Staff Report 2304-1277
City Council Staff Report From: City Manager Report Type: CONSENT CALENDAR Lead Department: Public Works Meeting Date: June 5, 2023 Report #:2304-1277 TITLE Approval of Construction Contract with O’Grady Paving, Inc. (C23187512) for the Churchill Avenue/Alma Street Railroad Crossing Safety Improvements Project, Capital Improvement Program Project PL-20000 in the amount of $2,265,340 and Authorization for the City Manager to Execute Change Orders up to $226,534; and CEQA status – exempt under CEQA Guidelines Section 15301(c) RECOMMENDATION Staff recommends that Council: 1. Approve and authorize the City Manager, or their designee to execute construction contract C23187512 with O’Grady Paving, Inc. in the amount of $2,265,340 for the Churchill Avenue/Alma Street Railroad Crossing Safety Improvements Project, Capital Improvement Program Project (PL-20000); and 2. Authorize the City Manager or their designee to negotiate and execute change orders to contract C23187512 with O’Grady Paving, Inc., the total value of which shall not exceed $226,534 for related, additional but unforeseen work that may arise. BACKGROUND The California Department of Transportation Division of Rail, in cooperation with the Peninsula Corridor Joint Power Board (also known as Caltrain or JPB) and the City of Palo Alto, proposed a railroad crossing improvement project at Churchill Avenue in Palo Alto. The intersection was identified by California Public Utilities Commission (CPUC) for safety improvements as part of Section 130 federal funding for hazard elimination on the railroad crossing. The final recommendations of the CPUC Rail Crossing Engineering Section staff for purposes of itemizing the safety improvements for the above noted at-grade railroad crossing, were developed by a diagnostic team. The diagnostic team analyzed the existing situation with respect to vehicular travel, bicycle travel, pedestrian pathways, and rail traffic, and determined that the identified improvements will improve safety and are eligible to be 100% funded by the Section 130 Program. The Railway-Highway Crossings (Section 130) Program overseen by The US Department of Item 4 Item 4 Staff Report Item 4: Staff Report Pg. 1 Packet Pg. 65 of 406 Transportation Federal Highway Administration (FHWA) provides funds for the elimination of hazards at railway-highway crossings. The Section 130 Program has been correlated with a significant decrease in collisions and fatalities at railway-highway grade crossings. In August 2019, the California Department of Transportation’s (Caltrans) Division of Rail and Mass Transportation executed a Service Contract with the City of Palo Alto. This was regarded as a Notice to Proceed for the City to complete the work as outlined in the Service Contract. On September 28, 2020, Council authorized a contract with BKF Engineers1 for the design of the Churchill Avenue and Alma Street Railroad Crossing Safety Improvement Plan, which includes preparation of concept plans, final design plans, and construction documents for intersection improvements at Churchill Avenue and Alma Street. Improvements include, but are not limited to, traffic signal modifications, sidewalk widening, high-visibility crosswalks, signing and striping, and pedestrian railroad crossing improvements. Concurrently with the above- described City project, JPB developed project plans for improvements within their right-of-way at this intersection. JPB and the City are coordinating the improvements at the intersection to ensure that each entity’s respective work items are compatible. JPB will be responsible for the majority of the construction and improvements within their right of way, and the City will manage the construction and improvements within the City’s right-of-way. The objectives of the project are to improve safety, efficiency, and experience of the intersection and rail crossing for pedestrians, bicyclists, and motorists. As per the scope of improvements listed in the Service Contract with Caltrans, BKF Engineers in consultation with City staff, developed two alternative concept plans. On May 3, 20212, Council reviewed the two concept plan alternatives for the near-term safety improvements to the Alma Street and Churchill Avenue intersection and recommended alternative #1 as a preferred alternative and directed staff to complete final design plans, environmental analysis, specifications, and estimates for construction. ANALYSIS Project Description Staff recommends approval of Construction Contract No. C23187512.3 This scope of work includes installation of a pre-signal for eastbound traffic on Churchill, installation of new traffic signals at the intersection, modifications to the signal timing, and pedestrian and bicyclist improvements including enlarged pedestrian queuing areas, a widened pedestrian railroad 1 City Council, September 28, 2020, Agenda Item #4, SR #11497 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/reports/city-manager-reports- cmrs/year-archive/2020-2/id-11497.pdf?t=58177.19 2 City Council, May 3, 2021, Agenda Item #10, SR #12062 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/reports/city-manager-reports- cmrs/year-archive/2021/id-12062.pdf 3 Contract No. C23187512: https://www.cityofpaloalto.org/files/assets/public/public-works/engineering- services/cip-contracts/c23187512-ogrady-paving-contract.pdf Item 4 Item 4 Staff Report Item 4: Staff Report Pg. 2 Packet Pg. 66 of 406 crossing area, advanced stop bars, improved bike lane markings, and high visibility crosswalks. A project map can be seen in Attachment A. Procurement Process On February 28, 2023, an Invitation for Bids (IFB) for the Churchill Avenue/Alma Street Railroad Crossing Safety Improvements Project was posted on Planet Bids, the City’s eProcurement system. The bidding period was 30 calendar days. The City received one (1) bid from a qualified contractor on March 30, 2023 as listed on the attached Bid Summary (Attachment B). Summary of Procurement Process Bid Name/Number Churchill Avenue/Alma Street Railroad Crossing Improvements Project IFB #187512 Proposed Length of Project 120 calendar days # of Bid Packages Downloaded by Builder’s Exchanges 2 # of Bid Packages Downloaded by Contractors 16 Total Days to Respond to Bid 30 Pre-Bid Meeting?Yes # of Bids Received 1 Bid Price Range $2,265,340 Public Link to Solicitation https://pbsystem.planetbids.com/p ortal/25569/bo/bo-detail/102731 The bid price of $2,265,340 is 29% above the engineer’s estimate of $1,752,965. Staff has reviewed the bid and recommends the bid amount of $2,265,340 submitted by O’Grady Paving, Inc., be accepted, and that O’Grady Paving, Inc. be declared the lowest responsible bidder. The construction contingency amount of $226,534, which equals approximately 10 percent of the contract value, is requested for related, additional, but unforeseen work which may arise during the project, implemented via City-approved Change Order. As a specific capital improvement project, there are no prior contracts to compare these costs to. However, staff reviewed information and similar projects performed by the lowest bidder - O’Grady Paving, Inc. - and found them to be the lowest responsive and responsible bidder. Staff also checked with the Contractor's State License Board and confirmed the contractor has an active license on file. As with most federally-funded projects, a mandatory pre-bid meeting was required. Only two contractors attended the pre-bid meeting. Staff believes there may been low contractor interest in the project due to the complexities of working near the Caltrain right- of-way, and the requirement to work during the busy summer construction season. In addition, as a federally-funded contract it involves a high level of compliance reporting for a relatively small contract. Given the grant deadline of December 2023 for completing the project, staff recommends awarding the contract to O’Grady Paving, Inc. Item 4 Item 4 Staff Report Item 4: Staff Report Pg. 3 Packet Pg. 67 of 406 FISCAL/RESOURCE IMPACT Funding for this contract is available in the Fiscal Year 2023 Adopted Capital Improvement Program budget for the Churchill Avenue/Alma Street Railroad Crossing Safety Improvements project (PL-20000). This railroad crossing intersection was identified through the Federal Section 130 funds, a federally funded program administered by the states (Caltrans administers this is in California), for increasing safety at at-grade highway-rail crossings. As per the agreement between the City of Palo Alto and the California Department of Transportation (Caltrans) Division of Rail and Mass Transportation, Service Contract No. 75LX335, the City will receive federal funding through the Section 130 Grade Crossing Improvement Program on a reimbursement basis. The reimbursement amount of up to $3,996,000 is available for reimbursement from the Section 130 Program for all work to be completed as part of the project. The existing design contract with BKF Engineers is for $286,686. STAKEHOLDER ENGAGEMENT The project design team has been conducting monthly stakeholder check-in meetings since October 2020, to give the pertinent stakeholders updates on the project’s progress, and provide a forum for the design team, City, and stakeholders to discuss and coordinate the proposed improvements. The stakeholders that are involved with the monthly meeting include: • Design team - BKF Engineers, Hexagon Transportation Consultants, Callander Associates • The City of Palo Alto • Caltrans • The California Public Utilities Commission (CPUC) • Caltrain/JPB City staff has also been coordinating internally with another City project, the “Churchill Avenue Enhanced Bikeway project” which is nearly complete with design and will extend the bike path along Churchill Avenue from Castilleja Avenue/Paly Road to Stanford Perimeter Trail. Various outreach and coordination meetings have been conducted to educate the community on the project objectives, solicit site-specific feedback on existing issues, understand existing community concerns, and coordinate improvements with entities that operate and oversee the nearby railroad facilities. These meetings include two community meetings held on January 21 and November 16, 2021, as well as meetings with Palo Alto Pedestrian and Bicycle Committee, City School Traffic Safety Committee, and Planning and Transportation Commission during the design process. Extensive public outreach will be conducted during the construction phase to keep the community informed throughout the process, including flyers sent to adjacent residences and businesses, and notices posted online on Nextdoor and the City’s website. Item 4 Item 4 Staff Report Item 4: Staff Report Pg. 4 Packet Pg. 68 of 406 ENVIRONMENTAL REVIEW This project is environmentally cleared with FHWA obligation and Caltrans have completed the National Environmental Policy Act (NEPA) process and determined that this project is a NEPA CE (Categorical Exempt). Given the nature of the proposed improvements for the project (safety improvements to an existing intersection), this project qualifies for a Class 1 Categorical Exemption under California Environmental Quality Act (CEQA) Guidelines Section 15301. The Class 1 exemption covers minor alterations to existing facilities. City staff has filed for CEQA Notice of Exemption (NOE) with Santa Clara County. ATTACHMENTS Attachment A: Project Map Attachment B: Bid Summary APPROVED BY: Brad Eggleston, Director Public Works/City Engineer Item 4 Item 4 Staff Report Item 4: Staff Report Pg. 5 Packet Pg. 69 of 406 1 2 0 -3 0 -0 3 1 1 2 0 -2 9 -0 4 1 1 2 0 -2 0 -0 1 0 1 2 4 -1 2 -0 2 5 1 2 4 -0 2 -0 51 2 0 -3 0 -0 2 1 1 2 4 -1 2 -0 2 4 1 2 4 -0 7 -0 4 5 1 2 4 -0 2 -0 6 01 2 0 -3 0 -0 0 9 1 2 4 -0 7 -0 3 9 1 2 4 -0 2 -0 0 2 1 2 4 -0 2 -0 2 3 1 2 0 -3 0 -0 3 2 1 2 0 -2 0 -0 1 5 1 2 4 -1 2 -0 0 4 1 2 4 -0 7 -0 3 81 2 0 -3 0 -0 2 0 1 2 0 -2 9 -0 5 5 1 2 4 -1 2 -0 2 3 1 2 4 -0 2 -0 3 9 1 2 4 -0 2 -0 5 6 1 2 0 -2 0 -0 1 1 1 2 0 -3 0 -0 3 3 1 2 0 -3 0 -0 1 0 1 2 4 -0 7 -0 4 3 1 2 4 -0 7 -0 3 4 1 2 4 -0 2 -0 2 41 2 4 -1 2 -0 0 5 1 2 4 -0 7 -0 0 1 1 2 4 -0 2 -0 5 71 2 4 -1 2 -0 3 6 1 2 4 -0 2 -0 0 1 1 2 0 -3 0 -0 3 4 1 2 0 -2 0 -0 1 2 1 2 4 -1 2 -0 0 6 1 2 4 -0 2 -0 2 6 1 2 4 -0 2 -0 3 81 2 0 -3 0 -0 1 9 1 2 0 -2 9 -0 5 4 1 2 4 -0 7 -0 4 2 1 2 0 -3 0 -0 1 1 1 2 0 -2 0 -0 1 3 1 2 4 -0 2 -0 6 1 1 2 4 -0 2 -0 5 83 0 -0 4 8 1 2 0 -3 0 -0 3 5 1 2 4 -0 7 -0 4 1 1 2 0 -3 0 -0 1 8 1 2 4 -1 2 -0 3 7 1 2 4 -1 2 -0 0 7 1 2 4 -0 7 -0 4 41 2 0 -3 0 -0 1 2 1 2 4 -1 2 -0 1 1 1 2 4 -0 7 -0 0 2 1 2 4 -0 2 -0 2 51 2 0 -3 0 -0 4 7 1 2 0 -3 0 -0 3 6 1 2 4 -0 2 -0 3 0 1 2 4 -0 2 -0 3 71 2 0 -3 0 -0 1 7 1 2 0 -2 0 -0 1 4 1 2 4 -0 7 -0 3 0 1 2 4 -0 2 -0 2 7 1 2 4 -0 2 -0 6 2 1 2 0 -3 0 -0 5 11 2 0 -3 0 -0 4 6 1 2 4 -1 2 -0 1 0 1 2 4 -1 2 -0 0 8 1 2 4 -0 2 -0 6 31 2 0 -3 0 -0 1 6 1 2 4 -0 7 -0 2 9 1 2 4 -0 8 -0 0 11 2 4 -0 7 -0 1 6 1 2 4 -0 7 -0 0 3 1 2 4 -0 2 -0 2 9 1 2 4 -0 2 -0 3 6 1 2 0 -3 0 -0 5 2 1 2 4 -0 2 -0 6 4 61 2 0 -3 0 -0 4 5 1 2 0 -3 0 -0 3 7 1 2 4 -0 7 -0 2 8 1 2 4 -0 2 -0 8 3 1 2 4 -0 7 -0 4 9 1 2 0 -3 0 -0 3 8 1 2 0 -3 0 -0 1 4 1 2 4 -1 2 -0 0 9 1 2 4 -0 7 -0 1 5 1 2 4 -0 7 -0 2 7 1 2 4 -0 8 -0 8 5 1 2 4 -0 2 -0 2 8 1 2 0 -3 0 -0 1 5 1 2 4 -0 2 -0 3 4 1 2 4 -0 2 -0 6 51 2 4 -0 7 -0 0 4 1 2 0 -3 0 -0 3 9 1 2 4 -1 2 -0 1 6 T h e C i t y o f1 2 4 -0 8 -0 2 4 1 2 0 -3 0 -0 4 4 1 2 0 -3 0 -0 4 0 1 2 4 -0 2 -0 3 3 1 2 4 -0 2 -0 6 6 P a l o A l t o1 2 4 -0 7 -0 2 3 1 2 4 -0 7 -0 2 6 1 2 4 -0 8 -0 6 3 1 2 4 -0 2 -0 6 7 1 2 4 -0 6 -0 2 6 1 2 0 -3 0 -0 4 3 1 2 0 -3 0 -0 4 1 1 2 4 -1 5 -0 0 1 1 2 4 -1 2 -0 3 1 1 2 4 -0 7 -0 1 4 1 2 4 -0 2 -0 3 21 2 4 -0 8 -0 2 3 1 2 0 -3 0 -0 4 2 1 2 4 -1 2 -0 3 4 1 2 4 -0 7 -0 5 3 1 2 4 -0 7 -0 0 5 1 2 4 -0 2 -0 6 8 1 2 4 -0 6 -0 2 5 1 2 4 -1 5 -0 4 2 1 2 4 -1 5 -0 0 2 1 2 4 -0 7 -0 2 4 1 2 4 -0 2 -0 3 1 1 2 4 -0 2 -0 7 41 2 4 -1 2 -0 3 3 1 2 4 -0 7 -0 1 3 1 2 4 -0 8 -0 6 4 1 2 4 -0 2 -0 6 9 1 2 4 -0 6 -0 2 4 1 2 4 -1 5 -0 4 3 1 2 4 -0 7 -0 2 2 1 2 4 -0 8 -0 6 8 1 2 4 -0 2 -0 7 3 1 2 4 -0 6 -0 2 3 1 2 4 -1 5 -0 4 1 1 2 4 -0 7 -0 2 51 2 4 -1 5 -0 0 3 1 2 4 -1 5 -0 0 4 1 2 4 -0 8 -0 2 5 1 2 4 -0 2 -0 7 0 1 2 4 -1 5 -0 4 4 1 2 4 -1 5 -0 4 0 1 2 4 -1 6 -0 1 8 1 2 4 -0 7 -0 5 2 1 2 4 -0 2 -0 7 2 1 2 4 -0 6 -0 2 2 1 2 4 -1 5 -0 0 5 1 2 4 -0 7 -0 2 1 1 2 4 -0 7 -0 0 6 1 2 4 -0 8 -0 6 7 1 2 4 -0 8 -0 6 2 1 2 4 -1 5 -0 3 9 1 2 4 -1 5 -0 3 8 1 2 4 -1 6 -0 1 7 1 2 4 -0 8 -0 0 8 1 2 4 -0 8 -0 6 1 1 2 4 -0 2 -0 7 1 1 2 4 -0 6 -0 2 1 1 2 4 -1 6 -0 1 9 1 2 4 -0 7 -0 2 0 1 2 4 -0 6 -0 7 11 2 4 -1 5 -0 2 6 1 2 4 -0 8 -0 0 5 1 2 4 -1 5 -0 3 7 1 2 4 -1 6 -0 1 6 1 2 4 -1 6 -0 2 1 1 2 4 -0 8 -0 6 0 1 2 4 -0 8 -0 7 0 1 2 4 -1 5 -0 4 5 1 2 4 -0 8 -0 2 6 1 2 4 -0 8 -0 2 8 1 2 4 -0 6 -0 1 91 2 4 -1 5 -0 2 7 1 2 4 -0 8 -0 0 6 1 2 4 -1 5 -0 3 6 1 2 4 -0 7 -0 1 1 1 2 4 -0 8 -0 2 1 1 2 4 -1 5 -0 3 5 1 2 4 -1 5 -0 4 6 1 2 4 -1 6 -0 1 5 1 2 4 -1 6 -0 2 3 1 2 4 -0 7 -0 0 7 1 2 4 -0 8 -0 5 9 1 2 4 -0 6 -0 1 81 2 4 -1 5 -0 2 8 1 2 4 -1 6 -0 2 0 1 2 4 -1 6 -0 2 2 1 2 4 -0 8 -0 2 9 1 2 4 -0 7 -0 1 0 1 2 4 -0 8 -0 0 7 1 2 4 -0 8 -0 6 9 1 2 4 -0 8 -0 3 01 2 4 -1 6 -0 1 4 1 2 4 -0 7 -0 0 9 1 2 4 -0 6 -0 1 71 2 4 -1 5 -0 3 4 1 2 4 -1 5 -0 2 5 1 2 4 -0 8 -0 5 8 1 2 4 -0 6 -0 7 0 1 2 4 -1 6 -0 1 31 2 4 -1 5 -0 2 9 1 2 4 -0 8 -0 2 0 1 2 4 -0 8 -0 5 7 1 2 4 -0 8 -0 3 1 1 2 4 -1 5 -0 2 4 1 2 4 -1 5 -0 0 7 1 2 4 -1 6 -0 2 4 1 2 4 -0 6 -0 1 5 1 2 4 -0 6 -0 3 1 2 4 -1 6 -0 1 21 2 4 -1 5 -0 3 0 1 2 4 -0 8 -0 5 6 1 2 4 -0 8 -0 3 21 2 4 -1 5 -0 0 9 1 2 4 -1 6 -0 6 21 2 4 -1 5 -0 0 8 1 2 4 -0 9 -0 0 1 1 2 4 -0 6 -0 3 51 2 4 -0 7 -0 0 8 1 2 4 -0 8 -0 3 3 1 2 4 -1 5 -0 3 1 1 2 4 -1 5 -0 4 8 1 2 4 -1 5 -0 1 0 1 2 4 -1 6 -0 2 5 1 2 4 -0 8 -0 8 1 1 2 4 -0 8 -0 5 51 2 4 -1 6 -0 1 1 1 2 4 -0 6 -0 6 61 2 4 -1 6 -0 6 3 1 2 4 -0 8 -0 1 9 1 2 4 -0 8 -0 1 0 1 2 4 -0 8 -0 3 4 1 2 4 -0 9 -0 0 21 2 4 -1 5 -0 3 2 1 2 4 -1 5 -0 4 7 1 2 4 -1 5 -0 1 1 1 2 4 -0 8 -0 4 0 1 2 4 -1 5 -0 2 2 1 2 4 -1 5 -0 1 2 1 2 4 -1 6 -1 0 4 1 2 4 -0 8 -0 4 1 1 2 4 -0 9 -0 4 2 1 2 4 -0 6 -0 6 7 1 2 4 -1 6 -0 2 9 1 2 4 -1 6 -0 2 6 1 2 4 -1 6 -0 6 1 1 2 4 -0 8 -0 1 8 1 2 4 -0 8 -0 3 9 1 2 4 -0 8 -0 3 5 1 2 4 -1 5 -0 2 1 1 2 4 -1 5 -0 1 3 1 2 4 -1 6 -0 1 0 1 2 4 -0 9 -0 4 51 2 4 -1 6 -0 6 0 1 2 4 -1 6 -0 6 4 1 2 4 -0 8 -0 1 1 1 2 4 -1 5 -0 5 2 1 2 4 -1 6 -0 2 7 1 2 4 -1 6 -0 6 5 1 2 4 -0 8 -0 1 7 1 2 4 -0 8 -0 3 6 1 2 4 -1 5 -0 2 0 1 2 4 -1 5 -0 7 1 1 2 4 -1 6 -0 0 9 1 2 4 -0 8 -0 8 3 1 2 4 -0 9 -0 4 4 1 2 4 -1 5 -0 5 1 1 2 4 -0 9 -0 0 41 2 4 -1 5 -0 5 3 1 2 4 -0 8 -0 3 8 1 2 4 -1 5 -0 1 9 1 2 4 -1 5 -0 5 4 1 2 4 -1 6 -0 3 2 1 2 4 -1 6 -0 5 9 1 2 4 -1 6 -0 6 6 1 2 4 -0 8 -0 1 6 1 2 4 -0 8 -0 8 4 1 2 4 -0 9 -0 4 6 1 2 4 -1 6 -0 2 81 2 4 -1 5 -0 5 0 1 2 4 -0 8 -0 8 21 2 4 -1 5 -0 7 2 1 2 4 -1 6 -0 0 8 1 2 4 -0 8 -0 1 5 1 2 4 -0 8 -0 3 71 2 4 -1 5 -0 4 9 1 2 4 -1 5 -0 5 5 ALMA CHURCHILL PROJECT LIMITS 1 2 4 -1 6 -0 5 8 1 2 4 -1 6 -0 6 7 1 2 4 -0 9 -0 3 8 1 2 4 -1 5 -0 5 6 1 2 4 -1 6 -0 0 7 1 2 4 -0 8 -0 4 2 1 2 4 -0 9 -0 2 71 2 4 -1 5 -0 5 7 1 2 4 -0 9 -0 3 7 1 2 4 -1 5 -0 1 6 1 2 4 -1 6 -0 9 4 1 2 4 -1 6 -0 3 3 1 2 4 -1 6 -0 5 7 1 2 4 -1 6 -0 6 8 1 2 4 -0 8 -0 7 4 1 2 4 -0 9 -0 2 8 1 2 4 -0 9 -0 0 51 2 4 -1 5 -0 5 8 1 2 4 -1 6 -0 9 8 1 2 4 -1 6 -0 3 4 1 2 4 -0 8 -0 5 3 1 2 4 -0 8 -0 7 5 1 2 4 -0 9 -0 3 61 2 4 -1 5 -0 6 1 1 2 4 -1 7 -0 8 0 1 2 4 -1 6 -0 9 3 1 2 4 -1 6 -0 7 1 1 2 4 -0 9 -0 3 5 1 2 4 -0 9 -0 2 9 1 2 4 -1 5 -0 6 0 1 2 4 -1 6 -1 0 5 1 2 4 -1 6 -1 0 6 1 2 4 -0 9 -0 0 6 1 2 4 -1 6 -0 0 4 1 2 4 -1 6 -0 3 5 1 2 4 -0 8 -0 7 6 1 2 4 -0 9 -0 3 41 2 4 -1 6 -0 9 7 1 2 4 -0 8 -0 7 31 2 4 -1 6 -0 9 1 1 2 4 -1 6 -0 3 8 1 2 4 -0 9 -0 3 0 1 2 4 -1 6 -0 0 3 1 2 4 -1 6 -0 3 6 1 2 4 -0 9 -0 2 51 2 4 -1 6 -0 5 6 1 2 4 -0 8 -0 4 6 1 2 4 -1 7 -0 1 4 1 2 4 -1 3 -0 0 1 1 2 4 -0 9 -0 3 1 1 2 4 -1 6 -0 0 2 1 2 4 -1 6 -0 7 2 1 2 4 -0 8 -0 4 7 1 2 4 -1 7 -0 1 8 1 2 4 -0 8 -0 7 2 1 2 4 -0 9 -0 2 61 2 4 -1 6 -0 0 1 1 2 4 -1 6 -0 3 7 1 2 4 -1 6 -0 9 2 1 2 4 -0 9 -0 3 3 1 2 4 -1 6 -0 7 3 1 2 4 -0 8 -0 7 8 1 2 4 -0 8 -0 4 8 1 2 4 -1 3 -0 0 2 1 2 4 -1 6 -0 4 6 1 2 4 -1 6 -0 5 51 2 4 -1 6 -0 4 7 1 2 4 -1 7 -0 1 3 1 2 4 -1 7 -0 1 7 1 2 4 -1 3 -0 4 7 1 2 4 -0 9 -0 3 21 2 4 -1 6 -0 7 4 1 2 4 -0 9 -0 2 41 2 4 -1 6 -0 4 0 1 2 4 -0 8 -0 4 91 2 4 -1 6 -0 5 4 1 2 4 -1 7 -0 1 9 1 2 4 -0 8 -0 7 71 2 4 -1 6 -0 7 6 1 2 4 -1 3 -0 4 6 1 2 4 -1 3 -0 0 3 1 2 4 -1 3 -0 0 40 0 0 -0 0 -0 0 0 1 2 4 -1 6 -0 4 1 1 2 4 -0 9 -0 2 3 1 2 4 -0 8 -0 5 01 2 4 -1 6 -0 7 71 2 4 -1 6 -0 4 4 1 2 4 -1 7 -0 1 2 1 2 4 -1 7 -0 5 3 1 2 4 -1 3 -0 0 51 2 4 -1 6 -0 5 3 1 2 4 -1 6 -0 7 5 1 2 4 -0 9 -0 2 2 1 2 4 -1 6 -0 4 2 1 2 4 -1 3 -0 4 51 2 4 -1 6 -0 7 8 1 2 4 -1 7 -0 2 0 1 2 4 -0 8 -0 5 1 1 2 4 -0 9 -0 2 11 2 4 -1 6 -0 5 2 1 2 4 -1 3 -0 5 1 1 2 4 -1 3 -0 0 6 1 2 4 -1 6 -0 4 3 1 2 4 -1 6 -0 5 1 1 2 4 -1 6 -0 7 9 1 2 4 -0 9 -0 2 0 1 2 4 -1 7 -0 5 2 1 2 4 -0 9 -0 1 91 2 4 -2 1 -0 0 1 1 2 4 -1 7 -0 2 2 1 2 4 -1 3 -0 4 41 2 4 -1 6 -0 5 0 1 2 4 -1 6 -0 8 0 1 2 4 -1 3 -0 5 0 1 2 4 -1 6 -0 4 9 1 2 4 -1 6 -1 0 9 1 2 4 -1 6 -0 8 1 1 2 4 -1 7 -0 1 1 1 2 4 -1 7 -0 2 1 1 2 4 -1 7 -0 5 4 1 2 4 -1 3 -0 0 7 1 2 4 -0 9 -0 1 8 1 2 4 -1 6 -0 9 6 1 2 4 -1 3 -0 3 8 1 2 4 -1 6 -0 4 8 1 2 4 -1 6 -1 0 8 1 2 4 -1 7 -0 1 0 1 2 4 -1 7 -0 5 1 1 2 4 -1 7 -0 5 5 1 2 4 -1 3 -0 4 3 1 2 4 -1 3 -0 3 61 2 4 -1 6 -0 8 8 1 2 4 -1 3 -0 3 9 1 2 4 -1 6 -0 9 0 1 2 4 -1 3 -0 0 81 2 4 -1 6 -0 9 5 1 2 4 -1 7 -0 0 9 1 2 4 -1 6 -1 0 7 1 2 4 -1 7 -0 5 0 1 2 4 -1 6 -0 8 3 1 2 4 -1 7 -0 5 6 1 2 4 -1 3 -0 4 0 1 2 4 -1 3 -0 0 91 2 4 -1 7 -0 0 8 1 2 4 -1 3 -0 3 50 0 0 -0 0 -0 0 0 1 2 4 -1 6 -0 8 7 1 2 4 -1 7 -0 9 0 1 2 4 -1 7 -0 4 91 2 4 -1 6 -0 8 4 1 2 4 -1 7 -0 2 3 1 2 4 -1 7 -0 5 7 1 2 4 -1 3 -0 5 5 1 2 4 -1 7 -0 2 5 1 2 4 -1 7 -0 5 8 1 2 4 -1 8 -1 0 6 1 2 4 -1 3 -0 1 1 1 2 4 -1 6 -0 8 6 1 2 4 -1 7 -0 0 7 1 2 4 -1 3 -0 5 4 1 2 4 -1 3 -0 3 4 1 2 4 -1 7 -0 0 5 1 2 4 -1 7 -0 4 8 1 2 4 -1 8 -1 0 71 2 4 -1 7 -0 2 6 1 2 4 -1 7 -0 5 9 1 2 4 -1 3 -0 4 8 1 2 4 -1 3 -0 1 3 1 2 4 -2 2 -0 4 3 1 2 4 -1 6 -0 8 5 1 2 4 -1 7 -0 9 1 1 2 4 -1 7 -0 6 3 1 2 4 -1 8 -0 1 8 1 2 4 -1 3 -0 1 01 2 4 -1 7 -0 0 4 1 2 4 -1 3 -0 3 31 2 4 -1 7 -0 0 6 1 2 4 -1 3 -0 4 9 1 2 4 -1 3 -0 1 21 2 4 -1 7 -0 6 0 1 2 4 -2 2 -0 4 2 1 2 4 -1 7 -0 0 3 1 2 4 -1 7 -0 3 0 1 2 4 -1 7 -0 2 8 1 2 4 -1 8 -0 1 7 1 2 4 -1 8 -0 2 0 1 2 4 -1 7 -0 0 2 1 2 4 -1 7 -0 8 4 1 2 4 -1 7 -0 8 2 1 2 4 -1 8 -0 2 2 1 2 4 -1 3 -0 1 51 2 4 -1 7 -0 8 7 1 2 4 -1 8 -0 2 1 1 2 4 -1 3 -0 3 2 1 2 4 -1 3 -0 5 31 2 4 -2 2 -0 4 1 1 2 4 -1 7 -0 0 1 1 2 4 -1 7 -0 2 9 1 2 4 -1 7 -0 8 3 1 2 4 -1 8 -1 0 5 1 2 4 -1 8 -0 1 6 1 2 4 -1 8 -0 2 31 2 4 -2 2 -0 2 1 1 2 4 -1 7 -0 8 51 2 4 -2 2 -0 4 0 1 2 4 -1 7 -0 3 7 1 2 4 -1 3 -0 3 1 1 2 4 -1 3 -0 1 6 1 2 4 -1 7 -0 3 8 1 2 4 -1 7 -0 6 21 2 4 -1 7 -0 8 6 1 2 4 -1 7 -0 8 9 1 2 4 -1 7 -0 6 4 1 2 4 -1 8 -0 2 41 2 4 -2 2 -0 2 0 1 2 4 -1 3 -0 3 01 2 4 -2 2 -0 2 2 1 2 4 -2 2 -0 3 9 1 2 4 -1 7 -0 3 2 1 2 4 -1 3 -0 2 91 2 4 -1 7 -0 3 6 1 2 4 -1 7 -0 8 8 1 2 4 -1 7 -0 6 7 1 2 4 -1 8 -1 0 4 1 2 4 -1 3 -0 1 7 1 2 4 -1 8 -0 1 4 1 2 4 -1 8 -0 2 51 2 4 -2 2 -0 2 3 1 2 4 -2 2 -0 3 8 1 2 4 -1 7 -0 3 3 1 2 4 -1 7 -0 4 4 1 2 4 -1 8 -0 6 81 2 4 -2 2 -0 1 9 1 2 4 -1 7 -0 6 81 2 4 -1 7 -0 6 5 1 2 4 -1 8 -0 1 3 1 2 4 -1 3 -0 5 2 1 2 4 -2 2 -0 1 8 1 2 4 -2 2 -0 2 4 1 2 4 -2 2 -0 3 7 1 2 4 -1 7 -0 3 4 1 2 4 -1 8 -0 6 7 1 2 4 -1 7 -0 6 6 1 2 4 -1 8 -1 1 1 1 2 4 -1 3 -0 2 71 2 4 -1 7 -0 4 5 1 2 4 -1 7 -0 6 9 1 2 4 -1 8 -0 6 9 1 2 4 -2 2 -0 1 7 1 2 4 -2 2 -0 2 5 1 2 4 -2 2 -0 3 6 1 2 4 -1 7 -0 4 3 1 2 4 -1 8 -0 3 4 1 2 4 -1 3 - 1 2 4 -2 4 -0 3 3 1 2 4 -1 7 -0 3 5 1 2 4 -1 7 -0 4 2 1 2 4 -1 7 -0 7 0 1 2 4 -1 8 -0 3 3 1 2 4 -1 8 -0 6 6 1 2 4 -2 2 -0 3 5 1 2 4 -1 8 -0 3 2 1 2 4 -1 8 -0 2 7 1 2 4 -1 3 -0 2 11 2 4 -2 2 -0 1 6 1 2 4 -2 2 -0 2 6 1 2 4 -1 3 -0 2 61 2 4 -1 7 -0 4 1 1 2 4 -1 7 -0 7 1 1 2 4 -1 8 -0 6 5 1 2 4 -1 8 -0 1 2 1 2 4 -1 3 -0 5 8 1 2 4 -2 4 -0 0 1 1 2 4 -2 2 -0 1 5 1 2 4 -2 2 -0 2 7 1 2 4 -2 2 -0 3 4 1 2 4 -1 7 -0 7 2 1 2 4 -1 8 -0 2 8 1 2 4 -1 8 -0 7 0 1 2 4 -1 8 -0 7 1 1 2 4 -2 4 -0 3 2 1 2 4 -1 7 -0 4 0 1 2 4 -1 8 -0 3 11 2 4 -1 8 -0 1 1 1 2 4 -1 8 -0 6 4 1 2 4 -1 3 -0 5 9 1 2 4 -2 2 -0 1 4 1 2 4 -2 2 -0 2 8 1 2 4 -2 2 -0 3 3 1 2 4 -1 7 -0 7 3 1 2 4 -1 8 -0 7 2 1 2 4 -2 4 -0 0 2 1 2 4 -1 8 -0 2 91 2 4 -1 7 -0 3 9 1 2 4 -1 8 -0 3 5 1 2 4 -2 2 -0 2 9 1 2 4 -2 2 -0 3 2 1 2 4 -3 4 -0 0 4 1 2 4 -1 8 -0 1 0 1 2 4 -1 8 -1 1 0 1 2 4 -1 8 -0 7 3 1 2 4 -1 3 -0 2 51 2 4 -2 4 -0 3 1 1 2 4 -2 4 -0 0 3 1 2 4 -2 2 -0 1 3 1 2 4 -1 7 -0 7 4 1 2 4 -1 8 -0 3 0 1 2 4 -1 8 -0 7 4 1 2 4 -2 2 -0 0 1 1 2 4 -2 3 -0 7 0 1 2 4 -1 8 -0 0 8 1 2 4 -1 8 -0 3 6 1 2 4 -2 2 -0 1 2 1 2 4 -2 2 -0 3 0 1 2 4 -1 7 -0 7 8 1 2 4 -2 4 -0 3 0 1 2 4 -2 4 -0 0 4 1 2 4 -1 8 -0 0 6 1 2 4 -1 8 -0 3 7 1 2 4 -1 8 -0 6 2 1 2 4 -1 8 -0 7 5 1 2 4 -1 3 -0 2 4 1 2 4 -2 2 -0 0 8 1 2 4 -2 3 -0 6 9 1 2 4 -1 7 -0 7 5 1 2 4 -1 9 -0 1 91 2 4 -2 2 -0 1 1 1 2 4 -1 8 -0 3 8 1 2 4 -1 8 -0 6 1 1 2 4 -1 8 -0 7 61 2 4 -2 2 -0 3 1 1 2 4 -2 2 -0 0 2 1 2 4 -2 3 -0 6 8 1 2 4 -1 7 -0 7 6 1 2 4 -1 8 -0 0 4 1 2 4 -2 2 -0 1 0 1 2 4 -1 8 -0 0 9 1 2 4 -1 8 -0 6 0 1 2 4 -1 8 -0 7 7 1 2 4 -1 9 -0 2 01 2 4 -2 4 -0 0 5 1 2 4 -1 8 -0 0 7 1 2 4 -1 8 -0 3 9 1 2 4 -2 4 -0 3 4 1 2 4 -2 3 -0 6 7 1 2 4 -1 7 -0 7 7 1 2 4 -1 8 -0 8 4 1 2 4 -1 8 -0 8 3 1 2 4 -2 4 -0 2 9 1 2 4 -2 2 -0 0 7 1 2 4 -2 2 -0 0 9 1 2 4 -1 9 -1 1 3 1 2 4 -2 2 -0 0 3 1 2 4 -1 8 -1 1 3 1 2 4 -1 8 -0 0 5 1 2 4 -1 8 -0 4 0 1 2 4 -1 8 -0 8 2 1 2 4 -1 0 -0 2 5 1 2 4 -2 3 -0 6 6 1 2 4 -1 8 -0 7 81 2 4 -2 3 -0 4 0 1 2 4 -2 4 -0 3 5 1 2 4 -1 8 -0 4 1 1 2 4 -1 9 -0 1 7 1 2 4 -1 9 -1 1 41 2 4 -2 4 -0 2 8 1 2 4 -1 8 -0 5 9 1 2 4 -2 4 -0 0 6 1 2 4 -2 4 -0 4 5 1 2 4 -2 2 -0 0 6 1 2 4 -2 3 -0 4 1 1 2 4 -2 3 -0 6 5 1 2 4 -1 8 -0 0 2 1 2 4 -1 8 -0 4 2 1 2 4 -1 8 -0 7 9 1 2 4 -1 9 -0 2 2 1 2 4 -1 9 -0 2 3 1 2 4 -2 2 -0 0 41 2 4 -2 4 -0 3 6 1 2 4 -2 3 -0 5 7 1 2 4 -1 8 -0 5 8 1 2 4 -1 8 -0 8 1 1 2 4 -1 9 -0 1 61 2 4 -2 4 -0 2 7 1 2 4 -1 9 -0 2 41 2 4 -2 3 -0 4 2 1 2 4 -2 3 -0 6 4 1 2 4 -1 8 -0 4 3 1 2 4 -2 4 -0 0 7 1 2 4 -2 4 -0 4 4 1 2 4 -1 8 -0 0 1 1 2 4 -1 8 -0 8 5 1 2 4 -2 4 -0 3 7 1 2 4 -2 2 -0 0 5 1 2 4 -2 3 -0 5 6 1 2 4 -1 9 -0 1 5 1 2 4 -1 9 -0 2 51 2 4 -2 4 -0 2 6 1 2 4 -2 3 -0 4 3 1 2 4 -2 3 -0 6 3 1 2 4 -1 8 -0 4 8 1 2 4 -1 8 -0 5 7 1 2 4 -1 8 -0 8 0 1 2 4 -1 9 -0 1 4 1 2 4 -1 9 -0 2 61 2 4 -2 4 -0 4 3 1 2 4 -2 3 -0 5 5 1 2 4 -1 8 -0 4 4 1 2 4 -2 4 -0 0 8 1 2 4 -2 4 -0 3 8 1 2 4 -2 3 -0 4 4 1 2 4 -2 3 -0 6 2 1 2 4 -1 8 -0 5 61 2 4 -2 4 -0 2 5 1 2 4 -2 3 -0 2 6 1 2 4 -1 8 -0 8 6 1 2 4 -1 9 -0 1 31 2 4 -2 4 -0 4 6 1 2 4 -1 9 -0 2 71 2 4 -1 8 -0 4 51 2 4 -2 4 -0 4 2 1 2 4 -2 3 -0 5 4 1 2 4 -1 8 -1 1 4 1 2 4 -1 8 -0 8 8 1 2 4 -2 4 -0 0 9 1 2 4 -2 4 -0 3 9 1 2 4 -2 3 -0 4 5 1 2 4 -2 3 -0 6 1 1 2 4 -1 8 -0 8 7 1 2 4 -1 9 -0 1 2 1 2 4 -1 9 -0 2 8 1 2 4 -2 4 -0 4 7 1 2 4 -2 3 -0 3 9 1 2 4 -2 3 -0 2 7 0 0 0 -0 0 -0 0 0 1 2 4 -1 8 -0 5 3 1 2 4 -1 8 -0 5 5 1 2 4 -1 8 -0 8 9 1 2 4 -1 9 -0 7 3 1 2 4 -2 3 -0 5 31 2 4 -2 4 -0 4 1 1 2 4 -2 3 -0 4 6 1 2 4 -1 9 -0 1 1 1 2 4 -1 9 -0 2 9 1 2 4 -2 3 -0 6 0 1 2 4 -1 8 -0 4 7 1 2 4 -1 8 -1 1 5 1 2 4 -1 8 -0 9 0 1 2 4 -1 9 -0 3 61 2 4 -2 4 -0 5 6 1 2 4 -2 4 -0 4 8 1 2 4 -2 3 -0 2 8 1 2 4 -2 3 -0 5 2 1 2 4 -1 9 -0 3 71 2 4 -2 4 -0 2 4 1 2 4 -2 4 -0 1 0 1 2 4 -2 4 -0 4 0 1 2 4 -2 3 -0 4 7 1 2 4 -1 8 -0 5 2 1 2 4 -1 8 -0 9 1 1 2 4 -1 9 -0 7 21 2 4 -2 3 -0 3 8 1 2 4 -1 8 -0 5 4 1 2 4 -1 9 -0 3 51 2 4 -2 4 -0 4 9 1 2 4 -2 3 -0 2 9 1 2 4 -2 3 -0 5 1 1 2 4 -1 9 -0 3 0 1 2 4 -2 4 -0 5 5 1 2 4 -2 3 -0 1 4 1 2 4 -1 8 -0 5 1 1 2 4 -1 9 -0 7 11 2 4 -2 3 -0 4 8 1 2 4 -2 3 -0 5 9 1 2 4 -1 8 -0 9 2 1 2 4 -1 9 -0 1 0 1 2 4 -2 4 -0 1 1 1 2 4 -2 4 -0 5 0 1 2 4 -2 3 -0 3 7 1 2 4 -2 3 -0 3 0 1 2 4 -2 3 -0 5 0 1 2 4 -1 8 -0 9 3 1 2 4 -1 9 -0 3 1 This map is a product of the City of Palo Alto GIS 1 2 4 -2 4 -0 5 4 1 2 4 -1 8 -0 5 0 1 2 4 -1 9 -0 0 9 1 2 4 -1 9 -0 3 41 2 4 -2 3 -0 1 51 2 4 -2 4 -0 2 3 1 2 4 -2 3 -0 2 5 1 2 4 -2 3 -0 3 6 1 2 4 -2 3 -0 3 11 2 4 -2 4 -0 1 2 1 2 4 -2 4 -0 5 1 1 2 4 -2 3 -0 4 9 1 2 4 -1 8 -0 9 4 1 2 4 -1 9 -0 3 2 1 2 4 -1 9 -1 1 51 2 4 -1 9 -0 3 8 1 2 4 -2 4 -0 5 3 1 2 4 -2 3 -0 1 6 1 2 4 -2 3 -0 5 8 1 2 4 -1 8 -0 4 9 1 2 4 -1 8 -1 0 11 2 4 -2 4 -0 2 2 1 2 4 -2 4 -0 1 3 1 2 4 -2 3 -0 2 4 1 2 4 -2 3 -0 3 5 1 2 4 -2 3 -0 3 2 1 2 4 -1 9 -0 0 8 1 2 4 -1 9 -1 1 2 1 2 4 -1 8 -1 0 0 1 2 4 -1 8 -0 9 5 1 2 4 -1 9 -0 3 3 1 2 4 -1 9 -0 6 8 1 2 4 -2 4 -0 2 1 1 2 4 -2 4 -0 5 2 1 2 4 -2 3 -0 1 71 2 4 -2 4 -0 1 4 1 2 4 -2 3 -0 2 3 1 2 4 -2 3 -0 3 4 1 2 4 -1 9 -0 0 7 1 2 4 -1 9 -0 6 71 2 4 -2 3 -0 0 1 1 2 4 -1 8 -0 9 61 2 4 -2 4 -0 2 0 1 2 4 -2 3 -0 1 81 2 4 -2 4 -0 1 5 1 2 4 -2 3 -0 3 3 1 2 4 -1 9 -1 1 1 1 2 4 -1 9 -0 4 0 1 2 4 -2 3 -0 7 4 1 2 4 -2 5 -0 2 3 1 2 4 -1 8 -0 9 9 1 2 4 -1 9 -0 4 1 1 2 4 -1 9 -0 6 6 1 2 4 -2 4 -0 1 9 1 2 4 -2 3 -0 0 2 1 2 4 -2 5 -0 2 2 1 2 4 -1 9 -0 0 5 1 2 4 -1 9 -0 4 2 1 2 4 -1 9 -0 6 51 2 4 -2 3 -0 1 9 1 2 4 -1 8 -0 9 7 1 2 4 -1 9 -0 8 71 2 4 -2 4 -0 1 6 1 2 4 -2 3 -0 1 3 1 2 4 -1 9 -0 0 61 2 4 -2 3 -0 7 3 1 2 4 -1 9 -1 1 6 1 2 4 -1 9 -0 4 31 2 4 -2 4 -0 1 8 1 2 4 -2 3 -0 0 3 1 2 4 -2 5 -0 2 1 1 2 4 -2 5 -0 2 4 1 2 4 -1 8 -0 9 81 2 4 -2 3 -0 2 0 1 2 4 -1 9 -0 8 8 1 2 4 -1 9 -0 8 6 1 2 4 -2 3 -0 1 2 1 2 4 -2 3 -0 0 4 1 2 4 -2 3 -0 7 1 1 2 4 -2 5 -0 2 0 1 2 4 -2 5 -0 2 5 1 2 4 -2 6 -0 2 5 1 2 4 -1 9 -1 1 7 1 2 4 -1 9 -0 4 4 1 2 4 -1 9 - 1 2 4 -2 4 -0 1 7 1 2 4 -2 5 -0 2 6 1 2 4 -1 9 -0 0 3 1 2 4 -1 9 -0 4 51 2 4 -2 5 -0 1 9 1 2 4 -2 3 -0 0 5 1 2 4 -2 3 -0 2 1 1 2 4 -2 5 -0 2 7 1 2 4 -1 9 -0 0 2 1 2 4 -1 9 -0 6 4 1 2 4 -1 9 -0 8 2 1 2 4 -2 5 -0 0 1 1 2 4 -2 3 -0 1 1 1 2 4 -2 5 -0 1 8 1 2 4 -1 9 -0 4 6 1 2 4 -1 9 -0 8 5 1 2 4 -2 3 -0 0 6 1 2 4 -2 5 -0 2 8 1 2 4 -1 9 -0 0 1 1 2 4 -1 9 -0 4 7 1 2 4 -1 9 -0 6 31 2 4 -2 5 -0 0 2 1 2 4 -2 3 -0 1 0 1 2 4 -2 5 -0 1 7 1 2 4 -1 9 -0 5 3 1 2 4 -1 9 -0 8 3 1 2 4 -2 5 -0 2 9 1 2 4 -1 9 -0 5 5 1 2 4 -1 9 -0 6 2 0'308'1 2 4 -2 5 -0 5 1 1 2 4 -2 5 -0 1 6 1 2 4 -1 9 -0 8 9 1 2 4 -2 3 -0 0 9 1 2 4 -2 3 -0 0 7 1 2 4 -1 9 -0 8 4 1 2 4 -2 5 -0 0 3 1 2 4 -2 5 -0 3 0 1 2 4 -1 9 -0 4 81 2 4 -2 5 -0 1 5 1 2 4 -2 6 -0 0 5 1 2 4 -1 9 -0 5 41 2 4 -2 5 -0 5 0 1 2 4 -2 5 -0 0 4 1 2 4 -2 5 -0 3 1 1 2 4 -1 9 -0 6 1 1 2 4 -1 9 -0 9 01 2 4 -2 7 -0 5 0 tbotkin, 2023-04-11 08:46:59 (\\cc-maps\Encompass\Admin\Meta\View.mdb) This document is a graphic representation only of best available sources. The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto Item 4 Attachment A - Project Map Item 4: Staff Report Pg. 6 Packet Pg. 70 of 406 CHURCHILL AVENUE/ALMA STREET RAILROAD CROSSING SAFETY IMPROVEMENT PROJECT Bid Summary UNIT COST TOTAL COST UNIT COST TOTAL COST 1 Mobolization:1 LS $ 300,000.00 300,000.00$ $ 255,000.00 255,000.00$ 2 Caltrain ROW Coordination: 1 LS $ 50,000.00 50,000.00$ $ 60,000.00 60,000.00$ 3 Traffic Control:1 LS $ 175,000.00 175,000.00$ $ 225,000.00 225,000.00$ 4 Demolition:1 LS $ 75,000.00 75,000.00$ $ 200,000.00 200,000.00$ 5 Clear and Grubbing: 1 LS $ 5,000.00 5,000.00$ $ 50,000.00 50,000.00$ 6 Erosion Control:1 LS $ 15,000.00 15,000.00$ $ 30,000.00 30,000.00$ 7 Tree Preservation:1 LS $ 2,500.00 2,500.00$ $ 12,000.00 12,000.00$ 8 Handrail:80 LF $ 150.00 12,000.00$ $ 200.00 16,000.00$ 9 2" Grind and Overlay: 26,840 SF $ 10.00 268,400.00$ $ 8.00 214,720.00$ 10 Asphalt Deeplift:200 SF $ 8.50 1,700.00$ $ 50.00 10,000.00$ 11 Inert Recycle Construction Materials: 400 TON $ 20.00 8,000.00$ $ 30.00 12,000.00$ 12 6" Vertical Curb and Gutter: 180 LF $ 80.00 14,400.00$ $ 250.00 45,000.00$ 13 6" Vertical Curb:20 LF $ 60.00 1,200.00$ $ 100.00 2,000.00$ 14 Sidewalk Concrete: 1,950 SF $ 20.00 39,000.00$ $ 70.00 136,500.00$ 15 Curb Ramp:6 EA $ 8,000.00 48,000.00$ $ 13,000.00 78,000.00$ 16 Relocate Backflow Preventer: 1 EA $ 4,500.00 4,500.00$ $ 9,000.00 9,000.00$ 17 Utility Box Adjustment: 1 EA $ 2,500.00 2,500.00$ $ 1,500.00 1,500.00$ 18 Storm Drain Catch Basin" 1 EA $ 5,000.00 5,000.00$ $ 10,000.00 10,000.00$ 19 8" PVC Storm Drain Line: 9 LF $ 175.00 1,575.00$ $ 500.00 4,500.00$ 20 Sign Adjustment:1 EA $ 150.00 150.00$ $ 750.00 750.00$ 21 New Regulator Signage: 1 EA $ 350.00 350.00$ $ 600.00 600.00$ 22 Striping - Caltrans Detail 1 125 LF $ 5.00 625.00$ $ 3.00 375.00$ 23 Striping - Caltrans Detail 8 370 LF $ 5.00 1,850.00$ $ 3.00 1,110.00$ 24 Striping - Caltrans Detail 21: 80 LF $ 8.00 640.00$ $ 10.00 800.00$ 25 Striping - Caltrans Detail 22: 230 LF $ 10.00 2,300.00$ $ 12.00 2,760.00$ 26 Striping - Caltrans Detail 27B: 70 LF $ 5.00 350.00$ $ 5.00 350.00$ 27 Striping - Caltrans Detail 38: 70 LF $ 8.00 560.00$ $ 7.00 490.00$ 28 Striping - Caltrans Detail 38A: 50 LF $ 8.00 400.00$ $ 7.00 350.00$ 29 Striping - Caltrans Detail 39: 710 LF $ 5.00 3,550.00$ $ 5.00 3,550.00$ 30 12" Yellow Crosswalk Stripe: 280 LF $ 10.00 2,800.00$ $ 10.00 2,800.00$ 31 24" Yellow Ladder Crosswalk: 450 LF $ 15.00 6,750.00$ $ 20.00 9,000.00$ 32 24" White Stop Line: 40 LF $ 15.00 600.00$ $ 20.00 800.00$ 33 12" White Stop Line: 80 LF $ 10.00 800.00$ $ 10.00 800.00$ 34 4" White Stripe:45 LF $ 3.00 135.00$ $ 3.00 135.00$ 35 6" White Stripe:250 LF $ 5.00 1,250.00$ $ 5.00 1,250.00$ 36 Thermoplastic Pavement Marking: 1,010 SF $ 8.00 8,080.00$ $ 20.00 20,200.00$ 37 Green Thermoplastic Bike Lane: 1,100 SF $ 20.00 22,000.00$ $ 30.00 33,000.00$ 38 Traffic Signal:1 LS $ 500,000.00 500,000.00$ $ 400,000.00 400,000.00$ 39 Traffic Control Assembly: 1 LS $ 30,000.00 30,000.00$ $ 100,000.00 100,000.00$ 40 Service Equipment: 1 LS $ 10,000.00 10,000.00$ $ 15,000.00 15,000.00$ 41 Push Button Assembly Post: 2 EA $ 5,000.00 10,000.00$ $ 5,000.00 10,000.00$ 42 Traffic Signal Box: 12 EA $ 500.00 6,000.00$ $ 2,500.00 30,000.00$ 43 Traffic Signal Conduit and Conductors: 1 LS $ 100,000.00 100,000.00$ $ 240,000.00 240,000.00$ 44 Loop Detector Replacement: 1 LS $ 15,000.00 15,000.00$ $ 20,000.00 20,000.00$ 1,752,965.00$ 2,265,340.00$ % Over/Under Engineer's estimate 29% O'Grady Paving, Inc. Base Bid Total (Items 001 through 044) BID ITEM BASE - DESCRIPTION APPROX. QTY UNIT ENGINEER'S ESTIMATE Item 4 Attachment B - Bid Summary Item 4: Staff Report Pg. 7 Packet Pg. 71 of 406