Loading...
HomeMy WebLinkAbout2001-05-21 City CouncilCity of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL 7 FROM:CITY MANAGER DEPARTMENT: UTILITIES DATE:MAY 21, 2001 CMR:200:01 SUBJECT:APPROVAL OF A BUDGET AMENDMENT ORDINANCE AND RESOLUTION ADOPTING A GAS RATE INCREASE RECOMMENDATION Staff and the Utilities Advisory Commission recommend that the City Council approve: A 67 percent retail gas rate increase effective June 11 2001 to offset higher wholesale natural gas costs and to build up the Gas Rate Stabilization Reserves. Approve a Budget Amendment Ordinance (BAO) providing an additional appropriation in the amount of $1.577 million for Gas Fund commodity purchases; adjusting gas sales revenue by a net $536,000; and transferring $1.04 million from the Supply Rate Stabilization Reserve (SRSR) and the Gas Fund. Conservation Loan Reserve. Approve raising the cap of the commodity portion of the Large Commercial Core Gas Service rate schedules G-3, G-11, and G-12 to $2 to reflect the gas market conditions. DISCUSSION Natural gas prices continue a dramatic and uncharacteristic rise, which began in May 2000, because of nationwide supply and demand issues~ To cushion the rate shock of escalating natural gas prices to Palo Alto residents and businesses, the City Council has approved a combination of a series of rate increases and withdrawal of funds from Rate Stabilization Reserves (RSR). During this period the Distribution Rate Stabilization Reserve (DRSR) and Supply Rate Stabilization Reserve (SRSR) have been drawn down to cover rising purchase gas costs while residents and businesses have been provided notifications of future rate increases as well as provided ample time to implement conservation measures to help CMR:200:01 Page 1 of 4 manage rising energy, costs. This proposed rate increase is necessary to fully recover the wholesale cost of gas and provide a contribution to reserves. The effect of the rate increase on the reserves will not be realized until fiscal year 2001-02. Current rates and reserve levels are not sufficient to recover the cost to buy and deliver gas to customers. The projected cost of gas for fiscal 2000-01 has risen above the estimated revised budget by $1.6 million due to a colder than normal winter. To provide an additional $536,000 in sales revenue in the current fiscal year to partially offset these unanticipated costs, staff recommends an effective date of June 1, rather than July 1,2001. The Gas Fund Conservation Loan Reserve was created several years ago and the program for which it was created no longer exists.~ The reserve currently has a balance of approximately $634,000. Staff recommends transferring $600,000 from the Conservation Loan Reserve to the SRSR to help cover the increased cost of gas for fiscal year 2000-01. Staff will return with a proposal for the use of the remaining balance in the Gas Fund Conservation Loan Reserve. This rate proposal is based upon budget projections for fisca!year 200.1-02. As part of the budget process this spring, staffplans to seek Council authority to bond finance the GasFund Capital Improvement Program (CIP)projects for the next three years. This is a temporary departure from long-standing practice to finance the CIP through rates and reserves. Staff believes this is a prudent action the City can take on behalf of Palo Alto residents and businesses to provide rate relief during this unprecedented energy crisis. At the completion of the three-year period, rates will fully fund the CIP. If the Gas Utility does not use bond financing to fund CIP projects, the proposed 67 percent retail rate increase would rise to 77 percent to recover the Gas Fund revenue requirement. Staff will continue to monitor the cost of gas in this era of uncertainty. Depending on the gas market prices during fiscal year 2001-02, staff may propose additional rate adjustments during the year. The timing and size of any other rate increases will be based on the actual cost of new supply contracts This rate increase has been spread among customer classes based on the system average of 67 percent. In addition, staff is proposing to raise the cap on Large Commercial Gas Service rate schedules G-3, G-11, and G-12 to $2.00 to reflect market conditions. Despite this rate increase, Palo Alto retail gas rates remain competitive with PG&E gas rates in nearby communities. All gas customers have been notified through the media and bill inserts that subsequent gas rate increases in 2001 would likely be necessary. The notice also encourages CMR:200:01 Page 2 of 4 customers to invest in energy conservation solutions and, for .qualifying customers, to seek financial assistance through the Residential Rate Assistance Program. UTILITIES ADVISORY COMMISSION REVIEW This rate increase proposal was presented to the UAC on April 4, 2001. At that meeting the UAC recommended that the City Council approve the 67 percent rate increase effective June 1, 2001. However, some of members of the UAC have expr~essed concerns regarding the value of bond financing the CIP projects. They were of the opinion that rates should be raised enough to fund the CIP projects and that reserves may continue to be at their lowest possible levels for another year. Staff responded to the concern that bond financing is being used to build up the reserves by indicating that, while indirectly, reserves will be partially replenished, it is not the reason for bond financing the CIP projects. The main reason for proposing to fund the CIP through bonds instead of rates is to relieve customers from paying for the accelerated infrastructure projects while experiencing unprecedented high gas bills. As for building up reserves, the Gas Fund’s RSRs have been depleted and will no longer be able to handle any emergencies such as unanticipated higher purchase costs due to higher consumption. Staff also indicated that there is no intent to undertake on-going bond financing. Bond financing is anticipated to last for three years while gas commodity prices are rising. Staff projects that gas prices will continue to rise.at least until fiscal year 2002-03. RESOURCE IMPACT Approval of this proposed 67 percent rate increase will increase the Gas Fund revenues by approximately $19.7 million on an annual basis. Eor the current fiscal year, the revenue increase will be approximately $536,000. This item will include a proposed BAO upon its return to Council, appropriating $1.577 million for increased gas commodity costs. This cost will.be funded in the BAO with $536,000 in additional revenues, $600,000 transferred from the Gas Fund Conservation Loan Reserve and $441,000 from the Gas Fund SRSR. For informational purposes, a summary of the BAOs approved to date in 2000-01 that impact the Utilities Rate Stabilization Reserves will be attached when this item returns to Council. This attachment also estimates future year ongoing costs associated with BAOs approved to date to provide a projection for the future resource needs from the Utility Funds for those programs approved atter the adoption of the 2000-01 budget. CMR:200:01 Page 3 of 4 POLICY IMPLICATIONS These recommendations do not represent a change in current City policies. TIMELINE The effective date of the proposed rates is effective June 1, 2001. ENVIRONMENTAL REVIEW The adoption of the resolution does not constitute a project under the Calif.omia Environmental Quality Act, therefore, no environmental assessment is required. ATTACHMENTS: B. C. D. E. Resolution Gas Rate Schedules, G-I, G-2, G-3, G -7, G-10, G-i 1 and G-12 Utilities Advisory Commission Report dated April 4, 2001 Budget Amendment Ordinance (to follow when item returns to Council) Summary of Budget Amendment Ordinances impacting the Utilities Rate Stabilization Reserves to Date in 2000-01 (to follow when item returns to Council). REVIEWED BY: PREPARED BY: Girish Balachandran, Manager Supply Resources Randy Baldschun, Assistant Director of Utilities Lucle Hlrmlna, Rates Manager DEPARTMENT HEAD: ector of Utilities CITY MANAGER APPROVAL: ~ -- _RRIS~//~ ~¢z,~f EMILY HA 4!(" Assistant City MOaager CMR:200:01 Page 4 of 4 RESOLUTION NO. RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING UTILITY RATE SCHEDULES G-l, G-2, G-3, G-7, G-10, G-f1,. and G-12 OF THE CITY OF PALO ALTO UTILITIES RATES AND CHARGES PERTAINING TO GAS RATES The Council of the City of Palo Alto does hereby RESOLVE asfollows: SECTION I.Pursuant to Section 12.20.010 of the Palo Alto. Municipal Code, Schedules G-I (Residential Core Gas Service), G-2 (Commercial Core Gas Service), G-3 (Large Commercial Core Gas Service), G-7 (Large Commercial Core Gas Service), G-10 (Compressed. Natural Gas Service) G-II (Large Commercial Fixed-Term Commodity Gas Services), and G-12 (Large Commercial Custom Commodity Gas Service) of the Palo Alto Utilities Rates and Charges are hereby amended to read in accordance with Sheets G-l-l, G-2-1,G-3-1, G-7-1, G-10-1, G-II-I, and G-12-1, respectively,attached hereto and incorporated herein by reference. The foregoing Utility Rate Schedules, as amended, shall become effective on June i, 2001. SECTION 2. The Council finds that the revenue derived from the. authorized adjustments of the several gas service rates shall be used only for the purposes set forth in Article VII, Section 2, of the Charter of theCity of Palo Alto. SECTION 3. The Council finds that the adoption of this resolution does not constitute a project under the California Environmental Quality Act, California Public Resources Code section 21080, subdivision (b) (8). INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST:APPROVED : City Clerk APPROVED AS TO FORM: Senior Asst. City Attorney Mayor City Manager Director of Utilities Director of Administrative Services 010405 syn 0072001 RESIDENTIAL CORE GAS SERVICE APPLICABILITY: UT]:LITY RATE SCHEDULE G-1 This schedule applies to core natural gas service to individually metered single family premises, including those separately metered in a multi-family complex. TERRITORY: Co Within the service area of the City of Palo Alto and on land owned or leased by the City. ¯ RATES:Per Meter Per Month (A) (B) Summer Rates (May. 1 to October 31): 0-20 therms per therm "$1.279 Over 20 therms per therm ""$1.792 Winter Rates (Nov. 1 to April 30): 0-96 therms per therm Over 96 therms per therm ................. ; ...........................: ...........................$1.279 .............. ~ ...............: .........................................$1.792 SPECIAL NOTES: Seasonal rate changes: The summer peri0d {s effective May 1 to October 31 and the winter period is effective from November 1 to April 30. When.the billing period is partly in the summer period and partly in the Winter period, the billing will be computed by prorating the total therm usage and the applicable rates thereto between the two seasonal periods, according to the ratio of the number of days in each seasonal period to the total number of days in the billing period. Service under this schedule is subject to discontinuance in whole or in part, for operational reasons or. if the City experiences supply or capacity shofiages. The City will exercise reasonable diligence and care to furnish and deliver continuous service and a sufficient quantity of gas to customers, but does not guarantee continuity of service or sufficiency of quantity. The City shall not be liable for any damage caused by interruption of service, if the interruption of service is caused by an act of God, Fire, Strikes, riots, war, or any other cause that is beyond the City’s control. {End} CITY OF PALO ALTO UTILITIES ’ Issued by the City Council Supersedes Sheet No.G-l-‘1 dated 4-’1-01 CITY OF PALO ALTO UTILITIES Effective 6-1-2001 sheet No. G-l-1 COMMERCIAL coRE GAS SERVICE UTILITY RATE SCHEDULE G-2 APPLICABILITY: This schedule applies to non-residential customers who use less than 250,000 therms per year at a single address. TERRITORY: Within the service area of the City of Palo Alto and on land owned or leased by the City. C. RATES: All year-round delivered commodity:Per Meter Per Month ¯. .......................................................................................................................-$1.336PerTherm" " " ~ D.SPECIAL CONDITIONS: Service under this schedule is subject to discontinuance in whole or in part, for operational reasons or if the City experiences supply or capacity shortages. The City will exercise reasonable diligence and care to furnish and deliver continuous service and a sufficient quantity of gas to customers, but does not guarantee continuity of service or sufficiency of quantity. The City shall not be liable for any damage caused by interruption of service, if the interruption of service is caused by an act of God, Fire, Strikes, riots, war,. or any other cause that is beyond the City’s control. {End} CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. G-2-’I dated 4-1-01 CITY OF PALO ALTO UTILITIES Effective 6-1-2001 Sheet No. G-2-1 LARGE COMMERCIAL CORE GAS SERVICE UTILITY RATE SCHEDULE G-3 APPLICABILITY: This schedule applies, to service for large commercial customers who use at least 250,000 therms per year at one site. Be TERRITORY: Within the service area of the City of Palo Alto and on land owned or leased by the City. RATES: Monthly Market-based Power Supply Charge: Supply Charges: 1. 2. 3. Cents Per Therm Commodity Charge .........................................................i ......................$0.10-$2.00 Administrative Fee ...... ........~ .....................,., ....................................................$0.004 ’ PG&E Local Transportation ...........................................................................$0.019 Distribution Charge: 1. Palo Alto Local Distribution ........ : ................................................. ~ ........ i ....... $0.237 D. SPECIAL CONDITIONS: Service under this schedule is subject to discontinuance in whole or in part, for operational reasons, or if the City experiences supply or capacity shortages. The City will exercise reasonable diligence and care to furnish and deliver continuous service anda sUfficient quantity of gas to customers, but does not guarantee continuity of service or sufficiency of quantity. The City shall not be liable for any damage caused by interruption of service, if the interruption of service is caused by an act of God, Fire, Strikes, riots, war, or any other cause that is beyond the City’s control. The commodity charge is equal to the City’s bidweek price of the natural gas paid at the PG&E City Gate for the month immediately preceding the month in which the customer is CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. G-3-1 dated 4-1-01 CI’I’Y OF PALO ALTO UTILITIES Effective 6-1-2001 Sheet No. G-3-1 LARGE COMMERCIAL CORE GAS SERVICE UTILITY RATE SCHEDULE G-7 APPLICABILITY: This schedule applies to service for large commercial customers who use at least 250,000 therms per year at one ~ite. TERRITORY: Within the service area of the City of Palo Alto and on land ovc~.ed or leased by the City. RATES:Per Therm Supply Charges: 1.Commodity Charge ...........................................................;... .........................$0.911 2.Administrative Fee ........~ .................: .........................................................~ .....$0.004 3.PG&E Local Transportation ..........................- ...........................’ .....................$0.019 Distribution Charge: 1. Total Supply Charges ................i..,.i ..............................................................$0.934 Palo Alto Local Distribution ...................: .................- ...............".... ....................$0.237 D.SPECIAL CONDITION: Service under this schedule is subject to discontinuance in whole or inpart, for operational reasons or if the City experiences supply or capacity shortages. The City will exercise reasonable diligence and care to furnish and deliver continuous service and a sufficient quantity of gas to customers, but does not guarantee continuity of service or sufficiency of quantity. The City shall not be liable for any damage caused by interruption of service, if the interruption of service is caused by an act of God, Fke, Strikes, riots, war, or any other cause that is beyond the City’s control. A customer who elects to be served under this rate Will pay an administrative fee equal to the allocable’administrative costs incurred by the City in providing the gas service. PG&E Local transportation charge is equal to the cost of transporting gas from the PG&E’s City Gate to the Palo Alto City Gate. CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. G-7-’I d~ted 4-1-01 CITY OF PALO ALTO " UTILITIES Effective 6-1..2001 Sheet No. G-7-1 COMPRESSED NATURAL GAS SERVICE UT]I,ITY RATE SCHEDULE G-IO A. APPLICABILITY: This schedule applies to the sale of compressed natural gas (CNG) at the City-owned natural gas fueling stations to customer who use CNG for fueling CNG vehicles.. TERRITORY:. Applies to locations within the service area of the City of Palo Alto. RATES: Per Therm Per Gasoline Gallon Equivalent Commodity Charge $1.210.$1.400 For billing purposes, the number of gallons will be complied from a Summary of Transactions recorded by the. dispensing unit for the customer during the month. D.SPECIAL CONDITIONS Service under this schedule is subject to discontinuance in whole or in part in case of actual or ’ anticipated shortage of natural gas resulting from insufficient supply, inadequate transmission or delivery capacity of facilities. Service under this schedule is provided o/fly from a designated City fueling station which will deliver CNG at approximately 3,000 pounds per square inch (PSI). Individuals responsible for fueling a Natural Gas Vehicle shall be required to complete training sessions to be certified to fuel a vehicle. Each individual must sign and date the Certificate of Instruction for Fueling Natural Gas Vehicle. Customers requesting to take service under this rate schedule are required to sign a Compressed Natural Gas Agreement before commencing service. 5.If r.equired by local or federal law, assessed applicable taxes shall be added to charges shown in this rate schedule. CITY OF PALO ALTO UTILITIES Issued by the City Council Supersedes Sheet No. G-10-1 dated 4-1-01 CITY OF PALO ALTO UTILITIES Effective 6-1-2001 Sheet No.G-10-1 LARGE COMMERCIAL FIXED-TERM COMMODITY GAS SERVICE UTILITY.RATE SCHEDULE G-11 APPLICABILITY: This schedule applies to large commercial one site. TERRITORY: ’ Within the service area of the City of Palo Alto and on land owned or leased.by the City. customers who use at least 250,000.therms per year at RATES:Per Therm Supply Charges: 1.Commodity Charge .........................~ ........................................~ ..............$0.20-$2.00 2.Administrative Fee .........................................................................................$0.004 3.PG&E Local Transportation ....................................................i ......................$0.019 Distribution Charge: 1 . Palo Alto Local Distribution ................................ ........................................... $0.237 TERM:12 Months or 24 Monflas SPECIAL CONDITIONS: Service under this schedule is subject to discontinuance in whole or in part, for operational reasons, or if the City experiences supply or capacity shortages. The City will exercise reasonable diligence and care to furnish and deliver continuous service and a sufficient quantity of gas to customers, but does not guarantee continuity of service or sufficiency of quantity. The City shall not be liable for any damage caused by interruption of service, if the interruption of service is causedby an, act of God, Fire, Strikesl riots, war, or any other cause that is beyond the City’s control Customers who choose to be charged under this rate schedule are required ,to sign a letter with CPAU committing.to a price and term and to adhere to rules and regulations set forth in CPAU Rule and Regulation No. 5 (Contracts). The letter shall indicate the estimated gas consumption over theterm of the contract rate. This consumption shall be served solely by CPAU. CITY OF PALO ALTO UTILITIES. Issued by the City Council Supercedes Sheet No. G-11-1 dated 1-1-0"1 CITY OF PALO ALTO UTILITIES Effective 6-1-2001 Sheet No. G-11-1 LARGE COMlVIERCIAL CUSTOM COMMODITYGAS SERVICE- UTILITY I~TE SCI~DULE G-12 APPLICABILITY: This schedule apphes to large Commercial cusiomers who use at least 250,000 therms per year at one site. TERRITORY: Within the service area of the City of Palo Alto and on land owned or leased by the City. RATES:Per Therm Supply Charges: 1.Commodity Charge ................................................................................$0.20-$2.00. 2.Administrative Fee .........................................................................................$0.004. 3.PG&E Local Transportation .......................... ..................................................$0.019 Distribution Charge: 1. Palo Alto Lo~al Distribution .......................................................: ..................$0,237 TERM: Up t9 5 years - SPECIAL CONDITIONS: Service under this schedule is subject to discontinuance in whole or in part, for operational reasons, or if the City experiences supply or capacity shortages. The City will exercise reasonable diligence and care to furnish and dehver continuous service and a sufficient. quantity of gas to customers, but does not guarantee continuity of service or sufficiency of quantity. The City shall not be liable for any damage caused by interruption of service; if the interruption of Service is caused by an act of God, Fire, Strikes, riots, war, or any other cause that is beyond the City’s control. Customers who choose to be charged under this rate schedule are required to sign a contract and confirmation schedule with CPAU and adhere to rules and regulations set forth in CPAU Rule and Regulation No. 5 (Contracts). The Commodity Charge shall be based upon the customer load shape and size, term, and market prices. The other components of the rate: Administrative Fees, Transportation Charges,. and Distribution Charges may be modified periodically with the Council’s approval. CITY OF PALO ALTO UTILITIES Issued by the City Council Supercedes Sheet No. G-12-1 dated 1-1-01 CITY OF PALO ALTO. UTILITIES Effective 6-1-2001 Sheet No. G-12-1 MEMORANDUM 8 TO:UTILITIES ADVISORY COMMISSION FROM:UTIITIES DEPARTMENT DATE: SUBJECT: APRIL 4, 2001 PROPOSED GAS RATE INCREASE .RECOMMENDATION This report.requests the Utilities Advisory Commission (UAC) recommend that the City Council approve a 67% percent retail.gas rate increase effective June 1, 2001 to recover the high cost of natural gas and to begin replenishing cash reserves. BACKGROUND Natural gas prices continue the uncharacteristic rise, which began in May 2000, because of nationwide supply and demand issues. Since May 2000, the wholesale price of gas to the City has risen substantially. Staff developed a financial strategy to recover the increased gas purchase costs, which was presented to the UAC in November 2000. The plan includes a combination of a s~ries Of rate. increases and withdrawal of funds from the Rate Stabilization Reserves (RSR). This financial plan recognizes the need to (1) stagger rate adjustments to cushion the rate shock of escalating ~natural gas prices to Palo Alto residents and businesses, (2)recover rising wholesale gas costs and, (3) to use and replenish cash reserves. The first step to execute this financial plan was taken by the City Council on July 17, 2000. At this meeting a 15 percent retail rate increase was approved effective August 1, 2000 (CMR330:00). In additioia, Council approved withdrawals of $3.5 million from the Supply Rate Stabilization Reserve (SRSR) and $1.7 million from the Distribution Rate Stabilization Reserve (DRSR) to partially offset the increased purchase costs. Subsequently, a 25 percent retail rate increase was approved and implemented January 1, 2001 (CMR:399:00) and another 25 percent increase was approved and implemented April 1, 2001 (CMR: 144:01). DISCUSSION Continued increases in the cost to purchase gas have adversely impacted the financial condition of the Gas Fund this fiscal year. Current rates and reserve levels are not sufficient to recover the cost to buy and deliver gas to customers. This proposed retail rate increase is designed to offset forecasted gas purchase costs of approximately $33 million for FY01-02 and to replenish approximately $6.6 million to the rate stabilization reserves. However, to provide approximately $536,000 additional revenues for the current fiscal year, staff is recommending an effective date of June 1 rather than July Page 1 of 3 1. Staffwill continue to monitor the cost of gas paid in this era of uncertainty. The timing and size of any further rate adjustments will be based on the actual cost of new supply contracts for FY01-02 and the need to restore the Gas Fund reserves to prudent levels. Depending on the cost of gas during FY01-02, staff may propose an additional rate adjustment this fall or winter, if reserves are not accumulating as planned. This revenue increase has been spread to all retail rate schedules on an equal percentage basis. The following table shows the impactof this rate proposal on a typical monthly bill for the various customer classes. Despite the rate increases of August 2000, January 2001, April, 2001 and this proposed June 2001 rate increase, Palo Alto retail gas rates remain competitive with PG&E gas.rates effective for March 200 lin nearby communities. TABLE 1 Impact of Rate Increase on Customer Bills Customer Usage Therms Monthly Bill Amount of Increase Percent Increase Percent PA Below or Above PG&E as of 3/01 Residential/Winter Residential/Winter 100 150 $ 129.97 219.57 $ 52.14 88.09 67 67 (8 %) Residential/Summer 26 36.34 14.58 67 0 Residential/Summer 40 61.42 24.64 67 6 Commercial G-2 500 668.00 268.00r 67 (3) Industrial G-2 10,000 13,360 5,360 67 8 Industrial G-7 30,000 35,120 14,090 67 0 Finally, to help stabilize gas rates, the Palo Alto Gas Utility has been entering into long-term wholesale agreements. Because these agreements obligate the City to purchase gas quantities to meet specific gas consumption requirements, it is important that Palo Alto gas users commit to buy gas from the City for the contract period. To manage the financial risk arising from these wholesale contracts, the City will require large industrial, customers, who are eligible for direct access, to select one of the following four options: Page 2 of 3 ° o Palo Alto’s Gas Rate Schedule G-3 whereby the commodity price changes monthly (PG&E approach). Enter into a fixed term contract with the Palo Alto Gas Utility. Elect to be included in the Palo Alto’s load and take advantage of the City’s portfolio management. A customer exercising this option will limit their rights to direct Access. The new requirement is that if a customer elects the Direct Access option after June 1, 2001, they will compensate the Palo Alto Gas Utility for any outstanding supply liability incurred by the City on behalf of serving that customer. Elect Direct Access whereby the customer would buy gas under contract with an outside energy supplier. In this case, customers who elect to contract with other suppliers, have to do that before June 1, 2001 .and the Palo Alto Gas Utility would not enter into gas supply contracts to serve their load. RESOURCE IMPACT Approval of this proposed rate increase will increase the Gas Fund sales revenues by approximately $19.7 million annually above the rates approved effective April 1, 2001. A portion of this additional sales revenue will build up the reserves. The projected ending balances of the DRSR and SRSR for FY01-02 are $3.6 million and $3.0 million respectively. If wholesale gas costs rise in the months ahead, staff will propose a subsequent retail rate increase in the fall or winter of this year to maintain or accelerate funding of the reserves. POLICY IMPLICATIONS These recommendations do not represent a change in current City policies. TIMELINE The effective date of the proposed rates is effective June 1,2001. ENVIRONMENTAL REVIEW The adoption of the resolution does not constitute a project under the Califomia Environmental Quality Act, therefore, no environmental assessment is required. PREPARED BY:Lucie Hirmina, Rates Manager REVIEWED BY:Girish Balachandran, Manager Supply Resources Randy Baldschun, Assistant Director of Utilities DEPARTMENT HEAD: JOHN ULRICH Director of Utilities Page 3 of 3 ORDINANCE NO. ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE BUDGET FOR THE FISCAL YEAR 2000-01 TO PROVIDE AN ADDITION~_L APPROPRIATION OF $1,577,000 FOR GAS FUND COMMODITY PURCHASE COSTS WHEREAS, pursuant to the provisions of Section 12 of Article IiI of the Charter of the City of Palo Alto, the Council on June 19, 2000 did adopt a budget for fiscal year 2000-01; and WHEREAS, the Gas uti!ity’s adopted budget for fiscal year 2000-01 is based on historically normal gas price forecasts as of December 1999; and WHEREAS, gas prices have increased more than two hundred fifty percent since the May 2000 forecast due to several factors, relating to supply and demand; and WHEREAS, the Council has adopted three previous rate increases during fiscal year 2000-01, totaling sixty-five percent or $10.3 million in gas fund revenues over the adopted budget; and WHEREAS, an estimated additional $1,577,000 beyond budget amount adjusted by these rate increases, is required for gas commodity purchases; and WHEREAS, an additional sixty~seven percent rate increase, effective June i, 2001 will generate an additional $536,000 in gas sales revenue for the remainder of fiscal .2000-01, partially offsetting increasing gas commodity costs; and WHEREAS, the Gas Fund Supply Rate Stabilization Reserve is below Council recommended guidelines and a $600,000 transfer from the Gas Fund Conservation Loan Reserve is proposed to achieve an adequate funding level for commodity purchases; and WHEREAS, City Council authorization is needed to amend the 2000-01 budget as hereinafter set forth. NOW, THEREFORE, the Council of the City of Palo Alto does ORDAIN as follows: SECTION i. The sum of One Million Five Hundred Seventy-Seven Thousand Dollars ($1,577,000) is hereby appropriated to commodity purchases expense in the Supply Resource Management Functional Area in the Gas Fund, and the Supply Rate Stabilization Reserve is correspondingly reduced. .. SECTION 2. The sum of Six Hundred Thousand Dollars ($600,000) is hereby transferred from the Gas Fund Conservation Loan Reserve to the Gas Fund Supply Rate Stabilization Reserve. SECTION 3. The transactions authorized by Section 1 and 2 will reduce the Gas Fund Supply Rate Stabilization Reserve by a net $441,000 from $2,410,051 to $1,969,051. SECTION 4. Gas Fund revenues are hereby increased by a net of Five Hundred Thirty-Six Thousand Dollars ($536,000) to reflect the rate increase. SECTION 5. As specified in Section 2.28.080(a) of the Palo Alto Municipal Code, a two-thirds vote of the City ~ouncil is required to adopt this ordinance. SECTION 6. The Council of the City of Palo Alto hereby finds that this is not a project under the California Environmental Quality Act and, therefore, no environmental impact assessment is necessary. SECTION 7. As provided in Section 2.04.350 of the Palo Alto Municipal Code, this ordinance shall become effective upon adoption. INTRODUCED AND PASSED: AYES: NOES: ABSTENTIONS: ABSENT: ATTEST:APPROVED: City Clerk Mayor APPROVED AS TO FORM:City Manager Senior Asst. City Attorney Director of Administrative Services ~ Director of Utilities City of ATTACHMENT E Budget Amendment Ordinances Impacting Utilities Rate Stabilization Reserves Approved To Date in 2000-01 UTILITY FUNDS ....-, -Piaceholders -Already in the Impact on theRevenue Net Cost 2000-01 Adopted RSR Budget Gas Fund Estimated Gas Distribution Rate Stabilization Reserve (RSR) Balance Gas Rate Increase BAO Gas Rate Increase BAO #2 Mid-Year Report $7,355,000 ($ !,700,000)($1,700,000) ($2,780,001)($2,780,001) ($560,551)($560,551) 05/15/01 Estimated Future Year IOngoing Costs] Total BAOs ($5,040,552)$0 ($5,040,552)$0 RSR Balance After BA O’s $2,314,448 Gas Fund Estimated Gas Supply Rate Stabilization Reserve (RSR) Balance Gas Rate Increase BAO #1 Gas Rate Increase BAO #2 Mid-Year Report/Gas Rate Increase BAO #3 Gas Rate Increase BAO #4 $3,832,000 ($4,567,307)($4,567~307) $2,173,358 $2,173,358 $972,000 $972,000 ($441,000)($441,000) Total BAOs $972,000 ($2,393,949)$0 ($1,862,949)$0 RSR Balance After BAO’s $1,969,051 Estimated Net Gas Fund RSR Balance¯_ ....._~:__ __ .......$4,283~499