HomeMy WebLinkAbout2000-03-21 City Council (5)City of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL ATTENTION: FINANCE COMMITTEE FROM:CITY MANAGER DEPARTMENT:ADMINISTRATIVE SERVICES DATE:MARCH 21, 2000 CMR:167:00 SUBJECT:1999-00 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS REPORT This is an informational report and no Council action is required. BACKGROUND This report provides the Finance Committee with information on the status of the City’s Capital Improvement Program (CIP) projects as of December 31, 1999. In the attached matrix (Attachment A), all City departments have submitted information on their projects and commented on any issues which might cause a change in the scope or timing of the projects. Information in this report is intended to keep Council abreast of progress on all CIP projects that were open at the beginning of the 1999-00 fiscal year and on those projects which were added or completed during the current year. DISCUSSION The attached matrix categorizes CIP projects into minor projects (projects which can be completed within a one-year period) and multi-year projects (projects which have multi- year budgets and/or complex implementation schedules with identifiable phases). The projects status portion of the matrix identifies the phase the project was in as of December 31, 1999. Information on phases is intended to give Council a perspective on how much progress was made on a project. Three distinct phases are utilized, as follows: CMR: 167:00 Page 1 of 3 Phase: Pre-Design Design Construction Activities: Preparation of a feasibility study Development of a master plan Definition of a project scope Preparation of an Environmental Impact Report Hiring a design consultant Completion of project design Soliciting bids or proposals Acquisition of major equipment Installation Implementation of a project The comments section of the matrix provides Council with in, formation clarifying the status of certain projects. In the attached matrix, projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. Within each department or fund, the projects are ordered by project number, which includes the year of Council approval (year of approval is shown by the second two digits of the 5-digit project number or the first two digits of a 4-digit project number). The matrix also includes information on the total or accumulated budget for projects, the remaining budget as of the beginning of the fiscal year, the fiscal year expenditures through December 31, 1999, including commitments (encumbrances), and the remaining balance in the project budget as of mid- year. The matrix does not include "continuous" projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect the continuing replacement cycles or commitments. During the first half of 1999- 00, progress was made on all of the "continuous" projects (Attachment B). ATTACHMENTS Attachment A: Attachment B: Mid-Year Capital Improvement ProjectS Status Matrix List of Continuous Projects PREPARED BY:Larry Hartmann, Staff Accountant Mary White, Staff Accountant CMR: 167:00 Page 2 of 3 DEPARTMENT HEAD APPROVAL: Services CITY MANAGER APPROVAL: City Manager CMR: 167:00 Page 3 of 3 UJ 0 (::)(:3 C,0’)(D 0 r.,...~- o o. ,:::,. 0o o0 o0 0o 0 o 0000 0o.o o ooo"0 LO 0,1 o~ o8 00 o o o0 o o o ooooo~.o.o o. ~ ~ o z E "~E0~0on0 0 I.,0 o 0o0 0o 0 0 0 o00 0 0 u.I o 0 0 0o 0o LO0 00 0 o o0 0o0 uJ o 00 o0 0o o0 o 0 o00 o 0 0o ooo 00 00 o 0 o ooooo 0 00o 0 00 o0 o0 0 o o00 o0 0 oo~ o o00 o0o o o 0o0o0o0 znO UJ Z 0 0 o c) 0 o o 0 0 0 0 o 0o o0o 0 o ZLU LU 0 0o o0 0 w o 00 0 o0 0 o 0o 0’~o o o 0o o0o 00 o0 E c t- ~.0 0 0 (3 0 o 0 0 00ooL~0 0~~o "13 0 0o 0 000(:3 0~0 0 0 0 I~0 o0 o o o0I~0 o ~ o o o 0 0 0oI~oO.¢~0 0 o~0 0o0 0o 0oo 0o0 ,o0 0o 0 0 ¢~1 00 ~,0 0 ~0 ~~0 O0 ’,--0h,-h~0’)0 0 o oo oo o 0o 0oo 0 0 0 0 0 0 000000.0o.o~o.o o o 0o 0 00 00 o0 0 00 0o 0o 00 o0 o0 o0 ~0 0o 00 00 0 0o 000 0 0 oo 00 00 000 000 000 _.o ~0 O~ 0 0 0 000 000 000 000 0 000 000 000 000 °o o oiO0 0 6 000 000 000 00 0 0 000 000 000 O00 00O 000 000 000 C)0O 00 0 000 000 000 0o oo 0 o 0o 0 0oo ~o oo ~’) oo ooo ooo jo 0oo 0oo ~I~o)oooo~v,- F- W o0 0 ~ w 0 oo o o ooo o o ooo 0o ooo ooo 00 2 0 ~0 0 0 0’) Attachment B LIST OF CONTINUOUS PROJECTS Administrative Services 18822 18614 19618 19808 19914 Computer Aided Map Financial Database Upgrade GIS Application Financial Applications Development New Computer Acquisitions Community Services 18617 19415 Art in Public Places Park Facilities Improvements Public Works General Fund 18903 18971 18670 19018 19101 19309 8870. 8021 8022 Sidewalk Improvements Street Improvements (Utility Users Tax) Street Improvements (Street Improvement Fund) Cubberley Building Code Modification Tank Investigation and Removal ADA Compliance Storm Drainage Fund Collection System Improvements Wastewater Treatment RWQCP Plant Equipment Replacement RWQCP System Flow Metering Utilities 8928 8930 8931 8938 8944 9354 9703 9801 9802 9803 Electric Fund Customer Design and Connection Services Traffic Signals Upgrade Communication System Improvements Substation Protection Improvements Substation Facility Improvements Street Light Replacements Underground Cable and Equipment Replacement Fiber Optics Ring System Improvements Fiber Optics Customer Design and Connection Services Electric Distribution System Reconstruction and Improvements Gas Fund 8017 8019 9230 9912/0002 Gas System Extensions Gas Meters and Regulators Natural Gas Vehicle Conversions and Purchases Gas Main Replacements Wastewater Collection 8020 Sewer System Extensions 9913/9914/0003 Sewer System Rehabilitation and Augmentation W~erFund 8013 8014 8015 9915/0004 0005 Water System Extensions Service and Hydrant Replacements Water Meters Water Main Replacements Water Receiving Station