HomeMy WebLinkAboutStaff Report 2303-122610.Approval of a one-year General Services contract with Stephen Ciari Plumbing and
Heating, Inc. for Backflow Prevention Devices Testing, Repair, and Certification Services
and Approval of a FY 2023 Budget Amendment in the General Fund; CEQA Status –
Categorically Exempt 15301 and 15302
City Council
Staff Report
From: City Manager
Report Type: CONSENT CALENDAR
Lead Department: Public Works
Meeting Date: June 19, 2023
Report #:2303-1226
TITLE
Approval of a one-year General Services contract with Stephen Ciari Plumbing and Heating, Inc.
for Backflow Prevention Devices Testing, Repair, and Certification Services and Approval of a FY
2023 Budget Amendment in the General Fund; CEQA Status – Categorically Exempt 15301 and
15302
RECOMMENDATION
Staff recommends that Council:
1. Approve and authorize the City Manager or their designee to execute contract
C23187444 with Stephen Ciari Plumbing and Heating, Inc. in the amount of $146,308 for
Backflow Prevention Device Testing, Repair, and Certification Services; and
2. Authorize the City Manager or their designee to negotiate and execute one or more
change orders to the contract with Stephen Ciari Plumbing and Heating, Inc. for related,
additional but unforeseen work which may develop during the contract period, the total
value of which shall not exceed $14,630; and
3. Amend the Fiscal Year 2023 budget appropriation for the General Fund (requires a 2/3
vote) by:
a) Increasing the Public Works Department Public Services Division operating budget
ongoing contract expenses expenditure by $55,911;
b) Increasing the Community Services Department Parks Division operating budget
ongoing contract expenses expenditure by $55,911; and
c) Decreasing the Budget Stabilization Reserve by $111,822.
BACKGROUND
In accordance with State law, backflow prevention devices require annual testing and
certification. The testing of City of Palo Alto-owned backflow prevention devices must follow
current regulations of the California State Department of Public Health contained in Title 17 of
the California Administrative Code, Chapter 5, Subchapter 1, Group 4, Sections 7583 through
7604.
ANALYSIS
Scope Overview
The City has about 400 backflow devices that need to be tested and certified annually. Prior to
starting work, the contractor is required to meet with City of Palo Alto Cross Connection
Control Staff from the Utilities Department, who will provide prefilled test forms and tags for
known devices. The annual inspections will occur in July, and repairs or replacements will
immediately follow. There are also miscellaneous inspections, repairs, or replacements that
happen throughout the year.
Bid Process
On March 14, 2023, a notice inviting formal bids for Backflow Prevention Device Testing, Repair,
and Certification Services was posted on the PlanetBids website. The bidding period was 15
days. Bids were received from two qualified contractors on March 28, 2023, as listed on the
attached Bid Summary (Attachment A).
Summary of Bid Process
Bid Name/Number
Backflow Prevention Devise Testing,
Repair, and Certification Services
RFQ #187444
Proposed Length of Contract Three Years
Total Days to Respond to Bid 15
Number of Bids Received 2
Bid Price Range $457,791 to $693,979
Staff has reviewed the submitted bids and recommends that the bid of $457,791 submitted by
Stephen Ciari Plumbing and Heating, Inc. be accepted and that Stephen Ciari Plumbing and
Heating, Inc. be declared the lowest responsible bidder. The award of contract1 includes the
base bid, but for a term of one year rather than the three-year term originally included in the
procurement. The change order amount of $14,630 (which equals 10 percent of the total
1 Stephen Ciari Plumbing and Heating, Inc C23187444: https://www.cityofpaloalto.org/files/assets/public/public-
works/public-services/contracts/contract-c23187444-stephen-ciari-plumbing-and-heating-inc.pdf
contract) is requested for related, additional but unforeseen work which may develop during
the contract term. Staff confirmed with the Contractor's State License Board that the contractor
has an active license on file. Staff also confirmed with the California Department of Industrial
Relations (DIR) that the contractor has an active DIR registration.
Contract Cost Increases
The prior three-year contract was $122,325. The new three-year contract total as submitted by
the low bidder was $457,791. As a comparison, individual inspection costs under the previous
contract were $75 whereas for the new contract, they are ranging from $229 to $611.
Prevailing and union wage rates have substantially increased in the last three years.
Additionally, the prior contractor had significant and ongoing performance issues in completing
the required work, which may have been related to their lower costs in comparison to other
contractors. Staff contacted other local cities to ask for cost comparisons, but was unable to
obtain comparisons. Several cities stated that they perform this work in-house. Staff also
contacted one of the contractors who downloaded the bid package but chose not to submit a
bid. The contractor verbally stated a price higher than the two bids that were received as the
bid they had developed but decided not to submit.
Given the significantly higher cost of the new contract, staff recommends approval of a one-
year contract rather than the three-year contract originally intended under the procurement.
After further review, staff believes that the tight timeframe requirement to complete all testing
and any needed repairs may have contributed to higher bids. Staff is reevaluating this
requirement and will adjust the contract specifications to provide greater flexibility to bidders
and complete a new procurement prior to the expiration of the recommended one-year
contract. Additionally, the Utilities Department is considering a potential in-house model under
which Utilities staff would conduct backflow prevention device testing for all water utility
customers.
FISCAL/RESOURCE IMPACT
Funding for a portion of the first year of the Backflow Prevention Device Testing, Repair, and
Certification Services contract is available in the Fiscal Year 2023 Public Works Department and
Community Services Department operating budgets. For the remaining portion, staff
recommends increasing the Fiscal Year 2023 budget by $55,911 in the Public Works operating
budget and by $55,911 in the Community Services operating budget, and decreasing the Budget
Stabilization Reserve (BSR) by $111,822. This draw would reduce the BSR to $52.8 million, this
reserve level is 19% of General Fund expenses, above the Council target of 18.5% however,
impact the estimates used to develop the FY 2024 Proposed Budget as this use was not
included.
STAKEHOLDER ENGAGEMENT
Ten contractors were notified through Planetbids for this solicitation. Staff will be notified if
testing or repair work will be disruptive in their workspace.
ENVIRONMENTAL REVIEW
This contract is categorically exempt from the California Environmental Quality Act (CEQA)
under Sections 15301 and 15302 of the CEQA guidelines as an alteration to an existing facility
and no further environmental review is necessary.
ATTACHMENTS
Attachment A: Bid Summary for Backflow Prevention Devices Testing, Repair, and Certification
Services
APPROVED BY:
Brad Eggleston, Director Public Works/City Engineer
Bid Summary
Backflow Prevention Devices Testing, Repair, and Certification Services
RFQ187444
Vendor Name Bid Amount
Stephen Ciari Plumbing and Heating, Inc.$457,791.35
Backflow Prevention Specialists $693,979.19