HomeMy WebLinkAboutStaff Report 3303 City of Palo Alto (ID # 3303) Finance Committee Staff Report Report Type: Action Items Meeting Date: 12/4/2012 City of Palo Alto Page 1 Summary Title: FY 2012 Year-End CIP Matrices Title: Fiscal Year 2012 Year-End Capital Improvement Program Projects Status Report From: City Manager Lead Department: Administrative Services RECOMMENDATION Staff recommends that the Finance Committee review and accept the information on the City’s Capital Improvement Program contained in this report. BACKGROUND This report provides information on the status of the City’s Capital Improvement Program (CIP) projects as of the end of Fiscal Year (FY) 2012. The attached graphs and matrix (Attachments 1 through 4 and Exhibit A) list all CIP projects and their current status, and include any issues that might cause a change in the scope or timing of the projects. The report is intended to update Council on the progress of all CIP projects that were open at the beginning of FY 2012, and on those that were added or completed during the fiscal year. The report also provides an update on the General Fund infrastructure backlog. DISCUSSION The attached graphs/tables provide detail for General Fund projects: o General Fund Capital Improvement Program Expenditures Summarized by Project Category for Fiscal Years 2007-2012 (Attachment 1) o General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2007-2012 (Exhibit A) o General Fund Transfers to Infrastructure Reserve for Fiscal Years 2007-2016 (Attachment 2) City of Palo Alto Page 2 The attached matrices provide detail for all funds: o Fiscal Year 2012 Year-End Capital Improvement Program Projects Status (Attachment 3) o Continuous Capital Projects Expenditures for Fiscal Years 2007-2012 (Attachment 4) In the attached matrix (Attachment 3), the city departments have submitted information on their projects and commented on any issues that might cause a change in the scope or timing of the projects. The matrix categorizes CIP projects into minor projects (projects that can be completed within a one-year period) and multi-year projects (projects that have multi-year budgets and/or complex implementation schedules with identifiable phases). The project status portion of the matrix identifies the phase of the project at fiscal year-end, and illustrates how much progress was made. Three distinct phases are utilized, as follows: Phase Activities Pre-Design Preparation of a feasibility study Development of a master plan Definition of a project scope Preparation of an Environmental Impact Report Design Hiring a design consultant Completion of project design Soliciting bids or proposals Construction Acquisition of major equipment Installation Implementation of a project In the attached matrix, projects are listed by department for the General Fund and by fund for the Enterprise and Internal Service Funds. The matrix also includes information on the total budget of the project from inception, available budget as of the beginning of the fiscal year, fiscal year expenditures, fiscal year contingencies, fiscal year encumbrances, remaining balance in the project budget as of year-end, and the budget percent complete for the project. The matrix does not include “continuous” projects. These projects, such as water meter replacement, have no definitive beginning or end dates and receive ongoing funding to reflect continuing replacement cycles or commitments. Continuous projects are listed by responsible department and fund and include five years of actual expenditures including the current fiscal year through June 30, 2012 (Attachment 4). Attachments 3 and 4 together represent all open City of Palo Alto Page 3 CIP projects in the City. RESOURCE IMPACT Below is a summary of the General Fund CIP budget through June 30, 2012. Total Adjusted Budget for FY 2012 $102,844,341 Less: Total Expenditures for FY 2012 32,234,892 Less: Total Encumbered Balance as of June 30, 2012 22,402,670 Remaining balance of the budget carried over to FY 2013 $ 48,206,779 * * Continuing Projects PE-09006 (Mitchell Park Library and Community Center New Construction), PE-11000 (Main Library New Construction & Improvements), and LB-11000 (Furniture & Technology for Measure N Project) represent more than half of the carry forward balance. Projects that were completed but still had remaining appropriations as of FY 2012 were closed at the beginning of FY 2013 and the balances will be returned to appropriate reserves. These projects are included in the Comprehensive Annual Financial Report (CAFR) CMR since Council approval is necessary. Below we have listed highlights of various projects from the General and Enterprise Funds: General Fund: AS-08000 - Acquisition of Los Altos Treatment Plant o Three new leases with various contractors were executed for portion of this site. The new leases resulted in new annual revenues in the amount of $40,000. CC-11000 - Cubberley Gym Activity Room o Although a relatively small capital project, this complete renovation of the old boys’ locker room at Cubberley converted a space with limited function as storage into a multi-use athletic, training and dance facility that now serves as many as 300 class participants and renters per week. LB-11000 - Furniture & Technology for Library Measure N Project City of Palo Alto Page 4 o The newly renovated Downtown Library reopened in July 2011 with furniture, computers and other items purchased through the Captial Project Fund. This branch was the first of three Measure N projects to be completed. It is fully funded by the Palo Alto Library Foundation’s multi-million dollar campaign to support the new and renovated libraries. PE-09005 - Downtown Library Improvements o The Downtown Library renovation project was successfully completed in FY2012. The first of three library projects to be completed with funds from 2008’s Measure E, the project provides a community meeting room with 50-60 seats, a small dedicated children’s room, and a new group study room. Other features included lighting improvements, new mechanical systems, accessible restrooms, and new carpet and paint. Enterprise Funds: Electric o The $1.5 million contract to reconductor the overhead 60kV line on Alma St. from Addison Ave. to El Carmelo Ave. was completed. o The $900,000 contract to convert existing High Pressure Sodium (HPS) streetlight fixtures to Light Emitting Diode (LED) lights is 50% complete. o The final service conversions for the $3.2 million Underground District 45 Project were completed. Gas o The $4.4 million contract for the replacement of 38,000 linear feet of gas main pipe and 260 services with PE pipe is 85% complete (Gas Main Replacement Project 18/19A). o The replacement of the regulating equipment at Gas Stations 2 and 4 has been completed. Water o The $8.6 million contract for the construction of the El Camino Reservoir, pump station and well is 55% complete. o The $4.8 million contract for the rebuilding of the Mayfield Pump Station is 65% complete. o The $2 million contract for the seismic retrofit of Mayfield and Boranda Reservoirs is 45% complete. o The $2.6 million contract for the rehabilitation of the five existing wells is 95% City of Palo Alto Page 5 complete. The wells are currently going through final testing. Wastewater Collection o The $ 3.5 million to perform closed circuit TV scans of sanitary sewer laterals for the presence of gas crossbores is 50% complete. GENERAL FUND INFRASTRUCTURE BACKLOG UPDATE The City’s infrastructure remains a top priority. In October 2010, the City Council created the Infrastructure Blue Ribbon Commission (IBRC) to identify and prioritize the City’s infrastructure needs and to determine funding sources and financing mechanisms to address the City’s backlog and future needs. On December 22, 2011, the IBRC issued its final report, ’Palo Altos Infrastructure: Catching Up, Keeping Up, and Moving Ahead <http://www.cityofpaloalto.org/civicax/filebank/documents/29729> In its report, the IBRC concluded that annual maintenance of existing infrastructure or “keep- up” needs have been underfunded by about $2.2 million per year. According to the IBRC, the underfunding of “keep-up” needs over prior years has led to a deferred maintenance backlog of $41.5 million. The IBRC recommended annual funding of about $4.2 million for the next ten years to address these deferred maintenance or “catch-up” needs. The IBRC also identified major capital expenditures of $210.7 million for “new and replacement” needs, including the replacements of the Public Safety Building and the Municipal Services Center. To address annual “keep-up” needs as defined by the IBRC, the annual capital transfer from the General Fund was increased by $2.2 million in the FY 2013 Adopted Capital Budget. On September 18, 2012, the City Council approved a plan and timeline to place a potential infrastructure finance measure on the November 2014 ballot. The strategy for this endeavor encompasses the following four fundamental tracks: 1. Strategic Planning/Opinion Research 2. Community Outreach 3. Plan/Design Review 4. Ballot Preparation Next steps include retaining outside professional expertise for public opinion research as well as hiring an external communications strategist. The plan and timeline are outlined in Staff City of Palo Alto Page 6 Report #3140: <http://www.cityofpaloalto.org/civicax/filebank/documents/31161> CAPITAL PROJECTS APPROVED AFTER BUDGET PROCESS Attachment 5 shows capital projects approved by Council after the approval of the adopted budget for fiscal years 2007 through 2013. The inclusion of this list satisfies a request from the IBRC. Attachments:  Attachment 1: FY2012 GF CIP Expenditures By Project Category (Graph) (XLS)  Attachment 2: GF Xfers To Infra Reserve For FYs 2007-2016 (XLS)  Attachment 3: FY2012 Year-End CIP Project Status Reports (XLS)  Attachment 4: Continuous Projects June 30 2012 (XLS)  Exhibit A: GF CIP Project Expenditures For FYs 2008-2012 (XLS) Attachment 1 Buildings & Facilities Land & Land Improvements Miscellaneous Non- Infrastructure Management Plan Parks & Open Space Streets & Sidewalks Totals By Year FY 2008 5,797 2,654 453 2,977 3,630 5,859 21,370 FY 2009 10,082 2,503 110 440 1,733 6,227 21,095 FY 2010 9,312 2,353 291 7 3,460 5,855 21,278 FY 2011 20,250 98 211 889 1,731 7,422 30,601 FY 2012 23,868 17 228 31 1,113 6,977 32,235 Totals 69,309 7,625 1,293 4,344 11,667 32,340 126,579 5,797 2,654 453 2,977 3,630 5,859 21,370 10,082 2,503 110 440 1,733 6,227 21,095 9,312 2,353 291 7 3,460 5,855 21,278 20,250 98 211 889 1,731 7,422 30,601 23,868 17 228 31 1,113 6,977 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 18,000 20,000 22,000 24,000 26,000 28,000 30,000 32,000 General Fund Capital Improvement Program Expenditures Summarized by Project Category for Five Years: Fiscal Years 2008-2012 ($ in thousands) Page 1 of 1 12/4/2012 Attachment 2 Amount Transferred to Infrastructure Amount Returned to General Fund Net Amount Fiscal Year $(000)$(000)$(000) 2007 $8,736 $75 a $8,661 2008 $11,807 $117 $11,690 2009 $14,648 b $14,648 2010 $9,900 $3,243 $6,657 2011 $9,857 $9,857 2012 $18,644 c $18,644 2013 $10,852 $10,852 2014 $11,294 $11,294 2015 $11,747 $11,747 2016 $12,217 $12,217 Total $119,702 $3,435 $116,267 Notes:a. Funds transferred to cover GF engineering costs for structures and grounds. b. Includes funding for the Public Safety Building $3,437K c. Includes one-time transfer of $7.6 million to reduce GF BSR to 18.5 percent target level Sources: FY 2007 through 2012 are actual amounts FY 2013 through 2016 based on Long Range Financial Forecast $8,661 $11,690 $14,648 $6,657 $9,857 $18,644 $10,852 $11,294$11,747 $12,217 $5,000 $7,000 $9,000 $11,000 $13,000 $15,000 $17,000 $19,000 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 $000 Fiscal Year General Fund Transfers to Infrastructure Reserve for Fiscal Years 2007-2016 Page 1 of 1 12/4/2012 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments AS-09000 City of Palo Alto Municipal Airport Transition Project Land and Land Improvements $130,000 $0 $0 $0 $0 $0 $0 100%Complete Complete Close CIP project. AS-08000 Acquisition of Los Altos Treatment Plant Land and Land Improvements $7,223,394 $0 $0 $0 $0 $0 $0 100%Complete Complete Close CIP project. AS-10001 Sustainability Contingency Miscellaneous $400,000 $100,000 $0 $0 $0 $0 $100,000 75%Complete Complete Close CIP project. 12/4/2012 MULTI-YEAR PROJECTS FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND ADMINISTRATIVE SERVICES DEPARTMENT MINOR PROJECTS Page 1 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments AC-09001 Children's Theatre Replacement and Expansion Buildings and Facilities $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Pre-Design Jun 13 Needs assessment has been completed. Staff preparing Requests for Proposal. AC-09002 Community Theater Sound System Replacement Buildings and Facilities $200,000 $200,000 $0 $0 $0 $0 $200,000 0%Pre-Design Jun 13 Needs assessment has been completed. Staff preparing Requests for Proposal. AC-12001 Junior Museum & Zoo Perimeter Fence and Footpath Parks and Open Space $50,000 $50,000 $0 $0 $0 $19,819 $30,181 40%Pre-Design Sep 12 Staff to complete design and then project to go out to bid. CC-09001 Dimmer Replacement and Lighting System Buildings and Facilities $152,821 $148,824 $0 $4,609 $0 $9,815 $134,400 12%Design Jun 13 Project has been delayed as it will now be a design-and-build contract. CC-11000 Cubberley Gym Activity Room Buildings and Facilities $63,398 $5,357 $0 $0 $0 $0 $5,357 92%Complete Complete Project completed and to be closed. Remaining balance to be returned to Infrastructure Reserve. OS-09002 Baylands Emergency Access Levee Repair Parks and Open Space $175,000 $175,000 $0 $0 $0 $0 $175,000 0%Pre-Design Jun 13 Survey work for levee done by Public Works Engineering. Project now independent of and will no longer be paired with JPA flood control project. PG-09003 Park Maintenance Shop Remodel Parks and Open Space $159,096 $100,423 $2,244 $0 $0 $1 $98,178 38%Design TBD Since there is common shared space, this project will now be designed and constructed in-house by Public Works Facilities Management in conjunction with the Tree Division.PG-11000 Hopkins Park Improvements Parks and Open Space $95,000 $95,000 $0 $0 $0 $0 $95,000 0%Design TBD Staff in initial planning and development of scope of contract. PG-11001 Cogswell Plaza Improvements Parks and Open Space $150,000 $150,782 $10,341 $782 $0 $0 $139,659 7%Design Oct 12 Staff in planning and development of scope of contract. PG-11002 Monroe Park Improvements Parks and Open Space $250,000 $250,000 $0 $0 $0 $0 $250,000 0%Pre-Design TBD Staff in initial planning and development of scope of contract. PG-11003 Scott Park Improvements Parks and Open Space $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Design TBD Landscape architect hired for planning and development of scope of contract. PG-12001 Stanford / Palo Alto Playing Field Netting Parks and Open Space $50,000 $50,000 $0 $0 $0 $0 $50,000 0%Design TBD Staff in initial planning and development of scope of contract. PG-12002 Golf Course Tree Maintenance Parks and Open Space $75,000 $75,000 $21,014 $0 $0 $1,088 $52,898 29%Design TBD Staff in initial planning and development of scope of contract. PG-12004 Sarah Wallis Park Improvements Parks and Open Space $65,000 $65,000 $0 $0 $0 $0 $65,000 0%Pre-Design TBD Staff in initial planning and development of scope of contract. PG-12005 Relocate Power Poles for Soccer Field Parks and Open Space $100,000 $100,000 $0 $0 $0 $0 $100,000 0%Design TBD Project on hold pending staff land evaluation. MINOR PROJECTS FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND COMMUNITY SERVICES DEPARTMENT MINOR PROJECTS Page 2 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND COMMUNITY SERVICES DEPARTMENT MINOR PROJECTSPG-12006 Magical Bridge Playground Parks and Open Space $0 $0 $0 $0 $0 $0 $0 0%Design TBD Contractor selected. Staff in initial planning and development of scope of contract. Project to be taken over by Public Works (PE-12013). OS-00001 Open Space Trails & Amenities Parks and Open Space $2,025,720 $394,040 $101,440 $61,026 $0 $17,320 $214,254 89%Ongoing Various trail improvements at Arastradero, Foothills Park, and Baylands. Year 1 of 3 year contract. OS-00002 Open Space Lakes & Ponds Maintenance Parks and Open Space $442,183 $59,535 $15,080 $9,535 $0 $0 $34,920 92%Ongoing Year 1 of 3 year contract for Boronda Lake. MULTI-YEAR PROJECTS Page 3 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND COMMUNITY SERVICES DEPARTMENT MINOR PROJECTSOS-07000 Foothills Park Road Improvements Parks and Open Space $525,000 $275,000 $150,000 $0 $0 $0 $125,000 76%Ongoing Work is now in-house by Public Works Engineering or combined with their paving contracts. This is anticipated to result in future cost savings to address current overage. OS-09001 Off-Road Pathway Resurfacing and Repair Parks and Open Space $180,668 $130,486 $4,130 $0 $0 $1 $126,355 30%Ongoing Work is now done in-house by Public Works Engineering or combined with their paving contracts. PG-06001 Tennis & Basketball Court Resurfacing Parks and Open Space $526,443 $59,253 $50,321 $3,314 $0 $0 $5,618 99%Ongoing Cubberley Community Center Tennis courts 1-6 completed in FY 2012. Staff in initial planning for FY2012/13. PG-06003 Benches, Signage, Fencing, Walkways, and Perimeter Landscaping Parks and Open Space $675,668 $274,094 $46,243 $58,982 $0 $24,477 $144,392 79%Ongoing Projects Completed in FY 2012 - Site Amenities: Kings Plaza furniture, Signage: Open Space signage (Esther Clark Park & Emily Renzel Marsh). Landscaping: California Avenue hanging planters. Pathways: Gamble Garden pathways, DG pathway repairs throughout Bol Park, ADA pathway repair at Heritage Park. MULTI-YEAR PROJECTS Page 4 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND COMMUNITY SERVICES DEPARTMENT MINOR PROJECTSPG-09002 Park and Open Space Emergency Repairs Parks and Open Space $357,761 $86,037 $52,875 $0 $0 $5,316 $27,845 92%Ongoing Projects completed in FY 2012: Hoover Park: Fence repair at tennis courts. Rinconada & Weisshaar Park: Tennis court tripping hazard surface repairs. Stanford Palo Alto Playing Fields: Artificial turf repairs. Asphalt paving repair to Greer Park after mainline break. Repair of Mitchell Park play structure. Page 5 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FD-12000 ALS EKG Monitor Replacement Miscellaneous $180,000 $180,000 $0 $0 $0 $1 $179,999 0%Ongoing Jun 13 We have completed the evaluation on the field monitors and we are proceeding with getting quotes for the replacements. Please move all $$ to FY13 budget. FD-08001 Fire Station #6 Improvements Buildings and Facilities $60,000 $3,829 $271 $0 $0 $0 $3,558 94%Ongoing TBD We have completed the evaluation on the field monitors and we are proceeding with getting quotes for the replacements. Please move all $$ to FY13 budget. MULTI-YEAR PROJECTS FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND FIRE DEPARTMENT Page 6 of 32 Budget FY 2012 FY 2012 Estimated Project Project Project From Available FY 2012 Labor FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date Comments PD-08000 Crime Scene Evidence Collection Vehicle Miscellaneous $180,000 $5,799 $6,039 $0 $0 $1 ($241)100%Complete Vehicle construction completed and is now in service. Remaining balance to be returned to Infrastructure Reserve. FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND POLICE DEPARTMENT MINOR PROJECTS Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments LB-11000 Furniture & Technology for Library Measure N Project Miscellaneous $4,800,000 $1,646,876 $178,774 $0 $0 $718,271 $749,831 84%Ongoing Jun 15 Project activity is being coordinated with the construction schedule of the Mitchell Park Library & Community Center and Main Library Measure N building renovations. FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND LIBRARY SERVICES DEPARTMENT MULTI-YEAR PROJECTS Page 7 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments PL-05002 Charleston/ Arastradero Corridor Plan Non- Infrastructure Management Plan $1,211,890 $237,493 $26,988 $0 $0 $2 $210,503 83%Ongoing Dec 13 The City completed implementation of the project as a trial in October 2012. Remaining funds will be used to complete the design phase of the final median island improvements. PL-05003 College Terrace Traffic Calming Streets and Sidewalks $217,484 $0 $0 $0 $0 $1 ($1)100%Complete Mar 12 Project Complete. OK to Close. PL-06005 Installation of Ticket Machines Non- Infrastructure Management Plan $94,900 $0 $0 $0 $0 $0 $0 100%Complete Jun 09 Project Complete. OK to Close. PL-07002 El Camino Real/ Stanford Intersection Streets and Sidewalks $1,872,003 $1,658,067 $319,197 $22,486 $0 $70,000 $1,246,384 33%Ongoing Feb 12 Project Complete but waiting for final invoice from construction management consultant, Ghiardelli. Leave open until final invoice is paid. FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PLANNING AND COMMUNITY ENVIRONMENT DEPARTMENT MINOR PROJECTS Page 8 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PLANNING AND COMMUNITY ENVIRONMENT DEPARTMENT MINOR PROJECTS PL-11001 Dinah SummerHill Pedestrian Bicycle Path Streets and Sidewalks $300,000 $304,837 $183,350 $4,837 $0 $597 $116,053 61%Ongoing Dec 13 City is currently in a consultant-selection stage for a minor traffic study that is required to complete the public outreach process. The design is being done in-house in partnership with public works. Estimated construction period is Spring 2013. PL-00026 Local and Neighborhood Collector Street Traffic Calming Program (SIF) ("Safe Routes To Schools") Streets and Sidewalks $1,167,000 $640,160 $74,913 $12,408 $0 $389,605 $163,234 86%Ongoing This ongoing CIP implements traffic calming improvements along Residential Arterial Streets and also funds the development of Safe Routes to School Programs and Projects at schools. KEEP OPEN. PL-04010 Bicycle and Pedestrian Transportation Plan Implementation Project Streets and Sidewalks $341,149 $171,804 $103,599 $0 $0 $21,681 $46,524 86%Ongoing This ongoing CIP implements project recommendations from the City's Bike Transportation Plan. Active projects include an update of the Bike Transportation Plan and include a new Pedestrian section. Other active projects include bike rack deployments, bike route signage deployment, and the design of bike boulevard facilities. KEEP OPEN. PL-06002 Comprehensive Parking Signage Plan Non- Infrastructure Management Plan $475,000 $4,248 $4,248 $0 $0 $0 $0 100%Complete Complete The installation of color zone signage was completed in 2008. Current projects include hiring of a new Parking Manager to identify parking improvement strategies. This CIP will be closed eventually and remaining funds transferred to a new CIP entitled Transportation and Parking Improvements. PL-11002 California Avenue Transit Hub Corridor Streets and Sidewalks $1,725,200 $1,725,508 $16,053 $308 $0 $300,000 $1,409,147 18%Design Oct 14 Project delayed due to litigation. Design restarted in Summer 2012. Anticipated construction start date: Sept 2013 thru Summer 2014. MINOR PROJECTS MULTI-YEAR PROJECTS Page 9 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PLANNING AND COMMUNITY ENVIRONMENT DEPARTMENT MINOR PROJECTSPL-11003 Palo Alto Traffic Signal Central System Streets and Sidewalks $400,000 $364,472 $0 $0 $0 $0 $364,472 9%Design Dec 13 Staff is in the process of completing additional Caltrans Local Assistance documents to authorize the expenditure of funds for the project. PL-11004 Alma Street Traffic Signal Improvements Streets and Sidewalks $699,000 $645 $645 $0 $0 $0 $0 100%Complete Complete This project was dropped from the CIP last year. Caltrain, whom the City partnered with on a grant for this project, is leading the project on their own. PL-12000 Transportation and Parking Improvements Streets and Sidewalks $750,000 $750,000 $91,002 $0 $0 $141,060 $517,938 31%Ongoing N/A This CIP funds miscellaneous parking programs, studies and transportation projects. KEEP OPEN. PL-98013 School Commute Safety Improvements (SIF) Streets and Sidewalks $150,000 $1 $0 $0 $0 $1 $0 100%Complete Complete Project Complete. OK to Close. 12/4/2012 MULTI-YEAR PROJECTS Page 10 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments PE-06005 University Avenue Gateway Landscaping Improvements Parks and Open Space $240,480 $4,641 $0 $429 $0 $1 $4,211 100%Complete Mar 12 Remaining balance to be used on irrigation repairs. Project completed as of March 2012. All work has been completed as of March 2012.PE-07005 California Avenue Improvements Parks and Open Space $754,305 $40,285 $0 $0 $0 $0 $40,285 100%Complete Dec 11 Planning is the lead division in the designing phase with separate project number. Technically closed. PE-08004 Lytton Plaza Renovation Parks and Open Space $793,142 $43,879 $11,793 $0 $0 $1 $32,085 96%Construction Dec 12 CSD is still working with the Friends of Lytton Plaza on open items. (Upgrade on site FFE) PE-09002 Greer Park Phase IV Parks and Open Space $2,032,251 $225,920 $138,828 $3,202 $0 $9,006 $74,884 96%Construction Dec 12 Waiting for the final as-built drawing and resolution of construction defects. PE-11011 Highway 101 Pedestrian/Bicycle Overcrossing Streets and Sidewalks $499,806 $372,316 $12,096 $102,915 $0 $266,036 ($8,731)102%Design Jul 13 The feasibility study completed in November 2011. Preliminary Engineering and Environmental assessment started in June 2012. Council directed staff to explore design competition. PE-12002 Tree Wells - University Avenue Irrigation Miscellaneous $100,000 $128,743 $0 $28,743 $0 $0 $100,000 0%Construction Apr 13 Design (99%) phase is near completion. Construction expected to begin in mid February 2013 PE-12003 Rinconada Park Long Range Plan & Design Parks and Open Space $150,000 $213,447 $58,243 $63,447 $0 $82,739 $9,018 94%Pre-Design Jan 13 Project is in pre-design phase. PE-12004 Municipal Services Center Facilities Study Miscellaneous $100,000 $100,000 $220 $0 $0 $0 $99,780 0%Pre-Design Dec 13 Draft request for proposal is in review. PE-12009 Alma Guardrail Miscellaneous $115,889 $115,889 $0 $5,888 $0 $27,495 $82,506 29%Pre-Design PE-12013 Magical Bridge Playground Parks and Open Space $1,300,000 $1,364,047 $64,190 $65,047 $0 $186,313 $1,048,497 30%Design Jul 13 Design and constrution document is expected to be completed by Summer 2013 pending Friends of the Magical Bridge fund raising effort. PF-04000 Security System Improvements Buildings and Facilities $275,000 $59,768 $0 $0 $0 $0 $59,768 78%Construction Jun 13 Additional security for MSC to be installed. FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT MINOR PROJECTS Page 11 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT MINOR PROJECTSPF-06004 Cubberley Restroom Renovation Buildings and Facilities $327,422 $300,858 $2,271 $858 $0 $1 $297,728 9%Pre-Design Jun 13 On hold until decision made concerning Cubberley. PF-07003 Children's Theatre Fire/Life Safety Upgrade Buildings and Facilities $278,549 $231,711 $0 $131 $0 $0 $231,580 17%Design Jun 13 Project scope to be combined with more comprehensive CIP, PF- 09000. PF-07011 Roth Building Maintenance Buildings and Facilities $424,395 $259,781 $1,205 $0 $0 $0 $258,576 39%Ongoing Jun 13 All initial work completed. Ongoing work is for maintenance and repairs.PF-10002 Lot "J" Cowper/Webster Structural Repairs Buildings and Facilities $582,299 $543,356 $32,672 $0 $0 $20,953 $489,731 16%Design Dec 12 Completing bid process PF-12001 Parks and PWD Trees Work Space Improvements Parks and Open Space $375,000 $375,836 $0 $836 $0 $1 $374,999 0%Design Jun 13 Design completed. Work will be completed by June 2013 pending staffing resources. PF-12004 Citywide Backflow Preventer Installations Miscellaneous $250,000 $250,000 $0 $0 $0 $0 $250,000 0%Design Nov 12 All backflow meters identified. Bid process started. PF-12005 Council Conference Room Renovations Buildings and Facilities $0 $0 $0 $0 $0 $0 $0 0%Closed Aug 12 Closed PE-12017 City Hall First Floor Buildings and Facilities $213,020 $216,296 $36,241 $27,295 $0 $142,477 $10,283 95%Design TBD PO-10002 Downtown Tree Grates Miscellaneous $300,000 $261,985 $0 $0 $0 $4,000 $257,985 14%Ongoing Dec 15 Ongoing. Project is being done in conjunction with PO-89003 and tree replacement schedule. PO-12000 Wilkie Way Bridge Deck Replacement Streets and Sidewalks $50,000 $50,000 $0 $0 $0 $0 $50,000 0%Design Jun 13 Replacement deck materials are being evaluated for suitability. PO-12001 Curb and Gutter Repairs Streets and Sidewalks $250,000 $250,000 $1,851 $0 $0 $152,805 $95,344 62%Construction Oct 12 Ongoing. This is an annual project being done in conjunction with PO-89003. PO-12002 LATP Site Development Preparation & Security Miscellaneous $250,000 $250,000 $8,636 $0 $0 $0 $241,364 3%Design Jun 13 Preparing scope of work for demo, remediation, and wetland permitting work. Security fence repaired via minor contract. MINOR PROJECTS Page 12 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT MINOR PROJECTSPO-12003 Foothills Fire Management Streets and Sidewalks $200,000 $200,000 $0 $0 $0 $27,241 $172,759 14%Ongoing Jun 17 Clearing delayed. Scope for contract being determined. PE-00104 San Antonio Road Median Improvements Streets and Sidewalks $2,195,007 $1,081,318 $529,957 $146,427 $0 $361,676 $43,258 98%Construction Dec 12 Project is currently in Phase II: Tree removal has been completed, replacement of trees will be completed upon completion of the Overlay project which is expected to be completed by December of 2012. PE-05010 College Terrace Library Improvements Buildings and Facilities $3,723,874 $220,505 $7,344 $0 $0 $4,605 $208,556 100%Complete Jun 12 Project completed June 2012 PE-06006 Alma Street Landscape Improvements Streets and Sidewalks $131,934 $0 $0 $0 $0 $1 ($1)100%Complete Jun 12 Project completed June 2012 PE-06007 Park Restroom Installation Parks and Open Space $927,029 $619,435 $27,394 $70,725 $0 $1 $521,315 44%Construction Mar 13 Construction is underway and is expected to be completed in March of 2013. PE-09003 City Facility Parking Lot Maintenance Buildings and Facilities $430,000 $430,000 $51,098 $0 $0 $0 $378,902 12%Ongoing Jun 13 This is an annual project. Funding will be used for repaving the Cubberley Parking lot has been postponed, funds will be used for Mitchell Park Library and Sailing Station parking lots. PE-09005 Downtown Library Improvements Buildings and Facilities $5,524,772 $1,785,327 $679,043 $35,000 $0 $70,671 $1,000,612 82%post-construction Dec 12 Construction completed in FY 2012, project should remain open until warranty period is over December 2012.PE-09006 Mitchell Park Library & Community Center (New Construction) Buildings and Facilities $49,743,741 $36,035,972 $13,752,441 $460,741 $0 $13,160,977 $8,661,813 75%Construction Apr 13 Construction began Jun 10. Project is 75% complete. PE-09010 Library & Community Center Temporary Facilities Buildings and Facilities $792,770 $137,467 $0 $2,205 $0 $25,772 $109,489 86%Construction Apr 13 After final invoices are received, project should remain open until warranty period is over. Demobilization when Mitchell Library has opened. MULTI-YEAR PROJECTS Page 13 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT MINOR PROJECTSPE-10002 Ventura Community Center and Park Buildings and Facilities $371,913 $378,010 $1,750 $19,380 $0 $0 $356,880 4%Design Oct 13 Design underway, construction scheduled for 2014. PE-11000 Main Library New Construction and Improvements Buildings and Facilities $18,076,718 $17,460,912 $962,697 $177,107 $0 $426,930 $15,894,178 12%Design Aug 14 Currently have completed 95% of design phase. Construction expected to begin June 2013. PE-11012 Temporary Main Library Buildings and Facilities $500,000 $500,000 $96,435 $0 $0 $323,012 $80,553 84%Construction Feb 13 Conversion of Art Center auditorium to begin Jan 2013. PE-12011 Newell Road Bridge / San Francisquito Creek Bridge Replacement Streets and Sidewalks $360,000 $592,711 $2,004 $53,711 $0 $517,173 $19,823 94%Design Mar 13 Received proposal from consultants, awaiting Caltrans approval for an increase in grant funding. PE-12012 Eleanor Pardee Park Improvements Parks and Open Space $674,000 $695,507 $320 $21,507 $0 $0 $673,680 0%Construction Mar 13 Construction phase is expected in winter 2012/2013 PE-98020 Public Safety Building Buildings and Facilities $4,291,838 $109,862 $6,784 $8,159 $0 $908 $94,011 98%Design TBD Project currently on hold. PF-01002 Civic Center Infrastructure Improvements Buildings and Facilities $15,970,506 $2,689,681 $1,755,810 $194,799 $0 $537,313 $201,759 99%post-construction .Dec 12 Civic Center Improvements are in the punch-list stage. PF-04010 Cubberley Mechanical & Electrical Upgrades Buildings and Facilities $1,614,695 $0 $0 $0 $0 $0 $0 100%Design TBD Project on hold due to staff vacancy and lack of capital funds. Construction phase to be rescheduled for a later fiscal year. PF-05002 Municipal Service Center Renovation Buildings and Facilities $873,251 $681,764 $0 $0 $0 $0 $681,764 22%Design Jun 13 Project on hold per City Manager. PF-05003 Foothills Park Interpretive Center Improvements Buildings and Facilities $342,289 $226,341 $123,903 $17,730 $0 $0 $84,708 75%Construction Jun 13 HVAC, electrical, and lighting efficiency remaining. PF-06002 Ventura Buildings Improvements Buildings and Facilities $90,000 $0 $0 $0 $0 $0 $0 100%Pre-Design Jun 13 Pending priority meeting scope will be developed. MULTI-YEAR PROJECTS Page 14 of 32 Attachment 3 Total Budget FY 2012 FY 2012 FY 2012 FY 2012 FY 2012 Estimated Project Project Project From Available Expenditures Labor Contingencies Encumbrances Remaining Percent Project Completion Number Title Category Inception Budget Adjustments Balance Complete Status Date Comments FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS GENERAL FUND PUBLIC WORKS DEPARTMENT MINOR PROJECTSPF-07000 Art Center Electrical & Mechanical Upgrades Buildings and Facilities $8,145,197 $7,428,710 $4,382,651 $246,332 $0 $2,436,920 $362,806 96%Construction Dec 12 Currently under construction. PF-09000 Children's Theater Improvements Buildings and Facilities $200,000 $200,000 $0 $0 $0 $0 $200,000 0%Pre-Design TBD Project has not started PO-11000 Sign Reflectivity Upgrade Streets and Sidewalks $150,000 $163,600 $20,792 $0 $0 $142,808 $0 100%Design Dec 12 Contract Awarded and assessment has begun. PO-11001 Thermoplastic Lane Marking & Striping Streets and Sidewalks $350,000 $320,361 $127,958 $0 $0 $0 $192,403 45%Ongoing Jun 17 On-going annual contract in conjunction with PE-86070 (Streets Maintenance Program Projects). 12/4/2012 Page 15 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 Labor FY 2012 FY 2012 Remaining Percent Project Completion Comments Number Title Category Inception Budget Expenditures Adjustments Contingencies Encumbrances Balance Complete Status Date TE-01006 Enterprise Backup Solution Minor $70,000 $0 $0 $0 $0 $0 $0 100%Complete TE-01012 IT Disaster Recovery Plan Minor $578,626 $578,337 $0 $0 $0 $0 $578,337 0%Construction Jun-14 A draft disaster recovery plan has been completed. Planning SAP Windows server backup strategy. TE-05003 Internet Site Upgrade Minor $240,000 $42,262 $0 $0 $0 $0 $42,262 82%Complete This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-07002 Police Auto-Citation System Minor $125,000 $0 $0 $0 $0 $0 $0 100%Complete TE-08004 Fire Mobile Data Computer Minor $250,000 $69,199 $0 $0 $0 $1 $69,198 72%Construction Jun-13 Fire is in the process of assessing their mobile data needs to ensure all rigs have adequate equipment. TE-09000 Public Safety Computer-Aided Dispatch Replacement Minor $1,300,000 $1,300,000 $101,707 $0 $0 $0 $1,198,293 8%Construction Dec 12 Contract is under negotiations. TE-11002 Police Mobile In-Car Video System Replacement Minor $310,000 $310,000 $4,588 $0 $0 $0 $305,412 1%Pre-design Jun-13 Currently developing requirements. TE-11003 Recurring Credit Card Payment Minor $150,000 $150,000 $0 $0 $0 $0 $150,000 0%Pre-design Jun-14 Currently developing requirements. INFORMATION TECHNOLOGY DEPARTMENT MINOR PROJECTS MINOR PROJECTS FY 2012 YEAR -END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS INTERNAL SERVICE FUNDTECHNOLOGY FUND Page 16 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 Labor FY 2012 FY 2012 Remaining Percent Project Completion Comments INFORMATION TECHNOLOGY DEPARTMENT FY 2012 YEAR -END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS INTERNAL SERVICE FUNDTECHNOLOGY FUND TE-11001 Library Computer System Software Minor $350,000 $350,000 $0 $0 $0 $0 $350,000 0%Design Jun-14 Working with Information Technology Department to create the Request for Information. TE-95016 Permit Information Tracking System Multi-Year $980,050 $176,648 $0 $0 $0 $740 $175,908 82%Construction Jun-15 In planning phase of the Fire Module. This project ties into the Development Center Blueprint Project (TE-12001) TE-02013 Institutional Network (I-Net) Multi-Year $1,000,000 $604,122 $28,235 $0 $0 $0 $575,887 42%Construction Jun-15 In construction phase. TE-07006 SAP Continuous Improvement Project Multi-Year $8,898,680 $95,694 $0 $0 $0 $0 $95,694 99%Construction Jun-15 This project is identified as a possible additional funding source for the Telephone System Replacement Project. TE-99010 Acquisition of New Computers Multi-Year $362,350 $217,599 $32,784 $0 $0 $25,500 $159,315 56%Construction Jun-15 This is an ongoing project for the acquisition of new computers. TE-00010 Telephone System Replacement Multi-Year $2,646,587 $2,616,598 $72,015 $0 $0 $1,707,915 $836,668 68%Pre-design Dec-13 Finalizing recabling in facilities. Performing upgrade to high speed network. Target date for phone system cutover is Fall 2012. Unified Communications scheduled for Dec 2013. TE-02015 Citywide GIS Data, Infrastructure and Applications Multi-Year $2,228,954 $390,207 $181,297 $0 $0 $44,733 $164,177 93%Construction Jun-14 Performing application upgrade and modifications. MULTI-YEAR PROJECTS MULTI-YEAR PROJECTS Page 17 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 Labor FY 2012 FY 2012 Remaining Percent Project Completion Comments INFORMATION TECHNOLOGY DEPARTMENT FY 2012 YEAR -END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS INTERNAL SERVICE FUNDTECHNOLOGY FUND TE-05000 Radio Infrastructure Replacement Multi-Year $2,565,980 $1,948,160 $222,264 $0 $0 $1,055 $1,724,841 33%Pre-design Dec 16 This is a County-wide project. Awaiting project initiation from County. TE-06001 Library Radio Frequency Identification (RFID) Implementation Multi-Year $595,000 $467,607 $74,747 $0 $0 $46,676 $346,185 42%Construction Jun-14 The intent is to carry this funding over to FY 2013, add funding, and utilize for implementation per the upcoming Library Technology Plan. RFID implementation is being coordinated with the Library Construction /Remodeling Projects. TE-07000 Enterprise Application Infrastructure Upgrade Multi-Year $2,297,000 $554,000 $4,500 $0 $0 $41,408 $508,092 78%Construction Dec-13 $250K of this project is identified as a possible additional funding source for the Telephone System Replacement Project. Remaining dollars to be transferred to Application Maintenance Fund. TE-10000 Collections Software Multi-Year $111,800 $105,908 $76,108 $0 $0 $26,900 $2,900 97%Complete Dec-12 Live, remaining funds to be used for maintenance of system. TE-10001 Utility Customer Billing System Multi-Year $500,000 $500,000 $8,474 $0 $0 $75,526 $416,000 17%Pre-design Dec-15 Currently developing requirements. TE-11005 Implementation of Restructured Tiered Rates on Bills Multi-Year $200,000 $200,000 $0 $0 $0 $0 $200,000 0%Pre-design Dec-13 Currently developing requirements. TE-12001 Development Center Blueprint Multi-Year $935,600 $935,600 $9,230 $0 $0 $15,593 $910,777 3%Pre-design Jul-15 In Discovery Phase. Once this phase is complete the Development Center will decide on which initiatives they are going to pursue. $11,611,941 $815,949 0 0 $1,986,047 $8,809,946 MULTI-YEAR PROJECTS Page 18 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 Labor FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Adjustments*Contingencies Encumbrances Balance Complete Status Date Comments VR-01001 MSC Fuel Storage Tank /Svc Island Replacement Minor $2,609,597 $111,195 $31,650 $0 $0 $11,770 $67,775 97%Complete Project is complete and will be closed. Funds will be returned to funding source. VR-06801 Replace City-Wide Fuel Transaction and Inventory Management System Minor $285,000 $136,062 $26,224 $0 $0 $59,375 $50,463 82%Ongoing Jun 13 System has been installed at one site; site preparation in progress at remaining two sites. VR-07001 Automated Motor Pool Reservation and Vehicle Key Management System Minor $125,000 $98,398 $63,722 $0 $0 $26,334 $8,341 93%Ongoing Dec 13 All hardware at MSC, Elvell and Civic Center in place. Next step involves assigning vehicles and training of employees on on system. VR-09000 Vehicle Replacement Minor $2,378,327 $278,039 $275,720 $0 $0 $13 $2,306 100%Complete Project is complete and will be closed. Funds will be returned to funding source. VR-11000 Vehicle Replacement Minor $1,578,325 $1,402,973 $590,038 $0 $0 $371,284 $441,651 72%Ongoing Jun 13 Awaiting purchase and delivery of several vehicles. VR-12001 In-Ground Vehicle Lift Minor $50,000 $50,000 $0 $0 $0 $0 $50,000 0%Ongoing Jun 13 Bids received. Staff Report going to council to award. Next step issue Notice to Proceed. VR-04010 Vehicle Maintenance Facility Upgrades Multi-Year $561,733 $262,860 $0 $0 $0 $4 $262,856 53%Ongoing Jun 13 Ongoing, specifications need to be written for next phase of upgrades. INTERNAL SERVICE FUNDVEHICLE REPLACEMENT AND MAINTENANCE FUND MINOR PROJECTS MULTI-YEAR PROJECTS FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS PUBLIC WORKS DEPARTMENT Page 19 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 Labor FY 2012 FY 2012 Remaining Percent Project Completion INTERNAL SERVICE FUNDVEHICLE REPLACEMENT AND MAINTENANCE FUND FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS PUBLIC WORKS DEPARTMENT VR-07002 Diesel Truck Engine Emissions Retrofits Multi-Year $846,488 $297,279 $242,519 $0 $0 $24,581 $30,179 96%Ongoing Dec 15 Ongoing, Next set of DPF's not needed until 2015. BAO will be needed to cover difference in bid amount. VR-92006 Fuel Tank Storage/Upgrade Multi-Year $260,378 $149,519 $69,809 $24,196 $0 $100,150 $3,757 99%Design Oct 12 Was stalled due to soil contamination. Electrical installed and inspected. Page 20 of 32 Attachment 3 Total Budget FY 2012 Budget EstimatedProject Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments EL-04010 Foothills System Rebuild Minor $850,064 $102,802 $0 $0 $0 $102,802 88%Construction Dec 12 Portions of this project have been completed. The sections crossing the Palo Alto Country Club and Foothills park still remain EL-09004 W. Charleston/Wilkie Way to South City Limit 4/12 kV Conversion Minor $512,466 $101,234 $16,234 $0 $85,000 $0 100%Construction Jun 13 Construction is 95% complete. Remaining portion is delayed until the El Camino Real rebuild project is completed as they are connected. EL-10008 Advanced Metering Infrastructure System Minor $310,943 $255,577 $4,177 $0 $111,832 $139,568 55%Design Ongoing Phase 2 - implementation and planning for pilot projects is in progress. EL-11001 Torreya Court Rebuild Minor $101,683 $97,311 $34,899 $0 $13,000 $49,412 51%Design Dec 12 Contracts to be awarded and construction to start Oct 12. EL-11004 Hewlett Subdivision Rebuild Los Trancos Minor $803,766 $793,093 $225,105 $0 $171,770 $396,218 51%Construction Dec 12 Construction in progress. EL-11006 Rebuild UG District 18 Minor $352,846 $351,230 $66,255 $0 $9,137 $275,838 22%Design Dec 12 Design work in progress. EL-11016 Electric Vehicle Charging Infrastructure Minor $135,083 $135,083 $17,696 $0 $0 $117,387 13%Complete All work associated with this project is completed. ENTERPRISE FUND ELECTRIC FUND MINOR PROJECTS FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS UTILITIES DEPARTMENT Page 21 of 32 Attachment 3 Total Budget FY 2012 Budget EstimatedProject Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion ENTERPRISE FUND ELECTRIC FUND FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS UTILITIES DEPARTMENT EL-12002 Hanover 22 - Transformer Replacement Minor $1,000,000 $1,000,000 $17,627 $0 $946,932 $35,441 96%Design Jun 13 Transformer ordered. Procurement of other equipment and detailed installation design in progress. MULTI-YEAR PROJECTS EL-02010 SCADA System Upgrades Multi-Year $912,213 $243,023 $0 $0 $0 $243,023 73%Design and Construction Ongoing This project involves upgrading the Supervisory Control & Data Acquisitions (SCADA) Portal and Master computer software and operating systems . EL-04012 Utility Site Security Improvements Multi-Year $917,696 $527,456 $144,415 $0 $94,868 $288,173 69%Design & Construction Ongoing Construction completed Corte Madera Booster/Reservoir, Quarry Booster and Boronda Booster. Work on Quarry, Hanover, Hansen Way and Park Blvd. substations are next. EL-04014 Automated Meter Reading System Multi-Year $1,037,942 $0 $0 $0 $0 $0 100%Closed Pilot is completed. EL-05000 El Camino Underground Rebuild Multi-Year $1,624,196 $189,528 $42,415 $0 $0 $147,113 91%Design and Construction Feb 13 Preparation of construction estimate is in progress for the remaining areas of this project. EL-11008 Rebuild UG District 19 Multi-Year $161,156 $107,225 $1,040 $0 $0 $106,185 34%Design Dec 13 Preparation of construction estimate is in progress. EL-06000 Park Blvd. 4/12kV Conversion Multi-Year $376,606 $0 $0 $0 $0 $0 100%Closed Balance returned to reserves at year-end. Page 22 of 32 Attachment 3 Total Budget FY 2012 Budget EstimatedProject Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion ENTERPRISE FUND ELECTRIC FUND FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS UTILITIES DEPARTMENT EL-06001 230 KV Electric Intertie Multi-Year $505,437 $98,283 $28,588 $0 $2,450 $67,245 87%Pre-design Ongoing Stanford Utilities has expressed interest in Stanford Linear Accelerator Center (SLAC) - Quarry Road Substation 60kV tie. Preliminary power flow and feasibility study complete, interconnection at Quarry Substation appears feasible. Working with Stanford and DOE to encourage SLAC participation in this project. EL-06002 Underground District 45 Multi-Year $3,617,473 $319,123 $110,038 $0 $0 $209,085 94%Construction Nov 12 Electric work and a majority of customer connections completed. Awaiting completion of customer work and undergrounding of fiber facilities. EL-06003 Utility Control Center Upgrades Multi-Year $492,011 $0 $0 $0 $0 $0 100%Closed Balance returned to reserves at year-end. EL-08000 E. Charleston 4/12kV Conversion Multi-Year $665,324 $604,719 $233,110 $0 $41,446 $330,163 50%Design Dec 12 Contract to be awarded and construction to start Oct 12. EL-09000 Middlefield Underground Rebuild Multi-Year $627,718 $627,718 $86,894 $0 $2,363 $538,461 14%Design Dec 12 Contract to be awarded and construction to start Oct 12. EL-09002 Middlefield/Colorado 4/12 kV Conversion Multi-Year $323,653 $59,825 $19,747 $0 $0 $40,078 88%Complete Construction completed. EL-09003 Rebuild UG District 17 (Downtown) Multi-Year $1,229,843 $761,062 $53,547 $0 $0 $707,515 42%Construction Jun 13 Line construction begins Nov 12. MULTI-YEAR PROJECTS MULTI-YEAR PROJECTS Page 23 of 32 Attachment 3 Total Budget FY 2012 Budget EstimatedProject Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion ENTERPRISE FUND ELECTRIC FUND FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS UTILITIES DEPARTMENT EL-10006 Rebuild UG District 24 Multi-Year $1,349,038 $1,022,274 $48,601 $0 $0 $973,673 28%Design Oct 12 Preparation of construction estimate in progress. EL-10009 Street Light System Conversion Project Multi-Year $2,206,563 $1,737,641 $49,306 $0 $1,070,878 $617,457 72%Ongoing Nov 12 Phase A1 and A2 in construction. EL-11000 Seale/Waverley 4/12 kV Conversion Multi-Year $40,000 $0 $0 $0 $0 $0 100%Closed Balance returned to reserves at year-end. EL-11002 St. Francis/Oregon/Amarillo /Louis 4/12 kV Conversion Multi-Year $50,000 $0 $0 $0 $0 $0 100%Closed Balance returned to reserves at year-end. EL-11003 Rebuild UG District 15 Multi-Year $81,054 $77,228 $7,767 $0 $0 $69,461 14%Pre-design Dec 13 No work started due to limited staff availability. EL-11007 Rebuild Greenhouse Condo Area Multi-Year $508,047 $493,621 $116,332 $0 $199 $377,090 26%Construction Nov 12 Construction in progress. EL-11010 UG District 47 - Middlefield, Homer Avenue, Webster Street and Addison Avenue Multi-Year $1,652,748 $1,638,103 $15,583 $0 $0 $1,622,520 2%Design Dec 13 Preliminary design work started. Public hearings scheduled for Dec 12. EL-11014 Smart Grid Technology Installation Multi-Year $501,328 $501,328 $14,613 $0 $7,801 $478,914 4%Design Jan 17 Two pilot projects to be implemented. Bids have been received and reviewed and will be awarded after Council approval. EL-11015 Reconductor 60kV Overhead Transmission System with ACCR conductor Multi-Year $1,997,943 $1,981,063 $199,355 $0 $1,666,499 $115,209 94%Construction Nov 12 Phase 2 and half of Phase 3 in construction. EL-12001 UG District 46 - Charleston/El Camino Real Multi-Year $153,954 $153,954 $54,071 $0 $0 $99,883 35%Pre-design Jun 14 No work started due to limited staff availability. Page 24 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments GS-08000 Gas Station 2 Rebuild Minor $207,007 $203,584 $142,905 $0 $57,095 $3,584 98%Complete GS-09000 Gas Station 1 Rebuild Minor $201,000 $200,485 $143,199 $0 $57,095 $191 75%Construction Nov 12 Station is delivered and needs to be connected into the City's distribution and PG&E transmission systems. GS-10000 Gas Station 3 Rebuild Minor $207,007 $206,931 $146,520 $0 $58,522 $1,889 99%Design Jul 13 Design has been approved and skid is being assembled at Dresser facilities. Connection plan is in design phase. Delivery of the station is expected in Summer 13. GS-10002 General Shop Tooling Minor $62,910 $9,976 $9,976 $0 $0 $0 100%Closed Balance returned to reserves at year- end. GS-10003 Cathodic Current Interrupters Minor $287,141 $287,065 $287,065 $0 $0 $0 100%Closed Balance returned to reserves at year- end. GS-10004 Automating Test Station Minor $18,177 $18,177 $18,177 $0 $0 $0 100%Closed Balance returned to reserves at year- end. FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND GAS FUND UTILITIES DEPARTMENT MINOR PROJECTS Page 25 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND GAS FUND UTILITIES DEPARTMENT GS-11001 Gas Station 4 Rebuild Minor $337,000 $337,000 $236,344 $0 $94,405 $6,251 98%Construction Dec 12 Ongoing construction, project estimated completion in Dec 12. GS-01019 Global Positioning System Multi-Year $381,062 $118,248 $35,800 $0 $2,810 $79,638 79%Construction Jun 14 Integrating field data into mapping system, defining additional equipment needs. GS-08011 GMR - Project 18 Multi-Year $6,055,359 $4,866,786 $3,306,280 $161,287 $1,105,933 $293,286 95%Construction Dec 12 Ongoing construction, project estimated completion in Dec 12. GS-09002 GMR - Project 19 Multi-Year $5,788,297 $5,737,832 $233,921 $18,708 $984,692 $4,500,511 22%Construction Jan 15 Combined GMR 19B-21. Bid opened and construction will start Jan 15. GS-10001 GMR - Project 20 Multi-Year $6,616,749 $6,616,598 $30,089 $0 $0 $6,586,509 0%Construction Jan 15 Combined GMR 19B-21. Bid opened and construction will start Jan 15. GS-11000 GMR - Project 21 Multi-Year $457,951 $457,951 $9,321 $1,144 $0 $447,486 2%Construction Jan 15 Combined GMR 19B-21. Bid opened and construction will start Jan 15. GS-11002 Gas System Improvements Multi-Year $303,370 $286,870 $173,246 $11,788 $34,483 $67,353 78%TBD Ongoing This project addresses ongoing capital system improvements GS-12001 GMR - Project 22 Multi-Year $468,000 $468,000 $0 $0 $0 $468,000 0%Design Jun 14 Construction funds to be delayed until FY 2014. MULTI-YEAR PROJECTS Page 26 of 32 Attachment 3 Total Budget FY 2012 Budget EstimatedProject Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WS-09000 Seismic Water Tank Valve Minor $3,500,000 $3,478,715 $4,315 $0 $0 $3,474,400 1%Construction May 13 Final report completed in Nov 10, Mayfield seismic retrofit 90% completed; Boronda reservoir construction will commence Jan 13 and completed by May 13.WS-11001 Vacuum Excavation Equipment Minor $275,000 $275,000 $0 $0 $0 $275,000 0%Pre-Design Jul 13 Working with fleet to create specification and buy off from operational staff. WS-07000 Water Regulation Station Improvements Multi-Year $470,001 $359,580 $18,543 $0 $0 $341,037 27%Pre-Design Jul 15 Design to be completed by Jun 13. WS-07001 Water Recycling Facilities Multi-Year $1,100,542 $704,973 $99,727 $0 $228,688 $376,558 66%Pre-Design Jun 16 Preparing Environmental Impact Report (EIR). Construction to be completed in 2016. WS-07004 Water System Portable Emergency Generators Multi-Year $257,167 $0 $0 $0 $0 $0 100%Closed Balance returned to reserves at year- end. WS-08001 Water Reservoir Coating Improvements Multi-Year $2,050,491 $1,871,089 $35,452 $0 $0 $1,835,637 10%Design Jul 15 Construction to start Jan 13. WS-08002 Emergency Water Supply Project Multi-Year $37,270,524 $25,945,262 $5,479,736 $5,762,697 $12,886,423 $1,816,406 95%Construction Jul 13 El Camino reservoir construction 65% complete. Mayfield Pump Station construction 75% complete. Wells rehabilitation construction 90% complete. WS-08017 WMR - Project 22 Multi-Year $3,165,781 $156,082 $14,445 $0 $0 $141,637 96%Complete WS-09001 WMR - Project 23 Multi-Year $3,134,627 $2,149,773 $156,189 $0 $1,886,557 $107,027 97%Construction May 13 Council approved in Apr 12; currently installing 16" 4710 HDPE water main on Alma near Charleston. WS-10001 WMR - Project 24 Multi-Year $3,259,205 $3,133,614 $80,666 $0 $2,785,661 $267,287 92%Construction May 13 Council approved in Apr 12; currently installing 16" 4710 HDPE water main on Alma near Charleston. WS-11000 WMR - Project 25 Multi-Year $292,709 $292,709 $7,803 $0 $1 $284,905 3%Design Sep 14 Awaiting additional resource availability to complete the design combined with WMR-Project 26. WS-11003 Water Distribution System Improvements Multi-Year $282,011 $231,159 $18,823 $0 $13,333 $199,003 29%Ongoing TBD This project addresses ongoing capital distribution system improvements. WS-11004 Water System Supply Improvements Multi-Year $281,995 $271,071 $52,103 $0 $39,745 $179,223 36%Ongoing TBD This project addresses ongoing capital supply system improvements. WS-12001 WMR - Project 26 Multi-Year $305,000 $305,000 $0 $0 $0 $305,000 0%Pre-Design Sep 14 Awaiting additional resource availability to complete the design combined with WMR-Project 25. MULTI-YEAR PROJECTS MULTI-YEAR PROJECTS UTILITIES DEPARTMENT MINOR PROJECTS ENTERPRISE FUND WATER FUND FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Page 27 of 32 Attachment 3 Total Budget FY 2012 Budget EstimatedProject Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion UTILITIES DEPARTMENT ENTERPRISE FUND WATER FUND FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS Page 28 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WC-09002 Root Treatment, Sediment and Dewatering Container Minor $428 $0 $0 $0 $0 $0 100%Closed Balance returned to reserves at year- end. WC-11000 WC Reh/Aug. Prj 24 Multi-Year $3,119,500 $3,119,500 $0 $0 $0 $3,119,500 0%Pre-design Jun 14 This project will also include the WC Reh/Aug Prj 25 and the design effort will start May 13 with construction complete by Jun 14. WC-12001 WC Reh/Aug. Prj 25 Multi-Year $300,000 $300,000 $0 $0 $0 $300,000 0%Pre-design Jun 14 This project will also include the WC Reh/Aug Prj 26 and the design effort will start May 13 with construction complete by Jun 14. WC-12002 WW Lateral Pipe Bursting Machine Multi-Year $0 $0 $0 $0 $0 $0 100%Closed Balance returned to reserves at year- end. WC-15002 Wastewater System Improvements Multi-Year $136,403 $111,286 $55,416 $0 $35,117 $20,753 85%Ongoing TBD This project addresses on going capital system improvements. UTILITIES DEPARTMENT MINOR PROJECTS MULTI-YEAR PROJECTS FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND WASTEWATER COLLECTION FUND Page 29 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments RF-09004 LATP Site Development Preparation Minor $200,000 $23,421 $2,072 $0 $0 $21,349 89%Complete Consultant's environmental risk assessment for cleanup of site was approved by regulatory agency for Areas A and B. Existing funds in balance will be released. RF-10002 Flare Relocation Project Minor $700,000 $621,207 $14,661 $0 $58,559 $547,987 22%Construction Apr 14 Design, permitting and bidding was completed in late 2011 and the bids exceeded available budget. A modified design and a rebid is planned in Fall 2012. Work is expected to be substantially complete by Mar 14. RF-07001 Relocation of Landfill Facilities Multi-Year $620,818 $276,701 $61,949 $0 $16,662 $198,090 68%Design Apr 13 The relocation of the Recycling Center has been cancelled. Improvements to the permanent Household Hazardous Waste (HHW) facility at the end of Embarcadero Way on the wastewater treatment plant property are proceeding. Final design and permitting was completed and bid in mid 2012. No bids were received due to a purchasing problem. Will rebid in Oct 12 and work is scheduled to be substantially completed by Mar 13. RF-10003 Drying Beds, Material Storage and Transfer Area Multi-Year $122,700 $75,000 $21,969 $0 $0 $53,031 57%Construction Nov 14 Additional material storage bunkers have been constructed at the MSC. Drying beds currently located on the 10 acres that was subject to Measure E are to be relocated inside the RWQCP. RF-11001 Landfill Closure Multi-Year $6,718,404 $6,663,603 $635,398 $23,103 $278,800 $5,726,302 15%Construction Jan 14 Construction was completed in Mar 12 for the undergrounding of environmental control systems in the closed sections of the landfill. A design contract for the Phase IIC cap and closure has been awarded with the additional funds scheduled for FY 2013. Closure work is scheduled to be completed by Dec 13. MINOR PROJECTS MULTI-YEAR PROJECTS FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS ENTERPRISE FUND REFUSE FUND PUBLIC WORKS DEPARTMENT Page 30 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments SD-08101 Alma Street Storm Drain Improvements Minor $748,505 $0 $0 $0 $0 $0 100%Closed Project has been closed and balance returned to reserves at mid-year. SD-06102 San Francisquito Creek Storm Water Pump Station Multi-Year $6,387,019 $79,291 $31,078 $0 $14,565 $33,648 99%Complete Jun 19 Required mitigation monitoring for 10 years (through FY 2019) is the only remaining task. SD-06104 Connect Clara Drive Storm Drains to Matadero Pump Station Multi-Year $953,480 $1 $0 $0 $0 $1 0%Design May 14 Project design is being performed by in- house staff. New construction funding has been programmed for FY 2014. SD-10101 Southgate Neighborhood Storm Drain Improvements Multi-Year $181,261 $181,261 $104,771 $0 $73,491 $2,999 98%Design May 13 Project design continues with construction scheduled for Summer 13. SD-11101 Channing Avenue/Lincoln Avenue Storm Drain Improvements Multi-Year $4,097,581 $3,523,792 $1,311,198 $122,998 $1 $2,089,595 49%Construction Dec 12 Phase 1 complete. Phase 2 out for bids; construction scheduled to begin in Aug 12. STORM DRAINAGE FUND PUBLIC WORKS DEPARTMENT FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MULTI-YEAR PROJECTS MINOR PROJECTS ENTERPRISE FUND Page 31 of 32 Attachment 3 Total Budget FY 2012 Budget Estimated Project Project Project From Available FY 2012 FY 2012 FY 2012 Remaining Percent Project Completion Number Title Category Inception Budget Expenditures Contingencies Encumbrances Balance Complete Status Date Comments WQ-10001 Plant Master Plan Minor $981,266 $616,383 $582,375 $0 $34,008 $0 100%Complete Final report to be printed Oct 12. WQ-04011 Facility Condition Assessment and Retrofit Multi-Year $4,050,082 $2,294,043 $193,519 $0 $761,744 $1,338,780 67%Design Jun 13 Ongoing retrofit projects. WQ-06014 Disinfection Facility Improvement Program Multi-Year $18,207,803 $361,419 $359,902 $1,518 $0 $0 100%Closed Project complete WASTEWATER TREATMENT FUND PUBLIC WORKS DEPARTMENT FY 2012 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS MULTI-YEAR PROJECTS MINOR PROJECTS ENTERPRISE FUND Page 32 of 32 Attachment 4 Project Category Department/Fund Project Title FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Community Services : Land & Land Improvements AC-86017 Art in Public Places $64,410 $21,556 $17,256 $77,956 $17,171 Planning & Community Environment : Streets & Sidewalks PL-05030 Traffic Signal Upgrades 35,908 39,983 278,187 183,141 244,272 Public Works - General Fund : Streets & Sidewalks PE-86070 Street Improvements (Street Improvement Fund)3,368,496 3,702,381 3,323,063 4,710,791 3,170,679 Building & Facilities PF-00006 Roofing Replacement 256,831 21,073 227,495 104,617 319,495 Building & Facilities PF-01003 Building Systems Improvements 34,304 114,152 36,053 74,876 59,798 Building & Facilities PF-02022 Facility Interior Finishes 65,797 47,116 11,076 23,874 234,085 Building & Facilities PF-93009 ADA Compliance 49,955 121,617 216,133 9,994 167,537 Streets & Sidewalks PO-05054 Street lights Improvements 11,814 15,970 32,976 159,070 61,844 Streets & Sidewalks PO-89003 Sidewalk Improvements 2,030,796 1,675,527 952,503 1,611,917 1,673,715 Public Works - Storm Drainage Fund : SD-06101 Storm Drain System Replacement 675,832 445,582 81,878 488,793 361,842 Public Works - Wastewater Treatment Fund : WQ-80021 RWQCP Plant Equipment Replacement 1,156,156 2,544,261 403,293 66,916 589,965 WQ-80022 RWQCP System Flow Metering 0 56,245 0 28,468 0 Electric Fund : EL-02011 Electric Utility GIS 83,546 39,414 188,231 321,713 175,832 EL-06005 Fiber Optics Ring System Improvements 112,435 58,124 5,531 0 0 EL-06006 Fiber Optics Customer Design and Connection Services 134,498 195,808 17,203 0 0 EL-89028 Electric Customer Connections 1,982,607 1,467,233 1,702,232 1,882,242 2,522,815 EL-89031 Communications System Improvements $50,458 $21,784 $0 $3,501 $0 EL-89038 Substation Protection Improvements 423,904 94,411 133,185 129,086 200,418 EL-89044 Substation Facility Improvements 7,147 93,735 3,133 148,871 180,672 EL-98003 Electric Distribution System Reconstruction and Improvements 2,260,973 1,265,486 1,330,082 1,608,521 2,389,593 Fiber Optics Fund : FO-10000 Fiber Optic Customer Connections 0 0 68,373 88,061 125,913 FO-10001 Fiber Optic Network System Improvements 0 0 34,614 327,736 448,950 Continuous Capital Projects Five Years of Expenditures for Fiscal Years 2008-2012 Page 1 of 2 12/4/2012 Attachment 4 Project Category Department/Fund Project Title FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Continuous Capital Projects Five Years of Expenditures for Fiscal Years 2008-2012 Gas Fund : GS-02013 GS-03007 Directional Boring Equipment 63 59,410 0 162 20,160 GS-03002 GS-04003 GS-05002 Gas Main Replacements 433,894 38,121 87,706 86,159 54,157 GS-03008 Polyethylene Fusion Equipment Replacement 0 35,650 0 444 0 GS-03009 System Extensions-Unreimbursed 115 12,000 4,005 7,718 0 GS-06001 Gas Main Replacements, GMR-Project 16 2,256,296 2,423,677 89,180 127,056 0 GS-07002 Gas Main Replacements, GMR-Project 17 614,485 912,018 3,681,252 211,515 139,958 GS-80017 Gas System Extensions 609,566 356,666 347,412 471,001 605,635 GS-80019 Gas Meters and Regulators 272,386 244,129 313,598 294,191 325,988 Wastewater Collection Fund: WC-02002 WC-03003 WC-04002 Sewer System Rehabilitation and Augmentation, Project 15,16 and 17 1,394,506 8,840 27,141 122,870 57,715 WC-05003 WC-06003 WC-07004 Sewer System Rehabilitation and Augmentation, Project 18,19 and 20 1,378,862 2,154,931 1,761,725 94,468 188,511 WC-08012 WC-09001 WC-10002 Sewer System Rehabilitation and Augmentation, Project 21,22 and 23 126 285,858 543,313 1,928,374 1,023,537 WC-80020 Sewer System Extensions 561,620 370,253 251,152 224,066 270,793 WC-99013 Sewer Manhole Rehabilitation 116,173 48,227 168,722 378,841 357,343 Water Fund : WS-02003 Water Main Replacements, Project 16 4,629 19,695 0 0 0 WS-02014 Water-Gas Wastewater utilities GIS Data 0 33 204,583 289,694 222,244 WS-06002 Water Main Replacements, Project 20 1,830,359 93,554 349 10,821 0 WS-07003 Water Main Replacements, Project 21 57,923 226,559 1,383,427 1,432,826 528 WS-80013 Water System Extensions 400,152 295,194 285,945 258,968 551,131 WS-80014 Service and Hydrant Replacements 58,212 104,951 43,538 44,232 151,928 WS-80015 Water Meters 127,109 14,712 2,298 0 34,000 Page 2 of 2 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category AC-09001 Children's Theatre Replacement and Expansion Buildings and Facilities AC-09002 Community Theatre Sound System Replacement Buildings and Facilities CA-01014 Community Services Facilities Lighting Enhancements Buildings and Facilities $30,760 $3,663 CC-09001 Dimmer Replacement and Lighting System Buildings and Facilities $995 $7,611 $4,609 CC-10000 Replacement of Cubberley Gym B Bleachers Buildings and Facilities 6,739 29,495 CC-11000 Cubberley Gym Activity Room Buildings and Facilities 58,041 FD-08001 Fire Station #6 Improvements Buildings and Facilities 8,061 48,110 271 OS-07003 Foothills Park Maintenance Building Rehabilitation Buildings and Facilities 30,442 249,933 General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 Page 1 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PE-04010 Children's Library Improvements & Expansion Buildings and Facilities 813,189 58,561 PE-04011 Cambridge Parking Structure Improvements Buildings and Facilities 287,034 PE-04012 Mitchell Park Library & Community Center Improvements Buildings and Facilities 1,162,429 179,071 123 PE-04014 Animal Shelter Expansion & Renovation Buildings and Facilities 144,610 762,057 61,539 PE-05002 Main Library Space Reconfiguration Buildings and Facilities 34,838 PE-05010 College Terrace Library Improvements Buildings and Facilities 273,077 337,154 1,545,763 846,020 7,344 PE-06001 San Antonio Bridge Structural Repairs & Maintenance Buildings and Facilities 2,338 494 82,782 PE-08005 Municipal Service Center Resurfacing Buildings and Facilities 11,323 752,021 326,898 Page 2 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PE-09003 City Facility Parking Lot Maintenance Buildings and Facilities 51,098 PE-09005 Downtown Library Improvements Buildings and Facilities 78,162 562,707 3,133,576 714,043 PE-09006 Mitchell Park Library & Community Center (New Construction) Buildings and Facilities 509,024 3,278,486 10,381,000 14,213,182 PE-09010 Library & Community Center Temporary Facilities Buildings and Facilities 28,866 518,623 110,020 2,205 PE-10002 Ventura Community Center and Park Buildings and Facilities 13,283 21,130 PE-11000 Main Library New Construction and Improvements Buildings and Facilities 792,913 1,139,804 PE-11012 Temporary Main Library Buildings and Facilities 96,435 PE-12017 City Hall 1st Floor Buildings and Facilities 63,537 Page 3 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PE-89004 Yacht Harbor Improvements Buildings and Facilities 7,080 21,584 PE-98020 Public Safety Building Buildings and Facilities 1,093,208 1,000,414 175,289 30,910 14,943 PE-95030 Downtown Parking Structure Buildings and Facilities 91,576 155 469 PF-00006 Roofing Replacement Buildings and Facilities 256,831 21,073 251,344 104,617 319,495 PF-01002 Civic Center Infrastructure Improvements Buildings and Facilities 106,643 4,915,782 1,344,006 3,803,962 1,950,609 PF-01003 Building Systems Improvements Buildings and Facilities 34,304 114,152 36,098 74,876 59,798 PF-01004 Fire Station Improvements Buildings and Facilities 232,168 575,700 237,018 394 PF-01005 Lucie Stern Community Center Improvements Buildings and Facilities 980 Page 4 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PF-02022 Facility Interior Finishes Buildings and Facilities 65,797 47,116 11,076 23,874 234,085 PF-04000 Security System Improvements Buildings and Facilities 5,983 8,903 3,581 PF-04001 General Building Study Buildings and Facilities 170,312 PF-04010 Cubberley Mechanical & Electrical Upgrades Buildings and Facilities 165,456 5,218 9,369 PF-05002 Municipal Service Center Renovation Buildings and Facilities 18,316 12,057 3,530 12,176 PF-05003 Foothills Park Interpretive Center Improvements Buildings and Facilities 1,290 12,897 141,633 PF-06002 Ventura Buildings' Improvements Buildings and Facilities PF-06003 Cubberley Community Center Fire Alarm System Buildings and Facilities 648,988 70,949 Page 5 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PF-06004 Cubberley Restroom Renovation Buildings and Facilities 27,422 3,129 PF-07000 Art Center Electrical & Mechanical Upgrades Buildings and Facilities 52,063 132,737 234,143 543,877 4,628,983 PF-07001 ADA Compliance - Cubberley Community Center Buildings and Facilities 37,815 13,512 205,388 PF-07003 Children's Theatre Fire/Life Safety Upgrade Buildings and Facilities 32,980 7,592 6,150 131 PF-07011 Roth Building Maintenance Buildings and Facilities 17,909 1,931 3,729 1,205 PF-08000 Art Center Kiln Hood Replacement Buildings and Facilities 10,076 60,654 14,570 PF-09000 Children's Theatre Improvements Buildings and Facilities PF-09002 Lucie Stern Community Center and Theatre Exterior Paint Buildings and Facilities 4,510 90,816 Page 6 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PF-10000 Civic Center Chiller Drive Replacement Buildings and Facilities 72,380 PF-10001 Rinconada Pool Plaster Buildings and Facilities 117,756 PF-10002 Lot "J" Cowper/Webster Structural Repairs Buildings and Facilities 23,682 15,260 32,672 PF-12005 Council Conference Room Renovations Buildings and Facilities PF-93009 ADA Compliance Buildings and Facilities 49,955 121,617 235,410 9,994 167,537 Total Buildings and Facilities $5,888,480 $10,082,066 $9,311,891 $20,250,843 $23,867,878 AC-86017 Art in Public Places Land and Land Improvements $64,410 $21,556 $17,256 $77,956 $17,171 Page 7 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 AS-08000 Acquisition of Los Altos Treatment Plant Land and Land Improvements 2,590,061 2,306,958 2,252,250 AS-09000 City of Palo Alto Municipal Airport Transition Project Land and Land Improvements 39,075 67,775 4,050 PE-09004 Los Altos Treatment Plant Master Plan Study Land and Land Improvements 135,905 15,468 16,278 Total Land and Land Improvements $2,654,471 $2,503,494 $2,352,749 $98,284 $17,171 AS-10001 Sustainability Contingency Miscellaneous FD-09001 Fire Apparatus Equipment Replacement Miscellaneous $48,352 $261,283 FD-09002 Jaws of Life Hurst Tool Replacement Miscellaneous 60,905 Page 8 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 FD-12000 ALS EKG Monitor Replacement Miscellaneous LB-11000 Furniture & Technology for Measure N Project Miscellaneous $28,124 $178,774 LB-94018 Library Automation Service Miscellaneous $5,026 732 PE-12002 Tree Wells - University Avenue Irrigation Miscellaneous 28,743 PE-12004 Municipal Services Center Facilities Study Miscellaneous 220 PE-12009 Alma Guardrail Miscellaneous 5,888 PD-04010 Fire Portable Radio Replacement Miscellaneous 112,526 PD-07001 SWAT Van Replacement Miscellaneous 203,193 Page 9 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PD-08000 Crime Scene Evidence Collection Vehicle Miscellaneous 174,201 6,039 PD-93012 Fire Communications Computer Systems Miscellaneous 6,812 PD-99013 Police Records Management System Miscellaneous 31,307 PF-12004 Citywide Backflow Preventer Installations Miscellaneous PL-02023 Master Schematic Design Miscellaneous 2,090 PO-10002 Downtown Tree Grates Miscellaneous 29,879 8,136 PO-12002 LATP Site Development Preparation & Security Miscellaneous 8,636 Total Miscellaneous $360,954 $109,989 $291,162 $210,461 $228,300 Page 10 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 FD-05000 Sixteen (16) ALS Monitors Non-Infrastructure Management Plan $214,734 $62,650 $434 PD-07000 Mobile Command Vehicle Non-Infrastructure Management Plan 695,337 PE-05001 Photovoltaic Design and Installations Non-Infrastructure Management Plan 2,184,597 325,978 $6,448 PE-07011 Library Service Model Analysis Non-Infrastructure Management Plan 1,478 PG-08001 Golf Course Driving Range Turf & Netting Non-Infrastructure Management Plan 511,921 PL-05002 Charleston/Arastradero Corridor Plan Non-Infrastructure Management Plan 32,076 193,613 26,988 PL-06001 Adobe Creek Bicycle Bridge Replacement Non-Infrastructure Management Plan 4,184 Page 11 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PL-06002 Comprehensive Parking Signage Plan Non-Infrastructure Management Plan 43,470 4,248 PL-06005 Installation of Ticket Machines Non-Infrastructure Management Plan 33,994 2,250 Total Non-Infrastructure Management Plan $2,977,322 $440,010 $6,448 $889,384 $31,236 AC-10000 Junior Museum & Zoo New Bobcat Habitat Parks and Open Space $101,790 $23,210 AC-12001 Junior Museum & Zoo Perimeter Fence and Footpath Parks and Open Space OS-00001 Open Space Trails and Amenities Parks and Open Space $257,594 $123,193 97,766 47,473 162,466 OS-00002 Open Space Lakes & Ponds Maintenance Parks and Open Space 41,462 35,909 63,263 54,097 24,615 Page 12 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 OS-07000 Foothills Park Road Improvements Parks and Open Space 225,000 25,000 150,000 OS-07002 Foothills Park Interpretive Center & Open Space Maintenance Yard Parking Parks and Open Space 258,253 2,302 OS-09001 Off-Road Pathway Resurfacing and Repair Parks and Open Space 25,463 24,719 4,130 OS-09002 Baylands Emergency Access Levee Repair Parks and Open Space PE-00110 College Terrace Park Improvements Parks and Open Space 97,998 154,927 522 PE-05300 Arastradero Preserve Gateway Parks and Open Space 1,519 9,156 PE-06004 Bowden Park Improvements Parks and Open Space 876 PE-06005 University Avenue Gateway Landscaping Improvements Parks and Open Space 27,324 166,612 6,709 1,479 429 Page 13 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PE-06007 Park Restroom Installation Parks and Open Space 13,042 41,134 100,096 224,048 98,119 PE-06008 Johnson Park Improvements Parks and Open Space 8,648 PE-07002 Hoover Park Improvements Parks and Open Space 696,240 67,053 PE-07003 Ramos Park Improvements Parks and Open Space 458,628 PE-07005 California Avenue Improvements Parks and Open Space 64,985 49,900 465,324 53,810 PE-07006 Boulware Park Improvements Parks and Open Space 298,717 3,799 PE-07007 Cubberley Turf Renovation Parks and Open Space 190,950 969,963 PE-07009 Baylands Athletic Center Fencing, Dugout & Trailhead Parking Parks and Open Space 241,891 46,164 Page 14 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PE-08002 Peers Park Improvements Parks and Open Space 250,622 301,383 PE-08004 Lytton Plaza Renovation Parks and Open Space 23,530 725,733 2,545 11,793 PE-09002 Greer Park Phase IV Parks and Open Space 1,134 168,231 515,091 925,076 142,030 PE-12003 Rinconada Park Master Plan & Design Parks and Open Space 121,690 PE-12012 Eleanor Pardee Park Improvements Parks and Open Space 21,827 PE-12013 Magical Bridge Playground Parks and Open Space 129,237 PE-98003 Mitchell Park Facilities Parks and Open Space 196,655 24,962 PF-12001 Parks and PWD Trees Work Space Improvements Parks and Open Space 836 Page 15 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PG-00010 Park Facilities Improvements Parks and Open Space 1,361 PG-04010 Stanford/Palo Alto Community Playing Field Parks and Open Space 2,050 869 PG-06001 Tennis and Basketball Court Resurfacing Parks and Open Space 46,881 107,117 100,159 77,512 53,635 PG-06003 Benches, Signage, Fencing, Walkways, and Perimeter Landscaping Parks and Open Space 76,788 85,766 73,480 118,366 105,225 PG-07000 Heritage Park Playground Parks and Open Space 243,546 PG-07700 Golf Course Irrigation Pump, Motors & Control Panel Replacement Parks and Open Space 63,315 PG-09002 Park and Open Space Emergency Repairs Parks and Open Space 73,190 50,883 147,651 52,875 PG-09003 Park Maintenance Shop Remodel Parks and Open Space 402 2,858 55,414 2,244 Page 16 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PG-11000 Hopkins Park Improvements Parks and Open Space PG-11001 Cogswell Plaza Improvements Parks and Open Space 11,123 PG-11002 Monroe Park Improvements Parks and Open Space PG-11003 Scott Park Improvements Parks and Open Space PG-12001 Stanford / Palo Alto Playing Field Netting Parks and Open Space PG-12002 Golf Course Tree Maintenance Parks and Open Space 21,014 PG-12004 Sarah Wallis Park Improvements Parks and Open Space PG-12005 Relocate Power Poles for Soccer Field Parks and Open Space Page 17 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PG-12006 Magical Bridge Playground Parks and Open Space PG-98001 School Site Irrigation Parks and Open Space 57,268 4,596 161,399 Total Parks and Open Space $3,630,436 $1,732,969 $3,459,755 $1,730,681 $1,113,288 PE-00104 San Antonio Road Median Improvements Streets and Sidewalks $153,112 $743,106 $239,404 $142,556 $676,384 PE-00105 Embarcadero Road Median Improvements Streets and Sidewalks 1,191 PE-01013 El Camino Median Landscape Streets and Sidewalks 73,655 4,525 PE-06006 Alma Street Landscape Improvements Streets and Sidewalks 16,576 40,901 26,371 Page 18 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PE-10006 Bridge Rail, Abutment, and Deck Repair Streets and Sidewalks 167,062 PE-11011 Highway 101 Pedestrian / Bicycle Overcrossing Streets and Sidewalks 36,385 194,020 115,011 PE-12011 Newell Road Bridge / San Francisquito Creek Bridge Replacement Streets and Sidewalks 55,715 PE-86070 Street Improvements (Street Improvement Fund) Streets and Sidewalks 3,368,496 3,702,381 3,658,566 5,110,791 3,170,679 PL-00026 Safe Routes to School Streets and Sidewalks 105,802 30,000 20,750 87,321 PL-04010 Bicycle Transportation Plan Implementation Project Streets and Sidewalks 44,483 30,000 80,862 103,599 PL-05003 College Terrace Traffic Calming Streets and Sidewalks 17,088 545 PL-05030 Traffic Signal Upgrades Streets and Sidewalks 35,908 39,983 279,590 183,141 244,272 Page 19 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PL-07002 El Camino Real/ Stanford Intersection Streets and Sidewalks 2,490 4,790 247,112 341,683 PL-11001 Dinah SummerHill Pedestrian/Bicycle Path Streets and Sidewalks 188,187 PL-11002 California Avenue Transit Hub Corridor Streets and Sidewalks 16,361 PL-11003 Palo Alto Traffic Signal Central System Streets and Sidewalks 35,528 PL-11004 Alma Street Traffic Signal Improvements Streets and Sidewalks 645 PL-12000 Transporation and Parking Improvements Streets and Sidewalks 91,002 PL-98013 School Commute Safety Improvements (SIF) Streets and Sidewalks 2,490 6,170 PO-05054 Street lights Improvements Streets and Sidewalks 11,814 15,970 40,430 159,070 61,844 Page 20 of 21 12/4/2012 Exhibit A FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project Project Project Expenditures Expenditures Expenditures Expenditures Expenditures Number Title Category General Fund Capital Improvement Program Project Expenditures for Fiscal Years 2008-2012 PO-11000 Sign Reflectivity Upgrade Streets and Sidewalks 20,792 PO-11001 Thermoplastic Lane Marking and Striping Streets and Sidewalks 29,639 127,958 PO-12000 Wilkie Way Bridge Deck Replacement Streets and Sidewalks PO-12001 Curb and Gutter Repairs Streets and Sidewalks 1851 PO-12003 Foothills Fire Management Streets and Sidewalks PO-89003 Sidewalk Improvements Streets and Sidewalks 2,030,796 1,675,527 1,341,916 1,211,917 1,673,715 Total Streets and Sidewalks $5,858,921 $6,227,373 $5,855,059 $7,421,556 $6,977,019 Page 21 of 21 12/4/2012