Loading...
HomeMy WebLinkAboutStaff Report 14035 City of Palo Alto (ID # 14035) City Council Staff Report Meeting Date: 5/9/2022 Report Type: Consent Calendar City of Palo Alto Page 1 Title: Approval of Construction Contract Number C22182558 with Enterprise Roofing Service, Inc. in an Amount Not-to-Exceed $497,233 to Replace the Existing H Wing Roof at Cubberley Community Center, Capital Improvement Program Project CB-16002; and Authorization of Contract Contingency in an Amount Not-to-Exceed $49,723 for Related, Additional but Unforeseen Work Which May Develop During the Project. From: City Manager Lead Department: Public Works Recommendation Staff recommends that Council: 1. Approve and authorize the City Manager or their designee to execute Construction Contract Number C22182558 with Enterprise Roofing Service, Inc. in the amount of $497,233 for the Cubberley Community Center H-Wing Re-Roof Project, Capital Improvement Program Project CB-16002; and 2. Authorize the City Manager or their designee to negotiate and execute one or more change orders to the construction contract with Enterprise Roofing Service, Inc. for related, additional but unforeseen work which may develop during the project, the total value of which shall not exceed $49,723. Background The existing Cubberley Community Center H-Wing roof has been in service for 29 years and is exhibiting signs of severe wear. The roof is leaking and has been patched several times in various locations. To avoid the potential for larger leaks and structural damage to the building, staff has determined that the roof needs a complete replacement. Discussion Project Description This project will replace the existing H-wing roof with a new, energy efficient bituminous roof. The existing tar-and-gravel roof is past the end of its useful life and needs to be replaced. The application will meet current cool roofing codes to optimize energy efficiency. The roofing manufacturer will provide a 20 year, no dollar limit warranty. City of Palo Alto Page 2 Bid Process On December 9, 2021, a notice inviting formal bids for the Cubberley Community Center H- Wing Re-Roof Project was posted online on the City’s PlanetBids e-procurement website. The bidding period was 41 days. Bids were received from 7 qualified contractors on January 18, 2022, as listed on the attached Bid Summary (Attachment A). Summary of Invitation for Bids Process Bid Name/Number Cubberley Community Center H-Wing Re-Roof Project, Capital Improvement Program Project CB-16002/IFB #182558 Proposed Length of Project 45 calendar days Total Days to Respond to Bid 30 Mandatory Pre-Bid Meeting December 20, 2021 at 10:00 A.M. Number of Company Attendees at Pre-Bid Meeting 24 Number of Bids Received: 7 Bid Price Range $396,500 – $ 585,500 Staff reviewed the seven bids, and all were deemed responsive. Bids ranged from a low bid of $396,500 to a high bid of $585,500 for the project. The lowest bidder asked to withdraw their bid in accordance with the Public Contract Code, due to an error in pricing. The request to withdraw was reviewed, found to comply with statutory requirements, and was thus approved. Staff recommends that the bid of $497,233 submitted by Enterprise Roofing Service, Inc. be accepted and that Enterprise Roofing Service, Inc. be declared the lowest responsible bidder. The low bid is 16.7 percent below the engineer's estimate of $596,736. The change order amount of $49,723 (which equals 10 percent of the total contract) is requested for related, additional but unforeseen work which may develop during the project. Staff confirmed with the Contractor's State License Board that the contractor has an active license on file. Staff also contacted the listed references for Enterprise Roofing Service, Inc. and found that they have performed satisfactorily on past construction projects for other clients. Resource Impact Funding for the re-roofing of Wing H contract recommended in this report is available in the Fiscal Year 2022 Adopted Budget for the Cubberley Property Infrastructure Fund Capital Improvement Program, Cubberley Roofing Replacements project CB-16002. Policy Implications The recommendation does not represent any changes to existing City policy. Stakeholder Engagement City of Palo Alto Page 3 The Cubberley Community Center H Wing Re-Roof Project has been coordinated with the Community Services Department and the Cubberley tenants/users. It does not conflict with any upcoming events. Environmental Review This project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under Section 15301 of the CEQA Guidelines as repair, maintenance and/or minor alteration of existing facilities and no further environmental review is necessary. Attachments: • Attachment A: IFB182558 Bid Summary Bid Results for Project:Cubberley H Wing Re-roof IFB182558 Issued on 12/09/2021 Bid Due on January 18, 2022 3:00 PM (Pacific) Vendor Name Mandatory Pre- Bid Meeting 12/20/21 Bid Form Signed Questionnaire Signed SubCon List Non- Collusion Bid Bond Addendum 1 Addendum 2 Stronger Building Services (withdrawn)yes X X X X X X X Sub: Alliance Contracting Services Enterprise Roofing Service, Inc.yes X X X X X X X Sub: K S Kruse Plumbing Co Sub: Alliance Contracting Inc. I & A Contractor Inc.yes X X X X X X X State Roofing Systems, Inc.yes X X X X X X X San Francisco Roofing Services, Inc.yes X X X X X X X Waterproofing Associates, Inc.yes X X X X X X X Best Contracting Services yes X X X X X X X BASIS FOR AWARD: Required: C-39 Roofing Contractor CSLB (CCL)CSLB Class DIR California Secretary State licence BID FORM Bid Amount PLANET BIDS Bid Amount 955618 C-39/B 1000002136 C3325262 396,500.00$396,500.00$ 221274 C- 39/C43/B/C20 1000000444 C0448913 $497,233.00 497,233.00$ 989071 B/C39 1000005233 C3604746 $512,000.00 512,000.00$ 417692 C-39 1000001108 C1075296 $528,177.00 528,177.00$ 1047655 C-39 100063028 C3823532 $575,000.00 575,000.00$ 649862 C-39/C-43 1000000647 C1817060 $575,058.00 575,058.00$ 456263 C39/B/A/C43/ C17 1000000563 C1158028 $582,650.00 585,500.00$ Prime Budget:$85,000.00