HomeMy WebLinkAbout2000-12-18 City Council (18)TO:
City of Palo Alto
C ty Manager’s Report
HONORABLE CITY COUNCIL
2
FROM:CITY MANAGER DEPARTMENT: PLANNING AND
COMMUNITY ENVIRONMENT
DATE:
SUBJECT:
DECEMBER 18, 2000 CMR: 441: 00
APPROVAL OF A BUDGET AMENDMENT ORDINANCE IN THE
AMOUNT OF $100,000 TO CREATE CAPITAL IMPROVEMENT
PROGRAM 10121, HOMER AVENUE CALTRAIN UNDERCROSSING
PROJECT, AND ACCEPTANCE OF AN AWARD OF $2.3 MILLION IN
STATE AND FEDERAL GRANT FUNDS
RECOMMENDATION
Staff recommends that Council:
Approve the attached Budget Amendment Ordinance (BAO) in the amount of $100,000,
amending the 2000-01 budget to create and fund a new Capital Improvement Program
project, number 10121, for the Palo Alto Medical Foundation/South of Forest Area
("Homer Avenue") Undercrossing Project (Attachment A).
Accept the award of $2.3 million in grant funds for the Homer Avenue Caltrain
Undercrossing capital project number 10121, to be paid on a reimbursement basis from
the Federal Transportation Equity for the 21st Century (TEA-21) Corridor Management
Program ($2,035,500). State Transportation Improvement Program (STIP) grant monies
to be provided by the Santa Clara Valley Transportation Authority (VTA) as matching
funds ($263,810).
Direct staff to proceed with the project and return to Council at the 15 percent design
stage with refined cost estimates for the project to receive Council direction before
proceeding further with the project.
BACKGROUND
The need for a pedestrian and bicycle connection between the new Palo Alto Medical
Foundation (PAMF) campus and the South of Forest Area (SOFA) neighborhood was first
raised during the review of the new PAMF campus. The approved PAMF campus plan
includes an area to accommodate a pedestrian/bicycle access/landing area for a future
CMR:441:00 Page 1 of 6
crossing and a connection to the existing segment of the bike path built by PAMF on its
campus.
The project is also supported by policies in the PAMF/SOFA Coordinated Area Plan. A
feasibility study was prepared during the SOFA I study which identified a recommended
conceptual design and preliminary cost estimate of $2.3 million for construction of the new
undercrossing. The study estimated the undercrossing would attract up to 1,800 users a day.
In February 2000, Council authorized staff to file an application for $2.3 million in grant
funds for the Homer Avenue Caltrain Undercrossing Project from the Federal Surface
Transportation Program and Congestion Mitigation and Air Quality Improvement Program
(STP/CMAQ) through the Second Cycle of the TEA-21 Corridor Management Program
(CMR: 153:00).
In September, the VTA formally notified the City of the approval of the grant funding by
the Federal Highway Administration and Federal Transit Administration and the inclusion
of the project in the Metropolitan Commission’s Draft 2001 Transportation Improvement
Program. The total amount of grant funding is $2.3 million, including the STP/CMAQ
grant of $2,035,500, and an additional $263,810 to be provided by the VTA with funds set-
aside for local matching funds.
DISCUSSION
The Homer Undercrossing will provide bicycle and pedestrian access between the SOFA
neighborhood and the PAMF campus, Caltrain station and the Urban Lane bike path to
University Avenue. Staff considers this project to be a very high priority due to its
relationship to the SOFA Plan, its importance to the City’s bicycle system, and its
contribution to realizing the "Dream Team" Intermodal Transit Center plan.
The project consists of design and construction of a new pedestrian/bicycle undercrossing of
the Caltrain tracks between the Alma Street/Homer Avenue intersection and the Palo Alto
Medical Foundation. The undercrossing’s proposed alignment and conceptual design were
developed in the feasibility study (see Attachments E and F). To facilitate access to the
undercrossing from Homer Avenue, the traffic signal will be modified to provide a
pedestrian crossing phase across Alma Street. (This work will be undertaken as a separate
signalmodification project, funded by the Electric Utility fund).
The TEA-21 grant funds must be committed in a construction contract by September 30,
2002. The City must execute an agreement with the Caltrans Office of Local Assistance and
work through the Caltrans Federal Aid Process. In order to meet this accelerated timeline,
staff must move quickly to begin work on this project.
Building upon the base data developed in the feasibility study, the Public Works
Engineering Deparmaent has revised and updated the original preliminary 1998 construction
CMR:441:00 Page 2 of 6
cost estimate of $2.3 million. The full cost of the project based on the design concept in the
feasibility study is now estimated to be in the range of $3.2 to $3.8 million. The increase in
the cost estimate reflects refinement of the costs for design, testing, environmental analysis
and construction management,, and an escalation factor for construction in 2002. Other new
factors must be considered, including the proposed policy that art be integrated into all City
capital projects, and that artists be included in projects at the initial stages of design, thereby
ensuring that art elements become an integral part of the overall design.
Until additional detailed design work is completed, staff is not prepared to ref’me the cost
estimate further. Staff recommends proceeding incrementally with the project. The next
incremental step would be to hire the design team and pursue the design to the 15 percent
stage. At this stage, staff will have developed the project sufficiently to identify any
potential right-of-way issues completed the environmental analysis, and taken the project
design through the Architectural Review Board process. Staff expects that the 15 percent
design work would result in a "bare-bones" (safe and functional) project as close as possible
to the available $2.6 million in state, federal and local developer funds already secured for
this project. Any enhancements and project add-ons to the basic design would also be
estimated. Staff would return to Council at the 15 percent design phase with more complete
information on the scope of the project, detailed costs and a more realistic estimate of the
amount of City funding that would be required to complete the project. Council would have
the discretion to select which, if any, enhancements beyond the basics are included in the
f’mal design, and would then decide whether to authorize funding any shortfall between the
project cost and the grant and other funds already committed. Council could direct staff to
complete the design or cease work on the project. In the event the project is cancelled, it
would be necessary for the City to reimburse the State for any TEA-21 funds spent during
the design phase.
RESOURCE IMPACT
Design Phase
Staff recommends that Council approve the attached budget amendment to create a new
Homer Undercrossing CIP project and appropriate funding to complete the 15 percent
design phase of the project. The attached BAO requests an appropriation of $100,000,
which will be funded from the Budget Stabilization Reserve. The attached BAO also
requests an increase in revenue from TEA-21, which will replace funds advanced from the
Stabilization Reserve. Attachment B summarizes the BAO’s approved to date in 2000-01
that impact the General Fund Budget Stabilization Reserve.
Complete Project
A total of $2,649,310 is already committed to this project from the following sources:
$2,035,500 from Federal STP/CMAQ grant, $263,810 from and State STIP and $350,000 in
local development mitigation fees ($300,000 from PAMF and $50,000 from the Sheraton to
be payable upon commencement of construction of the project). The STIP funds will. cover
CMR:441:00 Page 3 of 6
the 11.5 percent local match requirement for the STP/CMAQ funds. Because grant funds
are allocated on a reimbursement basis, City funds must be appropriated in the Capital
Improvement Program budget and then reimbursed with grant funds.
To date, no City funds have been committed to the project. However, at the current
estimated project cost of $3.2 to $3.8 million, the funding shortfall for the project could be
in the range of $550,000 to $1,250,000. A more accurate estimate of the funding shortfall
will be developed when project costs are further refined in the initial design phase. Staff
will continue to seek additional grant funds for this project over the next two years with the
expectation that a portion of the shortfall could be reimbursed from other outside funds. For
example, staff intends to. reapply for ftmding from the VTA for a Transportation Fund for
Clean Air grant in 2001, and anticipates that up to $150,000 could be allocated to this
project through a successful grant application. Staff will also pursue funding from other
potential sources including the Transportation Development Act and Transportation for
Livable Communities grants. Notwithstanding the procurement of such additional grant
funds, it is highly likely that the City will need to commit City funds in order to leverage the
significant level of grant funds already committed.
Workload Considerations
The Planning Department developed this project to the feasibility study stage. Design and
construction of the project will be managed by Public Works Engineering. A detailed
analysis of project workload and staffing was recently completed as part of the
Infrastructure Management Plan. Existing staff resources have been committed to
completing infrastructure projects that are included in the current five-year capital
improvement program.
The Homer Avenue Caltrain Undercrossing Project can be completed without additional
staff’mg resources in Public Works Engineering. However, in order to implement this project
within the timeline mandated by the TEA-21 grant, staff has reprioritized work assignments
and project schedules for existing. Infrastructure projects in the Public Works Engineering
(PWE) Division. This will result in the following adjustments to the existing approved
transportation projects and the PWE work program: The E1 Camino/Churchill Avenue
Intersection Modifications (CIP 10117) scheduled for design in 2000-01 will be postponed
indefinitely. This project will be re-evaluated and prioritized for funding as part of the
transportation master plan. The Page Mill!Hanover Intersection Improvements (CIP 19923)
scheduled for 2000-2001 will be postponed until 2004-2005.
Staffing projections for the Engineering Division completed as part of the infrastructure
management plan include $1,000,000 per year for infrastructure projects that could be added
to the plan but that were not specifically identified. Proceeding with the Homer
Undercrossing will use up this capacity for additional infrastructure projects for the next two
and one half years. Other new infrastructure projects that proceed during this time frame
CMR:441:O0 Page 4 of 6
would require additional staff’mg resources. This would include projects such as renovation
of the Roth Building, Public Safety Building, Downtown Parking Structures, and Library
Master Plan. The need for additional staffing resources will be evaluated and requested as
each of these projects move forward, and staff will make recommendations to Council as
appropriate.
POLICY IMPLICATIONS
Current Council priorities have established that existing infrastructure projects have priority
over new infrastructure projects. Approval of this project would be a change in current
Council policy regarding the implementation of the Infrastructure Management Plan. This
project is consistent with existing policy, including Comprehensive Plan Transportation
Policy T-14: Improve pedestrian and bicycle access to and between local destinations and
Program T-21: Study projects to depress bikeways and pedestrian walkways under Alma
Street and the Caltrain tracks and implement if feasible.
In addition, the Coordinated Plan for the South of Forest Area includes two policies related
to this facility: Policy T-13: Support the construction of a railroad undercrossing at Homer
and Alma, and Policy T-20: Facilitate implementation of the recommendations of the
Railroad Crossing Feasibility Study to improve pedestrian access from SOFA to the PAMF
campus and points west.
TIMELINE
This ’project will need to be implemented on an accelerated timeline in order to safeguard
the substantial amount of grant funding which must be obligated in a construction contract
no later than September 30, 2002. In order to meet this deadline, staff has identified the
following milestone dates:
Milestone
Council Approval of New CIP project
Caltrans Field Review
Environmental Certification
Right-of-Way Certification
Complete Plans and Specifications
Final Caltrans Certification of Project Plans
Award of Construction Contract
Timeline (Qtr/FY)
2n° 2000/01
2nd 2000/01
1st 2001/02
1st 2001/02
3rd 2001/02
4th 2001/02
4th 2001/02
ENVIRONMENTAL REVIEW
An environmental review for the Homer Undercrossing will be conducted prior to obligating
the grant funds for this project.
CMR:441:00 Page 5 of 6
ATTACHMENTS
Attachment A: Budget Amendment Ordinance
Attachment B: Budget Amendment Ordinances Impacting the Stabilization Reserve
Approved to D~ite in 2000-01
Attachment C: Grant Award Notification Letter from VTA dated September 15, 2000
Attachment D: CIP Project Description
Attachments E & F: Tunnel Design Options, Homer Undercrossing Feasibility Study, 1998
PREPARED BY:Gayle Likens, Senior Planner
Kent Steffens, Assistant Director, Public Works
DEPARTMENT HEAD:
Director of Planning and
Community Environment
CITY MANAGER APPROVAL:
Assistant City Manager
Palo Alto Bicycle Advisory Committee
David Jury, Palo Alto Medical Foundation
Walt Stringer, Caltrain Joint Powers Board
SOFA Working Group
Elaine Meyer, University South Neighborhood Group
Chamber of Commerce
Clement Chen, Sheraton Hotel
CMR:441:00 Page 6 of 6
ATTACHMENT A
ORDINANCE NO.
ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO
AMENDING THE BUDGET FOR THE FISCAL YEAR 2000-01 TO
PROVIDE AN APPROPRIATION OF $i00,000 FOR HOMER AVENUE
UNDERCROSSING CAPITAL IMPROVEMENT PROJECT, NUMBER 10121
WHEREAS, pursuant to the provisions of Section 12 of Article
III of the Charter of the City of Palo Alto, the Council on June 19,
2000 did adopt a budget for fiscal year 2000-01; and
WHEREAS, the need for a new pedestrian/bicycle crossing of the
railroad tracks south of the downtown Palo Alto Caltrain station
between the Alma Street/Homer Avenue intersection and the Palo Alto
Medical Foundation (PAMF) was identified during the review of the
PAMF campus plan; and
WHEREAS, the City has secured an award of $2.3 million in
grant funds for the Homer Avenue Undercrossing project; and
WHEREAS, the grant funds will be allocated on a reimbursement
basis and receipt of these funds will not occur until after the City
has incurred actual expenses; and
WHEREAS, the budget needs to be amended to create and fund a
capital improvement project for 15 percent of the design phase of
the Homer Avenue undercrossing; and
WHEREAS, staff will return to Council at the 15 percent design
phase with more complete information on the scope of the project and
the amount of City funding that would be required to complete the
project; and
WHEREAS, in the event that the project is cancelled an
additional appropriation of funds will be required to reimburse the
grant funds spent during the design phase; and
WHEREAS, the additional appropriation of funds from the
General Fund Budget Stabilization Reserve is a one-time cost and
future year General Fund ongoing maintenance costs are anticipated.
WHEREAS, City Council authorization is needed to amend the
2000-01 budget as hereinafter set forth.
SECTION i. Capital Improvement Project (CIP) 10121, Homer
Avenue Undercrossing, is hereby created.
SECTION 2. The sum of One Hundred Thousand Dollars ($i00,000)
is hereby appropriated to Capital Improvement Project No. 10121, and
the Stabilization Reserve is hereby decreased by $100,000.
SECTION 3. Revenue in CIP Project Number 10121 is increased
by the sum of One Hundred Thousand Dollars ($i00,000) for receipt
of funds from the Federal Transportation Equity for the 21st Century
Corridor Management Program (TEA-21), which will be received on a
reimbursement basis and will replace funds advanced from the
Stabilization Reserve to pay project costs.
SECTION 4. The transactions in sections 2 and 3 above will
have no impact on reserves.
SECTION 5. As specified in Section 2.28.080(a) of the Palo
Alto Municipal Code, a two-thirds vote of the City Council is
required to adopt this ordinance.
SECTION 6. The environmental review for the Homer
Undercrossing will be conducted prior to obligating the grant funds
for this project.
SECTION 7. As provided in Section 2.04.350 of the Palo Alto
Municipal Code, this ordinance shall become effective upon adoption.
INTRODUCED AND PASSED:
AYES:
INTRODUCED AND PASSED:
AYES:
NOES:
ABSTENTIONS:
ABSENT:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Senior Asst. City Attorney
APPROVED:
Mayor
City Manager
Director of
Services
Administrativ~
Director of Planning
Directory of Public Works
ATTACHMENT B
Budget Amendment Ordinanceslmpacting General Fund Reserves Approved-To-Date in 2000=01
~=:~ :-Placeholders~=,
¯
¯ =Already in the Impact on the ¯Estimated
-General Fund Future YearBAO Description ~Cost Revenue 200001 Adopted BSR OngolngCosts~Budget
Estimated Beginning Budget Stabilization Reserve (BSR) Balance
Adopted Budget Addition to BSR
Public Safety Building - CIP 19820
Planning Transcription Services
Office of Transportation Safety Grant
Cubberley Theatre Chiller Replacement - CIP 10120
Arts Council Silicon Valley Grant
Police Department Grants (1)
Zoning Ordinance Update
Friends of the Palo Alto Library Granl
Office Space Renovation - CIP 10020
Acquisition of Pinkerton Property
Homer Avenue Undercrossing - CIP 10121
$13,385,753
$1,075,000
($74,000)($74,000)
($40,000)($40,000)
($187,065)$187,065 $0
($22,000)($22,000)
($5,192)$5,192 $0
($277,314)S277,314 $0
($110,000)$110,000 $0
($59,000)$59,000 $0
$411,000 $156,000 ($255,000)
($400,000)
($10o,000)$100,0o0 $o
$40,000
$17,000
$188,000
BSR Balance After BAO’s
(1) Of this amount $121,259 will be deposited in the General Fund and $156,055 deposited in the Special Revenue Fund.
ATTACHMENT C
September 15, 2000
Gayle Likens, Senior Planner
City of Palo Alto
250 Hamilton Avenue
Palo Alto, CA 94301
Dear Project Spdnsor:
Congratulations! The Federal High’,vay Administration ~’~d Federal Transit
Administration have approved your Second Cycle Corridor Management~ (TSO)
grant(s). Your project(s) are now listed in the Metropolitan Transportation
Commission’s 1999 Transportation Improvement Program (1999 TIP) and the
draft 2001 TIP. A listing of all the funded 2"~ Cycle Corridor Management project
is attached to this letter.
The Corridor Management (TSO) grants are Federal STP/CMAQ funds and are
subject to all Federal Requirements, including (but not limited to) NEPA, Federal
DBE compliance and pre-award audits. To access the funds, your agency will
need to execute an agreement with the Caltrans Office of Local Assistance and
work thr’ough the Caltrans Federal Aid Process. Information on the Caltrans
Federal Air process is available at www.dot.ca.gov. Caltrans has just implemented
a new and more complicated DBE compliance policy. If you have not been
certified in the last 6 months, the Federal Aid process can add up to 12 months to
the project delivery process. Your grants expire on September 30, 2002.
Please contact Caltrans at the earliest possible opportunity. Please contact
Caltrans at the earliest possible opportunity.
If your project is CMAQ funded, itis be eligible for up to 11.47% in matching funds
from the STIP. These matching funds are tied to the years in which your p.roject is
programmed in the TIP. If you decide to construct ahead of the programmed
schedule, the STIP matching funds can only be advanced one fiscal year. They
cannot be "slipped" once you are in the fiscal year in which they are listed. If your
project is delayed, you will lose this match.
Regardless of phase and/or program year shown in the TIP, your Federal grants
expire on September 30, 2002. All Federal funds must be encumbered via
receipt of a signed Federal E-76 form from the Caltrans Office of Local Assistance
on that date. All unencumbered funds will revert to the Metropolitan
Transportation Commission. Project Sponsors ’whose actions result in the loss of
these grant funds to the county will be penalized in later grant funding cycles.
You may encumber your Federal grant funds at any time prior to September 30,
3331 North First Street ¯ Son Jose, CA 95134-1906 ¯ Administration 408.321.5555 ¯ Customer Service 408.321.2300
2002, regardless of the actual year in which they are programmed. This flexibility
does not apply to STIP matching funds.
STIP Matching Funds are state gas tax funds, subject to SB-45’s Use-It-Or-Lose-It
provisions. Your STIP matching funds will expire on the last day of the state
fiscal year in which they are programmed. The State fiscal year ends June 30.
Fiscal Year Programmed Expiration Date
2000/01 STIP Match Funds June 30, 2001
2001/02 STIP Match Funds June 307 2002
2002/03 STIP Match Funds June 307 2003
Please look up your project in the 1999 TIP or 2001 TIP to determine when your
projects’ STIP matching funds will expire. The TIP web address is
www.mtc.ca.gov/publications/tip/tipind.htm. This page is no__At accessible to the
general public by "drilling" through the main MTC homepage, so please bookmark
the reference.
If you have any programming questions, fell free to contact me by phone at (408)
321-5717 or via e-mail at marcella.rensi@vta.or~. If you have any other questions,
contact Amin Surani at (408) 321-7989 or amin.surani@vta.org.
Sincerely,
Marcella M. Rensi
Sr. Transportation Planner
SANTA CLARA COUNTY
2ND CYCLE CORRIDOR MANAGMENT PROJECTS
All costs rounded to the nearest $1,000s of dollars
Sponsoring
Agency
San Jose
Morgan Hill
Caitrain
Sarat%na
San Jose
County of Santa
Clara
VTA
County of Santa
Clara
Campbell
Palo Alto
San Jose
Palo Alto
Cupertino
Cupertino
Sunnyvale
VTA
Caltrans
County of Santa
Clara
Morgan Hill
Sunnyvale
Project Title
Stevens Creek Bird/Winchester Bird
ATMS: Silicon Valley - West Corridor
Main Avenue/UPRR Crossing Safety
Improvement
Replacement of Grade Crossing
Warning Predictors
City of Saratoga Cit.vwide Signal
Upgrade Project
Silicon Valley Internet Traveler
Information System
Bicycle Detection at Signalized
Expressway Intersections
1-880 Smart Park at Tasman/Alder
Monterey Highway at Masten Av./
Fitzgerald Av. Railroad Crossing
Improvements
Winchester Blvd Bike Video Detection
and Traffic Surveillance Systems
Palo Alto Medical Foundation/South of
Forest Area Caltrain Pedestrian and
Bicycle Undercrossin.q
Proactive Signal Timing Program
City of Palo Alto NTCIP Traffic Signal
System Upgrade
City of Cupertino Adaptive Traffic Signal
Control System
De Anza Blvd. Corridor ATMS
Pedestrian Access Improvements Near
Tasman LRT in Sunnyvale
Monterey Road Transit Stop
Improvements
TOS Improvements in FremontlSouth
Bay Corridor
Eastside Community Safety
Enhancement
Monterey Hwy./UPRR Undercrossing &
Bikeway Improvement
Wolfe Rd. Traffic Signal Coordination
/Radio Spread Spectrum Interconnect
TOTAL
Cum.PROJECT
Fed. Total COST
$ 2,748 $357 $3,105
$3,036 $38 $326
$ 3,832 $104 $900
$ 4,217 $50 $435
$ 4,482 $35 $300
$ 4,614 $18 $150
$ 5,394 $101 $881
Total Other
Funding/
Local Match
6,058 $86 $750
6,244 $24 $210
$ 8,279 $565 $2,600
$ 8,722 $57 $500
$ 9,607 $115 $1,000
$ 10,492 $115 $1,000
$ 11,288 $104 $900
$ "i!,788 $65 $565
$ 12,231 $58 $501
$ 12,496 $34 $300
$ 12,718 $29 $251
$ 13,072 $354
$ 13,223 $20 $ 170
PROJECT DESCRIPTION
ATTACHMENT D
This project consists of design and construction of a new pedestrian/bicycle grade-separated crossing of the
Caltrain tracks approximately 800 feet south of the Palo Alto Caltrain station platform between the Palo Alto
Medical Foundation and the Homer/Alma intersection. The project will provide access from the South of Forest
Area (SOFA) residential and commercial areas to the new Palo Alto Medical Foundation (PAMF) campus, to the
Caltrain station, and to the new bike path constructed by PAMF along Urban Lane which is planned to be extended
south to Churchill Avenue. By improving access to the major multi-modal hub the project will encourage and
facilitate multi-modal trips.
PROJECT JUSTIFICATION
The need for a new pedestrian/bicycle crossing of the railroad tracks was identified during the review of the plan for
the new PAMF campus. The approved PAMF campus plan includes an area to accommodate a pedestrian/bicycle
access/landing area for a future crossing and a connection to the existing segment of the bike path built by PAMF
on its campus. In conjunction with the PAMF/SOFA Coordinated Area Plan study, a planning and feasibility study
for the pedestrian/bicycle crossing of the Caltrain right-of-way in the vicinity of the Homer/Alma intersection was
prepared. It is projected that approximately 1,600 to 1,800 pedestrians and bicyclists would use this facility daily.
FUTURE FINANCIAL REQUIREMENTS
FISCAL YEAR
PY Budget
2000-01
2001-02
2002-0~
2003-04
2004-05
AMOUNT
$335,000
TBD
COMPONENTS
Design
Construction
Sources of Funding: General Fund with full reimbursement of design phase from Federal TEA-21 grant.
IMPACT AND SUPPORT ANALYSIS
Environmental:
Design Elements:
Operating:
Telecommunications:
An environmental analysis will be required.
Project will be reviewed by CIP Design Consultant and is subject to Architectural
Review Board and Bicycle Advisory Committee review.
Maintenance costs through the Public Works Operations Division.
None.
COMPREHENSIVE PLAN
This project furthers policy T-14 and program T-21 0f the Comprehensive Plan.
451