HomeMy WebLinkAboutStaff Report 2304-13303.Approval of a Purchase Order with The Public Restroom Company in the Amount of $369,749 to Provide and Install a Modular Restroom Building at the Cubberley Community Center Fields for the Cubberley Field Restroom Capital Project (CB-17002); CEQA status – exempt under CEQA Guidelines Section 15303 City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Public Works Meeting Date: June 19, 2023 Report #:2304-1330 TITLE Approval of a Purchase Order with The Public Restroom Company in the Amount of $369,749 to Provide and Install a Modular Restroom Building at the Cubberley Community Center Fields for the Cubberley Field Restroom Capital Project (CB-17002); CEQA status – exempt under CEQA Guidelines Section 15303 RECOMMENDATION Approve and authorize the City Manager or their designee to execute Purchase Order No. C23187750 with The Public Restroom Company in an amount not to exceed $369,749, including $336,136 for basic services and $33,613 for additional services, for the purchase of a modular park restroom building for the Cubberley Community Center Fields for the Cubberley Field Restroom project, Capital Improvement Program Project (CB-17002). BACKGROUND The Cubberley Community Center (Cubberley) field is the City’s largest field complex and includes soccer and softball fields, tennis courts, and a running track. There are currently only two portable restrooms available onsite. A permanent restroom is a much-needed facility to accommodate the heavy field usage. The City currently owns eight acres, and the Palo Alto Unified School District (PAUSD) owns 27 acres at Cubberley. The proposed restroom will be located on the property owned by the PAUSD between the sports fields and the running track. The restroom location has been coordinated with the PAUSD. The restroom location was determined based on its proximity to the fields and community input, and it will primarily serve the City’s sports fields users. It is possible that the prefabricated restroom could be moved in the future should discussions of land allocations between the City and PAUSD make an alternative location desirable. The Cubberley Field Restroom project (CB-17002) began in 2018 and was postponed due to staffing constraints. The project originally included a two-stall restroom building. Based on the input received from the community, a four-stall restroom in the proposed location was preferred to accommodate the heavy usage of the fields. A lift station is also needed to pump sanitary sewage from the restroom to the City’s sewer on Nelson Drive. ANALYSIS The Public Restroom Company provides modular restrooms at public facilities and provided such restrooms for the City in 2017 as part of the Palo Alto Municipal Golf Course Reconfiguration Project. On April 10, 2023, Council approved a Purchase Order with The Public Restroom Company to provide two-stall restroom buildings at Rinconada and Ramos Parks.1 The restroom at Cubberley will consist of four universal stalls and will be approximately 12 feet by 27 feet in size. It will automatically lock at 10pm, be cleaned daily, and have security lighting. The estimated fabrication time for the modular restroom building is approximately 12 months. Staff proposes a piggyback contract procurement process as permitted under Palo Alto Municipal Code section 2.30.360(k), allowing the use of another governmental agency’s contract or substantially the same contract terms and exempting the competitive solicitation requirements to purchase the modular building. Purchase Order No. C231877502 incorporates the City of Los Angeles Contract with the Public Restroom Company. The City’s Procurement Officer has determined that the City of Los Angeles solicitation process is substantially similar to the City’s and that the City has good experience with the quality and aesthetics of the modular restroom provided by The Public Restroom Company at the golf course. This approach would allow staff to purchase the modular restroom building directly from the vendor, rather than have a one-year or longer lead time following completion of the bidding process for both design and construction, and Council approval of a construction contract. The offsite building prefabrication would be cost-effective and would reduce onsite construction time compared to the traditional design/bid/build process. Prior to completion of the building fabrication, staff will complete a bidding process to award a construction contract for site preparation, pump station installation, and utilities work for the building installation. The restroom is anticipated to be installed by summer/fall of 2024. The cost of the prefabricated restroom building is comparable to previous restroom buildings at City facilities with consideration of cost escalation. For example, the cost of prefabricated restroom buildings and installation for Briones Park and the Golf Course were approximately $120,000 in 2012 and $170,000 in 2017, respectively. In general, the cost of prefabricated restroom buildings has escalated at an average 7-8% per year over the last decade with continued material price increases and market conditions. Staff also collected available data of prefabricated restroom buildings provided by the Public Restroom Company to other municipal agencies in the region, and found the costs comparable to the proposed restroom at Cubberley. For example, the cost of a four-stall prefabricated restroom in the City of Fremont’s California Nursery Historical Park was approximately $600,000 in 2022 and the cost of a two-stall prefabricated restroom in the City of East Palo Alto’s Cooley Landing Park was approximately $250,000 in 2018. 1 City Council, April 10, 2023; Agenda Item #8, SR #2212-0529, https://recordsportal.paloalto.gov/Weblink/DocView.aspx?id=82222 2 C23187750 Public Restroom Company Contract https://www.cityofpaloalto.org/files/assets/public/public-works/engineering-services/cip-contracts/c23187750- public-restroom-partially-executed.pdf Staff recommends approval of Purchase Order No. C23187750 with the Public Restroom Company for the purchase of the modular restroom building which includes cost of building fabrication, installation, all required state inspections and approval, and bonds. The scope of work for the restroom building can be seen in Attachment A. FISCAL/RESOURCE IMPACT The total purchase order with Public Restroom Company is $369,749, which includes $336,136 for basic services and $33,613 for additional services. Funding for the purchase recommended in this memo is primarily available in the Fiscal Year 2023 Adopted Capital Improvement Program Cubberley Field Restroom project (CB-17002). Additional funding for site preparation, installation of a lift station, and utilities for the restroom is included in the Fiscal Year 2024 Proposed Capital budget. Both the Fiscal Year 2023 and Fiscal Year 2024 funding amounts are from the Cubberley Property Infrastructure Fund. Approval of this purchase order is contingent on approval and adoption of the Fiscal Year 2024 Capital budget, which is currently scheduled for June 19, 2023. This work will be constructed by a contractor to be determined through a bid solicitation process. STAKEHOLDER ENGAGEMENT On August 17, 2022, staff held a community meeting to review the proposed restroom location and building style. Due to limited attendance, staff conducted an online survey to obtain community input. The survey results can be viewed on City’s Park Restrooms webpage.3 Staff presented the community survey results, restroom location options, and a 4-stall restroom option to the Parks and Recreation Commission (PRC) on January 24, 2023.4 The PRC and the community supported the 4-stall restroom in the proposed location. In May 2023, a minor Architectural Review Board approval was provided for the restroom. ENVIRONMENTAL REVIEW The installation of a modular restroom building is categorically exempt from California Environmental Quality Act (CEQA) under Section 15303 (New Construction of Small Structures) of the CEQA guidelines. ATTACHMENTS Attachment A: Cubberley Restroom Scope of Work APPROVED BY: Brad Eggleston, Director Public Works/City Engineer 3 Park Restrooms Webpage, www.cityofpaloalto.org/parkrestrooms 4 Parks and Recreation Commission, January 24, 2023; https://www.cityofpaloalto.org/files/assets/public/agendas- minutes-reports/agendas-minutes/parks-and-recreation-commission/agendas-minutes/2023-agendas-and- minutes/1-jan/staff-report-w-attachments-cubberley-field-restroom.pdf DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 Price Proposal:Cubberley Field Restroom, Palo Alto CA Reference:10575-2/19/2023-7 Sourcewell:Contract # 081721-PRM Our Offer to Sell: 1. Restroom Building delivered to site @ $ 305,074 Public Restroom Company (PRC) herein bids to furnish (building only per plans and (Retention is not allowed as this is materials or a product fully assembled before shipment to the site and therefore not subject to retention.) 2. Installation: Turnkey Installation of the Building above @ $ 25,388 with retention allowed. Public Restroom Company also includes in this two-part quotation our turnkey installation package for this building. Our national factory authorized installation team will: a. Arrive onsite to confirm and verify the Owner/General Contractor provided scope of work in preparation for installation including access to the site. b. Verify the building pad size, building corners, finished slab elevation, utility depth and d. Set the building on the site pad. e. Connect the utility piping stub ups to the building piping stub down building points of 3. Owner/General Contractor Final Tie In of Utilities and other site work: a. The Owner/Contractor is responsible for making all final plumbing connections at the 6’ POC locations. b. The Owner/Contractor is responsible for pulling wire and completing all final tie-ins to the electrical panel from the 6’ POC location. c. The Owner/Contractor is responsible for preparing the pad/foundation. PRC will trench through provided pad/foundation to run utilities to 6’ POC locations. 6. Total Cost of Building, Installation & Bonds @ $ 336,136 Cubberley Field Restroom, Palo Alto CA | 05/08/2023| Reference # 10575-2/19/2023-7 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 1 of 8 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 OWNER/GENERAL CONTRACTOR SCOPE OF WORK WITH/WITHOUT FOOTINGS: Scope of Work Background: Owner/General Contractor shall survey the site, establish survey for the building pad and prefabricated Preparation of Building Pad: Owner/General Contractor is responsible for providing the building subgrade pad or when required Subgrade Pad/Foundation Requirements: 1. Owner/General Contractor shall survey the building site and provide a finished slab elevation for Owner/General Contractor verification of site access to allow Building Delivery: 1. You certify to PRC that suitable delivery access to the proposed building site is available. Suitable access is defined as 14’ minimum width, 16’ minimum height, and sufficient turning radius for a crane and 70’ tractor-trailer. 2. Our cost is based upon the crane we provide being able to get within 35’ from the building Installation Notice and Site Availability: PRC will provide sufficient notice of delivery of the prefabricated building. The Owner/General Contractor shall make the site available during the delivery period. During the delivery period, on an Cubberley Field Restroom, Palo Alto CA | 05/08/2023| Reference # 10575-2/19/2023-7 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 2 of 8 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 improved site, Owner should stop site watering several days before delivery to minimize the impact on Caution: If site is not ready for our field crew to perform their installation and if no notice of delay in Public Restroom Company will “turn-key” set the buildings including the hook up of utilities inside the Utility Connections: 1. PRC to complete all internal building plumbing connections and connections from the electrical final plumbing connections at the 6’ POC locations. Special Conditions, Permits, and Inspection Fees: Follow any published specifications governing local building procedures for applicable building permit Jurisdiction for Off-site Work: Jurisdiction, for permitting and inspection of this building shall be either the State agency who manages PUBLIC RESTROOM COMPANY SCOPE OF WORK: Our In Plant/Off-Site Construction Scheduling System: PRC has several off-site manufacturing centers in the United States, strategically located, with the Cubberley Field Restroom, Palo Alto CA | 05/08/2023| Reference # 10575-2/19/2023-7 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 3 of 8 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 which we have designed and fabricated, are part of the project, PRC supplies the manufacturing centers Special Payment and Progress Billing Terms: Invoicing begins on the 30th of the month following an order and/or the acceptance of the proposal/contract. In the event of project stoppage, additional fees may be assessed for re-mobilization, storage, crane Our discounted project costs are based upon timely payments. Delays in payment could change delivery schedules and project costs. Delivery and Installation: Site Inspection: PRC staff, upon site arrival, will verify the required dimensions of the building pad and the corner Installation: PRC will install the building turn-key, except for any exclusion (listed under “Exclusions,” herein.) Installation of Utilities under the Prefabricated Building: We fabricate off-site an underground utilities (water, and DWV piping and fittings) preassembled We provide all the buildings under-slab piping including the driven electrical ground rod. The Connection of Utilities Post Building Placement: After placement of the building on the pad by PRC, our field staff will tie in the water and sewer Electrical: PRC provides the electrical conduit to the POC 6’ from the building. The Owner/General Contractor pulls Cubberley Field Restroom, Palo Alto CA | 05/08/2023| Reference # 10575-2/19/2023-7 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 4 of 8 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 Plumbing: PRC provides the POC up to 6’ from the building footprint and the Owner/General Contractor connects Sewer: Some sites depending on the local jurisdiction will require an outside house trap which Owner/General Testing of Water, Sewer, and Electrical in Plant and Final Site Utility Connection: Before the building leaves the manufacturing center, PRC certifies a pressure water piping test, DWV, Time of Completion: PRC estimates a 240 calendar day schedule to complete our scope of work from receipt of written notice Exclusions/Exceptions: 1. Access issues for delivery of the building by a clear unobstructed path of travel from an 4. Trench plates or matting needed for protection of site soils, sidewalks, hardscaping, or site Cubberley Field Restroom, Palo Alto CA | 05/08/2023| Reference # 10575-2/19/2023-7 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 5 of 8 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 5. Not responsible for removing any soil, sand, or other debris as a result of trenching or installation. 6. Survey, location of building corners, finish floor elevation, excavation, and construction of 7. Soil conditions not suitable for bearing a minimum of 1500 PSF with compaction to 90% 13. Backflow certification if applicable by Owner/ General Contractor. Insurance and Prevailing Wage Certification: PRC shall comply with the required insurance requirements, wage reports, and safety requirements for the project, including OSHA regulations. Special Insurance to protect the Building before acceptance: As PRC requires payment for each month of off-site construction, and since the building is not on owner Cubberley Field Restroom, Palo Alto CA | 05/08/2023| Reference # 10575-2/19/2023-7 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 6 of 8 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 Errors and Omissions Insurance: Our firm employs licensed architects, engineers, and drafting staff to provide design of our buildings. WARRANTY All work performed by PUBLIC RESTROOM COMPANY (called “Company”) shall be warranted to the Our Company extended warranties shall be Company only and shall have no effect on any required This warranty applies only if all work performed by Company has been fully paid for, including change The warranties expressed herein are exclusive, and are in lieu of all other warranties expressed or There are no warranties which extend beyond those described on the face of this Warranty. The Term of Offer to Sell and Owner/General Contractor Acceptance: This offer is valid for acceptance within 30 days, or when a part of a public bid for the applicable Special Notice of Possible Project Cost Increases as a Result of Late Payments: In the event of delayed or late payment, PRC shall have the right to remedies including late charges, Cubberley Field Restroom, Palo Alto CA | 05/08/2023| Reference # 10575-2/19/2023-7 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 7 of 8 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 cure and if payment is still not received, the discounted price for the payment due may increase, to an Termination Upon Termination for any reason, Owner/General Contractor shall be liable for the cost of all work Venue for Contract Jurisdiction: Public Restroom Company requires all contracts accepted by our firm to hold that the venue for legal No modifications to this offer shall be authorized unless confirmed in writing by the President Offered by: Public Restroom Company by _ This provides conditional acceptance of this preliminary purchase order for this building Accepted by: ______________________________________________________________ ______________________________________________________________ Cubberley Field Restroom, Palo Alto CA | 05/08/2023| Reference # 10575-2/19/2023-7 2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448 8 of 8 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 PROJECT REF#: 10575-5/8/2023-8 FLOOR PLAN SCALE: NOT TO SCALE RESTROOM BUILDING PALO ALTO, CALIFORNIACUBBERLEY FI ELD RESTROOM ARTIST IMPRESSION: 3D RENDERING ONLY FOR REPRESENTATION. COLORS AND MATERIALS ARE SUBJECT TO CHANGE www.PublicRestroomCompany.comCOPYRIGHT 2023, PUBLIC RESTROOM COMPANY THIS MATERIAL IS THE EXCLUSIVE PROPERTY OF PUBLIC RESTROOM COMPANY AND SHALL NOT REPRODUCED, USED OR DISCLOSED TO OTHERS EXCEPT AS AUTHORIZED BY THE WRITTEN PERMISSION OF PUBLIC RESTROOM COMPANY.2587 BUSINESS PARKWAY MINDEN NEVADA 89423 DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 PROJECT REF#: 10575-5/8/2023-8 3 30'-0" (ROOF OVERALL) 26'-8" (BUILDING OVERALL)1'-8"1'-8" MOP SINK W/ MOP HOLDER UTILITY SOAP DISPENSER HR ELEC.SOAP DISPENSER PANELDRINKING FOUNTAIN W/ BOTTLE FILLER 2 HD HD 4 ACC/ RR ACC/ RRALL GENDER ALL GENDERALL GENDER BC BC 27'-2" (SLAB OVERALL) 1 FLOOR PLAN SCALE: 3/16"=1'0" C O P Y R I G H T 2 0 2 3 , P U B L I C RESTROOM BUILDING REVISION #REVISION 5/8/2023 SHEET#BUILDING TYPE:A-18DATE: DRAWN BY: EOR CUBBERLEY FIELD RESTROOM PROJECT #:START MAX. PERSON / HOUR: 12/4/2018 180 SOTHERSEXCEPTAS10575AUTHORIZED BY THE WRITTEN DRAWN BY: EOR ~NOT FOR CONSTRUCTION ~ PRELIMINARY DESIGN DRAWING ONLY ~ DO NOT SCALE, DIMENSIONS PRESIDE DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 PROJECT REF#: 10575-5/8/2023-8 T.O. WALL BOARD & T.O. SLAB ELEVATION 1 SCALE:3/16"=1'-0" 12 1 T.O. WALL BOARD & BATTS T.O. SLAB DRINKING FOUNTAIN W/ ELEVATION 2 SCALE:3/16"=1'-0" C O P Y R I G H T 2 0 2 3 , P U B L I C RESTROOM BUILDING REVISION #REVISION 5/8/2023 SHEET#BUILDING TYPE:A-2RESTROOM COMPANY THIS 8 DATE: DRAWN BY:EOR CUBBERLEY FIELD RESTROOM PROJECT #:START MAX. PERSON / HOUR: 12/4/2018 180 SOTHERSEXCEPTAS10575AUTHORIZED BY THE WRITTEN DRAWN BY: EOR ~NOT FOR CONSTRUCTION ~ PRELIMINARY DESIGN DRAWING ONLY ~ DO NOT SCALE, DIMENSIONS PRESIDE DocuSign Envelope ID: 2E3514FE-F601-4A12-B443-C90422AC35B0 PROJECT REF#: 10575-5/8/2023-8 T.O. WALL BOARD & T.O. SLAB ELEVATION 3 SCALE:3/16"=1'-0" 12 T.O. WALL BOARD & BATTS T.O. SLAB ELEVATION 4 SCALE:3/16"=1'-0" C O P Y R I G H T 2 0 2 3 , P U B L I C RESTROOM BUILDING REVISION #REVISION 5/8/2023 SHEET#BUILDING TYPE:A-3RESTROOM COMPANY THIS 8 DATE: DRAWN BY:EOR CUBBERLEY FIELD RESTROOM PROJECT #:START MAX. PERSON / HOUR: 12/4/2018 180 SOTHERSEXCEPTAS10575AUTHORIZED BY THE WRITTEN DRAWN BY: EOR ~NOT FOR CONSTRUCTION ~ PRELIMINARY DESIGN DRAWING ONLY ~ DO NOT SCALE, DIMENSIONS PRESIDE