HomeMy WebLinkAbout2002-10-21 City Council (18)City of Palo Alto Manager’s Repor TO:HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES DATE:" SUBJECT: OCTOBER 21, 2002 CMR: 413:02 IMPLEMENT UTILITY RISK MANAGEMENT SUPPORT RECOMMENDATION To implement a Utility Risk Management Program, staff recommends that: Council adopt the attached Budget Amendment Ordinance and Resolution creating a Manager, Energy Risk position in the City’s Table of Organization and Employee Classification System. 2.Council direct staff to simultaneously pursue recruitment of a staff Manager, Energy Risk and contractual risk management services. BACKGROUND ., With deregulation of California’s energy markets in 1996, the City of Palo Alto began to develop an energy risk management program. Energy risk management can be defined as reducing the possibility of higher energy costs and higher rates to customers by assessing and addressing such issues as: Price Risk - energy prices will dramatically rise or fall resulting in higher costs and rates Credit Risk - energy suppliers that experience financial problemg may not be able to fulfill their supply commitments, exposing the City to market forces and potentially higher costs Administrative risk - a staff member completes an energy transaction outside established procedures that impacts the value of the Cit~?s energy portfolio The goals of energy risk management activities are to balance the business objectives of (1) providing stable gas and electric rates to end users, (2) preserving a supply cost advantage through obtaining the best available price, and (3) managing business processes to allow CPAU to work efficiently and cost effectively. To achieve these CMR:413:02 Page 1 of 6 processes to allow CPAU to work efficiently and cost effectively. To achieve these objectives, the City’s risk management program has undekg0ne considerable evolution since it began in 1997. A Risk Oversight Committee (ROC) was formed in 1998 by the City Manager. The Committee consists of the Assistant City Manager, the Directors of Utilities and Administrative Services, and the City Attorney’s and Auditor’s Offices acting as advisors. The ROC, which meets twice per month, is responsible for developing, approving and recommending the policies and guidelines driving the risk management function. To assist, with this effort, the firm of Deloitte and Touche (D&T) was hired in 1999 to provide the expertise and experience necessary to establish an effective risk management program. While the City had interim risk management policies and staff performing risk functions in 1999, D&T was charged to review and to recommend industry best practices for the City’s risk control infrastructure, policies and procedures, and credit evaluation techniques. One of D&T’s chief~recommendations was to separate or segregate risk management duties into three independent functions: a front, middle and back office. The primary goal of this recommendationis to create a system of checks and balances whereby staff who are executing transactions with supp!~ers (front office) are being monitored (middle office) for conformance with City pol~icies, procedures, and credit guidelines so as to prevent the City from being exposed to undue trading risks. The back office would track and process transactions, account for :and track bills, and issue payments among other duties. This recommendation .was~reinforced by the City Auditor’s recent "Assessment of Utility Risk Management Procedures" (Assessment), which was presented to the Utilities Advisory Commission (UAC) on July 10, 2002 and the Finance Committee (FC) on July 16, 2002. In this Assessment, recommendation 13 stated "the ROC...should segregate and clearly detail the roles, responsibilities and .authorities for the front, middle, and back office personnel. Recommendation 14 affirmed that "the Cityl should go forward with establishing a formal middle office function. The middle office,, once established, should report to the Director of Administrative Services." The Auditor further stated, "City of Palo Alto Utilities (CPAU) and Administrative Services Department (ASD) representatives plan to propose creation of a utilities risk management position in ASD to coordinate oversight and reporting functions. We support this recommendation." The City had additional recommendations (18 and 19) that outlined the responsibilities of the middle office. The FC unanimously approved all of the city Auditor’s recommendations and staff has developed a strategy to respond to those on the Middle Office. CMR:413:02 Page 2 of 6 DISCUSSION A linchpin to the success of a Risk Management Program is.to have a risk manager who will perform the middle office function. This person’s duties~include, for example: Evaluating financial impact and risk exposure of new transactions Monitoring trading activities to ensure compliance with policies and procedures Evaluating and managing credit risk exposure: with current and potential counter parties Monitoring and reporting on market conditions.relative to risk management and risks for energy portfolios and individuai’t?ansactions Ensuring appropriate data management, validation and testing within risk management system. The knowledge, skills and experience required of this position are substantial. The person must have energy trading ~ind/or financial risk management expertise and. have excellent financial, analytical, and economic skills. The risk manager must be proficient in statistical analysis, modeling and forecasting and be able to assimilate and conceptualize data quickly. In addition, solid interpersonal and communication skills are required. The risk manager must exercise good judgment, be’g:l(ader, and be able to deal with uncertainty and potential disagreements. The risk manager will act as staff to the ROC and will be expected to make presentations to the UAC and Council. Because of the considerable skills and expertise required of this position, staff recommends moving along two alternative paths simultane0usly. These consist of: 1) explore hiring, a permanent, full-time staff person, and 2):explore hiring a contract risk manager or contracting with a firm that offers a risk management program and on-site staffing. The rationale for pursuing two paths is that finding~ and hiring a regular staff risk manager may be unusually challenging. Since the g0al~is to have this expertise as soon as possible, staff wants an option in place to hire contractual risk management services, should the City be unable to hire a staff person. Staff’s preference is to have an in-house risk manager who is directly responsible to senior management and becomes an integral part of the City’s culture and environment. For this strategic position, an employee whose performance is. tied to salary and benefit incentives is, in staff’s opinion, optimal. Because of upheaval in the energy industry and the collapse and near collapse of energy companies, there i may be a window of opportunity to hire a staff risk manager. In a sample of thr(e California cities, public sector risk manager annual salaries range from $85,000 t0 $125,000. Those in the private, financial sector can range up to $400,000. ~ CMR:413:02 Page 3 of 6 Staff is realistic, however, about the potential difficulties in recruiting a risk manager. In addition to a limited pool of individuals who have the required expertise, staff anticipates obstacles such as: a reluctance of private sector employees .to move to the public sector; relocation to an area with high housing and other costs; limited opportunities for advancement; a relatively small and straightforward energy portfolio to manage; and remuneration based on public sector pay scales. It may be necessary, therefore, to enter into a contractual relationship with an individual risk manager or with a firm providing these services. Estimated costs for contractual support range from $235,000 to $260,000 annually. In order to pursue these paths simultaneously, staff recommends reclassifying a 1.0 FTE Utilities position to a 1.0 FTE Risk Manager position and transferring the position from the Electric, Gas and Electric Funds to the Administrative Services Department in the General Fund. This transfer follows the recommendation of the City Auditor to clearly segregate the functions of the front and middle offices and t0 have an effective system of checks and balances. The Utilities department, however, will continue to fund the risk manager position. The attached.Budget Amendment Ordinance (BAO) changes the 2002-03 Adopted Budget and the City’s Table of Organizati~n’to reflect this change. In addition, Council must adopt the attached resolution that ~adds the new position to the City’s employee classification system. With Council’s:,.adoption of the BAO and resolution, staff can begin the recruitment process. At the same time staff is recruiting a staff risk manager, it will send out a Request For Proposal for contractual risk management services. A D&T’~staff.member currently is assisting staff and Human Resources in identifying individuals and firms that may offer the desired services. Should the search for a staff risk manager: be unsuccessful, staff will return to Council with a report on its efforts to obtain contractual services. RESOURCE IMPACT The resource, impact of implementing the risk management program depends on the outcome of the search. Estimates for each option are as follows: Option 1: Hiring a staff Risk Manager Salary and benefits for this position are estimated at around $127,000 and $46,000, respectively. Since an existing position will be reclassified to the new position and is incorporated in the budget, the incremental cost to the City is approximately $41,000. Option 2: Contracting with a Risk Mana.~er or a Risk Management Company Estimated costs range from $235,000 to $260,000. ,~ POLICY IMPLICATIONS As stated, the City Auditor, the ROC, and Deloitte and Touche recommend procuring risk management services as a means to strengthening the City’s current program. Hiring a CMR:413:02 Page 4 of 6 Risk Manager is consistent with the final Risk Management Policies recommended by the UAC and the FC and to be reviewed by the Council on October 21, 2002. The energy risk program also is consistent with the Council approved Utilities Strategic Plan and Key Strategies: Strategy 2: "Preserve a supply cost advantage compared to the market price" and a tactic supporting that strategy is "Manage exposure to en,ergy commodity price risk." Strategy 3" "Streamline and manage business processes to allow CPAU to work ’ efficiently and cost-effectively." NEXT STEPS Once Council approves the Energy Risk Management Policies, the ROC will finalize and approve Energy Risk Management Guidelines that support and implement the Policies. The next step is for the front, middle and back office to develop detailed procedures, which will guide the day-to-day activities of each office in conformance with approved City risk management policies and guidelines. The risk manager (staff person or by contract) will be a key resource in developing final procedures for the middle office. TIMELINE October Council approves Risk Management Policies and directs staff to pursue risk management services November/December Staff conducts search for a risk manager January/February Risk manager services are procured ENVIRONMENTAL ASSESSMENT Approval of this position change does not constitute a project under the California Environmental Quality Act and, therefore, is exempt from the environmental assessment requirement. ATTACHMENTS Attachment 1:Ordinance of the Council of the City of Palo Alto Amending the Budget for the Fiscal Year 2002-03 Adding 1.0 Full-Time Equivalent Manager, Engergy Risk Position in the Administrative Services Department for the Utilities Risk Management Program and Dropping 1.0 Full-Time Equivalent Manager, Competitive Assessment in the Utilities Department :. ~ " CMR:413:02 Page 5 of 6 Attachment 2:Resolution of the Council of the City Of Palo Alto Amending the Compensation Plan for Management and Confidential Personnel and Council Appointed Officers Adopted by Resolution No. to Delete the Classification of Manager, Competitive Assessment, and Add the Classification of Manager, Energy Risk PREPARED BY: ~i~ut~y~D~ ~Administrative Services DEPARTMENT HEAD APPROVAL: Q___~~~, . _ CARL YEATS// Director, Adr~nistrative Services DEPARTMENT HEAD APPROVAL: CITY MANAGER APPROVAL: FRANK BENEST City Manager CMR:413:02 Page 6 of 6 ATTACHMENT 1 ORDINANCE NO.. ORDINANCE OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE BUDGET FOR THE FISCAL YEAR 2002-03 ADDING 1.0 FULL-TIME EQUIVALENT MANAGER, ENERGY RISK POSITION IN THE ADMINISTRATIVE SERVICES DEPARTMENT FOR THE UTILITIES RISK MANAGEMENT PROGRAM AND DROPPING 1.0 FULL-TIME EQUIVALENT MANAGER,COMPETITIVE ASSESSMENT IN THE UTILITIES DEPARTMENT WHEREAS, pursuant to the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Council on June 17, 2002 did adopt a budget for fiscal year 2002-03; and WHEREAS, the Utilities Department has developed a risk management program for its energy supply portfolio operations; and WHEREAS, the Risk Management Program requires the creation of a Middle Office function and the Consultant (Delloitte & Touche) and the City Auditor (City Auditor Report 02-R-13, July 2002) recommend that the function be under the direction of the Administrative Services Department Director instead of the Utilities Department Director; and WHEREAS, to ensure the success of the Risk Management Program, there is a need to add a full-time Manager, Energy Risk to oversee the Middle Office function in the Administrative Services Department; and WHEREAS, partial funding for this position will be provided from the 2002-03 Adopted Utilities Department’s operating budget by dropping a full-time Manager, Competitive Assessment and effecting an operating transfer to the General Fund to fund this position; and WHEREAS, an additional appropriation of funds from the Gas Supply and Electric Supply Rate Stabilization Reserve will be partially offset by savings in the Gas Distribution, Electric DistributiOn and Water Rate Stabilization Reserve resulting in additional future year ongoing expense of approximately $40,889; and WHEREAS, six months of funding for this additional position must be included as a part of the 2002-03 Adjusted. Budget and will be incorporated as an additional component to the General Fund cost plan reimbursement from the Utilities DePartment;,and WHEREAS, City Council authorization is needed to amend the Table of Organization in the 2002-03 budget as hereinafter set forth. NOW, THEREFORE, the Counci! of the City of Palo Alto does ORDAIN as follows: SECTION 1. The Table of Organization as amended to reflect changes shown in the attached Exhibit A is hereby approved. SECTION 2. The sum of Eighty Six Thousand Three Hundred ($86,300) is hereby appropriated to the Administrative Services Department to hire and provide benefits for one full-time Manager, Energy Risk, and is offset by reimbursement revenue from the Utilities Department. SECTION 3. This transaction has no impact on the General Fund Budget Stabilization Reserve. SECTION 4. As specified in Section 2.28.080(b) of the Palo Alto Municipal Code, a majority vote of the City Council is required to adopt this ordinance. SECTION 5. The Council of the City of Palo Alto hereby finds that this is not a.project under the California Environmental Quality Act and, therefore, no environmental impact assessment is necessary. SECTION 6. As provided in Section 2.04.350 of the Palo Alto Municipal Code, this ordinance shall become effective upon adoption. INTRODUCED AND PASSED: AYES: NOES: ABSTENTIONS: ABSENT: ATTEST:APPROVED: City Clerk Mayor APPROVED AS TO FORM: Senior Asst. City Attorney City Manager Director of Services Administrative Director of Utilities Exhibit A 2002-03 TABLE OF ORGANIZAT ON AS AMENDED CONTINUED Manager, Information Technology Manager, Accounting Manager, Budget Manager, Purchasin~ & Contract Administration Manager, Real Property Manager, Investments, Debts & Projects 2000-01 2001-02 2002-03 Actual Adjusted Adopted Budget Budget Budget 3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 2002-03 BAO Changes 2002-03 Adjusted Budget 3.00 1.00 1.00 0.95 1.00 1.00 Office Specialist (25) Payroll Analyst Program Assistant (24) Senior Technologist Senior Accountant Senior Buyer Senior Financial Analyst (24) Staff Accountant (13) Staff Secretary Storekeeper (23) Storekeeper-Lead (23) Supervisor Revenue Collections (24) Technologist Warehouse Supervisor 0.00 0.00 1.00 2.00 2.00 2.00 1.00 1.00 0.00 17.00 21.00 21.00 4.00 4.00 4.00 1.00 1.00 1.00 9.00 9.00 10.00 3.00 3.00 4.00 2.00 2.00 2.00 4.00 3.00 4.00 0.00 1.00 0.00 1.00 1.00 0.00 1.00 2.00 2.00 1.00 1.00 1.00 2.00 0.00 21.00 4.00 1.00 10.00 3.00 2.00 3.00 1.00 .0.00 2.00 1.00 Community Services Department Administrative Assistant Administrator, Human Services Administrator Special Events Building Serviceperson Building Serviceperson-Lead Coordinator, Child Care Coordinator, Library Circulation 1.00 1.00 1.00 1.00 0.00 0.00 1.00 ’ 1.00 1.00 4.00 4.00 4.00 2.00 2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 4.00 2.00 1.00 1.00 2002-03 Budget Cit3, of Palo Alto 287 Exhibit A 2002-03 TABLE OF ORGANiZATiON AS AMENDED CONTINUED 2000-01 Actual Budget Business Analyst 1.00 Cathodic Technician 1.00 1.00 Cement Finisher 1.00 1.00 Chief Electric Underground Inspector (6)1.00 0.00 Chief Inspector, WGW (6)1.00 0.00 Coordinator, Utility Projects (1)4.00 4.00 Customer Service Representative 4.00 5.00 Customer Service Specialist 3.00 3.00 Desktop Technician 1.00 0.00 Director, Utilities 1.00 1.00 Electrical Assistant I 5.00 5.00 Electric Project Engineer 0.00 3.00 Electric Underground Inspector 2.00 2.00 Electric Utility Compliance Technician 3.00 2.00 Electric Utility Compliance Technician - Lead 0.00 1.00 Electrician 14.00 14.00 Electrician-Lead 6.00 7.00 Engineer 6.00 4.00 Engineering Technician III 6.00 2.00 Engineering Manager, Electric 1.00 1.00 Engineering Manager, WGW 1.00 1.00 Equipment Operator 2.00 2.00 Executive Secretary (4)2.00 2.00 Gas System Technician 3.00 3.00 Heavy Equipment Operator 9.00 9.00 Inspector, Field Services 3.00 4.00 Instrumentation Electrician 0.00 0.00 Lineperson/Cable Splicer 11.00 10.00 Lineperson/Cable Splicer-Lead 4.00 5.00 Maintenance Mechanic 2.00 2.00 Manager Utilities Telecommunication 1.00 1.00 2001-02 2002-03 2002-03 Adjusted Adopted BAO Budget Budget Changes 1.00 1.00 1.00 1.00 0.00 0.00 4.00 5.00 3.00 0.00 1.00 5.00 3.00 2.00 2.00 1.00 14.00 7.00 4.00 2.00 1.00 1.00 2.00 1.00 3.00 9.00 4.00 0.00 10.00 5.00 2.00 1.00 2002-03 Adjusted Budget 1.00- 1.00 1.00 0.00 0.00 3.00 5.00 3.00 0~00 1.00 5100 3.00 2.00 2.00 14.00 7.00 4.00 2.00 1.00 1.00 2.00 1.00 3.00 9.00 4.00 0.00 10.00 5.00 2.00 1.00 Manager, Public Relation 1.00 1.00 1.00 1.00 2002-03 Budget ~City of Palo Alto 299 Exhibit A 2002-03 TABLE OF ORGANIZATION AS AMENDED CONTINUED 2000-01 2002-03 Actual Adopted Budget Budget Utilities Installer/Repairer 15.00 14.00 14.00 Utilities Installerl/Repairer Assistant (2)2.00 2.00 2.00 Utilities InstalleWRepairer-Lead 5.00 6.00 6.00 Utilities Rate Analyst 1.00 1.00 1.00 Utilities System Operator 5.00 5.00 5.00 Utilities Accounting Technician 1.00 1.00 1.00 Utilities Key Account Representative 3.00 3.00 3.00 Utilities Locator 2.00 3.00 3.00 Utilities Market Analyst 2.00 0.00 0.00 Water Transmission Specialist-Lead ........1.00 1.00 1.00 Water Transmission Specialist 2.00 2.00 2.00 Water Transmission Supervisor (1)0.00 0.00 0.00 Water Meter/Cross Connection 2.00 2.00 2.00Technician 2001-02 2002=03 Adjusted BAO . Budget Changes. 2002-03 Adjusted Budget 14.00 1.00 6.00 1.00 5.00 1.00 3.00 3.00 O.00 1.00 2.00 1.00 2.00 CPA External Services Manager, Information Technology *0.00 1.00 1.00 Technologist * (3)0.00 3.00 3.00 Human Resources Assistant- Confidential 0.00 0.00 1.00¯ (5) .... " 1.00 5.00 Footnotes: These positions are tied to contracts with outside agencies or external revenues. They wil be eliminated by attrition if funding source is lost. ~ 1 Reclassification of 1 FFE Coordinator, Utilities Projects to Water Transmission Supervisor. 2 Add 1.5 Program Assistant, Drop 0.5 Staff Secretary and 1.0 Utility Installer/Repairer Assistant. 3 Addition of 2.0 Technologist to support external service contracts (cost recovery). 4 Adopted-in-concept Removal of 1.0 Executive Secretary due to retirement. 2002-03 Budget City of Palo Alto 301 ATTACHMENT 2 RESOLUTION NO. RESOLUTION OF THE COUNCIL OF THE CITY OF PALO ALTO AMENDING THE COMPENSATION PLAN FOR MANAGEMENT AND CONFIDENTIAL PERSONNEL AND COUNCIL APPOINTED OFFICERS ADOPTED BY RESOLUTION NO.TO DELETE THE CLASSIFICATION OF MANAGER,COMPETITIVE ASSESSMENT,AND ADD THE CLASSIFICATION OF MANAGER, ENERGY RISK The Council of zhe City of Palo Alto does RESOLVE as follows: SECTION i. Pursuant zo the provisions of Section 12 of Article III of the Charter of the City of Palo Alto, the Management Compensation Plan, adopted by Resolution No. , is hereby amended by deleting the classification of Manager, Competitive Assessment, and adding the classification of Manager, Energy Risk, as shown in Exhibit "A", attached hereto and incorporated herein by reference. SECTION 2. The Director of Administrative Services is authorized to implement the amended classifications and salary as sez forth in Section i. SECTION 3. The Council finds that this is not a project under the California Environmental Quality Act and, therefore, no environmental impact assessment is necessary. INTRODUCED AND PASSED: AYES: NOES: ABSENT: ABSTENTIONS: ATTEST: City Clerk APPROVED AS TO FORM: Mayor APPROVED: Senior Asst. City Attorney City Manager Director of Administrative Services Director of Human Resources 021016 cl 8120285