Loading...
HomeMy WebLinkAboutStaff Report 3382 City of Palo Alto (ID # 3382) City Council Staff Report Report Type: Consent Calendar Meeting Date: 12/17/2012 City of Palo Alto Page 1 Summary Title: 2014 Infrastructure Finance Measure Update Title: Update on Planning for Potential Infrastructure Finance Measure for 2014 Ballot From: City Manager Lead Department: City Manager Recommendation Staff recommends that Council accept this report providing an update on planning for a potential infrastructure finance measure for the 2014 ballot. This has been placed on consent because of the volume on the action agenda and because the related contract award for public opinion research is also on the consent agenda. Background On September 18, 2012, the City Council adopted the plan and high level schedule of the work to be completed over the next two years for a potential 2014 infrastructure finance measure (included as Attachment A). This staff report provides an update on initial planning efforts and strategy development, community outreach, and follow-up items from the September 18, 2012 meeting, as well as, a more detailed timeline of the work to be completed through 2014. Discussion This report provides an update on the following plan components: 1. Core Strategy Team 2. Planning & Opinion Research 3. Community Outreach & Engagement 4. Plan Design/Review City of Palo Alto Page 2 1. Core Strategy Team The first step of the plan is to assemble a core strategy team. Given the complexity of the work to be completed over the next two years, staff established a Management Team overseeing three tracks of work: 1) planning and opinion research, 2) community outreach and engagement, and 3) technical (project plan/design). The City Manager’s Office is leading the project. A Leadership Advisory Team has also been established to assess key policy issues and recommendations, with the City Manager making final recommendations to the Council at key milestones. Attachment B provides an organizational chart and identifies the core members of the Leadership Advisory Team, Management Team and working groups that are assembled. It is also envisioned that the City’s Chief Communication’s Officer will play a key role in the community outreach and engagement work. The recruitment for this position is underway. 2. Public Opinion Research Since September, staff has proceeded with retaining assistance of outside experts in two areas: 1) public opinion research and 2) public communications and educational outreach strategy. On the consent agenda this evening, Council will consider entering into an agreement with Fairbank, Maslin, Maullin, Metz and Associates (FM3) to conduct opinion research for the City over the next two years. FM3 has extensive knowledge in public opinion research and a proven track record providing services on successful ballot measures. FM3 conducted the opinion research for the City’s successful Library bond measure in 2008 and has worked with numerous public agencies in California. There are four phases of the opinion research beginning with a feasibility survey in March 2013. If the research indicates that a finance measure(s) to support infrastructure improvements is potentially feasible, the second phase is to conduct focus groups over the summer. The third phase is a refinement survey to be conducted in the fall of 2013, and a final tracking survey in the spring of 2014 prior to Council’s decision whether to place a measure on the 2014 ballot. Proceeding with each phase of the research is dependent on the results and is at the discretion of the City. Below is a summary timeline of the research phases. The four phases are described in more detail in the contract award (Consent Item #12). Opinion Research Timeline Research Phase Timeframe Phase 1: Feasibility Survey February-April 2013 Phase 2: Focus Groups July-August 2013 Phase 3: Refinement Survey September- October 2013 Phase 4: Tracking Survey April-June 2014 City of Palo Alto Page 3 Council requested that staff return with a recommendation about engaging a Council Committee or subcommittee to vet key policy issues over the next two years. Staff is recommending that the incoming Mayor appoint two to three Council members as part of the Committee assignments in January 2013 to work with staff on an ad hoc basis on the public opinion research, and other areas to be determined such as community outreach and ballot preparation, as needed. A similar approach was used in 2008 on the library bond measure. Based on the anticipated limited scope of these assignments, staff anticipates at this time that they will be temporary ad hoc committees not subject to the Brown Act. It is anticipated that the appointed members may participate in two to three planning meetings during each phase of the opinion research and the development of the communication plan and review draft documents via email. The appointed members may also be asked to assist with ballot preparation in early 2014 should the City Council elect to proceed with a finance measure. 3. Community Outreach & Engagement Consistent with the plan, a solicitation is underway to retain the services of a professional strategic communications and educational outreach firm to develop a community outreach plan and assist with its implementation. The communications firm will work with the City and the City’s polling firm to:  Develop and manage strategies focused on the finance measure’s feasibility.  Support the development of survey instruments and tracking polls on communications/messaging and analyses and application of results.  Recommend how to structure/define the finance measure(s).  Develop, refine, and target key messages and themes.  Develop a communications plan.  Implement community outreach and education activities prior to Council’s decision to place a measure(s) on the ballot. The City issued a request for proposals for the communications strategist on November 8, 2012. Staff held a pre-proposal conference on November 28, with six vendors attending. Proposals are due to the City on December 11, with staff evaluation of the proposers in December. Interviews with the top candidates are planned in early January. Staff anticipates bringing an agreement forward for Council consideration in January 2013 and commencing work in early February 2013 in alignment with the first phase of opinion research. To date, reporting on infrastructure related issues has been on the Infrastructure Blue Ribbon Commission (IBRC) report, and related City Manager Reports, as well as current projects described on various webpages on the City’s website. Additionally, the City has distributed construction updates to impacted neighborhoods, emails to various project City of Palo Alto Page 4 subscriber lists, posts to social media sites, emails to the Palo Alto Neighborhood group, alerts to the media, updates provided in the Mayor’s Message newsletter, and City Manager Comments at Council meetings. Additionally, space for text messages and flyers in the utility bills has been reserved over the next six months. In preparation for the communication consultant’s work, staff is reviewing all infrastructure-related topics on the City’s website in order to assess what information currently exists and how to make it more accessible to the community. This initial review, to be completed in January, will help inform early infrastructure educational efforts. These efforts will become more strategic as the City has more refined information about community perspectives and priorities as a result of the City’s opinion research. A key element of the City’s community outreach strategy is to engage a Citizen Advisory Committee. The purpose of the advisory committee is to supplement City leadership with external community partners and leaders to help build broad-based consensus, provide input to finance measure planning, and to be partners in informing the community about the City’s infrastructure needs. Staff is currently conducting research on best practices on the development of a Citizen Advisory Committee and recommends utilizing the expertise of the City’s polling and communications consultants to develop a plan to engage and support a Committee. Staff is committed to returning to Council with recommendations in early 2013 based on the experience and suggestions of the City’s polling and communications consultants. 4. Plan/Design Review The initial feasibility survey will focus on the projects reviewed by City Council at its September 18, 2012 meeting: 1. Public Safety Building 2. Bike/Pedestrian Plan 3. Bike Bridge 4. Byxbee Park 5. Fire Stations 6. Streets (also includes Charleston/Arastradero and accelerated resurfacing) 7. Sidewalks (surface catch-up) 8. Cubberley (replace/expand) 9. Parks catch-up 10. Animal Services Center 11. Playing Fields (golf course) 12. Post Office 13. Ventura Community Center 14. School Childcare Sites At the September 18 meeting, staff provided a series of one page summary sheets for each project. The project sheets provided a project description, the estimated project cost and basis of the estimate, information on identified and potential funding sources City of Palo Alto Page 5 that may offset the need for public financing, and other variables or considerations that may affect project timing, cost, or viability. Council requested staff develop a one page summary worksheet of similar information that identified all the projects, estimated cost, potential funding, net cost, importance of project, availability of funding, and public support. Attachment C provides a draft of the worksheet. Staff will continue to update and refine the worksheet as new information is available. Council also requested staff return to Council with a strategy and timeline for refining project costs. This will occur as staff works with the public opinion research consultant to develop questions for polling that will provide information about the public’s support for infrastructure projects. It is important to refine the cost estimates used as much as possible at the current levels of project design. The goals of the near-term work on cost estimates are as follows:  verify the cost estimates and update them as necessary to reflect any changes to the project scopes  define and utilize a consistent set of assumptions about project contingencies, soft costs, and construction escalation  develop new cost estimates for newly defined projects such as the Ventura Community Center and School Childcare Sites There are a variety of factors influencing the project cost estimates. In some instances, such as the Public Safety Building and the Cubberley (replace/expand) projects, ongoing processes and Council policy decisions will inform the cost estimates. Given the number of projects and the extensive variables that may impact cost estimates, the need for accurate project estimates must be balanced with the resources that are used to refine the estimates. The initial baseline survey will focus on public support for projects and some preliminary cost estimates or ranges of costs. The table below describes staff’s proposed work on the cost estimates, to be completed prior to the initial public opinion polling in spring 2013. Project Initial Estimated Cost (in millions) Level of Effort Needed Public Safety Building 47 Staff review of project scope, project design and construction contingencies, construction year escalation, and soft costs such as design and environmental clearance. Update estimates as appropriate for consistency. Byxbee Park 3.6 Sidewalks (surface catch-up) 3.7 Cubberley (replace/expand) 83* Parks catch-up 9.8 Playing Fields (golf course) 6 City of Palo Alto Page 6 Bike/Pedestrian Plan 25 Consultant peer review of existing construction costs estimates. Staff review of project scope, project design and construction contingencies, construction year escalation, and soft costs such as design and environmental clearance. Update estimates as appropriate for consistency and accuracy of construction costs. Bike Bridge 10 Fire Stations 14.2 Streets 9.75 Animal Services Center 6.9 Post Office 10 Ventura Community Center tbd Develop new cost estimate. Define scope and estimate construction cost with consultant assistance, applying consistent contingencies and soft costs such as design and environmental clearance. School Childcare Sites tbd *City’s estimated portion $83M; total estimated cost $200M. Timeline The draft working schedule is included as Attachment D. Staff will continue to develop and refine the timeline and schedule based on the results of the opinion research, decisions about the strategy and priorities for the infrastructure finance measure, and the communication plan. Staff will also continue to provide regular informational updates to the Council on the progress of work. Attachments:  Attachment A. Strategy and High Level Schedule (PDF)  Attachment B. Organization and Core Teams (PDF)  Attachment C. Project Summary Sheet (PDF)  Attachment D. Project Schedule (PDF) Attachment A. High Level Work Plan & Schedule Opinion Research/ Strategic Planning • Assemble Core Team • Identify Priority          Projects & Costs • Retain Expertise • Conduct Feasibility  Research • Assess Baseline Results  for Feasibility • Track/Reassess Support • Act to Place Measure  on Ballot (Policy ‐June/  Official ‐July 2014) RFP 20 1 3 J F M A M J J A S O N D J 20 1 4 J F M A M J J A S O N 20 1 5 Community Outreach • Retain  Communications  Strategist • Conduct Preliminary  Community Outreach • Develop  Communication Plan • Implement Outreach &  Engagement Program • Engage Citizen  Advisory Committee RFP Preliminary Plan/Design Review(as applicable) • Refine Project Costs • Develop/Update  Schematic Designs • Conduct  Environmental Review • Council & Committee  Review/Approval Ballot PreparationOpinion Research/ Strategic Planning • Prepare Ballot Measure • Prepare Synopsis  • Adopt Resolution of   Necessity • Adopt Ordinance  Calling Election • File Ordinance • Hold Election  Attachment B. Organization, Management and Leadership Teams Attachment C. Infrastructure Project Summary Sheet (all costs/revenues in millions of dollars) Project Estimated  Cost Potential  Funding Net Cost Importance  Ranking Public  Support  Ranking Annual  Operating  Revenue Other One  Time Costs Public Safety Building 47 27 20 tbd tbd 1.4 tbd Bike/Pedestrian Plan 25 1.2 23.8 tbd tbd Bike Bridge 10 5 5 tbd tbd Byxbee Park 3.6 0 3.6 tbd tbd Fire Stations 14.2 0 14.2 tbd tbd Streets 1 9.75 0.45 9.3 tbd tbd Sidewalks (surface catch‐up)3.7 0 3.7 tbd tbd Cubberley Replace/Expand 200 117 83 tbd tbd Parks Catch Up 9.8 0 9.8 tbd tbd Animal Services Center 6.9 0 6.9 tbd tbd Playing Fields (at Golf Course)6 0 6 tbd tbd tbd Post Office 2 10 0 10 tbd tbd 1.2 3 Ventura Community Center tbd tbd tbd tbd tbd School Childcare Centers tbd tbd tbd tbd tbd Surface Catch Up 5.1 0 5.1 Buildings Catch Up 4.5 0 4.5 Cubberley Deferred Maintenance 6.9 0 6.9 Civic Center 16 0 16 Los Altos Treatment Plant 2 0 2 tbd Airport 5 5 0 Golf Course 8.1 7.6 0.5 Municipal Services Center 93 93 0 Regional Water Quality Control Plant 2 88 88 0 Energy/Compost Facility 100 100 0 Sum: 674.6 444.3 230.3 2.6 3 1 Streets project is defined as completion of the Charleston/Arastradero project with acceleration of the overall street resurfacing program;     this placeholder estimate is for the Charleston/Arastradero project and does not yet include additional cost for accelerated resurfacing 2 Project cost figures have been updated since the 9/18/2012 City Council meeting  Pr o j e c t s  ap p r o v e d  by  Co u n c i l  for  ini t i a l   pu b l i c  op i n i o n  res e a r c h Ot h e r  pr o j e c t s  no t  pla n n e d  for   pu b l i c  op i n i o n  re s e a r c h The project information and cost estimate information on this sheet represent staff’s best information at this  time. Staff will continue to refine the information as new and more precise information becomes available.   ID Task Name Start Finish 1 1 Public Opinion Research Tue 1/1/13 Tue 7/1/14 2 1.1 Feasability Survey Sun 1/13/13 Mon 4/15/13 3 1.1.1 Review Past Surveys &  Background Material Tue 1/15/13 Fri 2/1/13 4 1.1.2 Conduct Kick Off Meeting Fri 2/1/13 Fri 2/1/13 5 1.1.3 Develop Survey QuestionnairFri 2/1/13 Fri 3/1/13 6 1.1.4 Pre‐test Survey, Evaluate, RefFri 3/1/13 Fri 3/8/13 7 1.1.5 Conduct Feasility Survey Fri 3/15/13 Fri 3/22/13 8 1.1.6 Present Top Line Results and Findings to City and Key  Stakeholders Mon 4/1/13 Mon 4/1/13 9 1.1.7 Council Evaluates Results &  Determines Next Steps Mon 4/15/13 Mon 4/15/13 10 1.2 Focus Groups Mon 7/1/13 Mon 9/2/13 11 1.2.1 Conduct Kick Off Meeting Mon 7/1/13 Mon 7/1/13 12 1.2.2 Develop Recruitment Plan Mon 7/1/13 Sun 7/14/13 13 1.2.3 Develop Moderator Guide Sun 7/7/13 Thu 8/1/13 14 1.2.4 Complete Focus Group RecruSun 7/14/13 Thu 8/1/13 15 1.2.5 Conduct Focus Groups Thu 8/1/13 Thu 8/15/13 16 1.2.6 Provide Key Findings to City Mon 9/2/13 Mon 9/2/13 17 1.3 Refinement Survey Mon 9/2/13 Fri 11/1/13 18 1.3.1 Council Evaluates Results &  Determines Next Steps Fri 11/1/13 Fri 11/1/13 19 1.4 Tracking Survey Sat 3/1/14 Thu 5/1/14 20 1.4.1 Council Makes Policy  Decision on Whether to Pursue  Sun 6/1/14 Sun 6/1/14 21 2 Communication & Engagement  Strategy Wed 11/7/12 Mon 7/14/14 22 2.1 Vendor Selection Wed 11/7/12 Mon 1/28/13 23 2.1.1 Release RFP for  Infrastructure Communications Wed 11/7/12 Tue 12/11/12 24 2.1.2 Evaluate Proposals Wed 12/12/12 Fri 12/21/12 25 2.1.3 Interview and Select  Communications Vendor Mon 1/7/13 Fri 1/11/13 26 2.1.4 Council Considers Contract anMon 1/28/13 Mon 1/28/13 2/1 4/1 4/15 7/1 9/2 11/1 6/1 1/28 O N D J F M A M J J A S O N D J F M A M J J A S 2013 2014 Attachment D.  Draft Project Schedule 12‐12‐2012 Page 1 ID Task Name Start Finish 27 2.2 Communications and Outreach Mon 1/14/13 Mon 7/14/14 28 2.2.1 Review Past Infrastructure  Outreach Efforts Mon 1/14/13 Thu 1/31/13 29 2.2.2 Conduct Kick Off Meeting Fri 2/1/13 Fri 2/1/13 30 2.2.3 Develop Messaging from  Feasibility Survey Results Mon 4/1/13 Fri 4/12/13 31 2.2.4 Develop Communications  Strategy and Implementation Plan from Survey Results Mon 4/1/13 Tue 4/30/13 32 2.2.5 Implement Outreach &  Engagement Program Wed 5/1/13 Mon 7/14/14 33 2.2.6 Refine Messaging after  Focus Groups Thu 8/15/13 Thu 8/15/13 34 2.2.7 Update Messaging after  Refinement Survey Fri 11/1/13 Fri 11/1/13 35 2.2.8 Refine Messaging after  Tracking Survey  Thu 5/1/14 Thu 5/1/14 36 2.3 Citizen Engagement Mon 4/15/13 Mon 7/14/14 37 2.3.1 Engage/Support Citizen  Advisory Committee  Mon 4/15/13 Mon 7/14/14 38 3 Plan Design and Review Mon 12/3/12 Sat 3/15/14 39 3.1  Review Existing Cost Estimates Mon 12/3/12 Thu 1/31/13 40 3.2  Develop Consultant Scope of ServMon 12/17/12 Fri 1/18/13 41 3.3 Engage Consultant Fri 1/18/13 Fri 1/18/13 42 3.4  Refine Existing Cost Estimates  and Develop New Ones Fri 1/18/13 Fri 3/15/13 43 3.5 Continue to Refine Plan  Design/Cost as Applicable Fri 3/15/13 Sat 3/1/14 44 4 Ballot Preparation Mon 6/2/14 Mon 8/4/14 45 4.1  Preparation of Synopsis of Ballot Sun 6/1/14 Sun 6/15/14 46 4.2  Council Adopts Resolution of  Necessity Mon 7/14/14 Mon 7/14/14 47 4.3  Council Adopts Ordinance  Calling Election Mon 7/21/14 Mon 7/21/14 48 4.4  Last Day for City Clerk to File  Ordinance Mon 8/4/14 Mon 8/4/14 2/1 8/15 11/1 5/1 1/18 7/14 7/21 8/4 O N D J F M A M J J A S O N D J F M A M J J A S 2013 2014 Attachment D.  Draft Project Schedule 12‐12‐2012 Page 2