Loading...
HomeMy WebLinkAbout2001-12-18 City CouncilCity of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL ATTENTION: FROM: FINANCE COMMITTEE CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES DATE:DECEMBER 18, 2001 CMR:445:01 SUBJECT:2000-01 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS REPORT This is an informational report and no Council action is required. BACKGROUND This report provides the Finance Committee with information on the status of the City’s Capital Improvement Program (CIP) projects as of the end of the fiscal year 2000-01. In the attached matrix (Attachment A), all City departments have submitted information on their projects and commented on any issues which might cause a change in the scope or timing of the projects. Information in this report is intended to keep Council abreast of progress on all CIP projects that were open at the beginning of the 2000-01 fiscal year and on those projects that were added or completed during the same fiscal year. DISCUSSION The attached matrix categorizes CIP projects into minor projects (projects which can be completed within a one-year period) and multi-year projects (projects which have multi-year budgets andYor complex implementation schedules with identifiable phases). The project status portion of the matrix identifies the phase the project was in at fiscal year-end. Information on phases is intended to give Council a perspective on how much progress was made on a project. Three distinct phases are utilized, as follows: CMR: 445:01 Page 1 of 3 Phase: Pre-Design Design Construction Activities: o Preparation of feasibility study o Development of a master plan o Definition of a project scope o Preparation of an Environmental Impact Report o Hiring a design consultant o Completion of project design o Soliciting bids or proposals o Acquisition of major equipment o Installation o Implementation of a project The comment section of the matrix provides Council with information clarifying the status of certain projects. In the attached matrix, projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. Within each department or fund, the projects are ordered by project number, which includes the year of Council approval (year of approval is shown by the second two digits of the 5-digit project number or the first two digits of a 4- digit project number). The matrix also includes information on the total or accumulated budget for projects, the remaining budget as of the beginning of the fiscal year, the fiscal year expenditures through June 30, 2001, including commitments (encumbrances). The matrix does not include "continuous" projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect continuing replacement cycles or commitments. During fiscal year 2000-01, progress was made on all of the City’s "continuous" projects (Attachment B). At year-end, all completed CIP’s (after .settlement of encumbrances) and CIP’s where no activity is planned in the near future were closed and the remaining balances transferred to the Budget Stabilization Reserve for General Fund projects; to Retained Earnings for Internal Service Funds; and for Utility Fund projects, to the appropriate Rate Stabilization Reserves. CMR: 445:01 Page 2 of 3 General Fund Infrastructure Plan Pro)ects The Capital Improvement Program reflects the significantly increased level of commitment to renovating and repairing the City’s general infrastructure -buildings and facilities, streets and sidewalks, parks and open space and transportation systems. Staff has prepared a presentation for the December 4 Finance Committee meeting that provides additional information and an up-to-date look at the accomplishments of the Infrastructure Program. ATTACHMENTS Attachment A: Attachment B: Year-end Capital Improvement Projects Status Matrix List of Continuous Projects PREPARED BY: LARR7 HARTMANN Staff Accountant F. JAC~KIE AGUSTIN Staff Accountant DEPARTMENT HEAD APPROVAL: CITY MANAGER APPROVAL: EMILY HARRISON Assistant City Manager CMR: 445:01 Page 3 of 3 E 0 0 o o z LU LU LU LU o ~- ~ I11 E E ’E 0 0 ~0 s oo oo 00 o {.0 0 00 0 00 0 0 ~3 o4 0 0oJ~o 0 o~3 04 ~0 00 0 00 0 0 o 0 00000000~3 0 00 0 o~o 0 0 0 0 0 0 o 0 00000 ~o o-o- 0 0 0 000000000 u3 0 0 0~ e~ z ZLU 00 F- LU 0o0 0 00 0 0 0 00 0 =E E E ’0 0 0 0 ~ ~0 000 0 0 0 oo00~o 0 0 000 0 000 0 0 0o0 000 00 0 E 0 0 o ~D ~ n ILl -J 0 0 0 0 0 0 0 0 0 00000 0 0 ~0 E o o o oo 0 oo0 00o o o o 000 o 0 o o ooo o c0 o o ooo 0 o o o 0o 69- C E 0oo o3 o c oo O~Z n~Z o c oo oo ooo ooo oo oo0 c o o ooo "o c o c c ooo 00 6£- oo 0 oo ooo oo C o"oo c ooo o ooo o ~0 oo ooo ooo o ooo o ._~ 12) o o I-- 0 0 ILl I.,U 0 z~J ooo ooo qo ooo o ooo oo ~. E E E o o o o 0 0 ooo o 000 00 00 ooo 00 o oo oo 0 00 0 00 00 0 00 L~-~C)~ ~-c "~c_m _m ~o0_D_rn 0 ~E E E o o o E E E E oo 000 E LU ¯ ~E Eo0 or-’,0 E E "~ E E "~ 0 0 0 0 0 0000000000000 oo o co Eo o~° LU 0 c o N 0 0 o 0 0 0~ oo o o oo c c0o t~ ¯ mn~ o 0 000 0 C 00 00 000 00 000 00 E 00o 0 0 0 00 o4 0 o 000 0.~- 0 0"- 0 cO 0 000 00 69- 0 o~ O o O 000 0co c .,~ 0 0.,~ 000 0(13o4 c 0 0 0 000 000 00 000 ~oo 000 0 000 00 00 000 i~. 000 0000 000 000 0O~ 000 0 000 0 000 e-- m ~..-- 00 00 000 000 0 ~ o o(.3 u- xo~~-o~ ~o--j g ooo oo oo0 ~o~o oo ooo o 0 t- o o ~0 ooo ooo E o~ c 000 0 000 000 000 ~U o 0 o o o ooo c0 .~_r- 0 00 ¯ mn~ 0 oo o c~ o o oo d oo d~0 ~ w ooo o o o0o ooo o ooo oo0 IV- Io o o ooo ooo (0 0 0 "~ ~-0 Attachment B LIST OF CONTINUOUS PROJECTS Administrative Services 18614 18822 19618 19808 19914 Financial Database Upgrade Computer Aides Mapping GIS Application Financial Applications Development New .Computer Acquisitions Community Services 18617 19415 Art in Public Places Park Facilities Improvements Public Works General Fund 18903 18971 18670 19018 19101 19309 Sidewalk Improvements Street Improvements (Utility Users Tax) Street Improvements (Street Improvement Fund) Cubberley Building Code Modification Tank Investigation and Removal ADA Compliance 8870 Storm Drainage Fund Collection System Improvements Wastewater Treatment 8021 RWQCP Plant Equipment Replacement 8022 RWQCP System Flow Metering Utilities 8928 8930 8931 8938 8944 9354 9703 9801 9802 9803 Electric Fund Customer Design and Connection Services Traffic Signals Upgrade Communication System Improvements Substation Protection Improvements Substation Facility Improvements Street Light Replacements Underground Cable and Equipment Replacement Fiber Optics Ring System Improvements Fiber Optics Customer Design and Connection Services Electric Distribution System Reconstruction and Improvements Gas Fund 8017 8019 9230 8018/9912/0002/0104 Gas System Extensions Gas Meters and Regulators Natural Gas Vehicle Conversions and Purchases Gas Main Replacements Wastewater Collection 8020 Sewer System Extensions 9913/9914/0003/0105 Sewer System Rehabilitation and Augmentation Water Fund 8013 8014 8015 8016/99151000410106 Water System Extensions Service and Hydrant Replacements Water Meters Water Main Replacements