HomeMy WebLinkAboutStaff Report 13652 City of Palo Alto (ID # 13652) City Council Staff Report Meeting Date: 11/29/2021 City of Palo Alto Page 1 Title: Approval of Amended and Restated Purchase Order Number 4521000199 with Altec Industries, Inc., to Increase the Purchase Order Amount by $33,202 to a New Not-to-Exceed Amount of $667,068, for the Purchase of Two Peterbilt Crane Trucks through a Cooperative Contract, in the Scheduled Vehicle and Equipment Replacement -Fiscal Year 2020 Capital Improvement Project (VR-20000) From: City Manager Lead Department: Public Works Recommendation Staff recommends that Council approve and authorize the City Manager or their designee to execute Amended and Restated Purchase Order No. 4521000199 (Attachment A) with Altec Industries, Inc., to increase the Purchase Order amount by $33,202 for a new total not to exceed amount of $667,068 in the Scheduled Vehicle and Equipment Replacement - Fiscal Year 2020 Capital Improvement Project (VR-20000), for the purchase of two 2022 Model DH50 Hydraulic Digger Derrick rear-mount Peterbilt crane trucks, utilizing a cooperative purchase agreement via Sourcewell (contract number 012418-ALT), a cooperative purchasing agency serving government and not-for-profit organizations. Background On January 11, 2021, Council approved a request to purchase two new 2022 Model DH50 Hydraulic Digger Derrick rear-mount Peterbilt crane trucks (CMR 11582) for an amount not to exceed $633,866, to replace units 7602 and 7603. These vehicles were programmed in the Fiscal Year 2020 Scheduled Vehicle and Equipment Replacement Capital Improvement Program project (VR-20000). Purchase Order 4521000199, in the amount of $633,866 was issued with Altec Industries, Inc. (Altec) on January 13, 2021. Discussion On August 13, 2021, Altec reached out to Public Works Fleet staff and indicated that with the unprecedented rise in materials costs experienced over the last year, they have reached a point where they are no longer able to absorb these increases from their suppliers. In turn, Altec can no longer honor the original quote provided to the City for these new units and has provided a letter recognizing these unique market conditions (Attachment B). An additional surcharge, per 5 Packet Pg. 38 City of Palo Alto Page 2 unit, in the amount of $9,924 now applies to the Altec portion of the build. Also reflected is a surcharge from Peterbilt of $4,960 per chassis as well as an updated sales tax quote that reflects the current sales tax rate of 9.125%. A revised quote for the new total purchase cost of $667,068 was provided on October 19, 2021 (Attachment C). Altec’s contract amendment with Sourcewell, in which Sourcewell approved Altec’s request to adjust its existing Sourcewell contract pricing, was also provided (Attachment D), along with Peterbilt’s breakdown of the surcharges for the chassis (Attachment E). Procurement Process Palo Alto Municipal Code section 2.30.360 (j) allows the use of cooperative purchasing agreements in lieu of conducting a competitive solicitation. Altec was awarded a contract by Sourcewell (formerly known as the National Joint Powers Alliance or NJPA), a cooperative purchasing agency serving governmental, higher education, K-12 education, not-for-profit, tribal government, and other public agencies. Sourcewell conducted a Request for Proposals under which Altec Capital was an awarded vendor. Altec’s contract with Sourcewell was subsequently amended to allow Altec to increase its contract pricing. If this request is not approved, we will forfeit the two 2022 Peterbilt chassis that are designated for this build. Staff would then have to request a new specification and quote for a later year model chassis and return to Council for approval. This would further increase the purchase cost and delay the delivery of these new vehicles. On this basis, staff recommends proceeding with the amendment. Resource Impact Funding was approved for the purchase of two 2022 Model DH50 Hydraulic Digger Derrick rear mount crane trucks in the Fiscal Year 2020 Scheduled Vehicle and Equipment Replacement Capital Improvement Project (VR-20000). Funding appropriated in VR-20000 in the FY 2022 Budget is sufficient to cover the increased costs of the purchases recommended in this report. Stakeholder Engagement Requests for vehicle replacements are presented to the Fleet Review Committee (FRC) for approval. FRC approved the replacement of these two vehicles through the scheduled five-year replacement review. Policy Implications The approval of this request to purchase vehicles is consistent with existing City policies, including the Council-approved Utilities Strategic Plan. The Utilities Strategic Plan includes operating the electrical distribution system in a cost-effective manner, which includes investments in vehicles and infrastructure to deliver reliable service. Environmental Review This purchase is exempt from the provisions of the California Environmental Quality Act (CEQA) under Sections 10560 and 10561. Attachments: • Attachment5.a: Attachment B - Altec Material Surcharge Letter • Attachment5.b: Attachment C - Quote 5 Packet Pg. 39 City of Palo Alto Page 3 • Attachment5.c: Attachment D - Altec/Sourcewell Contract Amendment • Attachment5.d: Attachment E - Statement from Coast Counties Peterbilt 5 Packet Pg. 40 September 21, 2021 City of Palo Alto, Thank you for being a valued Altec customer. We greatly appreciate our relationship and look forward to serving you for years to come. Costs in our industry continue to be volatile, increasing, and in cases like steel, at unprecedented levels. These increases have been widespread, affecting not only commodities like steel, aluminum, resins, and petroleum-based products, but also manufactured components from industrial suppliers. Steel futures indicate that prices will remain at elevated levels for the foreseeable future. The Producer Price Indexes (PPIs) below illustrate the magnitude of the impact to our business. We continue to experience price increases from key suppliers as shown in examples below: We will continue to focus on lean manufacturing and implement cost-saving measures where possible. However, we are unable to absorb the entirety of the increased material costs we are experiencing in today’s environment. To offset a portion of these unanticipated costs, Altec is continuing a 5% surcharge into 2022. We will continue to monitor material prices to evaluate the need for this surcharge. Thank you for your understanding. Steven Ankney 5.a Packet Pg. 41 Appendix: These images can be substituted in the letter as needed 5.a Packet Pg. 42 Quote Number:694090-1 Opportunity Number:10569607 Sourcewell Contract #:012418-ALT Date:9/29/2021 REFERENCE ALTEC MODEL 50' Fully Hydraulic derrick, rear mount $225,797 (A.) 1 2 3 4 (A1.) 1 UHBD Aluminum Bayonet Capstan Drum (fits any winch extended shaft)$568 2 DP Dica Pads and Pad Holder - 24" x 24" x 1", With Rope Handle (Pair)$633 3 SPOT6 Remote Spot Light, LED, Permanent Mount, With Wireless Dash Mounted Controls And Programmable Wireless Remote $709 4 VCAM Backup Camera System $835 5 TBE ELECTRIC TRAILER BRAKE CONTROLLER. Controls Trailers with Electric Brakes, Wired to 7-Way Plug Next to Pintle Hook $233 6 ISG Inverter Storage Inside of Body Compartment with Guard $588 7 8 SOURCEWELL OPTIONS TOTAL:$229,363 (B.) 1 UNIT 2 UNIT & HYDRAULIC ACC 10' JIB and braket, AB chance adapter, PCD24B Capstain w/ foot controller, Hyd hose reel (50'), Tiiger pole puller w/ brackets, custom rope guides, custom subbase compartmentation $11,700 3 BODY Custom 2020 Altec Body with ladder, hotstick and open top storage boxes ILO Sourcewell contract $9,184 4 BODY & CHASSIS ACC Holland pintle hitch, custom derrick access step, cone holder (underhung), shovel storage, modified exhaust tip, sign base holder, rigging D-ring for capstan, two-pole capacity pole rack $4,251 5 ELECTRICAL TruckLite spot light above rotation, 42" LED directional light bar, four (4) 4.75" flood lights, four (4) Federal Signal lights, 3600W Inverter and two (2) Aux batteries, 120V GFCI quad receptacle and two (2) standard 120V GFCI, boom out of stow indicators, additional strobe $10,785 6 FINISHING Non-Regional build, CA Crane Certification (Incl/ horn at lower controls)$408 7 CHASSIS Custom Peterbilt 348 ILO Sourcewell Contract $21,708 OPEN MARKET OPTIONS TOTAL:$58,036 SUB-TOTAL FOR UNIT/BODY/CHASSIS:$287,399 Delivery to Customer:$3,568 Chassis Surcharge:$4,960 Altec Material Surcharge:$9,924ESTIMATED Sales Tax (9.125%):$27,583 Doc/Admin Fee:$100 (C.) 1 2 3 4 Altec Industries, Inc. SOURCEWELL OPTIONS ON CONTRACT (Unit) SOURCEWELL OPTIONS ON CONTRACT (General) OPEN MARKET ITEMS (Customer Requested) TOTAL FOR UNIT/BODY/CHASSIS:(each) $333,534 TOTAL FOR UNIT/BODY/CHASSIS QUANITY OF TWO (2): $667,068 ADDITIONAL ITEMS (items are not included in total above) DH50 Quoted for: City of Palo Alto **Pricing valid for 45 days** NOTES PAINT COLOR: White to match chassis, unless otherwise specified Quoted by: Omar Salcedo Altec Account Manager: William Hamburger Phone: (707) 693-2579 / Email: omar.salcedo@altec.com BUILD LOCATION: St. Joseph, MO WARRANTY: Standard Altec Warranty for Aerials and Derricks - One (1) year parts warranty One (1) year labor warranty Ninety TRADE-IN: Equipment trades must be received in operational condition (as initial inspection) and DOT compliant at the time of CHASSIS: Per Altec Commercial Standard DELIVERY: No later than __270__ days ARO, FOB Customer Location TERMS: Net 30 days BEST VALUE: Altec boasts the following "Best Value" features: Altec ISO Grip Controls for Extra Protection, Only Lifetime TO ORDER: To order, please contact the Altec Account Manager listed above. Sourcewell (formerly NJPA) updated with surcharges with updated tax 5.b Packet Pg. 43 1 ☐ ☐ ☐ ☐ ☐ Supplier Name: CONTRACT AMENDMENT PRICE AND PRODUCT CHANGE REQUEST FORM Altec Industries, Inc 012418-ALT Sourcewell Contract Number: (Contract) Instructions A request for product or service changes, additions, or deletions to the Contract will be considered at any time throughout the Contract term. All modifications must be within the scope of the original RFP and be in the best interests of Sourcewell and Sourcewell Participating Entities. If approved, the request will be incorporated into the above- referenced contract; however, no changes will be binding unless the request is approved by the Manager of Supplier Development and this request is signed by Sourcewell’s Chief Procurement Officer. Additions: New products and related services may be added to the contract if they are within the scope of the original RFP. Deletions: Products and related services may be deleted from the contract if they are no longer available. Price increases: Price increase requests must provide sufficient justification for the change (e.g., recently imposed tariffs or significant petroleum cost increases), not merely generalized statements requesting the increase. Price decreases: Price decreases are accepted at any time. Submit this request to the assigned Sourcewell Supplier Development Administrator. ______________________________________________________________________________________________ Request Check all that apply ✔ Adding Products/Services ✔ Deleting Products/Services ✔ Price Increase ✔ ✔ Price Decrease Other Detailed Justification for Changes 1. Changed Product List List the products and/or services that are changing from the previous contract price list, along with the percentage change for each item or category. Attach a separate sheet if a large number of changes are included in this request. Please see attached document "Supplement to P&P" for detail around 2023 Model Year pricing. Additionally the surcharge approved from PnP June 6 2021 is being extended and will effect trucks currently scheduled to complete production through the 1st half of 2022. This action is expanding the reach to orders quoted before 5-4-2021 which will invoice between 7-1-2021 and 6-30-2022 (originally invoice dates were 7-1-2021 to 12-31-2021) DocuSign Envelope ID: 7D0F5D62-3A21-46AB-AE69-F155C7C15C87 5.c Packet Pg. 44 2 2. Justification for Changes Provide justification and documentation explaining the requested changes (e.g., add a product because of technology advances in new model of equipment, increased raw material costs, add a Hot List of products). Include the percentage range of increase. Please see attached document Altec Model Year 2023 Price Increase Reference Material. Significant changes since Altec's most recent P&P (fully executed 5-4-2021): * Altec Model Year 2023 pricing is now being quoted * Costs continue to increase and remain at unprecedented levels * Chassis new model year pricing has significantly increased, especially Ford Light Duty 3. Product additions only Describe how the product additions fit within the scope of the original RFP. Altec would like to add a new hybrid technology, JEMS SE Jobsite Anti-Idle and ePTO for Service Aerials with "Fiber to the Boom Tip" included. This is within the scope of the original RFP in that it provides Sourcewell members the most up to date offering to reduce emissions at their job site while performing work with our equipment. 4. Price changes or product/service additions only State how the requested pricing is consistent with current Sourcewell contract pricing. Pricing is consistent with our existing Sourcewell contract in that the discount ratio % from MSRP is maintained and within the limits we proposed on contract. Complete Restatement of Pricing Submitted I understand that a complete restatement of pricing must be attached with this request or it will not be processed. Approvals Supplier Offer: This Price and Product Change Request has been submitted for review to be considered as an amendment to the above referenced Contract. Riley Browne Digitally signed by: Riley Browne DN: CN = Riley Browne C = US O = Altec Industries Inc OU = A01427E000001689A3A3F4C00012E5A 9-8-2021 By: Date: 2021.09.08 12:30:54 -05'00' Supplier Authorized Signature Date Riley Browne - Contract Specialist Print Name and Title of Authorized Signer Sourcewell Acceptance: Sourcewell accepts Supplier’s offer in this Price and Product Change Request. By Sourcewell’s signature below, this document becomes an amendment to the above referenced Contract and incorporates all referenced attachments into this Amendment. By: Jeremy Schwartz Sourcewell Chief Procurement Officer Date DocuSign Envelope ID: 7D0F5D62-3A21-46AB-AE69-F155C7C15C87 9/14/2021 | 8:41 AM CDT 5.c Packet Pg. 45 Statement from Coast Counties Peterbilt Without rehashing the detail of the causes, the bottom line is the following as it relates to your size of truck: • Thousands of trucks slated for 2021 production have been taken out of build slots and put in an unscheduled 2022 build bucket • They have abandoned and/or modified the previous plan sent over in early August imposing surcharges on all scheduled units depending on deal • While a large portion of 2021 orders for fleets were cancelled and must be repriced/reordered the older priced units remain viable to build with structured increases • All dealers were placed on allocation, we are allowed a limited number of build slots per model/month throughout the year. In your case what we would have is access to build your truck in the first half of next year with one more additional $1,000 material surcharge, a $500 increase in freight, and inclusion of the new mandatory CARB emission warranty. So with that pricing we would be as follows: (2) 2023 Peterbilt 348 2-axle Trucks Original sale price: $ 91,105.00 Surcharge from August 2, 2021 1,000.00 Surcharge for 2022 build 1,000.00 2022 Freight surcharge 500.00 5 year/150,000 CARB emission warranty 2,460.00 Total per unit $ 96,065.00 5.d Packet Pg. 46