City Manager’s Report
’TO:HONORABLE CITY COUNCIL
ATTN:FINANCE COMMITTEE
FROM:CITY MANAGER DEPARTMENT: ADMINISTRATIVE
SERVICES
DATE:
SUBJECT:
MARCH 21, 2000 CMR: 165:00
RENOVATION AND UPGRADES TO SECOND FLOOR AND A
LEVEL
This is an informational report and no Council action is required.
BACKGROUND
This report provides information on a proposed Capital Improvement Program (CIP),
project number 10027, for renovations and upgrades to the City’s computer and
equipment rooms. The detailed CIP project description is included in Attachment A.
Funding for this project is included in the Midyear Financial Summary staff report and
accompanying Budget Amendment Ordinance.
DISCUSSION
In 1998, as a part of the overall examination of space needs at the City, a space shortage
of several hundred feet was identified in the computer room on the second floor of City
Hall. At that time, it was determined that the space shortage put computer equipment at
risk and potentially shortened its lifespan due to the potential for overheating. The
implementation of the IT Strategic Plan has increased the problem. The Plan calls for the
consolidation of all IT functions into one Information Technology Group, and the
centralization of IT equipment into the computer room. This centralization will ensure
that computer systems are maintained in an efficient and effective manner and have
sufficient power back up and protection from fire. In addition, the public safety
communications dispatch equipment located on A Level in City Hall is inadequately
vented and is not sufficiently protected against power failure. Given that the equipment
serves a public safety function, it is critical that it have an Uninterrupted Power Supply
(UPS) for all components of the system in case of power failure. These improvements
CMR: 165:00 Page 1 of 3
have become increasingly important since the recent implementation of the new
Computer Aided Dispatch System and the enhanced Emergency 911 system.
This new CIP will provide funds to design and implement improvements to the second
floor and A Level of City Hall. The improvements on the second floor include expansion
of the computer room, design and upgrade of the electrical and life safety systems, and
shelving. The improvements to A Level include design, acquisition of a larger UPS,
modification to the ventilation and air conditioning system, and upgrades to electrical
systems.
RESOURCE IMPACT
The total project cost is $800,000. A portion of the work being done directly affects
existing infrastructure (electrical work, ventilation, and air conditioning), and staff
proposes funding it from the General Fund Infrastructure Reserve ($400,000). While
these systems were not specifically identified in the Infrastructure Managemen~ Plan
(IMP), staff believes that these upgrades should be included as" part of this CIP. This
represents a change in the original concept of the IMP, that .only existing systems would
be replaced and not upgraded. Staff has discussed with the Council and Finance
Committee the concept that replacing only existing systems does not meet the intent of
the IMP and upgrades to outdated systems should be included as part of the IMP
program. This inclusion may affect the long-term total cost of the IMP program. In
addition to Infrastructure Reserve funding, Stanford will reimburse the City for a portion
of the costs related to dispatch. The remainder of the funding would come from the
General Fund Budget Stabilization Reserve and the Utilities Funds reserves. The table
below summarizes the various sources of funding. The project-funding request is
included in the Midyear Financial Summary staff report and accompanying Budget
Amendment Ordinance.
Funding by Fund ($000)
Infra-General Refuse
structure Fund Fund
Reserve Budget Reserve
Stab.
Reserve
$400 $263 $6
Storm Waste-Gas Electric Water Waste-Stanford
Drain water Fund Fund Fund water
Fund Treat.Reserve Reserve Reserve Coll.
Reserve Fund Fund
Reserve Reserve
$2 $12 $26 $26 $13 $8 $44
Total
Costs
$800
POLICY IMPLICATIONS
This report does not represent any change to existing City policies.
consistent with the Council approved Information Technology Plan.
This request is
ENVIRONMENTAL REVIEW
This project is categorically exempt under Section 15301 of CEQA.
CMR: 165100 Page 2 of 3
ATTACHMENT
CIP Project Number, 10027, Renovation and Upgrades to Data Management Areas
PREPARED BY: Shannon Gaffney, Senior Financial Analyst
DEPARTMENT HEAD APPROVAL:
Services
CITY MANAGER APPROVAL"
JUNE FL
City Manager
CMR: 165:00 Page 3 of 3
ATTACHI~ENT
PROJECT DESCRIPTION
This project will fund the expansion and renovation of the computer room on the second floor of City Hall, as well
as improvements needed in the Police Department dispatch center and adjoining equipment room of City Hall.
These improvements will address severeand long-standing overcrowding in the computer room, electrical power
quality problems caused by overextended electrical circuits, and will include ventilation system modifications, as
well as reconfiguration of the space to create more room for equipment. In addition, funding is included to equip
the renovated room with shelving for proper storage. Improvements for the Level A Communications Dispatch
equipment area will include improved ventilation, a new Uninterruptible Power Supply (UPS) to support
communications equipment, redistribution of loads on generators and an automatic transfer switch to provide
redundancy for the Computer Aided Dispatch System and the Enhanced Emergency 911 system. Replacement of
the Main Emergency Generators and Building UPS is addressed separately in the Infrastructure Management Plan
and will be completed at a later date.
PROJECT JUSTIFICATION
These improvements are necessary to ensure that electrical and ventilation systems are appropriate for the computer
equipment located at City Hall. Due to expanded public access and use of the City’s web site, employee use of e-
mail, new telephone 911 technology that allows emergency cell phone call reception at the dispatch center, and
improvements called for in the IT Strategic Plan, it is necessary to address electrical capacity deficiencies and
uninterruptible power shortfalls. In addition, in order to correct equipment crowding, an expansion of the current
computer room is necessary. In spring of 1998, a several hundred foot space shortage was identified in the computer
room. This space shortage places computer equipment at risk and potentially shortens its life span due to the
possibility of overheating. The shortage has since been exacerbated as a result of implementation of
recommendations in the IT Strategic Plan, including consolidating the Utilities technology functions into one
Information Technology group, and centralizing all information technology systems in City Hall to ensure they
have sufficient power back up and protection from fire.
FUTURE FINANCIAL REQUIREMENTS
FISCAL YEAR
PY Budget
1999-00
2000-01
2001-02
2002-03
2003-04
AMOUNT
$800,000
COMPONENTS
Improvements to the 2nd floor computer room and the Level A Police
dispatch area, including computer room expansion and shelving on the
2nd floor ($200,000), electrical design, upgrades, and controls on 2nd
floor and Level A ($300,000), Level A design work, air conditioning
and ventilation ($150,000), and a Uninterruptible Power Source for
Level A ($150,000).
Sources of Funding: General Fund with reimbursement from the Utility Funds and the Infrastructure Reserve
100
Infra-
structure
$400
General
Fund
$263
Refuse
Fund
$6
Storm
Drain
Fund
$2
~’unding by Fund (in $1,00gs) -
Waste-
water
’ Treat.
Fund
$12
’ Electric
Gas Fund Fund
$26 $26
Water
Fund
$13
Waste-
water
Coil.
Fund
$8
Stanford
$44
Total
$800
IMPACT AND SUPPORT ANALYSIS
~Environmental:Categorically exempt under Section 15301 of CEQA.
*Design Elements:,None.
*Operating:None.
Telecommunications:None.
COMPREHENSIVE PLAN
The Comprehensive Plan contains no policies or procedures directly related to this project.