Loading...
HomeMy WebLinkAboutStaff Report 14049 City of Palo Alto (ID # 14049) City Council Staff Report Meeting Date: 4/4/2022 City of Palo Alto Page 1 Title: Approval of Construction Contract Number C22181213 with Stronger Building Services in the Amount of $179,500 for the Mitchell Park Library Roof and Gutter Repair Project; Authorize the City Manager or their Designee to Negotiate and Execute one or more Change Orders for Related Additional but Unforeseen Work Not to Exceed $17,950; and Approval of a Budget Amendment for the Roofing Replacement Capital Project (PF-00006) in the Capital Improvement Fund From: City Manager Lead Department: Public Works Recommendation Staff recommends that Council: 1. Approve and authorize the City Manager or their designee to execute a construction contract with Stronger Building Services (Contract No. C22181213) in the amount of $179,500 for the Mitchell Park Library Roof and Gutter Repair Project, Capital Improvement Program Roofing Replacement Project PF-00006; 2. Authorize the City Manager or their designee to negotiate and execute one or more change orders to the contract with Stronger Building Services for related additional but unforeseen work which may develop during the project, the total value of which shall not exceed $17,950; and 3. Amend the Fiscal Year 2022 budget appropriation (by a 2/3 vote) for the Capital Improvement Fund by: a) Decreasing the Library Bond Proceeds Reserve in the Capital Improvement Fund Infrastructure Reserve (Ending Fund Balance) by $197,450; and b) Increasing the Roofing Replacement Project (PF-00006) appropriation by $197,450. Background The existing roof and gutter design at the northeast corner of the Mitchell Park Library has caused substantial water intrusion into the building. A temporary repair has been made to prevent further water damage. Staff worked with the original design consultants (at no cost to the City) to develop a permanent redesign solution for this roof and gutter area of the building. Discussion 14 Packet Pg. 179 City of Palo Alto Page 2 Project Description This project will reconstruct the roof and gutter system on the northeast corner of the Mitchell Park Library to prevent further water intrusion into the building. This CMR requests use of $197,450 of the remaining funds from the 2013 GO Bonds Project funding to complete this work under Project PF-00006. The remaining bond funds were not needed for the completion of the Mitchell Park Library and Community Center Project (PE-09006); however, the need for potential future repairs was identified during the close out of the project, and the remaining bond funding was retained in the Capital Improvement Fund as a Library Bond Proceeds Reserve. The City received the Bond Counsel’s legal clearance to use the GO Bond project funds for this repair. Bid Process On December 20, 2021, a notice inviting formal bids for the Mitchell Park Library Roof and Gutter Repair Project was posted online on the PlanetBids website. The bidding period was 44 days. Three responsive bids were received from contractors on February 1, 2022, as listed on the attached Bid Summary (Attachment A). Summary of Bid Process Bid Name/Number Mitchell Park Library Roof and Gutter Repair Project, Capital Improvement Program Project PF-00006 / IFB #181213 Proposed Length of Project 60 calendar days Total Days to Respond to Bid 44 Pre-Bid Meeting January 12, 2022 at 9:00 A.M. Number of Company Attendees at Pre-Bid Meeting 5 Number of Bids Received: 4 Bid Price Range $179,500 – $ 428,600 Staff reviewed all bids submitted and recommends that the bid of $179,500 submitted by Stronger Building Services be accepted and that Stronger Building Services be declared the lowest responsive and responsible bidder. The award of contract includes the base bid. The low bid is 2.6 percent above the engineer's estimate of $175,000. The contingency amount of $17,950 (which equals 10 percent of the total contract) is requested for related, additional but unforeseen work which may develop during the project. Staff confirmed with the Contractor's State License Board that the contractor has an active license on file. Staff also contacted the listed references for Stronger Building Services and found that they have performed satisfactorily on past construction projects for other clients. Resource Impact Funding for the Mitchell Park Library Roof and Gutter Repair Project is available in the Library Bond Proceeds Reserve in the Capital Improvement Fund Infrastructure Reserve (Ending Fund Balance). These funds represent leftover bond funding from the Mitchell Park Library and 14 Packet Pg. 180 City of Palo Alto Page 3 Community Center Project (PE-09006). When construction was completed on the new Mitchell Park Library and Community Center in 2014, the need for potential future repairs was known. Rather than return the leftover bond funding, it was decided to retain this funding for any necessary repairs in the future. In total $197,450 of these funds will be appropriated for the roofing repairs, leaving approximately $400,000 for additional repair needs at the Mitchell Park Library and Community Center. Policy Implications The recommendation does not represent any changes to existing City policy. Stakeholder Engagement The Mitchell Park Library Roof and Gutter Repair Project has been coordinated with the Library Department and does not conflict with any upcoming Public Works, Library, or Utilities Department projects. Construction is scheduled for 30 days. City staff will work with the contractor to schedule the most disruptive work during Library closed hours. Environmental Review This project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under Section 15301 of the CEQA Guidelines as repair, maintenance and/or minor alteration of existing facilities and no further environmental review is necessary. Attachments: • Attachment14.a: Attachment A: Bid Summary 14 Packet Pg. 181 Issued on 12/20/21 Required: Bid Due on February 1, 2022 3:00 PM (Pacific) C-39 Roofing Contractor Vendor Name Bid Form Signed Questionnaire Signed SubCon List Non- Collusion Bid Bond Addendum 1 CSLB (CCL) CSLB Class DIR California Secretary State liencse BID FORM Bid Amount PLANET BIDS Bid Amount Bid Award Andy's Roofing Co., Inc. X X Missing X XX 521860 C-39/B 1000002720 C1590682 169,640.00$ 169,640.00$ Nonresponsive Stronger Building Services X X X X X X 955618 C-39/B 1000002136 C3325262 $ 179,500.00 179,500.00$ Lowest  Responsible Bidder VNH Builders X X X X X X 1064244 B/C-10 PW-LR-1000631655 C4787555 $ 227,129.00 227,129.00$ Responsive S&H Construction, Inc. X X X X X X 786358 B/C9/C20/C10 1000000362 C2464229 $ 428,600.00 428,600.00$ Responsive Budget:$85,000.00 Prime Bid Results for Project: Mitchell Park Library Roof & Gutter Repair IFB181213 14.a Packet Pg. 182