C ty Manager’s Report
16
TO:HONORABLE CITY COUNCIL
ATTN:POLICY & SERVICES COMMITTEE
FROM:CITY MANAGER DEPARTMENT:COMMUNITY SERVICES
DATE:AUGUST 1, 2000 CMR: 345:00
SUBJECT:TRANSMITTAL OF LIBRARY ADVISORY COMMISSION
REPORT: NEW LIBRARY PLAN
REPORT IN BRIEF
This report forwards the New Library Plan (Plan), a report of the Library Advisory
Commission (LAC), to Council. The plan recommends that the City: create Resource
Libraries in north Palo Alto at the Main/Children’s libraries and in south Palo Alto at the
Mitchell Park Library at which people will find the greatest number of materials and
services; preserve geographically-based neighborhood libraries for reading and limited
services at College Terrace, Downtown and Terman Park; and expand children’s
programs and services. The plan also makes specific recommendations regarding library
operations, such as hours, collections, and staffing and recommends significant capital
improvements at the Resource Libraries. The plan, if implemented in full as
recommended by the LAC, would require an on-going annual increase in General Fund
expenses of $4.6 million and $48 million in capital expenses.
Staff recommends conceptual approval of the key components of the Plan. Staff also
recommends that Council direct staff to return with a Phase I implementation plan and
cost proposal and to prepare a multi-year plan to implement and finance the key
components of the plan.
CMR:345:00 Page 1 of 7
RECOMMENDATIONS
The LAC recommends that the City Council approve its New Library Plan (Plan),
Attachment 1, which includes the following key components:
1) Create Resource Libraries at Main/Children’s Libraries and Mitchell Park Library
serving the north and south parts of the city at which "people of any age will find the
greatest number of materials and services";
2) Preserve "the concept of geographically-based small neighborhood libraries for
reading and limited services at Downtown, College Terrace, and Terman Park (or
another facility in the southwest section of Palo Alto)";
3) "Expand children’s programs and services, including substantial [capital]
improvements at the Resource Libraries."
The LAC also makes specific recommendations regarding the capital and operating
requirements for implementation of the key components.
Staff recommends that the City Council:
1) Approve the key components of the Plan in concept that is the creation of two
Resource Libraries at Main/Children’s Libraries and Mitchell Park Library and the
preservation of Neighborhood Libraries at Downtown, College Terrace, and Terman
Park Libraries.
2) Direct staff to proceed in development of Phase I of the Plan and return to Council
with a proposal that outlines expense to implement it.
3)Direct staff to return to Council with a multi-year plan to implement and finance and
the key elements of the Plan; including projected operating and capital expenses.
PROJECT DESCRIPTION
Background
A Draft Library MaSter Plan prepared by City staff was submitted to the Council on
March 16, 1998 and referred to the Policy and Services Committee. Subsequently, the
LAC was established, members were appointed and a yearlong review of the library
system was undertaken.
In May 2000, the LAC completed its New Library Plan (Plan), a report describing its
findings about the library system after a year of study and its recommendations for
current and future service delivery. The report, presented to Council at a study session on
May 22, was’researched and written in its entirety by LAC members after they analyzed
data, gathered community input, visited new and remodeled public libraries in the Bay
CMR:345:00 Page 2 of 7
Area, attended meetings with commissioners from other jurisdictions, and discussed
issues and options in small committee and scheduled LAC meetings. Staff assisted the
LAC by providing information and data upon request, reacting to proposals when
requested and assisting in the clerical details of compiling and printing the report.
Summary_ of LAC Recommendation
The Plan looks comprehensively at all library service programs and facilities in Palo
Alto, often in comparison with other heavy-use public libraries in California. It
envisions the development of high quality library, service, yet recognizes the expense and
operational overhead a multi-branch system requires. After considerable deliberation, the
LAC has recommended what it believes to be the most efficient proposal possible. The
proposal seeks to balance the community value for multiple neighborhood branches, the
need to significantly upgrade services and facilities, the challenge of serving a population
that is nearly equally spread between north and south Palo Alto, and the importance of
remedial support for current services.
The LAC recommendation includes the following key components:
1. Improved and expanded, full-service Resource Libraries, similar in collection size,
hours and programs, in both north Palo Alto (Main/Children’s) and south Palo
Alto (Mitchell Park).
This proposal involves: eventual expansion at all three libraries, which are too
crowded and insufficient in size to accommodate current and increasing use;
improvements in hours, breadth and depth of collections and-services; new
services (such as teen programs); and required basic facility improvements (such
as electrical infrastructure, air-conditioning). The Plan includes a significant
upgrade in services and collections for all ages at Mitchell Park Library~to make it
comparable with the services in north Palo Alto.
A new definition for branches, (College Terrace, Downtown, and Terman Park) as
Neighborhood Libraries, with a reading room flavor, limited in services and size
but filled with interesting, popular collections.
This proposal recommends that collections be updated so that all materials in the
collections are current, with Terman Park (or a replacement library in southwest
Palo Alto) moving from a paperback-based collection to one similar to the other
Neighborhood Libraries. Hours at Terman Park would also be upgraded.
Professional staff would no longer provide direct reference service. Some staff
CMR:345:00 Page 3 of 7
classifications would be downgraded at these facilities and questions and research
tutoring would be referred to Resource Libraries.
This model prioritizes library services at Resource Libraries, especially in times of
economic decline when expense reduction is required. If funding for library services is
reduced, this model supports the continuation of comprehensive library service for both
geographic areas of Palo Alto. In addition, the Plan recommends remediation of current
library services (collections, services and staffing levels) and the introduction of new
services, such as teen programs, consistent with progressive public library services
provided in most other communities.
Identification of Policy Issues
There are several major policy issues to be addressed in review and discussion of the
Plan. If Council approves the key components of the Plan in concept, it will establish the
following policy directions.
1.The City will continue to operate six libraries.
The strength of this policy is its acknowledgement of public support for the value of
public libraries as community gathering places in neighborhoods. This is also
consistent with public feedback, both through focus groups conducted in 1997, and
recent input to the LAC via letters and public meetings. Weaknesses of this policy
include the on-going operational expense and capital costs to support and maintain
quality library service at multiple sites. In addition, the six-branch structure is
vulnerable in times of financial constraints, and may result in a gradual eroding of
quality library services citywide.
The City will improve and expand services for all ages at Main/Children’s libraries
as full service Resource Libraries serving north Palo Alto, and upgrade Mitchell
Park branch to become a full service Resource Library serving south Palo Alto. All
buildings will be expanded and renovated or demolished and rebuilt.
This policy direction addresses critical weaknesses in the current service level,
especially inadequacies of primary facilities (Children’s and Main Libraries and
Mitchell Park Library), which receive 85 percent of use. The policy addresses the
need to restore and augment collections, services, technology access, space and
staffing levels. It is also responsive to the need for more equitable services in south
Palo Alto, where more than 50 percent of population resides. As detailed in
Appendix G of the Plan, this policy maintains and strengthens a traditional program
for children, birth through elementary school, their parents and caregivers and
recognizes the need to provide teen spaces, collections and services.
CMR:345:00 Page 4 of 7
There are two weaknesses of this policy direction. First, it designates three libraries
as Resource Libraries, which will be more costly than maintaining the current focus
on Main/Children’s Libraries as the City’s primary service libraries. Second, it
maintains a dual-library focus in the north, splitting full service for families between
two facilities at different but nearby locations, that is Main Library, (which serves
teens and adults) and Children’s Library (which serves infants through elementary
schoolage children).
o College Terrace and Downtown branches will be designated as Neighborhood
Libraries, with more current and popular reading collections and a reduction in
reference service level from that currently provided at these locations. Terman Park,
or its successor, will be upgraded to a Neighborhood Library with similar hours,
services, collections and staffing.
This policy direction clarifies service delivery expectations for each library and
acknowledges the need to upgrade Terman Park service. It optimizes professional
staff skills at Resource Libraries and provides efficient staffing configurations at
Neighborhood Libraries. For some users, this policy reduces direct reference
assistance by professional librarians at College Terrace and Downtown libraries,
substituting paraprofessional support.
Plan Implementation
Approving the key components of the Plan in concept at this point does not commit the
City to implement every element in the plan. As set forth by the LAC, the plan is
estimated to require approximately $4.6 million to fund annual operations and $48
million in capital expense. The Plan need not be implemented in all its details nor all at
once. Staff has begun to outline phases for Plan implementation. Staff will develop a
multi-year, multi-phase implementation and financing plan to implemenl the key
components of the Plan. More immediately, staff will return to Council with a proposal
for Phase 1 implementation and funding which incorporates improvements begun with
the 2000-01 operating budget.
The Components of Phase I implementation will include:
[] Complete consultant study of staffing operational requirements and job assignments
and a transition plan.
"Migrate Terman Park services to Neighborhood Library model.
¯Begin upgrading to popular collection concept at Neighborhood Libraries by
refreshing collection with new materials.
[]Continue improvements to speed up delivery of new materials to public and removal
of out-dated/unused materials.
CMR:345:00 Page 5 of 7
[]Develop funding plan, complete architectural design and begin construction of
Children’s Library.
[]Complete expansion feasibility and cost studies for Main and Mitchell Park libraries
and building service program studies for expansion of Resource Libraries
(Main/Children’s and Mitchell Park).
[]Add morning hours at Mitchell Park and Terman Park, where demand and need are
highest.
[]Improve staff development opportunities.
[]Implement outreach program for pre-school children in daycare programs and
community/non-profit groups.
[] Relocate Children’s Library staff and services to other library/libraries.
[] Add library staffing to support existing and improved services.
Phase I will enable library services to begin immediate improvements and prepare for
capital building in the near future. Phase 1 will allow the City to take advantage of some
unique opportunities to prepare for capital building and for a potential bond measure. On
the horizon are: a joint feasibility study of the Art Center/Main Library site, partially
funded by a grant; planning for the Mitchell Park Library and Community Center site and
its potential for State public library building funds; and use of private funding through the
Arrillaga gift for architectural work at Children’s Library. This phase does not account
for uncertainties about the potential relocation of the Terman Park and/or Downtown
libraries.
In addition funds in the 2000-01 budget will support some components of Phase I
implementation. However, additional funds will be required and staff will return to
Council in the short-term with a more detailed implementation plan and a resource
request for Phase I.
ALTERNATIVES TO COMMISSION RECOMMENDATIONS
There are many alternatives to the LAC’s plan that could be considered and which would
require different levels of funding. The major alternatives are to:
[]Provide only North and South Resource Libraries and no Neighborhood Libraries.
[]Reduce the number of libraries.
[]Retain current facilities’ size and service levels without significant expansion or
improvement in services.
[]Augment LAC’s proposed program and services.
[]Selectively adopt/not adopt portions of LAC proposal.
CMR:345:00 Page 6 of 7
RESOURCE IMPACT :
The Plan in its full implementation would require $4.6 million in new, on-going
operating funds and $48 million in capital funds. Staff proposes that Council direct staff
to proceed in development of a Phase I plan to implement the key elements of the Plan
and return to Council with a funding proposal. Support for Phase I will come in part from
funds included in the 2000-01 Budget and from opportunities to leverage other City
projects and external funding sources. Beyond Phase I, staff will return to Council with a
multi-phase implementation and financing proposal to implement the key elements of the
Plan.
ATTACHMENTS
Attachment A: New Library Plan prepared by the Library Advisory Commission, May
2000
PREPARED BY:Mary Jo Levy, Director of Libraries
DEPARTMENT HEAD:
PAUL THILTGEN
Director, Community Services
E~cI~L-Y I-I~RRISON
Assistant City Manager
c. Library Advisory Commission
CMR:345:00 Page 7 of 7
N WL A LAN
LIBRARY ADVISORY COMMISSION
CITY OF PALO ALTO
MAY 2000
MEMBERS:
Anthony Angiletta
Lenore Jones
John Kagel
Warren Kallenbach
Tina Kass, vice-chair
Mary Jean Place
Tom Wyman, chair
Table of Contents
Executive Summary
Section I. Introduction
Section II. Mission and Recommendations
Mission and Vision of the Palo Alto Library
Recommendations
Section III. Implementation of Recommendations
Program Support. Correcting Current Deficiencies
Library Collections
Library Staff
Program Support. How to Meet Future Needs
Library Collections
Library Staff
Facilities
Appendix A. General Information and Data
1. Background
Community Participation
Commission Meetings and Discussions
2. Assessment of Palo Alto Libraries
A. Characteristics of the Palo Alto Library System
B. Comparisons with Other Libraries
Size of Facilities
Library Staff
Library Collection Budgets
Library Circulation
3. Trends in Library Services
Appendix B. Children’s Library
Appendix C. Southwest Palo Alto Library Services
Appendix D. Friends of the Palo Alto Library
Appendix E. Palo Alto Historical Association
Appendix F. Chronology of draft Library Master Plan
Appendix G. Full Program Descriptions
Appendix H. Hours
Appendix I. Spatial Chart
page 1
page 3
page 4
page 4
page 5
page 7
page 7
page 7
page 8
page 12
page 12
page 13
page 14
page 16
page 16
page 16
page 17
page 18
page 18
page 19
page 19
page 21
page 22
page 24
page 26
page 28
page 29
page 31
page 32
page 33
page 34
page 52
page 53
05/15/00
List of Tables
Table 1. Staff Needed to Support Present Programs page 9
Table 2. Budget Improvements page 13
Table 3. Incremental Staffing Requirements page 13
Table 4. Library Facilities Expansion page 14
Table 5. General Measure of Library Services in 11 California Cities page 19
Table 6. Library Space in other Cities (All Library Buildings)page 20
Table 7. Size of Palo Alto Libraries (includes areas used by other City staff)page 20
Table 8. Comparison of Staff Levels page 21
Table 9. Staff Available to Keep Libraries Open. FTEs per 1000 Hours
Are Open per Year
page 21
Table 10. Comparison of Library Collections Expenditures page 22
Table 11. Palo Alto Library Collection Budgets. Loss in Purchasing
Power, 1985/86 to 1999/2000
page 23
Table 12. Comparison of Circulation. Annual Circulation per capita Population page 24
Table 13. Library Circulation Compared to Staffing FY1980/81 to 1999/2000 page 25
05/15/00
Executive Summary
On March 16, 1998, the City Council received a Draft Library Master Plan from the City
Manager. Subsequently, in 1999, Council appointed a commission to advise on library
matters. The Library Advisory Commission’s charge was to review the Palo Alto City
Library, the Draft Library Master Plan and to make recommendations for improvements
of library resources. This report embodies the Commigsion’s findings in the form of a
New Library Plan for the City of Palo Alto.
After a year of meetings, including special hearings soliciting citizens’ opinions on the
state and future of the Palo Alto Library, we find:
Residents value highly continuation of a core and neighborhood library system
Residents value expanded services for children and teens
¯ Residents value integration of technological innovation, but not at the price of
neighborhood libraries or in reduction or non-growth of printed and other non-
computer-based materials and services
Residents value expanded hours and services across the system
We find, further:
* Financial support for library collections, reference services, hours of opening,
cataloging and processing and technological innovation has been insufficient to
meet present public needs; alone, 17.0 FTE are needed to bring the system up to
the requirements of the present program
On the
* The Library compares unfavorably with adjacent communities and with cities
similar to Palo Alto in California on a number of indicators, including staffing,
facilities and size and diversity of programs and services
basis of these findings, we recommend, in terms of timing:
¯ Immediate remedial actions in staffing and collections, including a revised
budget request for FY00/01 that includes 8.0 new FTE and $59,000 in new base
dollars for books and periodicals. An additional 9.0 FTE should be added over
the short term bringing the total new FTE to 17.0.
* Capital improvements in the form of facilities remodeling and expansion,
comprising a 115% increase in system-wide square footage which includes
approximate doubling and tripling of libraries at the Main and Mitchell Park sites,
respectively
05/15/00 1
o Operational funding improvements for incremental staffing, collections and
other resources necessary to implement the Library Plan, including a total of 35.5
FTE and a 185% increase in collections outlays over the life of the plan
We recommend, in terms of personnel, program configuration and facilities:
¯ Creation of two Resource Libraries at the present Main and Mitchell Park where
citizens will find the bulk of improved and expanded services and collections
¯ Preservation of neighborhood libraries for reading and limited services in the
downtown, College Terrace and southwest areas of Palo Alto
*Expansion of children’s services and establishment of teen services, including
preservation of the Children’s Library as part of that program
The Library Advisory Commission holds that this plan is at once restorative, preservative
and progressive. It is neither futuristic nor unimaginativ, e in character. We believe it is a
necessary blending of continuity and change that matches well with the kind of
community we are and with the range of information needs our citizens have had and will
have.
05/15/00 2
Section Io Introduction
In March, 1999, a newly appointed seven-member Library Advisory Commission
(hereafter LAC) of Palo Alto took office. It had been almost fifty years since the city last
had an official library commission. Since 1989 the community had witnessed a serious
decline in library services, program and collections. The City Council’s charge to the new
Commission was to review the conditions existing in our libraries and to make
recommendations for a_’mprove~ments.
On March 16, 1998, the City Manager presented to the City Council a Draft Library
Master Plan, created by Library and City staff. The draft was then referred to the Policy
and Services Committee. The plan was not received well, either by the community or by
many City Council members, mainly because it suggested that three libraries should be
eliminated.
At the time the Plan was being presented, a proposal by the Friends of the Palo Alto
Library to resurrect the idea of a Library Advisory Commission was successfully working
its way through the political process. One of the key responsibilities of such a body
would be to provide advice to the Council on long-range planning for the libraries.
In assessing the needs of Palo Alto’s libraries, th~ first order of business was to review
the staffDraft Library Master Plan that had been referred to the Policy and Services
Committee and had been put on hold until the new Commissioners were appointed and
took office. The Commission reviewed the Plan and began to elicit the views of the
various constituencies of Palo Alto’s library system. The commissioners were briefed by
Library staff on programs, technology, collections, facilities and staffing. They reviewed
the evaluation of the Draft Master Plan prepared by the Friends of the Palo Alto Library.
They held two public meetings to get public input and to hear first hand the community’s
ideas and aspirations for its libraries.
The Commission has chosen to create a new dynamic and visionary plan that is program
driven addressing the interests and needs of Palo Alto’s highly educated, service-
demanding community of library users. That plan is presented in this report.
Because context is so important in a major report like this, the Commission is including
material that compares Palo Alto to other communities similar in size, geographic
location and demographics along with proposals on how to satisfy unmet needs. In order
to reduce redundancy, all analysis and data supporting the recommendations in Section II
are contained in the Appendixes.
Since it is impossible to estimate financial data until specific programs and library spaces
are stipulated and endorsed by the Council, cost data are not included.
05/15/00 3
Section II. Mission and Recommendations
The Mission and Vision of the Palo Alto City Library
Palo Altans are distinctive, diverse and demanding. They expect high standards in the
performance of municipal services and in the provision of community resources. The
Palo Alto City Library system exists in order to meet the varied needs of this population.
The Library should make it convenient for Palo Altans to acquire knowledge and
information, to find recreational reading, and to develop literacy skills. It should also
provide a safe and comfortable setting for community activities.
The Library Advisory Commission envisions a community library and information
system that is at once restorative, preservative and progressive in character. We see a
resource program embodied in attractive, comfortable and welcoming spaces where
residents can gain access to the world’s knowledge and culture for learning and
enjoyment. We see excellent and multifaceted collections of print and multimedia
materials at the libraries as well as access to the world of electronic resources in the
libraries, homes, offices and schools. We see a helping staff sufficient in number and
expertise to achieve these ends.
05/15/00 4
Recommendations
A vision has little meaning without a plan of action. A plan of action requires making
choices among available options. The choices that the Library Advisory Commission
recommends require significant financial commitments in human, physical, and
technological resources. We are striving to satisfy the diverse and dynamic library and
information needs of all of Palo Alto’s reading and information-seeking public.
The LAC firstidentified the 15fbgrarriS and g6fvices lhat must-drive-its’proposals. We then
proceeded to assess the physical plant, technological infrastructure and personnel needs
such an array of programs requires. Finally, we have considered timelines ne.cessary to
implement such a program.
At the core of our plan of action are three features that embody the most significant
changes in program and the necessary physical plant and personnel changes for their
execution. They also include continuities that the Library Advisory Commission and
numerous citizens value:
¯ Creation of two Resource Libraries at the present Main and Mitchell Park
Library sites (serving north and south parts of the city, respectively). At these
sites people of any age will find the greatest number of materials and services,
including core reference services with electronic links for remote users, email
correspondence with reference librarians, centralized phone service, fax,
expanded current and historical collections, computer clusters, teen and children’s
services, group study rooms, and other features;
,, Preservation of the concept of geographically-based small neighborhood
libraries for reading and limited services, including Downtown, College Terrace
and Terman Park or another facility in the southwest section of Palo Alto;
¯ Expansion of children’s programs and services, including substantial
improvements at the Resource Library sites; specific plans for the Main
Library/Children’s Library will depend on the outcome of the architectural review
for the optimal expansion and improvement at Children’s Library.
We recommend, therefore, in terms of library programs and services:
* Increase in the size of the collection by 56%, and expansion of the character and
formats represented by the collection.
. Expansion of system-wide hours by 31%;
* Creation of substantially expanded children’s programs and collections at the
Main/Children’s and Mitchell Park sites and expansion of existing children’s
services in neighborhood libraries;
. Creation of teen programs, spaces and services at the Main and Mitchell Park
sites;
o Creation of group study and meeting spaces at the Main and Mitchell Park
sites;
. Creation of computer clusters for electronic access at the Main and Mitchell
Park sites;
05/15/00 5
¯Expansion of services for persons with disabilities or special needs;
¯Creation of a coordinated volunteer program;
¯Expansion of school outreach programs;
¯ Improvements in technical processing resulting in materials becoming available
sooner;
¯Integration of the program of the Palo Alto Historical Association, including its
collections and the services of a Palo Alto Historian;¯ oIntegratio.n of the progr .am a~_d seryj.ces of._t.he Friends~ ~ofthe Pa!9’ Alto Library,
including its book sales to the public.
We recommend, therefore, in terms of physical plant and capital improvements:
¯ Substantial facilities improvements in the form of new construction or additions
to the square footage of the Resource Libraries at the Main and Mitchell Park
sites;
¯ New construction or renovation of a site (including the present Terman Park
site, if available) to maintain a neighborhood library in southwest Palo Alto;
¯ Renovation of the Downtown Library to reclaim space currently being used by
another C!ty Department or relocation to an alternate site in the downtown area;
¯ Pending architectural review, renovation and possible expansion of the
Children’s Library;
¯ Completion of structural repairs at College Terrace and internal reorganization
of shelving capacity;
¯Upgrade facilities to accommodate evolving technology.
We recommend, therefore, in terms of personnel changes required to carry out
these programs:
~ Additions to regular Library staff over a period of 5 years resulting in a net
expansion of up to 35.5 FTE (full-time employees);
¯ Immediate conversion of 6 FTE from hourly part-time to regular benefited ’
status;
¯ Reconfiguration of staff, using only paraprofessional staff at the neighborhood
libraries.
05/15/00 6
Section III. Implementation of Recommendations
The programmatic recommendations of the Commission fall into two phases: what must’
be done now, and what can be implemented over time.
Program Support. Correcting Current Deficiencies
Over the past fifteen years, increases in library budget and staffing have been insufficient
to keep up With ifi~ inflati6n-drivefie0st oflStoviding services. ]~uring~the same,period,
however, residents have demanded substantial increases in library services. In addition,
there have been dramatic increases in technology, information formats and delivery
methods available to the Library.
This lack of financial support has resulted in a library system that cannot adequately
maintain the current level of programs, including collections, hours, staffing.
Comparative data supporting this conclusion are contained in Appendix A, Section 1
(pages 18-26). The Commission believes that amelioration of this past neglect needs to
begin now, rather than waiting until the conclusion of the Master Plan approval process.
Specific shortcomings of the current program include:
.¯ Inadequate budgets for purchasing new materials;
¯ Delays in processing new and!or damaged materials, resulting in collections
being unavailable;
¯ Insufficient weeding of outdated materials, resulting in collections that are not
current, but that occupy precious space available in our limited fa’eilities;
¯Reliance on overtime to open facilities on Sundays;
¯ Limited hours in branches, especially at the heavily used Mitchell Park library;
¯ Staff unavailable to answer phones or to provide reference service to users
waiting at the desk;
o Library supervisors unavailable to manage staff (train, direct work, develop) or
to plan for improved services because they must fill in for staff at service points;
¯ Inadequate access to PCs and electronic resource for patrons;
¯ Insufficient staff to support improvements to the on-line catalog, to implement
projects that can improve availability of materials, to maintain support of current
technology, and to plan for the future.
Immediate steps need to be taken to bring to the library program adequate levels of
support, both for staffing and collections.
Library Collections
The collection of the Library is the foundation of the services it provides. Until more
space is available, however, major efforts to improve the collection will have to occur
through attention to improving currency of materials, discarding dated materials and
increasing the purchase of videos, CDs, CD-ROMs, tapes and other non-book materials
(e.g., DVDs and E-books). Increasing library staffwill support the weeding and
maintenance of collections; increases in the materials budget are required to purchase
current materials in all formats.
05/15/00 7
The library materials budget for FY99/00 is $490,000. Increased numbers of updated
titles, more unique titles, improved currency of collections and limited expansion of the
non-book materials and foreign language items (currently funded by Friends
contributions) will require an increase of 15%, resulting in materials budget of $563,000
a year, beginning with FY00/01, and continuing with annual inflationary increases.
-In addition to this increase in the materials budget, staff additions described below ,will be
required to Select and purchase new matei-ials, and to Weed’the’existing collections. Staff
assigned these responsibilities typically carry out other duties as well; therefore the FTE
staff included in the "Improve public services" category in Table 1 (page 9) will have
collection development duties as part of their assignment.
Library Staff
To provide even a minimal level of service, the Library requires additional staff. This can
be accomplished by:
1) adding new positions (itemized in Table 1, page 9);
2)converting 6.0 FTE positions from hourly part-time to regular, benefited
status.
This remedial staffing step cannot wait until facilities improvements are under way or
completed. Fortunately, it can be implemented quickly and will result in improved
service that will be immediately apparent to library users before building and renovation
programs receive funding. Improved staffing levels will not only go far to support
existing services but will also be consistent with the program recommendations (as
described in Program Support. How to Meet Future Needs, p. 12) that the Commission is
proposing for the longer term.
The following summary of staffing priorities provides a reasonable approach to
correcting the current situation. This is an example of how increased staffing can improve
services immediately.
05/15/00 8
Table 1. Staff Needed to Support Present Programs
Purpose
1. Improve public services
2.Improve cataloging and
processing
3. Provide technology
planning expertise and
support for use of equipment
4. Improve collections
5. Sustain overall operations
TOTAL
FTE
6.5 FTE
3.0 FTE
2.0 FTE
3.0 FTE
2.5 FTE
17.0 FTE
Result
Staff neighborhood libraries at the 4.5 FTE level
(average across branches).
Staff Children’s Library at the 9.5 FTE level.
Increase library hours by 5 % (reinstate morning
hours at Mitchell Park and add hours at Terman
Park).
Change loan period from 4 weeks to 3 weeks.
Establish staffing levels that will accommodate
staff illness, training, eamed vacation.
Reinstate telephone reference service on Sunday
and accept inquiries by FAX and e-mail in
addition to phone and in person.
Increase use by 12% (measured by circulation).
Establish capacity for supervisors to spend 75%
of their time to hire, train, supervise staff, and to
plan and improve services to users.
Make 80% of new items available within three
weeks.
Have dedicated expertise in library for library
technology applications, planning and operations,
including maintenance.
Make 97% of equipment available for public use
at all times.
Increase new title additions by 10%/year.
Increase discard rate of outdated materials by
15%
Enable implementation of Draft Plan, including
planning for program and building enhancements.
Enable fundraising efforts to proceed by means of
grants, Friends of the Library and other private
sources with $250,000 in new contributions
received each year.
Establish volunteer program and increase
volunteer support over time from 4 FTE per year
to 8 FTE.
Support Library Commission.
05/15/00 9
Positioning the Library in the Immediate Future
These additional staff represent the Library Advisory Commission’s best estimate of
wfiat we require to address shortfalls that have developed over the past fifteen years. This
level of staffing will also position the Library for implementation of the proposed plan for
the future. The Commission is requesting a budget revision for the second year
(FY2000/2001) of the current budget cycle that includes an increase in staffing of 8.0
FTE in the following areas:
Improve public services
¯Begin improvement of staffing at branch libraries
¯Reinstate morning weekday hours at Mitchell Park
¯Increase circulation by 12%
o Change loan period from 4 weeks to 3 weeks
.Accommodate morning opportunities at Mitchell Park for visits
by pre-schools, people with special needs, classes, etc.
Improve ability to maintain public service during staff illnesses,
vacation and training
3.0 FTE
Improve cataloging and processing of materials 1.0 FTE
Make 75% of new items available on the shelf within one month
Provide technology planning expertise/support 2.0 FTE
¯ Make 97% of equipment available at all times
¯Provide dedicated expertise for library technology applications
in the library
Improve collections
*Increase number of new titles by 5%
*Increase discard rate of outdated materials by 10%
2.0 FTE
In addition, this proposal assumes conversion of 6.0 FTE hourly part-time staffto regular
benefited status.
The above summary is not presented in priority order. The sequencing of service
improvements will be the responsibility of the library staff once funding is secured.
Similar additions to the staff should also be made over the next three fiscal years in order.
to bring current library operations to the appropriate level of service.
Conclusion
We emphasize that we should not separate these recommendations from the
Commission’s overall Draft Plan proposal. We believe they represent what must be done
simply in order to bring the system up to date and to begin creating the enhanced library
system that the community demands and will support.
05/15/00 10
This first phase of the Draft Plan must be implemente.d before any further phases Can be
successful. It requires political determination and courage to approve a plan that is both
dramatic and costly, but it is the only way to remedy past neglect. No long-term building
plan, however inspired, can overcome the serious deficiencies in operational support that
the library and its patrons have tolerated for so many years.
On April 20, 2000, the foregoing analysis was presented to the City Council’s Finance
Committee. That Committee has recommended 2.0 FTE IT positions for the Library. It
recommended im’~additioniff$200~000 for’lheCity~Mhnager’s bUdget for staff additions to
the Library. It also recommended an expenditure for an outside consultant to assess
Library operations, the consultant to be employed, after consultation with the LAC, on a
"fast track" to report back as soon as possible so that additional timely Council
consideration can be given to Library staffing.
The LAC believes that the foregoing, if approved by the full Council, would be a
responsive first step to begin to meet the Library’s current staffing deficiencies as found
by the LAC.
05/15/00 11
Program Support. How to Meet Future Needs
The program recommendations described in Section II will require increased support for’
collections and staff in addition to substantial capital investments in almost every library
facility in Palo Alto. Analysis and data supporting this conclusion are provided in
Appendix A, Section 1 (pages 18-26).
The Commission and the Library staff cannot yet determine with certainty the costs of a
library building program. Staffing and collections costs can ’be estimated with greater
precision, although all of these components of the library program depend on decisions
by the City Council regarding the Draft Plan. The following sections contain a
recommendation for expanded staffing and facilities as well as our best current estimates
of the costs of improving collections.
Library Collections
The City’s library collections budget has not kept pace with the Consumer Price Index for
at least fifteen years, with the result that the library has lost approximately 24% of its
purchasing power during that period (see table on page 23). The library collection has
fallen behind those of comparable communities in terms of number of volumes and types
of materials, and Palo Alto residents are frequently forced to use libraries in other cities
for their information needs. As an example, a "snapshot" taken on one day in April 1999
showed that over 6100 items from the Los Altos library were on loan to Palo Alto
residents.
The following improvements in the collections are essential:
¯ Increase the overall size of the collection to 400,000 items, an increase of 43 % over
the current size of 280,000 items. ~
¯ Expand the number of unique titles from 169,000 to 232,000, an increase of 37%:
Unique titles will typically be located in the Resource Libraries, providing broader
and deeper collections for research needs of residents.
* Increase the number of copies of popular titles purchased by 33%: Palo Alto
residents have a history of high use of the public libraries, not only for study and
research, but also for keeping up with popular titles. The Neighborhood Libraries will
continue to maintain their collections of the duplicate popular titles.
¯ Improve the collection replacement rate (number of titles withdrawn and replaced
from current collections divided by size of total collection) to 10%-13%: This ratio
has ranged from 4.4% to 7.4% for a number of years. This is the only way we can be
sure the collections remain current and useful.
05/15/00 12
Table 2. Budget Improvements
Budget Period Budgeted Amount Increase over FY 99/00
Current Collections Budget FY99/00 $490,000
Immediate Improvements (FY00/01)$563,000 15%
Library Plan Full Implementation $1,400,000"185%
* Budget is augmented by 3% annually for each often years until 2010forpurposes ofplanning," the actual
amount required may be more or less than this.
These recommended increases in the collections budget will add a wide range of current
fiction, nonfiction, and reference books and periodicals--plus electronic databases and
audiovisual items--to the City library collections at both the adult and juvenile levels,
thus meeting the needs and expectations of Palo Alto library users.
The Commission recognizes that the Friends of the Palo Alto Library have raised and
contributed significant funds for the collection that have been critical to the libraries over
many years. The Commission strongly urges, however, that no line budgetary items such
as books, periodicals and audio materials should be funded by donations. If this were to
continue, it would represent an abdication of public funding responsibility and an
assumption that there would be a continuing subsidy. The fundraising efforts by civic
organizations such as the Friends should instead be used to seed, enhance or supplement
special programs of the Library and its operations, and not to support ongoing needs of
the Library. We leave the determination of what those special aspects and programs
might be to the City library staff and the Friends.
Library Staff
Library staffing in Palo Alto has remained virtually unchanged over the past twenty years
despite dramatically increasing demands for library services; the staff count for FY99/00
is 55.5 FTE, while for FY 80/81 it was 52.87 FTE. As a consequence, the Palo Alto
library system, with one of the highest per capita circulation levels in California, has
fewer full-time employees than comparable communities with fewer libraries and lower
circulation levels (see Table 8 on page 21 and Table 12 on page 24). What this means is
clear: Palo Alto cannot offer its citizens the same level of library service and personalized
attention that patrons in other communities enjoy.
The LAC urged immediate improvements in staffing levels earlier in this section. In
addition, implementation of the public programs identified in Section II (pages 5-6) of the
proposal and the opening of new, larger facilities when the Library Plan is completed will
require additional staff to maintain the level of support expected by Palo Alto residents.
Table 3. Incremental Staffing Requirements
Budget Period Total FTE FTE over FY99/00
Current FY 99/00 55.5 FTE
Immediate Improvements (see p. 10) 72.5 FTE 17.0 FTE
Library Plan Full Implementation 91.0 FTE 35.5 FTE
Facilities
05/15/00 13
Except for the building of the Downtown Library in 1971, Palo Alto’s library buildings
have received little attention since the Main Library and Mitchell Park Libraries were
opened in 1958. (Terman Park opened in 1985, although its limited collection, services
and hours have not resulted in significant use; it currently represents 3% or less of total
library service.) The city’s population has grown by 50% since 1958, ~with corresponding
increases in library usage and demand for services.
Although Pal0 Alt0 has ~ix fibrari~h’,~ th~"t0tii1 d~-dicatefflibr~iry space~i~" significantly less
than it is in comparable cities with fewer libraries (see Table 6 on page 19). Library
facilitiesat Main, Mitchell Park and Children’s are operating beyond capacity. These
facilities lack sufficient parking, seating, shelving, quiet study areas, small group meeting
areas, and designated program spaces.
Increasing square footage and improving the existing space available to the libraries is a
start, but only a start. We must improve the technical infrastructure that will let the
libraries provide access to electronic sources of information. The libraries are severely
limited in their ability to accommodate technology-based services. At present, there is a
waiting list for every computer we have at almost any hour of the day.
We cannot project the cost of expanding and renovating library buildings without detailed
program and building plans. These will involve both the City’s Public Works staff and
Library staff. They cannot begin, however, until the City Council approves the Library
Plan. Also, the feasibility study for the Children’s Library will affect the final
recommendation of the LAC regarding facilities.
The following summarizes library space the Library Commission believes is needed to
support our program recommendations:
Table 4. Library Facilities Expansion
Library
Main (1)
Mitchell Park (2)
Children’s
College Terrace
Downtown (2)
Southwest
TOTAL
Current Size
26,300 sq. ft.
9,814 sq. ft.
3,400 sq. ft.
2,400 sq. ft.
7,964 sq. ft.
3,980 sq. ft.
53,858 sq. ft.
Recommended Size
60,000 sq. ft.
33,500 sq. ft.
6,000 sq. ft.
2,400 sq. ft.
8,774 sq. ft.
5,000 sq. ft.
115,674 sq. ft.
Increase
128%
241%
76%
O%
10%
26%
115%
1. In addition to collections and public space, it is assumed that the technical process~ng staff will be
housed at the Main Library. In addition, space for the Friends of the Palo Alto Libraries and for the Palo
Alto Historical Association history collection will be located in the Main Library. Any of these functions
could be moved to another facility with the resulting alteration in recommended size.
2. The current square footage of both the Mitchell Park and Downtown Libraries does not include space
currently occupied by other City departments (1170 sf for Mitchell Park and 810 sf for Downtown). The
Recommended Size figures for Mitchell Park and Downtown assume returning that space to library use.
The funding strategy for such substantial projects will be complex; it will involve city
funds, possible bond issues and the potential of the Proposition 14 public library
construction bond support, and possible private funding.
05/15/00 14
Conclusion
The plan outlined in this section will enable the Library to provide the services and
facilities that Palo Alto residents demand and require. It will move Palo Alto to a level of
library service that is already enjoyed by neighboring cities. The Library Advisory
Commission strongly recommends that the City Council take positive action on the
proposals for the Palo Alto Library presented in this plan.
05/15/00 15
Appendix A. General Information and Data
The following pages provide information and data to support the Library Advisory
Commission’s recommendations. On virtually every measure, the condition of Palo
Alto’s library system is deficient.
o The entire library system is under-funded;
o Staffing is inadequate;
¯Library collections have declined in depth and breadth;
¯Library buildings are dated and unattractive;
¯Main, Children’s and Mitchell Park libraries are crowded beyond capacity and
there is little shelf space to expand collections;
There are no dedicated spaces for teens, for group work or for meetings.
Ten California cities comparable in various ways to Palo Alto were selected as the basis
for comparing the City’s library system. This cross-comparison of library systems was
most revealing. Palo Alto’s six-branch library system far surpasses the number of
branches that comparable communities have. In terms of library circulation, Palo Alto
ranks near the top. In terms of the money it spends on library collections it ranks near the
bottom.
This assessment ofPalo Alto’s library system is a call to action. Palo Alto’s library system
must be substantially expanded and services must be improved to meet the rapidly
evolving technological challenges of the new global information era.
1. BACKGROUND
Community Participation
The history ofPalo Alto’s libraries and the active public participation in making them
what they are today can be traced back to 1895 when the Woman’s Club assessed its
members one dollar per year to establish the town’s first "Free Reading Room." As the
library system developed, it became one of the community’s most important services,
ranking alongside the City’s schools, parks and recreational facilities in attracting new
residents to Palo Alto and making our community uniquely desirable.
In developing plans to transform Palo Alto libraries to meet the evolving requirements in
the 21 st century, the LAC relied heavily on community participation in public hearings
and on written input from library users. Information elicited during eighteen Library-
sponsored focus group meetings involving over 230 participants of all ages over a five-
month period in 1996 provided a good initial overview of how Palo Altans feel about
their libraries. This input was supplemented last October by two well-attended LAC-
sponsored meetings--one at Cubberley and one at the Art Center. At these meetings,
members of the public were invited to express views on what should be done about the
City’s library system. In addition, the LAC received many letters from individuals and
05/16/00 16
noted written comments involving libraries that appeared frequently in local newspapers;
The thrust of the public sentiment gleaned from these sources may be summarized as
follows:
¯ Don’t close our libraries. Even during the focus group sessions in 1996, well
before the Staff report that appeared in 1998 proposing the closure of three
libraries, strong community support was expr~essed among all groups for the Palo
Alto branch library system.
¯ Our library collections are inadequate and in many cases dated. We need
more books as well as more material in non-book formats and in foreign
languages.
¯ Facilities are dated, poorly lighted with unattractive interiors and
uncomfortable seating. They are often too crowded and have no space for group
meetings, small or large. Parking is insufficient at some of our libraries.
¯ Services are too limited. Children’s programs are too few and over-crowded;
there is insufficient staffing, a condition heightened by limited and inconsistent
hours at the branches; there are no specialized services or spaces for teens and
there is no Internet access at some branches.
¯ More funding is required. For some time funding has been insufficient to
support needed services and collections and to improve facilities. The public
expressed willingness to provide more financial support for Palo Alto’s libraries.
The message from the public was consistent: The public loves its libraries and recognizes
that we are fortunate to have as good a system as we do. At the same time, library users
clearly recognize that the City has fallen behind in funding basic library facilities and
services, and they believe that corrective action should be taken without delay.
After completion of its draft report in April 2000, the LAC invited public review and
comment of the report before formally transmitting it to the City Council for action.
There was strong support for the LAC recommendations, both at the public meeting and
in letters from residents.
Commission Meetings and Discussions
Following its first meeting, Library Advisory Commission members concentrated on
developing an in-depth understanding of the Palo Alto Library System. Information
contained in the staffDraft Library Master Plan provided Commission members valuable
background and perspective. Library staff has been extremely helpful in this education
process. They have been forthcoming in providing information and in responding to LAC
requests for clarification and supplementary data. Friends of the Palo Alto Library also
offered helpful comments on the City’s Draft Library Master Plan.
More than twenty LAC meetings were devoted to learning about the City’s library
system, receiving public input and visiting public libraries in nearby communities.
05/16/00 17
During its retreat on November 7, 1999, the LAC formally began to exchange thoughts
on developing its own proposal. Three committees composed of Commission members
were formed to study and prepare sections of this report. These were the Operations,
Finance and Data and Southwest committees. Since that time, the Commission has
developed, discussed and refined elements of its Library Master Plan. This plan defines
what the Library should become to respond to the needs and resources of Palo Alto.
2. Assessment of Palo Alto Libraries
Palo Alto’s library system has not been a City priority for some fifteen years. Funding has
been inadequate to sustain and build a system that meets current user needs and fully
incorporates evolving technology. As a result, the City now faces the challenge of
playing catch-up for past neglect. The Commission sees this as both a problem and an
opportunity.
A. Characteristics of the Palo Alto Library System
Library services in Palo Alto reflect the population of the city and the history of the
library system. Following are some of the special characteristics of Palo Alto that affect
its library service requirements.
o High Usage: Despite the deficiencies of its system, the Palo Alto Library is second
in per capita usage within its population range. Statewide, Palo Alto ranks sixth
among all communities; in the past it has ranked first.
¯ Changing City Demographics: As Palo Alto has grown, library locations and the
availability of library services, no longer reflect the population distribution within the
City. Approximately 54% ofPalo Alto’s population now lives south of Oregon but
only two libraries--comprising 27% of the City’s total library space--are located there.
Over the last decade, the circulation at Main has gradually declined while that at
Mitchell Park has been growing; now the two libraries are virtually equal at about
30% of total circulation in each facility.
. Branch Libraries: Palo Alto’s six-branch library system poses both fiscal and
operating challenges. The branch system requires added expenses for a daily delivery
system, for multiple handling of returned materials, for purchase of multiple copies of
books and magazines, and for regular scheduled use of overtime to staff six facilities.
Management of a branch system is complex on a number of measures, including
materials selection and processing, coordination of schedules and policies,
coordination of patron accounts, and accommodation of daily travel by library staff.
Despite the expense and complexity of the branches, however, library users have
grown to depend on it. In addition, the branches address broader Citypriorities. For
example, retention of the six-branch system is consistent with the Policy C-29 under
Goal-5 of the Palo Alto Comprehensive Plan which states, "Strategically locate public
05/16/00 18
facilities...to serve all neighborhoods in the City." It is also consistent with the Plan’s
objectives to reduce traffic and to discourage use of private transportation.
B. Comparisons with other Cities
The Commission
communities that
cities selected for
Sunnyvale with a
compared the Palo Alto library system with libraries in ten other
are similar to Palo Alto on various measures. The population of the
analysis range from Menlo Park with a population of 31,250 to
population of 132,900.
Table 5. General Measure of Library Services in 11 California Cities
Palo Alto
Berkeley
Beverly Hills
Carlsbad
Menlo Park
Mountain View
Newport Beach
Redwood City
Santa Clara
Sunnyvale
Thousand Oaks
2 3
Pop.# of
1/1/98 Libs
60,500
107,800
34,050
73,700
31,250
74,7O0
72,6O0
65,800
101,900
132,900
115,700
6
5
2
3
2
1
4
3
2
1
2
Total Circ
Staff per
(FTE)Cap
Annual
Hrs of
Service
54.5 16.9 13,967
121.1 14.7 16,822
78.1 24.8 3,262
82.4 14.6 7,852
19.1 13.8 3,272
52.6 10.1 4,019
63.9 18.1 11,036
64.8 10.8 8,216
57.1 13.3 6,732
63.9 10.2 6,057
83.5 11 5,876
Library
Budget
$4,130,098
$9,336,665
$6,650,153
$5,300,000
$1,388,750
$3,784,831
$3,937,455
$4,814,400
$4,758,400
$5,766,609
8 9
General %of
Fund Budget Gen
Fund
Budg
$94,577,000 4.4%
$93,081,091 10%
$99,755,913 6.6%
$61,600,000 8.6%
$25,917,410 5.5%
$63,100,000 6%
$85,031,578 4.6%
$48,144,000 10%
$97,320,000 4.9%
$52,040,490 11%
Columns 2-6from California Library Statistics, 1999; fiscal year 1997/98. Published by California State
Library, Library Development Bureau, Sacramento, 1999.
Columns 7-9 show data for FY 1999/2000.
Notes: Menlo Park General Fund Budget does not inelude fire services.
Column 9 in Table 5 above shows the proportion of total general funds dedicat6d to the
library budget in selection other communities. Since each city compared uses a different
accounting system, a precise comparison between total general funds and library funding
is difficult. It is clear from this survey, however, that other cities allocate significantly
more of the general funds to libraries than does Palo Alto.
Analysis based on this data consistently shows that Palo Alto’s library, system is seriously
deficient and compares poorly with l!brary systems in other communities. Deficiencies of
Palo Alto’s services are revealed in several-ways.
Size of Facilities: Although Palo Alto has six libraries, its total library space is
significantly less than comparable cities with fewer libraries. Palo Alto has 57,600 square
feet of library space divided among six libraries; the ten other communities surveyed
have an average of 66,000 square feet of library space divided among 2.5 libraries. Four
of the libraries surveyed have together another 235,000 square feet authorized and under
construction.
05/16/00 19
Table 6. Library Space in Other Cities (All Library Buildings)
~= o
200
150
100
50
~1~Projected
Actual
Palo Alto’s 53,900 square feet of library space is not as large as it would appear since
part of it is lost because of the need to duplicate facilities such as checkout areas, staff
space and restrooms at six locations.
Table 7. Size of Palo Alto Libraries (includes areas used by other City staff)
[] Other Staff
~ Library Area
Since Palo Alto’s comparatively modest total library space is divided among six libraries,
no single library has adequate work or program spaces. Finally, approximately 1,980
square feet, or some 7% of Palo Alto library space, is currently occupied by other City
staff and is not available for library use.
05/16/00 20
Library Staffing: With the exception of Menlo Park with two libraries and Mountain
View with one library, Palo Alto has fewer full time library employees than the other
communities.
Table 8. Comparison of Staff Levels
140
120
100
80
60
40
20
0
The average number of employees for the ten communities surveyed is 68.7 while Palo
Alto currently has an authorized FTE level of 55.5 employees. Staffing is 25-30% below
that of other communities with shorter hours and fewer libraries.
Because of this low staffing level, the Palo Alto Library has only 3.9 FTE available per
1000 hours that the libraries are open each year. The average number of employees
available in other communities surveyed is 9.3 per 1000 hours. Palo Alto staff spends
more time on routine tasks such as checking books in and out, and less time on providing
user services (reference, collection development, etc.). One example of the consequence
of this situation is that during 1998/99, 40% of library users who telephoned the Main
library reference desk were unable to get through.
Table 9. Staff Available to Keep Libraries Open. FTEs per 1000 Hours Libraries are
Open per Year
05/16/00 21
During the period 1980 to 2000, the Palo Alto City Library has added 2.63 FTE to the
Library staff, peaking in 1984/85 at 56.35 FTE. Current staffing is 55.5 FTE, an increas~
of 5% over the 1980/81 level of 52.87 FTE. During this same time, Library circulation, a
basic measure of workload, however, has grown by 67%. Additional measures of
increased workload over the twenty-year period include:
Reference/inquiries
Collection size (cataloged items, excluding Terman)
Programs (adult and children)
Program attendance (adult and children)
1980 1999
109,000 182,671
226,050 283,050
414 317
8889 24,651
This level of staffing places heavy burdens on Library employees. It requires frequent
assignments across the city to cover ~chedules, vacancies and illnesses. Supervi.sion,
planning and essential training must often be neglected, and staff morale suffers.
Personnel tumover and recruitment are becoming problems. City residents have been
clear that they view the Library staff as the best part of the system. We must provide
enough staff to ensure that employees have opportunities to do the work they have been
trained for.
Library Collection Budgets: Palo Alto’s budget for its library collection-including
books and non-book items-ranks among the lowest of the communities surveyed. This
shortfall is dramatically worsened by the fact that Palo Alto has more branch library
collections to maintain than any of the other cities surveyed. In addition, minimal
inflation-based increases in the collection budget since 1985 have resulted in a significant
loss in purchasing power.
Table 10.
Palo Alto
Berkeley
Beverly Hills
Carlsbad
Menlo Park
Mountain View
Newport Beach
Redwood City
Santa Clara
Sunnyvale
Thousand Oaks
Comparison of Library Collections Budgets
Branches Budget for Collection Size
Collections
6 $475,100 (1)283,050
5 $790,000 574,890
2 $1,237,706 275, 165
4 $666,500 236,727
2(2)$144,500 131.383
1(3)$375,444 264,275
4 $675,304 360,724
3 $400,900 223,609
2(3)$711,000 289,808
2(3)$591,625 330,937
2 $640,300 348,477
(Items)
(1)In addition, the Friends of the Palo Alto Library contributed $60,240 for libra~
(2)Menlo Park opened the Belle Haven branch in 99/OO fiscal year.
(3)Also operates a bookmobile.
Collection Size (Titles)
165,662
238,130
214,561
n.a.
205,063
201,114
n.1.
184,000
220,000
219,423
~coHections.
05/16/00 22
Over the years, funds budgeted for Palo Alto’s library collections have not kept pace with
inflation. From 1985/86 to 1999/00 there has been a 20% increase in the amounts
budgeted for library collections. Over the same period, however, inflation has eroded
purchasing power to the point where the library’s collection budget is can now purchase
only 76% of what it could 15 years ago.
The current collection budget is about 25% lower in real dollars than it was fiscal year
1985/86. If budgeted amounts had simply kept pace with the Bay Area CPI over the 15-
year period from 1985 to 2000, the collections budget for 1999/00 would be about
$607,000 instead of $490,000.
Table 11. Palo Alto Library Collection Budgets. Loss in Purchasing Power, 1985/86 to
1999/2000.
100
90
80
o 70
"~60
~5o
20
"-
[] L(~ss vs 85/86
[] Budget
Fiscal Year
(Source: U.S. Bureau of Labor Statistics, Consumer Price Index for San Francisco, Oakland, San Jose)
As a result, the depth and breadth of book and other media collections have seriously
declined. Collection breadth and depth are measures of a library’s reputation and merit.
To the extent the City slacks off its support of libraries, Palo Alto’s reputation as a
community that places a high priority on having a first class library system is diminished.
The only way ~hat the library has been able to maintain collections and establish new
ones (such as foreign language collections) has been as through the generosity of the
Friends of the Palo Alto Library. The contributions of FOPAL, however, are meant to
add richness and diversity to our collections and cannot take the place of the basic
support required from the City.
05/16/00 23
The consequence of the woefully inadequate growth of the collection is clear. Collection.
weaknesses are becoming evident in nonfiction areas with science, history and biography
leading the list. Collections are aging and becoming less relevant because our collection
replacement rate is half of what it should be.
Library Circulation: Despite the poor showing of on many comparative measures, Palo
Alto’s annual per capR~ library ei~rculation of’t6:ritems is exceeded~onty.by Beverly
Hills and Newport Beach. This reflects this community’s reliance on City library
collections and services despite the inadequacies of the collection.
Table 12. Compar.&on of Circulation. Annual Circulation Per Capita Population
COMPARISON OF CIRCULATION
Annual Circulation Per Capita Population
3O
25
20
Part ofPalo Alto’s high library use is attributable to the fact that our residents are very
well educated. Census data show that Palo Alto residents’ level of educational attainment
increased during the 1970-1990 time period. Among persons over 25 years of age, those
with college education increased from 61% in 1970 to 85% in 1990. Those who had
completed four or more years of college increased from 42% in 1970 to 65% in 1990. In
fact, one-third of the 1990 population of persons 25 or over in Palo Alto had received at
least one graduate degree. (From draft EIR document for Sand Hill Road/Stanford West
in Library Administration Demographics folder.)
Despite this heavy usage, Library collections continue to age and become less relevant.
For the first time in FY 1998/99, Palo Alto became a net borrower rather than a net lender
in the region-wide Silicon Valley Library System. Palo Altans make active use of nearby
libraries, highlighting perceived inadequacies in their own City libraries. A "snapshot
survey" showed that on April 1, 1999, Palo Alto residents had over 6,100 items checked
out from the Los Altos library. These items included a wide range of fiction and
nonfiction hardbacks and paperbacks, videos and teen items.
05/16/00 24
Clearly, Palo Altans are active library users. The City should assure that its library
facilities and the quality of its collections and services are commensurate with that use
and with what is available in other communities.
Over the twenty year period 1980 to 2000 the Palo Alto Library System has added the
equivalent of 2.63 FTE employees, an increase of 5%. During this same time library
circulation has increased by 67% and would have increased even more had the checkout
times for library items not been ektended from three weeks to four weeks in 1992.
Table 13. Library Circulation Compared to Staffing FY 1980/81 to 1999/2000
70
65
6O
55
5O
45
40 80/81/821 831 84/85/861 87/881 89/901 911 92/931 94/951 961 97/981 991
81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 O0
1200
1000
800 ~
o FTEs
600 ~~
~Circulation
200
Fiscal Year
This provides further evidence that the current staff level is not adequate in terms of
growing demands on staff time. As the staff workload necessary to directly serve library
patrons "at the front desk" increases, other library functions such as collections
processing, staff training and development and user services and programs naturally
receive correspondingly less attention.
05/16/00 25
3. Trends in Library Service
Books and technology: Public libraries nationwide are exploring how facilities and
services must change to adapt to the rapid growth of new technology.and make best use
of the phenomenal expansion in new information sources. Information technology is
evolving at an astonishing rate, and the most forward-thinking libraries are positioning
themselves to help their various publics access the full potential of these resources.
Library buildings, staffing and or~inizations must be created with the flexibility and
mind-set to accommodate and adapt to change.
Technology is becoming pervasive, but traditional paper and print are also here to stay.
Both are valuable and have their own requirements--both space and staffing. Library
space is needed for an increased number of dedicated computer terminals to avoid
waiting lines. Particular attention must be given to providing library users with
convenient access to power and to electronic information banks as well as to online
networks where they can connect their personal electronic equipment. This requires up-
to-date infrastructure and skilled maintenance staff.
The demand continhes to grow for greater depth and breadth in a wide range of
collections coveting all segments of the population. These collections include books,
magazines and other periodicals, compact discs, CD-ROMS, books-on-tape and videos.
Each media format has its own cataloging, storage and circulation requirements.
Librarian’s changing role: With the proliferation of information sources, the role of the
librarian is changing from that of a provider of information to consultant and guide. The
new role of the librarian is like that of a navigator who is knowledgeable about
information sources and is prepared to help guide people in evaluating those sources and
accessing them. This requires ongoing staff training and skill improvement programs.
Working at home: Many Palo Altans now telecommute or use their home office for
business. These people will depend increasingly on libraries to supplement their home
resources. A natural outgrowth of this work-at-home phenomenon will,be extended
library hours and adjustments to collections, including more electronically accessible
resources.
Meeting places: New libraries are increasingly providing public areas to accommodate
the growing demand for meeting spaces. These include small enclosed areas where study
groups can work together, rooms for use by .tutors and staff in teaching and training, plus
areas for convening small meetings that may’ require teleconferencing. The objective is
to provide meeting areas that can be used by the public without disturbing other library
patrons. This is an extension of the services traditionally offered by libraries, provision of
meeting spaces has wide community support, and our libraries should provide such
services.
05/16/00 26
Communities are also looking to their libraries to provide architecturally attractive
buildings with comfortable, well-lighted interiors that can serve as meeting places for
small groups in addition to being sources of information and providing opportunities for
recreational reading, listening and viewing. Increasingly, libraries are becoming broadly
based resource centers serving growing public needs.
05/16/00 27
Appendix B. Children’s Library
For sixty years, generations of Palo Alto residents have enjoyed the Children’s Library, ’
the focus of children’s library services in the northern part of the city. The library is
considered a Palo Alto treasure by many, but the beloved and venerable building is
showing its age. The tile roof needs repair and space is at a premium, offering little room
for growth of collections or programs. As the Library Advisory Commission conducted
its review of library services in Palo Alto, it became clear that the Children’s Library
building in its current state cannot support the programmatic improvements envisioned
by the LAC.
The Friends of the Palo Alto Library proposed to provide partial funding for a jointly-
managed FOPAL-City Feasibility Study to determine the "footprint," the number of
square feet available for potential expansion, options for expansion and estimated cost of
the options. The report will be completed in June 2000, and will provide the LAC and the
City with alternatives to the current configuration along with cost estimates. It is the hope
of the LAC that a robust children’s program can continue in the building. Depending on
the possibilities for expansion, however, it may be necessary to house a portion of the full
birth through fifth grade program in an expanded Main Library.
The program description for children’s library services assumes the following:
o Expanded children’s services-both programs and collections-to ensure
comprehensive programming in the two Resource Libraries (Mitchell Park and
Main/Children’s); the ultimate configuration at the Main/Children’s nexus will depend
on the possibilities for expanding and updating the Children’s Library building.
¯ Continuing limited children’s programming and collections in the neighborhood
libraries.
The LAC recognizes the importance of the Children’s Library building to residents. The
feasibility study should provide the LAC and the City with an understanding of the
possibilities for the building within the context of overall library services.
05/15/00
28
Appendix C. Southwest Palo Alto Library Services
The Library Advisory Commission’s recommendations for improved library services in ¯
Palo Alto contain two important components:
1.Creation and operation of neighborhood libraries in existing locations: College
Terrace, Downtown and Southwest Palo Alto -now served by the Terman Park
Library.
2.Development of comparable library services and collections in the neighborhood
libraries, including collections, programs, and hours.
The neighborhood libraries will supplement the program at the two Resource Libraries,
providing localized facilities that are considered to be essential by Palo Alto residents.
The Commission expects that improvements and changes to College Terrace and
Downtown will be incremental. The Terman Park Library, however, will require
significant changes, ranging from the nature of the collections and hours to the location
of the library itself.
Given the uncertainties surrounding the use of the Terman Park site at this time, the
Commission cannot recommend a specific location. It does, however, make the following
recommendations specific to this facility:
A library will be located in the southwestern part of Palo Alto;
The Southwest Library facility will contain 5000 square feet of space
In addition, the Southwest Library will be comparable to other neighborhood libraries in
the following ways:
Collections (not exclusively paperback as is now the case at Terman Park)
Broadband connections to City and library networks and the Internet
Hours and staffing
Following are three options for the location of the Southwest Library:
Locate the Southwest Library at its current site within the Terman Park facility: The
PAUSD has begun.action to recover the Terman site for a third middle school. The
Southwest Library could be located within the new middle school. Such a location
presents a number of problems such as high noise levelsnear the library, parking,
traffic congestion, public access to a secure campus, public access to the school
during school hours. Advantages include easy access to the library via public
transportation, and opportunities to collaborate with the PAUSD on programs and
facilities.
Locate the library in a commercial area: The E1 Camino Real corridor provides a
number of shopping center possibilities for a public library. Such sites typically have
adequate parking and would be located on an active public transportation route.
29
05/15/00
3.Construct a new library within the Terman Park site, or elsewhere in the southwesterh
part of the city: This option is likely to be the most expensive.
A fourth option is one that the Library Advisory Commission does not support at this
time:
Locate the library on the Gunn High School campus as part of the new school library:
Earlier public hearings suggested developing a technology center at this site. PAUSD
officials have reported that their plans for the school library allow for an adjacent
5000 square foot public library facility.
There has not been public support for this option; residents have stated that they
prefer a neighborhood library in the southwestern part of Palo Alto and are willing to
forego the planned technology emphasis.
05/15/00
30
Appendix D. Friends of the Palo Alto Library
The main financial support for Palo Alto libraries in recent years, outside of the City
budget, has come from the Friends of the Palo Alto Library. The Library Lovers’ Fund,
membership and the Friends’ monthly book sales have given $350,000 to the libraries in
the last five years.
The Friends operate monthly book sales at Terman Park. In late 1999 and early 2000,
they have had~extr~’space ~forthis event;,’whieh,fora,nany years suffered from.extremely
limited space. As a result of the expanded space, the Friends have produced bigger and
bigger sales each month. Every month between 10,000 to 12,000 books are sold. Books
that are not sold are donated to 53 non-profit organizations for use overseas and locally.
This great service keeps books out of the landfill, an environmental need we all must
address.
Many surrounding libraries, including Los Alms, Menlo Park, and Redwood City, offer
on-site book sale spaces in their libraries, which produce on-going revenues and acquaint
many new people with the book sale concept.
The Palo Alto School Board has proposed taking back Terman Park for their use. This
would make it. imperative for any Library Plan for the Libraries to include a space where
the Friends could continue their very useful book sales activities.
In addition, FOPAL has no administrative space beyond that provided by it own
members. This has made operating efficiently a challenge, with files in five different
locations. As FOPAL expands its membership, public awareness of library needs, and
financial support for the libraries, a small but consistent office space is a high priority.
At the present time, volunteers manage all Friends’ activities.
The LAC is including space for FOPAL in its recommendations for library sites in the
furore. This will ensure that the Friends can continue its efforts on behalf of the Library.
Specifics include:
Administrative space: 100 to 150 square feet for files, fax, and computer.
Book sale space requirements:
o Monthly Book Sales at a regular location
o 2400 square feet work space for sorting and storage
o 1200 square feet multi-use space (this is temporary space needed two days
before the sales)
o For daily book sales: 150 square feet of in-library sales space in the two
Resource Libraries.
05/15/00
31
Appendix E: Palo Alto Historical Association
The Palo Alto Historical Association (PAHA) has staffed and maintained the City’s
historical collection for over forty years as a result of a long-standing agreement with the
City of Palo Alto.
The Guy Miller Archives occupies 390 square feet of open space in the northeastern
comer of the Main Library. In this area are located the Staff Historian’s desk, a large map
case, and thirty file cabinets containing .approximately 5000 photographs, thousands of
news clippings and other historical ephemera. Additional historical materials are stored in
the basement of Main Library; two hundred square feet of historical collections are stored
off-site and are not available to the public.
The Library Advisory Commission is including expanded space for a local history room
in its recommendations for library facilities. This will include 1180 square feet of
dedicated secure space for the local history room in one of the libraries. The space would:
* Provide enough space to house the current collection of photographs, clippings,
books, letters, documents, manuscripts, etc., as well as future additions to the
collection.
o Provide ready access to the collection
*Provide working space for the public using the collection
. Enable the Staff Historian to consult with collection users without disturbing users
of the general library collection
. Accommodate classes, volunteer training sessions, history groups and individuals
learning about the collection without disturbing users of the general library collection
. Enable patrons to listen to oral histories, view videotaped oral histories, and see
PAHA video programs
* Provide museum-type display space for Palo Alto artifacts; these cannot be viewed
in the current facilities.
Interest in local history continues to increase, and a history room is essential to house the
growing collection of historical documents and artifacts. Neighboring communities
(Mountain View, Redwood City, Menlo Park) all have dedicated, secure local history
rooms in their libraries which are used by large number of their residents.
05/15/00
32
Appendix F: Chronology of the Staff Draft Library Master Plan
The staff Draft Library Master Plan prepared by City Staff was submitted to the City
Council for review and action on March 16, 1998. The Plan proposed a three library
system with improvements and expansions to Main, Mitchell Park and Children’s
libraries and phasing out College Terrace, Downtown and Terman Park libraries. As it
developed, the progression of the Draft Master Plan was subordinated to the creation of a
Library Advisory Commission.
After hearing from members of the public, the City Council unanimously agreed to
refer the Draft Library Master Plan to the Policy and Services Committee. Council
Member Gary Fazzino asked if the pending issue of the proposal to form a library
advisory group would ftt into the Committee’s discussion of the Plan. City Manager
June Fleming commented that the question as to whether the proposed library group
would be advisory to the City Manager or report to the City Council was scheduled
for discussion at the Council’s April 13th, 1998 meeting and that there would be no
public input on the Plan until this issue was resolved.
On April 13, 1998, the City Council conducted hearings on the agenda item
"Evaluation of Proposal to Establish an Advisory Body for the Libraries," and after
receiving extended public comment, the Council moved to continue the item to its
May 26th meeting.
Following its discussion of the library advisory body on May 26, 1998, the City
Council unanimously agreed to direct staff to prepare a proposal to establish a Library
Advisory Commission appointed by the City Council. Although not explicitly stated,
it was generally understood that the first charge of the Commission would be to
review the Draft Library Master Plan. City Manager Fleming saw the new Library
Commission’s involvement as not being limited to the Library Master Plan although,
as she noted, it should be considered a foundation for the Commission. She went on
to observe that in her years of experience with government and libraries, she knew
issues would remain and evolve over time and become more complex as the world
became more complex.
The seven members of the Library Advisory Commission were appointed February
16, 1999. Again, it was implicit that the Commission’s first order of business would
be to review the Draft Library Master Plan and to develop a plan of its own that it
could submit to and recommend for action by the City Council. Members of the
Library Advisory Commission are: Anthony Angiletta, Lenore Jones, John Kagel,
Warren Kallenbach, Tina Kass (Vice Chair), Mary Jean Place, Thomas Wyman
(Chair).
The Library Advisory Commission’s first meeting was on March 25, 1999. The City’s
1998 draft Library Master Plan remains with the Policy and Services Committee where it
was referred on March 16, 1998. The Committee plans no action on the earlier draft plan
since it will be superseded by this plan.
05/15/00,
33
Appendix G. Full Program Descriptions
The following statements flesh out concepts of library service incorporated in the Library
Advisory Commission’s plan. These include many entirely new services as well as en-
hancements to current services, items which are new or improved services are under-
lined and in italics throughout. All have been discussed in detail by the, Commission and
were formally adopted as integral to the service plan on February 9, 2o00.
CHILDREN’S SERVICES PROGRAM
Definition
Library services targeted to children from birth to fifth grade, their parents, teachers, caregivers,
authors and others interested in children’s literature.
Location of Children’s Services
Comprehensive juvenile collections and services at two Resource Libraries,
Main/Children’s and Mitchell Park
Smaller juvenile collections and limited service provided at neighborhood libraries.
Services Provided
Reference and Readers’ Advisory:
Full service provided at the two Resource Libraries supports in-house users including:
Assistance with search strategies, use of collections and resources, and answering ques-
tions
*Finding age-appropriate materials for children and their caregivers
~Assignment qflibrarians to respond to remote users (telephone, FAX,, e-mail inquiries)
o Providing age- and skill-appropriate training in use of library resources
~Consultation with librarian by appointment
~Enhanced Kids Pages on Web to assist in-house and remote users
Limited services provided at Neighborhood Libraries, including:
Assistance bvparaprqfessionals trained to complete sitnple reference inquiries and
refer other inquiries hV telephone, FAy, or e-mail to professionals designated as
Resource Libraries.
05/16/00 34
Electronic connection available_for patron from Neighborhood Libraries to children’s li-
brarians at Resource Libraries
Programming
At Resource Libraries
®
Weekly story times (one each location): lapsit/babv, toddler, preschool, school age, bed-
time, andfamily
Monthly special events (one per location): multicultural programs, author visits, story-
telling festival, Children’s Book week, seasonal programs, entertainment to promote col-
lections, etc.)
Weekly book discussion groups (alternating between Resource Libraries)
Homework centers staffed by volunteers at each location
Special programs to serve special populations, e.g. ESL students, homeless, develop-
mentally challenged.
Lectures and workshops for adults (parents, teachers, care givers, and others) as re-
quested or need arises.
Bookleggers (volunteer program qf book talking in public/private schools and da~ care
centers)
At Neighborhood Libraries
Monthly sto~_ times at each_facility
Quarterly special event at each_facility
At All Libraries
Outreach to public and private schools (day care, preschools, and elemental_ schools) as
requested and/or’ideallv at least once a year
Summer Reading Program
Class visits and library tours as requested
Implementation
When appropriate, programs are collaboratively planned, produced and funded in coop-
eration with other City departments, community agencies and organizations, and with lo-
cal schools.
Publicity and promotion of libra._ programs and services coordinated centrally
05/16/00 35
Juvenile Collections
At Resource Libraries
Circulating collections similar in size and scope.
Depth of the collections expanded in all content areas and formats
Maihtain hist6rical’juveni!e materials anti a Newb~ry and.Caldeeottawards,collection at
one Resource Library.
Support parent/teacher collections.
Provide more non-English materials in various formats; divide language specialties be-
tween Resource Libraries.
Collaborate with the Family Resources program to develop a collection which will sup-
port its goals at a Resource Libra,_
Address needs of children with disabilities (e.g. large print books).
At Neighborhood Libraries
Provide core collection of juvenile standards and focus on popular materials for circulat-
ing collection.
Electronic access to reference materials; limited hard cop~ reference items.
At All Libraries
Timely response to new purchase requests from children and caregivers.
Provide all_formats at all libraries
Add new formats, as they become available/as needed
Use displays to highlight collections.
Weed and maintain collection and related equipment on regular schedule.
Staff
Plan requires sufficient, skilled, customer-oriented, efficient children’s librarians at Re-
source Libraries.
Designate outreach children’s librarians at Resource Libraries.
Public relations staff support required.
Paraprofessionals staff children ’s services at Neighborhood Libraries, with collection
management oversight by children’s librarians.
An on-going stqff development component for all children’s services staff .
Volunteers support on-going and outreach services.
05/16/00 36
SERVICE TO TEENS
Definition
Library services, collections, staffing, space and programs targeted to teens (ages 12-18; grades 6-
12). This population group is also actively involved in planning and carrying out their services
and programs. This program is almost entirel!, new.
Location of and access to services
All facilities have some s~rvices for teens. However, the Resource Libraries provide designated
space, expanded and targeted collections, programs and staff for this target age.
The Resource Libraries provide multiple use areas offering both places for study and for "hanging
out". Teen-friendly libraries offer comfortable chairs for reading and tables and chairs and
en6ugh space for research and writing. Homework and multimedia centers offering word proc-
essing, photocopiers, scanners, and video transfer equipment are state-of-the-art. They have tech-
nology resources teen users are familiar with from school available to meet their after-school
needs. Spaces elsewhere in the libraries may be used for performance and program purposes.
Services Provided
Types of services available to teens:
Resource Libraries
Internet access
PCs for word processing, etc.
Recreational reading
Teen art displays
Reading clubs/discussion groups
Outlet for creative writing/poetry
Book discussion groups
Homework materials
Homework help
Teen-planned library Web page
Neighborhood Libraries
Internet access
Limited recreational reading
Limited homework materials
Teen art displays
05/16/00 37
Outreach
The Library, other City Departments/Divisions and the community interrelate by:
Schools promotion of public library use
School class visits to a public library
Public Library outreach to schools
City divisions cooperation with library staffto produce joint programs (e.g., the City’s
Arts and Culture Division joins with the library to produce a teen poetry or art contest)
Friends of the Palo Alto Library support of teen author programs
Collections
Teen collections emphasize both physical and digital resources. Materials are kept in good condi-
tion. Multiple copies for assignments and pleasure reading are a high priority; outreach to teach-
ers determines what assignments are coming up. Materials that are popular and contemporary-
especially magazines, CDs, videos and books on tape-are essential. Providing paperback books in
series is a plus. Library materials are marketed and merchandized in a way that is attractive to the
teen audience.
Teen Involvement
A teen advisory committee composed of teens from public and private schools acts as a liaison
between the teen community and the library. This committee helps influence staff decisions and
policies.
Staff
Resource Libraries have professional youth librarians focused on collections, services and pro-
grams. Staff members at all facilities are trained to be sensitive to and understand the needs of the
teen patron. Every librarian is also trained on how best to communicate with the teen patron.
05/16/00 38
ADULT REFERENCE SERVICES
Definition
Reference Service is the direct assistance that is provided in response to requests for help in an-
swering questions, locating information and utilizing resources, equipment and services needed to
satisfy each inquiry. Access to Reference Services is available free of charge to those who visit
the library and those who contact the library by telephone, mail, fax, and electronically by email.
Locations
Full service provided at both Resource Libraries, Main and Mitchell Park
Paraprofessionals at Neighborhood Libraries provide limited reference service.
Remote users referred to Resource Libraries.
Services provided at Resource Libraries
Librarians at public service desks support in-house users, including:
o Assistance with search strategies, use of collections and resources
¯Answering questions
¯Readers’ advisory provides help finding a "good read"
¯Sta~dedicated to supporting remote users Of ready reference (quick-look-up) via tele-
phone, voicemail, e-mail and fax both during and beyond open hours.
¯Training in use of library resources and tools for beginning, intermediate, advanced
searching consistent with building research skills of library users to promote sel_p
su.ff!ciency.
¯Librarians available for consultation by appointment
¯Strong and timely Web pages to help in-house and remote users get the information they
need or find the right information resources
Publications and other information tools available to assistpatrons in use of collections,
libraries, resources, and topical information.
Research service is provided to meet the information needs of the homebound and persons with
disabilities.
Community outreach is made available to assist and train community groups and non-profits to
meet their special information needs.
Collaborate with Palo Alto Historical Association for library users to gain access to Palo Alto’s
historical resources.
Coordinate Interlibrary loaning and borrowing.
05/16/00 39
Services provided at Neighborhood Libraries
Paraprofessional stqffassist in-house users, by
*Assistance with simple reference inquiries
o Help finding a "good read" (Readers’ Advisory)
e Referring other inquiries to Resource Libraries.
o Electronic connection for neighborh6od patr6ns to reference librarian at Resource Libraries.
Reference Collections Overview
Size, current: 11,000 volumes;~future, 22923 volumes
Main Library houses:
¯Print materials relevant to need
¯Unique reference tools
¯Historical materials
¯Retrospective periodical collections, i.e. the archive collections from Library’s early days
through present
Mitchell Park houses:
Print materials relevant to need
o Retrospective periodical collections, current - back ten years
Neighborhood Libraries house:
Minimal hard copy reference items.
o Electronic resources are available at all library locations and, as appropriate, remotely.
Building/space configuration
Reference service is provided from spaces configured to provide easy access to people using
electronic resources.
Staff
Professional librarians staff Resource Libraries and remote reference service center, co-
ordinate and provide public, staff and volunteer training programs.
Paraprofessional stqff is trained to assist patron ’s use pf libram_ resources.
Continuing education program is in place for all reference and adult services employees.
05/16/00 40
Impact measure
Respond to remote users within 8-24 hour turnaround (excluding holiday closure periods)
98% of time.
05/16/00 41
SERVING PEOPLE WITH DISABILITIES
Definition
People with’disabilities are those with physical disabilities, mental limitations and learning differ-
ences. The Library provides free and open access to all people, including people with disabilities.
This access is provided both inside and outside (e.g. at home and at work) libraries, as well as
through collections, services, programs and electronic and assistive technology.
Location of and access to services
People with disabilities are served at all facilities. However, the Resource libraries provide more
adaptive and assistive devices and more staff available to render special services. All buildings
are Americans with Disabilities Act (ADA) compliant, e.g. furnishings, electronic doors and rest-
rooms.
Services Provided
Types of programs, services and equipment that enable people with disabilities to have free, open
and equal access to the Palo Alto City Library include:
Outreach to homebound
ACCESS
®
The Operation Homeboun~d program provides increased home or institution delivery of
library materials by volunteers to Palo Altans who cannot get to the library because of a
long-term illness or physical disability.
to specialized equipment and materials by:
Establishing more site licensing agreements for software, such as screen-readers, assistive
Internet browsers or learning disabilities programs.
Connecting people with disabilities to the library through more varied access to equip-
ment and materials, such as computer with browser providing Web access to people with
visual impairments, reading machine that turns print into speech, print enlarger, described
(DVS) and American sign language (ASL) videos, books on tape, large prim books and
magazines and TDD telephone for hearing impaired people.
Increased use of alternative delivery of information including fax, mail, e-mail, Web
download.
Accessible Libra._ Web site, catalog, and portals to subscription databases and relevant
pages Ol~particular interest to people with disabilities.
Space, attention and service to individuals and groups of people with physical and/or
mental disabilities; this includes one-on-one assistance for parents and learning disabled
child, training sessions on use of adapted equipment, a place to sit and enjoy being part of
the community.
05/16/00 42
Publicity
Adequate publicity through a variety of sources (e.g., radio, community television,
agency publications, newspapers, etc.) to keep people in the community aware of library
services, programs and equipment for people with disabilities.
Outreach to agency and/or school directors and staff as well as to users in the community.
Networking between other professionals and organizations (library and other) within and
without the City.
Technical Support
Sufficient technical support ensures reliable service of computer hardware, software and elec-
tronic infrastructure.
Staff
o
o
Lead staff person to coordinate services to persons with disabilities including program
development, staff training, and outreach.
All staff are trained to be sensitive to the needs of people with disabilities.
Some staff are assigned and trained on the use of assistive equipment.
Staff seek input on informal basis from people with disabilities to solicit needs for
changes in services, policies, amenities or facilities.
Circulation Manager monitors special requests and needs for changes in circulation pol-
icy to facilitate fair access-to all individuals, including those people with disabilities.
05/16/00 43
LIBRARY COLLECTIONS
Definition
Library collections include books, periodicals and other serials, cassettes, videos, compact discs,
CD-ROMs, electronic.databases and other formats,not currently held by the Library (e.g. DVDs).
The professional library staff selects these items for addition to the collection and maintains its
relevancy and currency by removing outdated items. The Technical Services staff provides proc-
essing - acquisitions, cataloging and repair - for the materials acquired for the Library collec-
tions. Technical Services also maintains the online library catalog and provides oversight for the
Library’s computer system and related equipment.
Resource Libraries Collections
Main/Children’s Libraries serve the City north of Oregon as Resource Libraries for adult
and juvenile collections.
Main houses historical collections, including local history, Palo Alto Historical
Association files, periodical archives and printed indexes. Periodical collection
remains non-circulating.
Children’s continues to house "historical" juvenile collections, such as folktales
and award winners.
Mitchell Park Library serves as Resource Library for south City for adult and juvenile
collections.
Reference collection is expanded to provide richer service.
Periodical collections are inereasedfrom two to l O years of back issues.
Most new items are purchasedfor Resource Libraries. There is a high degree of overlap
in subject areas between Resource libraries, but some unique titles are held at each.
Teen collections, loeated at Mitehell Park and Main, contain all formats, including.
magazines. Collections are very similar at each Resource Libra,..
Resource Libraries house non-English language collections, including audiovisual, cur-
rent newspapers and magazines. Different languages are.found at each Resource.
Newspaper and periodical holdings are expanded to include more titles.
05/16/00 44
Neighborhood Library Collections
College Terrace, Downtown, and Southwest/Terman become popular reading centers
with large degree of overlap among these collections.
Southwest/Terman Park’s collections converted from paperback to hardback, enlarged
and cataloged like those in other library_facilities.
Collections contain all_formats.
Collections have a higher "refresh" rate than those do in Resource collections, with non-
fiction books re_freshed at a higher rate than l~etion.
Mass-market paperbaeks found in higher percentages in popular collections than in Re-
source collections.
All Collections
Increase number of unique titles in ~vstem hV 40%
Double the annual replacement rate system-wide to insure collections are up to date. Re-
place Resource Library collections at approximatel~ 9% and Neighborhood collections
at approximately 16% per year.
Gradually increase size Of collection to 450, 000 over whole system.
Increase pereentage of audiovisual items in collection from less than 10% to 20%.
Reduce waiting time for popular titles by increasing number of copies of high-demand
items purchased.
Increase number of electronic databases for use hv publie at Resource and Neighborhood
Libraries and via remote access.
Collection Management
¯Ensure timely ordering of new rifles.
¯Expand use o_fstanding order plans to promote quick receipt of items.
¯Provide adequate accessible and well-lit shelving_for all collections. Shelves should be
no more than 2/3_full when_full collection size is reached
¯Increase speed of deselection of titles that should be removed from the collection.
~Current circulatingperiodicals prepared With barcodes to track usage.
~Popular mass-marketpaperbacks receive minimal cataloging for improved access to
collection.
Securi~_ systems installed or replaced at all libraries to protect collections, improve op-
erational efficiency; ergonomic issues related to staff handling of materials addressed
05/16/00 45
Collection and Access Services
Make 90% of new purchases available on shelf within 14 days o_f receipt.
Complete in-house repairs of damaged and worn materials within 4 weeks.
Ability to purchase, catalog and process new media types, such as DVD, ~.
Ability to catalog more non-English collections with in-house staff versus hiring and
training contract staff.
Purchase pre-processed and/or pre-searched materials that improve quality of service or
meet current standards.
Maintain currency of online catalog with a record_for each item in the library collection.
Enhance catalog records to include active Web links when appropriate, and catalog ap-
propriate Internet resources.
Bibliographic indexes should be updated to meet user’s changing needs.
Catalog all items according to national standards and local practices.
Provide enhanced cataloging records that include table o_f contents, book jackets or other
supplemental_ material, when technological advances make them a part o_f the standard
cataloging record.
Convert and enlarge Terman Park’s collections_from paperback to hardback and catalog
the collection like those in the other libra~_ _facilities
Provide minimal cataloging_for popular, mass-market paperbacks to provide access to
the collection that is currently not cataloged.
Undertake and complete in a timely manner special projects that will improve access to
the collection.
Provide next day deliver_ service of Palo Alto City library materials between any two
City libraries.
Technology Services
Provide oversight and planning for technology and equipment needs library-wide.
Keep the library’s automation systems up to date with latest releases of vendor’s software
and products.
Respond to all technology and equipment problems and resolve them as soon as possible.
Train all staff on equipment and technology used in the libra._.
Staff
®Professional staff provides oversight of collection development at all facilities.
Paraprofessional staff will be trained to support collection development at neighborhood
libraries.
05/16/00 46
Su_ff!cient skilled paraprofessional and professional Technical Services staff will be
added, including staff to manage technolog3~ planning and implementation.
Ensure on-going staff development component for Technical Services staff and all staff
involved in collection development.
Institute a cross-training program between Technical Services and Public Services sta_ff"
to #nprove decisions made in Technical Services.
Provide Technical services staff with the appropriate computers, scanners and high-speed
connectivity to perform their tasks, many of which involve electronic transactions with
vendors outside the city network.
Use volunteer staff support for on-going tasks where feasible.
Location of Technical Services
Because Technical Services staff need to consult the collection and interact with other library
staff, Technical Services needs to be located at the library with the largest retrospective juvenile
and adult collection.
Building Space Requirements
Delivery area on ground floor for easy access and efficiency in handling of materials.
Deliver_/shipping and receiving room should be big enough to accommodate
variable size shipments and have a safe materials handling system.
" Provide a loading dock near the delivery area to receive large shipments.
Provide staff with individual, ergonomically designed work areas.
Make access to laser printers, copy machines, fax machines convenient for all authorized
users.
Book repair area includes a sink [’or mixing glues, cleaning tools, etc.
Adequate space tO accommodate materials in process without impacting aisle wa~s, as-
suring wheelchair accessibili.ty,
Adequate lighting and ventilation _[’or staff.
05/16/00 47
CIRCULATION SERVICES
Definition
Circulation services provides for the reservation and loan of library materials; this includes estab-
lishment of borrowing policies, registration of borrowers, maintenance of patron accounts, cash
handling, and shelving of materials.
Location
Circulation service at all locations.
One checkout desk provided at each location, with multiple stations at Resource
Libraries.
Circulation Services
Expand delivery service of materials between Palo Alto City libraries to offer next day
deliver_ from one library to another. Also provide weekend deliver_ service for all li-
braries.
*Change loan period for most items from four to three weeks.
*Circulation policies serve the needs of people with disabilities, providing extended loans
and free mailing of items, for example.
.Place self-checkout stations at both Resource Libraries and at Neighborhood Libraries
where space allows and circulation rate makes it cost-effective.
~Allow ATM/Debit and credit cards to pav libra~_fines and fees.
~Enhance the library card bv making it a "Smart Card" that wouM allow patrons to add
value and use it to pay_fines, _fees, photocopies, faxes, and other services.
Provide overdue and reserve notices in a variety of formats: paper, phone, and e-mail.
~ Upon request, mail items to patrons for a_fee; Mail requests to homeboundpatronsfree
of charge.
Install drive-up book returns andpiekups at Resource Libraries to make book exchanges
more convenient.
Equipment
Evaluate automatic sorting equipment for returned library materials to reduce staff han-
dling of materials and facilitate the re-shelving of items.
® Improve ability toprotect libra._ collection andstaffby installing a new lossprevention
system at all_facilities.
~ Bring allcirculation equipment up to ergonomic standards.
Space/Environment
Improve efficiencF Of customer work flow at heavily used Resource Libraries. Designing
circulation areas to locate check-in phvsieallF close to shelving area will reduce ban-
05/16/00 48
dling," moving checkout to an area apart_from check-in will decrease interruptions and
improve accura~. .
Provide a "Customer Service/Registration Desk" (not Re_ference questions) to assist pa-
trons with general questions at Resource locations.
05/16/00 49
VOLUNTEER SERVICES
Definition
Volunteers working under the direction of library staff on a broad spectrum of activities are a
major support for the library in meeting present and future needs. Individuals, groups, businesses
and organizations may provide volunteer assistance and/or may partner with the library to provide
financial contributions or sponsorships. The Friends of the Palo Alto Library are also a vital con-
tributor to library programs and services through their volunteer efforts.
Location of Volunteer Services
Volunteers provide on-site as well as outreach services at all Palo Alto City Library facilities. The
Resource Libraries will have greater volunteer involvement than the Neighborhood Libraries.
Services Provided
Types of volunteer activities which provide assistance to library staff:
Opening assistance-includes newspaper check-ins, book drop and delivery bin unpacking
Tours
Operation Homebound service for people residing at home or in retirements centers who
are unable to come to the library
Clerical support
Latehke~ children’s or teen programs
Family or adult programs
Exhibits or display design
Special projects, like library landscaping, grant proposal writing
Conservation/preservation, book repair
Book discussion groups_for various ages
Internet tutoring
Homework helpers
Shelving and shelf reading
Sponsorship of library programs
Storytelling
Friends of the Library board and projects
E_9_glish as a Seeond Language programming
05/16/00 50
Student Service learning programs
Staff
Volunteer Coordinator:
¯facilitates planning and oversees all volunteer activities
¯recruits, interviews, trains, and recognizes volunteers
¯works with local businesses and organizations to promote support and partnerships on a
variety of levels.
Library staffs who request volunteer assistance handle the orientation, training and supervision of
volunteers at their site.
The Operation Homebound coordinator oversees volunteers associated with this program.
Friends of the Palo Alto Library organize, train, and acknowledge their own cadre of volunteers.
Current volunteer program statistics:
1998/1999 245 Volunteers 9,948 hours
The above include Library and Friends of the Library volunteers.
05/16/00 51
Appendix H: Proposed Library Hours
Now
Main Library
Monday-Friday 10am- 9pm
Saturday 10 am- 6 pm
Sunday 1 pm -- 5 pm
Total = 67 hours
Mitchell Park
Monday-Thursday Noon- 9pm
Friday & Saturday 10am - 6pm
Sunday lpm--5pm
Total = 56 hours
College Terrace & Downtown
Monday-Saturday 11 am - 6pm
Total = 42 hours x 2 = 84 hours
Terman Park
Proposed
Times in bold denote changes
Monday-Friday 9am - 9pm
Saturday ’9am - 6pm
Sunday Noon - 9pm
Total = 78 hours
Same as Main Library
Monday-Friday 9am - 9pm
Saturday 9am - 6pm
Sunday Noon - 9pm
Total = 78 hours
Monday-Saturday 10am - 6pm
& one day/week: 10am - 9pm
Total = 51 hours
x2 = 102 hours
Tuesday Noon- 7pm
Wednesday-Saturday
2 pm - 6pm
Total= 23 hours
Children’s
Monday & Wednesday
Noon-8 pm
Tuesday & Thursday
10am-5pm
Friday & Saturday 10am-5 pm
Sunday lpm-5 pm
Total=48 hours
Grand total of hours = 278 per week
Note: Revised by Library Advisory
Commission at 2/10/00 meeting.
Same as College Terrace & Downtown
Monday- Saturday 10am - 6pm
& one day/week: 10am - 9pm
Total = 51 hours
Monday & Wednesday
10am - 8pm
Tuesday & Thursday 10am- 6pm
Friday & Saturday 10am - 6pm
Sunday lpm - 5 pm
Total = 56 hours
Grand total of hours = 365 per week
(31% increase)
52
o