HomeMy WebLinkAboutStaff Report 7193 City of Palo Alto (ID # 7193) City Council Staff Report Report Type: Consent Calendar Meeting Date: 12/5/2016 City of Palo Alto Page 1 Summary Title: Approval of a Budget Amendment in the Electric Fund for Underground Utility District Number 47 Title: Approve a Budget Amendment in the Electric Fund to Complete Conversion of Overhead Electric Facilities to Underground for Capital Project EL-11010 Underground Utility District 47 Increasing the Project From $2,346,000 to $2,946,000; and Finding of CEQA Exemption Pursuant to Guideline Section 15302 From: City Manager Lead Department: Utilities Recommendation Staff recommends that the City Council: 1) Amend the Fiscal Year 2017 Budget Appropriation Ordinance for the Electric Fund by: a) Increasing the Capital Improvement Project Underground Utility District No. 47 (EL-11010) appropriation in the amount of $600,000; and b) Decreasing the Electric CIP Reserve appropriation in the amount of $600,000 2) Adopt a Categorical Exemption under Section 15302 of the California Environmental Quality Act. Background Underground Utility District No. 47 (“UUD 47”) involves converting the overhead utility lines to underground in the Area of Middlefield Road, Homer Avenue, Webster Street, and Addison Avenue. In March 2015, construction began with the installation of conduits and vaults after the City Council approved and authorized the execution of contract with MP Nexlevel of California, Inc. (Staff Report #5469). MP Nexlevel has completed installation of substructures for electric, communication, telephone and cable television systems. The City has received reimbursement of $1,100,000 from AT&T and Comcast for work performed by MP Nexlevel on their facilities. The next step is construction of Utilities’ underground electric system and eventual removal of overhead facilities. Staff’s latest cost estimates for construction of the underground systems and connection of customer services, are higher than originally budgeted in 2011. Therefore, City of Palo Alto Page 2 staff is requesting additional funding of $600,000. The additional funding will allow for the purchase of electric equipment, streetlighting poles, cables, and labor for completion of the electric installation work for the underground distribution system for UUD 47. Discussion The original estimate for the conversion of the overhead utility system to underground was developed, based on actual costs from past projects, and used for budget approval. In April 2016, Council approved a Budget Amendment Ordinance (Staff Report #6631) in the amount of $96,000, to fund additional unforeseen work related to the installation of substructures for this project, which increased the approved budget funding for the project to $2,346,000. It was anticipated that the remaining funding in the budget was adequate for completion of the project. Upon further review and completion of the estimate for electric construction it was determined that additional funding was necessary. Several factors affected the cost of the project resulting in this request for additional funding. 1. For previous undergrounding projects, internal Utilities staff inspected the installation of substructure work. However, during the construction phase of UUD 47, Electric Operations expressed their inability to provide an inspector due to shortage of manpower. Electric Operations had a significant amount of construction work including on-going system improvement projects and other large commercial projects in the Stanford Medical Center area. This necessitated the usage of third party inspection services by Canus Corporation (“Canus”) to inspect the underground substructure installation. The city has a blanket contract with Canus to provide inspection services on an as-needed basis. Canus has been providing inspection services on Electric, Water, Gas, Wastewater, and Public Works projects for the past several years. By utilizing Canus Corporation’s services, Utility Department incurred an expenditure of approximately $195,000 on inspection services, approximately twice the cost of using internal staff. 2. Since the original estimate was developed, the cost of material (switches, transformers and associated cables) and labor have increased by approximately 20% and 15% respectively. 3. Changes made in the original design for optimizing reliability of the electric distribution system and addition of unforeseen items also added to the total cost of the project. Staff’s assessment, for procuring and installing electric equipment, energizing the new undergrounding electric distribution system, connecting customers to the new system, and removing the overhead system for UUD 47, indicates we will require an additional amount of $600,000 to complete UUD 47. City of Palo Alto Page 3 Resource Impact A budget amendment is required in the amount of $600,000, to add funds to CIP EL-11010 and decrease funds from the Electric CIP Reserve. This amount will increase the total authorized budget of CIP EL-11010 from $2,346,000 to $2,946,000. Policy Implications This project supports City of Palo Alto Key Strategy number 7 – Implement programs that improve the quality of the environment and Supporting Objective number 2 – Invest in utility infrastructure to deliver reliable service. Timeline Substructure installation work pertaining to UUD 47 is complete. Adding money to WBS EL- 11010 will allow for procurement of materials, and completion of electric system construction, with an anticipated completion of the new underground system by December 31, 2017. Environmental Review This project is categorically exempt from the California Environmental Quality Act under Section 15302(d) of the California Code of Regulations, Title 14, Chapter 3 (conversion of overhead electric utility facilities to underground).