Loading...
HomeMy WebLinkAbout2001-05-07 City CouncilCity of Palo Alto City Manager’s Report TO:HONORABLE CITY COUNCIL 4 FROM:CITY MANAGER DEPARTMENT: UTILITIES DATE: SUBJECT: MAY 7, 2001 CMR:208:01 APPROVAL OF AMENDMENT NO. 2 TO CONTRACT WITH UTILITY CONSTRUCTORS IN THE AMOUNT OF $400,000 FOR PROVIDING OVERHEAD CONSTRUCTION SERVICES AND INCIDENTAL UNDERGROUND ELECTRICAL WORK, CONTRACT NO. C9111693 RECOMMENDATION Staff recommends that Council approve and authorize the Mayor to execute the attached amendment to contract C9111693 with Utility Constructors, to increase the contract amount by $400,000 for a total contract price of $3,023,856. BACKGROUND In February 1999, the City entered into a contract with Utility Constructors in the amount of $370,832 for providing overhead construction services on the City’s overhead electric transmission and distribution system (CMR: 146:99). The contractor was asked to provide two overhead crews (four-man crew and two-man crew) to be used full time by the City’s Electric Operations Division for a period of five months, with an option to extend the term for two additional 12-month periods. The contractor services mainly include: replacement of deteriorated poles on the overhead electrical system, replacement of transformers, air switches, connectors, insulators, conductors, and other miscellaneous equipment; and overhead maintenance work required on the electric system to assure compliance with standards meeting General Order 95 guidelines. In addition, the contractor’s crews will be available to assist Electric Operations in the restoration of power during emergency and storm events. Utility Constructors was selected because of its recent experience with related projects, understanding of the scope of services to be provided, commitment of firm pricing for the entire contract period, and the foreman’s qualifications and experience. Utility Constructors CMR:208:01 Page 1 0f3 has been: working under that contract and has performed in an outstanding manner. The existing contract allows the City and Utility Constructors to extend the contract for up to two additional twelve-month periods, through July 31, 2001. In July 1999, staff issued contract Change Order No. 1 to extend the performance through July 31, 2000 and increase the contract amount by $ 876,512 for a total contract price of $1,247,344. In April 2001, the City issued Amendment No. 1 to contract (CMR: 193:00), to increase the contract amount by $100,000 for the remainder of the second twelve month period for a total contract price of $1,347,344. The additional funds were to cover the cost of an additional four-man crew to perform high priority maintenance work. Finally, in July 2000, staff issued contract Change Order No. 3 to exercise the option of final contract performance period extension, through July 31, 2001, and increase the contract amount by $1,276,512 for a total contract price of $2,623,856. DISCUSSION Due to current workload, the City has been utilizing Utility Constructors to perform more work than originally anticipated. The contractor has been asked to perform overhead and underground services to assist city crews in meeting deadlines of the different projects, including customer service connectionsand the Fiber To The Home (FTTH) project. In addition, as a result of ongoing overhead line and underground system inspection programs required by General Order 165 of the State of California, an increasing number of additional problems that could lead to safety hazards have been identified. These problems could affect the reliability of the electric system if not fixed as soon as possible. Utilities Engineering and .Operations proposes to have the contractor, Utility Constructors, perform this high priority maintenance work to maintain the safety of the overhead and underground electric system. Utility Constructors has agreed to provide an additional four-man crew to perform the additional work under the existing contract. Funding for this additional work was not included in the price of the original contract, and will require an additional $400,000 for the remainder of the contract. The attached amendment will increase the contract amount to cover additional work that will be performed by the contractor. RESOURCE IMPACT This amendment will increase the contract amount by $400,000. for the remainder of the contract final performance period through July 31, 2001. Funds for this contract are available in the fiscal year 2000-01 Electric Capital Improvement Program Budget. This action has no impact on construction work forces since it is being performed by an outside contractor. POLICY IMPLICATIONS This report does not represent any change to existing City policies. CMR:208:01 Page 2 of 3 ENVIRONMENTAL REVIEW This project is categorically exempt from California Environmental Quality Act (CEQA). ATTACHMENTS Amendment No.2 to Contract No. C9111693 PREPARED BY: DEPARTMENT HEAD: CITY MANAGER APPROVAL: %~¢fg er°’Far~j, S enl~or Power E n~i~er ~,¢ctor of Utilities E~I~~ "ItAliRISON Assistant City Manager CMR:208:01 Page 3 of 3 AMENDMENT NO. TWO TO CONTRACT NO. C9111693 BETWEEN THE CITY OF PALOALTOAND ~UTILITY CONSTRUCTORS This Amendment No.2 to Contract No. C9111693 ("Contract") is entered into , by and between the CITY OF PALO ALTO, a chartered city and a municipal corporation of the State of California ("CITY"), and UTILITY CONSTRUCTORS, a 9artnership, located at 7039 Ceres Court, Redding, California 96002 "CONTRACTOR"). RE C I TAL S: WHEREAS, the Contract was entered into between the parties for the provision of providing overhead construction services and incidental underground electrical work; and WHEREAS, the parties wish to amend the Contract; NOW, THEREFORE, in consideration of the covenants, terms, conditions, and provisions of this Amendment, the parties agree: SECTION I. Section 4 -is hereby amended to read as follows: "SECTION 4 - COMPENSATION 010423 syn 0072021 4.1 In consideration of the full performance of .the Services by CONTRACTOR, CITY will pay CONTRACTOR a total sum not to exceed Three Million Twenty-Three Thousand Eight Hundred Fifty-Six Dollars ($3,023,856) payable within thirty (30) days of submission by CONTRACTOR of its itemized billings, in. triplicate, in accordance with the .following fee schedule set forth in Exhibit ’B’ Payment of the services will be made in monthly progress payments in proportion to the quantum. of Services performed, as set forth in Exhibit ’A’." 1 SECTION 2. An amendment to the Scope of Services, Exhibi~ "A", is hereby attached. SECTION 3. Except as-herein modified, all other provisions of the Contract, including any exhibits and subsequent amendments thereto, shall remain in full force and-effect. iN WITNESS WHEREOF, the parties have by their duly authorized representatives executed this Amendment on the date first above written. ATTEST:¯ CITY OF PALO ALTO City Clerk APPROVED AS TO FORM: Mayor UTILITY CONSTRUCTORS Senior Asst. City Attorney APPROVED: By: Its: Taxpayer I.D. No. 68-0328862 Assistant City Manager Director of Utilities Acting Director of Administrative Services Purchasing/Insurance Review Attachment: ¯ EXHIBIT "A":SCOPE OF PROJECT AND TIME SCHEDULE 010423 syn 0072021 2 CERTIFICATE OF ACKNOWLEDGMENT (Civil Code § 1189) STATE OF COUNTY OF ) ) ) On notary public in and , before me, the undersigned, a for said County, personally appeared personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s)_ whose name(s) is/are subscribed to the within instrument, and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies),, and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. 010423 syn 0072021