HomeMy WebLinkAbout2001-04-30 City Council (7)City of Palo Alto
City Manager’s Report
TO:HONORABLE CITY COUNCIL
FROM:
DATE:
SUBJECT:
CITY MANAGER DEPARTMENT:CITY MANAGER
CMR: 219:0~
APRIL 30, 2001
UPDATE ON CITY COUNCIL 2000-01 PRIORITIES
This is an informational report and no Council action is required.
DISCUSSION
On November 29, 2000, the City Council reaffirmed its commitment to its top five
priorities - Joint Master Planning of City/School Facilities and Services; Infrastructure
Master Plan, Long Range Financial Planning, Zoning Ordinance Update and Traffic
Calming and Alternative Transportation - while clarifying somewhat its intent for each of
the priorities.
Staff has prepared a quarterly progress update on the priorities for internal reporting
purposes since the priorities were initially adopted in May 2000. This report will now be
provided to the City Council. Attached are the first, second and third quarter reports for
Fiscal Year 2000-01 (Attachments 1, 2 and 3).
ATTACHMENTS
Attachment 1: Third Quarter Report - Fiscal Year 2000-01
Attachment 2: Second Quarter Report - Fiscal Year 2000-01
Attachment 3: Fir.st Quarter Report - Fiscal Year 2000-01
PREPARED BY:
Emil3 Assistant City Manager
CITY MANAGER APPROVAL:
City Manager
CMR:219:0~Page 1 of 1
Ci,ty Council Priorities
Update: April 2001
ATTACHMENT 1
Joint Master Planning of City/School Facilities and Services: With the Palo
Alto Unified School District (PAUSD), develop and implement a processfor long-
range planning for facilities addressing educational and commtmity~services;
actively explore opportunities for joint use of facilities and joint provision of
services.
¯Negotiated and received City Council and School Board approval for a
Conceptual Agreement Between the City of Palo Alto and Palo Alto Unified
School District to Exchange Property (Terman and Cubberley); now
negotiating a four-party memorandum of understanding (to be presented to
Council and School Board in late May).
¯Completed Needs Assessment for City and School District Facilities and
presented to City/School Liaison Committee.
¯Completed Needs Assessment for Non-Profits in Palo Alto and transmitted to
City Council, School Board and all participating non-profit agencies.
¯Began planning for a Non-Profit Forum, to facilitate communications among
non-profits on facilities and service needs:
¯Prepared staff report to City Council which provided an update on the
discussions of the City/School Liaison Committee and requested Council input
in the prioritization of opportunities to be studied in Phase 2 of the Master
Plan.
¯Received direction from City/School Liaison Committee that joint library
services and expanded shuttle services will be the areas of focus for the
Committee; began preparing information on options and cost impacts.
Infrastructure Master Plan: Engage the community in a discussion of budget
and infrastructure priorities.. Continue implementation of the Infrastructure
Management Plan through recruiting and hiring key staff developing standards
and procedures and initiating projects.
¯Freed up additional $1 million in 2000-01 budget for Infrastructure Reserve.
¯Completed hiring of final approved infrastructure position, Senior Project
Manager in Public Works Engineering, who started March 26.
¯Significant progress on the following infrastructure projects: completed Alma
landscaping project, including Alma at West Meadow and Alma at Charleston
-1-
Q
Ci ,, Council Priorities
Update: April 2001
Road along the Caltrain tracks; completed Johnson Park lighting; held final
neighborhood meeting on Mitchell Park improvement project and finalizing
requests for bids that will be issued in June; completed design of Robles Park
improvement project, with RFB to be issued in April; completed design of
three PAUSD fields improvements projects with RFB to issued in April; began
construction on Duck Pond improvements; began design on improvements to
Byxbee Park and Harbor Point parking lots; and completed construction of
equipment washing facility at the Golf Course to prevent solid materials from
entering the Water Quality Control Plant.
¯Initiated quarterly review by staff Infrastructure Committee of all open capital
projects. In first review, identified approximately $600,000 of General Fund
projects that can be closed or disencumbered.
¯Completed 5 Community Dialogues (Juana Briones School, January 17; Art
Center, January 27; Mitchell Park, February 10;. Lucie Stem, February 21;
Service Clubs, January 24), and 5 Family Room Dialogues, as well as a City
staff Dialogue, to discuss the City’s budget and infrastructure priorities with
members of the Palo Alto community.
¯Worked with Midpeninsula Access Corporation to prepare a video on the
Community Room and Family Room Dialogues; scheduled meetings with
service groups and other business organizations to report back on results of the
Dialogues.
¯Developed two-year $14 million Capital Improvement Program (CIP) for
2001-03 (dramatically increasing previous CIP effort).
¯Developed "$22 Million Solution" to fully fund Infrastructure Management
Plan over 10-year period.
Zoning Ordinance Update." Complete work plan for Zoning Ordinance update by
the end of FY 00-01; review and receive approval from the Council and initiate
public input process in FY 01-02.
Created "CityWorks" brand for all non-utility infrastructure projects.
Phase I (Issues Identification) of the ZOU program was completed in
December of last year. Due to scheduling difficulties, the planned City
Council study session was not held. Instead, on March 5, staff prepared an
informational report to the Council outlining the major issues and transmitting
the summary list of issues, zoning library catalog information and a "white
paper" on issues and consideration. The informational report also outlined the
next steps for the update effort including an analysis of ordinance techniques
-2-
t
Ci , Council Priorities
Update: April 2001
and formats, history of major policy issues addressed in the last comprehensive
update (1978) and amendments since, and an analysis of use classifications and
districts.
¯Study session with the Planning and Transportation Commission scheduled for
May 30th, to be followed by a Council study session or informational report.
¯Council and Commission Members invited to class on "Designing and
Implementing Effective Zoning Ordinances" taught by Paul Crawford, a land-
use consultant (and former San Luis Obispo planning director) who specializes
in comprehensive zoning ordinance updates.
¯Per City Manager’s request, staff is prioritizing the "top ten!’ zoning ordinance
update issues.
¯Completed process to devise R-1 Single Family Review Guidelines (to be
presented to Council in June).
¯Engaged residents, merchants and property owners in issue of preserving
neighborhood-serving retail; interim ordinance now in place for Charleston and
Midtown.
¯Secured Council direction to seek and acquire land for affordable housing.
Traffic Calming and Alternative Transportation: Identify options for achieving
traffic calming in residential neighborhoods and on key arterials in the city.
Institute driver education and awareness programs. Vigorously pursue
opportunities for alternative transportation including a citywide shuttle.
¯Neighborhood Traffic CalmingProgram: The City Council approved the
program on April 9, 2001, to implement the $100,000 that was budgeted for
FY 200-2001. This program is for ".spot" traffic calming projects (i.e.,
involving just one or a few streets and smaller amounts of funding). To date,
the Transportation Division has received approximately six requests for traffic
calming, some of which were received several months ago. Ranking and
qualifying data has been obtained for about half of these requests. Within
about two weeks, Transportation will have the necessary data for the remainder
of the requests, at which time they canbe qualified and ranked and the process
for the first project can begin. The application of the Program to larger areas,
including entire neighborhoods, awaits further review by the Finance
Committee.
¯Embarcadero Road Traffic Calming Project: On April 9, 2001, staff
recommended to Council to defer this project indefinitely due to financial and
staff resource considerations. In the meantime, staff is pursuing operational
-3-
Ci,ty Council Priorities
Update: April 2001
improvements, including, but not limited to, (1) sychronization of the traffic
signals at 25 mph, (2) monitoring and enforcement of vehicle speeds using,’
primarily, motorcycle officers, (3) deployment of the speed trailer once every
two weeks, (4) completion of engineering and traffic surveys to determine if
the existing posted speed limit of 25 mph is consistent with the California
Vehicle Code and Caltrans requirements (to allow Police to use radar for speed
enforcement), (5) enforcement of red light, right-of-way, bicycle, and
pedestrian violations, and (6) encouraging Stanford University and other
employers using this corridor to use transit, ridesharing and other commute
options.
Traffic Signal Synchronization: Currently staff is converting the traffic signal
timing data to a format suitable for input in the computer for synchronization
and working toward completing the engineering and traffic surveys. Staff
anticipates that this work will be completed by the end of June. Additionally,
the Transportation Division staff, through the Commute Coordinator’s
program, will begin working with Stanford University and other employers in
the near future.
Trial Roundabout: Staff has solicited nominations from Palo Alto
neighborhood associations for a six-month roundabout trial. Two.
neighborhoods submitted nominations for the trial. The Midtown
Neighborhood Association submitted two locations-~-Loma Verde/Cowper and
Louis/Colorado, and the College Terrace Neighborhood Association submitted
one location--Stanford/Bowdoin. Over the next few months, staff will evaluate
the three locations, meet with the neighborhood associations, conduct
neighborhood meetings, and return to Council in the fall for approval of a
preferred location.
Public Education: The "Share Our Streets, As If" is a Traffic Safety Education
and Outreach program that is funded by the Office of Traffic Safety. The grant
for $79,000 (Transportation Division) has funded an educational campaign that
started in October of 2000. The program is in tandem with a grant that the Palo
Alto Police Department received to purchase additional motorcycles and radar
devices for the Traffic team. PD and Transportation have been working
together with a local graphic design firm (Jacobs Fulton Design Group) to
target all street users. The campaign includes posters, advertising, public
outreach and information. All,the design work has been done pro bono by
Jacobs Fulton Design Group and the advertisements running in the Weekly are.
sponsored by the Palo Alto Weekly. Grant funds have been used for printed
materials, reflective bands, production of two 3’ X 40’ banners and for
-4-
Ci,ty Council Priorities
Update: April 2001
disposable cameras used to take photos of the street environment. The
campaign will also include work with two PAUSD elementary schools using
the disposable cameras in an art project focused on traffic safety.
¯Downtown North Traffic Calming: The Council approved the Downtown
North project at its February 5, 2001 meeting, including a six-month trial of the
"Recommended Preferred Option," intersection improvements at Lytton/Alma
and Lytton/Middlefield, and a new Lytton Neighborhood traffic calming study
to be started with the installation of the Downtown North trial. Implementation
of these projects is. on hold indefinitely until a source of funding can be
identified.
¯Now finalizing Intermodal Transit Center and seeking grant funding for
engineering.
Long Range Financial Plan Update: Identify resources to address the current
funding gap for existing infrastructure. Make recommendations and receive
Council approval for a financing plan for new infrastructure. Analyze and make
recommendations regarding revenue opportunities including fees, and new or
extended taxes. Identify options for funding rehabilitation of the existing storm
drainage system. Complete implementation of financing plans for Council-
approved initiatives, including the downtown parking assessment district.
¯Development Impact Fees - a nexus study is being conducted.
¯Federal and State Grants - an aggressive grants procurement policy has been
initiated.
¯Redevelopment Funding - staff is investigating the advantages of establishing
a redevelopment agency and will be reporting to Council information on
creating a Redevelopment Project Area.
¯Business License Tax - staff is in the process of developing altemative forms
of a Business License Tax to propose to Council (to be discussed with Finance
Committee by June 30, 2001).
¯Transient Occupancy Tax (TOT) - staff will be discussing a proposal to
increase TOT when we do further infrastructure-related outreach to the
community in Fall 2001.
-5-
City Council Priorities
Update: January 2001
ATTACHMENT 2
Joint Master Planning of City/School Facilities and Services: With the Palo
Alto Unified School District (PAUSD), develop and implement a process for long-
range planning for facilities addressing educational and community services;
actively explore opportunities for joint use of facilities.
¯Continued work with City/School Advisory Committee to scope the planning
effort. As a result, have added opportunities for joint provision of services to
the contemplated scope for the Master Plan process.
¯Received City/School Advisory Committee approval of Proposed Criteria to
Guide Evaluation of Joint Facilities and Services Opportunities.
¯Prepared and distributed surveys on facilities and services to City and School
District staff as well as users.
¯Prepared and distributed inventory survey of current and projected services and
facilities needs of non-profits in the community.
o Infrastructure Master Plan.’ Continue implementation of the Infrastructure
.Management Plan through recruiting and hiring key staff, developing standards
and procedures and initiating first year projects.-
Completed Proposed 2001-03 General Fund Capital Improvement Program
proposal for infrastructure and received approval from City Manager and
Executive Staff.
Completed hiring of all but one of the approved infrastructure positions in
Community Services,. Public Works Facilities Management and Public Works
Engineering. After a lengthy recruitment process for Senior Project Manager
in Engineering, a key position for facilitating major infrastructure projects, the
candidate selected did not accept the City’s offer, citing commute and housing
costs as the primary reasons. A new recruitment process has been started. The
new Engineer in Facilities started on January 29, and will take some time to
become familiar with City processes and the infrastructure program.
-1-
o
City Council Priorities
Update: January 2001
Zoning Ordinance Update: Complete work plan for Zoning Ordinance update by
the end of FY 00-01; review and receive approval from the Council and initiate
public input process in FY 01-02.
¯Residential and commercial/industrial focus groups held in early December.
The residential group provided input on the physical transitions between
multiple family uses and single-family uses and between commercial and
single-family uses. The commercial/industrial group provided information
about parking ratios and commercial development standards. Both groups were
very concerned about the inability to design and build mixed-use,
residential/commercial, projects and said that the development regulations
regarding mixed-use projects were some of the most important ones to change.
¯"White paper" on the use of zoning codes nation-wide and the relationship
between the Zoning Ordinance, Comprehensive Plan and other policy
documents prepared. The paper is available through the Planning Division.
¯Study session with the Planning and Transportation Commission held on
December 13th. A study session with the City Council is tentatively scheduled
for April 2001.
¯As a result of the extensive community outreach and in-house staff meetings,
about 400 issues identified that are in need of updating. Planning staff is now
in the process of categorizing and organizing those issues and developing a
system for tracking the code sections that will change as a result of addressing
the issues. Planning staff is also continuing to obtain copies of zoning
ordinances from other jurisdictions to review the formats used.
Traffic Calming and Alternative Transportation: Implement residential traffic
calming by developing and receiving approval for a prioritization system and
completing the first year ($100, 000) of projects.
¯Solicited Neighborhood Associations. for a nomination of a trial modem
roundabout for traffic calming on two residential streets. The deadline for
receipt of nominations is March 2, 2001.
¯Prepared staff report and revised neighborhood traffic calming, as
recommended by the Planning and Transportation Commission, for Council
consideration.
-2-
City Council Priorities
Update: January 2001
Presented Downtown North Traffic Calming plan, as recommended by the
Planning and Transportation Commission for initial Council review in
December.
Long Ra.nge Financial-Plan Update: Complete the Long Range Financial Plan
by 1) identifying the remainder of the financing required for the Infrastructure
Management Plan; 2) making recommendations and receiving Council approval
for a financing plan for new infrastructure; and 3) completing implementation of
financing plans for Council-approved initiatives, including the storm drainage fee
increase, downtown maintenance district and parking assessment district.
¯Reside~nt survey placed on hold until the Community Dialogues are completed.
¯Began process for implementing Development Impact Fees.
¯Worked with the City Attorney on reviewing the Utility Uses Tax ordinance to
determine methods to increase revenue; once the Community Dialogues are
completed, will begin to work on the process for increasing the TOT
¯Given Council’s preliminary approval for the Downtown parking structures,
moving forward with the mail-in ballot process.
¯Working on the preliminary.plan for adoption of a Redevelopment Agency.
-3-
ATTACHMENT 3
City of Palo Alto
CITY COUNCIL PRIORITIES UPDATE
September 2000
Long Range Financial Plan Update: Complete the Long Range Financial Plan by
1) identifying the remainder of the financing required for the Infrastructure
Management Plan; 2) making recommendations and receiving Council approval
for a financing plan for new infrastructure; and 3) completing implementation of
financing plans for Council-approved initiatives, including the storm drainage fee
.increase, downtown maintenance district and parking assessment district.
Plan reviewed by Finance Committee in June 2000; staff was directed to:
v" Conduct voter survey to determine resident preference and sensitivity to
cost.
v" Move forward with major funding objectives.
" Pursue a TOT increase of 2%.
v" Extend the Utility Users Tax to interstate and international phone calls.
v" Update Utility Tax Ordinance to include appropriated forms of
telecommunications not included in the current ordinance.
"Return with final recommendations on financing options after voter survey
is completed.
¯Hired public education consultant to assist in analysis of survey results
¯Survey firm is on-bOard and in final stages of completing draft survey
questions
Joint Master Planning of City/School Facilities: With the Palo Alto Unified School
District, develop and implement a process for long-range planning for facilities
addressing educational and community services; actively explore opportunities
for joint use of facilities.
¯Formed Steering Committee with representatives from City staff (City
Manager’s Office and Community Services), PAUSD and Stanford.
)
Prepared and issued Request for Proposals for consultant.
Selected Parsons Brinkerhoff as consultant.
¯In the process of re-evaluating scope of services for consultant in light of
developments with Terman/JCC.
Zoning Ordinance Update: Complete work plan for Zoning Ordinance update by
the end of FY 00-01; review and receive approval from the council and initiate
¯ public input process in FY 01-02.
¯City Council Study Session.- Sept. 18
¯Staff currently compiling list of issues, basic Comprehensive Plan
Comments from Planning Commission (PC), Architectural Review Board
(ARB), and Historic Resources Board (HRB)
v" PC - enthusiastically support the project and "oversight" role
v" HRB - issue of transfer of Title 16 to Title 18 (Zoning Ordinance)
v" ARB - several issues including supporting "sustainable city", transfer of
Sign Ordinance to Zoning Ordinance
Community Meetings - identify Issues, "kick-off’ and community information,
advertised in PA Daily and Weekly, mailing to community and professional
organizations, press release
v" Tuesday, Sept. 19th @ tChUbberley Community Center, 7 p.m.v" Monday, September 25 @ City Hall., 7 p.m.
v" Wednesday,.October 4~h @ Juana Briones school, 7 p.m.
¯Web Page - Zoning Ordinance Update - featured site, will be updated, on a
regular basis through the "life of the project"
¯E-mail address: zoneupdate@city.palo-alto.ca.us, staff will be reviewing
regularly, respond if request for staff contact
Combined CC and PC study session on issues identification and identification
of specific modules for review (i.e.i order and composition of components for
review such as land use characterization, development standards) anticipated
in January.
Infrastructure Master Plan: Continue implementation of the Infrastructure
Management Plan through recruiting and hiring key staff, developing standards
and procedures and initiating first year projects.
A team of City managers representing allCity departments has held 3
meetings to identify and begin prioritizing the City’s existing and new
infrastructure needs.
¯A comprehensive list of City infrastructure needs and costs has been
collected and is being finalized.
Of the 6.5 FTE approved by Council for the existing infrastructure program,
1.5 positions have been filled and interviews for the remaining positions will
be completed by the end of September.
The team is ready to begin the prioritization process and has scheduled
weekly meetings in order to develop recommendations and meet the City’s
budget schedule.
Administrative Services has agreed to work with former Assistant Director
Melissa Cavallo on a contract basis, to take the lead on recommended
improvements to the contract/procurement process.
Residential Traffic Calming: Implement residential traffic calming by developing
and receiving approval for a pdoritization system and completing the first year
($100, 000). of projects.
The Neighborhood Traffic Calming Program will address single street "low-
impact" traffic calming measures and neighborhood-wide traffic calming
studies and projects. Guidelines will be reviewed by the Planning and
Transportation Commission on September 27, 2000.
¯The proposed Downtown North traffic calming plan will be discussed by the
Planning and Transportation Commission on October 11, 2000.
The City has undertaken a Residential Arterial Traffic Calming Program,
beginning with an extensive study of ways and means of slowing cars speeds
on Embarcadero Roads without shifting traffic into adjacent neighborhoods.
The Planning and Transportation Commission on November 8, 2000 will
discuss the Embarcadero Road traffic calming plan, The Residential Artedal
Traffic Calming Program will be extended to eventually include Middlefield,
Charleston, Arastradero, and University Avenue.
The City has undertaken, with -funding from the California Office of Traffic
Safety, development of a traffic safety education campaign. This initiative,
managed by the Transportation Division, will disseminate safe driving
messages to motorists, including the importance of "sharing the road" and of
responsible driving behavior.