Report Type: Consent Calendar Meeting Date: 6/27/2016
City of Palo Alto Page 1
Council Priority: Environmental Sustainability
Summary Title: Shiloh I Wind Off-Taker Generation Percentage Protection
Amendment
Title: Approval and Authorization for the City Manager or his Designee to
Execute the Off-Taker Generation Percentage Protection Amendment to the
City's Power Purchase Agreement (PPA) With Shiloh I Wind Project LLC
(Shiloh PPA) and Delegation of Authority to the City Manager to Execute
Documents Necessary to Administer the Shiloh PPA and the City's Five PPAs
Associated with Landfill Gas to Energy Projects
From: City Manager
Lead Department: Utilities
Recommendation
Staff recommends that Council:
1. Approve the Purchaser’s Off-Taker Generation Percentage Protection Amendment
(Amendment) (Attachment A) to the Power Purchase Agreement (PPA) with Shiloh I
Wind Project LLC (Seller) concerning the Shiloh I Wind Project (Project);
2. Delegate to the City Manager or his designee the authority to execute on behalf of the
City the Amendment, and any other documents necessary to administer the PPA that
are consistent with the Palo Alto Municipal Code and City Council approved policies; and
3. Delegate to the City Manager or his designee the authority to execute on behalf of the
City any documents necessary to administer the PPAs with Ameresco Santa Cruz Energy
LLC, Ameresco Half Moon Bay LLC, Ameresco Keller Canyon LLC, Ameresco Johnson
Canyon LLC, and Ameresco San Joaquin LLC that are consistent with the Palo Alto
Municipal Code and City Council approved policies.
City of Palo Alto Page 2
Executive Summary
In October 2005, Council approved the PPA with Seller (a wholly owned subsidiary of Iberdrola
Renewables, LLC, formerly known as PPM Energy, Inc.) to obtain a portion of the electric output
of a 150 megawatt (MW) wind energy generating facility in Solano County over a 15 year and 7
month term. The Project began delivering energy to Palo Alto in June 2006. Under the PPA,
the amount of renewable energy that is delivered to Palo Alto is equal to 16.66% of the
Project’s total metered output, which represents 25 MW. Several other entities have rights
under long-term PPAs to receive the remaining 83.34% of the Project’s output.
In 2014, the California Independent System Operator (CAISO) introduced a new market
construct which allows it to curtail intermittent resources such as the Project. Off-takers of the
Project are therefore now capable of submitting economic bids to the CAISO in order to curtail
some or all of their share of the Project’s output. An off-taker might choose to curtail in
situations where the Locational Marginal Price (LMP) for that power falls below a certain
threshold. For example, if the price was negative for a period of time (which has happened),
then rather than getting compensated for the generation, the off-taker would have to pay for
the generation.
If and when one of the other Project off-takers curtails some or all of its share of the Project,
the total output of the Project is reduced. Under the current PPA language, since Palo Alto’s
share is based on a percentage of the Project’s total output, curtailment by another Project off-
taker reduces the amount of energy that Palo Alto actually receives. The proposed Amendment
is intended to keep Palo Alto’s share of metered output whole by providing that if another off-
taker economically dispatches, Palo Alto’s share of output is calculated as if there had been no
such curtailment in order to maintain Palo Alto’s 16.66% share. The proposed Amendment
thereby protects the amount of energy delivered to Palo Alto and ensures it is not affected by
the decision of another Project off-taker to curtail its portion of the Project’s output.
Staff therefore recommends that the Council approve the proposed Amendment to the PPA,
which is necessary to protect the City’s share of the Project output if curtailment by another
off-taker occurs, and will result in no resource impact on the City. This is identical to the
modification made in 2015 to the High Winds Energy Center PPA (Staff Report 5939).
Staff also recommends delegating authority to the City Manager to execute routine contract
amendments and administrative documents, such as this one, for the Project as well as for the
City’s five long-term PPAs with landfill-gas-to-energy (LFGTE) projects.
Background
In October 2002 the Council approved the City’s first Renewable Portfolio Standard (RPS),
setting goals of meeting 10% of the City’s load through renewable energy purchases by 2008,
and 20% by 2015. (The RPS target was later increased to 33% by 2015, and the City is also
subject to the statewide requirement to achieve a 50% RPS level by 2030.) In its efforts to
achieve those targets, the City executed the Shiloh I Wind Project PPA—its fifth renewable
City of Palo Alto Page 3
energy PPA, and its second PPA with Iberdrola Renewables—in October 2005 (CMR 386:05,
Resolution 8559).
The Shiloh I Wind Project is a 150 MW facility located in Solano County, and the City’s
contracted share of the Project is 25 MW, which equals 16.66% of the total resource. The City
began receiving energy deliveries from the Project on June 1, 2006, and the contract term is set
to run through December 2021. On average, the Project provides enough energy to the City to
meet about 7% of its total annual load.
Discussion
In May 2014, the CAISO launched a new Fifteen Minute Market (FMM) for bidding and
scheduling generation resources in order to comply with the Federal Energy Regulatory
Commission’s (FERC) Order 764. The purpose of this intra-hour scheduling market was to
facilitate the integration of intermittent resources such as wind and solar. Prior to this point,
CAISO had operated on an hourly scheduling market system, which was a distinct disadvantage
to intermittent resources, whose actual generation patterns frequently varied significantly from
the amount of generation that was forecasted on an hour-ahead basis.
Proposed PPA Amendment
Under the FMM, the CAISO has begun to implement economic dispatch capability for
intermittent resources with multiple off-takers, such as the Project. Typically these individual
off-takers each simply receive their pro rata share of whatever output the project generates in
a given time interval. However, with the new CAISO economic dispatch capability, any of the
Project off-takers will have the ability to direct the Seller to shut down all, or a portion of, its
share of the Project. (It might do so in a situation where the Project’s LMP for a certain period
became negative—meaning that the off-taker would essentially be paying the CAISO to take the
energy that its share of the Project was generating, rather than being compensated by the
CAISO for that output.) At this time, some of the other Project off-takers have the ability to
economically dispatch their shares of the Project while the City does not have this capability.
However, staff is working with the Seller to provide the City with this capability in the coming
months.
Because the PPA currently defines the share of the Project’s energy generation that the City is
entitled to as a percentage of total Project output (16.66%), if another off-taker reduces the
Project’s output by curtailing its portion, the City would receive less than its intended share of
the output. For example, if one off-taker has rights to a 50 MW share of the 150 MW Project
and chooses to curtail all of that capacity, the Project would effectively become a 100 MW
resource. Under the current PPA language, the City would receive 16.66% of that amount, or
16.66 MW, rather than the full 25 MW share that Palo Alto was to receive under the PPA but
for the curtailment.
In order to address this situation, the City and the Seller desire to modify the PPA only with
respect to this one issue. The proposed language modifies the definition of the term “Metered
City of Palo Alto Page 4
Output” such that if another off-taker economically dispatches its share of the Project for any
period of time, the City’s “Metered Output” is calculated by the Seller as though there had been
no such curtailment instruction, in order to maintain Palo Alto’s intended 16.66% share (25
MW) of the Project output. The proposed Amendment thereby protects the amount of
generation to which Palo Alto is entitled under the PPA. The proposed Amendment language is
also nearly identical to the language approved by Council in August 2015 to protect the City’s
share of the output of the High Winds Energy Center.
Delegation of Authority
At this time, the City has 13 executed PPAs in place for renewable energy facilities (two wind
resources, five LFGTE resources, and six solar resources). For seven of those PPAs, the City
Council has delegated to the City Manager (or his designee) the authority to execute
amendments and any other documents necessary to administer the PPAs that are consistent
with the Palo Alto Municipal Code and City Council approved policies. This delegation of
authority saves a significant amount of staff time, enabling staff to more efficiently manage
these contracts by handling routine contractual matters (such as this amendment) on an
administrative basis. Staff therefore recommends extending this delegation of authority to the
remaining PPAs (the Shiloh PPA and the five LFGTE PPAs) that have not yet been granted it by
the City Council.
Resource Impact
Approving the recommendation is not expected to result in any resource impact to the City.
Declining to approve the recommendation could result in the City receiving less renewable
energy from the Project, resulting in additional replacement energy having to be procured from
the market in order for the City to satisfy its load and RPS requirements.
Policy Implications
Approval of the Consent and the proposed Amendment is in conformance with the City’s Long-
term Electric Acquisition Plan (LEAP), specifically the City’s RPS strategy, which entails reducing
the carbon intensity of the electric portfolio through the acquisition of renewable energy
supplies while ensuring that the retail rate impact for renewable purchases does not exceed 0.5
¢/kWh on average (Staff Report 2710). The recommended action is also consistent with the
Utilities Strategic Plan objective of reducing costs.
Environmental Review
Approval of the Consent and the Amendment does not meet the definition of a project under
the California Environmental Quality Act (CEQA), pursuant to Public Resources Code Section
21065.
Attachments:
Attachment A: Amendment No 2 to Palo Alto Shiloh PPA (PDF)
SECOND AMENDMENT
TO LONG-TERM POWER PURCHASE AGREEMENT
FOR
OFF-TAKER GENERATION PERCENTAGE PROTECTION FOR THE
SHILOH WIND PROJECT
This SECOND AMENDMENT TO LONG-TERM POWER PURCHASE
AGREEMENT FOR OFF-TAKER GENERATION PERCENTAGE PROTECTION FOR THE
SHILOH WIND PROJECT (this “Second Amendment”) is entered into this __ day of June,
2016, by and between Shiloh I Wind Project LLC (“Seller”) and The City of Palo Alto
(“Purchaser”) and amends that certain Long-Term Power Purchase Agreement (Shiloh Wind
Project) dated October 11, 2005, as amended by that certain Amendment No. 1 to Long-Term
Power Purchase Agreement dated September 14, 2009, between them (the “PPA”; initially
capitalized terms used and not defined herein are defined in the PPA) concerning the Shiloh
Wind Energy Center (the “Project”), with reference to the following:
RECITALS:
1. Purchaser is one of several off-takers from the Project; and
2. The PPA provides that Seller shall sell and Purchaser shall purchase as Purchaser’s
Metered Output a fixed percentage of Metered Output; and
3. The PPA provides that “Metered Output is intended to represent the quantity of
electrical energy generated by the Project on an ‘as delivered’ basis”; and
4. The California Independent System Operator (“CAISO”) has implemented economic
dispatch capability for resources, such as the Project; and
5. The Parties wish to avoid any impact to Purchaser’s Metered Output due to economic
dispatch by a different off-taker; and
NOW, THEREFORE, in consideration of the mutual covenants herein contained, the
PPA is amended as follows:
1.Section 1 Definitions. The definition of “Purchaser’s Metered Output” shall be deleted in
its entirety and replaced with the following:
“Purchaser’s Metered Output” shall mean Purchaser’s MW Share multiplied by the
Metered Output.
2.Section 1 Definitions. The definition of “Other Off-Taker” shall be added as follows:
“Other Off-Taker” shall mean any Person other than Purchaser with a contract to
purchase energy from the Project.
ATTACHMENT A
3. Section 1 Definitions. The definition of “Other Off-Taker Economic Dispatch” shall be
added as follows:
“Other Off-Taker Economic Dispatch” means a change to Metered Output due to an
economic dispatch instruction by an Other Off-Taker(s).
4. Section 1 Definitions. The definition of “Purchaser’s MW Share” shall be added as
follows:
“Purchaser’s MW Share” means 16.66%; provided, that if there is an Other Off-Taker
Economic Dispatch for any period of time, then Purchaser’s MW Share shall mean the
ratio, calculated to the thousandths of a MW (i.e., rounded to three decimal places), of (i)
25 MW, to (ii) the 150 MW minus Other Off-Taker(s)’ curtailed capacity (in MW).
5. Section 4.8 Partial Curtailment Allocation. Section 4.8 shall be changed by removing
“16.66%” and replacing it with “Purchaser’s MW Share.”
6. All other provisions of the PPA are reaffirmed and not amended hereby.
IN WITNESS WHEREOF, the parties have executed this Amendment as of the date and
year first above written.
SHILOH I WIND PROJECT LLC CITY OF PALO ALTO
By: By:
Name:_______________________________ Name:____________________________
Title: Title: _____________________
Date of Signature: Date of Signature:
Approved as to form:
By: By:
Name:_______________________________ Name:____________________________
Title: Title: _____________________
Date of Signature: