. These will be in the form of two
activity posters, one set of handouts, contact information flyers, and associated activity materials
to encourage
community engagement and input. Rincon assumes the City will be responsible for all printing
and distribution of materials.
Deliverables
Webpage initial language and update language
Digital and printed neighborhood and pop-up materials
Digital roadshow materials
Information Flyer
Materials will be designed for posting at pre-determined locations to generate interest in the
Housing Element Update. These could take the form of a flyer or postcard that the City will be
responsible for posting. The Rincon/VTA team will provide data and information but has assumed
that the City and Santa Clara County Planning Collaborative (SCCPC) will be responsible for
development of informational materials and all printing costs.
Deliverables
Language for informational flyer in Word format
Task A.5 Online Engagement
Over the past decade, communication through online and social media has transformed how
information is both disseminated and received by the public. These online media tools are
powerful, cost-effective and increasingly becoming the expected norm for how information is
communicated. For the Palo Alto Housing Element Update, a variety of tech tools can replicate
and supplement the core outreach methods used in the traditional General Plan workshops.
Components of online engagement are proposed to include:
Participatory Mapping Exercises and Tools. Participatory mapping exercises are a type
of survey that allows participants to view, comment, and prioritize specific topics.
Participatory mapping exercises can allow community members to identify and rank
current housing conditions, identify and rank potential opportunity sites, and rate
potential methods for implementing affordable housing, design standards, and policy
changes to reduce barriers to housing.
Story Maps: Vision, Issues, and Priorities. Story maps are an educational tool to help
guide the viewer through the history, purpose, and process and easily provide
information in a spatial format. Story Maps are clearly organized, visually appealing, and
easy to use and allow us to tell the story of Palo Alto and its community and residents.
Each story map should focus on a specific topic and contain a variety of content
necessary to help educate stakeholders about the Housing Element. The Rincon/VTA
team will design an online story map that educates and informs residents and
stakeholders about the housing history, conditions, and potential future in Palo Alto.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 9 of 31
Online Survey. Knowing that many residents lead busy lives and may not be able to set
aside time or have the ability to attend a virtual workshop, the Rincon/VTA team will
design and disseminate a survey that will allow people to participate on their own time
and in their own way. The Rincon/VTA team will draft the survey and revise questions
based on staff feedback. Staff will be responsible for advertising the survey’s availability
through the City’s other communication channels. Following its closing, an
accompanying summary report will be created with numerical breakdowns of responses,
charts and graphs where applicable, and narrative descriptions of the qualitative results.
Social Media. A strategy will be developed for sharing project information through social
media outlets such as Facebook, NextDoor, and Twitter. Language and images will be
provided at key points in the process to the City for managing content through existing
City accounts (up to four social media pushes are anticipated).
Email Blasts. In concert with social media efforts, content for email blasts will be
prepared to keep the community engaged and informed at key point in the process.
Rincon will prepare content for up to four email blasts, which the City will send through
established email listservs or newsletters.
Deliverables
Survey questions and online survey
Social media language
Email blast content
B. Housing Element Review and Assessment
Task B.1 Document Review
Rincon will review all readily available resources including various codes, standards, and policies
maintained by the Planning Department, the Comprehensive Plan Elements and 2017 Final EIR,
all Area Plans and studies, the 2020-2025 Draft Consolidated Plan (Community Development
Block Grant program), Eichler Design Guidelines, Single Story Overlay regulations, and housing
services documents. Additional information will be provided by the City upon award of contract,
including the City’s updated site inventory and development status information and city GIS data
layers. We also anticipate the use of regional planning documents such as the Association of Bay
Area Governments (ABAG) Comprehensive Economic Development Strategy for the San
Francisco Bay Area, 2011 Bay Area Hazard Mitigation Plan, the Metropolitan Transportation
Commission Plan Bay Area 2050 plans, the Santa Clara County 2020-2025 Consolidated Plan and
Assessment of Fair Housing, and ABAG housing information, including the Regional Housing
Needs Assessment (RHNA) for the Housing Element Cycle, when finalized. Any additional data or
document needs will be assessed and discussed with the city to determine how the information
is best accessed and/or shared.
Task B.2 Review and Evaluation of Current Housing Element
As an initial task to the Housing Element update, and following the kickoff meeting, we will review
and evaluate the 2015-2023 Housing Element. Specifically, we will:
Discuss the effectiveness and continued appropriateness of current housing programs and
policies
Evaluate the City’s progress in meeting current goals
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 10 of 31
Identify any barriers to achieving identified goals
Review compliance with new State laws
Identify potential revisions to existing programs
We will start by evaluating the City’s latest Housing Element Annual Progress Report (APR). We
will interview staff and compile additional information to provide an assessment of the continued
appropriateness of existing programs and whether new programs should be added to address
emerging trends and issues. Upon completion of this review, we will provide a memo
summarizing our findings and a draft outline for the Housing Element Update.
Deliverable
Assessment Memorandum to include details on our review of the 2015-2023 Housing
Element
C. Housing Element
Task C.1 Housing Resources and Opportunities
The Rincon/VTA team will compile a list of housing resources and opportunities for inclusion in
the Draft Housing Element. The Housing Resources and Opportunities section will include a
description of the City’s 2023-2031 RHNA from ABAG. This analysis will examine the resources
and opportunities available for the development, rehabilitation, and preservation of housing,
which we have assumed will be provided by City staff or SCCPC, and shall include the following:
Units Approved, Built, or Under Construction
Adequacy of Public Facilities and Services
Inventory of Financial and Administrative Resources available to support housing
resources
Energy Conservation Opportunities
Deliverable
None – information to be wrapped into Housing Element
Task C.2 Housing Constraints
The Rincon/VTA team will identify potential governmental and non-governmental constraints to
housing production, including environmental and infrastructural constraints. This analysis will
contain a review of factors that may potentially constrain the development, improvement, and
preservation of housing in Palo Alto. Factors to be reviewed include market, governmental,
environmental, and infrastructural constraints. New Housing Element laws also require the
assessment of non-governmental constraints, including NIMBYism, lending practices, shortage of
labor, and other economic factors.
Where constraints exist, the Rincon/VTA team will identify and develop housing programs that
can assist in the removal of constraints, where feasible. For each program, the Rincon/VTA team
will identify potential funding sources, the lead agency or City division responsible for
implementation, objectives, and timeframes.
Deliverable
Analysis of governmental constraints (to be wrapped into Housing Element)
List of Housing Programs for inclusion in Housing Element Update
Task C.3 Housing Inventory of Sites Analysis
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 11 of 31
ABAG’s Illustrative RHNA Allocation for the 6th cycle is 10,058 units. Based on this allocation, the
Housing Element update will require efforts to identify sites with sufficient capacity for the RHNA,
taking into consideration the following adequate site requirements under new Housing Element
laws:
No net loss of capacity when sites are developed
Continued ability to meet the RHNA by income group
Stringent standards for assessing feasibility when reusing vacant and underutilized sites that
have previously been included in the 5th cycle Housing Element
Demonstrated trends of development
Per Addendum No. 1, we understand that ABAG is developing a site selection tool to assist
jurisdictions as they prepare their parcel-specific sites inventory. We assume this tool will be
available to the for use in the development of the Palo Alto sites inventory. Using this tool, a
parcel-specific sites inventory will be developed and opportunities for lot consolidation will be
identified. We will prepare an “adequate sites analysis” showing the relationship between the
City’s RHNA and the dwelling unit capacity, availability of potential housing sites based on zoning,
infrastructure, and General Plan policies, requirements, and limitations.
It is important to note that AB 1397 (Adequate Sites) and SB 166 (No Net Loss) impose stringent
requirements on the sites inventory for RHNA. Given the City’s development pattern, it is
anticipated that most sites identified in the sites inventory will have an existing use and
improvements and will be smaller than one-half acre. These sites may also have been used in a
previous housing element cycle. In order to include these sites in the sites inventory, additional
justification is required and may need to include:
Lot consolidation potential
Feasibility of development on smaller sites
Impediments for residential development on non-vacant sites
Recent development on similar sites
Substantial evidence the existing use is likely to be discontinued within the planning period
Following the analysis of available sites, a sites inventory will be prepared using HCD’s current
inventory worksheet format and template. The Rincon/VTA team will work closely with staff and
HCD to provide an expanded analysis of the sites inventory.
Deliverables
Draft Sites Inventory and Review of Sites for Suitability/Adequacy for RHNA
Task C.4 Housing Needs Assessment
The Rincon/VTA team will prepare a complete housing assessment and needs analysis consistent
with State Housing Element law and HCD’s Completeness Review Checklist. The Needs Analysis
will be comprehensively updated with the most recent American Community Survey (ACS) and
housing market data. The Needs Analysis will contain the topics listed below to satisfy
Government Code Section 65583(a) requirements:
Demographics, Income, and Employment Trends. This section includes information on the
population growth trends, along with income distribution and employment trends.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 12 of 31
Household Characteristics. This section will also discuss household characteristics such has
size, tenure, composition, and overcrowding conditions that may impact housing needs.
Housing Stock Characteristics. This section will be an analysis of the condition of the existing
housing stock as well as cost and affordability, including discussions on cost burden
(overpayment).
Affirmatively Furthering Fair Housing. This section will discuss new Housing Element law,
which requires jurisdictions to examine barriers to fair housing and ensure housing
programs are implemented in a manner to affirmatively further fair housing.
Residential Building Permit Activity. This section will discuss residential building permit
trends for single-family and multi-family products, building code regulations, fees, and
permit and processing procedures. We will also analyze constraints on housing for persons
with disabilities, as well as the city’s current permitting procedures for emergency shelters,
transitional and supportive housing, and single-room occupancy units.
Analysis of Special Housing Needs. The Rincon team will update the analysis of housing
needs for special needs populations, including senior households, persons with disabilities,
large families, single female-headed households, low-and very-low-income households, and
the homeless.
At-Risk Housing (Assisted Unit) Analysis. This task will include an analysis of existing
assisted housing developments that are eligible to change from low income housing to
market rate over the next ten years (i.e., at-risk housing). This analysis will cover units that
are deed-restricted as low income housing as a result of public assistance, density bonus
requirements, and inclusionary housing program.
Deliverable
Housing Needs Analysis
Task C.5 Goals, Policies, and Implementing Programs
Based upon the analyses and research conducted in the previous tasks, the Rincon/VTA team will
develop programs and policies to guide implementation of the Housing Element over the next
eight years. Housing goals, policies, and quantified objectives will focus on the production,
conservation, maintenance, preservation, and improvement of housing. For each program
included in the Housing Element, we will establish the timeframe for implementation, specific
objectives, funding sources, and responsible agencies. All goals, policies and programs will be
incorporated into the Housing Element.
Deliverables
None – information to be included in Housing Element
D. Refine VTA Travel Demand Model
The City of Palo Alto Travel Demand Model (PATDM), which is a refinement of VTA’s Countywide
Model (VTATDM), was calibrated and validated in 2013 against 2010 travel data based on ABAG
Projections 2013 (P’13). In the fall of 2019, ABAG and the VTA developed new sets of land use
data based on ABAG’s Projections 2017 (P’17). Review of the year 2015 local and regional land
use assumptions show significant differences, not only future year (2040) projections but also for
the 2015 base year. Existing 2015 land use assumptions from P’17 are more accurate than the
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 13 of 31
P’13 since the P’13 was a land use forecast while the P’17 land uses are based on actual historical
data.
In addition, the United States Census Bureau recently released the 2011-2015 journey to work
data from the American Community Survey and MTC compiled transit ridership data from
household and on-board surveys and developed a database of regional transit trips by submode
and by mode of access for the Bay Area Region.
Based on these data, VTA updated the VTATDM. This update involved recalibrating the
distribution and mode choice models and performing a “soft” model validation based on a very
limited set of traffic counts and transit ridership data.
While the VTATDM was validated at the County level, the validation effort concentrated on the
regional facilities such as freeways major arterials. Updating the PATDM involves using the
VTATDM and focus on refining the model’s capability of producing accurate travel patterns in the
larger Palo Alto area. This model refinement includes the following tasks:
Task D. 1 Land Use Data
With input from the jurisdiction in Santa Clara County, the VTA recently developed a year 2015
land use data set that is generally consistent with the ABAG P’17. For the purpose of this scope
of work, it is assumed that VTA’s 2015 land use assumption for the region, including the City of
Palo Alto, will be the basis for the model update.
Task D.2 Review Trip Distribution and Mode Choice Models
In recent years, more current travel data has become available. The US Census Bureau released
county to county journey to work data and workers per household by auto ownership data from
the American Community Survey. These data were used to recalibrate the home-based work trip
distribution model. For the non-work trip purposes, the 2013 California Household Travel Survey
was used as the bases for calibration the distribution models. MTC’s 2015 Regional Transit Survey
and daily transit ridership for the major transit operators were used to calibrate the mode choice
models. Hexagon will review the calibration results to ensure that the model accurately reflects
observes travel patterns. If necessary, Hexagon will adjust the model. In order to maintain
consistency with the travel patterns from the VTA model, Hexagon may need to recalibrate the
distribution and mode choice models. Hexagon will request the calibration files from the VTA and
recalibrate these models if necessary.
Task D.3 Highway Model Validation
Model validation will use generally accepted validation criteria:
The volumes on all roadway links for which counts are available should be within 10 percent
of the counts.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 14 of 31
At least 75 percent of the roadway links for which counts are available should be within the
maximum desirable deviation, which ranges from approximately 15 to 68 percent depending
on total volume.
The model-wide coefficient of determination (R2) should be greater than 0.77.
The correlation coefficient between the actual ground counts and the estimated traffic
volumes should be greater than 88 percent.
The Root Mean Square Error (RMSE) should not exceed 40 percent.
Task D.4 Transit Model Validation
The PATDM model will be validated against observed transit ridership. The transit validation will
focus on comparing systemwide estimated ridership by mode (Caltrain, VTA Express Bus and VTA
Local Bus and Marguerite, if daily boarding counts are made available) and daily boardings at the
Palo Alto Caltrain Station. The target for transit systemwide validation is to be within 10% of the
counts. However, larger differences are expected at the route level.
Task D.5 Model Validation Documentation
A memorandum will be prepared to document the input assumptions and results of the model
update. The results will be presented in tabular form with comparisons of 2015 model volumes
and existing traffic counts.
Data to be provided by the City
Although we have 2013 and 2014 traffic counts in the Palo Alto, additional traffic counts are
needed to validate the model. It is our understanding that the City does have traffic counts from
traffic studies conducted in the past five years. When available, the City will provide daily
roadway segment counts and peak hour intersection turning movements counts. Counts should
have been taken on weekdays between 2015 and 2019.
E. Updates to Other Comprehensive Plan Elements
Task E.1 Comprehensive Plan Amendments
Based on the evaluation of the current Comprehensive Plan, issues and opportunities identified
as part of the legislative analysis, and in conjunction with the Housing Element Update, we will
prepare revisions to existing goals, policies, and actions, as appropriate and propose new goals,
policies, and actions, as appropriate. This effort will focus on refinements and updates to address
key policy topics and new state mandates and guidelines.
If determined necessary, Rincon will update the Circulation Element of the Comprehensive Plan
with information provided by Hexagon. The Circulation Element will describe the existing
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 15 of 31
transportation system and its physical and operational characteristics within the City of Palo Alto.
The plan will include a description of the various transportation systems serving the city, existing
level of service conditions at intersections and numerous freeway segments, truck routes, travel
patterns based on forecasts developed with the TFM, transit ridership on the rail and bus systems
and bicycle travel. The circulation element will also include transportation related goals, policies
and programs to address future transportation needs for residents, visitors and businesses. Any
necessary amendments to the goals and policies for the Comprehensive Plan will be the
responsibility of Rincon with input from Hexagon.
Rincon will utilize the City’s existing format, layout, and style to create an amended
Comprehensive Plan. Rincon will edit Comprehensive Plan Elements as Word files in track
changes before converting the document to another format. If Word files are not available,
Rincon will work with the City to establish the best method for these amendments.
Rincon anticipates up to two rounds of review of the Comprehensive Plan amendments. Each
draft will be submitted electronically only and we will address one set of compiled, tracked
changes from the City. The Comprehensive Plan table of contents (including figures, tables, and
charts), glossary, and index will be updated as appropriate to reflect changes made throughout
the document.
Deliverables
Administrative Draft of updated Comprehensive Plan (electronic delivery)
Draft Comprehensive Plan (electronic delivery)
Final Comprehensive Plan (electronic delivery)
F. Zoning Code Amendments
Task F.1 Rezoning
Following preparation of the Administrative Draft Housing Element, the Rincon/VTA team will
prepare a list of municipal code sections that will need to be amended to maintain consistency
with updated Housing Element programs and identified Comprehensive Plan amendments.
Changes to the municipal code will need to address the development of new residential zones or
any re-zoning or upzoning that are required in order to accommodate the City’s RHNA allocation.
The list will prioritize changes to
Title 18, Zoning, with those that would result in the most widespread housing development
potential prioritized over changes that would not have as much impact.
Deliverable
List of Impacted Code Sections
Task F.2 Draft Ordinance
The Rincon/VTA team will support staff in their preparation of draft ordinance language to reflect
the required updates to the Palo Alto Municipal Code. Staff will be expected to provide any draft
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 16 of 31
ordinance language, edits, and comments to Rincon staff in Microsoft Word format with a single
set of consolidated comments. Rincon will then deliver suggested edits on the revised Draft
Ordinance language in tracked changes to the City.
Deliverable
Draft Ordinance Language Edits
G. Environmental Document
We understand that Palo Alto would like to prepare a supplement to the 2030 Comprehensive
Plan Update EIR, certified in 2017, rather than a subsequent or new EIR. In accordance with
Section 15164 of the CEQA Guidelines, a lead agency may prepare a supplement to a previously
certified EIR if some changes or additions are necessary, but none of the conditions described in
Section 15162 calling for preparation of a subsequent EIR have occurred.
Our approach in preparing the Supplemental EIR is to develop a user-friendly document that
identifies potentially new CEQA impacts that need to be addressed, including Wildfire and
Energy, and to address transportation impacts using Vehicle Miles Traveled (VMT) as a
significance criterion replacing the traditional Level of Service (LOS) standard (requirement
beginning in July of 2020). To the greatest extent feasible, Rincon will utilize the analysis
contained within the previously certified 2030 Comprehensive Update EIR as the basis for the
supplemental analysis, allowing for the assessment of issue areas where there has been minimal
change or where existing mitigation still addresses the potential impacts, thereby reducing costs
for the city.
Task G.1 Environmental Assessments
In conjunction with the Initial Adequate Sites Inventory (Task C.3) and in support of the project’s
CEQA compliance requirements, Rincon will conduct focused assessments of the following
environmental topics of concern. The analyses described herein will be summarized in the
corresponding IS and/or Supplemental EIR section and separate technical reports will not be
prepared (except for the traffic impact analysis). All data used in the technical analyses will be
included as appendices to the primary environmental document.
Air Quality
Rincon will conduct air quality analyses for proposed project to determine if the predicted
emissions during construction or operation of development envisioned under the Housing
Element, Comprehensive Plan, and Zoning Code updates would result in significant impacts
beyond those assessed in the 2030 Comprehensive Plan Update EIR. Construction emissions
estimates would be generated from generalized construction data developed in conjunction with
the city. Mobile source emissions will be estimated based primarily on trip generation data from
traffic reports prepared for the GPU. The California Emissions Estimator Model (CalEEMod) will
be used to estimate emissions of criteria pollutants associated with the project. Rincon will use
the California Department of Transportation’s (Caltrans) Transportation Project-Level Carbon
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 17 of 31
Monoxide Protocol methodology to determine if project traffic may result in local carbon
monoxide hotspots. It is not anticipated a detailed hot spot analysis would be required. The
analysis will address the project’s conformance with the Bay Area Air Quality Management
District Air Quality Strategy and/or the State Implementation Plan. The analysis will also
determine if the project will expose any sensitive receptors to substantial pollutant
concentrations or create objectionable odors.
Biological Resources
A Rincon biologist will review the city's RHNA allocation and city-supplied data, the initial "first-
pass" of potentially adequate sites inventory for biological resource constraints, and biological
resource data including but not limited to query of relevant databases such as California Natural
Diversity Database and National Wetlands Inventory, for information pertaining to biological
resources occurring in the city. Based on this review, Rincon will prepare a map indicating areas
with low, medium or high biological constraints.
The analysis will prioritize those biological constraints that could result in high mitigation costs
or but will identify all potential biological resource constraints. Rincon will provide an overview
of the type and extent of additional studies that may be needed to adequately examine future
project effects; typical avoidance measures and compensatory mitigation that may be required
to address impacts to biological resources; and responsible resource/regulatory agencies with
jurisdictional authority for each specific resource identified.
Cultural Resources Evaluation
Rincon will prepare a programmatic cultural resources analysis to address potential impacts to
archaeological and historic built environment resources. The cultural resources analysis will
review historic resources and archaeological resources within the potential housing locations and
the potential impacts to those resources as a result of the project. The study will include research
on the prehistory and history of Palo Alto, as well as a review of historic maps, aerial photographs
and data included in the California Historic Resources Inventory. Rincon assumes that no
fieldwork or project level analyses will be required.
Rincon will discuss the existing geologic setting, determine the paleontological sensitivity of
geologic units within the Plan area, identify potential impacts to paleontological resources from
development within the Plan area, discuss significance thresholds, and propose mitigation to
avoid or mitigate impacts to scientifically significant paleontological resources. No formal
museum records search will be performed, and the analysis will consist of an online search of
available fossil locality records, review of existing geologic maps, and a review of primary
literature regarding fossiliferous geologic units within the Plan area and region.
Greenhouse Gases
Rincon will conduct GHG analyses for proposed plans to determine if the predicted emissions
during construction or operation of development proposed under proposed Housing Element
Update, and the Comprehensive Plan and Zoning Code updates would result in substantial
increase in GHG emissions beyond those assessed in the 2015 FEIR. Projected construction
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 18 of 31
emissions would be generated from construction data developed with the city as part of the air
quality analysis scope. Mobile source emissions will be estimated based primarily on trip
generation data from traffic reports for proposed plans. CalEEMod will be used to estimate GHG
emissions associated with the proposed Housing Element, Comprehensive Plan, and Zoning Code
updates. The GHG analysis will also address the project’s conformance with the City of Palo Alto
Climate Action Plan, including the City’s Climate Action Plan Ordinances.
Noise and Vibration
Rincon will conduct an noise and vibration analysis to determine if the predicted noise levels
during construction or operation of land uses under the proposed Housing Element,
Comprehensive Plan, and Zoning Code updates would exceed applicable city noise standards or
result in impacts not already assessed in the 2017 FEIR. As part of the analysis, Rincon will
perform long- and short-term field measurements at various potential housing sites within a plan
area and at locations with receptors that may be affected by noise resulting from future
developments and to document the existing noise environment. Project construction noise
impacts would be generated from construction data (e.g., assumed duration of construction,
phasing, types of equipment to be used, number of construction workers, etc.) developed in
conjunction with the city. Construction traffic noise levels affecting existing land uses will be
modeled to determine the potential traffic noise increases.
The analysis of long-term operational noise impacts associated with the future development will
include noise increases generated by vehicle traffic on area roadways and noise from typical
onsite noise sources, e.g. mechanical ventilation. Rincon will calculate traffic noise levels based
existing, existing plus project, and cumulative plus project scenarios of forecasted traffic volumes
as identified in traffic reports. Rincon will use this information to determine if increases to
roadway noise levels would adversely affect existing or future land uses along affected roadways.
On-site noise sources will be evaluated based on typical requirements for mechanical ventilation
based on building size and other published noise reference data for activities.
Transportation/Traffic
Hexagon Transportation Consultants, Inc. will prepare a traffic impact analysis to assess the
effects of the Housing Element Update compared to the current General Plan Housing Element
conditions. The effects of increased traffic due to housing density increase or rezoning at selected
locations will be assessed. The document will be a supplement to the General Plan and Climate
Action Plan Final EIR, certified in 2015.
The evaluation of the Housing Element will be based upon the City’s transportation policy. The
City’s CEQA transportation policies require an evaluation of potential impacts related to vehicle-
miles traveled (VMT) criteria. In addition, the effects of the plan on travel mode split, the
percentage of travelers using a particular type of mode of travel or number of trips, intersection
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 19 of 31
levels of service and other performance measures evaluated in the existing Comprehensive Plan
will also be evaluated for informational purposes to better understand the transportation-related
outcomes associated with the plan. However, the determination of project impacts per CEQA
requirements will be based solely VMT.
The transportation analysis will consist of an evaluation of the effects of the housing
development plan for Palo Alto on the citywide transportation system through the year 2031.
The existing Comprehensive Plan and its certified EIR included the planned development growth
levels adopted in the Comprehensive Plan. Therefore, this traffic analysis will utilize the
Comprehensive Plan land use data as the basis from which land use adjustments for the proposed
Comprehensive Plan are made.
Furthermore, the Palo Alto travel forecasting model (TFM) used for the completion of the existing
Comprehensive Plan will be used for this traffic analysis, and VMT calculations will include the
latest (ABAG Projections 2017) land use assumptions. Forecasts and traffic analyses will be based
on year 2031 conditions and include the following project scenarios:
Existing Comprehensive Plan which includes the adopted land use plan and assumed
transportation system.
Evaluation of up to three alternative project land use plans that include the approximately
10,000 housing units per the Regional Housing Needs Allocation
Evaluation of the preferred land use plan
Develop Forecasts for the Existing Comprehensive Plan. The City’s Travel Demand Forecast
model includes the roadway network in the project area that is representative of Year 2030. The
2030 roadway network will be reviewed and adjustments made to reflect the roadway network
to ensure that improvements identified as part of the adopted Comprehensive Plan roadway
network are included. In addition, the review will identify adjustments that must be made to
reflect any planned roadway adjustments and improvement projects that were not included in
the Comprehensive Plan. Hexagon will run the travel forecasting model and develop year 2030
travel forecast for the existing Comprehensive Plan.
Develop Year 2030 Travel Forecast for the Proposed Plan. Land use input data for the proposed
plan, which will include 10,000 or more housing units in Palo Alto will be provided by City staff or
Rincon. The data need to be provided for each traffic analysis zone in Palo Alto. Hexagon will
update the land use data base to reflect the housing allocation of the plan and run the model to
develop forecast for the proposed Comprehensive Plan.
Performance Statistics. Consistent with SB 743, VMT will be used as the metric to evaluate
significant transportation impacts. The assessment of VMT impacts will be based on the process
and criteria documented in the SB 743 Implementation Decisions for Palo Alto, dated July 1, 2020.
A Vehicle Miles Traveled (VMT) will be prepared and Hexagon will work with City staff to
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 20 of 31
determine project adjustments necessary to mitigate any identified project impacts to VMT.
Other performance statistics that were used in the current Comprehensive Plan will be
summarized and analyzed.
Deliverables
Technical Memorandums
Transportation Analysis
Task G.2 Notice of Preparation (NOP) and Scoping Meeting
Pursuant to CEQA Guidelines Section 15163(c), a Supplemental EIR shall be given the same kind
of notice and public review as is given to a draft EIR under CEQA Guidelines Section 15087. The
NOP is intended to alert other public agencies about the undertaking, and to solicit their input
on the scope of the Draft Supplemental EIR. Rincon will submit a final PDF copy of the NOP to city
staff for posting on its website and for distribution to public agencies. It is assumed that the city
will distribute the NOP using the city’s distribution list. Rincon will be responsible for filing the
NOP with the Santa Clara County Clerk and State Clearinghouse/OPR. As required by CEQA, the
NOP will circulate to responsible and trustee agencies for 30 days.
During the 30-day NOP review process, Rincon will facilite a public scoping meeting to inform the
public on the environmental issues they should expect to see addressed in the EIR as well as
gather public input. Rincon will make a brief presentation on the Housing Element,
Comprehensive Plan, and Zoning Code updates, and environmental review process, then record
relevant public comments received.
These comments will be summarized in the Supplemental EIR.
Rincon assumes that the city will be responsible for notifying and consulting with local tribes
pursuant to SB 18 and AB 52 requirements. Rincon can assist with that process by preparing
materials and instructions for tribal noticing.
Deliverables
NOP for posting on website
SB 18 and AB 52 Noticing Materials
Task G.3 Preparation of a 15162 Initial Study
The Initial Study will evaluate each of the CEQA environmental issue areas using a modified CEQA
Appendix G environmental checklist in accordance with CEQA Guidelines Section 15162. The IS
analysis will also include a comprehensive review of the certified EIR mitigation measures. The
purpose of the IS will be to determine the extent to which the environmental impacts associated
with the proposed Housing Element, Comprehensive Plan, and Zoning Code updates were
adequately addressed in the original EIR. This process will determine whether a Supplemental
EIR is the appropriate document as assumed, and which CEQA environmental topics may need
to be focused on for supplemental analysis.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 21 of 31
Rincon will incorporate information from any relevant and available technical studies to assist in
addressing checklist issues. Where appropriate, impacts will be quantified in relation to
established thresholds of significance. A determination of significance will be made for each issue
area and mitigation measures will be provided as necessary for identified significant effects.
Although each topic will be discussed in appropriate detail in the IS, we anticipate that key issue
areas for the project will include topics found to be potential significant in the 2017 EIR. These
topics include air quality and transportation. We will also assess potential impacts related to new
CEQA topics including Energy and Wildfire.
Deliverable
Initial Study (electronic delivery)
Task G.4 Administrative Draft Supplemental EIR
The supplement to a certified EIR only needs to contain the information necessary to make the
previous EIR adequate for the project as revised. Therefore, the format of the Administrative
Draft Supplemental EIR will follow that of a focused EIR, concentrating on only those topics found
to require minor additions or changes as a result of the proposed Housing Element,
Comprehensive Plan, and Zoning Code updates. Our general report structure will include all the
required sections of an EIR: Introduction; Executive Summary; Project Description and
Environmental Setting; Analysis, Impacts, and Mitigation Measures; Alternatives Analysis;
Cumulative Impacts; and Other CEQA Sections.
The number of impacts to be analyzed and the depth of analysis will be a function of the IS
conclusions, responses to the NOP, and staff direction based on current needs, and those still
adequately addressed by the current EIR. New potential impacts will be identified, and mitigation
measures will be prepared or modified to reduce significant impacts to a less-than- significant
level, when feasible. For each potentially significant impact identified, the team will develop, in
coordination with city staff and the broader consultant team, General Plan goals and/or policies
to avoid or reduce identified impacts as self- mitigating policies. New or modified mitigation
measures will be developed only if self-mitigating policies are determined not feasible or
reasonable. The alternatives analysis will focus on reexamining the 2017 EIR alternatives and
revise the alternatives and associated analysis only as necessary based on the changes from the
Housing Element, Comprehensive Plan, and Zoning Code updates.
Hexagon will be responsible for preparing the transportation analysis for use in the SEIR for the
Housing Element and subsequent Comprehensive Plan Amendments. In addition to existing
conditions, the transportation section will analyze traffic conditions of the existing and the
proposed Comprehensive Plan. Traffic analysis will include analysis of freeway segments,
interchanges, study intersections, transit ridership, and bicycle and pedestrian usage. Consistent
with SB 743, VMT will be used as the metric to evaluate significant transportation impacts. The
assessment of VMT impacts will be based on the process and criteria documented in SB 743
Implementation Decisions for Palo Alto, dated July 1, 2020.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 22 of 31
Following internal city staff comments on the Administrative Draft Supplemental EIR (up to two
rounds of review), the team will incorporate appropriate revisions to the Administrative Draft
Supplemental EIR and prepare a Screencheck Draft Supplemental EIR for final internal review. All
submissions of the Administrative Draft Supplement EIR will be provided in an editable, electronic
Word format only. We assume all comments and revision requests will be submitted in a
compiled and tracked changes Word format.
Deliverables
Administrative Draft Supplemental EIR (electronic delivery)
Screencheck Draft Supplemental EIR (electronic delivery)
Task G.5 Draft Supplemental EIR
Upon authorization from city staff, the team will prepare the Public Review Draft Supplemental
EIR for public circulation and distribute the Draft Supplemental EIR to the State Clearinghouse,
responsible agencies, and interested agencies, organizations, and persons as part of the 45-day
public circulation and review period per CEQA regulations. Rincon will provide digital versions
(PDF and Word) of the Supplemental EIR (including appendices) for city use.
Task G.6 Final Supplemental EIR
Following public review, the team will prepare draft Responses to Comments. As part of
preparing the responses, we will use the bi-weekly conference calls to discuss comment
responses. Following internal comments on the draft responses, the team will prepare the final
Responses to Comments. Concurrent with the preparation of Responses to Comments, Rincon
will prepare a Mitigation Monitoring and Reporting Plan (MMRP) to be included in the Final
Supplemental EIR.
The team will prepare the Final Supplemental EIR after receipt of all written comments received
during the review period. The Final Supplemental EIR will consist of the comments, responses,
and corrections to the Draft Supplemental EIR, if any are warranted and be subject to up two
rounds of review. Rincon will prepare a Screencheck Final Supplemental EIR for one round of
internal city staff review and confirmation. The city will be responsible for submitting the Notice
of Determination (NOD) to the County Clerk per CEQA regulations. Rincon assumes that no more
than 72 hours of professional time will be required to respond to public comments on the Draft
EIR. Rincon will provide digital versions (PDF and Word) and 15 printed copies of the
Supplemental EIR (including appendices) for city use.
Pursuant to CEQA Guidelines Section 15163(e), when the City Council ultimately decides whether
to approve the project, they will need to consider the 2017 EIR as revised by the Supplemental
EIR. Findings under Section 15091 will need to be made for each significant effect shown in the
2017 EIR as revised. Our Scope of Work does not include assistance with the preparation of
Findings of Fact. This task can be added with written authorization of a change in scope and in
accordance with our standard fee schedule.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 23 of 31
Deliverables
Responses to Comments (electronic delivery)
MMRP (electronic delivery)
Final Supplemental EIR (electronic delivery)
H. Prepare and Finalize Housing Element
Task H.1 Administrative Draft Housing Element
We will prepare the Administrative Draft Housing Element based on analysis, research, and
comments/discussions from the previous tasks. Our timeline and budget assume one round of
review by City staff. The document will be provided in Word and PDF versions.
Deliverable
Administrative Draft of the Housing Element Update (electronic delivery)
Task H.2 Public Review Draft Housing Element
We will incorporate staff comments to formulate the Public Review Draft to be reviewed by City
decision makers prior to submitting to HCD for review. We will work with City staff to compile a
list of stakeholders and agencies/organizations to receive notification of the availability of the
Draft Housing Element.
Deliverable
Public Review Draft of the Housing Element Update (electronic delivery)
Amendment No. 1 - Task H.2.1 - Draft Housing Element for HCD Submittal (New)
CONSULTANT will incorporate comments received from Veronica Tam and Associates, Inc. (VTA) following
an internal screen check, and comments received from the public following the 30-day public review
period to formulate City of Palo Alto Housing Element Update the Draft Housing Element. CONSULTANT
understands that public comments are anticipated to be extensive, and that the City has requested an
expedited schedule with a submittal date of December 23, 2022.
Deliverables
Draft of the Housing Element Update (electronic delivery)
Hard copy of the Housing Element Update to be mailed (via USPS) to HCD
Task H.3 Final Draft Housing Element
Following HCD review, the Rincon/VTA team will incorporate any comments to formulate the
Final Housing Element prior to City Council adoption.
Deliverables
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 24 of 31
Final Adopted Housing Element Update (electronic delivery)
All background and base data, including any GIS maps and digital data files
Task H.4 HCD Certification
HCD review of the Draft Housing Element is mandatory. During the review, we will work to
address all HCD comments and will communicate with HCD and facilitate review of the revisions
via revised pages. All revisions made to the Draft Housing Element will be shown as tracked
changes. The goal is to secure a Finding of Substantial Compliance on the Draft Element before
proceeding to adoption. This way, final certification will be contingent upon adopting the Housing
Element as revised and reviewed by HCD and the City would avoid adopting a Housing Element
that does not completely meet HCD requirements and needing to repeat the review and adoption
process again. Throughout the HCD review process, the Rincon/VTA team will maintain contact
with HCD staff via email and phone calls regarding the City’s progress, key issues to be addressed,
and alternative approaches to compliance. After adoption, the Housing Element must be
submitted to HCD for its final review within 90 days.
Deliverables
Cover letter summarizing changes
Final Housing Element for certification
Amendment No. 1 - Task H.4 - HCD Review #1 (Addition)
HCD review of the Draft Housing Element is mandatory. Following the review, CONSULTANT will work to
address HCD comments and will communicate with HCD and facilitate review of the revisions. This task
includes edits following preliminary review by HCD (comment table titled “Received Dec 23”) and
additional edits following receipt of a formal HCD comment letter (anticipated late March 2023).
All revisions made to the Draft Housing Element will be shown as tracked changes. The goal is to secure a
Finding of Substantial Compliance on the Draft Element before proceeding to adoption. This way, final
certification will be contingent upon adopting the Housing Element as revised and reviewed by HCD and
the City would avoid adopting a Housing Element that does not completely meet HCD requirements and
needing to repeat the review and adoption process again. That said, based on CONSULTANT’s recent
experience with housing element updates in the 6th cycle, we anticipate that 2-3 rounds of review will be
required.
Throughout the HCD review process, the CONSULTANT and VTA team will maintain contact with HCD
staff via email and phone calls regarding the CITY’s progress, key issues to be addressed, and alternative
approaches to compliance. This task includes two hours of virtual meetings with CITY staff to address
comments that require local knowledge and CITY feedback. The CONSULTANT team will coordinate with
HCD staff for clarification and guidance as needed. Please note that the Housing Element will need to be
available to the public for 7 days prior to sending to HCD for additional review.
Deliverables
Cover letter summarizing changes, to be included as part of resubmittal package
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 25 of 31
Housing Element for resubmittal to HCD (CONSULTANT will resubmit electronically but assumes
the CITY will be responsible for the printing of any hard copies and mailing to HCD)
Amendment No. 1 - Task H.5 - Adoption of Housing Element Update (New)
CONSULTANT will attend five public hearings, to adopt the Housing Element. If desired, CONSULTANT will
make a presentation summarizing HCD’s comments and proposed revisions. For budgeting purposes, we
have assumed virtual attendance at all meetings. CONSULTANT attend additional meetings or hearings in
accordance with approved fee schedule within the Not to Exceed authority of contract. CONSULTANT will
with CITY to use contingency or cost savings from other tasks. After adoption, the Housing Element must
be submitted to HCD for review within 30 days.
Deliverables
Attendance and presentation support at five public hearings
Amendment No. 1 - Task H.6 - HCD Review #2 (New)
Following HCD’s review of the Adopted Housing Element, CONSULTANT will work to address HCD
comments, will communicate with HCD, and will facilitate review of the revisions. All revisions made to
the Draft Housing Element will be shown as tracked changes.
Throughout the HCD review process, the CONSULTANT and VTA team will maintain contact with HCD staff
via email and phone calls regarding the CITY’s progress, key issues to be addressed, and alternative
approaches to compliance. This task includes two hours of virtual meetings with CITY staff to address
comments that require local knowledge and CITY feedback. CONSULTANT will coordinate with HCD staff
for clarification and guidance as needed.
Deliverables
Cover letter summarizing changes, to be included as part of resubmittal package
Housing Element for resubmittal to HCD (CONSULTANT will resubmit electronically but assumes
the CITY will be responsible for the printing of any hard copies and mailing to HCD)
Amendment No. 1 - Task H.7 - HCD Review #3 (New)
Following HCD’s review of the Adopted Housing Element, we will work to address HCD comments, will
communicate with HCD, and will facilitate review of the revisions. All revisions made to the Draft Housing
Element will be shown as tracked changes.
Throughout the HCD review process, the CONSULTANT and VTA team will maintain contact with HCD staff
via email and phone calls regarding the CITY’s progress, key issues to be addressed, and alternative
approaches to compliance. This task includes two hours of virtual meetings with CITY staff to address
comments that require local knowledge and CITY feedback. CONSULTANT will coordinate with HCD staff
for clarification and guidance as needed.
Deliverables
Cover letter summarizing changes, to be included as part of resubmittal package
Housing Element for resubmittal to HCD (Rincon will resubmit electronically but assumes the
City will be responsible for the printing of any hard copies and mailing to HCD)
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 26 of 31
I. Project Management
Project Management
Ms. Acosta will serve as the main point of contact with the City and track the project schedule
and budget to ensure that we stay within their respective parameters. As Project Manager, she
will regularly communicate with the City via telephone and email and will proactively identify
any potential issues that arise. If issues arise that may affect the project schedule or budget,
Rincon will immediately communicate this to the City and determine a mutually agreeable
course of action for resolution. The Project Manager and the Principal in Charge will help
ensure quality control by reviewing all work products before they are sent to the City. As part of
this assignment, Ms. Acosta and/or our Housing Team lead, Ms. Weatherby, will participate in
and/or conduct bi-weekly check-in conference calls with City staff, and pertinent consultant
team members as needed, to review project statuses, milestones, and project needs and
concerns. We have found such meetings to be essential in ensuring timely project execution.
Through these regular check-in calls, we will proactively identify project issues, immediately
bring those issues to the attention of city staff, identify potential solutions, and coordinate with
city staff as to the best course of action. Topics at these meetings may include any aspect of the
project, e.g. public outreach, housing inventory assessment, document preparation, and CEQA.
Amendment No. 1 - Project Management
The extended process and lengthened project schedule have required more project management and
administrative time than included in our original City of Palo Alto and previously amended budget. The
typical time needed to track the project and related issues and coordinate with City staff and internally
increases commensurate with the overall project timeline. The original schedule assumed a project
completion date of March 2023. The extended schedule will result in the need for additional project
management services over an estimated 9-month period.
Amendment No. 1 - Task J: Add Services: Housing Element Review (New)
SUBCONSULTANT, VTA, to review HCD comment letters sent to other Santa Clara County jurisdictions and
conduct and analysis and propose changes to the CITY’s draft Housing Element with the intent to minimize
the number of HCD correction comments to Palo Alto’s Housing Element. CITY anticipates a review of the
AFHH and programs will be prioritized and VTA would provide direct edits where feasible and engage City
staff where input is needed to implement policy changes. Prepare an AFHH matrix, if needed.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 27 of 31
EXHIBIT B
SCHEDULE OF PERFORMANCE, AMENDMENT NO. 1
(AMENDED, REPLACES PREVIOUS)
CONSULTANT shall perform the Services so as to complete each milestone within the number of
days/weeks specified below. The time to complete each milestone may be increased or
decreased by mutual written agreement of the Project Managers for CONSULTANT and CITY so
long as all work is completed within the term of the Agreement. CONSULTANT shall provide a
detailed schedule of work consistent with the schedule below within 2 weeks of receipt of the
notice to proceed (“NTP”) from the CITY.
Milestones Status
1. TASK A: COMMUNITY ENGAGEMENT PROGRAM DEVELOPMENT
Task A.1 Kick off Mtg and Community Engagement Plan
Task A.2 Community Workshops and Working Group Meetings
Task A.3 Public Meetings
Task A.4 Other Outreach
Task A.5 Online Engagement
Completed
Completed
Completed
Completed
Ongoing
2. TASK B: HOUSING ELEMENT REVIEW AND ASSESSMENT
Task B.1 Document Review
Task B.2 Review and Evaluation of Current Housing Element
Completed
Completed
3. TASK C: HOUSING ELEMENT COMPONENTS
Task C.1 Housing Resources and Opportunities
Task C.2 Housing Constraints
Task C.3 Housing Inventory of Sites Analysis
Task C.4 Housing Needs Assessment
Task C.5 Goals, Policies, and Implementing Programs
Completed
Completed
Completed
Completed
Completed
4. TASK D: REFINE VTA TRAFFIC DEMAND MODEL Completed
5. TASK E: UPDATES TO OTHER COMPREHENSIVE PLAN ELEMENTS
Task E.1 Recommendations Memo
Task E.2 Comprehensive Plan Amendments
Completed
Completed
6. TASK F: ZONING CODE AMENDMENTS
Task F.1 Rezoning
Task F.2 Draft Ordinance
Completed
Completed
7. TASK G: ENVIRONMENTAL REVIEW
Task G.1 Environmental Assessments
Task G.2 Notice of Preparation and Scoping Meeting
Task G.3 Preparation of a 15162 Initial Study
Task G.4 Administrative Draft Supplemental EIR
Task G.5 Draft Supplemental EIR
Completed
Completed
Completed
Completed
Completed
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 28 of 31
Task G.6 Final Supplemental EIR Preparation (contingent on
comments received)
Completed
8. TASK H: PREPARE UPDATES FOR HCD REVIEW AND
CERTIFICATION
Task H.1 Administrative Draft Housing Element
Task H.2 Public Review Draft Housing Element
Task H.2.1 - Draft Housing Element for HCD Submittal (Amendment
No. 1)
Task H.3 Final Draft Housing Element
Task H.4 HCD Certification (Amendment No. 1)
Task H.5 - Adoption of Housing Element Update (Amendment No.
1)
Task H.6 - HCD Review #2 (Amendment No. 1)
Task H.7 - HCD Review #3 (Amendment No. 1)
Completed
Completed
Completed
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
9. Task I. Program Management Ongoing
10. TASK J: Add Services: Housing Element Review Completed
Optional Schedule of Performance Provision for On-Call or Additional Services Agreements.
(This provision only applies if checked and only applies to on-call agreements per Section 1 or
agreements with Additional Services per Section 4.)
The schedule of performance shall be as provided in the approved Task Order, as detailed in
Section 1 (Scope of Services) in the case of on-call Services, or as detailed in Section 4 in the case
of Additional Services, provided in all cases that the schedule of performance shall fall within the
term as provided in Section 2 (Term) of this Agreement.
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 29 of 31
EXHIBIT C
COMPENSATION, AMENDMENT NO. 1
(AMENDED, REPLACES PREVIOUS)
CITY agrees to compensate CONSULTANT for Services performed in accordance with the terms
and conditions of this Agreement, and as set forth in the budget schedule below. Compensation
shall be calculated based on the rate schedule attached as Exhibit C-1 up to the not to exceed
budget amount for each task set forth below.
CITY’s Project Manager may approve in writing the transfer of budget amounts between any of
the tasks or categories listed below, provided that the total compensation for the Services,
including any specified reimbursable expenses, and the total compensation for Additional
Services (if any, per Section 4 of the Agreement) do not exceed the amounts set forth in Section
4 of this Agreement.
CONSULTANT agrees to complete all Services, any specified reimbursable expenses, and
Additional Services (if any, per Section 4), within this/these amount(s). Any work performed or
expenses incurred for which payment would result in a total exceeding the maximum amount of
compensation set forth in this Agreement shall be at no cost to the CITY.
BUDGET SCHEDULE
TASKS NOT TO EXCEED
AMOUNT
Task A: Community Engagement Program $85,868
Task B: Housing Element Review and Assessment $10,993
Task C: Housing Element $101,208
Task D: Refine VTA Traffic Demand Model $23,670
Task E: Updates to Other Comprehensive Plan Elements $21,038
Task F: Zoning Code Amendments $19,044
Task G: Environmental Documents $186,845
Task H: Prepare and Finalize Housing Element $43,747
Task I: Project Management $30,914
Sub-total of Services (Tasks A-I): $523,327
Sub-total for Reimbursable Expenses: $0
Total for Services and Reimbursable Expenses* $523,327
Additional Services (if any, per Section 4) $104,665
Maximum Total Compensation $627,993
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 30 of 31
Amendment No. 1
(Amended Task H thru J)
Task H.2.1 - Draft Housing Element for HCD Submittal $23,837
Task H.4 - HCD Review #1 $26,510
Task H.5 - Adoption of Housing Element Update $7,121
Task H.6 - HCD Review #2 $20,039
Task H.7 - HCD Review #3 $11,908
Task I - Project Management $32,965
Task J – Housing Element Review $11,204
Subtotal (Rincon) $133,584
Veronica Tam and Associates, Inc. (subconsultant – direct expense) $19,849
Amendment No. 1 Subtotal (Rincon + VTA) $153,433
Additional Services (10% Contingency) $15,343
Amendment No. 1 Services & Additional Services Subtotal $168,776
Original Contract Services & Reimbursable Subtotal Compensation $523,327
Original Contract Additional Service Subtotal $104,665
New Maximum Total Compensation $796,768
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B
Vers.: Aug. 5, 2019
Page 31 of 31
EXHIBIT C-1
SCHEDULE OF RATES, AMENDMENT NO. 1
(AMENDED, REPLACES PREVIOUS)
CONSULTANT’s schedule of rates is as follows:
POSITION HOURLY RATE
Principal I $202.40
Director I $202.40
Senior Supervisor II $188.60
Senior Professional II $175.00
Senior Professional I $147.20
Professional IV $145.00
Professional III $119.60
GIS/CADD Specialist II $115.00
Production Specialist $88.00
DocuSign Envelope ID: 0A2E9658-80EF-4336-AFCC-7A2956D8A50B