Loading...
HomeMy WebLinkAboutStaff Report 3357 City of Palo Alto (ID # 3357) City Council Rail Committee Staff Report Report Type: Meeting Date: 12/6/2012 City of Palo Alto Page 1 Summary Title: Rail Guiding Principles Update Title: Proposed Updates to the Palo Alto City Council Rail Committee Guiding Principles From: City Manager Lead Department: Planning and Community Environment Recommendation Staff recommends that the Rail Committee recommend approval by the City Council of the draft revisions to the Rail Committee Guiding Principles following Rail Committee review and input. Executive Summary At the October 11, 2012 Rail Committee meeting, the Rail Committee directed staff to propose further updates to the Rail Committee Guiding Principles to reflect changes that have occurred relative to both California high-speed rail (HSR) and Caltrain since the City Council last revised the Rail Committee Guiding Principles in December 2011. Therefore, attached for Rail Committee review, are three documents: 1. The most recently adopted version of the Rail Committee Guiding Principles approved by the City Council on December 19, 2011 (Attachment A) 2. A redlined version of the most recently adopted version of the Rail Committee Guiding Principles reflecting proposed revisions; however, the introduction is not redlined as it was completely rewritten (Attachment B) 3. A clean version of the Rail Committee Guiding Principles reflecting proposed revisions (Attachment C) Attachments:  Attachment A: Rail Committee Guiding Principles, December 19, 2011 (PDF) City of Palo Alto Page 2  Attachment B: REDLINED DRAFT - Rail Committee Guiding Principles, December 6, 2012 (PDF)  Attachment C: CLEAN DRAFT - Rail Committee Guiding Principles, December 6, 2012 (PDF)       1 PALO ALTO CITY COUNCIL RAIL COMMITTEE  GUIDING PRINCIPLES  Role and Authority of the Rail Committee  The Committee shall advise the City Council on high speed rail (HSR), Caltrain and related rail  transit matters and provide the community with appropriate forums for the discussion of such  issues.  The Committee shall keep the full Council informed on a regular basis.  The Committee shall have the authority to act on behalf of the City on HSR, Caltrain and related  rail transit matters when there is not sufficient time to refer a particular issue to the full City  Council before action is needed. However, the Committee shall forward their recommendations  to the Council for final action if the Committee determines that it is feasible to do within the  time available.  Such actions by the Committee shall include, but not be limited to, advocacy to  the state legislature, the HSR Authority, Caltrain Joint Powers Board, Congress and other  pertinent governmental agencies.  Such actions by the Committee shall be consistent with the  following policies of the City:  Background  In November 2008 California voters approved Prop 1A, a nearly ten billion dollar bond measure,  the primary purpose of which is to develop HSR service from Los Angeles to San Francisco.  The  High Speed Rail Authority (the Authority) has decided that the route HSR will take from San Jose  to San Francisco is along the Caltrain right of way (ROW), including the portion of the ROW that  runs through Palo Alto.  However, the Environmental Impact Report used by the Authority in  making this decision has been de‐certified per court order.  Many issues, such as the vertical  alignment of the HSR, remain undecided.  Recognizing that HSR could have significant impacts  on Palo Alto, the City Council on May 18, 2009 created an ad hoc High Speed Rail Subcommittee  of four Council Members, (since changed to a standing committee and renamed the Rail  Committee).  The Council also adopted a set of Guiding Principles which allowed the Committee  to take a variety of actions in the name of the City without action of the full Council.  Subsequently, the Committee‐‐‐ indeed the entire community‐‐‐ has learned a great deal about  HSR and many HSR related actions have taken place.  The Authority has selected the central valley as their first construction segment which allows  for more a more deliberative and collaborative consideration of alternatives on the peninsula.   Additionally, an alternative for a limited “blended” rail system along the Caltrain corridor has        2 been proposed along with a corresponding limited EIR. This proposal limits the scale of rail on  the peninsula.  The Authority in November 2011 issued its revised Business Plan showing that  the cost of HSR would be $98 billion dollars.  In the revised Business Plan the Authority used the  same ridership forecast model as it had in the past and did not address numerous flaws  identified by many experts who found the Authority’s projections to be unfounded and  unreliable.    Guiding Principles  The City Council therefore, adopts the following Principles to guide its decision making  framework and the actions of the Committee:   The City of Palo Alto believes that the High Speed Rail (HSR) Project should be terminated for  the following reasons:  1. The current project fundamentally contradicts the measure presented to the voters under  Prop. 1A in 2008.  2. The Business Plan is fatally flawed and not credible.  In November 2008, the voters passed a bond measure for a HSR project based on:  • Grossly understated construction costs,  • Understated fares and overstated ridership,  • Operating without a government subsidy, and  • A Funding Plan legally required to identify funding sources and achieve environmental       review prior to construction of an Initial Operating Segment (IOS).   Since the revised HSR Business and Funding Plans do not meet the projected ridership, fare, job  creation, and other significant requirements, the City believes that the voters were not given  accurate information during the 2008 election to make an informed decision on a HSR project  for the State of California.  If the State should move forward with the HSR project, the following Guiding Principles shall  apply to the City’s positions on HSR:  1. The City is opposed to an elevated alignment of HSR/Caltrain in Palo Alto.  2. The City’s preferred vertical alignment of fixed rail in Palo Alto is below grade.  3. All neighborhoods in Palo Alto affected by HSR/Caltrain should be treated with equal  consideration with respect to vertical alignment impacts.        3 4. The City believes that the pending program EIR for the Central Valley to San Francisco  portion of HSR is fatally flawed and that the HSR Authority should reopen and  reconsider its decision to use the Pacheco Pass route.  5. The City supports the findings of the Legislative Analyst’s Office, State Auditor and the  HSR Peer Review Committee which question the viability and accuracy of the Authority’s  Business Plan on such matters as the ridership projections, identification of sufficient  and reliable funding sources, project management, and operations of HSR.   6. The City favors legislation which would enable effective implementation of the HSR Peer  Review Committee authorized by AB 3034.  7. Palo Alto supports transit and urban design solutions that will be compatible with our  economic development strategies, transportation goals, and vision of the transit  corridor within our boundaries; HSR/Caltrain needs to complement the goals and  strategies of our Comprehensive Plan.   8. Palo Alto supports the use of the Context Sensitive Solutions related to HSR and Caltrain  that is effectively funded and implemented by the Authority.   9. The High Speed Rail Authority should provide sufficient funding to affected Cities to  allow them to hire experts to study reports requiring feedback and sufficient outreach  to the community to capture their concerns and suggestions.  10. Proposed changes to the Caltrain corridor by either the Authority or Caltrain should  provide realistic renderings of the various alternatives and also provide simulations that  would help to provide an understanding of the sound and vibrations.   11. Palo Alto strongly supports Caltrain and the commuter rail service at the present or  improved levels of service.  12. Palo Alto also supports the modernization of Caltrain, and/or as the lead agent for a  phased alignment with but independent of HSR.  13. Palo Alto will work cooperatively with neighboring communities with respect to HSR and  Caltrain issues of mutual concern through vehicles such as the Peninsula Cities  Consortium.  14. Palo Alto expects all current rail crossings to remain active.  In the event that the  modernization of Caltrain and/or HSR increases train service from current 2011 levels,  Palo Alto will consider grade separation solutions for the Alma, Churchill, East Meadow,        4 and East Charleston crossings that are effectively funded and implemented by the lead  agency  15. The Guiding Principles of the Committee incorporates by reference Council adopted  written comments to the Authority, the Caltrain Joint Powers Board, and other relevant  agencies. In case of any conflict in policies the most recent language prevails.      Updated: December 19, 2011 (previously updated October 12, 2011 and May 17, 2010)  Background  In November 2008 California voters approved Proposition 1A, a $9.95 B bond measure, for High  Speed Rail (HSR) service from Los Angeles to San Francisco.  The San Jose to San Francisco  segment of the selected route will take HSR rail service through Palo Alto.  This segment is now  proposed to be a “blended system”, primarily relying on existing Caltrain right‐of‐way and  track.  In anticipation of HSR, Caltrain is proposing to modernize this segment, including  electrification of the trains.  However, the costs and environmental impacts of this “blended  system” continue to evolve, and have not yet been fully defined, studied or mitigated.   The most recent HSR business plan sets the initial cost of the overall HSR system at  approximately $68 B.  While this cost reflects a reduction compared to recent cost estimates, it  still significantly exceeds the $33 B cost estimate advertised in Proposition 1A.  In this revised  business plan, the California High Speed Rail Authority (CHSRA) also continues to use the  debatable and highly optimistic ridership forecast models, and does not address numerous  inconsistencies that had been noted by experts in previous business plans.  This analysis,  therefore, creates an unreliable framework for accurate fiscal and environmental review of the  HSR system.  Moving forward, the initial construction segment (ICS) for HSR will be in the Central Valley.  In  July 2012, legislation was enacted that allocated approximately $8 B of state and federal money  for construction of the ICS, and for investments in Northern and Southern California commuter  rail systems in anticipation of the future operation of HSR trains on these tracks as part of a  Blended System.  However, at least $55 B of unidentified funding remains necessary for  completion of the Los Angeles to San Francisco system.  Therefore, important funding and  environmental issues remain undecided, and must be critically examined prior to final decisions  being made.  An ongoing, detailed analysis is even more critical for the complex, blended San  Jose to San Francisco segment.          Guiding Principles  The City Council adopts the following Principles to guide its decision making framework and the  actions of the Committee:   The City of Palo Alto believes that the HSR project should be terminated for the following  reasons:  1. The current project fundamentally contradicts the measure presented to the voters  under Prop. 1A in 2008.  The voters approved the measure based on grossly  underestimated construction costs, overstated ridership numbers and underestimated  fares.  The voters also expected that HSR could operate without a subsidy and that  Deleted: therefore,  funding sources would be identified and environmental review would be complete prior  to construction of an Initial Operating Segment.     2. Given that the revised HSR Business and Funding Plans do not meet the projected  ridership, fare, job creation, and other significant requirements, the City believes that  the voters were not given the accurate information during the 2008 election necessary  to make an informed decision on a HSR project for the State of California.  The City realizes, however, that there is momentum at the Federal and State level to make  HSR a reality, despite the conflicts with Prop 1A.  That said, there are many evolving aspects  of HSR that have not yet been studied or decided.    Therefore, if the State should move forward with the HSR project, the following Guiding  Principles shall apply to the City’s positions on HSR:  1. The City supports a non‐elevated alignment of HSR/Caltrain in Palo Alto.    2. The City’s preferred vertical alignment of fixed rail in Palo Alto is below grade.  3. When examining the potential impacts of vertical rail alignments equal attention shall  be given to all Palo Alto neighborhoods.  Adopted mitigation measures should be  proportionate to the impacts identified in the studies.    4. The City believes that the Program Environmental Impact Report (EIR) for the Central  Valley to San Francisco portion of HSR is fatally flawed and that the CHSRA should  reopen and reconsider its decision to use the Pacheco Pass route.  5. The City supports the findings of the Legislative Analyst’s Office, State Auditor, and the  HSR Peer Review Committee regarding the viability and accuracy of the CHSRA’s  Business Plan on such matters as the ridership projections, the identification of  sufficient and reliable funding sources, project management, and operation of HSR.   6. The City favors legislation which would enable implementation of the HSR Peer Review  Committee authorized by AB 3034.  7. Palo Alto supports transit and urban design solutions that will be compatible with our  economic development strategies, transportation goals, and rail corridor vision..   HSR/Caltrain needs to complement the goals and strategies of the City’s Comprehensive  Plan.   8. Palo Alto supports the use of the Context Sensitive Solutions process for HSR and  Caltrain that is funded and implemented by the CHSRA.   Deleted: However Deleted: component and many  Deleted: <#>All neighborhoods in Palo Alto  affected by HSR/Caltrain should be treated with  equal consideration with respect to vertical  alignment impacts.¶ Deleted: which question Deleted: effective  Deleted:  of the transit corridor within our  boundaries Deleted: effectively  9. The CHSRA should provide sufficient funding to affected cities to allow them to hire  experts to study reports requiring feedback and sufficient outreach to the community to  capture their concerns and suggestions.  10. Proposed changes to the Caltrain corridor by either the CHSRA or PCJPB should provide  both realistic renderings of the various alternatives and simulations that would help  provide an understanding of the system’s sound and vibration impacts.   11. Palo Alto strongly supports Caltrain and the commuter rail service at the present or  improved levels of service.  12. Palo Alto supports the modernization of Caltrain.  However, whether the City supports  electrification cannot be determined until all potential impacts are identified, studied  and suitable mitigation measures are implemented.  13.  Palo Alto supports Caltrain as the lead agency for all Caltrain Corridor environmental  documents and system improvements.  14. Palo Alto will work cooperatively with neighboring communities with respect to HSR and  Caltrain issues of mutual concern through vehicles such as the Peninsula Cities  Consortium.  15. Palo Alto expects all current rail crossings to remain open to automobiles, bicycles and  pedestrians.  In the event that the modernization of Caltrain and/or HSR increases train  service from current 2012 levels, Palo Alto will consider grade separation solutions for  the Alma, Churchill, East Meadow, and East Charleston crossings. These improvements  must be funded and implemented by the lead agency.  16. A detailed and transparent environmental analysis of all proposed improvements must  be completed.  Therefore, the California Environmental Quality Act (CEQA) and the  National Environmental Policy Act (NEPA)shall not be modified in any way that affects  the HSR or Caltrain Corridor environmental review process as currently required by law.  17. Palo Alto strongly supports revisions to the Peninsula Corridor Joint Powers Board  (PCJPB) governance structure that more accurately reflect the distribution of Caltrain  ridership.  Additionally, the PCJPB should consider making such revisions consistent with  a ballot measure seeking a dedicated funding source for Caltrain operations, should one  occur.  18. The Guiding Principles of the Committee incorporates by reference Council adopted  written comments to the CHSRA, PCJPB, and other relevant agencies.  In case of any  conflict in policies the most recent language prevails.    Deleted: but  Deleted: or not that includes Deleted: is still  Deleted: un Deleted: <#>Palo Alto supports Caltrain as the  lead agency for all system improvements in the  Caltrain corridor.¶ Deleted: active Deleted: thatare Deleted: effectively  Deleted: Under no circumstances should HSR  or Caltrain be exempted in any way from the Deleted: or  Deleted: ), including any amendments. Deleted: in congruence    Updated: December 6, 2012(previously updated December 19, 2011 October 12, 2011 and May  17, 2010)                  Deleted: December 19, 2011  Background  In November 2008 California voters approved Proposition 1A, a $9.95 B bond measure, for High  Speed Rail (HSR) service from Los Angeles to San Francisco.  The San Jose to San Francisco  segment of the selected route will take HSR rail service through Palo Alto.  This segment is now  proposed to be a “blended system”, primarily relying on existing Caltrain right‐of‐way and  track.  In anticipation of HSR, Caltrain is proposing to modernize this segment, including  electrification of the trains.  However, the costs and environmental impacts of this “blended  system” continue to evolve, and have not yet been fully defined, studied or mitigated.   The most recent HSR business plan sets the initial cost of the overall HSR system at  approximately $68 B.  While this cost reflects a reduction compared to recent cost estimates, it  still significantly exceeds the $33 B cost estimate advertised in Proposition 1A.  In this revised  business plan, the California High Speed Rail Authority (CHSRA) also continues to use the  debatable and highly optimistic ridership forecast models, and does not address numerous  inconsistencies that had been noted by experts in previous business plans.  This analysis,  therefore, creates an unreliable framework for accurate fiscal and environmental review of the  HSR system.  Moving forward, the initial construction segment (ICS) for HSR will be in the Central Valley.  In  July 2012, legislation was enacted that allocated approximately $8 B of state and federal money  for construction of the ICS, and for investments in Northern and Southern California commuter  rail systems in anticipation of the future operation of HSR trains on these tracks as part of a  Blended System.  However, at least $55 B of unidentified funding remains necessary for  completion of the Los Angeles to San Francisco system.  Therefore, important funding and  environmental issues remain undecided, and must be critically examined prior to final decisions  being made.  An ongoing, detailed analysis is even more critical for the complex, blended San  Jose to San Francisco segment.          Guiding Principles  The City Council adopts the following Principles to guide its decision making framework and the  actions of the Committee:   The City of Palo Alto believes that the HSR project should be terminated for the following  reasons:  1. The current project fundamentally contradicts the measure presented to the voters  under Prop. 1A in 2008.  The voters approved the measure based on grossly  underestimated construction costs, overstated ridership numbers and underestimated  fares.  The voters also expected that HSR could operate without a subsidy and that  funding sources would be identified and environmental review would be complete prior  to construction of an Initial Operating Segment.     2. Given that the revised HSR Business and Funding Plans do not meet the projected  ridership, fare, job creation, and other significant requirements, the City believes that  the voters were not given the accurate information during the 2008 election necessary  to make an informed decision on a HSR project for the State of California.  The City realizes, however, that there is momentum at the Federal and State level to make  HSR a reality, despite the conflicts with Prop 1A.  That said, there are many evolving aspects  of HSR that have not yet been studied or decided.    Therefore, if the State should move forward with the HSR project, the following Guiding  Principles shall apply to the City’s positions on HSR:  1. The City supports a non‐elevated alignment of HSR/Caltrain in Palo Alto.    2. The City’s preferred vertical alignment of fixed rail in Palo Alto is below grade.  3. When examining the potential impacts of vertical rail alignments equal attention shall  be given to all Palo Alto neighborhoods.  Adopted mitigation measures should be  proportionate to the impacts identified in the studies.    4. The City believes that the Program Environmental Impact Report (EIR) for the Central  Valley to San Francisco portion of HSR is fatally flawed and that the CHSRA should  reopen and reconsider its decision to use the Pacheco Pass route.  5. The City supports the findings of the Legislative Analyst’s Office, State Auditor, and the  HSR Peer Review Committee regarding the viability and accuracy of the CHSRA’s  Business Plan on such matters as the ridership projections, the identification of  sufficient and reliable funding sources, project management, and operation of HSR.   6. The City favors legislation which would enable implementation of the HSR Peer Review  Committee authorized by AB 3034.  7. Palo Alto supports transit and urban design solutions that will be compatible with our  economic development strategies, transportation goals, and rail corridor vision..   HSR/Caltrain needs to complement the goals and strategies of the City’s Comprehensive  Plan.   8. Palo Alto supports the use of the Context Sensitive Solutions process for HSR and  Caltrain that is funded and implemented by the CHSRA.   9. The CHSRA should provide sufficient funding to affected cities to allow them to hire  experts to study reports requiring feedback and sufficient outreach to the community to  capture their concerns and suggestions.  10. Proposed changes to the Caltrain corridor by either the CHSRA or PCJPB should provide  both realistic renderings of the various alternatives and simulations that would help  provide an understanding of the system’s sound and vibration impacts.   11. Palo Alto strongly supports Caltrain and the commuter rail service at the present or  improved levels of service.  12. Palo Alto supports the modernization of Caltrain.  However, whether the City supports  electrification cannot be determined until all potential impacts are identified, studied  and suitable mitigation measures are implemented.  13. Palo Alto supports Caltrain as the lead agency for all Caltrain Corridor environmental  documents and system improvements.   14. Palo Alto will work cooperatively with neighboring communities with respect to HSR and  Caltrain issues of mutual concern through vehicles such as the Peninsula Cities  Consortium.  15. Palo Alto expects all current rail crossings to remain open to automobiles, bicycles and  pedestrians.  In the event that the modernization of Caltrain and/or HSR increases train  service from current 2012 levels, Palo Alto will consider grade separation solutions for  the Alma, Churchill, East Meadow, and East Charleston crossings. These improvements  must be funded and implemented by the lead agency.  16. A detailed and transparent environmental analysis of all proposed improvements must  be completed.  Therefore, the California Environmental Quality Act (CEQA) and the  National Environmental Policy Act (NEPA)shall not be modified in any way that affects  the HSR or Caltrain Corridor environmental review process as currently required by law.  17. Palo Alto strongly supports revisions to the Peninsula Corridor Joint Powers Board  (PCJPB) governance structure that more accurately reflect the distribution of Caltrain  ridership.  Additionally, the PCJPB should consider making such revisions consistent with  a ballot measure seeking a dedicated funding source for Caltrain operations, should one  occur.  18. The Guiding Principles of the Committee incorporates by reference Council adopted  written comments to the CHSRA, PCJPB, and other relevant agencies.  In case of any  conflict in policies the most recent language prevails.      Updated: December 6, 2012 (previously updated December 19, 2011 October 12, 2011 and  May 17, 2010)