Loading...
HomeMy WebLinkAboutStaff Report 4143 City of Palo Alto (ID # 4143) City Council Staff Report Report Type: Informational Report Meeting Date: 10/21/2013 City of Palo Alto Page 1 Summary Title: Measure N Reporting Requirement Title: Submission of Measure N (General Obligation Bond) Library Report From: City Manager Lead Department: Administrative Services Background On November 4, 2008, City voters passed Measure N which gave the City authority to issue a maximum amount of $76,000,000 million of General Obligation bonds (the "Bonds") for capital improvements to the Mitchell Park, Downtown, and Main libraries and to the Mitchell Park community center. The City successfully sold the Bonds in two series to provide $76 million in funds for the design and construction costs. Both Standard and Poor's (S&P) and Moody's awarded their highest credit ratings, Triple A, to both series of Bonds. Discussion Measure N requires that the Director of the Administrative Services Department send by November 1st an annual report to Council which “shall contain pertinent information regarding the amount of funds collected and expended, as well as the status of the Library/Community Center project listed in the Measure”. This requirement overlaps with or duplicates two reports that Council is receiving; a bi-monthly report from the Public Works Department (Attachment A) and a quarterly report from the Library Bond Oversight Committee (LBOC) (Attachment B). Council received the last progress report (dated August 5th) with another pending in October/November and will formally receive the Oversight Committee’s quarterly report in the near future. The Finance Committee already received the report in September. Attachment B shows funds collected and expended and it has been reviewed and approved by the Oversight Committee. At the September 17 Finance Committee meeting a committee member asked two budget line item questions for the Downtown Library project that is itemized in Attachment B’s financial statement. First question, the roof replacement with a budget of $125,000; isn’t this a maintenance expense and why should the GO Bond funds be used for this? Secondly, there City of Palo Alto Page 2 was a budget line item titled “Fixed Equipment” for $187,000; isn’t equipment a non-bondable expense? In the case of roof replacement, there were significant mechanical and skylight improvements to the roof top, and it didn’t make sense to simply patch the roof. Also, the replacement of existing black gravel-type roofing with white TPO materials that reflects sunlight off the rooftop earned points that were needed for the LEED certification of the project. So, this expense was properly charged to the bonds. As for the “Fixed Equipment”, there is a distinction between fixed equipment and non- bondable furniture, fixtures, and equipment (i.e. tables, chairs). The City’s Bond Counsel stated that “items of moveable tangible property which are affixed to a building in such a manner as to indicate a permanent location for that item of property” are deemed real property fixtures which are eligible for bond funding. In this case, the fixed equipment is broadcast media system and the book checkout equipment. The media system cost includes equipment and installation of cameras, turner, speakers, amplifiers and touch panels which allow such things as instructor or students at a remote location to view and broadcast story times, author visits, talent shows, musical productions, public meetings, etc. Similarly, the book checkout includes various equipment and installation costs. These fixed equipment expenses are bondable. Fiscal Impact This is an information report. Environmental Review This information report is not a project under the California Environmental Quality Act; therefore, an environmental review is not required. Attachments:  Attachment A: Public Works Bi-Monthly Library Progress Report (ID # 3955) 08-05-2013 (PDF)  Attachment B: Library Bond Oversight Committee Quarterly Report (ID # 4095) 09-17- 2013 (2) (PDF) City of Palo Alto (ID # 3955) City Council Staff Report Report Type: Consent Calendar Meeting Date: 8/5/2013 City of Palo Alto Page 1 Summary Title: Mitchell Park Construction Contract Bi-Monthly Report Title: Submittal of Mitchell Park Library and Community Center Bi-Monthly Construction Contract Report From: City Manager Lead Department: Public Works Recommendation and Draft Motion: Draft Motion: I move that Council: 1)Accept this update on the Mitchell Park Library and Community Center (MPL&CC) construction project; and 2)Direct staff to continue to submit bi-monthly reports to Council and to take related actions which Council may direct. Executive Summary The MPL&CC construction is approximately 88%complete (based on expenditures to Flintco) and it is anticipated that the three-building complex will be open to the public in late 2013. The estimated opening time frame has been changed from our earlier estimate of spring 2013 to late 2013 due to delays caused by the contractor and their subcontractors, the necessity to fully correct every deficiency, and to insure that the buildings are of the highest quality. It will also take six to eight weeks after construction is completed to move into the buildings, prepare the library collection and other materials for public use,and ready the staff and the space for opening. The percentage completion has increased from 84%to 88%since the last report. Because of the delays, errors,omissions, and unacceptably slow pace of construction, the City issued a Notice to Flintco on May 2, 2013 (Attachment F)that it intends to initiate default proceedings unless specified actions are completed by designated milestones. If initiated, these proceedings would remove Flintco and replace it with a new general contractor to complete the project. The number of subcontractor personnel on site and the pace of the City of Palo Alto Page 2 project have improved since the May 2 Notice. However,schedule slippages for completion of key mechanical and electrical components have occurred.The City and its contractors are attempting to adjust the work sequencing to avoid further project completion delays.Staff is monitoring compliance with the milestone dates and the pace of construction very closely and will report to Council frequently in the coming weeks. As a follow-up to the City’s May 2, 2013 letter, subsequent letters were also sent reiterating previous statements. The most recent of those follow-up letters is also attached (Attachment G). Costs have increased above the bid amount partially due to building complexities and partially due to the performance of the City’s contractors. To date, a total increase (Construction Contract Change Orders)of $3,724,508 has been approved by the City, or approximately 15% above the base construction contract amount.The bid amount was approximately 24% below the City Engineer’s estimate and Council has authorized a maximum increase of 20% above the base contract amount in change orders. Thus,the project remains below budget, despite the unforeseen costs. Background At 56,000 square feet, MPL&CC is the City's largest construction project in four decades.Inside the state-of-the-art library building, teens, children, and those just wanting a quiet space will all have their own dedicated areas.The two-building Community Center complex will contain an expansive community room, kitchen, teen center, cafe,computer room and game room.The complex will be the City's model for an eco-friendly facility with extensive green roofs, solar water heating, night sky water cooling, photovoltaic panels, stormwater infiltration, and natural daylight utilization all wired with a state-of-the-art data feedback and control system. On September 12, 2011,Council authorized an increase in change order authority and a ceiling for the MPL&CC construction contract from 10% to 20% to cover unanticipated construction costs. Council also directed staff to provide Council with a monthly report (subsequently modified to bi-monthly)on change orders with Flintco, the general contractor.Council also requested the City Attorney to provide additional confidential briefings regarding potential claims against other responsible parties. Additionally, Council also directed staff to report on project milestones in the bi-monthly reports. Discussion Construction Progress On June 4, 2012, Council requested information on construction progress and set-backs since City of Palo Alto Page 3 the last report and milestones that staff expects will be reached by the next report. Since the last bi-monthly report,which was submitted to Council on June 17, 2013,several major milestones have been completed.All major HVAC systems have now been started up, with the exception of the unit for Building C-South, the Community Room and Kitchen. Carpeting and cabinet installation has commenced. The terrazzo floor in the Café has been completed. Wood slat work finishes have commenced and are almost completed. The Green Wall on the northeast wall of the building has been completed. The attached “Schedule Milestones” page in Attachment E has been revised to show the remaining key milestones. Some corrections to mechanical, electrical,and plumbing (MEP)work below the floor and above the ceiling are still outstanding, but much progress has been made. Some floor panels will have to be temporarily removed to allow for corrections and re-inspections. The number of corrections and re-inspections required is much higher than for a typical project. All of these problems were detected by the City’s building inspectors or construction manager, Turner Construction,and the contractor is contractually required to correct them. The City will pursue recovery of these costs from the contractor, either by way of withholding payment or through separate action. Sub-standard work will not be accepted.However,these corrections cause delays in the work of the next subcontractor and some could cause a delay in a critical path item,thus further delaying the project. City staff is proactively working with the general contractor and City consultants to avoid delays while not compromising quality. In addition, the City contracted with Big D Builders to perform work on an “as needed”basis to complete specific components of the work that Flintco is unable or unwilling to do.The City plans to pass the Big D costs on to Flintco Pacific. The maximum amount of the contract is $240,000, which is below the threshold for Council approval.An action will be brought to Council for approval should it become necessary to increase this contract. Big D Builders is the construction firm that recently completed the Palo Alto Art Center renovations and their work on this project was done on time and under budget. Compounding problems, Flintco has recently undergone some significant organizational changes. The President of the company has been replaced and a portion of the Flintco organization has been sold. In addition, several of the contractor’s key sub-contractors have also gone out of business. The City has and will continue to meet with Flintco’s new President to discuss performance issues. The contract contains a liquidated damage provision for each day of contractor delay and the City expects to invoke this provision once the job is finally completed. City of Palo Alto Page 4 Approved Construction Contract Change Orders To date, 48 change orders have been approved for a total amount of $3,724,508. This amount constitutes approximately 15%of the base construction contract amount. Since the last bi- monthly report, there have been five additional change orders issued. Council has authorized change orders up to 20% of the base contract amount;leaving about 5%remaining. A breakdown of the change orders and the key components of each are contained in Table 1 listed below with a brief description of each. Please recognize that change orders can include reductions and credits as well as new costs. You will see this, for example, reflected in Change Order #5 in Table 1 below. The shaded change orders have been issued since the last bi- monthly report. Table 1 Change Order Amount Change Order Summary 1 $41,725 Eight extra work items including the pruning of trees, clean- up of the old building, and removing conduit found during site clearing and grading. 2 $33,102 Four extra work items including the rerouting of a storm drain around tree roots and the addition of a new manhole that the drawings showed being present but wasn’t. 3 $215,501 10 extra work items including an adjustment needed due to tree root interference, an upgrade in wall insulation capability, and design coordination needed for steel installation. 4 $242,754 11 extra work items including the installation of dowels at additional locations, the installation of thicker glass railings to increase stability, increased gas transmission line coordination, and extra concrete water protection. 5 $4,436 24 extra work items including an extra light fixture cost, fire safety drawing coordination, and a variety of additional required supplies totaling $70,536 minus credit given for three of the 24 work items including spare fixtures no longer required and reimbursed City of Palo Alto dump fees totaling $66,100. 6 $25,123 Seven extra work items including additional gas main protection, curb strengthening, and deck support for the Building A green roof. City of Palo Alto Page 5 7 $74,304 19 extra work items including HVAC driven floor adjustments, electrical system adjustments, data cable rerouting, and a new load break cabinet totaling $109,965 minus credit given for two of the 19 work items including stones for the Arch provided by the artist and value engineering totaling $35,661. 8 $385,251 10 extra work items including additional fill, perforated metal panel ceiling work, various waterproofing, and conduit. 9 $195,706 18 extra work items including multiple curb installations, a basketball court slab, and an art sculpture foundation. 10 $78,514 13 extra work items including a Flintco field staff supplement, waterproofing, plumbing and electrical system alterations, and tree protection measures totaling $79,226 minus credit given for one of the 13 work items identified as plumbing fixture changes totaling $712. 11 $224,662 14 extra work items including beam strengthening, interior & exterior roof tank pipe supports, electric vehicle chargers, load break cabinet bollards, and additional steel. 12 $20,347 Seven extra work items including A/V work, electrical changes, and a roof access ladder. 13 $80,721 13 extra work items including metal stud framing, light fixtures, and miscellaneous electrical work. 14 $54,028 Five extra work items including a thickened roof edge, equipment curbs, a Building A ramp, signage support, and a book drop. 15 $176,586 12 extra work items including additional lighting, electrical work, soil for silva cells & planting areas, and HVAC work. 16 $53,256 Four extra work items including traffic signal modifications, construction recovery costs, and a tube steel base plate modification. 17 $278,710 Five extra work items including tube steel and supplemental exterior wall steel revisions. 18 $76,823 Seven extra work items including concrete floor sealer, wall short panels, leakage testing, pipe supports,and permit processing. 19 $36,526 Eight extra work items including building security, lighting, and electrical work. City of Palo Alto Page 6 20 $20,832 Seven extra work items including lighting and electrical work. 21 $122,071 Six extra work items including roof curbs, studs, and roof crickets. 22 $16,839 Six extra work items including duct, gutter, and ceiling work. 23 $122,472 Nine extra work items include occupancy changes, tube steel and the related work, and artwork preparation totaling $123,104 minus credit given for one of the nine work items for roof parapets, flashing, and crickets totaling $632. 24 $46,654 Three extra work items including night sky cooling tank repair work and parapet and roof details. 25 -$37,158 20 extra work items including glass changes and book drop and elevator improvements totaling $44,790 minus credit given for five of the 20 work items including deleted A/V work, geotextile fabric work, and storm drain/gas line cost savings totaling $81,948. 26 $28,056 Five extra work items including roof substrate revisions and curtain wall supports totaling $31,465 minus credit given for one of the five work items related to roof drain plumbing totaling $3,409. 27 $49,470 Eight extra work items including exhaust fan work, additional channels, and roof work. 28 $24,225 Nine extra work items including expansion joint work, kitchen equipment wiring, and roof and plumbing work. 29 $94,174 14 extra work items including exterior wall water proofing, bathroom work, plumbing work, and electrical work totaling $101,983 minus credit given for two of the 14 work items including a WAP reduction and book drop work totaling $7,809. 30 $32,331 Eight extra work items including power for signage and other outdoor expenditures. 31 $23,886 Eight extra work items including perimeter wall work, elevator shaft power and lighting, and electrical work. 32 $102,472 Five extra work items including demolition, reconstruction, and fire prevention work. 33 $73,172 10 extra work items including data, raised floor, electrical, and shelving work. City of Palo Alto Page 7 34 $37,090 Five extra work items including door, fire prevention, and signage work. 35 $59,002 10 extra work items including window shade, door, flooring, and electrical work. 36 $62,559 Seven extra work items including tile, landscaping, and electrical work. 37 $12, 446 Six extra work items including electrical and plumbing work. 38 $27,673 Six extra work items including basketball equipment, signage, and wall work totaling $27,789 minus credit given for one of the six work items for tree planting work adjustments totaling $116. 39 $48,234 Nine extra work items including a trash & bike enclosure, art backing, signage work, and framing work. 40 $112,459 10 extra items including hand excavation work, EV work, window work, and electrical work totaling $115,573 minus credit given for two of the 10 work items for lighting adjustments totaling $3,114. 41 $33,582 12 extra work items including column work, wall work, and electrical work totaling $35,574 minus credit given for two of the 12 work items for plumbing and ceiling adjustments totaling $1,992. 42 $73,796 15 extra work items including fencing and gate installation, AV work, and curbing totaling $88,558 minus credit given for two of the 15 work items for driveway and waterproofing adjustments totaling $14,762. 43 $47,849 12 extra work items including water system work, wood slat steel supports, and trellis work totaling $52,281 minus credit given for three of the 12 work items for granite bollards and accent stone, drain piping, and a system permit set totaling $4,432. 44 $30,299 Six extra work items including flooring work and curb work. 45 $83,960 Nine extra work items including flooring work, lighting work, ventilation work, kitchen work for ADA purposes, and metal planters. 46 $31,788 15 extra work items including landscaping work,plumbing work, steel work, electrical work, and ventilation work totaling $34,709 minus credit given for one of the 15 work items for flooring work totaling $2,921. City of Palo Alto Page 8 47 $29,389 20 extra work items including stonework, telecom cabling, exhaust fan work, painting, electrical work, and green roof work. 48 $16,811 Four extra work items including AC work, counter work, and electrical work. TOTAL $3,724,508 TOTAL CO’s 1-48 *For further information about each of the change orders see the attached corresponding Contract Change Order Scopes of Work (Attachment A). Change order requests submitted by the contractor are typically bundled together and summarized in one single change order. On September 12, 2011,Council further directed staff to submit any change order request which exceeds $85,000 to Council for approval. Staff is interpreting this to mean an individual change order line item more than $85,000. One may note that over the course of a period of time a number of on-site decisions are made, in order to not slow the project down, which can add up to more than $85,000 when compiled later. Bundled Change Order 11, for example, totals $224,662, but includes a series of change orders, none of which exceeds $85,000. Council has approved one change order to date (Change Order # 17)which contained line items exceeding $85,000. Related Council Directives for the Bi-Monthly Report Council further directed that staff report to Council on oversight activities. Therefore, attached is the most recent Library Bond Oversight Committee agenda (Attachment B)and Library Bond Oversight Committee minutes (Attachment C). On October 17, 2011, Council requested information on two other related topics and these are addressed below. 1)Expenditures for New Consultants The City Attorney’s Office has hired the following consultants to assist with the review of construction costs requested by Council. The table below shows the amount encumbered and the amount spent to date. City of Palo Alto Page 9 Contract Amount Amount Expended ZFA Structural Engineers $25,000 $19,581 Legal Counsel (Jarvis Fay)$75,000 $58,362 Reidinger Consulting (Scheduling)$85,000 $72,327 Legal Counsel (Otis & Iriki)$455,000 $440,113 Legal Counsel (Ginn & Crosby, LLP)$35,000 $17,923 David Neagley $275,000 $0 Project Controls & Forensics $100,000 $0 2)Outstanding Change Orders Proposed by the Construction Contractor (Flintco) In addition to knowing the amount of the change orders approved to date by the City (above), Council members asked the value of the outstanding change orders proposed by Flintco but not yet approved or rejected. This information is contained in Attachment D. The first graph in Attachment D shows both Potential Change Orders (PCOs), which is an internal list compiled by the City’s construction manager of certain work items that could eventually result in extra work claims,and actual Change Order Requests (CORs),a subset of the PCOs, which have been submitted by Flintco to date. The latest bi-monthly report concerning all Library Projects (“Palo Alto Library Projects”) is included as Attachment E. Resource Impact There are no resource impacts associated with providing the bi-monthly reports to Council. The approved change orders are within the Capital Improvement Program Project (CIP)Budget PE- 09006 for the MPL&CC project. Policy Implications There are no policy implications in providing the bi-monthly reports to Council. Environmental Review Providing bi-monthly reports on this topic to Council does not constitute a project under the California Environmental Quality Act (CEQA). Attachments: ·A -MPL COs # 43-48 (PDF) City of Palo Alto Page 10 ·B -LBOC Agenda_7-9-2013 (PDF) ·C -LBOC Minutes_4-23-2013 (PDF) ·D -MPL Financial Charts_6-30-2013 (PDF) ·E -PAL Bi-Monthly Report May-June 2013 (PDF) ·F -City Notice to Flintco_5-2-2013 (PDF) ·G -City Follow-up Letter to Flintco_6-17-2013 (PDF) Contract Change Order City of Palo Alto Department: Public Works Engineering Contract Number: C11136473 ~b~ntltact Change e':d~r R~r:t~ .. ''i;jJ,ree ~, cpnti~J~i!J ' , . , ' . ;, ~ 0 ," _~j< ~ • " • I "', ,I., ~ ~ '1 '~"-/' ,,_"..,~ 'j " " ,"~_ll:¥ " , . . , CONTRACTOR CERTIFICATION: The undersigned Contractor approves this Change Order as to the changes, if any, in the contract price specified for each Line Item and as to the extension of time allowed, if any, for completion of the entire work on account of each Line Item, and agrees to furnish all labor and materials and perform all work necessary to complete any additional work specified therein, for the consideration stated therein. CLAIM PROCEDURE: Any items in Contractor's Change Order Request that are not included in this Change Order are hereby deemed rejected as of the date of this letter. If Contractor wishes to dispute this rejection, it may submit a Claim pursuant to Section 4.2 of the Contract General Conditions within thirty (30) days of the date of this Change Order. Accepted for Contractor: By: Title: Date: Signature Declined Andy Brophy Flintco -Project Manager .... 0 N ... ... 0 :IE u: en Il.. 0 0::: <C 111 184 154.2 582 171.2 348 736 105 171.3 348 1314 171.4 348 1315 171.5 348 1331 171.6 348 1380 186.2 577 577.3 300 464 123 331.2 672 1165.1 426 561 1526 163 483 648 1495 I. Potential Change Order 2. Change Management Accept~or City ~ Palo ~Ito: BY:£'15J~ ... Phil Bobel Title: Assistant Director of Public Works Date: tf/.x(/l3 I I SCOPE OF WORK i:t: 11) 0 0 u.. 0 Description Amount 81 Granite Bollards and Accent Stones at Arch-Adjustment -2,977 1166,2 PhotoVoltaic System Permit Set -479 1095 ASI 105 Wood Slat Steel Supports 23,449 1095 RFI1314 WD Slat support A206 Col ACtA5 clearstory Included 1095 RFI 1315 Wd Slat Steel Bldg A (A206) Col ACtA5 Included 1095 RFI 1331 Wood Slat Steel Supports (C139) Included 1095 RFI1380 Wood Slat Steel Supports Bldg C Included 1174 RFI 577.3 Drain Piping at VRF 2nd Floor Bldg A -976 1090 ASI 123 Vertical Trellis Bldg A 9,245 1197 RFI 1165.1 AHU-2A Copper Piping 4,895 1096.1 ASI163 Valves & ControlsAHU, FCU & Water Systems 13,942 065 1204 RFI1495 C02 Sensor at Shelving 2tF Bldg A 750 Total for this change order 47,849. 3. Request for Information 5. Field Order or Extra Work Authorization 4. Architect's Supplemental Instructions 6. Change Order Request Note: This Change Order is being issued unilaterally by the City. The basis for the adjustment in the contract sum was determined by the City pursuant to Section 7.2.4 (iii). Contractor has indicated that it is unwilling to execute a Change Order because it does not wish to be bound by subsection 7.2.13 of the Contract General Conditions. The City's action in approving this unilateral Change Order is intended to ensure fair and prompt adjustment to the Contract Sum. In doing so, the City expressly disavows any intent to waive or any actual waiver of any of the Contract provisions regarding Change Orders. All provisions of the Contract Documents remain in full force and effect. ApPENDIX B -CONTRACT CHANGE ORDER PAGE20F3 Contract Change Order City of Palo Alto Department: Public Works Engineering Contract Number: C11136473 t'":G}~Q'tt:aefe'n~q'ye';~~~~d-~~'~M~~~~~~~~:~~:p~i~~~~~:,':~ ":~t ~:',,: :,' ::', ':~','_:' :': ,', < .. ',<',i':-,;' ,:':':~' .,":" \ ,,:'" ," ":' .. :':~ l ,,~ I .,... ~., ~ ~, , .. c~ -~ J. "-~ __ • 'i> __ ''''~.,,~, "-_~ ~( '.I.T y ~ .:...:.t ~~ ~ -_ ~ «. ~ "'''~ .. ,, "' ... ~" L}, ,.' '-'it'. 1", ~ __ \j' • C", _, --, _. _ , ,( -"1 ,II CONTRACTOR CERTIFICATION: The undersigned Contractor approves this Change Order as to the changes, if any, in the contract price specified for each Line Item and as to the extension of time allowed, if any, for completion of the entire work on account of each Line Item, and agrees to furnish all labor and materials and perform all work necessary to complete any additional work specified therein, for the consideration stated therein. CLAIM PROCEDURE: Any items in Contractor's Change Order Request that are not included in this Change Order are hereby deemed rejected as of the date of this letter. If Contractor wishes to dispute this rejection, it may submit a Claim ursuant to Section 4.2 of the Contract General Conditions within thirt 30 da s of the date of this Chan e Order. Accepted for Contractor: Accepted for Cit of Palo Alto: By: Signature Declined By: Title: Andy Brophy Title: Flintco -Project Manager Date: Date: SCOPE OF WORK "'0 N "2-v II) "'a:: (.) :e LL Cii 0 0 a. (.) a:: « LL (.) Description Amount 294 407 1089 1193 RFI 1089 Flashing for EF Curbs Bldg B&C 1,650 355 503 133 1093 ASI 133 & 133.2 Sidewalk Grade 3,589 133.2 370.1 567 988 165 1053R1 ASI 165 FD-3 Diffusers and Controls Bldg A 8,855 381 507 1261 1051 RFI1261 Duct Shaft Enclosure (A222) 1,275 401.5 699 1274 147 052 1184 ASI147 Linear Floor Diffuser Color 14,006 468 618 1424 1207 RFI 1424 Duct Adapter Rectangular to Oval Bldg A 924 Total for this change order 30,299. 1. Potential Change Order 3. Request for Information 5. Field Order or Extra Work Authorization 2. Change Management 4. Architect's Supplemental Instructions 6. Change Order Request Note: This Change Order is being issued unilaterally by the City. The basis for the adjustment in the contract sum was determined by the City pursuant to Section 7.2.4 (iii). Contractor has indicated that it is unwilling to execute a Change Order because it does not wish to be bound by SUbsection 7.2.13 of the Contract General Conditions. The City's action in approving this unilateral Change Order is intended to ensure fair and prompt adjustment to the Contract Sum. In doing so, the City expressly disavows any intent to waive or any actual waiver of any of the Contract provisions regarding Change Orders. All provisions of the Contract Documents remain in full force and effect. ApPENDIX B -CONTRACT CHANGE ORDER PAGE 2 OF3 Contract Change Order City of Palo Alto Department: Public Works Engineering Contract Number: C11136473 CONTRACTOR CERTIFICATION: The undersigned Contractor approves this Change Order as to the changes, if any, in the contract price specified for each Une Item and as to the extension of time allowed, if any, for completion of the entire work on account of each Line Item, and agrees to furnish all labor and materials and perform all work necessary to complete any additional work specified therein, for the consideration stated therein. CLAIM PROCEDURE: 'Any items in Contractor's Change Order Request that are not included in this Change Order are hereby deemed rejected as of the date of this letter. If Contractor wishes to dispute this rejection, it may submit a Claim ursuant to Section 4.2 of the Contract General Conditions within thirt 30 da s of the date of this Chan e Order. Accepted for Contractor: Accepted Cit]l f Palo Alto: ~~,r~~------------------~ By: Signature Declined Title: Title: Andy Brophy Flintco -Project Manager Date: Date: SCOPE OF WORK " . ... _-- '0 N ... "t.. It) I 1/)0:: I 0 :& u: U) 0 0 Q. 0 0:: <C u.. 0 Description Amount 186.2 577 1174adj C0-43 Deleted Column Cover Credit Revised 801. 681 352 485 1111 1209 NSC Tank Copper Vent Material 14,173. 1111.1 1111.2 378 493 1225 1162 Refridgerant Pipe Flashing hood 5,475. I' Library Entray Under Floor Ductwork and 418 485 158 1209 Terrazzo epoxy sand fill upgradeA103 and B101b 27,518. I' Coordinate & adjust resin floor at cafe counter no cost 434 690 164 1187 FQ1 Stack Lighting perpendicular to s. wall room A202 20,581 I" 434 1427.1 095 FR1 Stack Light on south wall of room A203 Inc void 434 566 1427.2 164 FR1 Stack light deleted on south wall of Room A202 Inc Closed 452 596 176 89r2 Metal Planters 6,148. 497 657 1 187 1183r1 Cafe and Kitchen revisions per ADA 9,264. I / Total for this change order 83,960. V 1. Potential Change Order 3. Request for Infonnation 5. Field Order or Extra Work Authorization 2. Change Management 4. Architect's Supplemental Instructions 6. Change Order Request Note: This Change Order is being issued unilaterally by the City. The basis for the adjustment in the contract sum was determined by the City pursuant to Section 7.2.4 (iii). Contractor has indicated that it is unwilling to execute a Chang~ Order because it does not wish to be bound by SUbsection 7.2.13 of the Contract General Conditions. The City's action in approving this unilateral Change Order is intended to ensure fair and prompt adjustment to the Contract Sum. In doing so, the City expressly disavows any intent to waive or any actual waiver of any of the Contract provisions regarding Change Orders. All provisions of the Contract Documents remain in full force and effect. ApPENDIX B -CONTRACT CHANGE ORDER PAGE20F3 Contract Change Order City of Palo Alto Department: Public Works Engineering Contract Number: C11136473 CONTRACTOR CERTIFICATION: The undersigned Contractor approves this Change Order as to the changes, if any, in the contract price specified for each Line Item and as to the extension of time allowed, if any, for completion of the entire work on account of each Line Item, and agrees to furnish all labor and materials and perform all work necessary to complete any additional work specified therein, for the consideration stated therein. CLAIM PROCEDURE: Any items in Contractor's Change Order Request that are not included in this Change Order are hereby deemed rejected as of the date of this letter. If Contractor wishes to dispute this rejection, it may submit a Claim ursuant to Section 4.2 of the Contract General Conditions within thirt 30 da s of the date of this Chan e Order. Accepted for Contractor: Accept City of Palo Alto: By: Signature Declined By: Phil BODel Assistant Director of Public Works Title: Andy Brophy Flintco -Project Manager Title: Date: Date: SCOPE OF WORK "0 II) C'I '" ~ II) 0:: 0 :E u: (i) 0 0 Il. 0 0:: c( u.. 0 Description Amount 101.3 576 022 1113 ASI 022 Granite Treads Stairs 2 & 3 Bldg A 1,993 304.3 692 076 1215 Pavers South of Southeast Driveway 3,857 342 497 1249 125 1062 ASI 125 Double Door & Steel Under Window Teen Room (A 104) 6,016 393 509 1198.1 1107 RFI1198 & 1198.1 Ladder Safety Post NSC Tank 1,050 405 506 1278 1064 RFI1278 Compressed Lugs for Electrical Equipment -Settlement 4,500 430 555 1310.1 1160 RF11310.1 Accent Stone Soils Compaction 562 435 569 167 1136 ASI 167 Wharf Hydrant Location in Courtyard 5,141 451 588 1402 1110 RFI 1402 Stair 2 Angle Support Modification 1,009 457 646 1486 200 066 1195 ASI200 Exhaust Ventilation Tech Services (A216) 2,954 458 593 1152 Signage Foundations 338 485 640 1482 1180 RFI1482 Guardrail Receptacle Conflict East Terrace Bldg A 1,887 509 673 203.1 1185 ASI 203.1 NDS EZ-Drains at Landscape Areas 5,090 988, 1274, 1274.1, 19,49, 517.2 1274.2, 1274.3, 129,147, Floor Diffuser and Plenum Box Reconciliation -2,921 1535, 1536 165 525 713 208 1218 ASI 208 Plant Substitutions Courtyard 157 528 714 210 1228 ASI 210 Granite Seat Paver at Beasley Sculpture 155 Total for this change order 31,788. 1. Potential Change Order 3. Request for Information 5. Field Order or Extra Work Authorization 2. Change Management 4. Architect's Supplemental Instructions 6. Change Order Request Note: This Change Order is being issued unilaterally by the City. The basis for the adjustment in the contract sum was determined by the City pursuant to Section 7.2.4 (iii). Contractor has indicated that it is unwilling to execute a Change Order because it does not wish to be bound by subsection 7.2.13 of the Contract General Conditions. The City's action in approving this unilateral Change Order is intended to ensure fair and prompt adjustment to the Contract Sum. In doing so, the City· expressly disavows any intent to waive or any actual waiver of any of the Contract provisions regarding Change Orders. All provisions of the Contract Documents remain in full force and effect. ApPENDIX B -CONTRACT CHANGE ORDER PAGE 2 OF 3 ./ ./ ./ Contract Change Order City of Palo Alto Department: Public Works Engineering Contract Number: C11136473 t .~, "t? I' '.,.. 'If ' ,', > '< " ' I ,'; • ,'.r,,' ",-", 'J , , ~ ''1 , , ' ,,~~ '. " ' , ' ' , ' " , , , " ti~~''!!t1~~:~·cZ~~~€I;,~:~,:~~~ 1f.Q'~~~~~;'f~.fi!,.+:;·~f!'!:tJi:np:~tiJ: . .' ' " \'~i' \ ':', '.' "" ',':' , " , 1 , ~ -:." • ~ -j CONTRACTOR CERTIFICATION: The undersigned Contractor approves this Change Order as to the changes, if any, in the contract price specified for each Line Item and as to the extension of time allowed, if any, for completion of the entire work on account of each Line Item, and agrees to fumish all labor and materials and perform all work necessary to complete any additional work specified therein, for the consideration stated therein. CLAIM PROCEDURE: Any items in Contractor'.s Change Order Request that are not included in this Change Order are hereby deemed rejected as of the date of this letter. If Contractor wishes to dispute this rejection, it may submit a Claim pursuant to Section 4.2 of the Contract General Conditions within thirty (30) days of the date of this Change Order. Accepted for Contractor: By: Title: Date: Signature Declined Andy Brophy Flintco -Project Manager ~o 0 Il. 154.3 175.4 217.5 257.2 266.2 365.2 398.2 404 419 444.2 449 456 464 488 500 502 510.2 510.3 530 535 N '" '<t :E u: Ci) 0 0::: 0( 636 731 695 1558 701 127 686 111 649 894 671 700 1286 524 1043.2 543 1333 705 171 586 1397 599 479.1 179 611. 658 191 650 1103.1 652 1504 674 675 655 1445 709 1577 I. Potential Change Order 2. Change Management ApPENDIX B -CONTRACT CHANGE ORDER It) 0 u.. 071 072 061 073 073 Accept~r City~f Palo Alto: BY:(~ .. \",/ Phil Bobel Title: Assistant Director of Public Works Date: fr3;'f~ I I SCOPE OF WORK Q: 0 0 Description Amount 1178 RFI 731 Paint GSM Cap Flashing for PV Curbs Bldg A 1,471 .,/ 1201 RFI 1558 Aluminum Angle and Paint 946 ./ 1200 ASI127 Telecom Cabling 1,588 V 1188 ASI 111 Rework Column Ceiling Slope Revision Bldg A 995 ,/ 1149 RFI 894 Motor Starters Exhaust Fans Mechanical Yard 2,962 ./ 1219 Blackout Painting Above Bldg A Entry & Bldg C Classrooms 2,610 ,/ 1198 RFI1286 Reroute Fire Sprinkler for Tunnel Bldg C 393 V 1073.1 RFI 1043.2 Electrical for Green Wall Control Panel -Settlement 2,142 ./ 1114 RFI1333 Closure Panel North CW Bldg A 1,139 .,/ 1214 ASI171 Engineering Ceiling Framing 938 ./ 1127 RFI 1397 Exterior Soffit Bldg B South Elevation 1,230 ",.. 1132 ASI179 Night Sky Cooling Riser Room (A233) 2,836 .,/ 1220 Shim Aluminum Angle for Stonework at Door Frames 3,004 v 1179 ASI 191 HC Pull Straps at Lockers 362 .,./ 1203 RFI 1103.1 Soffit at Drift Clips Bldg A (A208) 1,419 ./ 1181 RFI1504 LF1 Type Light Fixtures Beasley Sculpture ' 669 ,/ 1211 FO-073 Furred Drywall Partition Bldg A (A205! A231) 590 ,/ 1213 FO-073 Furred Drywall Partition Bldg A (A 137 A) 420 t/ 1194 RFI1445 Green Roof Irrigation Connection 2,813 V 1221 RFI 1577 Bench Back at Casework (A 1 08) 862 ./ Total for this change order 29,389. v' 3. Request for Infonnation 5. Field Order or Extra Work Authorization 4. Architect's Supplemental Instructions 6. Change Order Request PAGE 20F4 Contract Change Order City of Palo Alto Department: Public Works Engineering Contract Number: C11136473 CONTRACTOR CERTIFICATION: The undersigned Contractor approves this Change Order as to the changes, if any, in the contract price specified for each Line Item and as to the extension of time allowed, if any, for completion of the entire work on account of each Line Item, and agrees to fumish all labor and materials and perform all work necessary to complete any additional work specified therein, for the consideration stated therein. CLAIM PROCEDURE: Any items in Contractor's Change Order Request that are not included in this Change Order are hereby deemed rejected as of the date of this letter. If Contractor wishes to dispute this rejection, it may submit a Claim • pursuant to Section 4.2 of the Contract General Conditions within thirty 30) days of the date of this Change Order. Accepted for Contractor: Accept City 0 Alto: By: Signature Declined Title: Andy Brophy Flintco -Project Manager Date: .... 0 N <') 'l:... <n 0 ::2: i! ~ 0 Il. 0 0:: IJ.. 390 512 1272 407 525 1279.1 415 549 1354 I 155 545 727 1. Potential Change Order 2. Change Management SCOPE OF WORK it: 0 0 Description 1067 ~F11272 Counter Support Furring Bldg B (B104) -Settlement 1074 RF11279.1 Conduit Seals -Settlement 1142 ASI 155 Door Hardware & Light Switch -Settlement 1229R2 I AC in NW Parking Lot (1000 SF) Total for this change order Amount 2,465 1,025 990 12,331 16,811. / ,/ ./ ./ ./' 3. Request for InfonnatiOl1 5. Field Order or Extra Work Authorization 4. Architect's Supplemental Instmctions 6. Change Order Request Note: This Change Order is being issued unilaterally by the City. The basis for the adjustment in the contract sum was determined by the City pursuant to Section 7.2.4 (iii). Contractor has indicated that it is unwilling to execute a Change Order because it does not wish to be bound by subsection 7.2.13 of the Contract General Conditions. The City's action in approving this unilateral Change Order is intended to ensure fair and prompt adjustment to the Contract Sum. In doing so, the City expressly disavows any intent to waive or any actual waiver of any of the Contract provisions regarding Change Orders. All provisions of the Contract Documents remain in full force and effect. ApPENDIX B -CONTRACT CHANGE ORDER PAGE20F3 Agenda Library Bond Oversight Committee Quarterly Meeting Tuesday, July 9, 2013 7th Floor Conference Room 4:00 PM – 5:30 PM Committee Members: Sandra Hirsh (Chair), Alice Smith (Vice-Chair), John Melton, Dena Mossar, James Schmidt Staff: Phil Bobel (Public Works), Brad Eggleston (Public Works), Debra Jacobs (Public Works), Richard Hackmann (Public Works), Monique leConge (Library), Joe Saccio (Administrative Services), Tarun Narayan (Administrative Services), Jim Pelletier (City Auditor’s Office), Cara Silver (City Attorney’s Office) Others: ROLL CALL ORAL COMMUNICATIONS APPROVAL OF MINUTES – April 23, 2013 AGENDA REVIEW & REVISIONS UNFINISHED BUSINESS 1. DISCUSSION – Construction Progress a. Mitchell Park Library & Community Center NEW BUSINESS 2. DISCUSSION - Update on Main Library Project a. Construction Progress and Schedule b. Bond Issuance 3. DISCUSSION - Draft Financial Report Summary from Administrative Services a. Expenditures to Date – Summary Spreadsheet 4. ACTION - Approval of Quarterly Report to Finance Committee 5. Next Steps a. Next Meeting – Tuesday, October 22, 2013 or another date? ADA: Persons with disabilities who require auxiliary aids or services in using City facilities, services, or programs or who would like information on the City's compliance with the Americans with Disabilities Act (ADA) of 1990, may contact (650) 329-2550. Sign language interpreters will be provided upon request with 72 hours in advance notice. Meeting materials will be provided at the meeting. Visit www.cityofpaloalto.org or call (650) 617-3174 for more information. 1 Minutes Library Bond Oversight Committee Quarterly Meeting Tuesday, April 23, 2013 7th Floor Conference Room 4:00 PM – 5:30 PM Committee Members Present: Sandra Hirsh (Chair), Alice Smith (Vice-Chair), John Melton, Dena Mossar Committee Members Absent: James Schmidt Staff: Phil Bobel (Public Works), Brad Eggleston (Public Works), Debra Jacobs (Public Works), Richard Hackmann (Public Works), Monique leConge (Library), Joe Saccio (Administrative Services), Tarun Narayan (Administrative Services), Jim Pelletier (City Auditor’s Office), Cara Silver (City Attorney’s Office) Others: ROLL CALL ORAL COMMUNICATIONS APPROVAL OF MINUTES – February 5, 2013  Approved as amended 4-0 o Amendment: fix typos AGENDA REVIEW & REVISIONS UNFINISHED BUSINESS 1. DISCUSSION – Construction Progress a. Mitchell Park Library & Community Center  Melton recommended going back and recalculating the percent complete  Pellentir asked to make sure that Change Orders (CO’s) are accounted for in the percent complete figure  Hackmann said staff has been working on refining the percent complete figure  Eggleston and Jacobs explained staff is continually working through issues related to the percent complete figure with Turner and Flintco  Mossar said that it is the LBOC’s job to ensure that there is enough money to complete the project and that the LBOC needs to know all outstanding 2 charges related to the project to determine the City’s vulnerability  Smith then asked for an explanation of the worst case scenario  Eggleston suggested that staff bring back more information on this at the next meeting  Smith encouraged far greater attorney involvement in all meetings between staff and Turner and/or Flintco  Melton encouraged staff to email information to the LBOC if completed earlier than the next meeting b. Temporary Main Library  Eggleston said that the Temporary Main Library bookshelves have arrived, the shelving has been installed, the office furniture and check out machines are in place, and Main will close on April 30th with Temporary Main opening May 3rd  leConge said that Temporary Main is very small, has very little shelving, reduced hours, and is meant to be an in-and-out or pick-up library 2. DISCUSSION – Design Progress a. Main Library  Eggleston said the design is done and the permits are ready  Eggleston said the project went out to bid in early March, bids were opened April 9th, and of the five pre-qualified contractors four submitted bids  Eggleston said the engineers estimate was $15.9 M and one bid was well below that and most bids were $2-3 M above that  Eggleston said that the low bidder did not submit to the City the additional, necessary paperwork and withdrew their bid  Eggleston said the City is working with the City Attorney’s Office on whether or not they can cash in their bid bond  Eggleston said the low bid now is now approximately $17.7 M with SJ Amoroso Construction Company  Eggleston said SJ Amoroso is a union contractor that does a lot of public sector work  Eggleston said the buffer between the costs and the bonds is narrowing but for reasons such as a new roof at the Main Library the City can dip into the infrastructure reserve  Mossar said that the extra infrastructure projects (like roofing at Downtown Library) may put the total library projects budget over the amount approved by the voters. We should know in advance how this would be handled.  Eggleston added that staff will recommend the City accept the SJ Amoroso bid and not re-bid the project o leConge agreed with this  leConge said the Palo Alto Library Foundation has achieved their $4 M fundraising goal 3 NEW BUSINESS 3. DISCUSSION - Update on Main Library Project a. Bidding and Construction Schedule  See 2A notes b. Preparation of Bond Issuance  Narayan gave an update on the status of the bond issuance  Narayan said staff will ask Council on May 6th for the authority to issue the remainder of the bonds  Narayan said if Council approves that request the bonds will go to market in June with the intent to close the bond issuance by the end of June 4. DISCUSSION - Draft Financial Report Summary from Administrative Services a. Expenditures to Date – Summary Spreadsheet  Narayan said there have been $560,000 in expenses since the last report  Narayan explained the additional detail he added to the financial report since the last meeting  Eggleston again explained additional expenses to the Main Library and that those can come from the General Fund if necessary because they were not included in the bond estimate  Pelletier said to update the figure for the next meeting on the Main Library and the reasons for the budget increases  Pelletier asked why pages five to 16 of the financial report were included o Narayan said those pages are provided because the LBOC asked for that level of detail on expenditures  Pelletier asked about the difference between the contract amount and what has been paid 5. ACTION - Approval of Quarterly Report to Finance Committee  Approved as amended 4-0 (moved by Mossar, seconded by Melton) o Amendment: the LBOC Chair will add a paragraph to the Finance Committee transmittal letter highlighting LBOC concerns about future costs o Smith also requested that language be added stating that the LBOC financial reports are not independently audited 6. Next Steps a. Next Meeting – Tuesday, July 23, 2013 or another date?  The July 23, 2013 meeting was moved to July 9, 2013 $0 $1,000,000 $2,000,000 $3,000,000 $4,000,000 $5,000,000 $6,000,000 $7,000,000 $8,000,000 Co s t Percent Completion Mitchell Park Library Approved Change Orders (CO's) and Outstanding Potential Change Orders (PCO's) Approved CO's Outstanding PCO's Flintco COR's 10% Contingency 20% Contingency 4.19 (DT) 5.21 (DT) 4 (DT) $45.56 (Mitchell) $49.04 (Mitchell) $50 (Mitchell) $22.39 (Main) $20.1 (Main) $18 (Main) 1.33 (Other) 1.65 (Other) 4 (Other) Cu r r e n t P r o j e c t i o n En g i n e e r ' s E s t i m a t e Bo n d E l e c t i o n Es t i m a t e Dollars (Millions) Library Bond Fund Utilization Projections (June 2013) Mitchell Park Library Main Library Temporary Libraries & Bond Costs $76M $73.47M $76M $29.24 (Flintco) $5.83 (Turner) $6.02 (Group 4) $4.47 (Other) Palo Alto Library Projects Bi-Monthly Progress Report May/June 2013 Mitchell Park Library & Community Center Main Library Mitchell Park Main Entry Table of Contents I. Mitchell Park Library & Community Center  Status Report  Management Summary  Schedule Milestones II. Main Library  Status Report III. Financial Summary Mitchell Park Library & Community Center 3700 Middlefield Road, Palo Alto The new Mitchell Park Library and Community Center is a highly sustainable joint-use facility that will be a vibrant destination for civic, cultural, social, educational, and recreational activities. The new center, which will replace undersized and aged facilities, is made possible through Measure N and the strong partnership between the city and the community. During construction, temporary library and teen center facilities are available at the Cubberley Community Center. WEB CAM LINK: http://173.164.239.206/view/viewer_index.shtml May/June 2013 PROJECT CONSTRUCTION CONSTRUCTION BEGAN: September 2010 ANTICIPATED OPENING: Late 2013 PROJECT TEAM OWNER: City of Palo Alto Public Works ARCHITECT: Group 4 Architecture GENERAL CONTRACTOR: Flintco Pacific, Inc. CONSTRUCTION MANAGER: Turner Construction Company FOR MORE INFORMATION www.cityofpaloalto.org/gov/topics/pro jects/facilities/library/default.asp KEY ACCOMPLISHMENTS  Carpeting and terrazzo flooring installation commenced  Cabinet installation commenced  Green Wall completed  Three HVAC systems online UPCOMING ACTIVITIES  Exterior painting and trim  Interior ceilings in progress  Finish carpeting  Finish cabinets Mitchell Park Library Shelving Installation Commenced Library Roofing Started May/June 2013 Mitchell Park Library Green Wall Photos Mitchell Park Library & Community Center Management Summary May/June 2013 Noteworthy Accomplishments  Carpeting and terrazzo flooring installation commenced  Cabinet installation commenced  Green Wall completed  Three HVAC systems online Current Project Challenges:  Processing the high volume of change documentation and providing direction o Flintco reports submittal of 97 more change order requests is still pending o Weekly review meetings are in progress  The pace of work needs to pick up with more manpower assigned to critical path activities  Disputes over non-compliant work needs resolution Safety  Public Safety is a priority outside the fence. No incidents reported to date. Quality Control  City and Special Inspection Work: o Work needs to be ready when inspection is requested o Work should pass inspection the first time  Quality Control Observation Reports: o Open reports for above ceiling and under floor work need to be signed off o Remedial sliding glass doors work is in progress Mitchell Park Library & Community Center Schedule Milestones May/June 2013 Mitchell Park Library & Community Center Completion Plan (Updated 7/31/2013) Building Interior (Project Wide) City Target Date Mechanical/Electrical/Plumbing (MEP) Rough-in 8/5 Fire Life Safety Systems Online 8/8 Grid for Sloped Ceilings 8/9 HVAC System in C-South Online (Heat) 8/13 Interior Painting 8/13 Elevator Final Inspection 8/21 Begin System Furniture & Casework* 8/26 Automated Handling System 8/30 Staff Moves In (Substantial Completion; TCOO)** 9/25 Open To Public (COO) Late 2013 Building Exterior (Project Wide) City Target Date Exterior Stone 8/7 Exterior Painting 8/9 Final Parking Lot Paving 8/12 Art Work 9/30 *Air-out of buildings commences (14 day process) **Inspections completed and a small number of punch list items remain. All fire safety requirements are met. Main Library 1213 Newell Road, Palo Alto Exterior View May/June 2013 2011 PROJECT CONSTRUCTION CONSTRUCTION BEGINS: Summer 2013 ANTICIPATED OPENING: Late 2014 PROJECT TEAM OWNER: City of Palo Alto Public Works ARCHITECT: Group 4 Architecture CONSTRUCTION MANAGER: Nova Partners FOR MORE INFORMATION www.cityofpaloalto.org/gov/topics/pro jects/facilities/library/default.asp KEY ACCOMPLISHMENTS  Demolition work commenced including asbestos abatement UPCOMING ACTIVITIES  Complete lobby demolition  Complete roof demolition  Commence geo-thermal wells The Palo Alto Main Library renovation and addition is in the final phase of design “Better Libraries for Palo Alto” projects, funded by the passage of Measure N by voters in 2008. The project incorporates upgrades to the historic building’s structural, electrical and mechanical systems while preserving the integrity of architect Edwards Durrell Stone’s iconic design. The new addition includes a program room and additional restrooms to extend the services of this heavily-used branch. The project targets LEED certification. MEASURE N ENGINEER'S ESTIMATE PROJECTED RESERVES 09010 Cubberley Temporary Library 645,000 619,687 25,313 09005 Downtown Library 4,000,000 5,212,000 4,191,782 1,020,218 09006 Mitchell Park Library & C.C.50,000,000 49,043,000 45,563,014 3,479,986 11000 Main Library 18,000,000 20,100,000 22,392,578 -2,292,578 11010 Art Center Temporary Library 500,000 528,232 -28,232 Bonding and Financing Costs 4,000,000 500,000 185,320 314,680 BONDED AMOUNT 76,000,000 76,000,000 73,480,613 2,519,387 Thru June 2013 PALO ALTO LIBRARIES BOND MEASURE N PROJECTS FINANCIAL SUMMARY BUDGET COSTS Last updated 7/30/2013 CITY OF PALO ALTO OFFICE OF THE CITY MANAGER 250 Hamilton Avenue. 7th Floor Palo Alto. CA 94301 650.329.2392 May 2,2013 Mr. Tom Maxwell, President and CEO Flintco Pacific 401 Derek Place Roseville, CA 95678 VIA CERTIFIED MAIL AND ELECTRONIC MAIL Re: Mitchell Park Library and Community Center Project, Palo Alto Palo Alto Contract No. Cll136473 NOTICE TO CORRECT DEFECTIVE WORK; NOTICE TO SUBMIT ACTION PLAN FOR PERFORMING UNCOMPLETED WORK AND NOTICE OF INTENT TO INVOKE DEFAULT PROCEEDINGS Dear Mr. Maxwell: We remain very concerned with the pace and quality of the construction at the Mitchell Park Library and Community Center project ("Project") in Palo Alto. The Project is now approximately one year behind schedule. Work crews are quitting or failing to show up to the job site on a regular basis. The number of workers on site on a typical day falls considerably short of what would be expected, and does not support significant progress on either available work or essential corrective work. On days when crews are present, Flintco is not adequately coordinating or supervising trades. Much of the work fails building department inspections, or is identified on site as not complying with the Contract requirements. Most troubling is that Flintco has submitted no plan for completing the Project any time soon. The City has repeatedly informed Flintco of these problems in weekly team meetings and regular correspondence, observation reports, corrective action reports, and inspection reports. The City put Flintco's surety on notice of these problems earlier this year (see attached letter dated January 18,2013) and has requested that it intervene to resolve these problems on multiple occasions. The City hoped there would be an improved approach to managing the project when Flintco's parent company was sold to Alberici Corporation. The reorganized senior management does not appear to have taken any significant steps to address the City's concerns. The City has attempted to motivate Flintco to complete the job by regular partnering meetings, field team motivators and even financial incentives. Nothing has worked. C i tyOf Pa I oA I to.o rg Printed With soy-based inks on 100% recycled paper processed without chlOrine. Page 1 of 4 The schedules provided by Flintco show slippage each month. Recently, the slippage has been so extensive that the schedule now indicates we are no closer to completion than we have been for many months. In fact, Flintco has actually lengthened the schedule due to completed work that must be torn out and re-done. This constant rework on the part of Flintco is impacting its subcontractors' willingness to maintain adequate crews at the Project. The latest schedule (submitted on 4/25/13) is the most alarming one yet as it shows extending completion from October 8 to November 22,2013. Flintco's own schedule estimates it will take seven additional months to complete a project that is already approximately one year late. In light of Flintco's schedules and the lack of progress on site, it is reasonable to conclude that the Project will not be completed for months without dramatic and immediate change. We must now embark on a course of action to effect a dramatic change quickly and a return to a normal and acceptable work pace. To that end, we are issuing this letter pursuant to sections 12.2.2 and 12.2.3 of the Contract's General Conditions requiring correction of defective work and establishing time frames for action. If these actions are not taken and dates are not met, the City anticipates issuing a Default Notice pursuant to section 15.2 of the Contact. The required actions fall into three categories and are described below and in the referenced attachments to this letter. Category I: Urgent Corrective Actions There are five components of the Mitchell work that need immediate corrective action. Those five components are summarized in Attachment I and described in Attachments LA through I.E. This letter constitutes your notice pursuant to sections 12.2.2 and 12.2.3 of the Contract's General Conditions that corrections must be commenced within 7 days of this notice and completed by May 30,2013. Category II : Correction of all identified Defective Work The Contract General Conditions section 3.6.1 provides that the methods and procedures adopted by Contractor shall be such as to secure a quality of Work satisfactory to City and to enable completion of the Work in the time agreed upon. Per General Conditions section 3.3.1, Contractor shall be in charge of and responsible for all portions of the Work of the Contract, and shall be responsible for conforming such portions to the requirements of the Contract Documents and readying such portions to receive subsequent Work. Lastly, per section 12.2.2 Contractor shall correct Defective Work that becomes apparent during the progress of the Work. Flintco has produced defective work which is identified in the following three Attachments: II.A. Inspection (Request) log II.B. Turner/ ABB Master QAlQC log (Site Observation Report) II.C. Group 4 Architects Field Observation Log (This includes observation logs from Group 4 and its consultants). C i tyOfPa I oA I to.o rg Printed With soy-based inks on 100% recycled paper processed without chlorine Page 2 of4 The Site Observation Reports and Quality Control Field Observation logs which describe defective work have been sent to Flintco via multiple emails and reviewed in the Owner, Architect, Contractor Meetings. The Tumer/ABB Master QAlQC logs have been provided to Flintco numerous times (throughout April, May, and June 2012 and an outstanding open issues log was provided on 7/11112, 7117112, 8/31112, & 11107112 ). We also sent you the Site Observation Report for the ABB "General Waterproofing Site Visit Report for Building A 9 11 12" on 9-20-12. Lastly, the Inspection Request logs and resulting Inspections are always available on Sharepoint for Flintco to view at any time. The City has requested Flintco to correct the items on the logs or provide the City with a corrective action plan and time line for completing the work. In addition, the City has requested to be advised when actions have been completed, so that they can be field verified by the City's appropriate agents. Flintco has either failed to correct the items, failed to complete a corrective action plan and/or failed to notify the City of any completed correction. Therefore, this letter constitutes notice to Flintco pursuant to sections 12.2 of the Contract's General Conditions that corrective action is required. Within 14 days of this notice, Flintco is required to submit to the City a detailed Plan of Correction showing with respect to each item on the three logs: (1) Certifying that the corrective work has been completed and is ready for a field re-inspection or (2) If the work has not been completed, a plan for correcting it and the date on which it will be corrected. Category III: Commencement of Available Work The City has, at each Wednesday's Owner, Architect, Contractor (O.A.C.) Meeting, requested Flintco to begin work in areas where work is available to Subcontractors. The pace of work is not sufficient in large part because staffing has not been assigned to work on building components which are available for such work. To avoid a default notice pursuant to Section 15.2 of our Contract, Flintco must submit a Staffing Plan of work for the areas listed below within 7 days and execute that plan immediately thereafter. The Staffing Plan shall list the Subcontractor, the number of workers and the dates to be worked to address the areas raised in Attachment IILA. Please respond to each of the requirements outlined above by the specified time frame. Failure to do so will result in further action pursuant to our Contract. Sincerely, [List of Attachments on Next Page] CityOfPaloAlto.org Printed With soy-based inks on 100% recycled paper processed without chloflne. Page 3 of4 Attachments A. Letter dated January 18,2013 Category I Attachments: Urgent Corrective Actions Summary of Items Requiring Urgent Corrective Actions LA. Remaining deficiencies in the Sliding Glass Doors as described in Attachment LA. I.B. Deficiencies in the Title 24 Glazing Certification as described in Attachment LB. I. C. Replacement of Cabling in Bldgs. B & C as described in Attachment I. C. LD. Correction of walls not meeting ADA clearances as described in Attachment LD. I.E. Correction of Waterproofing in Building A Shower Rooms as described in Attachment I.E. Category II Attachments: Correction of All Identified Defective Work ILA. Inspection (Request) log. Attachment ILA. ILB. Turner/ ABB Master QAlQC log. Attachment ILB. II.C. PA G4 Field Observation Log (This includes observation logs from Group 4 and its consultants). Attachment II.C. Category III Attachments: Commencement of Available Work lILA. Areas for Commencement of Available Work cc: John Stump, Senior Vice President ofFlintco Pacific Mark D. Wood, Fidelity and Deposit Company of Maryland, Bond Number PRF08975391/82198910 Alex Dam, Federal Insurance Company, Bond Number PRF08975391182198910 Jim Hamel, Zurich American Insurance Company Tom Tripp, Turner Construction J. Michael Sartor, Director, Public Works, City of Palo Alto Phil Bobel, Assistant Director, Public Works, City of Palo Alto Molly S. Stump, City Attorney, City of Palo Alto CityOfPaloAlto.org Printed With soy-based inks on 100% recycled paper processed without chlorine. Page 4 of4 CITY OF PALO ALTO PUBLIC WORKS DEPARTMENT PO Box 10250 Palo Alto, CA 94303 650.329.2151 June 17,2013 Mr. Tom Maxwell President and CEO Flintco Pacific 401 Derek Place Roseville, CA 95678 VIA CERTIFIED MAIL AND ELECTRONIC MAIL Re: Mitchell Park Library and Community Center Project, Palo Alto Palo Alto Contract No. CII136473 CITY'S EV ALUTION OF FLINTCO'S RESPONSE TO MAY 2, 2013 NOTICES Dear Mr. Maxwell: This letter follows up on my letter of June 6, 2013 in which the City acknowledged receipt of documentation dated 5/30/13 by Flintco with respect to the deadlines in the City's 5/2/13 letter concerning potential default on the Mitchell Library and Community Center construction project. We have since reviewed the submitted information and the work performed on site. Not all the work has been completed. This letter contains a summary of the remaining work which Flintco has indicated it will complete in order to avoid the City finding Flintco in default. Category I Corrections Five specific corrections were required to be completed by 5/30/13 and each is addressed below (Category I of the City's 5/2/13 letter): 1. Sliding Doors The problems with the doors have not all been corrected. In light of the inability ofthe current subcontractor to fix the doors by 5/30/13, Flintco has advised the City that it is in the process of receiving bids from new subcontractors to order and install the doors required by the City-Flintco Contract ("Contract"). We understand that Flintco has indicated that, if the City permits the door installation to proceed, that all door installation will be completed by 9/30/2013. In light of Flintco's commitment to a date certain for door installation, the City is presently reviewing whether to permit Flintco to proceed with sliding door installation. Tentatively, the City is willing to conduct air and water testing of the 3C­ West doors (121,122 and 126) as part of this evaluation, and Flintco has requested that the City schedule the testing. In the eve at these three doors pass all tests, the City Cit Y 0 ~~ge' y ~t ~ 0 . 0 r 9 Printed with soy~based Inks on 100% recycled paper processed Without chlorine will take that into its consideration of Flintco's progress. The City is hopeful that the testing and inspection of the doors will permit these doors to be accepted, with the remaining doors to have all corrections completed and accepted by Flintco's deadline of 9/30/2013. The City reserves its right to declare Flintco in default concerning its failure to install the sliding doors in accordance with its May 2,2013 letter, and any additional time provided to Flintco to complete its work shall not be considered a waiver of the City's right to require compliance with all contract requirements. Please provide a copy of the purchase order for the replacement sliding doors, and indicate submittal and delivery dates. Please note that compliance with Title 24 (discussed below) is a further requirement for acceptance of these doors. 2. Title 24 -Flintco submitted a package of materials on 5/29113 targeted to demonstrate compliance with Title 24 for glazing. Our analysis finds that this package is nearly complete. Flintco is expected to submit all remaining required documentation as detailed in Attachment A. We understand that Flintco requires additional time in order to submit the documentation and we agree to provide additional time. Flintco has indicated it will submit all documentation required for Title 24 glazing by 6/28/13. The City reserves its right to declare Flintco in default concerning its failure to provide all required Title 24 documentation in accordance with the May 2,2013 letter, and any additional time provided to Flintco to complete its work shall not be considered a waiver of the City's right to require compliance with all contract requirements. 3. Replacement of Cabling in Buildings Band C -Not all of the work was completed by 5/30, but it is now complete. The City expects Flintco to complete all testing immediately. 4. ADA Corrections of walls -This work has been completed, except for the tiling. Flintco has indicated to the City that there is additional lead time required when ordering new tile. The City understands this and is agreeable to allow for extra time for the tiling work. Flintco has indicated it will complete all tiling by 7119/13. 5. Waterproofing of Building A Shower Rooms -This work has been completed except for testing and tiling. As mentioned above, Flintco has indicated that there is additional lead time required for ordering new tile. The City understands this and is agreeable to allow for extra time for the tiling work and testing. Flintco has indicated it will complete all tiling and testing by 7119113. Category II and III Requirements With respect to Categories II and III in the City'S 5/2113 letter, Flintco has provided a 6 week schedule and a one week staffing plan as a way of meeting the requirements for Plans to address these two areas of concerns. Flintco indicated that it would submit a new staffing plan each week. This has not occurred following the first week. The City expects Flintco to submit its staffing plan and results from the previous week as Flintco had agreed to do in response to the May 2,2013 letter. Page 2 of3 Additional Requirements The City expects Flintco to meet the milestones indicated in Flintco's 6 week schedule. The 6/10/13 milestone for continuously operating the HVAC system in Building A was partially met in that air (albeit not conditioned air) is being moved through the building. The City expects that Flintco will be successful in reaching all of the following milestones based on Flintco's schedule: 6/18/13 -Passing all above-ceiling and below raised floor inspections 6/25/13 -Completion of installation of all pavers 6/27113 -Continuously operate HV AC systems in buildings B & C 7/10113 -Completion ofinstallation of all wood slats and panels Meeting all of the above requirements and time frames is necessary to avoid Flintco being found in default. The City reserves its right to declare Flintco in default concerning its failure to meet all of the above items in accordance with its May 2, 2013, and any additional time provided to Flintco to complete its work shall not be considered a waiver of the City's right to require compliance with all contract requirements. Sincerely, ichael Sartor, lrector, Public Works City of Palo Alto cc: John Stump, Senior Vice President of Flintco Pacific ,Mark D. Wood, Fidelity and Deposit Company of Maryland, Bond Number PFlF08975391/82198910 Alex Dam, Federal Insurance Company, Bond Number PFlF08975391182198910 Jim Hamel, Zurich American Insurance Company Tom Tripp, Turner Construction Phil Bobel, Assistant Director, Public Works, City of Palo Alto Molly S. Stump, City Attorney, City of Palo Alto Page 3 of3 City of Palo Alto (ID # 4095) Finance Committee Staff Report Report Type: Meeting Date: 9/17/2013 City of Palo Alto Page 1 Summary Title: Library Bond Oversight Committee Quarterly Reports Title: Library Bond Oversight Committee Quarterly Reports From: City Manager Lead Department: Public Works Executive Summary Please see the attached Library Bond Oversight Committee transmittal letter and attachments. Attachments:  A - LBOC Financial Reports Transmittal Letter_9-17-2013 (PDF)  B - LBOC Q2 2013 Financial Report_4-12-2013 (PDF)  C - LBOC Q3 2013 Financial Report_7-23-2013 (PDF) TO: Finance Committee FROM: Library Bond Oversight Committee DATE: September 17, 2013 SUBJECT: Library Bond Oversight Committee Reports The Library Bond Oversight Committee (LBOC) has met with members of City staff on the progress of the library bond projects the following months:  January, April, July, and October 2011  January, April, July, and October 2012  February, April, and July 2013 Attached for your approval is second quarter 2013 report (dated April 12, 2013) and the third quarter 2013 report (dated July 23, 2013). Based on the information provided, the Committee finds that the City’s financial reporting for all library-related projects is accurate and appropriate, however, these reports are not independently audited. The Committee forwards these reports to the Finance Committee and City Council for approval, with LBOC approval. Please note the reason for the variations between these reported figures and the reported figures in the Mitchell Park Library bi-monthly reports is due to variations in the reporting cycles. Additionally, the LBOC would like to note that it is concerned about the cost increases associated with the Mitchell Park Library & Community Center (MPL&CC) project. The LBOC wants the Finance Committee and City Council to be aware that future increases in the MPL&CC project cost are possible and will impact the overall Library Bond Fund budget. Submitted: Sandra Hirsh Library Bond Oversight Committee Chair ATTACHMENTS: Attachment B: LBOC Quarterly Financial Report (dated April 12, 2013) Attachment C: LBOC Quarterly Financial Report (dated July 23, 2013) 1 2 3 4 5 6 7 (3 minus 1) (4 minus 1) (4 minus 3) (6 divide by 3) Measure N Estimates Changes in Measure Estimates Engineer's Estimate February 2013 Projected Costs Diff. Between Measure N Estimates vs. Projected Costs $ Diff. Between Engineer's Estimate vs. Projected Costs % Diff. Between Engineer's Estimate vs. Projected Costs Downtown Library 4,000,000$ 1,212,000$ 5,212,000$ 4,189,759$ (189,759) 1,022,241$ 19.6% Mitchell Park & Community Center Library 50,000,000 (957,000) 49,043,000 44,597,041 5,402,959 4,445,959 9.1% Cubberley Temporary Library - 645,000 645,000 619,687 (619,687) 25,313 3.9% Main Library 18,000,000 2,100,000 20,100,000 22,660,263 (4,660,263) (2,560,263) (12.7%) Art Center Temporary Library - 500,000 500,000 528,232 (528,232) (28,232) (5.6%) Total Prior to Bond Financing Costs 72,000,000 3,500,000 75,500,000 72,594,982 (594,982) 2,905,018 3.8% Bond Financing Costs (a)4,000,000 (3,500,000) 500,000 385,320 3,614,680 114,680 22.9% Grand Total 76,000,000$ -$ 76,000,000$ 72,980,302$ 3,019,698$ 3,019,698$ 4.0% a) In addition, by law the actual (2010 bonds) and estimated (2013 bonds) Underwriter's Discount (Fee) of $513,570 must be paid by bond premium. The actual bond issuance cost is substantially lower than the Measure N estimate due to avoidance of Capitalized Interest costs. - Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Budget Original Budget (per Measure N Ballot Measure)72,000,000$ -$ -$ 72,000,000$ Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000 645,000 Temporary Main Library Facility - Art Center Auditorium 500,000 500,000 Net Other Budget Changes 2,355,000 2,355,000 Expenditures - Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 33,321,705 9,582,176 (42,903,881) Construction Costs - - - Contract Contingency 5,024,440 2,921,968 (7,946,408) Other Contract Services 1,042,801 643,227 (1,686,028) City (Inter-department) Service Charge 352,392 - (352,392) Miscellaneous Cost 107,546 - (107,546) Total Library Projects Expenditures 75,500,000 39,848,883 13,147,371 22,503,746 Estimate of Pending Commitments/Costs - - 19,598,728 (19,598,728) Total Bond Funds Less Bond Financing Costs 75,500,000 39,848,883 32,746,099 2,905,018 3.8% Bond Financing Costs (a)500,000 185,320 - 314,680 62.9% Grand Total 76,000,000$ 40,034,204$ 32,746,099$ 3,219,698$ 4.2% 2010 GO Bond True Interest Cost (TIC)4.21% a) In addition, by law the actual (2010 bonds) and estimated (2013 bonds) Underwriter's Discount (Fee) of $513,570 must be paid by bond premium. The actual bond issuance cost is substantially lower than the Measure N estimate due to avoidance of Capitalized Interest costs. Budget History and Projection City of Palo Alto Library Bond Oversight Committee Quarterly Financial Report As of April 12, 2013 Description of Activity Library Projects Budget to Actual Activities Summary 1 City of Palo Alto Library Bond Oversight Committee Quarterly Financial Report As of April 12, 2013 Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 4,000,000$ -$ -$ 4,000,000$ Budget Change 1,212,000 1,212,000 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 3,617,992 31,366 (3,649,358) Construction Costs - - - - Contract Contingency - 462,490 14,264 (476,754) Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost - 3,163 - (3,163) Total Library Projects Expenditures 5,212,000 4,157,071 45,631 1,009,298 Estimate of Pending Commitments/Costs - - (12,943) 12,943 Total Bond Funds Less Bond Financing Costs 5,212,000$ 4,157,071$ 32,688$ 1,022,241$ 19.6% Reasons for Budget Increase of:1,212,000$ 1) Seismic upgrade 30,000$ July 2010 2) Roof replacement 125,000 June 2011 3) LEED - Green building upgrades 100,000 4) Construction Management Services increase 400,000 5) Fixed Equipment 187,000 6) Moving costs deemed to be bondable costs 50,000 7) Contingency adjustment 320,000 Net Budget Change 1,212,000$ Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 50,000,000$ -$ -$ 50,000,000$ Budget Change (957,000) (957,000) Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 27,306,673 7,547,870 (34,854,543) Contract Contingency - 4,488,597 2,807,366 (7,295,963) Other Contract Services - 828,156 617,227 (1,445,383) City (Inter-department) Service Charge - 295,645 - (295,645) Miscellaneous Cost - 103,668 - (103,668) Total Library Projects Expenditures 49,043,000 33,022,739 10,972,463 5,047,798 Estimate of Pending Commitments/Costs 601,839 (601,839) Total Bond Funds Less Bond Financing Costs 49,043,000$ 33,022,739$ 11,574,302$ 4,445,959$ 9.1% Reasons for Budget Decrease of:(957,000)$ 1) LEED - Green building (Council approved) upgrades 1,200,000$ 2) Fixed Equipment 1,750,000 3) Moving costs deemed to be bondable costs 100,000 4) Contingency adjustment (4,007,000) Net Budget Change (957,000)$ Description of Activity Mitchell Park Library and Community Center Budget to Actual Activities Summary (PE-09006) Downtown Library Budget to Actual Activities Summary (PE-09005) Completed: Construction Began: Description of Activity 2 City of Palo Alto Library Bond Oversight Committee Quarterly Financial Report As of April 12, 2013 Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 18,000,000$ -$ -$ 18,000,000 Budget Change 2,100,000 2,100,000 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 1,904,367 1,979,658 (3,884,025) Contract Contingency - 39,854 84,997 (124,851) Other Contract Services - 186,719 26,000 (212,719) City (Inter-department) Service Charge - - - - Miscellaneous Cost - 590 - (590) Total Library Projects Expenditures 20,100,000 2,131,530 2,090,655 15,877,815 Estimate of Pending Commitments/Costs 18,438,078 (18,438,078) Total Bond Funds Less Bond Financing Costs 20,100,000$ 2,131,530$ 20,528,733$ (2,560,263)$ (12.7%) Reasons for Budget Increase of:2,100,000$ 1) Deferred Maintenance Items: a) Replace roof, fire sprinkers system, re-face exterior siding, and refurbish landscaping 812,700 b) Code Compliance items: replace basement sump pumps, upgrade stormwater treatment and parking lot lights 399,000 c) Service Enhancements: provide teen room after-hours entrance and broadcast center 155,400 2) Art Center Connectivity 732,900 Net Budget Change 2,100,000$ Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Mitchell Park Library (Council Approved - CMR: 463:09) 645,000$ -$ -$ 645,000$ Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 464,577 20,322 (484,899) Contract Contingency - 33,500 5,450 (38,950) City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost - 125 - (125) Total Library Projects Expenditures 645,000 509,448 25,772 109,780 Estimate of Pending Commitments/Costs 84,467 (84,467) Total Bond Funds Less Bond Financing Costs 645,000$ 509,448$ 110,239$ 25,313$ 3.9% Description of Activity Main Library Budget to Actual Activities Summary (PE-11000) Description of Activity Cubberley Temporary Library Budget to Actual Activities Summary (PE-09010) 3 City of Palo Alto Library Bond Oversight Committee Quarterly Financial Report As of April 12, 2013 Engineer's (Budget) Estimate Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Main Library Facility - Art Center Auditorium 500,000$ -$ -$ 500,000$ Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 28,096 2,959 (31,055) Contract Contingency - - 9,890 (9,890) Other Contract Services - City (Inter-department) Service Charge - - - - Miscellaneous Cost - - - - Total Library Projects Expenditures 500,000 28,096 12,849 459,055 Estimate of Pending Commitments/Costs 487,287 (487,287) Total Bond Funds Less Bond Financing Costs 500,000$ 28,096$ 500,137$ (28,232)$ (5.6%) Description of Activity Art Center Temporary Library Budget to Actual Activities Summary (Project # PE-11012) 4 Payment or Posting Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 4,000,000 Budget Change 1,212,000 Sub-total - 2010 Engineer's Budget Estimate 5,212,000 - - 5,212,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 418,563 08/24/10 Group 4 Architecture Research & Planning Architectural 362 09/21/10 Group 4 Architecture Research & Planning Architectural 135 08/03/10 Group 4 Architecture Research & Planning Architectural 16,233 08/03/10 Group 4 Architecture Research & Planning Architectural 56,000 08/10/10 Protech Consulting and Engineering Hazardous Material Testing 5,210 08/10/10 Turner Construction Company Construction Management Services 68,577 Oct. 21, 2010 Report 09/21/10 Group 4 Architecture Research & Planning Architectural 15 09/21/10 Group 4 Architecture Research & Planning Architectural 18,080 09/21/10 Group 4 Architecture Research & Planning Architectural 2,970 09/21/10 W.L. Butler Construction, Inc.Construction 93,177 10/05/10 Protech Consulting and Engineering Hazardous Material Testing 990 10/19/10 Group 4 Architecture Research & Planning Architectural 10,544 11/02/10 W. L. Butler Construction, Inc.Construction 69,984 11/02/10 Turner Construction Company Construction Management Services 27,984 11/02/10 Group 4 Architecture Research & Planning Architectural 11,864 12/07/10 Turner Construction Company Construction Management Services 55,174 12/07/10 Group 4 Architecture Research & Planning Architectural 11,688 Jan. 25, 2011 Report 12/07/10 W. L. Butler Construction, Inc.Construction 92,055 12/14/10 Group 4 Architecture Research & Planning Architectural 519 12/14/10 W. L. Butler Construction, Inc.Construction 159,940 01/04/11 Turner Construction Company Construction Management Services 27,984 01/07/11 Group 4 Architecture Research & Planning Architectural 11,688 01/21/11 West Coast Code Consultants, Inc.Plan Check 350 01/21/11 Turner Construction Company Construction Management Services 30,212 01/31/11 W. L. Butler Construction, Inc.Construction 211,220 02/18/11 W. L. Butler Construction, Inc.Construction 279,472 02/18/11 Group 4 Architecture Research & Planning Architectural 8,766 02/18/11 Turner Construction Company Construction Management Services 27,429 03/16/11 W. L. Butler Construction, Inc.Construction 277,033 April 26, 2011 Report 03/18/11 Group 4 Architecture Research & Planning Architectural 432 03/18/11 Group 4 Architecture Research & Planning Architectural 409 03/18/11 Group 4 Architecture Research & Planning Architectural 8,766 03/18/11 Group 4 Architecture Research & Planning Architectural 136 03/31/11 Pivot Interiors Design 2,250 03/31/11 Turner Construction Company Construction Management Services 17,808 04/07/11 Group 4 Architecture Research & Planning Architectural 13,149 04/19/11 Group 4 Architecture Research & Planning Architectural 2,795 04/25/11 W. L. Butler Construction, Inc.Construction 342,711 05/10/11 Turner Construction Company Construction Management Services 39,522 05/12/11 Group 4 Architecture Research & Planning Architectural 220 05/12/11 Group 4 Architecture Research & Planning Architectural 24,891 05/12/11 Group 4 Architecture Research & Planning Architectural 14,610 July 26, 2011 Report 05/17/11 Turner Construction Company Construction Management Services 28,334 05/27/11 W. L. Butler Construction, Inc.Construction 238,387 06/07/11 W. L. Butler Construction, Inc.Construction 352,713 06/07/11 Group 4 Architecture Research & Planning Architectural 14,610 06/09/11 Moovers, Inc.Moving Services 10,233 06/16/11 Group 4 Architecture Research & Planning Architectural 233 07/20/11 Group 4 Architecture Research & Planning Architectural 479.16 07/20/11 Group 4 Architecture Research & Planning Architectural 12,405 07/27/11 W.L. Butler Construction, Inc.Construction 157,980 07/27/11 Turner Construction Company Construction Management Services 26,028 08/31/11 Group 4 Architecture Research & Planning Architectural 19,560 October 25, 2011 Report 08/10/11 Group 4 Architecture Research & Planning Architectural 137 08/10/11 Group 4 Architecture Research & Planning Architectural 5,100 08/24/11 Turner Construction Company Construction Management Services 38,160 08/31/11 W.L. Butler Construction, Inc.Construction 137,659 09/14/11 Group 4 Architecture Research & Planning Architectural 2,550 09/14/11 Group 4 Architecture Research & Planning Architectural 1,116 12/07/11 Group 4 Architecture Research & Planning Architectural 5,100.00 10/19/11 Turner Construction Company Construction Management Services 1,176.00 12/21/11 Turner Construction Company Construction Management Services 3,806.42 January 18, 2012 11/09/11 Group 4 Architecture Research & Planning Architectural 1,146.02 12/07/11 W.L. Butler Construction, Inc.Construction 64,873.60 Downtown Library Activity Details (PE-09005) As of April 12, 2013 5 Payment or Posting Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Downtown Library Activity Details (PE-09005) As of April 12, 2013 02/08/12 Group 4 Architecture Research & Planning Architectural 29.33 02/08/12 W.L. Butler Construction, Inc.Construction 22,796.10 02/22/12 Group 4 Architecture Research & Planning Architectural 8,407.90 March 28, 2012 Report 03/08/12 Group 4 Architecture Research & Planning Architectural 1,275.00 03/21/12 Group 4 Architecture Research & Planning Architectural 6.82 08/22/12 Group 4 Architecture Research & Planning Architectural 1,268.06 October 30, 2012 Report 10/03/12 Group 4 Architecture Research & Planning Architectural 70.96 01/09/13 Turner Construction Company Construction Management Services 434.00 January 23, 2013 Report Group 4 Architecture Research Architectural 30,786 Moovers, Inc.Moving Services 580 Sub-total - Engineering and Architectural Costs - 3,617,992 31,366 (3,649,358) Contract Contingency Summary of Expenditures as of July 21, 2010 19,140 10/19/10 Group 4 Architecture Research & Planning Architectural 660 10/19/10 Group 4 Architecture Research & Planning Architectural 4,070 Oct. 21, 2010 Report 08/27/10 Asbestos Management Group Hazardous Material Testing 2,500 02/28/11 City of Palo Alto - Planning Plan Check Fee 93 April 26, 2011 Report 02/18/11 W. L. Butler Construction, Inc.Construction 15,686 04/25/11 W. L. Butler Construction, Inc.Construction 59,235 05/27/11 W. L. Butler Construction, Inc.Construction 163,149 07/01/11 Turner Construction Company Construction Management Services 1,123 July 26, 2011 Report 07/01/11 Turner Construction Company Construction Management Services 24,611 06/07/11 Group 4 Architecture Research & Planning Architectural 5,104 06/07/11 Group 4 Architecture Research & Planning Architectural 3,489 07/27/11 Group 4 Architecture Research & Planning Architectural 9,339 October 25, 2011 Report 08/31/11 W. L. Butler Construction, Inc.Construction 13,299 03/08/12 Group 4 Architecture Research & Planning Architectural 4,094 March 28, 2012 Report 02/08/12 W. L. Butler Construction, Inc.Construction 113,631 09/19/12 W. L. Butler Construction, Inc.Construction 10,000 October 30, 2012 Report 01/09/13 Turner Construction Company Construction Management Services 13,266 January 23, 2013 Report Group 4 Architecture Research & Planning Architectural 10,104 Turner Construction Company Construction Management Services 48 Moovers, Inc.Moving Services 4,113 Sub-total - Contract Contingency - 462,490 14,264 (476,754) Other Contract Services Summary of Expenditures as of July 21, 2010 2,225 08/27/10 Asbestos Management Group Hazardous Material Testing 25,700 Oct. 21, 2010 Report Sub-total - Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 43,990 07/13/11 City of Palo Alto - Public Works Parking Permit 230 October 25, 2011 Report 07/13/11 City of Palo Alto - Public Works Parking Permit 420 10/31/10 City of Palo Alto - Planning Plan Checking 861 Jan. 25, 2011 Report Sub-Total - City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,158 04/10/11 Santa Clara County Downtown-Notice of Completion Filing Fee 5 January 18, 2012 Report Sub-total - Miscellaneous Cost - 3,163 - (3,163) Grant Total 5,212,000 4,157,071 45,631 1,009,298 6 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 50,000,000$ Budget Change (957,000) Sub-total - 2010 Engineer's Budget Estimate 49,043,000 - - 49,043,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 3,101,748 08/03/10 Group 4 Architecture Research & Planning Architectural 37,609 08/10/10 Group 4 Architecture Research & Planning Architectural 18,595 10/05/10 Group 4 Architecture Research & Planning Architectural 7,522 10/05/10 Group 4 Architecture Research & Planning Architectural 13,942 10/05/10 Group 4 Architecture Research & Planning Architectural 2,971 07/27/10 Moovers, Inc.Moving Services 435 09/21/10 Turner Construction Company Construction Management Services 163,918 10/19/10 Group 4 Architecture Research & Planning Architectural 47,110 10/19/10 State Water Resources Control Board Submitting Permit Registration Documents 375 Oct. 21, 2010 Report 10/19/10 Group 4 Architecture Research & Planning Architectural 18,517 08/03/10 Peninsula Digital Imaging Reproduction Services 3,066 08/03/10 Peninsula Digital Imaging Reproduction Services 2,401 08/03/10 Peninsula Digital Imaging Reproduction Services 5,105 08/03/10 Peninsula Digital Imaging Reproduction Services 2,119 11/02/10 Bank of Sacramento - Flintco Pacific Escrow Construction 86,542 11/02/10 Flintco Pacific, Inc.Construction 778,876 11/02/10 Group 4 Architecture Research & Planning Architectural 1,037 12/07/10 Turner Construction Company Construction Management Services 635 12/07/10 Turner Construction Company Construction Management Services 70,780 12/07/10 Turner Construction Company Construction Management Services 64,319 12/07/10 Protech Consulting and Engineering Hazardous Material Testing 8,385 12/07/10 Peninsula Digital Imaging Reproduction Services 7,672 12/14/10 West Coast Code Consultants, Inc.Plan Check 26,820 12/14/10 Group 4 Architecture Research & Planning Architectural 46,200 Jan. 25, 2011 Report 12/21/10 Group 4 Architecture Research & Planning Architectural 46,297 12/21/10 Flintco Pacific, Inc.Construction 732,895 12/21/10 Flintco Pacific, Inc. Escrow 2841-042 Construction 81,433 12/28/10 Flintco Pacific, Inc.Construction 757,231 12/28/10 Flintco Pacific, Inc. Escrow 2841-042 Construction 84,137 01/04/11 Group 4 Architecture Research & Planning Architectural 2,942 01/04/11 Group 4 Architecture Research & Planning Architectural 4,564 01/04/11 Turner Construction Company Construction Management Services 73,919 1/21/2011 Group 4 Architecture Research & Planning Architectural 267 1/21/2011 Group 4 Architecture Research & Planning Architectural 46,261 1/21/2011 Turner Construction Company Construction Management Services 105,917 2/1/2011 Flintco Pacific, Inc.Construction 1,098,865 2/1/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 126,732 2/18/2011 Flintco Pacific, Inc.Construction 1,497,190 2/18/2011 Turner Construction Company Construction Management Services 94,502 2/18/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 193,977 2/24/2011 Group 4 Architecture Research & Planning Architectural 46,261 3/10/2011 West Coast Code Consultants, Inc.Plan Check 1,820 3/10/2011 West Coast Code Consultants, Inc.Plan Check 1,680 3/16/2011 West Coast Code Consultants, Inc.Plan Check (560) 3/16/2011 West Coast Code Consultants, Inc.Plan Check 560 April 26, 2011 Report 3/16/2011 Protech Consulting and Engineering Hazardous Material Testing 1,250 3/17/2011 West Coast Code Consultants, Inc.Plan Check 560 3/18/2011 Group 4 Architecture Research & Planning Architectural 46,261 3/31/2011 Flintco Pacific, Inc.Construction 446,177 3/31/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 76,548 3/31/2011 Turner Construction Company Construction Management Services 94,572 4/11/2011 Group 4 Architecture Research & Planning Architectural 4,219 4/11/2011 Group 4 Architecture Research & Planning Architectural 127 4/11/2011 Group 4 Architecture Research & Planning Architectural 7,366 4/11/2011 Group 4 Architecture Research & Planning Architectural 80,956 4/20/2011 West Coast Code Consultants, Inc.Plan Check 140 4/20/2011 West Coast Code Consultants, Inc.Plan Check 280 4/20/2011 West Coast Code Consultants, Inc.Plan Check 560 3/29/2011 Palo Alto Stores Supplies/Parts 1,342 4/25/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 85,140 4/25/2011 Flintco Pacific, Inc.Construction 766,263 4/26/2011 Group 4 Architecture Research & Planning Architectural 2,528 5/10/2011 Turner Construction Company Construction Management Services 82,594 5/12/2011 Group 4 Architecture Research & Planning Architectural 683 5/12/2011 Group 4 Architecture Research & Planning Architectural 80,956 5/17/2011 Turner Construction Company Construction Management Services 101,701 5/17/2011 Flintco Pacific, Inc.Construction 815,307 July 26, 2011 Report 5/17/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 93,874 Mitchell Park Library and Community Center Activity Details (PE-09006) 7 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) 5/17/2011 Flintco Pacific, Inc.Construction 29,559 7/1/2011 Turner Construction Company Construction Management Services 99,493 7/1/2011 Group 4 Architecture Research & Planning Architectural 19,540 7/1/2011 Group 4 Architecture Research & Planning Architectural 3,109 7/1/2011 Group 4 Architecture Research & Planning Architectural 17,038 7/1/2011 Group 4 Architecture Research & Planning Architectural 92,521 July 26, 2011 Report 7/1/2011 Group 4 Architecture Research & Planning Architectural 8,314 7/5/2011 Flintco Pacific, Inc. Escrow 2841-042 Construction 125,101 7/5/2011 Flintco Pacific, Inc.Construction 1,125,909 7/27/2011 Group 4 Architecture Research & Planning Architectural 57,826 7/27/2011 Group 4 Architecture Research & Planning Architectural 13,045 7/27/2011 Group 4 Architecture Research & Planning Architectural 1,954 7/27/2011 Flintco Pacific, Inc.Construction 2,316,525 7/27/2011 Flintco Inc. Escrow Construction 257,391 7/27/2011 Turner Construction Company Construction Management Services 127,367 October 25, 2011 Report 10/5/2011 Group 4 Architecture Research & Planning Architectural 1,898 10/5/2011 Group 4 Architecture Research & Planning Architectural 57,826 10/5/2011 Group 4 Architecture Research & Planning Architectural 1,647 10/5/2011 Flintco Pacific, Inc.Construction 483,144 10/5/2011 Flintco, Inc. Escrow Construction 53,683 10/19/2011 Turner Construction Company Construction Management Services 170,058 11/2/2011 Flintco Pacific, Inc.Construction 705,850 11/2/2011 Group 4 Architecture Research & Planning Architectural 57,826 11/2/2011 Group 4 Architecture Research & Planning Architectural 2,060 11/2/2011 Flintco Pacific, Inc.Construction 78,428 11/30/2011 West Coast Code Consultants, Inc.Plan Check 420 11/30/2011 West Coast Code Consultants, Inc.Plan Check 560 11/30/2011 West Coast Code Consultants, Inc.Plan Check 560 11/30/2011 Group 4 Architecture Research & Planning Architectural 2,051 11/30/2011 West Coast Code Consultants, Inc.Plan Check 700 January 18, 2012 Report 11/30/2011 Flintco Pacific, Inc.Construction 119,803 11/30/2011 Group 4 Architecture Research & Planning Architectural 1,722 11/30/2011 Group 4 Architecture Research & Planning Architectural 57,826 11/30/2011 Group 4 Architecture Research & Planning Architectural 4,789 11/30/2011 Flintco, Inc. Escrow Construction 837,115 *12/21/2011 Turner Construction Company Construction Management Services 187,775 12/21/2011 Turner Construction Company Construction Management Services 129,453 12/21/2011 Turner Construction Company Construction Management Services 233,061 12/21/2011 Turner Construction Company Construction Management Services 2,385 12/21/2011 Turner Construction Company Construction Management Services 109 12/21/2011 Group 4 Architecture Research & Planning Architectural 46,261 2/29/2012 West Coast Code Consultants, Inc.Plan Check 200 2/29/2012 Group 4 Architecture Research & Planning Architectural 1,600 3/21/2012 Group 4 Architecture Research & Planning Architectural 3,457 3/21/2012 Group 4 Architecture Research & Planning Architectural 19,603 2/1/2012 Flintco Pacific, Inc.Construction 940,940 2/1/2012 Flintco Pacific, Inc.Construction 104,549 2/1/2012 Group 4 Architecture Research & Planning Architectural 46,261 2/1/2012 Group 4 Architecture Research & Planning Architectural 654 March 28, 2012 Report 2/8/2012 Group 4 Architecture Research & Planning Architectural 6,417 2/24/2012 Turner Construction Company Construction Management Services 147,880 1/18/2012 Flintco Pacific, Inc.Construction 458,653 1/18/2012 Flintco Pacific, Inc.Construction 50,961 2/29/2012 Group 4 Architecture Research & Planning Architectural 46,261 3/21/2012 Flintco Pacific, Inc.Construction 722,810 3/21/2012 Flintco Pacific, Inc.Construction 80,312 3/21/2012 Group 4 Architecture Research & Planning Architectural 26,657 4/4/2012 Flintco Pacific, Inc.Construction 95,581 4/4/2012 Flintco Pacific, Inc. Escrow Construction 17,187 4/18/2012 Turner Construction Company Construction Management Services 129,709 4/18/2012 Turner Construction Company Construction Management Services 118,875 4/18/2012 Group 4 Architecture Research & Planning Architectural 2,100 4/18/2012 Group 4 Architecture Research & Planning Architectural 23,130 4/18/2012 Turner Construction Company Construction Management Services 120,219 5/9/2013 Sierra Traffic Markings Inc.Construciton 7,990 5/9/2012 Group 4 Architecture Research & Planning Architectural 16,191 5/16/2012 Flintco Pacific, Inc.Construction 254,477 5/16/2012 Flintco Pacific, Inc. Escrow Construction 28,395 5/16/2012 Group 4 Architecture Research & Planning Architectural 2,069 5/16/2012 Group 4 Architecture Research & Planning Architectural 9,511 5/16/2012 Turner Construction Company Construction Management Services 116,415 6/20/2012 Group 4 Architecture Research & Planning Architectural 2,551 6/20/2012 Group 4 Architecture Research & Planning Architectural 16,191 July 5, 2012 Report 6/20/2012 Flintco Pacific, Inc.Construction 189,316 6/20/2012 Flintco Pacific, Inc. Escrow Construction 22,270 8 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) 7/5/2012 West Coast Code Consultants, Inc.Plan Check 420 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 1,680 7/5/2012 West Coast Code Consultants, Inc.Plan Check 420 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 560 7/5/2012 West Coast Code Consultants, Inc.Plan Check 280 7/5/2012 West Coast Code Consultants, Inc.Plan Check 280 7/5/2012 Flintco Pacific, Inc. Escrow Construction 20,813 7/5/2012 Flintco Pacific, Inc.Construction 173,537 7/25/2012 Group 4 Architecture Research & Planning Architectural 762 7/25/2012 Group 4 Architecture Research & Planning Architectural 16,191 8/8/2012 Flintco Pacific, Inc.Construction 11,297 8/8/2012 Group 4 Architecture Research & Planning Architectural 16,191 October 30, 2012 Report 8/8/2012 Flintco Pacific, Inc.Construction 85,728 8/22/2012 Group 4 Architecture Research & Planning Architectural 280 9/26/2012 Group 4 Architecture Research & Planning Architectural 84,027 10/3/2012 Group 4 Architecture Research & Planning Architectural 16,191 10/10/2012 Turner Construction Company Construction 22,926 11/14/2012 Group 4 Architecture Research & Planning Architectural 20,325 11/19/2012 West Coast Code Consultants, Inc.Plan Check 350 11/19/2012 Flintco Pacific, Inc.Construction 383,239 11/19/2012 Flintco Pacific, Inc.Construction 88,321 11/19/2012 West Coast Code Consultants, Inc.Plan Check 420 12/12/2012 Flintco Pacific, Inc.Construction 608,951 12/12/2012 Flintco Pacific, Inc.Construction 81,614 12/12/2012 Flintco Pacific, Inc.Construction 505,497 12/12/2012 Flintco Pacific, Inc.Construction 96,133 12/19/2012 Group 4 Architecture Research & Planning Architectural 93,220 January 23, 2013 Report 12/19/2012 Group 4 Architecture Research & Planning Architectural 30,758 12/26/2012 Flintco Pacific, Inc.Construction 13,946 12/26/2012 Flintco Pacific, Inc.Construction 31,893 12/26/2012 Turner Construction Company Construction Management Services 270,207 12/26/2012 Turner Construction Company Construction Management Services 754,125 12/26/2012 Flintco Pacific, Inc.Construction 9,728 12/26/2012 Flintco Pacific, Inc.Construction 14,250 1/23/2013 West Coast Code Consultants, Inc.Plan Check 160 1/23/2013 West Coast Code Consultants, Inc.Plan Check 560 1/23/2013 Group 4 Architecture Research & Planning Architectural 626 1/23/2013 Group 4 Architecture Research & Planning Architectural 783 2/6/2013 Group 4 Architecture Research & Planning Architectural 68,238 2/20/2013 Group 4 Architecture Research & Planning Architectural 38,341 April 12, 2013 3/6/2013 Group 4 Architecture Research & Planning Architectural 2,775 4/3/2013 Group 4 Architecture Research & Planning Architectural 73,745 Moovers, Inc.Moving Services 19,853 Flintco Pacific, Inc.Construction 3,772,484 Protect Consulting and Engineering Hazardous Material Testing 12,699 Group 4 Architecture Research & Planning Architectural 455,608 Turner Construction Company Construction Management Services 1,750,864 Ross McDonald Company, Inc.Construction Services 648,412 Sign & Services Company Construction Services 443,920 West Coast Code Consultants, Inc.Plan Check 1,590 Muzak LLC Construction Services 201,992 BIG-D Pacific Builders, LP Construction 240,000 3DI West Aerial Photogrammetric Services 450 Sub-total - Engineering Costs - 27,306,673 7,547,870 (34,854,543) Contract Contingency Summary of Expenditures as of July 21, 2010 104,373 08/03/10 Group 4 Architecture Research & Planning Architectural 1,771 10/05/10 Group 4 Architecture Research & Planning Architectural 25,951 Jan. 25, 2011 Report 10/19/10 Group 4 Architecture Research & Planning Architectural 10,740 2/1/2011 Flintco Pacific, Inc.Construction 41,725.00 2/18/2011 Flintco Pacific, Inc.Construction 248,603.00 April 26, 2011 Report 3/31/2011 Flintco Pacific, Inc.Construction 242,754.00 8/31/2011 W. L. Butler Construction, Inc.Construction 22,712.50 8/24/2011 Flintco Pacific, Inc.Construction 987,123.00 8/24/2011 Turner Construction Company Construction Management Services 151,367.49 8/24/2011 Flintco Inc. Escrow Construction 117,936.00 8/24/2011 Group 4 Architecture Research & Planning Architectural 48,250.00 October 25, 2011 Report 8/24/2011 Group 4 Architecture Research & Planning Architectural 57,825.84 8/24/2011 Flintco Pacific, Inc.Construction 74,304.00 9 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) 10/5/2011 Group 4 Architecture Research & Planning Architectural 37,305.95 11/30/2011 Group 4 Architecture Research & Planning Architectural 20,265.95 January 18, 2012 Ewpoer 11/30/2011 Flintco Pacific, Inc.Construction 241,110.00 2/29/2012 West Coast Code Consultants, Inc.Plan Check 840.00 2/29/2012 West Coast Code Consultants, Inc.Plan Check 560.00 2/29/2012 West Coast Code Consultants, Inc.Plan Check 840.00 2/29/2012 West Coast Code Consultants, Inc.Plan Check 560.00 2/29/2012 West Coast Code Consultants, Inc.Plan Check 360.00 March 28, 2012 Report 3/8/2012 Group 4 Architecture Research & Planning Architectural 9,937.25 2/29/2012 Turner Construction Company Construction Management Services 39,360.00 3/21/2012 Flintco Pacific, Inc.Construction 104,819.00 3/21/2012 Flintco Pacific, Inc.Construction 11,647.00 4/18/2012 Turner Construction Company Construction Management Services 656.00 4/4/2012 Group 4 Architecture Research & Planning Architectural 91,383.24 5/23/2012 Group 4 Architecture Research & Planning Architectural 25,039.15 7/5/2012 Group 4 Architecture Research & Planning Architectural 12,870.63 4/4/2012 Flintco Pacific, Inc.Construction 59,097.00 July 5, 2012 Repport 5/16/2012 Flintco Pacific, Inc.Construction 1,077.00 6/20/2012 Turner Construction Company Construction Management Services 137,682.56 6/20/2012 Flintco Pacific, Inc.Construction 11,109.00 7/5/2012 Flintco Pacific, Inc.Construction 13,783.00 7/11/2012 Group 4 Architecture Research & Planning Architectural 65,495.00 8/22/2012 Group 4 Architecture Research & Planning Architectural 80,923.70 8/8/2012 Flintco Pacific, Inc.Construction 15,943.00 October 30, 2012 Report 10/3/2012 Turner Construction Company Construction Management Services 298,982.88 10/31/2012 Group 4 Architecture Research & Planning Architectural 1,578.00 12/26/2012 Group 4 Architecture Research & Planning Architectural 3,052.50 11/19/2012 Flintco Pacific, Inc.Construction 411,653.00 12/12/2012 Flintco Pacific, Inc.Construction 125,571.00 January 23, 2013 Report 12/12/2012 Flintco Pacific, Inc.Construction 359,703.00 12/26/2012 Flintco Pacific, Inc.Construction 73,605.00 12/26/2012 Flintco Pacific, Inc.Construction 96,352.00 Moovers, Inc.Moving Services 6,649 Flintco Pacific, Inc.Construction 2,570,597 Protect Consulting and Engineering Hazardous Material Testing 11,991 Group 4 Architecture Research & Planning Architectural 74,601 Turner Construction Company Construction Management Services 14,136 Ross McDonald Company, Inc.Construction Services 14,290 Sign & Services Company Construction Services 95,102 Muzak LLC Construction Services 20,000 Sub-total - Contract Contingency - 4,488,597 2,807,366 (7,295,963) Other Contract Services Summary of Expenditures as of July 21, 2010 93,750 07/01/11 FedEx Mailing 89 08/26/10 Bruce Beasley Sculpture 90,000 Oct. 21, 2010 Report 09/30/11 FedEx Coding Error Correction (89) October 25, 2011 Report 11/16/11 Jarvis, Fay, Doporto & Gibson, LLP Legal Services - Mitchell Park Library 3,776 12/21/11 ZFA Structural Engineers Mitchell Library Review 2,925 12/29/11 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 11,170 January 18, 2012 Report 12/29/11 State Water Resource Board Permit 505 02/08/12 Riedinger Consulting Outside Counsel 9,136 01/25/12 ZFA Structural Engineers Mitchell Library Review 9,289 01/25/12 ZFA Structural Engineers Mitchell Library Review 3,118 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 6,625 March 28, 2012 Report 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 9,960 02/29/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 10,423 03/14/12 Envision Ware, Inc.Professional services 5,850 04/04/12 ZFA Structural Engineers Mitchell Library Review 2,518 04/04/12 Riedinger Consulting Outside Counsel 28,371 04/04/12 Riedinger Consulting Outside Counsel 10,235 04/04/12 Riedinger Consulting Outside Counsel 24,585 05/09/12 Jam Services 3,897 July 5, 2012 Report 05/09/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 6,647 05/09/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 5,212 06/13/12 ZFA Structural Engineers Mitchell Library Review 1,732 06/20/12 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 4,549 06/20/12 Blackstone Discovery Legal Services for Mitchell Park Library 319 08/15/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 35,618 09/12/12 County of Santa Clara Mitchell Snack Bar - Environmental Health 220 October 30, 2012 Report 09/12/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 30,348 09/05/12 Bruce Beasley Sculpture 1,900 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 15,610 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 38,608 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 33,684 January 23, 2013 Report 10 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 77,708 12/31/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 12 01/00/00 3M Library Systems Library Self Check Stations - 3/20/2013 Bruce Beasley Sculpture 40,000 02/13/13 Ginn and Crosby, LLC Legal Services 1,272 02/13/13 Ginn and Crosby, LLC Legal Services 48 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 49,268 April 12, 2013 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 13,517 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 12,961 04/03/13 Moscone Emblidge Sater & Otis, LLP Legal Services 132,792 Bruce Beasley Sculpture 50,000 ZFA Structural Engineers Legal Services 5,418 Jarvis, Fay, Doporto & Gibson, LLP Legal Services for Mitchell Park Library 16,705 Envision Ware, Inc.Sorter System 469,149 Bibliotheca, Inc.Library Services 15,370 Riedinger Consulting Legal Services 12,673 Ginn and Crosby, LLC Legal Services 33,023 Moscone Emblidge Sater & Otis, LLP Legal Services 14,887 Sub-total - Other Contract Services - 828,156 617,227 (1,445,383) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 176,008 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Library - Bldg A 70,153 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Teen Center - Bldg B 10,768 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Multipurpose Center - Bldg C 21,184 Oct. 21, 2010 Report 09/30/10 City of Palo Alto - Planning Demolition Permit MPL - 3700 Middlefield 525 09/30/10 City of Palo Alto - Planning Demolition Permit MPCC - 3800 Middlefield 525 09/28/10 City of Palo Alto - Planning Permit (Grading and Fill)1,830 10/31/10 City of Palo Alto - Planning Revision permit for Mitchell Park Library & CC 141 11/16/10 City of Palo Alto - Planning Architectural Review Board Fees 2,090 Jan. 25, 2011 Report 01/31/11 Palo Alto Stores Supplies/Parts 101 03/31/11 Palo Alto Stores Supplies/Parts 97 03/31/11 Palo Alto Stores Supplies/Parts 4,045 April 26, 2011 Report 03/31/11 Palo Alto Stores Supplies/Parts 89 03/31/11 Palo Alto Stores Supplies/Parts 661 06/14/10 Palo Alto Stores Reversal of Prior Charges (2,834) 03/29/11 Palo Alto Stores Reversal of Prior Charges (628) 03/30/11 Palo Alto Stores Reversal of Prior Charges (571) July 26, 2011 Report 04/04/11 Palo Alto Stores Reversal of Prior Charges (143) 04/30/11 City of Palo Alto - Public Works Underground Fire Supply/Hydrant Permit Fee 1,335 07/06/11 City of Palo Alto - Development Center Plan Check Fee 93 07/06/11 City of Palo Alto - Planning Plan Check Fee 89 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 137 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 October 25, 2011 Report 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 121 08/31/11 City Of Palo Alto - Development Center Mitchell Library Plan Check 145 08/31/11 City Of Palo Alto - Development Center Mitchell Library Plan Check 277 08/31/11 City Of Palo Alto - Planning Mitchell Library Plan Check 40 09/30/11 City of Palo Alto - Planning Mitchell Library - Permit Revision 89 10/31/11 City of Palo Alto - Development Center Plan Check Fee 113 January 18, 2012 10/31/11 City of Palo Alto - Development Center Plan Check Fee 325 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 97 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 121 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 121 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 109 01/31/12 City of Palo Alto - Planning Plan Review - modify permit 85 01/31/12 City of Palo Alto - Planning Plan Review - modify permit 4,056 March 28, 2012 12/31/11 City of Palo Alto - Planning Plan Review - modify permit 93 12/21/11 City of Palo Alto - Planning Plan Review - modify permit 85 02/29/12 City of Palo Alto - Planning Plan Review - modify permit 89 02/29/12 City of Palo Alto - Planning Plan Review - modify permit 121 04/25/12 City of Palo Alto - Stores Inventory Conduit, Rgid Steel T/C 10Ft length 2"180.99 04/25/12 City of Palo Alto - Stores Inventory Pipes - Valves - Fitting 3.62 04/30/12 City of Palo Alto - Planning Plan Review (Electrical Veh. Chargers permit)977 05/16/12 City of Palo Alto - Planning Plan Review (Ceiling Structural Chgs.) - Mitchell 344 05/16/12 City of Palo Alto - Planning Plan Review (foundation, framing, plumbing) - Mitchell Park Libr 364 July 5, 2012 05/16/12 City of Palo Alto - Planning Plan Review (Solar Water Heater) - Mitchell Park Library 165 05/16/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 137 05/31/12 City of Palo Alto - Planning MP -Plan Review for electrical signage permit 112 06/28/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 105 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 105 11 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 300 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 151 October 30, 2012 09/14/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 89 09/14/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 137 11/30/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 116 12/31/12 City of Palo Alto - Public Works Mitchell Park Library - Plan Review 7 January 23, 2013 Report 03/31/13 City of Palo Alto - Development Center Architetural Review 92 April 12, 2013 Sub-total - City (Inter-department) Service Charge - 295,645 - (295,645) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,315 06/30/10 Office Max (US Bank-Calcard) - Reversed Reverse office supplies charged to project (246) 06/30/10 Debra Jacobs Reverse prior travel and meeting expense (6) Oct. 21, 2010 Report 06/30/10 Karen Bengard Reverse prior travel and meeting expense (20) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (11) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (20) 03/30/11 Palo Alto Stores Supplies/Parts 4 April 26, 2011 Report 03/30/11 Palo Alto Stores Supplies/Parts 214 03/30/11 Palo Alto Stores Reversal of Prior Charges (4) 03/30/11 Palo Alto Stores Reversal of Prior Charges (214) July 26, 2011 Report 04/21/11 City of Palo Alto - Utilities Utility Connection Fee 68,559 02/15/12 Palo Alto Stores Supplies/Parts 4 02/15/12 Palo Alto Stores Supplies/Parts 176 March 28, 2012 Report 02/15/12 Palo Alto Stores Supplies/Parts 218 02/15/12 Palo Alto Stores Supplies/Parts 4 12/31/12 State Water Resources Control Board Submitting Permit Registration Documents 505 January 23, 2013 Report 02/06/13 4LEAF, Inc.Building Inspection 2,553 02/06/13 4LEAF, Inc.Building Inspection 8,769 April 12, 2013 03/13/13 4LEAF, Inc.Building Inspection 9,213 03/13/13 4LEAF, Inc.Building Inspection 10,656 Sub-total - Miscellaneous Cost - 103,668 - (103,668) Grant Total 49,043,000 33,022,739 10,972,463 5,047,798 12 Payment Date Purchasing Document Payee Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 18,000,000$ Budget Change 2,100,000 Sub-total - 2010 Engineer's Budget Estimate 20,100,000 - - 20,100,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 10/05/10 Group 4 Architecture Research and Planning Architectural 73,246 10/05/10 Group 4 Architecture Research and Planning Architectural 700 10/05/10 Group 4 Architecture Research and Planning Architectural 73,246 11/02/10 Group 4 Architecture Research and Planning Architectural 5,785 11/02/10 Group 4 Architecture Research and Planning Architectural 122,100 Jan. 25, 2011 Report 12/07/10 Group 4 Architecture Research and Planning Architectural 2,390 01/04/11 Group 4 Architecture Research and Planning Architectural 15,000 01/04/11 Group 4 Architecture Research and Planning Architectural 583 01/04/11 Group 4 Architecture Research and Planning Architectural 859 01/04/11 Turner Construction Company Construction Management Services 1,195 02/24/11 Group 4 Architecture Research and Planning Architectural 4,860 03/18/11 Group 4 Architecture Research and Planning Architectural 73,246 03/18/11 Group 4 Architecture Research and Planning Architectural 7,500 03/18/11 Group 4 Architecture Research and Planning Architectural 53 03/18/11 Group 4 Architecture Research and Planning Architectural 3,843 04/11/11 Group 4 Architecture Research and Planning Architectural 112,464 04/11/11 Group 4 Architecture Research and Planning Architectural 3,993 04/11/11 Group 4 Architecture Research and Planning Architectural 7,500 01/21/11 Group 4 Architecture Research and Planning Architectural 24,392 April 26, 2011 Report 01/21/11 Turner Construction Company Construction Management Services 1,434 01/21/11 Group 4 Architecture Research and Planning Architectural 2,500 01/24/11 Group 4 Architecture Research and Planning Architectural 1,500 01/21/11 Group 4 Architecture Research and Planning Architectural 447 02/18/11 Turner Construction Company Construction Management Services 478 02/18/11 Group 4 Architecture Research and Planning Architectural 48,831 02/18/11 Group 4 Architecture Research and Planning Architectural 2,653 02/18/11 Group 4 Architecture Research and Planning Architectural 3,238 05/12/11 Group 4 Architecture Research and Planning Architectural 6,250 05/12/11 Group 4 Architecture Research and Planning Architectural 40,052 05/12/11 Group 4 Architecture Research and Planning Architectural 12,411 05/12/11 Group 4 Architecture Research and Planning Architectural 3,263 05/17/11 Group 4 Architecture Research and Planning Architectural 4,553 July 26, 2011 Report 06/09/11 Group 4 Architecture Research and Planning Architectural 31,374 07/01/11 Turner Construction Company Construction Management Services 9,169 07/11/11 Group 4 Architecture Research and Planning Architectural 11,100 07/11/11 Group 4 Architecture Research and Planning Architectural 488 07/11/11 Group 4 Architecture Research and Planning Architectural 15,687 07/27/11 Group 4 Architecture Research and Planning Architectural 319 07/27/11 Group 4 Architecture Research and Planning Architectural 1,150 07/27/11 Group 4 Architecture Research and Planning Architectural 1,875 07/27/11 Turner Construction Company Construction Management Services 5,572 08/10/11 Group 4 Architecture Research and Planning Architectural 31,374 08/24/11 Turner Construction Company Construction Management Services 2,868 October 25, 2011 Report 08/31/11 Group 4 Architecture Research and Planning Architectural 117 08/31/11 Group 4 Architecture Research and Planning Architectural 175 08/31/11 Group 4 Architecture Research and Planning Architectural 248 09/14/11 Group 4 Architecture Research and Planning Architectural 67 09/14/11 Group 4 Architecture Research and Planning Architectural 600 09/14/11 Group 4 Architecture Research and Planning Architectural 39,218 10/26/11 Group 4 Architecture Research and Planning Architectural 5,000 10/26/11 Group 4 Architecture Research and Planning Architectural 235,308 10/26/11 Group 4 Architecture Research and Planning Architectural 878 10/26/11 Group 4 Architecture Research and Planning Architectural 5,000 10/26/11 Group 4 Architecture Research and Planning Architectural 291 10/26/11 Group 4 Architecture Research and Planning Architectural 27 11/02/11 Group 4 Architecture Research and Planning Architectural 78,436 11/02/11 Group 4 Architecture Research and Planning Architectural 7,500 11/22/11 Group 4 Architecture Research and Planning Architectural 8,514 12/07/11 Group 4 Architecture Research and Planning Architectural 62,749 January 18, 2012 Report 12/14/11 Group 4 Architecture Research and Planning Architectural 12,584 12/14/11 Group 4 Architecture Research and Planning Architectural 79,172 12/14/11 Group 4 Architecture Research and Planning Architectural 12,584 12/21/11 Protect Consulting and Engineering Hazardous Material Testing 3,530 12/21/11 Group 4 Architecture Research and Planning Architectural 3,052 01/11/12 Group 4 Architecture Research and Planning Architectural 225 01/11/12 Group 4 Architecture Research and Planning Architectural 9,761 01/11/12 Group 4 Architecture Research and Planning Architectural 70,592 01/11/12 Group 4 Architecture Research and Planning Architectural 150 01/11/12 Group 4 Architecture Research and Planning Architectural 247 02/22/12 Group 4 Architecture Research and Planning Architectural 10,000 02/22/12 Group 4 Architecture Research and Planning Architectural 62,749 02/22/12 Group 4 Architecture Research and Planning Architectural 8,676 Main Library Activity Details (PE-11000) As of April 12, 2013 13 Payment Date Purchasing Document Payee Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance 02/22/12 Group 4 Architecture Research and Planning Architectural 3,590 March 28, 2012 Report 03/21/12 Group 4 Architecture Research and Planning Architectural 1,330 03/21/12 Group 4 Architecture Research and Planning Architectural 5,423 03/21/12 Group 4 Architecture Research and Planning Architectural 39,218 02/22/12 BIG-D Pacific Builders, LP Construction 32,500 12/21/12 BIG-D Pacific Builders, LP Construction 36,960 04/04/12 Group 4 Architecture Research and Planning Architectural 18,925 04/18/12 Group 4 Architecture Research and Planning Architectural 1,500 04/18/12 Group 4 Architecture Research and Planning Architectural 19 04/18/12 Group 4 Architecture Research and Planning Architectural 9,784 05/16/12 Group 4 Architecture Research and Planning Architectural 3,278 July 5, 2012 Report 05/16/12 Group 4 Architecture Research and Planning Architectural 29,046 05/30/12 Group 4 Architecture Research and Planning Architectural 39,504 06/20/12 Group 4 Architecture Research and Planning Architectural 13,884 07/05/12 Group 4 Architecture Research and Planning Architectural 407 07/05/12 Group 4 Architecture Research and Planning Architectural 2,500 07/25/12 Group 4 Architecture Research and Planning Architectural 1,613 07/25/12 Group 4 Architecture Research and Planning Architectural 1,535 07/25/12 Group 4 Architecture Research and Planning Architectural 1,992 October 30, 2012 Report 09/05/12 Group 4 Architecture Research and Planning Architectural 7,551 09/26/12 Group 4 Architecture Research and Planning Architectural 5,996 10/31/12 Turner Construction Company Construction Management Services 7,444 11/19/12 Group 4 Architecture Research and Planning Architectural 2,097 11/19/12 Group 4 Architecture Research and Planning Architectural 5,423 11/19/12 Group 4 Architecture Research and Planning Architectural 8,000 11/19/12 Group 4 Architecture Research and Planning Architectural 270 11/19/12 Group 4 Architecture Research and Planning Architectural 2,097 10/31/12 Turner Construction Company Construction Management Services 10,000 January 23, 2013 Report 10/11/12 Fastsigns signs 389 01/09/13 NOVA Partners, Inc.Construction Management Services 19,320 01/23/13 Group 4 Architecture Research and Planning Architectural 2,500 01/23/13 Group 4 Architecture Research and Planning Architectural 969 01/23/13 Group 4 Architecture Research and Planning Architectural 4,979 01/23/13 Group 4 Architecture Research and Planning Architectural 725 01/23/13 NOVA Partners, Inc.Construction Management Services 12,010 02/06/13 Group 4 Architecture Research and Planning Architectural 3,243 02/27/13 West Coast Code Consultants, Inc.Plan Check 13,300 02/27/13 NOVA Partners, Inc.Construction Management Services 18,280 April 12, 2013 03/06/13 Group 4 Architecture Research and Planning Architectural 30,776 04/03/13 NOVA Partners, Inc.Construction Management Services 17,000 Group 4 Architecture Research and Planning Architectural 1,249,749 Turner Construction Company Construction Management Services 34,986 West Coast Code Consultants, Inc.Plan Check 4,600 NOVA Partners, Inc.Construction Management Services 690,323 Sub-total - Engineering and Architectural Costs - 1,904,367 1,979,658 (3,884,025) Contract Contingency 05/27/11 Group 4 Architecture Research and Planning Architectural 22,152 July 26, 2011 Report 06/09/11 Group 4 Architecture Research and Planning Architectural 571 02/22/12 Group 4 Architecture Research and Planning Architectural 122 March 28, 2012 Report 11/19/12 Group 4 Architecture Research and Planning Architectural 124 January 23, 2013 Report 04/03/13 Group 4 Architecture Research and Planning Architectural 8,442 April 12, 2013 03/06/13 Group 4 Architecture Research and Planning Architectural 8,442 Metropolitan Van and Storage, Inc.Equipment Moving 84,997 Sub-total - Contract Contingency - 39,854 84,997 (124,851) Other Contract Services 12/05/12 Planet Orange Termite Inspection Fee 350 12/31/12 Fastsigns Sign 226 12/19/12 Creative Machines, Inc.Plans and Technical Drawings 52,000 12/19/12 Creative Machines, Inc.Plans and Technical Drawings 12,000 10/31/12 City of Palo Alto - Public Works Main Library Renovation - Plan Check Fee 115,654 12/06/12 City of Palo Alto - Development Center Architetural Review 2,678 January 23, 2013 Report 12/06/12 City of Palo Alto - Development Center Architetural Review 25 12/06/12 City of Palo Alto - Development Center Architetural Review 20 12/06/12 City of Palo Alto - Development Center Architetural Review 622 12/06/12 City of Palo Alto - Development Center Architetural Review 2,892 12/06/12 City of Palo Alto - Development Center Architetural Review 252 Creative Machines, Inc.Sculptures and Light Display 26,000 Sub-total - Other Contract Services - 186,719 26,000 (212,719) City (Inter-department) Service Charge Sub-total - City (Inter-department) Service Charge - - - - Miscellaneous Cost02/27/13 JP Morgan P-Card Other Contract Services 589.75 April 12, 2013 Sub-total - Miscellaneous Cost - 590 - (590) Grant Total 20,100,000 2,131,530 2,090,655 15,877,815 14 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Mitchell Park Library (Council Approved - CMR: 463:09) 645,000 g g Sub-total - 2010 Engineer's Budget Estimate 645,000 - - 645,000$ Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 439,283$ 10/05/10 Group 4 Architecture Research & Planning Architectural 5,774 Oct. 21, 2010 Report 08/24/10 Group 4 Architecture Research & Planning Architectural 329 01/27/11 Johnstone Moyer, Inc.Temp. Library Improvements 19,191 April 26, 2011 Report Group 4 Architecture Research & Planning Architectural 17,122 Ross McDonald Company, Inc.Library Shelving 3,200 Sub-total - Engineering and Architectural Costs - 464,577 20,322 (484,899) Contract Contingency Summary of Expenditures as of July 21, 2010 2,541 08/24/10 Johnstone Moyer, Inc.Temp. Library Improvements 24,604 Oct. 21, 2010 Report 08/27/10 West Corporation Temp. Lib. - Security Access Card & Alarm 310 01/27/11 Johnstone Moyer, Inc.Temp. Library Improvements 6,045 April 26, 2011 Report West Corporation Temp. Lib. - Security Access Card & Alarm 1,910 Ross McDonald Company, Inc.Library Shelving 3,540 Sub-total - Contract Contingency - 33,500 5,450 (38,950) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 11,247 March 28, 2012 Report Sub-total - City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 125 March 28, 2012 Report Sub-total - Miscellaneous Cost - 125 - (125) Grant Total 645,000 509,448 25,772 109,780 Temporary Library at Cubberley (for Mitchell Facility) - Activity Details (PE-09010) As of April 12, 2013 15 Payment Date Payee Description Engineer's (Budget) Estimate Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Main Library Facility - Art Center Auditorium 500,000 Sub-total - 2010 Engineer's Budget Estimate 500,000 - - 500,000$ Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 -$ 04/04/12 Group 4 Architecture Research & Planning Architectural 15,687 July 5, 2012 Report 04/04/12 Group 4 Architecture Research & Planning Architectural 11,288 07/25/12 Group 4 Architecture Research & Planning Architectural 1,121 October 30, 2012 Report Big-D Pacific Builders, LP Construction Services Group 4 Architecture Research & Planning Architectural 2,959 Sub-total - Engineering and Architectural Costs - 28,096 2,959 (31,055) Contract Contingency Summary of Expenditures as of July 21, 2010 - Ross McDonald Company, Inc.Library Shelving 9,890 Sub-total - Contract Contingency - - 9,890 (9,890) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 - Sub-total - City (Inter-department) Service Charge - - - - Miscellaneous Cost Summary of Expenditures as of July 21, 2010 - Sub-total - Miscellaneous Cost - - - - Grant Total 500,000 28,096 12,849 459,055 Art Center Temporary Library - Activity Details (Project # PE-11012) As of April 12, 2013 16 1 2 3 4 5 6 7 8 (3 minus 1) (5 minus 1) (5 minus 4) (7 divide by 4) Measure N Estimates Changes in Measure Estimates Engineer's Estimate Project Budget April 2013 (Revised) Projected Costs Diff. Between Measure N Estimates vs. Projected Costs $ Diff. Between Project Budget vs. Projected Costs % Diff. Between Project Budget vs. Projected Costs Downtown Library 4,000,000$ 1,212,000$ 5,212,000$ 4,212,000$ 4,191,782$ (191,782) 20,218$ 0.5% Mitchell Park & Community Center Library 50,000,000 (957,000) 49,043,000 47,725,437 45,942,397 4,057,603 1,783,040 3.7% Cubberley Temporary Library - 645,000 645,000 645,000 619,687 (619,687) 25,313 3.9% Main Library 18,000,000 2,100,000 20,100,000 22,342,563 23,166,063 (5,166,063) (823,500) (3.7%) Art Center Temporary Library - 500,000 500,000 500,000 528,232 (528,232) (28,232) (5.6%) Total Prior to Bond Financing Costs 72,000,000 3,500,000 75,500,000 75,425,000 74,448,161 (2,448,161) 976,839 1.3% Bond Financing Costs (a)4,000,000 (3,500,000) 500,000 500,000 185,320 3,814,680 314,680 62.9% Grand Total 76,000,000$ -$ 76,000,000$ 75,925,000$ 74,633,481$ 1,366,519$ 1,291,519$ 1.7% a) The actual bond issuance cost is substantially lower than the Measure N estimate due to avoidance of Capitalized Interest costs. Project Budget Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Budget Original Budget (per Measure N Ballot Measure)72,000,000$ -$ -$ 72,000,000$ Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000 645,000 Temporary Main Library Facility - Art Center Auditorium 500,000 500,000 Net Other Budget Changes 2,280,000 2,280,000 Expenditures - Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 35,414,444 24,826,642 (60,241,086) Construction Costs - - - Contract Contingency 5,505,249 4,705,979 (10,211,228) Other Contract Services 1,043,120 1,057,540 (2,100,661) City (Inter-department) Service Charge 499,757 - (499,757) Miscellaneous Cost 107,546 - (107,546) Total Library Projects Expenditures 75,425,000 42,570,115 30,590,161 2,264,723 Estimate of Pending Commitments/Costs - - 1,287,884 (1,287,884) Total Bond Funds Less Bond Financing Costs 75,425,000 42,570,115 31,878,046 976,839 1.3% Bond Financing Costs (a)500,000 185,320 - 314,680 62.9% Grand Total 75,925,000$ 42,755,436$ 31,878,046$ 1,291,519$ 1.7% 2010 GO Bond True Interest Cost (TIC)4.21% 2013 GO Bond True Interest Cost (TIC)3.85% a) The actual bond issuance cost is substantially lower than the Measure N estimate due to avoidance of Capitalized Interest costs. Budget History and Projection Description of Activity Library Projects Budget to Actual Activities Summary Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of July 23, 2013 (Revised) 1 Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of July 23, 2013 (Revised) Project Budget Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 4,000,000$ -$ -$ 4,000,000$ Budget Change 212,000 212,000 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 3,617,992 31,366 (3,649,358) Construction Costs - - - - Contract Contingency - 462,490 14,264 (476,754) Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost - 3,163 - (3,163) Total Library Projects Expenditures 4,212,000 4,157,071 45,631 9,298 Estimate of Pending Commitments/Costs - - (10,920) 10,920 Total Bond Funds Less Bond Financing Costs 4,212,000$ 4,157,071$ 34,711$ 20,218$ 0.5% Reasons for Budget Increase of:212,000$ 1) Seismic upgrade 30,000$ July 2010 2) Roof replacement 125,000 June 2011 3) LEED - Green building upgrades 100,000 4) Construction Management Services increase 400,000 5) Fixed Equipment 187,000 6) Moving costs deemed to be bondable costs 50,000 7) Contingency adjustment 320,000 8) Transfer to Main Library (1,000,000) Net Budget Change 212,000$ Project Budget Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure)50,000,000$ -$ -$ 50,000,000$ Budget Change (2,274,563) (2,274,563) Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 29,060,707 6,409,546 (35,470,252) Contract Contingency - 4,869,637 2,612,555 (7,482,192) Other Contract Services - 828,156 1,057,540 (1,885,697) City (Inter-department) Service Charge - 319,920 - (319,920) Miscellaneous Cost - 103,668 - (103,668) Total Library Projects Expenditures 47,725,437 35,182,087 10,079,641 2,463,708 Estimate of Pending Commitments/Costs 680,668 (680,668) Total Bond Funds Less Bond Financing Costs 47,725,437$ 35,182,087$ 10,760,310$ 1,783,040$ 3.7% Reasons for Budget Decrease of:(2,274,563)$ 1) LEED - Green building (Council approved) upgrades 1,200,000$ 2) Fixed Equipment 1,750,000 3) Moving costs deemed to be bondable costs 100,000 4) Contingency adjustment (4,007,000) 5) Transfer to Main Library Project (1,317,563) Net Budget Change (2,274,563)$ Description of Activity Mitchell Park Library and Community Center Budget to Actual Activities Summary (PE-09006) Downtown Library Budget to Actual Activities Summary (PE-09005) Completed: Construction Began: Description of Activity 2 Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of July 23, 2013 (Revised) Project Budget Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Original Budget (per Measure N Ballot Measure) 18,000,000$ -$ -$ 18,000,000 Budget Change 4,342,563 4,342,563 Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 1,982,269 18,367,209 (20,349,478) Contract Contingency - 138,011 2,068,931 (2,206,943) Other Contract Services - 187,039 - (187,039) City (Inter-department) Service Charge - - - - Miscellaneous Cost - 590 - (590) Total Library Projects Expenditures 22,342,563 2,307,909 20,436,141 (401,487) Estimate of Pending Commitments/Costs 422,013 (422,013) Total Bond Funds Less Bond Financing Costs 22,342,563$ 2,307,909$ 20,858,154$ (823,500)$ (3.7%) Reasons for Budget Increase of:4,342,563$ Lowest Accepted Bids Exceeded the Engineer's Estimates 4,342,563$ Net Budget Change 4,342,563$ Project Budget Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Mitchell Park Library (Council Approved - CMR: 463:09)645,000$ -$ -$ 645,000$ Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 464,577 15,562 (480,139) Contract Contingency - 33,500 8,299 (41,799) City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost - 125 - (125) Total Library Projects Expenditures 645,000 509,448 23,861 111,691 Estimate of Pending Commitments/Costs 86,378 (86,378) Total Bond Funds Less Bond Financing Costs 645,000$ 509,448$ 110,239$ 25,313$ 3.9% Description of Activity Cubberley Temporary Library Budget to Actual Activities Summary (PE-09010) Description of Activity Main Library Budget to Actual Activities Summary (PE-11000) 3 Library Bond Oversight Committee Quarterly Financial Report City of Palo Alto As of July 23, 2013 (Revised) Project Budget Expenses Commitment s (aka Purchase Orders) Remaining Balance % Diff. Between Engineer's Est. vs. Remaining Bal. Temporary Main Library Facility - Art Center Auditorium 500,000$ -$ -$ 500,000$ Expenditures Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 288,899 2,959 (291,858) Contract Contingency - 1,612 1,929 (3,541) Other Contract Services - City (Inter-department) Service Charge - 123,089 - (123,089) Miscellaneous Cost - - - - Total Library Projects Expenditures 500,000 413,600 4,888 81,513 Estimate of Pending Commitments/Costs 109,745 (109,745) Total Bond Funds Less Bond Financing Costs 500,000$ 413,600$ 114,632$ (28,232)$ (5.6%) Description of Activity Art Center Temporary Library Budget to Actual Activities Summary (Project # PE-11012) 4 Payment or Posting Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 4,000,000 Budget Change 212,000 Sub-total - 2010 Engineer's Budget Estimate 4,212,000 - - 4,212,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 418,563 08/24/10 Group 4 Architecture ResearcArchitectural 362 09/21/10 Group 4 Architecture ResearcArchitectural 135 08/03/10 Group 4 Architecture ResearcArchitectural 16,233 08/03/10 Group 4 Architecture ResearcArchitectural 56,000 08/10/10 Protech Consulting and EngineHazardous Material Testing 5,210 08/10/10 Turner Construction CompanyConstruction Management Services 68,577 Oct. 21, 2010 Report 09/21/10 Group 4 Architecture ResearcArchitectural 15 09/21/10 Group 4 Architecture ResearcArchitectural 18,080 09/21/10 Group 4 Architecture ResearcArchitectural 2,970 09/21/10 W.L. Butler Construction, Inc. Construction 93,177 10/05/10 Protech Consulting and EngineHazardous Material Testing 990 10/19/10 Group 4 Architecture ResearcArchitectural 10,544 11/02/10 W. L. Butler Construction, Inc.Construction 69,984 11/02/10 Turner Construction CompanyConstruction Management Services 27,984 11/02/10 Group 4 Architecture ResearcArchitectural 11,864 12/07/10 Turner Construction CompanyConstruction Management Services 55,174 12/07/10 Group 4 Architecture ResearcArchitectural 11,688 Jan. 25, 2011 Report 12/07/10 W. L. Butler Construction, Inc.Construction 92,055 12/14/10 Group 4 Architecture ResearcArchitectural 519 12/14/10 W. L. Butler Construction, Inc.Construction 159,940 01/04/11 Turner Construction CompanyConstruction Management Services 27,984 01/07/11 Group 4 Architecture ResearcArchitectural 11,688 01/21/11 West Coast Code ConsultantsPlan Check 350 01/21/11 Turner Construction CompanyConstruction Management Services 30,212 01/31/11 W. L. Butler Construction, Inc.Construction 211,220 02/18/11 W. L. Butler Construction, Inc.Construction 279,472 02/18/11 Group 4 Architecture ResearcArchitectural 8,766 02/18/11 Turner Construction CompanyConstruction Management Services 27,429 03/16/11 W. L. Butler Construction, Inc.Construction 277,033 April 26, 2011 Report 03/18/11 Group 4 Architecture ResearcArchitectural 432 03/18/11 Group 4 Architecture ResearcArchitectural 409 03/18/11 Group 4 Architecture ResearcArchitectural 8,766 03/18/11 Group 4 Architecture ResearcArchitectural 136 03/31/11 Pivot Interiors Design 2,250 03/31/11 Turner Construction CompanyConstruction Management Services 17,808 04/07/11 Group 4 Architecture ResearcArchitectural 13,149 04/19/11 Group 4 Architecture ResearcArchitectural 2,795 04/25/11 W. L. Butler Construction, Inc.Construction 342,711 05/10/11 Turner Construction CompanyConstruction Management Services 39,522 05/12/11 Group 4 Architecture ResearcArchitectural 220 05/12/11 Group 4 Architecture ResearcArchitectural 24,891 05/12/11 Group 4 Architecture ResearcArchitectural 14,610 July 26, 2011 Report 05/17/11 Turner Construction CompanyConstruction Management Services 28,334 05/27/11 W. L. Butler Construction, Inc.Construction 238,387 06/07/11 W. L. Butler Construction, Inc.Construction 352,713 06/07/11 Group 4 Architecture ResearcArchitectural 14,610 06/09/11 Moovers, Inc.Moving Services 10,233 06/16/11 Group 4 Architecture ResearcArchitectural 233 07/20/11 Group 4 Architecture ResearcArchitectural 479.16 07/20/11 Group 4 Architecture ResearcArchitectural 12,405 07/27/11 W.L. Butler Construction, Inc. Construction 157,980 07/27/11 Turner Construction CompanyConstruction Management Services 26,028 08/31/11 Group 4 Architecture ResearcArchitectural 19,560 October 25, 2011 Report 08/10/11 Group 4 Architecture ResearcArchitectural 137 08/10/11 Group 4 Architecture ResearcArchitectural 5,100 08/24/11 Turner Construction CompanyConstruction Management Services 38,160 08/31/11 W.L. Butler Construction, Inc. Construction 137,659 09/14/11 Group 4 Architecture ResearcArchitectural 2,550 09/14/11 Group 4 Architecture ResearcArchitectural 1,116 12/07/11 Group 4 Architecture ResearcArchitectural 5,100.00 10/19/11 Turner Construction CompanyConstruction Management Services 1,176.00 12/21/11 Turner Construction CompanyConstruction Management Services 3,806.42 January 18, 2012 11/09/11 Group 4 Architecture ResearcArchitectural 1,146.02 12/07/11 W.L. Butler Construction, Inc. Construction 64,873.60 02/08/12 Group 4 Architecture ResearcArchitectural 29.33 02/08/12 W.L. Butler Construction, Inc. Construction 22,796.10 Downtown Library Activity Details (PE-09005) As of July 23, 2013 (Revised) 5 Payment or Posting Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Downtown Library Activity Details (PE-09005) As of July 23, 2013 (Revised) 02/22/12 Group 4 Architecture ResearcArchitectural 8,407.90 March 28, 2012 Report 03/08/12 Group 4 Architecture ResearcArchitectural 1,275.00 03/21/12 Group 4 Architecture ResearcArchitectural 6.82 08/22/12 Group 4 Architecture ResearcArchitectural 1,268.06 October 30, 2012 Report 10/03/12 Group 4 Architecture ResearcArchitectural 70.96 01/09/13 Turner Construction CompanyConstruction Management Services 434.00 January 23, 2013 Report Group 4 Architecture ResearcArchitectural 30,786 Moovers, Inc.Moving Services 580 Sub-total - Engineering and Architectural Costs - 3,617,992 31,366 (3,649,358) Contract Contingency Summary of Expenditures as of July 21, 2010 19,140 10/19/10 Group 4 Architecture ResearcArchitectural 660 10/19/10 Group 4 Architecture ResearcArchitectural 4,070 Oct. 21, 2010 Report 08/27/10 Asbestos Management GroupHazardous Material Testing 2,500 02/28/11 City of Palo Alto - Planning Plan Check Fee 93 April 26, 2011 Report 02/18/11 W. L. Butler Construction, Inc.Construction 15,686 04/25/11 W. L. Butler Construction, Inc.Construction 59,235 05/27/11 W. L. Butler Construction, Inc.Construction 163,149 07/01/11 Turner Construction CompanyConstruction Management Services 1,123 July 26, 2011 Report 07/01/11 Turner Construction CompanyConstruction Management Services 24,611 06/07/11 Group 4 Architecture ResearcArchitectural 5,104 06/07/11 Group 4 Architecture ResearcArchitectural 3,489 07/27/11 Group 4 Architecture ResearcArchitectural 9,339 October 25, 2011 Report 08/31/11 W. L. Butler Construction, Inc.Construction 13,299 03/08/12 Group 4 Architecture ResearcArchitectural 4,094 March 28, 2012 Report 02/08/12 W. L. Butler Construction, Inc.Construction 113,631 09/19/12 W. L. Butler Construction, Inc.Construction 10,000 October 30, 2012 Report 01/09/13 Turner Construction CompanyConstruction Management Services 13,266 January 23, 2013 Report Group 4 Architecture ResearcArchitectural 10,104 Turner Construction CompanyConstruction Management Services 48 Moovers, Inc.Moving Services 4,113 Sub-total - Contract Contingency - 462,490 14,264 (476,754) Other Contract Services Summary of Expenditures as of July 21, 2010 2,225 08/27/10 Asbestos Management GroupHazardous Material Testing 25,700 Oct. 21, 2010 Report Sub-total - Other Contract Services - 27,925 - (27,925) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 43,990 07/13/11 City of Palo Alto - Public WorkParking Permit 230 October 25, 2011 Report 07/13/11 City of Palo Alto - Public WorkParking Permit 420 10/31/10 City of Palo Alto - Planning Plan Checking 861 Jan. 25, 2011 Report Sub-Total - City (Inter-department) Service Charge - 45,501 - (45,501) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,158 04/10/11 Santa Clara County Downtown-Notice of Completion Filing Fee 5 January 18, 2012 Report Sub-total - Miscellaneous Cost - 3,163 - (3,163) Grant Total 4,212,000 4,157,071 45,631 9,298 6 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 50,000,000$ Budget Change (2,274,563) Sub-total - 2010 Engineer's Budget Estimate 47,725,437 - - 47,725,437 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 3,101,748 08/03/10 Group 4 Architecture ResearcArchitectural 37,609 08/10/10 Group 4 Architecture ResearcArchitectural 18,595 10/05/10 Group 4 Architecture ResearcArchitectural 7,522 10/05/10 Group 4 Architecture ResearcArchitectural 13,942 10/05/10 Group 4 Architecture ResearcArchitectural 2,971 07/27/10 Moovers, Inc.Moving Services 435 09/21/10 Turner Construction CompanyConstruction Management Services 163,918 10/19/10 Group 4 Architecture ResearcArchitectural 47,110 10/19/10 State Water Resources ControSubmitting Permit Registration Documents 375 Oct. 21, 2010 Report 10/19/10 Group 4 Architecture ResearcArchitectural 18,517 08/03/10 Peninsula Digital Imaging Reproduction Services 3,066 08/03/10 Peninsula Digital Imaging Reproduction Services 2,401 08/03/10 Peninsula Digital Imaging Reproduction Services 5,105 08/03/10 Peninsula Digital Imaging Reproduction Services 2,119 11/02/10 Bank of Sacramento - Flintco Construction 86,542 11/02/10 Flintco Pacific, Inc.Construction 778,876 11/02/10 Group 4 Architecture ResearcArchitectural 1,037 12/07/10 Turner Construction CompanyConstruction Management Services 635 12/07/10 Turner Construction CompanyConstruction Management Services 70,780 12/07/10 Turner Construction CompanyConstruction Management Services 64,319 12/07/10 Protech Consulting and EngineHazardous Material Testing 8,385 12/07/10 Peninsula Digital Imaging Reproduction Services 7,672 12/14/10 West Coast Code ConsultantsPlan Check 26,820 12/14/10 Group 4 Architecture ResearcArchitectural 46,200 Jan. 25, 2011 Report 12/21/10 Group 4 Architecture ResearcArchitectural 46,297 12/21/10 Flintco Pacific, Inc.Construction 732,895 12/21/10 Flintco Pacific, Inc. Escrow 28Construction 81,433 12/28/10 Flintco Pacific, Inc.Construction 757,231 12/28/10 Flintco Pacific, Inc. Escrow 28Construction 84,137 01/04/11 Group 4 Architecture ResearcArchitectural 2,942 01/04/11 Group 4 Architecture ResearcArchitectural 4,564 01/04/11 Turner Construction CompanyConstruction Management Services 73,919 1/21/2011 Group 4 Architecture ResearcArchitectural 267 1/21/2011 Group 4 Architecture ResearcArchitectural 46,261 1/21/2011 Turner Construction CompanyConstruction Management Services 105,917 2/1/2011 Flintco Pacific, Inc.Construction 1,098,865 2/1/2011 Flintco Pacific, Inc. Escrow 28Construction 126,732 2/18/2011 Flintco Pacific, Inc.Construction 1,497,190 2/18/2011 Turner Construction CompanyConstruction Management Services 94,502 2/18/2011 Flintco Pacific, Inc. Escrow 28Construction 193,977 2/24/2011 Group 4 Architecture ResearcArchitectural 46,261 3/10/2011 West Coast Code ConsultantsPlan Check 1,820 3/10/2011 West Coast Code ConsultantsPlan Check 1,680 3/16/2011 West Coast Code ConsultantsPlan Check (560) 3/16/2011 West Coast Code ConsultantsPlan Check 560 April 26, 2011 Report 3/16/2011 Protech Consulting and EngineHazardous Material Testing 1,250 3/17/2011 West Coast Code ConsultantsPlan Check 560 3/18/2011 Group 4 Architecture ResearcArchitectural 46,261 3/31/2011 Flintco Pacific, Inc.Construction 446,177 3/31/2011 Flintco Pacific, Inc. Escrow 28Construction 76,548 3/31/2011 Turner Construction CompanyConstruction Management Services 94,572 4/11/2011 Group 4 Architecture ResearcArchitectural 4,219 4/11/2011 Group 4 Architecture ResearcArchitectural 127 4/11/2011 Group 4 Architecture ResearcArchitectural 7,366 4/11/2011 Group 4 Architecture ResearcArchitectural 80,956 4/20/2011 West Coast Code ConsultantsPlan Check 140 4/20/2011 West Coast Code ConsultantsPlan Check 280 4/20/2011 West Coast Code ConsultantsPlan Check 560 3/29/2011 Palo Alto Stores Supplies/Parts 1,342 4/25/2011 Flintco Pacific, Inc. Escrow 28Construction 85,140 4/25/2011 Flintco Pacific, Inc.Construction 766,263 4/26/2011 Group 4 Architecture ResearcArchitectural 2,528 5/10/2011 Turner Construction CompanyConstruction Management Services 82,594 5/12/2011 Group 4 Architecture ResearcArchitectural 683 5/12/2011 Group 4 Architecture ResearcArchitectural 80,956 Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 23, 2013 (Revised) 7 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 23, 2013 (Revised) 5/17/2011 Turner Construction CompanyConstruction Management Services 101,701 5/17/2011 Flintco Pacific, Inc.Construction 815,307 July 26, 2011 Report 5/17/2011 Flintco Pacific, Inc. Escrow 28Construction 93,874 5/17/2011 Flintco Pacific, Inc.Construction 29,559 7/1/2011 Turner Construction CompanyConstruction Management Services 99,493 7/1/2011 Group 4 Architecture ResearcArchitectural 19,540 7/1/2011 Group 4 Architecture ResearcArchitectural 3,109 7/1/2011 Group 4 Architecture ResearcArchitectural 17,038 7/1/2011 Group 4 Architecture ResearcArchitectural 92,521 July 26, 2011 Report 7/1/2011 Group 4 Architecture ResearcArchitectural 8,314 7/5/2011 Flintco Pacific, Inc. Escrow 28Construction 125,101 7/5/2011 Flintco Pacific, Inc.Construction 1,125,909 7/27/2011 Group 4 Architecture ResearcArchitectural 57,826 7/27/2011 Group 4 Architecture ResearcArchitectural 13,045 7/27/2011 Group 4 Architecture ResearcArchitectural 1,954 7/27/2011 Flintco Pacific, Inc.Construction 2,316,525 7/27/2011 Flintco Inc. Escrow Construction 257,391 7/27/2011 Turner Construction CompanyConstruction Management Services 127,367 October 25, 2011 Report 10/5/2011 Group 4 Architecture ResearcArchitectural 1,898 10/5/2011 Group 4 Architecture ResearcArchitectural 57,826 10/5/2011 Group 4 Architecture ResearcArchitectural 1,647 10/5/2011 Flintco Pacific, Inc.Construction 483,144 10/5/2011 Flintco, Inc. Escrow Construction 53,683 10/19/2011 Turner Construction CompanyConstruction Management Services 170,058 11/2/2011 Flintco Pacific, Inc.Construction 705,850 11/2/2011 Group 4 Architecture ResearcArchitectural 57,826 11/2/2011 Group 4 Architecture ResearcArchitectural 2,060 11/2/2011 Flintco Pacific, Inc.Construction 78,428 11/30/2011 West Coast Code ConsultantsPlan Check 420 11/30/2011 West Coast Code ConsultantsPlan Check 560 11/30/2011 West Coast Code ConsultantsPlan Check 560 11/30/2011 Group 4 Architecture ResearcArchitectural 2,051 11/30/2011 West Coast Code ConsultantsPlan Check 700 January 18, 2012 Report 11/30/2011 Flintco Pacific, Inc.Construction 119,803 11/30/2011 Group 4 Architecture ResearcArchitectural 1,722 11/30/2011 Group 4 Architecture ResearcArchitectural 57,826 11/30/2011 Group 4 Architecture ResearcArchitectural 4,789 11/30/2011 Flintco, Inc. Escrow Construction 837,115 *12/21/2011 Turner Construction CompanyConstruction Management Services 187,775 12/21/2011 Turner Construction CompanyConstruction Management Services 129,453 12/21/2011 Turner Construction CompanyConstruction Management Services 233,061 12/21/2011 Turner Construction CompanyConstruction Management Services 2,385 12/21/2011 Turner Construction CompanyConstruction Management Services 109 12/21/2011 Group 4 Architecture ResearcArchitectural 46,261 2/29/2012 West Coast Code ConsultantsPlan Check 200 2/29/2012 Group 4 Architecture ResearcArchitectural 1,600 3/21/2012 Group 4 Architecture ResearcArchitectural 3,457 3/21/2012 Group 4 Architecture ResearcArchitectural 19,603 2/1/2012 Flintco Pacific, Inc.Construction 940,940 2/1/2012 Flintco Pacific, Inc.Construction 104,549 2/1/2012 Group 4 Architecture ResearcArchitectural 46,261 2/1/2012 Group 4 Architecture ResearcArchitectural 654 March 28, 2012 Report 2/8/2012 Group 4 Architecture ResearcArchitectural 6,417 2/24/2012 Turner Construction CompanyConstruction Management Services 147,880 1/18/2012 Flintco Pacific, Inc.Construction 458,653 1/18/2012 Flintco Pacific, Inc.Construction 50,961 2/29/2012 Group 4 Architecture ResearcArchitectural 46,261 3/21/2012 Flintco Pacific, Inc.Construction 722,810 3/21/2012 Flintco Pacific, Inc.Construction 80,312 3/21/2012 Group 4 Architecture ResearcArchitectural 26,657 4/4/2012 Flintco Pacific, Inc.Construction 95,581 4/4/2012 Flintco Pacific, Inc. Escrow Construction 17,187 4/18/2012 Turner Construction CompanyConstruction Management Services 129,709 4/18/2012 Turner Construction CompanyConstruction Management Services 118,875 4/18/2012 Group 4 Architecture ResearcArchitectural 2,100 4/18/2012 Group 4 Architecture ResearcArchitectural 23,130 4/18/2012 Turner Construction CompanyConstruction Management Services 120,219 5/9/2013 Sierra Traffic Markings Inc. Construciton 7,990 5/9/2012 Group 4 Architecture ResearcArchitectural 16,191 5/16/2012 Flintco Pacific, Inc.Construction 254,477 5/16/2012 Flintco Pacific, Inc. Escrow Construction 28,395 5/16/2012 Group 4 Architecture ResearcArchitectural 2,069 5/16/2012 Group 4 Architecture ResearcArchitectural 9,511 8 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 23, 2013 (Revised) 5/16/2012 Turner Construction CompanyConstruction Management Services 116,415 6/20/2012 Group 4 Architecture ResearcArchitectural 2,551 6/20/2012 Group 4 Architecture ResearcArchitectural 16,191 July 5, 2012 Report 6/20/2012 Flintco Pacific, Inc.Construction 189,316 6/20/2012 Flintco Pacific, Inc. Escrow Construction 22,270 7/5/2012 West Coast Code ConsultantsPlan Check 420 7/5/2012 West Coast Code ConsultantsPlan Check 560 7/5/2012 West Coast Code ConsultantsPlan Check 560 7/5/2012 West Coast Code ConsultantsPlan Check 1,680 7/5/2012 West Coast Code ConsultantsPlan Check 420 7/5/2012 West Coast Code ConsultantsPlan Check 560 7/5/2012 West Coast Code ConsultantsPlan Check 560 7/5/2012 West Coast Code ConsultantsPlan Check 560 7/5/2012 West Coast Code ConsultantsPlan Check 560 7/5/2012 West Coast Code ConsultantsPlan Check 280 7/5/2012 West Coast Code ConsultantsPlan Check 280 7/5/2012 Flintco Pacific, Inc. Escrow Construction 20,813 7/5/2012 Flintco Pacific, Inc.Construction 173,537 7/25/2012 Group 4 Architecture ResearcArchitectural 762 7/25/2012 Group 4 Architecture ResearcArchitectural 16,191 8/8/2012 Flintco Pacific, Inc.Construction 11,297 8/8/2012 Group 4 Architecture ResearcArchitectural 16,191 October 30, 2012 Report 8/8/2012 Flintco Pacific, Inc.Construction 85,728 8/22/2012 Group 4 Architecture ResearcArchitectural 280 9/26/2012 Group 4 Architecture ResearcArchitectural 84,027 10/3/2012 Group 4 Architecture ResearcArchitectural 16,191 10/10/2012 Turner Construction CompanyConstruction 22,926 11/14/2012 Group 4 Architecture ResearcArchitectural 20,325 11/19/2012 West Coast Code ConsultantsPlan Check 350 11/19/2012 Flintco Pacific, Inc.Construction 383,239 11/19/2012 Flintco Pacific, Inc.Construction 88,321 11/19/2012 West Coast Code ConsultantsPlan Check 420 12/12/2012 Flintco Pacific, Inc.Construction 608,951 12/12/2012 Flintco Pacific, Inc.Construction 81,614 12/12/2012 Flintco Pacific, Inc.Construction 505,497 12/12/2012 Flintco Pacific, Inc.Construction 96,133 12/19/2012 Group 4 Architecture ResearcArchitectural 93,220 January 23, 2013 Report 12/19/2012 Group 4 Architecture ResearcArchitectural 30,758 12/26/2012 Flintco Pacific, Inc.Construction 13,946 12/26/2012 Flintco Pacific, Inc.Construction 31,893 12/26/2012 Turner Construction CompanyConstruction Management Services 270,207 12/26/2012 Turner Construction CompanyConstruction Management Services 754,125 12/26/2012 Flintco Pacific, Inc.Construction 9,728 12/26/2012 Flintco Pacific, Inc.Construction 14,250 1/23/2013 West Coast Code ConsultantsPlan Check 160 1/23/2013 West Coast Code ConsultantsPlan Check 560 1/23/2013 Group 4 Architecture ResearcArchitectural 626 1/23/2013 Group 4 Architecture ResearcArchitectural 783 2/6/2013 Group 4 Architecture ResearcArchitectural 68,238 2/20/2013 Group 4 Architecture ResearcArchitectural 38,341 April 12, 2013 3/6/2013 Group 4 Architecture ResearcArchitectural 2,775 4/3/2013 Group 4 Architecture ResearcArchitectural 73,745 06/12/13 Flintco Pacific, Inc.Construction 59,916.00 06/12/13 Flintco Pacific, Inc.Construction 31,230.00 06/12/13 Flintco Pacific, Inc.Construction 27,261.00 06/12/13 Flintco Pacific, Inc.Construction 12,816.00 04/08/13 Flintco Pacific, Inc.Construction 249,800.00 04/08/13 Flintco Pacific, Inc.Construction 184,895.50 04/08/13 Flintco Pacific, Inc.Construction 29,765.00 05/03/13 Flintco Pacific, Inc.Construction 350,886.00 July 23, 2013 04/24/13 Group 4 Architecture ResearcArchitectural 91,836.71 04/24/13 Group 4 Architecture ResearcArchitectural 449.55 06/05/13 Group 4 Architecture ResearcArchitectural 50,003.04 05/01/13 Ross McDonald Company, IncConstruction Services 495,000.00 04/24/13 West Coast Code ConsultantsPlan Check 320.00 06/17/13 Flintco Pacific, Inc.Construction 142,218.00 06/19/13 Flintco Pacific, Inc.Construction 27,637.00 BIG-D Pacific Builders, LP Construction 228,870 Flintco Pacific, Inc.Construction 3,191,827 Group 4 Architecture ResearcArchitectural 504,840 Moovers, Inc.Moving Services 19,853 Muzak LLC Construction Services 201,992 9 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 23, 2013 (Revised) Protect Consulting and EngineHazardous Material Testing 12,699 Ross McDonald Company, IncConstruction Services 153,412 Sign & Services Company Construction Services 443,920 Turner Construction CompanyConstruction Management Services 1,650,864 West Coast Code ConsultantsPlan Check 1,270 Sub-total - Engineering Costs - 29,060,707 6,409,546 (35,470,252) Contract Contingency Summary of Expenditures as of July 21, 2010 104,373 08/03/10 Group 4 Architecture Researc Architectural 1,771 10/05/10 Group 4 Architecture Researc Architectural 25,951 Jan. 25, 2011 Report 10/19/10 Group 4 Architecture Researc Architectural 10,740 2/1/2011 Flintco Pacific, Inc.Construction 41,725.00 2/18/2011 Flintco Pacific, Inc.Construction 248,603.00 April 26, 2011 Report 3/31/2011 Flintco Pacific, Inc.Construction 242,754.00 8/31/2011 W. L. Butler Construction, Inc.Construction 22,712.50 8/24/2011 Flintco Pacific, Inc.Construction 987,123.00 8/24/2011 Turner Construction CompanyConstruction Management Services 151,367.49 8/24/2011 Flintco Inc. Escrow Construction 117,936.00 8/24/2011 Group 4 Architecture Researc Architectural 48,250.00 October 25, 2011 Report 8/24/2011 Group 4 Architecture Researc Architectural 57,825.84 8/24/2011 Flintco Pacific, Inc.Construction 74,304.00 10/5/2011 Group 4 Architecture Researc Architectural 37,305.95 11/30/2011 Group 4 Architecture Researc Architectural 20,265.95 January 18, 2012 Ewpoer 11/30/2011 Flintco Pacific, Inc. Construction 241,110.00 2/29/2012 West Coast Code ConsultantsPlan Check 840.00 2/29/2012 West Coast Code ConsultantsPlan Check 560.00 2/29/2012 West Coast Code ConsultantsPlan Check 840.00 2/29/2012 West Coast Code ConsultantsPlan Check 560.00 2/29/2012 West Coast Code ConsultantsPlan Check 360.00 March 28, 2012 Report 3/8/2012 Group 4 Architecture Researc Architectural 9,937.25 2/29/2012 Turner Construction CompanyConstruction Management Services 39,360.00 3/21/2012 Flintco Pacific, Inc.Construction 104,819.00 3/21/2012 Flintco Pacific, Inc.Construction 11,647.00 4/18/2012 Turner Construction CompanyConstruction Management Services 656.00 4/4/2012 Group 4 Architecture Researc Architectural 91,383.24 5/23/2012 Group 4 Architecture Researc Architectural 25,039.15 7/5/2012 Group 4 Architecture Researc Architectural 12,870.63 4/4/2012 Flintco Pacific, Inc.Construction 59,097.00 July 5, 2012 Repport 5/16/2012 Flintco Pacific, Inc. Construction 1,077.00 6/20/2012 Turner Construction CompanyConstruction Management Services 137,682.56 6/20/2012 Flintco Pacific, Inc.Construction 11,109.00 7/5/2012 Flintco Pacific, Inc.Construction 13,783.00 7/11/2012 Group 4 Architecture Researc Architectural 65,495.00 8/22/2012 Group 4 Architecture Researc Architectural 80,923.70 8/8/2012 Flintco Pacific, Inc.Construction 15,943.00 October 30, 2012 Report 10/3/2012 Turner Construction CompanyConstruction Management Services 298,982.88 10/31/2012 Group 4 Architecture Researc Architectural 1,578.00 12/26/2012 Group 4 Architecture Researc Architectural 3,052.50 11/19/2012 Flintco Pacific, Inc.Construction 411,653.00 12/12/2012 Flintco Pacific, Inc.Construction 125,571.00 January 23, 2013 Report 12/12/2012 Flintco Pacific, Inc. Construction 359,703.00 12/26/2012 Flintco Pacific, Inc. Construction 73,605.00 12/26/2012 Flintco Pacific, Inc. Construction 96,352.00 04/08/13 Flintco Pacific, Inc. Construction 60,449 04/08/13 Flintco Pacific, Inc. Construction 31,269 04/08/13 Flintco Pacific, Inc. Construction 85,582 July 23, 2013 05/03/13 Flintco Pacific, Inc. Construction 188,366 05/01/13 4LEAF, Inc. Building Inspection 6,993 05/08/13 4LEAF, Inc.Building Inspection 8,381 Moovers, Inc.Moving Services 6,649 Flintco Pacific, Inc.Construction 2,275,786 Protect Consulting and EngineHazardous Material Testing 11,991 Group 4 Architecture ResearcArchitectural 74,601 Turner Construction CompanyConstruction Management Services 114,136 Ross McDonald Company, IncConstruction Services 65,000 Sign & Services Company Construction Services 44,392 Muzak LLC Construction Services 20,000 Sub-total - Contract Contingency - 4,869,637 2,612,555 (7,482,192) Other Contract Services Summary of Expenditures as of July 21, 2010 93,750 07/01/11 FedEx Mailing 89 10 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 23, 2013 (Revised) 08/26/10 Bruce Beasley Sculpture 90,000 Oct. 21, 2010 Report 09/30/11 FedEx Coding Error Correction (89) October 25, 2011 Report 11/16/11 Jarvis, Fay, Doporto & Gibson Legal Services - Mitchell Park Library 3,776 12/21/11 ZFA Structural Engineers Mitchell Library Review 2,925 12/29/11 Jarvis, Fay, Doporto & Gibson Legal Services for Mitchell Park Library 11,170 January 18, 2012 Report 12/29/11 State Water Resource Board Permit 505 02/08/12 Riedinger Consulting Outside Counsel 9,136 01/25/12 ZFA Structural Engineers Mitchell Library Review 9,289 01/25/12 ZFA Structural Engineers Mitchell Library Review 3,118 02/29/12 Jarvis, Fay, Doporto & Gibson Legal Services for Mitchell Park Library 6,625 March 28, 2012 Report 02/29/12 Jarvis, Fay, Doporto & Gibson Legal Services for Mitchell Park Library 9,960 02/29/12 Jarvis, Fay, Doporto & Gibson Legal Services for Mitchell Park Library 10,423 03/14/12 Envision Ware, Inc. Professional services 5,850 04/04/12 ZFA Structural Engineers Mitchell Library Review 2,518 04/04/12 Riedinger Consulting Outside Counsel 28,371 04/04/12 Riedinger Consulting Outside Counsel 10,235 04/04/12 Riedinger Consulting Outside Counsel 24,585 05/09/12 Jam Services 3,897 July 5, 2012 Report 05/09/12 Jarvis, Fay, Doporto & Gibson Legal Services for Mitchell Park Library 6,647 05/09/12 Jarvis, Fay, Doporto & Gibson Legal Services for Mitchell Park Library 5,212 06/13/12 ZFA Structural Engineers Mitchell Library Review 1,732 06/20/12 Jarvis, Fay, Doporto & Gibson Legal Services for Mitchell Park Library 4,549 06/20/12 Blackstone Discovery Legal Services for Mitchell Park Library 319 08/15/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 35,618 09/12/12 County of Santa Clara Mitchell Snack Bar - Environmental Health 220 October 30, 2012 Report 09/12/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 30,348 09/05/12 Bruce Beasley Sculpture 1,900 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 15,610 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 38,608 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 33,684 January 23, 2013 Report 10/24/12 Otis and Iriki, Inc.Legal Services for Mitchell Park Library 77,708 12/31/12 City of Palo Alto - Public WorkMitchell Park Library - Plan Review 12 01/00/00 3M Library Systems Library Self Check Stations - 3/20/2013 Bruce Beasley Sculpture 40,000 02/13/13 Ginn and Crosby, LLC Legal Services 1,272 02/13/13 Ginn and Crosby, LLC Legal Services 48 04/03/13 Moscone Emblidge Sater & OtLegal Services 49,268 April 12, 2013 04/03/13 Moscone Emblidge Sater & OtLegal Services 13,517 04/03/13 Moscone Emblidge Sater & OtLegal Services 12,961 04/03/13 Moscone Emblidge Sater & OtLegal Services 132,792 Bibliotheca, Inc.Library Services 15,370 Bruce Beasley Sculpture 50,000 David Neagley, AIA Legal Services 273,376 Envision Ware, Inc. Sorter System 469,149 Ginn and Crosby, LLC Legal Services 27,636 Jarvis, Fay, Doporto & Gibson Legal Services for Mitchell Park Library 30 Moscone Emblidge Sater & OtLegal Services 14,887 One Workplace L. Ferrari, LLCFurniture 89,000 Protect Consulting and EngineHazardous Material Testing 100,000 Riedinger Consulting Legal Services 12,673 ZFA Structural Engineers Legal Services 5,418 Sub-total - Other Contract Services - 828,156 1,057,540 (1,885,697) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 176,008 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Library - Bldg A 70,153 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Teen Center - Bldg B 10,768 09/30/10 City of Palo Alto - Planning Permit Fees - Mitchell Park Multipurpose Center - Bldg C 21,184 Oct. 21, 2010 Report 09/30/10 City of Palo Alto - Planning Demolition Permit MPL - 3700 Middlefield 525 09/30/10 City of Palo Alto - Planning Demolition Permit MPCC - 3800 Middlefield 525 09/28/10 City of Palo Alto - Planning Permit (Grading and Fill)1,830 10/31/10 City of Palo Alto - Planning Revision permit for Mitchell Park Library & CC 141 11/16/10 City of Palo Alto - Planning Architectural Review Board Fees 2,090 Jan. 25, 2011 Report 01/31/11 Palo Alto Stores Supplies/Parts 101 03/31/11 Palo Alto Stores Supplies/Parts 97 03/31/11 Palo Alto Stores Supplies/Parts 4,045 April 26, 2011 Report 03/31/11 Palo Alto Stores Supplies/Parts 89 03/31/11 Palo Alto Stores Supplies/Parts 661 06/14/10 Palo Alto Stores Reversal of Prior Charges (2,834) 03/29/11 Palo Alto Stores Reversal of Prior Charges (628) 03/30/11 Palo Alto Stores Reversal of Prior Charges (571) July 26, 2011 Report 04/04/11 Palo Alto Stores Reversal of Prior Charges (143) 11 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 23, 2013 (Revised) 04/30/11 City of Palo Alto - Public WorkUnderground Fire Supply/Hydrant Permit Fee 1,335 07/06/11 City of Palo Alto - DevelopmenPlan Check Fee 93 07/06/11 City of Palo Alto - Planning Plan Check Fee 89 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 137 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 133 October 25, 2011 Report 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 105 08/31/11 City of Palo Alto - Planning Plan Review - modify permit 121 08/31/11 City Of Palo Alto - DevelopmeMitchell Library Plan Check 145 08/31/11 City Of Palo Alto - DevelopmeMitchell Library Plan Check 277 08/31/11 City Of Palo Alto - Planning Mitchell Library Plan Check 40 09/30/11 City of Palo Alto - Planning Mitchell Library - Permit Revision 89 10/31/11 City of Palo Alto - DevelopmenPlan Check Fee 113 January 18, 2012 10/31/11 City of Palo Alto - DevelopmenPlan Check Fee 325 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 97 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 121 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 121 11/30/11 City of Palo Alto - Planning Plan Review - modify permit 109 01/31/12 City of Palo Alto - Planning Plan Review - modify permit 85 01/31/12 City of Palo Alto - Planning Plan Review - modify permit 4,056 March 28, 2012 12/31/11 City of Palo Alto - Planning Plan Review - modify permit 93 12/21/11 City of Palo Alto - Planning Plan Review - modify permit 85 02/29/12 City of Palo Alto - Planning Plan Review - modify permit 89 02/29/12 City of Palo Alto - Planning Plan Review - modify permit 121 04/25/12 City of Palo Alto - Stores InvenConduit, Rgid Steel T/C 10Ft length 2"180.99 04/25/12 City of Palo Alto - Stores InvenPipes - Valves - Fitting 3.62 04/30/12 City of Palo Alto - Planning Plan Review (Electrical Veh. Chargers permit)977 05/16/12 City of Palo Alto - Planning Plan Review (Ceiling Structural Chgs.) - Mitchell 344 05/16/12 City of Palo Alto - Planning Plan Review (foundation, framing, plumbing) - Mitchell Park Lib 364 July 5, 2012 05/16/12 City of Palo Alto - Planning Plan Review (Solar Water Heater) - Mitchell Park Library 165 05/16/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 137 05/31/12 City of Palo Alto - Planning MP -Plan Review for electrical signage permit 112 06/28/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 105 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 105 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 300 06/29/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 151 October 30, 2012 09/14/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 89 09/14/12 City of Palo Alto - Planning Plan Review - Mitchell Park Library 137 11/30/12 City of Palo Alto - Public WorkMitchell Park Library - Plan Review 116 12/31/12 City of Palo Alto - Public WorkMitchell Park Library - Plan Review 7 January 23, 2013 Report 03/31/13 City of Palo Alto - DevelopmenArchitetural Review 92 April 12, 2013 04/17/13 Ginn and Crosby, LLC Legal Services 225 04/17/13 Ginn and Crosby, LLC Legal Services 432 06/05/13 Ginn and Crosby, LLC Legal Services 144 06/05/13 Ginn and Crosby, LLC Legal Services 5,243 06/05/13 Javis, Fay, Doporto & Gibson, Legal Services 16,570 July 23, 2013 06/05/13 Javis, Fay, Doporto & Gibson, Legal Services 38 06/19/13 David Neagley, AIA Legal Services 1,624 Sub-total - City (Inter-department) Service Charge - 319,920 - (319,920) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 3,315 06/30/10 Office Max (US Bank-Calcard)Reverse office supplies charged to project (246) 06/30/10 Debra Jacobs Reverse prior travel and meeting expense (6) Oct. 21, 2010 Report 06/30/10 Karen Bengard Reverse prior travel and meeting expense (20) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (11) 06/30/10 Hung Nguyen Reverse prior travel and meeting expense (20) 03/30/11 Palo Alto Stores Supplies/Parts 4 April 26, 2011 Report 03/30/11 Palo Alto Stores Supplies/Parts 214 03/30/11 Palo Alto Stores Reversal of Prior Charges (4) 03/30/11 Palo Alto Stores Reversal of Prior Charges (214) July 26, 2011 Report 04/21/11 City of Palo Alto - Utilities Utility Connection Fee 68,559 02/15/12 Palo Alto Stores Supplies/Parts 4 02/15/12 Palo Alto Stores Supplies/Parts 176 March 28, 2012 Report 02/15/12 Palo Alto Stores Supplies/Parts 218 02/15/12 Palo Alto Stores Supplies/Parts 4 12/31/12 State Water Resources ControSubmitting Permit Registration Documents 505 January 23, 2013 Report 02/06/13 4LEAF, Inc.Building Inspection 2,553 02/06/13 4LEAF, Inc.Building Inspection 8,769 April 12, 2013 03/13/13 4LEAF, Inc.Building Inspection 9,213 03/13/13 4LEAF, Inc.Building Inspection 10,656 12 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Mitchell Park Library and Community Center Activity Details (PE-09006) As of July 23, 2013 (Revised) Sub-total - Miscellaneous Cost - 103,668 - (103,668) Grant Total 47,725,437 35,182,087 10,079,641 2,463,708 13 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Original Budget (per Measure N Ballot Measure) 18,000,000$ Budget Change 4,342,563 Sub-total - 2010 Engineer's Budget Estimate 22,342,563 - - 22,342,563 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs 10/05/10 Group 4 Architecture ResearcArchitectural 73,246 10/05/10 Group 4 Architecture ResearcArchitectural 700 10/05/10 Group 4 Architecture ResearcArchitectural 73,246 11/02/10 Group 4 Architecture ResearcArchitectural 5,785 11/02/10 Group 4 Architecture ResearcArchitectural 122,100 Jan. 25, 2011 Report 12/07/10 Group 4 Architecture ResearcArchitectural 2,390 01/04/11 Group 4 Architecture ResearcArchitectural 15,000 01/04/11 Group 4 Architecture ResearcArchitectural 583 01/04/11 Group 4 Architecture ResearcArchitectural 859 01/04/11 Turner Construction CompanyConstruction Management Services 1,195 02/24/11 Group 4 Architecture ResearcArchitectural 4,860 03/18/11 Group 4 Architecture ResearcArchitectural 73,246 03/18/11 Group 4 Architecture ResearcArchitectural 7,500 03/18/11 Group 4 Architecture ResearcArchitectural 53 03/18/11 Group 4 Architecture ResearcArchitectural 3,843 04/11/11 Group 4 Architecture ResearcArchitectural 112,464 04/11/11 Group 4 Architecture ResearcArchitectural 3,993 04/11/11 Group 4 Architecture ResearcArchitectural 7,500 01/21/11 Group 4 Architecture ResearcArchitectural 24,392 April 26, 2011 Report 01/21/11 Turner Construction CompanyConstruction Management Services 1,434 01/21/11 Group 4 Architecture ResearcArchitectural 2,500 01/24/11 Group 4 Architecture ResearcArchitectural 1,500 01/21/11 Group 4 Architecture ResearcArchitectural 447 02/18/11 Turner Construction CompanyConstruction Management Services 478 02/18/11 Group 4 Architecture ResearcArchitectural 48,831 02/18/11 Group 4 Architecture ResearcArchitectural 2,653 02/18/11 Group 4 Architecture ResearcArchitectural 3,238 05/12/11 Group 4 Architecture ResearcArchitectural 6,250 05/12/11 Group 4 Architecture ResearcArchitectural 40,052 05/12/11 Group 4 Architecture ResearcArchitectural 12,411 05/12/11 Group 4 Architecture ResearcArchitectural 3,263 05/17/11 Group 4 Architecture ResearcArchitectural 4,553 July 26, 2011 Report 06/09/11 Group 4 Architecture ResearcArchitectural 31,374 07/01/11 Turner Construction CompanyConstruction Management Services 9,169 07/11/11 Group 4 Architecture ResearcArchitectural 11,100 07/11/11 Group 4 Architecture ResearcArchitectural 488 07/11/11 Group 4 Architecture ResearcArchitectural 15,687 07/27/11 Group 4 Architecture ResearcArchitectural 319 07/27/11 Group 4 Architecture ResearcArchitectural 1,150 07/27/11 Group 4 Architecture ResearcArchitectural 1,875 07/27/11 Turner Construction CompanyConstruction Management Services 5,572 08/10/11 Group 4 Architecture ResearcArchitectural 31,374 08/24/11 Turner Construction CompanyConstruction Management Services 2,868 October 25, 2011 Report 08/31/11 Group 4 Architecture ResearcArchitectural 117 08/31/11 Group 4 Architecture ResearcArchitectural 175 08/31/11 Group 4 Architecture ResearcArchitectural 248 09/14/11 Group 4 Architecture ResearcArchitectural 67 09/14/11 Group 4 Architecture ResearcArchitectural 600 09/14/11 Group 4 Architecture ResearcArchitectural 39,218 10/26/11 Group 4 Architecture ResearcArchitectural 5,000 10/26/11 Group 4 Architecture ResearcArchitectural 235,308 10/26/11 Group 4 Architecture ResearcArchitectural 878 10/26/11 Group 4 Architecture ResearcArchitectural 5,000 10/26/11 Group 4 Architecture ResearcArchitectural 291 10/26/11 Group 4 Architecture ResearcArchitectural 27 11/02/11 Group 4 Architecture ResearcArchitectural 78,436 11/02/11 Group 4 Architecture ResearcArchitectural 7,500 11/22/11 Group 4 Architecture ResearcArchitectural 8,514 12/07/11 Group 4 Architecture ResearcArchitectural 62,749 January 18, 2012 Report 12/14/11 Group 4 Architecture ResearcArchitectural 12,584 12/14/11 Group 4 Architecture ResearcArchitectural 79,172 12/14/11 Group 4 Architecture ResearcArchitectural 12,584 12/21/11 Protect Consulting and EngineHazardous Material Testing 3,530 12/21/11 Group 4 Architecture ResearcArchitectural 3,052 01/11/12 Group 4 Architecture ResearcArchitectural 225 01/11/12 Group 4 Architecture ResearcArchitectural 9,761 01/11/12 Group 4 Architecture ResearcArchitectural 70,592 Main Library Activity Details (PE-11000) As of July 23, 2013 (Revised) 14 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Main Library Activity Details (PE-11000) As of July 23, 2013 (Revised) 01/11/12 Group 4 Architecture ResearcArchitectural 150 01/11/12 Group 4 Architecture ResearcArchitectural 247 02/22/12 Group 4 Architecture ResearcArchitectural 10,000 02/22/12 Group 4 Architecture ResearcArchitectural 62,749 02/22/12 Group 4 Architecture ResearcArchitectural 8,676 02/22/12 Group 4 Architecture ResearcArchitectural 3,590 March 28, 2012 Report 03/21/12 Group 4 Architecture ResearcArchitectural 1,330 03/21/12 Group 4 Architecture ResearcArchitectural 5,423 03/21/12 Group 4 Architecture ResearcArchitectural 39,218 02/22/12 BIG-D Pacific Builders, LP Construction 32,500 12/21/12 BIG-D Pacific Builders, LP Construction 36,960 04/04/12 Group 4 Architecture ResearcArchitectural 18,925 04/18/12 Group 4 Architecture ResearcArchitectural 1,500 04/18/12 Group 4 Architecture ResearcArchitectural 19 04/18/12 Group 4 Architecture ResearcArchitectural 9,784 05/16/12 Group 4 Architecture ResearcArchitectural 3,278 July 5, 2012 Report 05/16/12 Group 4 Architecture ResearcArchitectural 29,046 05/30/12 Group 4 Architecture ResearcArchitectural 39,504 06/20/12 Group 4 Architecture ResearcArchitectural 13,884 07/05/12 Group 4 Architecture ResearcArchitectural 407 07/05/12 Group 4 Architecture ResearcArchitectural 2,500 07/25/12 Group 4 Architecture ResearcArchitectural 1,613 07/25/12 Group 4 Architecture ResearcArchitectural 1,535 07/25/12 Group 4 Architecture ResearcArchitectural 1,992 October 30, 2012 Report 09/05/12 Group 4 Architecture ResearcArchitectural 7,551 09/26/12 Group 4 Architecture ResearcArchitectural 5,996 10/31/12 Turner Construction CompanyConstruction Management Services 7,444 11/19/12 Group 4 Architecture ResearcArchitectural 2,097 11/19/12 Group 4 Architecture ResearcArchitectural 5,423 11/19/12 Group 4 Architecture ResearcArchitectural 8,000 11/19/12 Group 4 Architecture ResearcArchitectural 270 11/19/12 Group 4 Architecture ResearcArchitectural 2,097 10/31/12 Turner Construction CompanyConstruction Management Services 10,000 January 23, 2013 Report 10/11/12 Fastsigns signs 389 01/09/13 NOVA Partners, Inc. Construction Management Services 19,320 01/23/13 Group 4 Architecture ResearcArchitectural 2,500 01/23/13 Group 4 Architecture ResearcArchitectural 969 01/23/13 Group 4 Architecture ResearcArchitectural 4,979 01/23/13 Group 4 Architecture ResearcArchitectural 725 01/23/13 NOVA Partners, Inc. Construction Management Services 12,010 02/06/13 Group 4 Architecture ResearcArchitectural 3,243 02/27/13 West Coast Code ConsultantsPlan Check 13,300 02/27/13 NOVA Partners, Inc. Construction Management Services 18,280 April 12, 2013 03/06/13 Group 4 Architecture ResearcArchitectural 30,776 04/03/13 NOVA Partners, Inc. Construction Management Services 17,000 04/24/13 Group 4 Architecture ResearcArchitectural 13 05/08/13 Group 4 Architecture ResearcArchitectural 479 05/08/13 Group 4 Architecture ResearcArchitectural 9,324 05/22/13 Group 4 Architecture ResearcArchitectural 1,641 05/22/13 Group 4 Architecture ResearcArchitectural 157 July 23, 2013 04/24/13 NOVA Partners, Inc. Construction Management Services 16,360 05/22/13 NOVA Partners, Inc. Construction Management Services 18,280 04/10/13 ARC Signs 71 05/01/13 ARC signs 210 06/19/13 Metropolitan Van and StorageEquipment Moving 31,367 Group 4 Architecture ResearcArchitectural 29,614 Turner Construction CompanyConstruction Management Services 24,236 West Coast Code ConsultantsPlan Check 3,000 NOVA Partners, Inc. Construction Management Services 580,759 S.J. Amoroso Construction Construction 17,707,000 Protech Consulting and EngineHazardous Material Testing 22,600 Sub-total - Engineering and Architectural Costs - 1,982,269 18,367,209 (20,349,478) Contract Contingency 05/27/11 Group 4 Architecture ResearcArchitectural 22,152 July 26, 2011 Report 06/09/11 Group 4 Architecture ResearcArchitectural 571 02/22/12 Group 4 Architecture ResearcArchitectural 122 March 28, 2012 Report 11/19/12 Group 4 Architecture ResearcArchitectural 124 January 23, 2013 Report 04/03/13 Group 4 Architecture ResearcArchitectural 8,442 April 12, 2013 03/06/13 Group 4 Architecture ResearcArchitectural 8,442 04/24/13 Group 4 Architecture ResearcArchitectural 6,300 05/22/13 Group 4 Architecture ResearcArchitectural 64,633 July 23, 201315 Payment Date Purchasing Document Payee Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Main Library Activity Details (PE-11000) As of July 23, 2013 (Revised) 06/05/13 Group 4 Architecture ResearcArchitectural 27,225 Metropolitan Van and StorageEquipment Moving 53,630 Group 4 Architecture Researc Architectural 135,179 Turner Construction CompanyConstruction Management Services 10,750 NOVA Partners, Inc. Construction Management Services 68,812 S.J. Amoroso Construction Construction 1,770,700 West Coast Code ConsultantsPlan Check 1,600 Protech Consulting and EngineHazardous Material Testing 2,260 Creative Machines, Inc. Plans and Technical Drawings 26,000 Sub-total - Contract Contingency - 138,011 2,068,931 (2,206,943) Other Contract Services 12/05/12 Planet Orange Termite Inspection Fee 350 12/31/12 Fastsigns Sign 226 12/19/12 Creative Machines, Inc. Plans and Technical Drawings 52,000 12/19/12 Creative Machines, Inc. Plans and Technical Drawings 12,000 10/31/12 City of Palo Alto - Public WorkMain Library Renovation - Plan Check Fee 115,654 12/06/12 City of Palo Alto - DevelopmenArchitetural Review 2,678 January 23, 2013 Report 12/06/12 City of Palo Alto - DevelopmenArchitetural Review 25 12/06/12 City of Palo Alto - DevelopmenArchitetural Review 20 12/06/12 City of Palo Alto - DevelopmenArchitetural Review 622 12/06/12 City of Palo Alto - DevelopmenArchitetural Review 2,892 12/06/12 City of Palo Alto - DevelopmenArchitetural Review 252 04/24/13 FedEx Mailing 111 04/24/13 FedEx Mailing 98 July 23, 2013 04/17/13 FedEx Mailing 111 Sub-total - Other Contract Services - 187,039 - (187,039) City (Inter-department) Service Charge Sub-total - City (Inter-department) Service Charge - - - - Miscellaneous Cost 02/27/13 JP Morgan P-Card Other Contract Services 589.75 April 12, 2013 Sub-total - Miscellaneous Cost - 590 - (590) Grant Total 22,342,563 2,307,909 20,436,141 (401,487) 16 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Mitchell Park Library (Council Approved - CMR: 463:09) 645,000 g g Sub-total - 2010 Engineer's Budget Estimate 645,000 - - 645,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 439,283$ 10/05/10 Group 4 Architecture ResearcArchitectural 5,774 Oct. 21, 2010 Report 08/24/10 Group 4 Architecture ResearcArchitectural 329 01/27/11 Johnstone Moyer, Inc. Temp. Library Improvements 19,191 April 26, 2011 Report Group 4 Architecture ResearcArchitectural 12,362 Ross McDonald Company, IncLibrary Shelving 3,200 Sub-total - Engineering and Architectural Costs - 464,577 15,562 (480,139) Contract Contingency Summary of Expenditures as of July 21, 2010 2,541 08/24/10 Johnstone Moyer, Inc. Temp. Library Improvements 24,604 Oct. 21, 2010 Report 08/27/10 West Corporation Temp. Lib. - Security Access Card & Alarm 310 01/27/11 Johnstone Moyer, Inc. Temp. Library Improvements 6,045 April 26, 2011 Report West Corporation Temp. Lib. - Security Access Card & Alarm Ross McDonald Company, IncLibrary Shelving 3,540 Group 4 Architecture ResearcArchitectural 4,759 Sub-total - Contract Contingency - 33,500 8,299 (41,799) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 11,247 March 28, 2012 Report Sub-total - City (Inter-department) Service Charge - 11,247 - (11,247) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 125 March 28, 2012 Report Sub-total - Miscellaneous Cost - 125 - (125) Grant Total 645,000 509,448 23,861 111,691 Temporary Library at Cubberley (for Mitchell Facility) - Activity Details (PE-09010) As of July 23, 2013 (Revised) 17 Payment Date Payee Description Project Budget Expenses Commitments (aka Purchase Orders) Remaining Balance Project Budget Temporary Main Library Facility - Art Center Auditorium 500,000 Sub-total - 2010 Engineer's Budget Estimate 500,000 - - 500,000 Engineering, Architectural, Constr., and Publishing (Reproduction) Costs Summary of Expenditures as of July 21, 2010 -$ 04/04/12 Group 4 Architecture Researc Architectural 15,687 July 5, 2012 Report 04/04/12 Group 4 Architecture Researc Architectural 11,288 07/25/12 Group 4 Architecture Researc Architectural 1,121 October 30, 2012 Report 06/15/76 Ross McDonald Company, IncLibrary Shelving 7,176 06/19/13 Big-D Pacific Builders, LP Construction Services 253,627 July 23, 2013 Big-D Pacific Builders, LP Construction Services Group 4 Architecture Researc Architectural 2,959 Sub-total - Engineering and Architectural Costs - 288,899 2,959 (291,858) Contract Contingency Summary of Expenditures as of July 21, 2010 - 04/30/13 Fastsigns Signs 593 04/30/13 Metropolitan Van and StorageEquipment Moving 380 04/30/13 Fastsigns Signs 598 July 23, 2013 04/30/13 Fastsigns Signs 41 Ross McDonald Company, IncLibrary Shelving 1,929 Sub-total - Contract Contingency - 1,612 1,929 (3,541) City (Inter-department) Service Charge Summary of Expenditures as of July 21, 2010 - 04/30/13 City of Palo Alto - Planning Architetural Review 384 04/30/13 City of Palo Alto - DevelopmenArchitetural Review 216 July 23, 2013 05/31/13 City of Palo Alto _ DeveopmenArchitetural Review 122,489 Sub-total - City (Inter-department) Service Charge - 123,089 - (123,089) Miscellaneous Cost Summary of Expenditures as of July 21, 2010 - Sub-total - Miscellaneous Cost - - - - Grant Total 500,000 413,600 4,888 81,513 Art Center Temporary Library - Activity Details (Project # PE-11012) As of July 23, 2013 (Revised) 18