Loading...
HomeMy WebLinkAboutStaff Report 14891 (2) City of Palo Alto (ID # 14891) City Council Staff Report Meeting Date: 12/5/2022 Report Type: Action Items City of Palo Alto Page 1 Title: Staff and the Council Sustainability and Climate Action (S/CAP) Ad Hoc Committee Recommend That Council Review and Provide Feedback to Staff on the Draft 2023-2025 S/CAP Work Plan and Direction on Governance of the Work Plan From: City Manager Lead Department: Utilities Recommendation Staff and the Council Sustainability and Climate Action Plan (S/CAP) Ad Hoc Committee recommend that Council: 1. Review and provide feedback to staff on the draft 2023-2025 S/CAP Work Plan (Attachments A and B) 2. Provide direction on governance of the 2023-2025 S/CAP Work Plan Executive Summary On October 3, 2022, the City Council accepted the Sustainability and Climate Action Plan (S/CAP) Goals and Key Actions (Staff Report 146061). That document lists the detailed actions needed to achieve the City’s 80x30 goal,2 but does not provide guidance on task prioritization or implementation timeline. The 2023-2025 S/CAP Work Plan is meant to guide staff efforts on the S/CAP over the next three years by prioritizing and providing more detail on implementation of the Key Actions accepted by Council on October 3, 2022. The Work Plan is contingent on completion of environmental review, which is underway and expected to come to Council for action in spring 2023. The draft 2023-2025 S/CAP Work Plan is split between a Climate Action section, which focuses on work items that achieve the City’s 80x30 goal, and a Sustainability section, which focuses on improving the City’s environmental impact in ways that are not primarily focused on reducing greenhouse gas emissions, but focus on critically important co-benefits that contribute to overall climate action. 1 Staff Report 14606 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/agendas- minutes/city-council-agendas-minutes/2022/20220927/20220927pccsmlinked-amended-v2.pdf#page=79 2 Achieving 80% reductions in greenhouse gas emissions from 1990 levels by 2030. City of Palo Alto Page 2 The Climate Action section focuses on launching higher potential, lower cost emissions reduction programs, building community confidence in the S/CAP, and laying the foundation for post-2025 work. The Sustainability section focuses on reducing waste, creating a sustainable and holistically managed water system, adapting to a changing climate, and enhancing the City’s thriving urban canopy. Included in the draft 2023-2025 S/CAP Work Plan are: • Priorities for 2023-2025 Climate Action work (Attachment A, Section 2.I, pg 3) • 51 Climate Action work items (Attachment A, Section 2.III, pp 5-17) and 27 Sustainability work items (Attachment A, Section 3, pp 18-23) • Policy guidelines for development of a Reliability and Resiliency Strategic Plan (Attachment A, Appendix C, pg 29) Policy guidelines for development of an Electric Vehicle Strategic Plan (Attachment A, Appendix D, pg 30) Background Attachment C provides a detailed history of the S/CAP to date. Staff began California Environmental Quality Act (CEQA) review of the S/CAP upon Council’s October 3, 2022 acceptance of the S/CAP Goals and Key Actions, with the goal of formally adopting the full S/CAP report in early 2023. The 2023-2025 Work Plan will guide staff work after adoption, and there is a great deal of staff work included in the 2023-2025 S/CAP Work Plan that can proceed even before formal adoption. Discussion There are two sections to the draft 2023-2025 S/CAP Work Plan: Climate Action and Sustainability. Climate Action P1. Complete grid modernization plan and begin construction to increase reliability and transformer capacity for electrification P2. Launch effective programs for emissions reductions with the highest impact and lowest cost, including single-family electrification, strategic promotion of electric vehicles (EVs), commercial rooftop heating, ventilation, and air conditioning (HVAC), and expanded transportation alternatives P3. Build community awareness and confidence in electrification through engagement, addressing concerns, and program results P4. Identify an additional 9% in emissions reduction opportunities to achieve the 80x30 goal P5. By 2024, identify funding needed and potential funding sources for full scale implementation of highest impact emissions reductions Table 1 below summarizes how these priorities are implemented in 2023-2025. Staff will City of Palo Alto Page 3 focus on increasing electric grid capacity while launching high potential, lower cost programs focused on residential heat pump water heaters (HPWH), commercial packaged rooftop heating, ventilation, and air conditioning (HVAC), and previously funded transportation programs. Funding needs and sources for these high potential programs will be evaluated. Studies on accelerating EV charger penetration in multi- family buildings (including affordable housing) and providing EV chargers in workplaces and business districts will be completed. Publicly-owned EV charging may also be part of the solution; and the Bicycle/Pedestrian Plan will be updated. A study of potential multi-family and non-residential electrification opportunities will be completed. This work will be performed with the intent of building community confidence in the City’s emissions reduction efforts, which will require results, engagement, and some focus on electric system reliability and resiliency. Table 1: Climate Action Priorities: Summary of Work Items and Timeline Priority 2023 (after certification of environmental review)3 2024 2025 P1 (Modernize grid) • Grid modernization study completion, hire contractor • Reliability/Resiliency Strategic Plan • Begin a 5-7 year construction effort to increase reliability and transformer capacity • Implement Reliability and Resiliency Strategic Plan P2 (Launch programs) Design and launch programs: • Full-scale HPWH program • Pilot commercial HVAC • Municipal electrification • Downtown parking management program • On-demand transit pilot • Single-family whole home • Full-scale commercial HVAC • Full-scale multi-family EV charger • Design and launch additional programs based on the 2024 studies (See P4 for other studies that may result in new programs) and the EV Strategic Plan Studies to guide program launches: • EV Strategic Plan • Multi-family and income- qualified EV charging plan • • Bicycle/Pedestrian Plan update • Commuter emissions reduction strategic plan • Workplace and visitor EV charger strategic plan • Vision Zero program P3 (Build Continued public engagement and marketing. Report results from new and existing programs: 3 It may be possible for some work to proceed prior to certification of environmental review, but other items may need environmental review to be completed prior to Council action (e.g. hiring a contractor for grid modernization work) City of Palo Alto Page 4 Priority 2023 (after certification of environmental review)3 2024 2025 awareness and confidence) • New program: HPWH pilot • Existing programs: • Existing Mobility programs • Multi-family EV charger • New programs: Full-scale HPWH program, commercial HVAC pilot • Continuation of existing programs • New programs; Full- scale HVAC, multi- family EV charger • Continuation of existing programs To address reliability and resiliency concerns, implement “Next Steps” from 8/16/21 Energy Storage report (Staff Report 121944) as time permits P4 (Additional emissions reductions) • Seek ideas from community members and other experts • Multi-family and non- residential electrification study P5 (Funding needs and sources) • Evaluate costs for full scale implementation of high potential/lower cost emissions reductions • Preliminary evaluations of potential funding sources • Decisions on how to fund priority electrification areas Sustainability The Sustainability section of the draft work plan implements the S/CAP goals for a sustainable natural environment (including reducing waste, creating a sustainable and holistically managed water system, and a thriving urban canopy) by: • Reducing water consumption while exploring ways to capture and store water, and increase the availability and use of recycled water • Developing and adopting a multi-year Sea Level Rise Adaptation Plan • Minimizing wildland fire hazards through Foothills Fire Management Plan implementation, zoning, and collaborating with Fire agencies • Increasing Palo Alto’s Tree Canopy and reducing pesticide usage in parks and open space preserves • Supporting the Green Stormwater Infrastructure (GSI) Plan and incorporating it in municipal projects • Encouraging food waste reduction, prevention, and recovery and providing waste prevention technical assistance • Eliminating single-use disposable containers and prioritizing domestic processing 4 Staff Report 12194 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/agendas- minutes/city-council-agendas-minutes/2021/08-august/20210816/20210816pccsm-final.pdf City of Palo Alto Page 5 of recyclable materials The Sustainability section Key Actions were prioritized based on the co-benefits analysis conducted by the City’s consultant, AECOM. The draft 2023-2025 S/CAP Work Plan implements the direction of the S/CAP Ad Hoc Committee as put forth in the October 3rd City Council Motion (October 3 Action Minutes, page 45) to refer to S/CAP Ad Hoc committee to begin work on the following and present to the City Council by yearend an outline of: 1. Identification of community partner organizations and how they can help support the S/CAP moving forward 2. Preliminary committee review of a prospective commercial HVAC electrification program (E2) 3. An EV strategic plan (EV1-10) It does this by creating a work plan and timeline for taking action on the items listed above. Governance There is a range of oversight work involved in the development and implementation of S/CAP programs. Staff has identified three main categories: • Policy-level strategic guidance: These are highly visible decisions with significant policy or political implications. For example, the Council S/CAP Ad Hoc Committee provided guidance on where to focus the City’s initial efforts on emissions reduction, resulting in the Advanced Heat Pump Water Heater Pilot Program approved October 3, 2022, the S/CAP Goals and Key Actions, and the 2023-2025 draft S/CAP Work Plan. • Oversight of ongoing work: As S/CAP work efforts or programs are launched an oversight body or bodies will need to be available to receive progress updates and make ongoing policy decisions as they arise. An example might be reports on various S/CAP key performance indicators (KPIs) or periodic status updates on the Advanced Heat Pump Water Heater Pilot Program after it launches. • Operational-level strategic guidance: These are decisions with significant operational impacts that require in-depth technical discussions. An example is the discussions of low-wattage EV charging solutions and how they relate to grid modernization undertaken by the S/CAP Committee. The in-depth detailed level of these discussions can be overwhelming to a body with a broad set of oversight responsibilities instead of a narrow set of responsibilities. At its April 19, 2021 meeting Council directed the Mayor to convene an S/CAP Ad Hoc Committee which has provided recommendations to Council on S/CAP-related policy 5 October 3 Action Minutes, page 4 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes- reports/agendas-minutes/city-council-agendas-minutes/2022/20221003/20221003amccsm.pdf#page=4 City of Palo Alto Page 6 decisions and prioritization. Staff is requesting that Council provide direction on continuing governance in 2023 as staff completes the S/CAP Update work and begins work on implementation. Some alternatives include: • Managing with the full Council • Delegating to the Council Finance or Policy and Services Committee • Forming another Council Ad Hoc Committee • Delegating to an existing Board or Commission • Developing a new Commission 1. Full Council or Council Committee Staff recommends against attempting to manage the entire S/CAP with the full Council or even a standing Council committee, since the complexity of the effort could potentially be overwhelming given the volume of other business. Certain issues might lend themselves to delegation to specific standing committees. For example, discussion of funding sources and needs might be appropriate to the Finance Committee. 2. Council Ad Hoc Committee A new ad hoc committee, while temporary in nature, could provide policy direction while a longer-term governance structure is being established. If a new ad hoc committee were established, staff would recommend clearly stating the expected term and scope of responsibilities. Establishing a new ad hoc could also facilitate the continuation of involvement and input from community members who have been involved as Working Group and Working Group Team contributors over the past year. Designating a member of the new ad hoc committee as the Utilities Advisory Commission liaison could also be an effective means to connect the related work of the two bodies. Staff would also recommend establishing ways for the Council to delegate some work to other bodies with feedback from the ad hoc committee to ensure coherence of the overall work plan. Once the work plan is approved (anticipated mid-2023), there will be a high volume of work to be reviewed and discussed, and an ad hoc committee may not be able to keep up on its own. 3. Existing Board or Commission The other existing bodies with expertise relevant to the S/CAP are the Utilities Advisory Commission (UAC), the Planning and Transportation Commission (PTC), and the Parks and Recreation Commission (PRC). Although all of these bodies have some responsibilities relevant to the S/CAP, the UAC’s role reviewing utility programs, utility finances, and utility infrastructure is by far the most relevant to much of the core work in the work plan. Additionally, the PTC reviews transportation policy and zoning code provisions that can affect how electrified equipment is installed, and the PRC serves in an advisory role on implementation of Urban Forestry programs relevant to the S/CAP’s Natural Environment goals. Oversight of the entire S/CAP would represent a very significant expansion of oversight City of Palo Alto Page 7 responsibilities for any of the bodies, but each could make recommendations to Council or a Council Ad Hoc Committee on specific issues. 4. Climate Action Commission In the longer-term, Council could consider a new Commission with responsibility for S/CAP oversight. At its October 3, 2022 meeting, Council directed staff to bring information on the design of a Climate Action Commission that would include student members when returning with the draft work plan. A Climate Action Commission may need to coordinate closely with other Commissions such as the UAC or PTC on specific issues, and potentially eliminate certain issues from those commissions’ areas of responsibility in order to avoid duplication and provide clarity. This would be necessary to provide a single body for oversight of the S/CAP Climate Action programs. Staff’s initial estimate is that support of the new Commission would require an additional 0.25 to 0.33 FTE of admin time not currently budgeted. Table 2 provides staff’s initial assessment of the design parameters for a Climate Action Commission. Table 2: Design Parameters of a Potential Climate Action Commission Appointees 5 or 7 members, including 1 or 2 student members Meeting Frequency Monthly or Semi-monthly during more intensive S/CAP program development in next 2-3 years; less frequently during ongoing implementation activities thereafter Meeting Requirements Subject to Brown Act; all meetings publicly noticed and including public participation Role Forum for discussion and recommendations to Council on S/CAP program development and implementation; requires analysis and definition to avoid overlap with advisory roles of other Boards and Commissions Implementation Steps Council decisions on size and scope; update to Municipal Code to codify new Commission; address staffing requirements; Commissioner application process; Council interviews and Commission selection; commence Commission activity Likely Minimum Time to Commence 1 – 1 ½ years Given the emphasis on strategic studies and program development during the first one to two years of the work plan, it is most important to obtain Council guidance on S/CAP governance over that initial timeframe. Timeline The timeline for this draft work plan is calendar years 2023 through 2025. Many elements of the work plan are contingent on certification of environmental review, City of Palo Alto Page 8 expected in spring 2023. A more detailed timeline for individual work items is included in Attachment B. Resource Impact Subject to certification of the S/CAP environmental review, the FY 2023 work items in the 2023-2025 draft S/CAP Work Plan can proceed with the actions approved in the FY 2023 Adopted Budget. Staff expects to submit additional resource requests as part of the annual budget process in subsequent years as the work plan proceeds for the following areas: • Funding for newly-launched programs: As new programs are proposed for launch, funding for third-party program operators, rebates, and other expenses may be recommended to manage the programs. • Program sales and marketing: Additional resources (consultants and/or staffing) may be needed for sales and marketing of future programs. Council partially approved these resources along with its October 3, 2022 approval of the Advanced Heat Pump Water Heater pilot program (Staff Report 146066). • Permit review: Permit activity associated with new programs will create a need for permit review staff and/or consultants. Council approved permit review resources for the Advanced Heat Pump Water Heater Pilot Program (Staff Report 146067), but not for future programs. These resource requests will be recommended to be funded by increased permit revenue. • Capital budgets for grid modernization: Additional engineering staffing has already been approved for grid modernization work, but capital budgets for design and construction work have not yet been proposed. Staff will recommend projects as part of the development of the 2024-2028 five-year Capital Improvement Plan. • Consulting budgets: Consulting budgets for calendar year 2023 and 2024 studies may be proposed in the FY 2024 budget if needed. Some items in other work plans are also relevant to the S/CAP Work Plan. The Utilities Strategic Plan, for example, includes workforce development and advanced metering infrastructure (AMI) work items that are directly relevant to the S/CAP. Some of these may involve future budget requests as well. Policy Implications The 2023-2025 S/CAP Work Plan aligns with one of the top four Council Priorities for CY 2022: “Climate Change - Protection and Adaptation.” Stakeholder Engagement 6 Staff Report 14606 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/agendas- minutes/city-council-agendas-minutes/2022/20220927/20220927pccsmlinked-amended-v2.pdf#page=79 7 Staff Report 14606 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/agendas- minutes/city-council-agendas-minutes/2022/20220927/20220927pccsmlinked-amended-v2.pdf#page=79 City of Palo Alto Page 9 Wide-reaching and coordinated public engagement was done as part of the S/CAP Update prior to acceptance of the proposed S/CAP Goals and Key Actions. Feedback from these engagement processes informed development of the draft 2023-2025 S/CAP Work Plan. For a summary, please see the Stakeholder Engagement section of Staff Report 146068, packet page 101. Additional engagement on the 2023-2025 S/CAP Work Plan included a meeting with the Council S/CAP Ad Hoc Committee’s Working Group on November 4, 2022. Staff incorporated the Working Group’s feedback and are developing an overall set of guiding principles that will be included in the S/CAP Report. These principles will guide implementation of the S/CAP. Environmental Review Staff commenced CEQA evaluation of the S/CAP, including the Work Plan elements described in this staff report, upon Council’s October 3, 2022 acceptance of the proposed S/CAP Goals and Key Actions. Once CEQA review concludes, staff will bring a complete S/CAP report and a formal Work Plan to Council for adoption. Any formal government actions stemming from work items in the S/CAP 2023-2025 Work Plan that occur prior to completion of the S/CAP’s CEQA review will be independently evaluated on a project by project basis. Attachments: • Att A: 2023-2025 S/CAP Work Plan • Att B: 2023-2025 S/CAP Work Plan Timeline • Att C - Background on Sustainability and Climate Action Plan 8 Staff Report 14606 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/agendas- minutes/city-council-agendas-minutes/2022/20220927/20220927pccsmlinked-amended-v2.pdf#page=101 Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 1 of 32 DRAFT City of Palo Alto Sustainability and Climate Action Plan Implementation Work Plan (2023 through 2025) Table of Contents: 1. Executive Summary 2. 2023-2025 Climate Action Section Work Plan: Making Progress on the 80x30 Goal i. Climate Action 2023-2025 Priorities ii. Summary Timeline, 2023-2025 iii. Climate Action 2023-2025 Work Plan 3. 2023-2025 Sustainability Section Work Plan: Creating a More Sustainable Natural Environment Appendix A: Detailed Implementation Timeline Appendix B: How Climate Action Priorities were Prioritized Appendix C: Policy Guidelines for Electric Vehicle Strategic Plan Development Appendix D: Policy Guidelines for Reliability and Resiliency Strategic Plan Development Appendix E: Index of S/CAP Key Actions and the Work Plan Items that Implement them 1. Executive Summary This work plan implements the City’s Sustainability and Climate Action Plan (S/CAP). In November 2016 the Council adopted the S/CAP Framework, which has served as the road map for achieving Palo Alto’s sustainability goals. On October 3, 2022, the City accepted an updated set of Goals and Key Actions and is performing CEQA review with the goal of formally adopting the S/CAP in spring of 2023. This work plan implements this updated set of Goals and Key Actions. The Goals and Key Actions are divided into eight areas, four of which are climate-focused and include actions to achieve the City’s “80x30”1 and carbon neutrality2 goals (Climate Action, Mobility, Electric Vehicles, and Buildings) and four of which are focused on actions that create a sustainable natural environment and adapting to a warming climate but do not contribute significantly to the 80x30 goal (Natural Environment, Zero Waste, Water, and Sea Level Rise). Based on Council’s acceptance of the S/CAP Goals and Key Actions, staff and the Ad Hoc Subcommittee developed five Climate Action priorities for 2023 through 2025, which are listed in Section 2.i below: It includes a variety of work items for achieving these priorities, including: • Promoting electric vehicles (EVs) for residents, commuters, visitors, and other users (e.g. deliveries, rideshare) and regionally, including micromobility (e-bikes, e-scooters, and other small EVs). • Reducing vehicle miles traveled through citywide Mobility programs, including parking management, piloting on- demand transit, implementing the City’s Housing Element, and updating the Bicycle Plan • Launching an Advanced Heat Pump Water Heater Pilot Program and scaling it up 1 The 80x30 goal is to reduce Palo Alto greenhouse gas emissions 80% from 1990 levels by 2030 2 Carbon neutrality means that all GHG emissions emitted into the atmosphere are balanced in equal measure by GHGs that are removed from the atmosphere, either through carbon sinks or carbon capture and storage Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 2 of 32 • Beginning a strategic upgrading of capacity in the residential areas of the electric grid and promoting whole home electrification in the upgraded areas • Expanding access to EV charging in multi-family buildings (including affordable housing) and exploring ways to electrify those buildings as well • Electrifying commercial rooftop packaged heating, ventilation, and air conditioning (HVAC). • Partnering with major employers on emissions reduction plans, including commuter emissions • Electrifying City buildings and vehicles where feasible • Engaging City operations to support these goals • Exploring additional emissions reduction opportunities by surveying multi-family and non-residential building equipment and exploring other ideas from the community (e.g. shuttles, shared vehicles) • Evaluating funding and resource needs of the above programs and identifying viable funding sources. This work plan implements the S/CAP goals for a sustainable natural environment (including reducing waste, creating a sustainable and holistically managed water system, and a thriving urban canopy) by: • Reducing water consumption while exploring ways to capture and store water, as well as to increase the availability and use of recycled water • Developing and adopting a multi-year Sea Level Rise Adaptation Plan • Minimizing wildland fire hazards through Plan implementation, zoning, and collaborating with Fire agencies • Increasing Palo Alto’s Tree Canopy and reducing pesticide use in parks and open space preserves • Supporting the Green Stormwater Infrastructure (GSI) Plan and incorporating GSI in municipal projects • Encouraging food waste reduction, prevention, and recovery and providing waste prevention technical assistance • Eliminating single-use disposable containers and prioritizing domestic processing of recyclable materials Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 3 of 32 2. 2023-2025 Climate Action Section Work Plan: Making Progress on the 80x30 Goal The Climate Action section of the S/CAP focuses on achieving the City’s 80x30 goal, and includes goals and key actions primarily focused on reducing emissions in transportation and buildings. The climate action sections of the S/CAP itself are divided into four topic areas (Climate Action, Mobility, EVs, and Energy), but this work plan is intended to prioritize and organize those key actions, so work plan items are organized according to five 2023-2025 Climate Action section priorities. 2.i 2023-2025 Climate Action Section Priorities The following five priorities are intended to focus the City’s efforts on the highest potential and lowest cost emissions reduction actions and supporting efforts to enable the City’s programs in these areas to be as impactful as possible. Appendix B outlines how the highest priority emissions reduction actions were chosen (single-family residential electrification, expanding EV charging access, commercial rooftop packaged HVAC, and Mobility). EV charging is a complex topic with a variety of different types of vehicle owner needs and potential electric grid impacts and benefits, and Appendix C outlines the guiding principles the City used for developing electric vehicle charging work items. These principles will also be reflected in any studies done on EVs or EV programs developed. The 2023-2025 climate action section priorities are: P1. Complete grid modernization plan and begin construction to increase reliability and transformer capacity for electrification P2. Launch effective programs for emissions reductions with highest impact and lowest cost: single-family electrification, strategic promotion of EVs, commercial rooftop HVAC, and expanded transportation alternatives P3. Build community awareness and confidence in electrification through engagement, addressing concerns, and program results P4. Identify an additional 9% in emissions reduction opportunities to achieve the 80x30 goal P5. By 2024 identify funding needed and potential funding sources for full scale implementation of highest impact emissions reductions Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 4 of 32 2.ii 2023-2025 Climate Action Summary Timeline The proposed timeline for the 2023-2025 Climate Action section work items (which are listed below in section 2.c) is outlined below. The proposed timeline is contingent on certification of environmental review and may be modified accordingly. A more detailed timeline for each work plan item is included in Appendix A. Priority 2023 2024 2025 P1 (Modernize grid) • Grid modernization study completion, hire contractor • Reliability/Resiliency Strategic Plan • Begin a 5-7 year construction effort to increase reliability and transformer capacity • Implement Reliability and Resiliency Strategic Plan P2 (Launch programs) Design and launch programs: • Full-scale HPWH program • Pilot commercial HVAC • Municipal electrification • Downtown parking management program • On-demand transit pilot • Single-family whole home • Full-scale commercial HVAC • Full-scale multi-family EV charger program (tentative) Design and launch additional programs based on the 2024 studies (See P4 for other studies that may result in new programs) and the EV Strategic Plan Studies to guide program launches: • EV Strategic Plan • Multi-family and income- qualified EV work plan • Bicycle Plan update • Work plan for commuter and visitor EV charging and EV promotion • Vision Zero program (tentative) P3 (Build awareness and confidence) Build awareness of the need for climate action and the City’s services and achievements. Drive community actions to achieve S/CAP goals. Build confidence in the City’s electric infrastructure. Report results from new and existing programs: • New program: HPWH pilot • Existing programs: • Existing Mobility programs • Multi-family EV charger • New programs: Full-scale HPWH program, commercial HVAC pilot • Continuation of existing programs • New programs; Full-scale HVAC, multi-family EV charger • Continuation of programs P4 (Additional emissions reductions) • Seek ideas from community members and other experts • Monitor technologies and medium term opportunities • Multi-family and non-residential electrification study • Study highest potential community ideas/technologies • Evaluate new programs based on studies P5 (Funding needs and sources) • Evaluate implementation cost for full scale high impact / lower cost programs • Preliminary evaluations of potential funding sources • Decisions on how to fund priority electrification areas • Develop financial and operational plan for gas utility • Implement follow up from prior-year studies Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 5 of 32 2.C Climate Action 2023-2025 Work Plan The climate change topic areas of the S/CAP (Energy, EVs, Mobility, and Climate Change) are highly inter-related. Multiple key actions can affect the same community members in various ways. For example, a multi-family building owner might do a project that builds EV charging, bike storage, and electrifies some building equipment, which touches all three topic areas. Programs should be as simple as possible for the community. As a result, the work plan below is organized according to the type of activity and the part of the community served instead of being organized by the S/CAP topic areas. The key actions being implemented are listed next to each work plan item, and an index is provided in Appendix D to help readers map the Key Actions from the S/CAP to all implementing work plan items. The work plan is organized according to the priorities above, as follows: P1. Grid Modernization: Complete grid modernization plan and begin construction to increase reliability and transformer capacity for electrification P2. Launch Programs: Launch effective programs for emissions reductions with highest impact and lowest cost: single-family electrification, strategic promotion of EVs, commercial rooftop HVAC, and expanded transportation alternatives P2.1 Residential Emissions Reduction P2.2 Non-Residential Emissions Reduction P2.3 Citywide Mobility P2.4 Municipal Electrification P2.5 EV Strategic Plan P3. Build Awareness and Confidence: Build community awareness and confidence in electrification through engagement, addressing concerns, and program results P4. Additional Emissions Reductions: Identify an additional 9% in emissions reduction opportunities to achieve the 80x30 goal P5. Funding Needs and Sources: By 2024 identify funding needed and potential funding sources for full scale implementation of highest impact emissions reductions Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 6 of 32 P1: Grid Modernization Grid modernization is critical, particularly for residential electrification. The programs below will impact the electric grid, and there are also supporting grid- related efforts that could reduce barriers to electrification citywide, such as examining electric rate design, low wattage solutions, and fee structures for transformer upgrades. Electric grid reliability and resilience will be important to inspiring confidence in electrified homes and vehicles. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 1.A Grid Modernization Study E8 Complete a grid modernization study covering scope, designs, high level cost estimates, and estimated implementation timelines for electric system upgrades. Recruitment challenges. Planning fully funded. Implementation funding needs under review. Dec ‘22: Complete study Dec ’23: Complete design, bring contractor on board Early 2024: Begin construction Consultant hired, study in progress, nearing release of initial draft study 1.B Reliability and Resiliency Strategic Plan E8 Develop Reliability and Resiliency strategic plan based on principles in Appendix D Fully staffed, funding needs under evaluation Dec 2023 Not started 1.C Reliability and Resiliency Strategic Plan Implementation E8 Implement Reliability and Resiliency Strategic Plan Staffing and funding needs to be evaluated To be evaluated as part of 1.B Policy guidelines for plan development to Council December 5, 2022 1.D Evaluate Utility Rates and Fees E6 Evaluate utility rate designs and fee structures in the context of future electrification, implement any needed changes Fully funded Mar 2023 Cost of service evaluation in progress P2.1: Residential Emissions The long-term goal in residential areas is full electrification of vehicles and buildings, but some electrification of some types of buildings is easier and less costly than others. Single-family homes tend to be easier and less costly to electrify than multi-family buildings. It is easier to install EV charger access as well. Grid capacity is an important consideration that drives the work plan in residential areas. The plan below prioritizes individual heat pump water heating electrification Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 7 of 32 (which is primarily in single-family homes, but also some multi-family) and EV charger access in multi-family homes. Individual heat pump water heaters have low grid impact compared to other electrification measures and can be installed citywide while grid modernization gets underway. In modernized neighborhoods electrification of space heating and other equipment and appliances can be promoted. The work plan for multi-family residential emissions reduction prioritizes EV charger access in multi-family homes. EV chargers are relatively easy to install without City assistance in single-family homes, but the City’s multi-family EV program will help multi-family building owners and condo associations install EV chargers so residents can access the savings and emissions reductions from EVs. This work plan includes development of a strategy to scale successful existing multi-family EV charging pilot programs to all multi-family buildings in Palo Alto. Multi-family building electrification requires more study to develop cost- effective strategies, since early studies and pilots have found multi-family building electrification to be very expensive. But more pilots in affordable housing projects, where grants and other funding might be available, would help the City get experience and develop strategies. All programs will be developed with equity in mind, considering how to serve low-income residents and renters. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) All Residential 2.1 A Promote EV Adoption EV1,EV4 Offer Workshops and Events to raise awareness of EVs, including electric micromobility options and incentives. Work item subject to change based on EV Strategic Plan (see 2.5A). Fully staffed and funded, staffing issues may impact this in the short term Ongoing In 2022 conduct 33 EV related workshops and expos. Contracting in progress to offer more awareness raising opportunites in 2023. 2.1 B Emissions Reduction Advisory Services C1 Provide single points of contact for online and phone advice for residents to reduce building and transportation emissions. Fully staffed and funded Dec ‘23: Phone advising Timeline for launch of online services under evaluation RFP responses evaluated and contract negotiations are in progress 2.1 C Evaluate small electric vehicles (e.g. e-bike) program potential EV4 Evaluate alternatives for providing residential small electric vehicle programs or pilots. Work item subject to change based on EV Strategic Plan (see 2.5A). Fully staffed and funded, though staffing issues may impact this in the short term Complete evaluation by December 2023 RFP being written Single-family Residential Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 8 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 2.1 D Heat Pump Water Heater Electrification Pilot Program E1,E5 Launch a pilot heat pump water heater electrification pilot to achieve 1000 gas water heater replacements by the end of 2023 Partly staffed and funded – sales/ marketing needs being evaluated Launch late 2022 / early 2023, aim to achieve goal by Dec 2023 Council approved program on October 3, staff implementing the plan 2.1 E Full-Scale Heat Pump Water Heater Electrification Program E1,E5 As pilot program nears its goals, transition to a full-scale program with the goal of electrifying all water heaters in Palo Alto Fully staffed for design, staffing / funding needs to be determined Based on pilot program progress, tentatively late 2023 Some preliminary analysis completed, otherwise not started. 2.1 F Electrification data collection program E1 Do home evaluations to collect data and help people plan for equipment or whole home electrification Fully staffed, funding needs under evaluation Program up and running by December 2023 Contract negotiations in progress 2.1 G Pilot Programs for Modernized Neighborhoods E1,E5 Identify and launch electrification programs for neighborhoods with increased electric capacity such as whole home or heat pump space heating pilot programs Fully staffed, funding needs under evaluation Program design and approvals by Dec 2024 Not started 2.1 H Single-family Electrification Rebates E1 Establish rebates for all appliances and equipment in single-family homes Fully staffed and funded Launch rebates by spring of 2024 Some analysis done, but moving slowly due to conflicting priorities Multi-family Residential 2.1 I Affordable Housing EV Charging and Electrification Pilot E5,EV5, EV7 Design a pilot electrification and EV project in an affordable housing multi-family building to test potential scalable approaches. Work item subject to change based on EV Strategic Plan (see 2.5A). Fully staffed, funding needs under evaluation Complete pilot design by December 2023 Partner identified, grant secured for EV charging, contract negotiations in progress for electrification pilot management, some analysis completed. Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 9 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 2.1 J Multi-Family EV Charger Program EV5,EV6 EV7 Establish rebates and EV charging technical assistance , with the goal of expanding charger access to 10% (1,100 units) of multifamily households. Work item subject to change based on EV Strategic Plan (see 2.5A). Fully staffed and funded Aiming for 1,100 units by December 2025 100+ multifamily properties actively proceeding in programs to install EV chargers 2.1 K Multi-family and Affordable Housing Electrification and EV Charger Access Strategy Development C8,EV6, EV7,EV8 Evaluate potential scalable strategies for multi-family and affordable housing EV charger and electrification programs, including the role of publicly-owned EV charging, such as in rights-of-way. Work item subject to change based on EV Strategic Plan (see 2.5A). Fully staffed and funded for evaluation, implementation needs TBD Complete evaluation by December 2023 Evaluating responses to RFP issued for multi-family electrification services, analyses of potential program designs / funding sources in progress. P2.2: Non-Residential Emissions City staff has less experience and knowledge with electrification of non-residential building equipment than with electrification of other types of building equipment. In section 6 of this work plan there are several studies planned that could help staff develop building electrification strategies for the non-residential sector. In the meantime, rooftop packaged heating, ventilation, and air conditioning (HVAC) units are potentially cost-effective to electrify. This work plan includes running a small initial pilot while simultaneously designing a potential advanced pilot and evaluating the potential for mandated electrification for end of life replacements. These rooftop HVAC programs and/or mandates can reduce emissions in major facilities as well (see Section 5) In addition, staff plans to partner with major facility owners in Palo Alto to help them achieve their sustainability goals. Ideally these partnerships would include both building electrification, promotion of alternative transportation and EVs for commuters, and expanded EV charger access. A successful partnership with at least one major employer could provide an example that could lead to future employer partnerships, while a partnership with the schools could be an educational opportunity that leads to more awareness of electrification among residents. Staff estimates about a third of transportation emissions come from drivers entering Palo Alto to visit or do business. The City is limited in its ability to affect these emissions, but partnering regionally to promote alternative transportation modes and personal and fleet EVs should help. Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 10 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 2.2 A Rooftop Packaged Heating, Ventilation, and Air Conditioning (HVAC) Pilot E2,C8, E7 Continue HVAC pilot with the goal of completing 4-5 installations Fully funded December 2023 Program launched, recruiting participants 2.2 B Rooftop Packaged HVAC Advanced Pilot Design E2,C8, E7 Develop proposal for an advanced pilot program and/or mandate Fully funded Proposal to Council for approval by Dec 2023, implementation 2024 Not started 2.2 C Major Employer Partnerships C2,E2, E3,EV3, other Develop custom sustainability partnership with at least one major employer, electrification pilots with City facilities and PAUSD. Work item subject to change based on EV Strategic Plan (see 2.5A). Fully funded for design, not implementation Complete goals listed in “Description” column by December 2023 Preparing to start discussions with various employers and PAUSD 2.2 D Commuter Transportation and EV Charging Strategy C8,EV1, EV3,EV8 Develop a strategy to promote EV adoption (including small EVs like e-bikes/e-scooters) and alternative transportation to commuters. Evaluate workplace charger programs and/or mandates, including role of publicly owned business district EV charging. Work item subject to change based on EV Strategic Plan (see 2.5A). Fully staffed, consultant funding needs being evaluated. Implementation needs TBD. Complete plan by end of December 2024, implementation timeline TBD Not started 2.2 E Regional and State Partnerships EV2, EV10 Identify promising regional partnerships and State programs for potential City participation. Work item subject to change based on EV Strategic Plan (see 2.5A). Under evaluation Ongoing Not started Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 11 of 32 P2.3: Citywide Mobility Road transportation represents the largest percentage of Palo Alto’s existing carbon footprint – and a congestion headache. Reducing vehicle miles traveled is an important element in reducing these emissions. Reductions are achieved through a comprehensive citywide effort to increase access to alternative modes and awareness of the benefits complemented by programs for specific groups within the community. Land use is an important lever for affecting vehicle miles traveled. The City already has a variety of transportation programs and is addressing land use via its Comprehensive Plan process (including the Housing Element) and subsequent implementation. The work plan below acknowledges those efforts and aims to modestly expand them as staff time and funding permit. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 2.3 A Transportation and Land Use Policies and Programs M1 Continue to implement existing transportation policies and programs to reduce VMT Fully funded Ongoing Continuing to work on Council Transportation priorities including grade separation, street closures 2.3 B Housing Element Adoption M7, M9 Update the Housing Element for 2023-2031. Fully funded January 2023 Draft document being prepared for Council consideration 2.3 C Housing Element Implementation M7, M9 Implement the 2023-2031 Housing Element, which is projected to reduce VMT Funding via grants and annual City budget process 2031 Not started – awaiting Housing Element adoption 2.3 D Micro-mobility evaluations M2 Evaluate opportunities to pilot bike/scooter share and neighborhood mobility hub pilots to provide last-mile connections Proceed as staff time is available No target, proceed as time is available Some design work and research completed, staff aims to develop potential funding and/or staffing proposals as time permits. 2.3 E On-demand transit pilot M2 Launch on-demand transit pilot to provide last-mile connections for 100% of the city for a limited time Fully funded for two years Launch by Mar 2023 Reviewing proposals for on-demand transit provider 2.3 F Update Bicycle Plan M3 Update the 2012 Bicycle and Pedestrian Transportation Plan Fully funded Dec 2024 Awaiting consultant proposals in response to RFP issued in fall 2022 Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 12 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 2.3 G Vision Zero Program M3 Program to reduce roadway severe injuries and fatalities to zero Applied for grant funding for planning To be determined, depends on whether grant is received Applied for Federal Safe Streets for All grant to fund a safety action plan. Implementation would require additional staffing and funding 2.3 H Evaluate expansion of employer transportation demand management (TDM) M4 Evaluate possible alternatives to expand TDM ordinance requirements and/or voluntary TDM services (e.g. expanding the Transportation Management Association) Proceed as staff time is available No target, proceed as time is available Some design work and staff research has been done, staff exploring ways to fund and staff a study of options as time permits. 2.3 I Proposals for Managing Downtown Parking Availability M5 Develop proposals for pricing strategies to manage parking supply and availability Fully funded Fall 2022 Proposals to be shared with Council in Fall 2022 2.3 J Implement Efficient Downtown Parking Management M5 Implement proposals for pricing strategies to manage parking supply and availability Funding and staffing to be determined Spring 2023 RFP for management services in development 2.3 K Traffic Signal Improvements & Transit Signal Priority M8 Maintain and modernize current traffic signals and central management systems. Use technology to improve traffic operations and safety. Work with transit providers on transit signal priority where feasible. Mostly funded, long-term funding needs being evaluated Ongoing Long-term system plan in development. Supporting transit signal priority project for Dumbarton Express. Implementing Automated Traffic Signal Performance Measures to improve signal timing. Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 13 of 32 P2.4: City Facilities and Fleet Emissions A priority for the Council in development of the S/CAP was that we lead by doing. Electrification of City facilities and the vehicle fleet is a critical part of that. In addition, if increased publicly-owned EV charging becomes a part of multi-family and/or business district EV charger strategies (see P2.1K and P2.2D), a detailed plan for maintenance and operation will be needed. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 2.4 A Facility Electrification Assessment Plan E4 Complete an assessment of electrification opportunities at City facilities Fully funded Under evaluation Assessment of all City facilities is underway 2.4 B Facility Electrification Assessment Implementation E4 Implement recommendations from the Facility Electrification Assessment Plan where feasible Under evaluation Under evaluation Not started 2.4 C Electrify Equipment at City Facilities during Routine Replacement E4 Evaluate the feasibility of electrification when doing end of life equipment replacements Under evaluation Under evaluation On-going. The mechanical equipment at MSC-B is at the end of its service life and we are currently looking into electric replacement solutions 2.4 D Electrify City Vehicle Fleet EV9 Convert all Palo Alto municipal vehicles to EVs when feasible and when the replacement is operationally acceptable. Evaluated with each replacement On-going There are two units identified in FY23 for potential EV replacements, pending manufacturer availability and cost 2.4 E Build City Fleet and Employee Charging Infrastructure EV9,EV3 Expand charging at City facilities to support an electrified fleet and employee EV adoption Under evaluation Under evaluation We are currently testing a low cost EV charger solution that could be used for future employee charging locations 2.4 F Publicly-owned charger strategic plan EV8 Evaluate potential publicly-owned EV charger strategies. Work item subject to change based on EV Strategic Plan (see 2.5A). Staffing and funding needs under evaluation Residential plan – by Dec ‘23 (see P2.1 K) Business district plan – by Dec ‘24 (see P2.2 F) Not started Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 14 of 32 P2.5: Electric Vehicles Strategic Plan Several work plan items relate to electric vehicle promotion and programs to improve access to charging. Coordinating staff effort across a variety of efforts focused on many different parts of the community requires some level of coordination. This strategic plan will guide development of other work items. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 2.5 A Electric Vehicle Strategic Plan Development EV1 thru EV10 Develop a strategic plan based on principles in Appendix C to guide coordination of various work items, including 2.1 A, C, I, J, and K, 2.2 C, D, and E, and 2.4 F. Align with Reliability and Resiliency Strategic Plan (1B and 1C) Fully funded Under evaluation Policy guidelines for plan development to Council December 5, 2022 P3: Building Awareness and Confidence To achieve high participation in electrification programs and other emissions reduction efforts and continuing support for S/CAP climate action programs requires building community awareness and confidence through engagement, addressing concerns, and achieving program results. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 3.1 A Build awareness of the need for climate action and the benefits the City and its utility can provide N/A Achieve widespread awareness of the need for climate action and the City’s services and achievements, including low electric rates. Use partnerships and volunteers to help deliver the message. Fully staffed, partially funded Ongoing Sustainability hub and various other engagement efforts implemented. 3.1 B Drive community actions to achieve S/CAP goals N/A Run effective marketing and outreach that drives community action on S/CAP goals Under evaluation Ongoing Marketing plan in development Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 15 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 3.1 C S/CAP Survey Program N/A Continuing surveys of community sentiment and engagement to guide decision making and track certain key performance indicators Under evaluation Under evaluation – requires coordination with other City surveys Not started 3.1 D S/CAP Reporting N/A Ongoing reporting of S/CAP results, including key performance indicators Under evaluation Ongoing Annual reporting provided in Earth Day report, to be expanded to cover all S/CAP KPIs 3.1 E Build confidence in the City’s electric infrastructure N/A Communicate actions the City is taking to improve electric reliability and grid capacity, to help residents and businesses build resiliency, and successes in these areas Under evaluation Under evaluation – requires coordination with other City surveys Not started 4. Additional Emissions Reductions A variety of planning efforts are needed to achieve 80x30. Emissions reductions identified to date only achieve 71% from 1990 levels, so the City must identify additional reductions to achieve its 80x30 goals. The multi-family and commercial building sectors have the smallest contribution to the emissions reductions identified to-date, so this will be an area of focus where staff is likely to find the most additional emissions reductions. Note that carbon dioxide removal technologies are not included in this effort, these are part of a separate future study on the City’s carbon neutrality goal. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 4.A Multi-family and Commercial End Use Study C3,E9 Do end use study of commercial and multi-family buildings to identify potential building electrification measures Fully staffed, consultant funding needs being evaluated December 2024 Writing consultant RFP Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 16 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 4.B Idea generation and additional research C3, M10 Consult community members and experts (including Stanford) and research new technologies to identify other potential approaches to reducing emissions in Palo Alto Staffing and funding needs to be evaluated December 2024 Not started 4.C Additional Emissions Reduction Project Prioritization C3 Prioritize the most cost-effective approaches to achieving the additional emissions reduction needed to achieve 80x30 in establishment of next three-year work plan Staffing and funding needs to be evaluated December 2025 Not started 5. Funding Needs and Funding Sources A high-level assessment of resource needs and funding sources will be done by fall of 2023 to allow for Council discussions on potential funding sources in late 2023 and early 2024. The needs of low- and middle-income residents will be assessed as part of this effort. Full-scale implementation of high potential programs will cause significant reductions in gas utility sales, necessitating careful planning to manage contracting revenues and operational needs. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 5.A Resource Needs Assessment C4 Complete study of staffing and other resources needed for programs and operations to implement all 80x30 activities Fully staffed, consultant funding needs being evaluated Dec 2023 Writing consultant RFP 5.B Funding Alternatives C5, M5 Complete study of funding alternatives for 80x30, taking into account Federal policy such as the Inflation Reduction Act. Fully staffed, consultant funding needs being evaluated Dec 2023 Writing consultant RFP Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 17 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 5.C Affordability Study C6,E5 Identify vulnerable populations who may need help electrifying and subsidy needed Fully staffed and funded Dec 2023 Consultant beginning work 5.D Gas Utility Financial and Operating Plan N/A Develop a financial and operating plan for declining gas utility sales that maintains safety and solvency while providing affordable gas service to remaining gas users Staffing and funding needs to be evaluated Dec 2024 Not started Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 18 of 32 3. 2023-2025 Sustainability Section Work Plan: Creating a More Sustainable Natural Environment In Palo Alto, we have a Sustainability and Climate Action Plan (S/CAP) because we include sustainability areas that don’t necessarily have a direct impact on greenhouse gas reductions, but have critically important sustainability, public health and safety, regional, resource conservation, and equity benefits that contribute to overall climate action. The Sustainability area Key Actions were prioritized based on the co-benefits analysis conducted by AECOM. Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 8.A Maximize Water Conservation and Efficiency W1 Maximize cost-effective water conservation and efficiency through incentives, outreach/education, and other programs Fully funded On-going This is an on-going effort 8.B Design and build a salt removal facility for the Regional Water Quality Control Plant W2 Facility that will remove salt from the recycled water produced at the RWQCP resulting in an enhanced product Negotiating with Valley Water and the City of Mountain View Bring to Council for approval by 2023 Design is 90% complete. Council has not approved construction of the facility 8.C Develop a “One Water” Portfolio for Palo Alto W3 Develop a “One Water” Portfolio that includes stormwater, recycled water, on-site reuse, conservation, and groundwater Fully funded August 2023 Study underway by staff and consultant 8.D Develop a tool for dynamic water planning in the future W4 Excel-based tool for water planning Fully funded August 2023 Included as deliverable under One Water consulting contract 8.E Complete the Sea Level Rise Vulnerability Assessment S1 Complete a Sea Level Rise Vulnerability Assessment to identify risks and hazards to the Palo Alto Baylands, City infrastructure, and residential and business property, considering high tide, 100-year coastal storm event scenarios and rising shallow groundwater impacts Fully funded Fall 2022 Completed in Fall 2022 Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 19 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 8.F Develop a Sea Level Rise Adaptation Plan S2 Develop a Sea Level Rise Adaptation Plan with goals to 1) Preserve and Expand Habitat, and 2) Protect City and Community Assets, and Private Property Partially funded to develop the plan, and funding needed for plan and implementation 2024 Preparing a contract amendment AECOM so that we can move to the second phase of the project, which is to develop a Sea Level Rise Adaptation Plan over the coming months with the goal of bringing a plan to Council in 2024 8.G Begin design process for a levee projects S3 Determine levee alignment and begin design process for a levee project that protects the Palo Alto community from sea level rise, and incorporates other related priorities including habitat restoration, recreation, transportation, City facilities, and community properties Funded by US Army Corps of Engineers (50% Fed) and Valley Water / CA Coastal Commission (50% Non-Fed) *PA staff is participating in the analysis 2024 Levee alignment will be determined by 2024 8.H Identify Protection Strategies from Significant Flood Events at Newell Road Bridge S4 Complete Newell Road Bridge improvements Funded by Caltrans / local sponsor (SFCJPA) 2024 Preparing construction documents and initiating right-of-way aquisition 8.I Identify Protection Strategies from Significant Flood Events at Pope Chaucer Bridge and Creek S4 Complete Pope Chaucer Bridge and Creek widening improvements Applied for grants and secured partial funding through SFCJPA / partner agencies contributions 2025-2026 Analysing existing conditions within Creek to verify structural integrity Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 20 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 8.J Identify Protection Strategies from Significant Flood Events S4 Working with San Francisquito Creek Joint Powers Authority (SFCJPA) partner agencies to identify strategies to protect the community from flows that exceed the 70-year + storm event Part of SFCJPA operating budget – Palo Alto contributes 1/5 of operating budget On-going This is an on-going coordination effort with Stanford (the entity not the University) 8.K Implement Foothills Fire Management Plan S5 Implement the Foothills Fire Management Plan to balance conservation of natural resources with reduction of fire hazards especially in open space areas Partially funded On-going This is an on-going effort 8.L Minimize Fire Hazards Through Zoning S6 Minimize fire hazards by maintaining low density zoning in wildland fire hazard areas and enforcing building codes for fire resistant construction Staff available On-going This is an on-going effort 8.M Collaborate on Reducing Wildfire Hazards S7 Coordinate with other Fire agencies through the Santa Clara County Fire Chiefs Association and CalFire Staff available On-going This is an on-going effort 8.N Implement CAL FIRE Public Education Programs S8 Implement CAL FIRE recommended programs in educating and involving the local community to diminish potential loss caused by wildfire and identify prevention measures to reduce those risks Fully Funded On-going This is an on-going effort Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 21 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 8.O Increase Palo Alto’s Tree Canopy and establish a baseline and Key Performance Indicator for carbon storage of tree canopy N1 N5 Develop programs to plant trees to increase tree canopy – that will be integrated with traditional tree planting programs and Green Stormwater Infrastructure programs – and provide carbon sequestration, improve water quality, capture stormwater when feasible, and reduce the urban heat island effect Partially funded, Staff available as time permits Establish baseline by 2024 New canopy cover GIS tool recently launched, which will help establish a baseline 8.P Ensure No Net Tree Canopy Loss for all Projects N2 Ensure no net tree canopy loss for all Projects Staff available On-going This is an on-going effort to implement the updated Tree Ordinance (effective July 21, 2022) 8.Q Reduce Pesticide Use in Parks and Open Space Preserves N3 Continue to review the use of pesticides in all parks and open space preserves to identify opportunities to further reduce and eliminate the use of pesticides Staff available as time permits On-going This is an on-going effort 8.R Coordinate Implementation of City Natural Environment-Related Plans N7 Coordinate implementation of the Urban Forest Master Plan, Parks Master Plan, Green Stormwater Infrastructure Plan and other citywide planning efforts through interdepartmental collaboration Staff available as time permits On-going This is an on-going effort 8.S Support the Green Stormwater Infrastructure (GSI) Plan and incorporate GSI in Municipal Projects N10 N11 Establish policies and ordinance changes as needed to support the Green Stormwater Infrastructure Plan as required due to Municipal Regional Stormwater Permit Staff available as time permits; Partially funded through GSI On-going This is an on-going effort to achieve a 10% increase in land area that uses green stormwater infrastructure to treat urban water runoff Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 22 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 8.T Encourage Food Waste Prevention and Require Food Recovery from Commercial Food Generators ZW1 Encourage food waste prevention and require edible food recovery for human consumption from commercial food generators Staff and County funded program staff available; Funded for FY 2023, may need funding for FY 2024 On-going Began 1/1/2022 per SB1383 requirements 8.U Promote Residential Food Waste Reduction ZW2 Create a new campaign to promote residential food waste reduction Existing outreach funding Launch by July 2023 Campaign strategy in development, for launch by July 2023 8.V Champion Waste Prevention, Reduction, Reusables, and the Sharing Economy ZW3 Promote adoption of a “Zero Waste lifestyle”, stimulate value of reuse, repair Existing outreach funding for initial promotion of a “Zero Waste lifestyle”; may need future funding for stimulating reuse, repair On-going This is an on-going effort 8.W Provide Waste Prevention Technical Assistance to the Commercial Sector ZW4 Develop an outreach tool and technical assistance to the commercial sector Existing outreach funding Launch in 2023 Outreach tool and technical assistance in development, for launch in 2023 8.X Prioritize Domestic Processing of Recyclable Materials ZW5 Prioritize domestic processing of recyclable materials Request for additional $500,000 On-going Domestic processing for Mixed Paper and Mixed Rigid Plastics began April 2022. Went to Council in November 2022 to request additional funding Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 23 of 32 Work Item Key Action Description Resource Availability Target Completion Date Status (Dec 2022) 8.Y Eliminate Single-Use Disposable Containers ZW6 Eliminate single-use disposable containers by expanding the Disposable Foodware Ordinance Funded for Ordinance Requirement, need additional funding for infrastructure and implementation of future requirements Launch in 2024 Strategy and timeline in development, for launch in 2024 8.Z Expand the Deconstruction and Construction Materials Management Ordinance ZW7 Expand the Deconstruction and Construction Materials Management Ordinance Additional staff and funding needed Launch by January 2026 Expand types of covered projects or increase diversion requirements, collaborate with other Departments; consider including in next Reach Code Cycle to be implemented in January 2026 8.aa Implement Reach Code standard for Low Carbon Construction Materials ZW8 Implement Reach Code standard for low carbon construction materials If approved, additional staff and funding needed Launch January 1, 2023 Reach Code going to Council for approval in October 2022. If approved, will go into effect January 1, 2023 Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 24 of 32 Appendix A: S/CAP Work Plan Timeline 2023-2025 Sustainability Workplan.xlsx Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 25 of 32 Appendix B: How Climate Actions were Prioritized The chart below gives an overview of how various emissions reduction activities were prioritized based on various factors. Activities were divided up into four priority tiers: A. Prioritize for immediate action B. Prioritize in areas where grid modernization has been completed C. Requires additional study or stakeholder engagement to determine priority D. Prioritize only if resources are available A fuller blue bubble denotes a program that ranks more favorably when considering S/CAP implementation efforts. For example, a program with a full blue bubble in the “Total emissions reduction potential” column has more emissions reduction potential than one with a partially filled bubble. See next page for more detail. Activity Cost effective (per metric ton basis) Total emissions reduction potential Minimizes Electric Utility Impacts Policy leverage – City ability to impact Funding Source Availability Priority Tier Mobility – Bicycling / Alternative Modes C Visitor EV adoption D New buildings/ADU A Single-Family Water Heating A Space Heating (w/ A/C) B Space Heating (w/o A/C) B Other Building Equipment B Electric Vehicles A Multi-Family Building retrofits (1) C Electric Vehicles A Non-Residential Rooftop HVAC A Other building equipment (2) C Fleet Electrification D Commuter EVs Small/Med Business (1) B Major Facilities (1) B 1. Tentative ranking based on some preliminary ideas that need more exploration, which will take staff time 2. Tentative conclusion based on initial impact analysis, needs more study Insights: • Mobility and EVs are the most cost-effective actions and the City has significant policy leverage in the Mobility area. • The City has less policy leverage to drive EV adoption, but there are a few areas where it has potential policy leverage, such as increasing EV charger access. Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 26 of 32 • Electrification of single-family building equipment is worth prioritizing under most criteria. Heat pump water heaters can be promoted citywide. Other equipment should be promoted primarily in neighborhoods with upgraded utility infrastructure. • Commercial building rooftop packaged HVAC units are worth prioritizing and may have fewer electric utility impacts than other electrification measures. • More study is needed to identify other viable building electrification actions in the commercial sector. • More study is also needed on multi-family building electrification. How to Ratings were Determined: - Rating, high (filled bubble) to low (empty bubble) Cost effective (MT CO2-e)3 Total emissions reduction potential** Minimizes Electric Utility Impacts Policy leverage – City ability to impact Funding Source Availability* Deep cost savings >25,000 MT/yr No permit review, does not impact utilities City policy has high impact Resources / staffing available in existing budget, no added funds needed Modest cost savings 15,000 – 25,000 MT/yr Permit review, but rare utility upgrades Dedicated funding source under City control, sufficient for pilot programs Break even 10,000 – 15,000 MT/yr Permit review, causes some utility upgrades Lower cost ($0/MT -$200/MT) 5,000 – 10,000 MT/yr Frequent utility impacts, must develop programs to limit impact. No dedicated funding source for S/CAP pilots, grants may be available High cost (>$200/MT) Minimal potential Utility upgrades often needed, cannot be avoided Little or no ability to impact No dedicated funding source for S/CAP pilots * It may not be possible to use the same funding source to achieve all goals using the same funding source. For example, Low Carbon Fuel Standard revenue might be available to fund residential EV programs or workplace charging programs, but not both. ** This represents the full potential contribution of this type of activity to achieving the 80x30 goals, not just the emissions reductions associated with the 2022-2024 work plan. 3 Metric tons (MT) of carbon-dioxide equivalent (CO2-e), a common measure of greenhouse gas emissions quantity. Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 27 of 32 Climate Actions by Individual Prioritization Criteria Key Actions by Cost per Metric Ton of Carbon Dioxide Equivalent Reduced4 4 Cost per metric ton shown as a range from a low-cost scenario to a high-cost scenario Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 28 of 32 Total Citywide Emissions by Source (MT CO2-e)5 5 Metric tons (MT) of carbon-dioxide equivalent (CO2-e), a common measure of greenhouse gas emissions quantity. Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 29 of 32 Appendix C: Policy Guidelines for Electric Vehicle Strategic Plan Development Work item 2.5A calls for the development of an electric vehicles strategic plan, which would guide implementation of several work items. The strategic plan would also relate to a reliability and resiliency strategic plan to be developed in parallel. Objectives 1. Promote residential, workplace, and visitor electric vehicle adoption 2. Lower the cost and carbon emissions of EV charging as much as possible 3. Decrease the impact of electric vehicle charging on the local electric distribution system 4. Explore how electric vehicles could contribute to the efficient and reliable operation of the statewide and local electric system 5. Explore the use of electric vehicles for increased home resiliency 6. Evaluate the reliability and resiliency needs of an electrified transportation system and the City’s role in fulfilling those needs Concepts to explore adding to Strategic Plan • Scalable programs to provide charging for multi-family and income-qualified households • Scalable programs to provide workplace and visitor charging • The role of publicly-owned charging in providing multi-family, income-qualified, workplace, and visitor charging • How much high-speed charging is needed in Palo Alto and where it should be located • Business models to make commuter and visitor mid-day low-cost, low-carbon charging more attractive than overnight home charging • New technologies such as vehicle to load, vehicle to home, and vehicle to grid and their roles in providing home resiliency and improving the efficiency and reliability of the statewide and local electric systems • Lower wattage chargers and charging behaviors • Time of day pricing and other ways to encourage off-peak and mid-day charging • The role of smaller electric vehicles such as e-bikes and e-scooters in transportation emissions reduction • The role of regional partnerships in driving electric vehicle adoption for commuters and visitors Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 30 of 32 Appendix D: Policy Guidelines for Reliability and Resiliency Strategic Plan Development Work item 1B calls for the development of a reliability and resiliency strategic plan, which would guide implementation of reliability and resiliency work items. This would be coordinated with development of an electric vehicle strategic plan. Objectives 1. Maintain and improve electric system reliability 2. Improve utility outage communication 3. Prepare the electric system for increased penetration of solar, batteries, electric vehicles and chargers, electrified building equipment, and similar new technologies 4. Optimize the use of local grid capacity in a cost-effective way 5. Promote technologies and behaviors that contribute to the efficient and reliable operation of the statewide and local electric system Concepts to explore adding to Strategic Plan • Addressing utility workforce issues • Replacing aging infrastructure as part of a grid modernization plan • Installing additional switching and other solutions to improve reliability and recovery from outages as part of a grid modernization effort • Improving utility outage management system and communications protocols • Technologies like vehicle to load or vehicle to home for home resiliency • Equity in resiliency – how to provide resiliency to income-qualified residents • Neighborhood-level resiliency solutions such as microgrids and local utility-scale battery storage • Community emergency center resiliency • Mobile battery strategies, such as large electric vehicles that could double as emergency resiliency solutions • Promoting low-wattage electrification solutions to reduce grid impacts of vehicle and building electrification • Time of day pricing and other ways to encourage shifting electric use to times of day with lower emissions, lower utility cost, and lower local grid impact • Increasing transformer capacity to accommodate higher loads Appendix E: Index of Key Actions and the Work Items that Implement them Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 31 of 32 Key Action Title Work Item(s) C1. Provide Building and Transportation Emissions Consultations for Residents P2.1B C2. Develop Major Employer Custom Emissions Reduction Plans P2.2C C3. Study Additional Key Actions Needed for 80 x 30 P4.A, P4.B, P4.C C4. Study Staffing and Budgetary Needs P5.B C5. Study Funding Alternatives P5.C C6. Conduct an Electrification Affordability Study P5.D C7. Study Carbon Neutrality Options C8. Accelerate GHG reductions through Mandates or Price Signals P2.1K, P2.2A, P2.2B, P2.2D E1. Reduce GHG emissions in Single- Family Appliances and Equipment P2.1D, P2.1E, P2.1F, P2.1G, P2.1H E2. Reduce GHG emissions in Non- Residential Equipment P2.2A, P2.2B, P2.2C E3. Reduce Gas Use in Major Facilities P2.2C E4. Reduce Natural Gas Use at City facilities P2.4A, P2.4B, P2.4C E5. Support Income-Qualified Residents and Vulnerable Businesses with Electrification P5.D, P2.1D, P2.1I E6. Develop Electric Rate Options P1.D Key Action Title Work Item(s) E7. Use Codes and Ordinances to Facilitate Electrification P2.2A, P2.2B E8. Electric Grid Modernization Plan P1.A, P1.B, P1.C E9. Additional Electrification Opportunities in Commercial and Multi-Family Buildings P4.B EV1. Raise Awareness of Alternative Transportation Modes, Micromobility, and EVs. P2.1A, P2.2D EV2. Collaborate to Promote EV Adoption Regionally P2.2E EV3. Promote EV Adoption and Alternative Commutes for Commuters P2.2C, P2.2D EV4. Facilitate the Adoption of EVs, E- bikes and other Light EVs. P2.1A, P2.1C, P2.2D EV5. Promote Alternative Transportation Modes and Infrastructure To Support Adoption P2.1I, P2.1J EV6. Expand EV Charging Access for Multi-Family Residents P2.1J, P2.1K P2.4F EV7. Improve EV Charging Access for Income-Qualified residents P2.1I, P2.1J, P2.1K P2.4F EV8. Ensure EV Charging Capacity Supports EV Growth P2.1K, P2.2D, P2.4C P2.4F Key Action Title Work Item(s) EV9. Electrify Municipal Vehicle Fleet P2.4D, P2.4E EV10. Support Policy to Electrify Fleet Vehicles P2.2E M1. Increase Active Transportation and Transit for Local Work Trips P2.3A M2. Expand Availability of Transit and Shared Mobility Services P2.3D, P2.3E M3. Implement the Bicycle and Pedestrian Transportation Plan P2.3F, P2.3G M4. Improve Transportation Demand Management for Employees and Residents P2.3H M5. Implement Smart Parking Infrastructure in Public Garages and Parking Fees in Business Districts P5.C, P2.3I, P2.3J M6. Study Land Use and Transportation M7. Continue to Implement the City’s Housing Element P2.3B, P2.3C M8. Improve Transit and Traffic Flow P2.3K M9. Create Housing Density and Land Use Mix that Supports Transit and Non-SOV Transportation P2.3B, P2.3C M10. Encourage Reductions in GHGs and VMT P4.A, P4.C W1. Maximize Water Conservation and Efficiency 8.A W2. Build a Salt Removal Facility 8.B W3. Implement One Water Portfolio Projects 8.C W4. Develop a Dynamic Water Planning Tool 8.D Draft S/CAP Three-Year Work Plan – Updated Fall 2022 Page 32 of 32 Key Action Title Work Item(s) S1. Complete a Sea Level Rise Vulnerability Assessment 8.E S2. Implement a Sea Level Rise Adaptation Plan 8.F S3. Begin Design Process for a Levee Project 8.G S4. Identify Protection Strategies from Significant Flood Events 8.H, 8.I, 8.J S5. Implement the Foothills Fire Management Plan 8.K S6. Minimize Fire Hazards Through Zoning 8.L S7. Collaborate on Reducing Wildfire Hazards 8.M S8. Implement CAL FIRE Public Education Programs 8.N N1. Increase Palo Alto's Tree Canopy 8.O N2. Ensure No Net Tree Canopy Loss for all Projects 8.P N3. Reduce Pesticide Use in Parks and Open Space Preserves 8.Q N4. Enhance Pollinator Habitat N5. Establish a Carbon Storage of Tree Canopy Baseline and KPI 8.O N6. Maximize Biodiversity and Soil Health N7. Coordinate Implementation of City Natural Environment-Related Plans 8.R N8. Expand Water Efficient Landscape Ordinance (WELO) Requirements N9. Phase out Gas-Powered Lawn and Garden Equipment Key Action Title Work Item(s) N10. Support the Green Stormwater Infrastructure Plan 8.S N11. Incorporate Green Stormwater Infrastructure in Municipal Projects 8.S ZW1. Encourage Food Waste Prevention and Require Food Recovery from Commercial Food Generators 8.T ZW2. Promote Residential Food Waste Reduction 8.U ZW3. Champion Waste Prevention, Reduction, Reusables, and the Sharing Economy 8.V ZW4. Provide Waste Prevention Technical Assistance to the Commercial Sector 8.W ZW5. Prioritize Domestic Processing of Recyclable Materials 8.X ZW6. Eliminate Single-Use Disposable Containers 8.Y ZW7. Expand the Deconstruction and Construction Materials Management Ordinance 8.Z ZW8. Implement Reach Code standard for Low Carbon Construction Materials 8.aa 2023 - 2024 Sustainability and Climate Change – Protection and Adaptation Work Plan Last Updated ________Last Updated ________ Jan/Feb Mar/Apr May/June July/Aug Sep/Oct Nov/Dec Jan/Feb Mar/Apr May/June July/Aug Sep/Oct Nov/Dec Jan/Feb Mar/Apr May/June July/Aug Sep/Oct Nov/Dec P1.A Grid Modernization Study P1.B Reliability and Resiliency Strategic Plan Development P1.C Reliability and Resiliency Strategic Plan Implementation P2.1 A Promote EV Adoption P2.1 B Emissions Reduction Advisory Services P2.1 C Small electric vehicles (e.g. e bike) program P2.1 D Heat Pump Water Heater Electrification Pilot Program P2.1 E Full-Scale Heat Pump Water Heater Electrification Program P2.1 F Electrification data collection program P2.1 G Pilot Programs for Modernized Neighborhoods P2.1 H Single-family Electrification Rebates P2.1 I Affordable Housing EV Charging and Electrification Pilot P2.1 J Multi-Family EV Charger Program P2.1 K Multi-Family and Affordable Housing EV Charger Access Strategy P2.2 A Rooftop Packaged Heating, Ventilation, and Air Conditioning (HVAC) Pilot P2.2 B Rooftop Packaged HVAC Advanced Pilot Design P2.2 C Major Employer Partnerships P2.2 D Commuter Transportation & EV Charging Strategy P2.2 E Regional and State Partnerships P2.3 A Transportation and Land Use Policies and Programs P2.3 B Housing Element Adoption P2.3 C Housing Element Implementation P2.3 D Micro-mobility evaluations P2.3 E On-demand transit pilot P2.3 F Update Bicycle Plan P2.3 G Vision Zero Program P2.3 H Evaluate expansion of employer transportation demand management (TDM) P2.3 I Proposals for Managing Downtown Parking Availability Council adoption P2.3 J Implement Efficient Downtown Parking Management P2.3 K Traffic Signal Improvements & Transit Signal Priority P2.4 A Facility Electrification Assessment Plan Continue ongoing transportation programs, traffic management, and partnerships and land use regulatory activity Adopt plan Implementation of Housing Element programs as outlined in Housing Element and as funded via grants and annual budget requests Evaluate opportunities to pilot bike/scooter share and neighborhood mobility hub pilots to provide last-mile connections as staff time becomes available Launch Pilot Pilot program in operation 2.2. Non-Residential Emissions Reduction Programs Multi-Family Residential Single-Family Residential All Residential 2. 1 R e s i d e n t i a l E m i s s i o n s R e d u c t i o n P r o g r a m s Timeline to be determined, depends on staffing and funding availability Evaluate possible alternatives to expand TDM ordinance requirements and/or voluntary TDM services (e.g. expanding the Transportation Management Association) as staff time becomes available Complete evaluation of potentially scaalable strategies for multi-family and affordable housing EV charging and/or building electrification, including evaluating the role of publicly-owned EV charging Achieve installations at four to five sites through existing rooftop HVAC pilot program Program design and approvals Assuming grid modernization has made enough progress, launch program(s) Cost-effectiveness studies to determine rebate amounts, software configuration, launch preparation Rebate launch Complete pilot design, hire consultant Ongoing data collection Ongoing Ongoing Get phone advisory services up and running Determine work plan for online services, begin implementation Complete evaluation Program implmentation? To be determined depending on results of program evaluation and staffing and funding analysis. Ongoing program activity with the goal of providing EV charging in buildings representing 10% of multi-family units in Palo Alto by 2025 Complete evaluation of potentially scaalable strategies for multi-family and affordable housing EV charging and/or building electrification, including evaluating the role of publicly-owned EV charging+L20:U20 Ongoing program activity with the goal of providing EV charging in buildings representing 10% of multi-family units in Palo Alto by 2025 202520232024 Complete study, design, and bring contractor on board following certification of environmental review Construction to increase capacity Develop strategic plan Ongoing Priority 1. Grid Modernization 2.3 Citywide Mobility Staff and Consultant Work a t i o n Work to achieve program goals Do program evaluation, assuming advanced pilot program goals are on track to be met.Transition to full scale program Finalize S/CAP and 2021 GHG Inventory Finalize CEQA Documents S/CAP Implementation Complete 2022 GHG Inventory S/CAP Implementation Complete 2023 GHG Inventory S/CAP Implementation Start Work Plan Update Finalizing Facility Electrification Assessment Plan Implementation based on timelines in Reliability and Resiliency Strategic Plan Implement pilot project Complete evaluation and develop recommendations for future programs Implement any adopted commute or EV charging programs Develop work plan and identify promising partnerships Continued participation in chosen partnerships, exploration of new partnerships Continued participation in chosen partnerships, exploration of new partnerships Develop proposal for an advanced pilot program and/or mandate and present to Council Launch program and/or mandate if approved Ongoing program management, if program is approved Develop custom ermissions reduction and sustainability partnership with at least one major employer. Develop electrification pilots with City facilities and PAUSD Develop additional employer partnerships Develop additional employer partnerships Hire parking management consultant Ongoing program management Cl i m a t e C h a n g e ( B u i l d i n g s , M o b i l i t y , E V s ) Pr i o r i t y 2 : L a u n c h P r o g r a m s Hire consultant, kick off study Study completion and plan adoption Plan implementation Maintain and modernize current traffic signals and central management systems. Use technology to improve traffic operations and safety. Work with transit providers on transit signal priority where feasible. Ongoing program operation Get program up and running by December 2023 Ongoing data collection P2.4 B Facility Electrification Assessment Implementation P2.4 C Electrify Equipment at City Facilities during Routine Replacement P2.4 D Electrify City Vehicle Fleet P2.4 E Build City Fleet and Employee Charging Infrastructure P2.4 F Publicly-owned charger strategic plan P2.5A Electric Vehicle Strategic Plan Development P3.1 A Build awareness of the need for climate action P3.1 B Drive community actions to achieve S/CAP goals P3.1 C S/CAP Survey Program P3.1 D S/CAP Reporting CDP Report CDP Report CDP Report P3.1 E Build confidence in the City’s electric infrastructure P4 A Multi-family and Commerical End Use Study P4 B Idea generation and additional research P4 C Additional Emissions Reduction Project Prioritization P5 A Resource Needs Assessment P5 B. Funding Alternatives P5 C. Affordability Study P5 D. Gas Utility Financial and Operating Plan 8.A Maximize Water Conservation and Efficiency 8.B Design and build a salt removal facility for the Regional Water Quality Control Plant 8.C Develop a “One Water” Portfolio for Palo Alto 8.D Develop a tool for dynamic water planning in the future 8.E Complete the Sea Level Rise Vulnerability Assessment Completed 8.F Develop a Sea Level Rise Adaptation Plan 8.G Begin design process for a levee projects 8.H Identify Protection Strategies from Significant Flood Events at Newell Road Bridge 8.I Identify Protection Strategies from Significant Flood Events at Pope Chaucer Bridge and Creek 8.J Identify Protection Strategies from Significant Flood Events 8.K Implement Foothills Fire Management Plan 8.L Minimize Fire Hazards Through Zoning 8.M Collaborate on Reducing Wildfire Hazards 8.N Implement CAL FIRE Public Education Programs 8.O Increase Palo Alto’s Tree Canopy and establish a baseline and Key Performance Indicator for carbon storage of tree canopy 8.P Ensure No Net Tree Canopy Loss for all Projects 8.Q Reduce Pesticide Use in Parks and Open Space Preserves Develop programs to plant trees to increase tree canopy – that will be integrated with traditional tree planting programs and Green Stormwater Infrastructure programs – and provide carbon sequestration, improve water quality, capture stormwater when feasible, and reduce the urban heat island effect Establish baseline and Key Performance Indicator for carbon storage of tree canopy; implement programs to increase tree canopy On-going implementation of programs to increase tree canopy On-going effort to implement the updated Tree Ordinance (effective July 21, 2022) On-going effort to review the use of pesticides in all parks and open space preserves to identify opportunities to further reduce and eliminate the use of pesticides On-going work with San Francisquito Creek Joint Powers Authority (SFCJPA) partner agencies to identify strategies to protect the community from flows that exceed the 70-year + storm event On-going implementation of the Foothills Fire Management Plan to balance conservation of natural resources with reduction of fire hazards especially in open space areas Ongoing work to minimize fire hazards by maintaining low density zoning in wildland fire hazard areas and enforcing building codes for fire resistant construction On-going coordinatation with other Fire agencies through the Santa Clara County Fire Chiefs Association and CalFire On-gong implementation of CAL FIRE recommended programs in educating and involving the local community to diminish potential loss caused by wildfire and identify prevention measures to reduce those risks Preparing construction documents and initiating right-of-way aquisition Construction of Newell Road Bridge improvements Analysing existing conditions within Creek to verify structural integrity Prepare construction documents Construction of Pope Chaucer Bridge and Creek widening improvement Maximize cost-effective water conservation and efficiency through incentives, outreach/education, and other programs Design is 90% complete. Bring to Council for approval of construction of the facility Study underway by staff and consultant Implementation of a “One Water” Portfolio that includes stormwater, recycled water, on-site reuse, conservation, and groundwater Included as deliverable under One Water consulting contract Develop a Sea Level Rise (SLR) Adaptation Plan CEQA Review of Sea Level Rise Adaptation Plan Bring SLR Adaptation Plan to Council for Approval Implement Sea Level Rise Adaptation Plan Explore Public Charging Pilot Develop publicly-owned charger strategic plan Determine levee alignment for a levee project that protects the Palo Alto community from sea level rise, and incorporates other related priorities including habitat restoration, recreation, transportation, City facilities, and community properties Begin design process Complete multi-family and non-residential end use survey to identify promising emissions reduction opportunities, develop recommendations based on survey Continuing Council discussions of potential funding options Ongoing engagement, including Sustainability Newsletter, Climate Action Blog, Social Media, Sustainability Hub, Electrification Portal, Website Updates, Utility Bill Inserts, Workshops, webinars, and departmental collaboration Ongoing engagement, including Sustainability Newsletter, Climate Action Blog, Social Media, Sustainability Hub, Electrification Portal, Website Updates, Utility Bill Inserts, Workshops, webinars, and departmental collaboration On-going On-going marketing On-going Marketing Develop Surveys Conduct Surveys On-going Marketing Conduct Surveys Seek ideas for emissions reductions from community, experts. Monitor emerging technologies. Evaluate new programs based on findings of studies Study those ideas and technologies with highest potential Building City Fleet Infrastructure is on-going, assessing Employee Charging Infrastructure On-going On-going On-going On-going On-going On-going On-going On-going On-going Natural Environment Climate Adaptation and Sea Level Rise Water 2.4 City Facilities and Fleet Su s t a i n a b i l i t y a n d C l i m a t e A c t i o n P l a n ( S / C A P ) a n d C l i m a t e C h a n g e - P r o t e c t i o n a n d A d a p t a Su s t a i n a b i l i t y Priority 4. Studies and Analysis Priority 5. Funding Needs and Funding Sources Develop financial and operating plan for contracting gas utility Implement any follow-up actions from prior year studies Implement any follow-up actions from prior year studies 2.5 EV Strategic Plan Develop EV Strategic Plan to coordinate efforts on various EV work items Earth Day Report Earth Day Report Earth Day Report Priority 3: Build Confidence and Awareness Complete RFP for consultant to do end use survey. Summarize resource needs for a selection of pilots, advanced pilots, full-scale programs + commercial end-use research program Study funding options available to fund programs evaluated in work item 4.B for most promising electrification programs, present findings to Council. Complete affordability study to inform funding needs and program design 8.R Coordinate Implementation of City Natural Environment-Related Plans 8.S Support the Green Stormwater Infrastructure (GSI) Plan and incorporate GSI in Municipal Projects 8.T Encourage Food Waste Prevention and Require Food Recovery from Commercial Food Generators 8.U Promote Residential Food Waste Reduction 8.V Champion Waste Prevention, Reduction, Reusables, and the Sharing Economy 8.W Provide Waste Prevention Technical Assistance to the Commercial Sector 8.X Prioritize Domestic Processing of Recyclable Materials 8.Y Eliminate Single-Use Disposable Containers 8.Z Expand the Deconstruction and Construction Materials Management Ordinance 8.aa Implement Reach Code standard for Low Carbon Construction Materials Council Study Session on S/CAP Progress Report Council Study Session on S/CAP Progress Report Council Approval of Sea Level Rise Adaptation Plan Council certification of CEQA and adoption of S/CAP, Council Meeting on Earth Day Report CEQA Public Review S/CAP Implementation Resources, Updates, Outreach, and Webinars Cross-promotional efforts with external partners and COPA departments (e.g. Library) Cross-promotional efforts with external partners and COPA departments (e.g. Library) Cross-promotional efforts with external partners and COPA departments (e.g. Library) On-going effort to encourage food waste prevention and require edible food recovery for human consumption from commercial food generators. Began 1/1/2022 per SB1383 requirements. May need funding for FY 2024 Campaign strategy in development Implement campaign to promote residential food waste reduction On-going effort to promote adoption of a “Zero Waste lifestyle”and stimulate value of reuse, repair. On-going effort to promote adoption of a “Zero Waste lifestyle”and stimulate value of reuse, repair. May need funding for stimulating reuse, repair outreach Develop an outreach tool and technical assistance to the commercial sector Implement outreach tool and technical assistance to the commercial sector On-going effort to prioritize domestic processing of recyclable materials. Domestic processing for Mixed Paper and Mixed Rigid Plastics began April 2022. Developing strategy and timeline to eliminate single-use disposable containers by expanding the Disposable Foodware Ordinance Implement the expanded Disposable Foodware Ordinance Implement Reach Code standard for low carbon construction materials (pending Council approval in October 2022) Expand types of covered projects or increase diversion requirements, collaborate with other Departments; consider including in next Reach Code Cycle to be implemented in January 2026Determine the most effective way of expanding the Deconstruction and Construction Materials Management Ordinance On-going effort to coordinate implementation of the Urban Forest Master Plan, Parks Master Plan, Green Stormwater Infrastructure Plan and other citywide planning efforts through interdepartmental collaboration On-going effort to achieve a 10% increase in land area that uses green stormwater infrastructure to treat urban water runoff Zero Waste COUNCIL AND COMMISSION MEETINGS COMMUNITY ENGAGEMENT S/CAP Implementation Resources, Updates, Outreach, and Webinars S/CAP Implementation Resources, Updates, Outreach, and Webinars Background on Sustainability and Climate Action Plan (S/CAP) Development • April 2016: City Council adopted the ambitious goal of reducing GHG emissions to 80 percent below 1990 levels by 20301 (the “80 x 30” goal) - 20 years ahead of the State of California 80 x 50 target, and an interim step towards California’s new statewide goal of achieving carbon neutrality by 20452. • November 2016: the Council adopted the S/CAP Framework3, which has served as the road map for achieving Palo Alto’s sustainability goals. • December 2017: Council accepted the 2018-2020 Sustainability Implementation Plan “Key Actions” as a summary of the City’s work program4. • June 2020: The City launched an S/CAP update to determine the goals and key actions needed to meet its sustainability goals, including the 80 x 30 goal.5 • April 2021: Staff presented a preliminary impact analysis and Council directed the Mayor to form an S/CAP Ad Hoc Committee.6 • August 2021 to April 2022: The S/CAP Committee held several public meetings with City staff.7 • November 17, 2021: The S/CAP Ad Hoc Committee held the first meeting of its S/CAP Working Group, which assembled knowledgeable members of the community to consult with Council members and City staff on S/CAP implementation priorities. • December 13, 2021: Staff presented a Progress Report on the Sustainability and Climate Action Plan Update and S/CAP Ad Hoc Committee Work8 to Council. • March 7, 2022: Council and the Utilities Advisory Commission (UAC) held a joint study session9 to discuss sustainability and utility related items. 1 https://www.cityofpaloalto.org/news/displaynews.asp?NewsID=3534&TargetID=268 2 In September 2018, Governor Brown signed California Executive Order B-55-18, setting the goal of achieving carbon neutrality as soon as possible, and no later than 2045. The state is to maintain net negative net emissions after 2045, meaning that GHG sinks must exceed GHG sources. The Executive Order explains that the carbon neutrality goal is layered on top of the state’s existing commitments to reduce greenhouse gas emissions 40% below 1990 levels by 2030 (as codified in SB 32), and 80% below 1990 levels by 2050. 3 https://www.cityofpaloalto.org/civicax/filebank/documents/60858 4 https://www.cityofpaloalto.org/civicax/filebank/documents/63141 5 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/reports/city-manager- reports-cmrs/year-archive/2020/id-11404-climate_sustainability-and-climate-action- plan.pdf?t=59513.75 6 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/reports/city-manager- reports-cmrs/year-archive/2021/id-12009.pdf 7 https://www.cityofpaloalto.org/Departments/City-Clerk/City-Council-Committees/Sustainability-and- Climate-Action-Plan-Ad-Hoc-Committee 8 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/reports/city-manager- reports-cmrs/2021/id.-13765-s-cap-update.pdf 9 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/agendas-minutes/city- council-agendas-minutes/2022/20220307/20220307pccsmamendedfinal-linked.pdf • April 11, 2022: Staff presented the Earth Day Report10 to Council on April 11, 2022. The Earth Day Report described the work of the S/CAP Ad Hoc Working Group teams. • June 14, 2022: The S/CAP Ad Hoc Working Group Teams held a public meeting to discuss their progress on three areas that would advance residential building electrification goals: • Engagement. The work of this team included fine-tuning messaging on residential building electrification and developing a strategy and timeline for engagement. • Technology. The work of this team included reviewing current and emerging technologies and their feasibility for meeting the demands of a typical home and developing a strategy. The team also considered the influence of electrification technologies that are implemented on the electrical grid improvements that are needed. • Finance. The work of this team included prioritizing the most feasible funding strategies and developing a strategy for financing S/CAP Implementation. The working group teams also discussed an outline of a proposed Advanced Heat Pump Water Heater Pilot Program at the June 14 meeting. They agreed to have staff develop the outline into a more defined proposal. • September 27 and October 3, 2022: Staff and the S/CAP Committee recommended, and Council accepted, the S/CAP Goals and Key Actions that would be used for environmental review. Staff and the S/CAP Committee recommended the creation of an Advanced Heat Pump Water Heater Pilot program and Council took several actions to enable the program to be launched.11 10 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/reports/city-manager- reports-cmrs/2022/id.-14174-earth-day-report-2022-edr22.pdf 11 https://www.cityofpaloalto.org/files/assets/public/agendas-minutes-reports/agendas-minutes/city- council-agendas-minutes/2022/20220927/20220927pccsmlinked-amended-v2.pdf#page=79