HomeMy WebLinkAboutStaff Report 3663City of Palo Alto (ID # 3663)
City Council Staff Report
Report Type: Consent Calendar Meeting Date: 4/1/2013
City of Palo Alto Page 1
Council Priority: Emergency Preparedness
Summary Title: Resolution Authorizing Grant Application for a Flood Warning
System
Title: Approval of a Resolution Authorizing the City Manager to Submit a
Grant Application to the California Department of Water Resources for an
Enhanced Regional Flood Warning System for the San Francisquito Creek
Watershed
From: City Manager
Lead Department: Public Works
Recommendation and Draft Motion
Draft Motion: I move that the Council approve the attached resolution
(Attachment A) authorizing the City Manager to submit a grant application to the
California Department of Water Resources for an enhanced regional flood
warning system for the San Francisquito Creek watershed.
Background
San Francisquito Creek poses the largest flooding threat to residents and
businesses in Palo Alto. The City monitors a network of rainfall and stream flow
gauges in the San Francisquito Creek watershed during winter storms in an effort
to identify potential flood events and provide advance warning to the public.
Some of the gauges are maintained by the City, while others are the responsibility
of other agencies. Information from these gauges is posted to the City’s Creek
Monitor web page to inform the public of current conditions and is used by
emergency managers to assess the likelihood of stream flooding.
City of Palo Alto Page 2
On December 23, 2012, a large storm dropped 2.75 inches of rainfall on the
saturated upper slopes of the San Francisquito Creek watershed. The
combination of the intense rainfall and the saturated ground conditions resulted
in a peak flow of 5,400 cubic feet per second in the creek, the third highest
recorded stream flow rate since 1930 (Attachment B). The high flows caused
stream overbanking at multiple locations into East Palo Alto and onto Highway
101 and near-overtopping at the Pope/Chaucer Street bridge. During post-event
internal and inter-agency reviews of the storm emergency response, it was noted
that the ability to effectively predict creek flooding is significantly hindered by the
scarcity of rainfall and stream flow data from the upper watershed. Current
problems include the ability to remotely monitor only one real-time rain gauge in
the watershed (in addition, the rainfall gauge is at the edge of the watershed, in a
sub-watershed that contributes only 14% of the flow to San Francisquito Creek)
and a stream flow gauge that transmits data only once every 15 minutes. There
was general agreement that a more robust, coordinated network of rainfall and
stream gauges would improve flood prediction capabilities.
Discussion
Staff at the San Francisquito Creek Joint Powers Authority (JPA) has identified a
grant program sponsored by the California Department of Water Resources that
could provide financial resources to help improve the rain and stream flow
instrumentation in the San Francisquito Creek watershed. The grant program,
funded with monies from State Proposition 84, is designed to assist local agencies
with implementation of flood emergency planning, preparedness, and response
activities. One of the activities specifically listed as being eligible for grant funding
is the “collecting and exchanging of flood information (static as well as real-time
information) and integrating information into a common operational picture”.
JPA staff have agreed to prepare a grant application and manage the coordinated
effort to implement an enhanced regional flood warning system for the San
Francisquito Creek watershed. The JPA would coordinate with staff from other
JPA member agencies, including the City of Palo Alto, during the development of
the system in order to ensure maximum functionality and accessibility of the data
for emergency response agencies throughout the watershed. If the grant
application is approved, the funds will be used to 1)purchase and install new
rainfall and stream flow gauges at strategic locations in the upper watershed;and
City of Palo Alto Page 3
2)pay for a consultant to assist with the selection of and installation of
rainfall/stream flow monitoring equipment, integration of existing and new
equipment into a unified monitoring system, and design of a robust
communications system that will optimize the availability of the rainfall and
stream flow data to emergency responders and the general public. The attached
map shows the potential new monitoring points along with the existing rainfall
and stream gauge locations (Attachment C).
Although the JPA will take a lead role in developing the grant application and
managing the implementation of the enhanced flood warning system, they have
asked the City to serve as the official applicant because the grant program
requires that the applicant be a public agency with primary responsibility for flood
emergency response. Approval of the attached resolution will authorize the City
Manager to sign and submit the grant application prepared by the JPA. If the
grant is approved, the City would be expected to provide upfront project funding,
with subsequent reimbursement from the State. The grant program does not
require the commitment of any local matching funds. Public Works staff will work
cooperatively with JPA staff and other JPA member agency staff to implement the
enhanced flood warning system if the grant is awarded.
Timeline
The grant application will be submitted to the California Department of Water
Resources prior to the grant program’s deadline of April 5, 2013. The JPA will
endeavor to have the enhanced flood warning system in place prior to the 2013-
14 winter storm season.
Resource Impact
If the grant is approved, the City would be expected to provide upfront project
funding, with subsequent reimbursement from the State. Staff would return to
Council for authorization of the upfront funding following approval of the grant.
Staff will contribute staff time towards the review and implementation of the
planned improvements.
City of Palo Alto Page 4
Policy Implications
Submittal of a grant application for an enhanced regional flood warning system is
consistent with Comprehensive Plan Policy N-55: “Minimize exposure to all
hazards through emergency management planning”.
Environmental Review
Submittal of a grant application is not a project under the provisions of the
California Environmental Quality Act (CEQA).
Attachments:
·A -Resolution (PDF)
·B -Historic San Francisquito Creek Stream Flow Rates (PDF)
·C -Map of Existing and Proposed Rainfall and Stream Flow Gages in San Francisquito
Creek Watershed (PDF)
NOT YET APPROVED
1
130322 jb 0131059
Resolution No. ______
Resolution of the Council of the City of Palo Alto Authorizing a Grant
Application to the State of California Department of Water Resources For
an Enhanced Regional Flood Warning System for the San Francisquito
Creek Watershed
R E C I T A L S
A. The City of Palo Alto, in cooperation with the San Francisquito Creek
Joint Powers Authority (JPA) and it member agencies, proposes to design and
implement an enhanced flood warning system for the San Francisquito Creek
Watershed; and
B. The City of Palo Alto intends to apply for grant funding from the
California Department of Water Resources for the project costs.
The Council of the City of Palo Alto RESOLVES as follows:
SECTION 1: That pursuant and subject to all of the terms and provisions of
the California Proposition 84 “Water Quality, Safety and Supply, Flood Control, Natural
Resource Protection, Park Improvements” Bond Law, and SB XX 1, application by this
Agency be made to the California Department of Water Resources to obtain a grant for
the Enhanced Regional Flood Warning System for the San Francisquito Creek
Watershed.
SECTION 2: The City Manager or his designee is hereby authorized and
directed to prepare the necessary data, make investigations, sign, and file such
//
//
//
//
//
//
//
//
NOT YET APPROVED
2
130322 jb 0131059
application with the California Department of Water Resources, and take such other
actions as necessary or appropriate to obtain the grant funding.
INTRODUCED AND PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
__________________________ _____________________________
City Clerk Mayor
APPROVED AS TO FORM: APPROVED:
___________________________ _____________________________
Senior Asst. City Attorney City Manager
_____________________________
Director of Public Works
_____________________________
Director of Administrative
Services
HISTORIC PEAK STREAMFLOW RATES
SAN FRANCISQUITO CREEK AT USGS GAGE
(LOCATED NEAR JUNIPERO SERRA BLVD)
1930 - 1941; 1950 - 2012
DATE PEAK FLOW
RATE (CFS)
1. FEBRUARY 3, 1998 7200
2. DECEMBER 22, 1955 5560
3. DECEMBER 23, 2012 5400
4. JANUARY 4, 1982 5220
5. DECEMBER 31, 2005 4840
6. APRIL 2, 1958 4460
7. JANUARY 21, 1967 4000
8. FEBRUARY 13, 2000 3930
9. FEBRUARY 16, 1982 3760
10. DECEMBER 16, 2002 3660
11. NOVEMBER 18, 1950 3650
12. FEBRUARY 17, 1986 3480
13. JANUARY 26, 1983 3420
14. APRIL 1, 1974 3410
15. JANUARY 16, 1973 3390
16. JANUARY 24, 1983 3340
17. JANUARY 9, 1995 3320
18. JANUARY 13, 1980 3300
19. JANUARY 31, 1963 3270
20. JANUARY 2, 1997 3250
SOURCE: USGS WEBSITE
R
R
R
R
USGS flow gauge
Existing City of Palo Alto
rain gauge
R
Existing SFCJPA
rain gauge
Stanford flow
gauge
Stanford
flow gauge
Proposed new rain gauges