TO:
FROM:
HONORABLE CITY COUNCIL
CITY MANAGER DEPARTMENT: PUBLIC WORKS17
DATE:NOVEMBER 13, 2000 CMR:409:00
SUBJECT:REJECTION OF
REPLACEMENT
PROJECT 10006)
BIDS FOR THE AVENIDAS ROOF
PROJECT (CAPITAL IMPROVEMENT
RECOMMENDATION
Staff recommends that Council:
Reject all bids received for the Senior Center Roof Replacement Project (Capital
Improvement Program project 10006).
2. Direct staff to revise the project scope and re-bid the work.
DISCUSSION
Proiect Description
The work to be performed under the contract was replacement of the existing built-up
roofs at the Avenidas facility at 450 Bryant Street (previously known as the Senior
Center). The City of Palo Alto is responsible for all exterior maintenance of this facility.
Bid Process
A notice inviting formal bids for the roof replacement project was sent to 13 contractors
and four builder’s exchanges on September 19, 2000. The bidding period was 28 days.
A pre-bid meeting was held on September 28, 2000. Bids were received from two
qualified contractors on October 17, 2000, as listed on the attached bid summary
(Attachment A). Bids ranged flom a high of $100,000 to a low bid of $95,873.
Contractors not responding indicated that they did not submit a bid due to their existing
heavy workload. The low bid of $95,873 exceeds the engineer’s estimate of $43,361 by
120%. The engineer’s estimate is consistent with recent roof contract unit pricing of $10
per square foot.
Staff recommends that none of the bids be accepted and the design be modified and re-
bid in spring of 2001. Staff believes the scope and project duration can be modified to
allow the contractor more flexibility in materials selection and work schedule.
CMR:409:00 Page 1 of 2
RESOURCE IMPACT
Funds for this project are available in the Roofing Replacement Capital Improvement
Project (CIP#10006). Roof patching of suspected leak areas will be funded from this CIP
to preserve the roof until the project is re-bid in the spring.
POLICY IMPLICATIONS
This recommendation does not represent any change to existing City policies.
ENVIRONMENTAL ASSESSMENT
This project is categorically exempt from California Environmental Quality Act and no
fm~er environmental review is necessary.
ATTACtlMENTS
Attachment A: Bid Summary
PREPARED BY:
DEPARTMENT HEAD:
Jim Gustafson, Facilities Projects Supervisor
Karen Smith, Manager of Facilities Maintenance and Projects
GLENN S. ROBERTS
Director of Public Works
CITY MANAGER APPROVAL:~
AUDRLW SEYMOUR
Assistant to the City Manager