Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Staff Report 6937
City of Palo Alto (ID # 6937) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/20/2016 City of Palo Alto Page 1 Summary Title: Approval of a Contract for FY17 Preventive Maintenance Project Title: Approval of a Contract With Graham Contractors, Inc., in the Amount of $1,340,469 for the FY 2017 Street Maintenance Program Preventive Street Maintenance Project, Capital Improvements Program Project PE- 86070 From: City Manager Lead Department: Public Works Recommendation Staff recommends that Council: 1. Approve and authorize the City Manager or his designee to execute the attached contract with Graham Contractors, Inc. (Attachment A) in an amount not to exceed $1,340,470 for the FY 2017 Preventive Maintenance Project (Capital Improvement Program projects PE-86070, PE-09003, PO- 11001, PL-04010 and PF-14003) for street maintenance; and 2. Authorize the City Manager or his designee to negotiate and execute one or more change orders to the contract with Graham Contractors, Inc. for related additional but unforeseen work, which may develop during the project, the total value of which shall not exceed $134,047. City of Palo Alto Page 2 Background Public Works Engineering Services Division manages construction contracts for concrete repair, preventive maintenance, resurfacing and reconstruction of various city streets on an annual basis. In recent years, due to the complexity of the anticipated construction and benefit of being included in a larger project, many other Capital Improvement Program (CIP) projects are being built through the annualized resurfacing contracts. All City of Palo Alto streets are surveyed biannually by Public Works Engineering Services staff and rated by a computerized pavement maintenance management system (PMMS) and Metropolitan Transportation Commission’s (MTC) pavement analysis program Street Saver. Since 2003, the Public Works Engineering Services Division has implemented multi-phased resurfacing projects by bidding one phase for concrete repairs and preparation, a second phase for preventive maintenance and a third phase for asphalt concrete resurfacing. This method of phasing has proved more cost effective by avoiding the usual 15% markup prime contractors place on work performed by their subcontractors. This typically includes all concrete and preventive maintenance work, which had been included in the asphalt overlay contract. This contract is the preventive maintenance contract which includes roadway seals, base repairs and crack sealing. Discussion Project Description The $1,340,470 expenditure for this contract includes preventive maintenance of 26.9 lane miles of public streets (2,129,850 square feet), over 2,200 tons of asphalt road base repairs and nearly 191,000 linear feet of crack sealing, including work on major streets such as Embarcadero and Greer Roads. This contract also includes thermoplastic striping in coordination with Public Works Public Services Division. The streets included in this contract are shown in (Attachment B). Additionally, this contract includes work on University Avenue Parking District Parking Lots F and O, as well as City facility parking lots at Fire Station 2 and Stanford/Palo Alto playing fields. Extensive public outreach will be conducted before and during the construction phase to inform the community throughout the process, including sending flyers City of Palo Alto Page 3 to adjacent residences and businesses, and posting notices on Nextdoor and the City’s website. In addition, staff will interface with the Palo Alto Downtown Business and Professional Association, neighborhood associations, and other organizations and businesses as appropriate. Bid Process On April 19, 2016, a notice inviting formal bids (IFB) for the FY 2017 Preventive Maintenance Project was posted at City Hall and sent to 268 contractors and 9 builder’s exchanges. The bidding period was 21 calendar days. Bids were received from four qualified contractors on May 10, 2016 as listed on the attached Bid Summary (Attachment C). Summary of Bid Process Bid Name/Number FY 17 Preventive Maintenance Project IFB #163851 Proposed Length of Project 70 calendar days Number of Bid Packages emailed to Contractors 268 Number of Bid Packages emailed to Builder’s Exchanges 9 Total Days to Respond to Bid 21 Pre-Bid Meeting? No Number of Bids Received: 4 Base Bid Price Range $1,304,972 to $1,450,013 Base bids ranged from $1,304,972 to $1,450,013, and ranged from 0.3% to 11.4% above the engineer’s estimate. Staff has reviewed all bids submitted and recommends the Base Bid and Add Alternate 1, totaling $1,340,470 submitted by Graham Contractors, Inc. be accepted and Graham Contractors, Inc. be declared the lowest responsible bidder. The change order amount of $134,047, which equals ten percent of the total contract, is requested for related additional, but unforeseen work which may develop during the project. The lowest responsible bidder, Graham Contractors, Inc. has worked with the City on previous preventive maintenance projects. Staff investigated the references City of Palo Alto Page 4 and found no significant complaints. Staff also checked with the Contractor's State License Board and found the contractor to have an active license on file. Resource Impact Funding for the FY 2017 Preventive Maintenance Project is available in the following CIP projects: PE-86070 Street Maintenance Program, PE-09003 City Facility Parking Lot Maintenance, PO-11001 Thermoplastic Lane Marking and Striping, PL-04010 Bicycle and Pedestrian Plan Implementation Project, and PF- 14003 University Avenue Parking District Parking Improvements. Funding allocations are listed in Table 1. Table 1. Funding Allocations Funding Source Contract Contingency Total Funding 1 PE-86070 $1,186,212 $118,621 $1,304,833 2 PE-09003 $18,850 $1,885 $20,735 3 PO-11001 $68,150 $6,815 $74,965 4 PL-04010 $47,575 $4,758 $52,332 5 PF-14003 $19,684 $1,968 $21,652 Totals $1,340,470 $134,047 $1,474,517 Policy Implications This project is in conformance with City of Palo Alto’s Comprehensive Plan and does not represent any changes to existing City policies. Environmental Review This proposed street resurfacing project is a minor alteration and repair to existing facilities and is categorically exempt from the California Environmental Quality Act (CEQA) under section 15301c of the CEQA guidelines. Attachments: Attachment A - Construction Contract (PDF) Attachment B - Project Maps (PDF) Attachment C - Bid Summary (PDF) Invitation for Bid (IFB163851) Package 1 Rev. April 20, 2015 CONSTRUCTION CONTRACT ATTACHMENT A CONSTRUCTION CONTRACT Contract No. C17163851 City of Palo Alto FY17 PREVENTIVE MAINTENANCE Project Invitation for Bid (IFB163851) Package 2 Rev. April 20, 2015 CONSTRUCTION CONTRACT CONSTRUCTION CONTRACT TABLE OF CONTENTS SECTION 1 INCORPORATION OF RECITALS AND DEFINITIONS…………………………………….…………..6 1.1 Recitals…………………………………………………………………………………………………………………….6 1.2 Definitions……………………………………………………………………………………………………………….6 SECTION 2 THE PROJECT………………………………………………………………………………………………………...6 SECTION 3 THE CONTRACT DOCUMENTS………………………………………………………………………………..7 3.1 List of Documents…………………………………………………………………………………………….........7 3.2 Order of Precedence……………………………………………………………………………………………......7 SECTION 4 CONTRACTOR’S DUTY…………………………………………………………………………………………..8 4.1 Contractor's Duties…………………………………………………………………………………………………..8 SECTION 5 PROJECT TEAM……………………………………………………………………………………………………..8 5.1 Contractor's Co‐operation………………………………………………………………………………………..8 SECTION 6 TIME OF COMPLETION…………………………………………………………………………………….......8 6.1 Time Is of Essence…………………………………………………………………………………………………….8 6.2 Commencement of Work…………………………………………………………………………………………8 6.3 Contract Time…………………………………………………………………………………………………………..8 6.4 Liquidated Damages…………………………………………………………………………………………………8 6.4.1 Other Remedies……………………………………………………………………………………………………..9 6.5 Adjustments to Contract Time………………………………………………………………………………….9 SECTION 7 COMPENSATION TO CONTRACTOR……………………………………………………………………….9 7.1 Contract Sum……………………………………………………………………………………………………………9 7.2 Full Compensation……………………………………………………………………………………………………9 SECTION 8 STANDARD OF CARE……………………………………………………………………………………………..9 8.1 Standard of Care…………………………………………………………………………………..…………………9 SECTION 9 INDEMNIFICATION…………………………………………………………………………………………..…10 9.1 Hold Harmless……………………………………………………………………………………………………….10 9.2 Survival…………………………………………………………………………………………………………………10 SECTION 10 NON‐DISCRIMINATION……..………………………………………………………………………………10 10.1 Municipal Code Requirement…………….………………………………..……………………………….10 SECTION 11 INSURANCE AND BONDS.…………………………………………………………………………………10 Invitation for Bid (IFB163851) Package 3 Rev. April 20, 2015 CONSTRUCTION CONTRACT 11.1 Evidence of Coverage…………………………………………………………………………………………..10 SECTION 12 PROHIBITION AGAINST TRANSFERS……………………………………………………………….…11 12.1 Assignment………………………………………………………………………………………………………….11 12.2 Assignment by Law.………………………………………………………………………………………………11 SECTION 13 NOTICES …………………………………………………………………………………………………………….11 13.1 Method of Notice …………………………………………………………………………………………………11 13.2 Notice Recipents ………………………………………………………………………………………………….11 13.3 Change of Address……………………………………………………………………………………………….12 SECTION 14 DEFAULT…………………………………………………………………………………………………………...12 14.1 Notice of Default………………………………………………………………………………………………….12 14.2 Opportunity to Cure Default…………………………………………………………………………………12 SECTION 15 CITY'S RIGHTS AND REMEDIES…………………………………………………………………………..13 15.1 Remedies Upon Default……………………………………………………………………………………….13 15.1.1 Delete Certain Services…………………………………………………………………………………….13 15.1.2 Perform and Withhold……………………………………………………………………………………..13 15.1.3 Suspend The Construction Contract…………………………………………………………………13 15.1.4 Terminate the Construction Contract for Default………………………………………………13 15.1.5 Invoke the Performance Bond………………………………………………………………………….13 15.1.6 Additional Provisions……………………………………………………………………………………….13 15.2 Delays by Sureties……………………………………………………………………………………………….13 15.3 Damages to City…………………………………………………………………………………………………..14 15.3.1 For Contractor's Default…………………………………………………………………………………..14 15.3.2 Compensation for Losses…………………………………………………………………………………14 15.4 Suspension by City……………………………………………………………………………………………….14 15.4.1 Suspension for Convenience……………………………………………………………………………..14 15.4.2 Suspension for Cause………………………………………………………………………………………..14 15.5 Termination Without Cause…………………………………………………………………………………14 15.5.1 Compensation………………………………………………………………………………………………….15 15.5.2 Subcontractors………………………………………………………………………………………………..15 15.6 Contractor’s Duties Upon Termination………………………………………………………………...15 SECTION 16 CONTRACTOR'S RIGHTS AND REMEDIES……………………………………………………………16 16.1 Contractor’s Remedies……………………………………..………………………………..………………….16 Invitation for Bid (IFB163851) Package 4 Rev. April 20, 2015 CONSTRUCTION CONTRACT 16.1.1 For Work Stoppage……………………………………………………………………………………………16 16.1.2 For City's Non‐Payment…………………………………………………………………………………….16 16.2 Damages to Contractor………………………………………………………………………………………..16 SECTION 17 ACCOUNTING RECORDS………………………………………………………………………………….…16 17.1 Financial Management and City Access………………………………………………………………..16 17.2 Compliance with City Requests…………………………………………………………………………….17 SECTION 18 INDEPENDENT PARTIES……………………………………………………………………………………..17 18.1 Status of Parties……………………………………………………………………………………………………17 SECTION 19 NUISANCE……………………………………………………………………………………………………….…17 19.1 Nuisance Prohibited……………………………………………………………………………………………..17 SECTION 20 PERMITS AND LICENSES…………………………………………………………………………………….17 20.1 Payment of Fees…………………………………………………………………………………………………..17 SECTION 21 WAIVER…………………………………………………………………………………………………………….17 21.1 Waiver………………………………………………………………………………………………………………….17 SECTION 22 GOVERNING LAW AND VENUE; COMPLIANCE WITH LAWS……………………………….18 22.1 Governing Law…………………………………………………………………………………………………….18 22.2 Compliance with Laws…………………………………………………………………………………………18 SECTION 23 COMPLETE AGREEMENT……………………………………………………………………………………18 23.1 Integration………………………………………………………………………………………………………….18 SECTION 24 SURVIVAL OF CONTRACT…………………………………………………………………………………..18 24.1 Survival of Provisions……………………………………………………………………………………………18 SECTION 25 PREVAILING WAGES………………………………………………………………………………………….18 SECTION 26 NON‐APPROPRIATION……………………………………………………………………………………….19 26.1 Appropriation………………………………………………………………………………………………………19 SECTION 27 AUTHORITY……………………………………………………………………………………………………….19 27.1 Representation of Parties…………………………………………………………………………………….19 SECTION 28 COUNTERPARTS………………………………………………………………………………………………..19 28.1 Multiple Counterparts………………………………………………………………………………………….19 SECTION 29 SEVERABILITY……………………………………………………………………………………………………19 29.1 Severability………………………………………………………………………………………………………….19 SECTION 30 STATUTORY AND REGULATORY REFERENCES …………………………………………………..19 30.1 Amendments of Laws…………………………………………………………………………………………..19 Invitation for Bid (IFB163851) Package 5 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 31 WORKERS’ COMPENSATION CERTIFICATION………………………………………………….….19 31.1 Workers Compensation…………………………………………………………………………………….19 SECTION 32 DIR REGISTRATION AND OTHER SB 854 REQUIREMENTS………………………………..…20 32.1 General Notice to Contractor…………………………………………………………………………….20 32.2 Labor Code section 1771.1(a)…………………………………………………………………………….20 32.3 DIR Registration Required…………………………………………………………………………………20 32.4 Posting of Job Site Notices…………………………………………………………………………………20 32.5 Payroll Records…………………………………………………………………………………………………20 Invitation for Bid (IFB163851) Package 6 Rev. April 20, 2015 CONSTRUCTION CONTRACT CONSTRUCTION CONTRACT THIS CONSTRUCTION CONTRACT entered into on June 20, 2016 (“Execution Date”) by and between the CITY OF PALO ALTO, a California chartered municipal corporation ("City"), and GRAHAM CONTRACTORS, INC. ("Contractor"), is made with reference to the following: R E C I T A L S: A. City is a municipal corporation duly organized and validly existing under the laws of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City. B. Contractor is a California Corporation duly organized and in good standing in the State of California, Contractor’s License Number 315789 and DIR registration number 1000006175 . Contractor represents that it is duly licensed by the State of California and has the background, knowledge, experience and expertise to perform the obligations set forth in this Construction Contract. C. On April 19, 2016, City issued an Invitation for Bids (IFB163851) to contractors for the Fy 17 Preventive Maintenance Project (“Project”). In response to the IFB, Contractor submitted a Bid. D. City and Contractor desire to enter into this Construction Contract for the Project, and other services as identified in the Contract Documents for the Project upon the following terms and conditions. NOW THEREFORE, in consideration of the mutual promises and undertakings hereinafter set forth and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, it is mutually agreed by and between the undersigned parties as follows: SECTION 1 INCORPORATION OF RECITALS AND DEFINITIONS. 1.1 Recitals. All of the recitals are incorporated herein by reference. 1.2 Definitions. Capitalized terms shall have the meanings set forth in this Construction Contract and/or in the General Conditions. If there is a conflict between the definitions in this Construction Contract and in the General Conditions, the definitions in this Construction Contract shall prevail. SECTION 2 THE PROJECT. The Project is the FY17 PREVENTIVE MAINTENANCE Project, located at VARIOUS STREETS WITHIN, Palo Alto, CA. ("Project"). Invitation for Bid (IFB163851) Package 7 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 3 THE CONTRACT DOCUMENTS. 3.1 List of Documents. The Contract Documents (sometimes collectively referred to as “Agreement” or “Bid Documents”) consist of the following documents which are on file with the Purchasing Division and are hereby incorporated by reference. 1) Change Orders 2) Field Orders 3) Contract 4) Bidding Addenda 5) Special Provisions 6) General Conditions 7) Project Plans and Drawings 8) Technical Specifications 9) Instructions to Bidders 10) Invitation for Bids 11) Contractor's Bid/Non‐Collusion Affidavit 12) Reports listed in the Contract Documents 13) Public Works Department’s Standard Drawings and Specifications (most current version at time of Bid) 14) Utilities Department’s Water, Gas, Wastewater, Electric Utilities Standards (most current version at time of Bid) 15) City of Palo Alto Traffic Control Requirements 16) City of Palo Alto Truck Route Map and Regulations 17) Notice Inviting Pre‐Qualification Statements, Pre‐Qualification Statement, and Pre‐ Qualification Checklist (if applicable) 18) Performance and Payment Bonds 3.2 Order of Precedence. For the purposes of construing, interpreting and resolving inconsistencies between and among the provisions of this Contract, the Contract Documents shall have the order of precedence as set forth in the preceding section. If a claimed inconsistency cannot be resolved through the order of precedence, the City shall have the sole power to decide which document or provision shall govern as may be in the best interests of the City. Invitation for Bid (IFB163851) Package 8 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 4 CONTRACTOR’S DUTY. 4.1 Contractor’s Duties Contractor agrees to perform all of the Work required for the Project, as specified in the Contract Documents, all of which are fully incorporated herein. Contractor shall provide, furnish, and supply all things necessary and incidental for the timely performance and completion of the Work, including, but not limited to, provision of all necessary labor, materials, equipment, transportation, and utilities, unless otherwise specified in the Contract Documents. Contractor also agrees to use its best efforts to complete the Work in a professional and expeditious manner and to meet or exceed the performance standards required by the Contract Documents. SECTION 5 PROJECT TEAM. 5.1 Contractor’s Co‐operation. In addition to Contractor, City has retained, or may retain, consultants and contractors to provide professional and technical consultation for the design and construction of the Project. The Contract requires that Contractor operate efficiently, effectively and cooperatively with City as well as all other members of the Project Team and other contractors retained by City to construct other portions of the Project. SECTION 6 TIME OF COMPLETION. 6.1 Time Is of Essence. Time is of the essence with respect to all time limits set forth in the Contract Documents. 6.2 Commencement of Work. Contractor shall commence the Work on the date specified in City’s Notice to Proceed. 6.3 Contract Time. Work hereunder shall begin on the date specified on the City’s Notice to Proceed and shall be completed not later than . within Seventy calendar days (70) after the commencement date specified in City’s Notice to Proceed. By executing this Construction Contract, Contractor expressly waives any claim for delayed early completion. 6.4 Liquidated Damages. Pursuant to Government Code Section 53069.85, if Contractor fails to achieve Substantial Completion of the entire Work within the Contract Time, including any approved extensions thereto, City may assess liquidated damages on a daily basis for each day of Unexcused Delay in achieving Substantial Completion, based on the amount of Five Hundred dollars ($500) per day, or as otherwise specified in the Special Provisions. Liquidated damages may also be separately assessed for failure to meet milestones specified elsewhere in the Contract Documents, regardless of impact on the time for achieving Substantial Completion. The assessment of liquidated damages is not a penalty but considered to be a reasonable estimate of the amount of damages City will suffer by delay in completion of the Work. The City is entitled to setoff the amount of liquidated damages assessed against any payments otherwise due to Contractor, Invitation for Bid (IFB163851) Package 9 Rev. April 20, 2015 CONSTRUCTION CONTRACT including, but not limited to, setoff against release of retention. If the total amount of liquidated damages assessed exceeds the amount of unreleased retention, City is entitled to recover the balance from Contractor or its sureties. Occupancy or use of the Project in whole or in part prior to Substantial Completion, shall not operate as a waiver of City’s right to assess liquidated damages. 6.4.1 Other Remedies. City is entitled to any and all available legal and equitable remedies City may have where City’s Losses are caused by any reason other than Contractor’s failure to achieve Substantial Completion of the entire Work within the Contract Time. 6.5 Adjustments to Contract Time. The Contract Time may only be adjusted for time extensions approved by City and memorialized in a Change Order approved in accordance with the requirements of the Contract Documents. SECTION 7 COMPENSATION TO CONTRACTOR. 7.1 Contract Sum. Contractor shall be compensated for satisfactory completion of the Work in compliance with the Contract Documents the Contract Sum of One Million Three Hundred Forty Thousand Four Hundred Sixty Nine Dollars and forty five cents($1,340,469.45). [This amount includes the Base Bid and Additive Alternates #1.] 7.2 Full Compensation. The Contract Sum shall be full compensation to Contractor for all Work provided by Contractor and, except as otherwise expressly permitted by the terms of the Contract Documents, shall cover all Losses arising out of the nature of the Work or from the acts of the elements or any unforeseen difficulties or obstructions which may arise or be encountered in performance of the Work until its Acceptance by City, all risks connected with the Work, and any and all expenses incurred due to suspension or discontinuance of the Work, except as expressly provided herein. The Contract Sum may only be adjusted for Change Orders approved in accordance with the requirements of the Contract Documents. SECTION 8 STANDARD OF CARE. 8.1 Standard of Care. Contractor agrees that the Work shall be performed by qualified, experienced and well‐supervised personnel. All services performed in connection with this Construction Contract shall be performed in a manner consistent with the standard of care under California law applicable to those who specialize in providing such services for projects of the type, scope and complexity of the Project. Invitation for Bid (IFB163851) Package 10 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 9 INDEMNIFICATION. 9.1 Hold Harmless. To the fullest extent allowed by law, Contractor will defend, indemnify, and hold harmless City, its City Council, boards and commissions, officers, agents, employees, representatives and volunteers (hereinafter individually referred to as an “Indemnitee” and collectively referred to as "Indemnitees"), through legal counsel acceptable to City, from and against any and liability, loss, damage, claims, expenses (including, without limitation, attorney fees, expert witness fees, paralegal fees, and fees and costs of litigation or arbitration) (collectively, “Liability”) of every nature arising out of or in connection with the acts or omissions of Contractor, its employees, Subcontractors, representatives, or agents, in performing the Work or its failure to comply with any of its obligations under the Contract, except such Liability caused by the active negligence, sole negligence, or willful misconduct of an Indemnitee. Contractor shall pay City for any costs City incurs to enforce this provision. Except as provided in Section 9.2 below, nothing in the Contract Documents shall be construed to give rise to any implied right of indemnity in favor of Contractor against City or any other Indemnitee. Pursuant to Public Contract Code Section 9201, City shall timely notify Contractor upon receipt of any third‐party claim relating to the Contract. 9.2 Survival. The provisions of Section 9 shall survive the termination of this Construction Contract. SECTION 10 NON‐DISCRIMINATION. 10.1 Municipal Code Requirement. As set forth in Palo Alto Municipal Code section 2.30.510, Contractor certifies that in the performance of this Agreement, it shall not discriminate in the employment of any person because of the race, skin color, gender, age, religion, disability, national origin, ancestry, sexual orientation, housing status, marital status, familial status, weight or height of such person. Contractor acknowledges that it has read and understands the provisions of Section 2.30.510 of the Palo Alto Municipal Code relating to Nondiscrimination Requirements and the penalties for violation thereof, and will comply with all requirements of Section 2.30.510 pertaining to nondiscrimination in employment. SECTION 11 INSURANCE AND BONDS. 11.1 Evidence of coverage. Within ten (10) business days following issuance of the Notice of Award, Contractor shall provide City with evidence that it has obtained insurance and shall submit Performance and Payment Bonds satisfying all requirements in Article 11 of the General Conditions. Invitation for Bid (IFB163851) Package 11 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 12 PROHIBITION AGAINST TRANSFERS. 12.1 Assignment. City is entering into this Construction Contract in reliance upon the stated experience and qualifications of the Contractor and its Subcontractors set forth in Contractor’s Bid. Accordingly, Contractor shall not assign, hypothecate or transfer this Construction Contract or any interest therein directly or indirectly, by operation of law or otherwise without the prior written consent of City. Any assignment, hypothecation or transfer without said consent shall be null and void, and shall be deemed a substantial breach of contract and grounds for default in addition to any other legal or equitable remedy available to the City. 12.2 Assignment by Law. The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of Contractor or of any general partner or joint venturer or syndicate member of Contractor, if the Contractor is a partnership or joint venture or syndicate or co‐tenancy shall result in changing the control of Contractor, shall be construed as an assignment of this Construction Contract. Control means more than fifty percent (50%) of the voting power of the corporation or other entity. SECTION 13 NOTICES. 13.1 Method of Notice. All notices, demands, requests or approvals to be given under this Construction Contract shall be given in writing and shall be deemed served on the earlier of the following: (i) On the date delivered if delivered personally; (ii) On the third business day after the deposit thereof in the United States mail, postage prepaid, and addressed as hereinafter provided; (iii) On the date sent if sent by facsimile transmission; (iv) On the date sent if delivered by electronic mail; or (v) On the date it is accepted or rejected if sent by certified mail. 13.2 Notice to Recipients. All notices, demands or requests (including, without limitation, Change Order Requests and Claims) from Contractor to City shall include the Project name and the number of this Construction Contract and shall be addressed to City at: To City: City of Palo Alto City Clerk 250 Hamilton Avenue P.O. Box 10250 Palo Alto, CA 94303 Copy to: City of Palo Alto Public Works Administration 250 Hamilton Avenue Palo Alto, CA 94301 Attn: Holly Boyd AND [Include Construction Manager, If Applicable.] Invitation for Bid (IFB163851) Package 12 Rev. April 20, 2015 CONSTRUCTION CONTRACT City of Palo Alto Utilities Engineering 250 Hamilton Avenue Palo Alto, CA 94301 Attn: In addition, copies of all Claims by Contractor under this Construction Contract shall be provided to the following: Palo Alto City Attorney’s Office 250 Hamilton Avenue P.O. Box 10250 Palo Alto, California 94303 All Claims shall be delivered personally or sent by certified mail. All notices, demands, requests or approvals from City to Contractor shall be addressed to: Graham Contractors, Inc. 860 Lonus Street San Jose Ca 95126 Gerald R. Graham, Jr. 13.3 Change of Address. In advance of any change of address, Contractor shall notify City of the change of address in writing. Each party may, by written notice only, add, delete or replace any individuals to whom and addresses to which notice shall be provided. SECTION 14 DEFAULT. 14.1 Notice of Default. In the event that City determines, in its sole discretion, that Contractor has failed or refused to perform any of the obligations set forth in the Contract Documents, or is in breach of any provision of the Contract Documents, City may give written notice of default to Contractor in the manner specified for the giving of notices in the Construction Contract, with a copy to Contractor’s performance bond surety. 14.2 Opportunity to Cure Default. Except for emergencies, Contractor shall cure any default in performance of its obligations under the Contract Documents within two (2) Days (or such shorter time as City may reasonably require) after receipt of written notice. However, if the breach cannot be reasonably cured within such time, Contractor will commence to cure the breach within two (2) Days (or such shorter time as City may reasonably require) and will diligently and continuously prosecute such cure to completion within a reasonable time, which shall in no event be later than ten (10) Days after receipt of such written notice. Invitation for Bid (IFB163851) Package 13 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 15 CITY'S RIGHTS AND REMEDIES. 15.1 Remedies Upon Default. If Contractor fails to cure any default of this Construction Contract within the time period set forth above in Section 14, then City may pursue any remedies available under law or equity, including, without limitation, the following: 15.1.1 Delete Certain Services. City may, without terminating the Construction Contract, delete certain portions of the Work, reserving to itself all rights to Losses related thereto. 15.1.2 Perform and Withhold. City may, without terminating the Construction Contract, engage others to perform the Work or portion of the Work that has not been adequately performed by Contractor and withhold the cost thereof to City from future payments to Contractor, reserving to itself all rights to Losses related thereto. 15.1.3 Suspend The Construction Contract. City may, without terminating the Construction Contract and reserving to itself all rights to Losses related thereto, suspend all or any portion of this Construction Contract for as long a period of time as City determines, in its sole discretion, appropriate, in which event City shall have no obligation to adjust the Contract Sum or Contract Time, and shall have no liability to Contractor for damages if City directs Contractor to resume Work. 15.1.4 Terminate the Construction Contract for Default. City shall have the right to terminate this Construction Contract, in whole or in part, upon the failure of Contractor to promptly cure any default as required by Section 14. City’s election to terminate the Construction Contract for default shall be communicated by giving Contractor a written notice of termination in the manner specified for the giving of notices in the Construction Contract. Any notice of termination given to Contractor by City shall be effective immediately, unless otherwise provided therein. 15.1.5 Invoke the Performance Bond. City may, with or without terminating the Construction Contract and reserving to itself all rights to Losses related thereto, exercise its rights under the Performance Bond. 15.1.6 Additional Provisions. All of City’s rights and remedies under this Construction Contract are cumulative, and shall be in addition to those rights and remedies available in law or in equity. Designation in the Contract Documents of certain breaches as material shall not waive the City’s authority to designate other breaches as material nor limit City’s right to terminate the Construction Contract, or prevent the City from terminating the Agreement for breaches that are not material. City’s determination of whether there has been noncompliance with the Construction Contract so as to warrant exercise by City of its rights and remedies for default under the Construction Contract, shall be binding on all parties. No termination or action taken by City after such termination shall prejudice any other rights or remedies of City provided by law or equity or by the Contract Documents upon such termination; and City may proceed against Contractor to recover all liquidated damages and Losses suffered by City. 15.2 Delays by Sureties. Time being of the essence in the performance of the Work, if Contractor’s surety fails to arrange for completion of the Work in accordance with the Performance Bond, within seven (7) calendar days from the date of the notice of termination, Contractor’s surety shall be deemed to have waived its right to complete the Work under the Contract, and City may immediately make arrangements for the completion of the Work through use of its own forces, by hiring a replacement contractor, or by any other means that City determines advisable under the circumstances. Contractor and its surety shall be jointly and severally Invitation for Bid (IFB163851) Package 14 Rev. April 20, 2015 CONSTRUCTION CONTRACT liable for any additional cost incurred by City to complete the Work following termination. In addition, City shall have the right to use any materials, supplies, and equipment belonging to Contractor and located at the Worksite for the purposes of completing the remaining Work. 15.3 Damages to City. 15.3.1 For Contractor's Default. City will be entitled to recovery of all Losses under law or equity in the event of Contractor’s default under the Contract Documents. 15.3.2 Compensation for Losses. In the event that City's Losses arise from Contractor’s default under the Contract Documents, City shall be entitled to deduct the cost of such Losses from monies otherwise payable to Contractor. If the Losses incurred by City exceed the amount payable, Contractor shall be liable to City for the difference and shall promptly remit same to City. 15.4 Suspension by City 15.4.1 Suspension for Convenience. City may, at any time and from time to time, without cause, order Contractor, in writing, to suspend, delay, or interrupt the Work in whole or in part for such period of time, up to an aggregate of fifty percent (50%) of the Contract Time. The order shall be specifically identified as a Suspension Order by City. Upon receipt of a Suspension Order, Contractor shall, at City’s expense, comply with the order and take all reasonable steps to minimize costs allocable to the Work covered by the Suspension Order. During the Suspension or extension of the Suspension, if any, City shall either cancel the Suspension Order or, by Change Order, delete the Work covered by the Suspension Order. If a Suspension Order is canceled or expires, Contractor shall resume and continue with the Work. A Change Order will be issued to cover any adjustments of the Contract Sum or the Contract Time necessarily caused by such suspension. A Suspension Order shall not be the exclusive method for City to stop the Work. 15.4.2 Suspension for Cause. In addition to all other remedies available to City, if Contractor fails to perform or correct work in accordance with the Contract Documents, City may immediately order the Work, or any portion thereof, suspended until the cause for the suspension has been eliminated to City’s satisfaction. Contractor shall not be entitled to an increase in Contract Time or Contract Price for a suspension occasioned by Contractor’s failure to comply with the Contract Documents. City’s right to suspend the Work shall not give rise to a duty to suspend the Work, and City’s failure to suspend the Work shall not constitute a defense to Contractor’s failure to comply with the requirements of the Contract Documents. 15.5 Termination Without Cause. City may, at its sole discretion and without cause, terminate this Construction Contract in part or in whole upon written notice to Contractor. Upon receipt of such notice, Contractor shall, at City’s expense, comply with the notice and take all reasonable steps to minimize costs to close out and demobilize. The compensation allowed under this Paragraph 15.5 shall be the Contractor’s sole and exclusive compensation for such termination and Contractor waives any claim for other compensation or Losses, including, but not limited to, loss of anticipated profits, loss of revenue, lost opportunity, or other consequential, direct, indirect or incidental damages of any kind resulting from termination without cause. Termination pursuant to this provision does not relieve Contractor or its sureties from any of their obligations for Losses arising from or related to the Work performed by Contractor. Invitation for Bid (IFB163851) Package 15 Rev. April 20, 2015 CONSTRUCTION CONTRACT 15.5.1 Compensation. Following such termination and within forty‐five (45) Days after receipt of a billing from Contractor seeking payment of sums authorized by this Paragraph 15.5.1, City shall pay the following to Contractor as Contractor’s sole compensation for performance of the Work : .1 For Work Performed. The amount of the Contract Sum allocable to the portion of the Work properly performed by Contractor as of the date of termination, less sums previously paid to Contractor. .2 For Close‐out Costs. Reasonable costs of Contractor and its Subcontractors: (i) Demobilizing and (ii) Administering the close‐out of its participation in the Project (including, without limitation, all billing and accounting functions, not including attorney or expert fees) for a period of no longer than thirty (30) Days after receipt of the notice of termination. .3 For Fabricated Items. Previously unpaid cost of any items delivered to the Project Site which were fabricated for subsequent incorporation in the Work. .4 Profit Allowance. An allowance for profit calculated as four percent (4%) of the sum of the above items, provided Contractor can prove a likelihood that it would have made a profit if the Construction Contract had not been terminated. 15.5.2 Subcontractors. Contractor shall include provisions in all of its subcontracts, purchase orders and other contracts permitting termination for convenience by Contractor on terms that are consistent with this Construction Contract and that afford no greater rights of recovery against Contractor than are afforded to Contractor against City under this Section. 15.6 Contractor’s Duties Upon Termination. Upon receipt of a notice of termination for default or for convenience, Contractor shall, unless the notice directs otherwise, do the following: (i) Immediately discontinue the Work to the extent specified in the notice; (ii) Place no further orders or subcontracts for materials, equipment, services or facilities, except as may be necessary for completion of such portion of the Work that is not discontinued; (iii) Provide to City a description in writing, no later than fifteen (15) days after receipt of the notice of termination, of all subcontracts, purchase orders and contracts that are outstanding, including, without limitation, the terms of the original price, any changes, payments, balance owing, the status of the portion of the Work covered and a copy of the subcontract, purchase order or contract and any written changes, amendments or modifications thereto, together with such other information as City may determine necessary in order to decide whether to accept assignment of or request Contractor to terminate the subcontract, purchase order or contract; (iv) Promptly assign to City those subcontracts, purchase orders or contracts, or portions thereof, that City elects to accept by assignment and cancel, on the most favorable terms reasonably possible, all subcontracts, purchase orders or contracts, or portions thereof, that City does not elect to accept by assignment; and (v) Thereafter do only such Work as may be necessary to preserve and protect Work already in progress and to protect materials, plants, and equipment on the Project Site or in transit thereto. Upon termination, whether for cause or for convenience, the provisions of the Contract Documents remain in effect as to any Claim, indemnity obligation, warranties, guarantees, Invitation for Bid (IFB163851) Package 16 Rev. April 20, 2015 CONSTRUCTION CONTRACT submittals of as‐built drawings, instructions, or manuals, or other such rights and obligations arising prior to the termination date. SECTION 16 CONTRACTOR'S RIGHTS AND REMEDIES. 16.1 Contractor’s Remedies. Contractor may terminate this Construction Contract only upon the occurrence of one of the following: 16.1.1 For Work Stoppage. The Work is stopped for sixty (60) consecutive Days, through no act or fault of Contractor, any Subcontractor, or any employee or agent of Contractor or any Subcontractor, due to issuance of an order of a court or other public authority other than City having jurisdiction or due to an act of government, such as a declaration of a national emergency making material unavailable. This provision shall not apply to any work stoppage resulting from the City’s issuance of a suspension notice issued either for cause or for convenience. 16.1.2 For City's Non‐Payment. If City does not make pay Contractor undisputed sums within ninety (90) Days after receipt of notice from Contractor, Contractor may terminate the Construction Contract (30) days following a second notice to City of Contractor’s intention to terminate the Construction Contract. 16.2 Damages to Contractor. In the event of termination for cause by Contractor, City shall pay Contractor the sums provided for in Paragraph 15.5.1 above. Contractor agrees to accept such sums as its sole and exclusive compensation and agrees to waive any claim for other compensation or Losses, including, but not limited to, loss of anticipated profits, loss of revenue, lost opportunity, or other consequential, direct, indirect and incidental damages, of any kind. SECTION 17 ACCOUNTING RECORDS. 17.1 Financial Management and City Access. Contractor shall keep full and detailed accounts and exercise such controls as may be necessary for proper financial management under this Construction Contract in accordance with generally accepted accounting principles and practices. City and City's accountants during normal business hours, may inspect, audit and copy Contractor's records, books, estimates, take‐offs, cost reports, ledgers, schedules, correspondence, instructions, drawings, receipts, subcontracts, purchase orders, vouchers, memoranda and other data relating to this Project. Contractor shall retain these documents for a period of three (3) years after the later of (i) Final Payment or (ii) final resolution of all Contract Disputes and other disputes, or (iii) for such longer period as may be required by law. Invitation for Bid (IFB163851) Package 17 Rev. April 20, 2015 CONSTRUCTION CONTRACT 17.2 Compliance with City Requests. Contractor's compliance with any request by City pursuant to this Section 17 shall be a condition precedent to filing or maintenance of any legal action or proceeding by Contractor against City and to Contractor's right to receive further payments under the Contract Documents. City many enforce Contractor’s obligation to provide access to City of its business and other records referred to in Section 17.1 for inspection or copying by issuance of a writ or a provisional or permanent mandatory injunction by a court of competent jurisdiction based on affidavits submitted to such court, without the necessity of oral testimony. SECTION 18 INDEPENDENT PARTIES. 18.1 Status of parties. Each party is acting in its independent capacity and not as agents, employees, partners, or joint ventures’ of the other party. City, its officers or employees shall have no control over the conduct of Contractor or its respective agents, employees, subconsultants, or subcontractors, except as herein set forth. SECTION 19 NUISANCE. 19.1 Nuisance Prohibited. Contractor shall not maintain, commit, nor permit the maintenance or commission of any nuisance in connection in the performance of services under this Construction Contract. SECTION 20 PERMITS AND LICENSES. 20.1 Payment of Fees. Except as otherwise provided in the Special Provisions and Technical Specifications, The Contractor shall provide, procure and pay for all licenses, permits, and fees, required by the City or other government jurisdictions or agencies necessary to carry out and complete the Work. Payment of all costs and expenses for such licenses, permits, and fees shall be included in one or more Bid items. No other compensation shall be paid to the Contractor for these items or for delays caused by non‐City inspectors or conditions set forth in the licenses or permits issued by other agencies. SECTION 21 WAIVER. 21.1 Waiver. A waiver by either party of any breach of any term, covenant, or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained herein, whether of the same or a different character. Invitation for Bid (IFB163851) Package 18 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 22 GOVERNING LAW AND VENUE; COMPLIANCE WITH LAWS. 22.1 Governing Law. This Construction Contract shall be construed in accordance with and governed by the laws of the State of California, and venue shall be in a court of competent jurisdiction in the County of Santa Clara, and no other place. 22.2 Compliance with Laws. Contractor shall comply with all applicable federal and California laws and city laws, including, without limitation, ordinances and resolutions, in the performance of work under this Construction Contract. SECTION 23 COMPLETE AGREEMENT. 23.1 Integration. This Agreement represents the entire and integrated agreement between the parties and supersedes all prior negotiations, representations, and contracts, either written or oral. This Agreement may be amended only by a written instrument, which is signed by the parties. SECTION 24 SURVIVAL OF CONTRACT. 24.1 Survival of Provisions. The provisions of the Construction Contract which by their nature survive termination of the Construction Contract or Final Completion, including, without limitation, all warranties, indemnities, payment obligations, and City’s right to audit Contractor’s books and records, shall remain in full force and effect after Final Completion or any termination of the Construction Contract. SECTION 25 PREVAILING WAGES. This Project is not subject to prevailing wages. Contractor is not required to pay prevailing wages in the performance and implementation of the Project in accordance with SB 7, if the public works contract does not include a project of $25,000 or less, when the project is for construction work, or the contract does not include a project of $15,000 or less, when the project is for alteration, demolition, repair, or maintenance (collectively, ‘improvement’) work. Or Contractor is required to pay general prevailing wages as defined in Subchapter 3, Title 8 of the California Code of Regulations and Section 16000 et seq. and Section 1773.1 of the California Labor Code. Pursuant to the provisions of Section 1773 of the Labor Code of the State of California, the City Council has obtained the general prevailing rate of per diem wages and the general rate for holiday and overtime work in this locality for each craft, classification, or type of worker needed to execute the contract for this Project from the Director of the Department of Industrial Relations (“DIR”). Copies of these rates may be obtained at the Purchasing Division’s office of the City of Palo Alto. Contractor shall provide a copy of prevailing wage rates to any staff or subcontractor hired, and shall pay the adopted prevailing wage rates as a minimum. Contractor shall comply with the provisions of all sections, including, but not limited to, Sections 1775, 1776, 1777.5, 1782, 1810, and 1813, of the Labor Code pertaining to prevailing wages. Invitation for Bid (IFB163851) Package 19 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 26 NON‐APPROPRIATION. 26.1 Appropriations. This Agreement is subject to the fiscal provisions of the Charter of the City of Palo Alto and the Palo Alto Municipal Code. This Agreement will terminate without any penalty (a) at the end of any fiscal year in the event that the City does not appropriate funds for the following fiscal year for this event, or (b) at any time within a fiscal year in the event that funds are only appropriated for a portion of the fiscal year and funds for this Construction Contract are no longer available. This section shall take precedence in the event of a conflict with any other covenant, term, condition, or provision of this Agreement. SECTION 27 AUTHORITY. 27.1 Representation of Parties. The individuals executing this Agreement represent and warrant that they have the legal capacity and authority to do so on behalf of their respective legal entities. SECTION 28 COUNTERPARTS 28.1 Multiple Counterparts. This Agreement may be signed in multiple counterparts, which shall, when executed by all the parties, constitute a single binding agreement. SECTION 29 SEVERABILITY. 29.1 Severability. In case a provision of this Construction Contract is held to be invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining provisions shall not be affected. SECTION 30 STATUTORY AND REGULATORY REFERENCES. 30.1 Amendments to Laws. With respect to any amendments to any statutes or regulations referenced in these Contract Documents, the reference is deemed to be the version in effect on the date that the Contract was awarded by City, unless otherwise required by law. SECTION 31 WORKERS’ COMPENSATION CERTIFICATION. 31.1 Workers Compensation. Pursuant to Labor Code Section 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self‐insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work on this Contract.” Invitation for Bid (IFB163851) Package 20 Rev. April 20, 2015 CONSTRUCTION CONTRACT SECTION 32 DIR REGISTRATION AND OTHER SB 854 REQUIREMENTS. 32.1 General Notice to Contractor. City requires Contractor and its listed subcontractors to comply with the requirements of SB 854. 32.2 Labor Code section 1771.1(a) City provides notice to Contractor of the requirements of California Labor Code section 1771.1(a), which reads: “A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or Section 10164 or 20103.5 of the Public Contract Code, provided the contactor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.” 32.3 DIR Registration Required. City will not accept a bid proposal from or enter into this Construction Contract with Contractor without proof that Contractor and its listed subcontractors are registered with the California Department of Industrial Relations (“DIR”) to perform public work, subject to limited exceptions. 32.4 Posting of Job Site Notices. City gives notice to Contractor and its listed subcontractors that Contractor is required to post all job site notices prescribed by law or regulation and Contractor is subject to SB 854‐compliance monitoring and enforcement by DIR. 32.5 Payroll Records. City requires Contractor and its listed subcontractors to comply with the requirements of Labor Code section 1776, including: (i) Keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by, respectively, Contractor and its listed subcontractors, in connection with the Project. (ii) The payroll records shall be verified as true and correct and shall be certified and made available for inspection at all reasonable hours at the principal office of Contractor and its listed subcontractors, respectively. (iii) At the request of City, acting by its project manager, Contractor and its listed subcontractors shall make the certified payroll records available for inspection or furnished upon request to the project manager within ten (10) days of receipt of City’s request. City requests Contractor and its listed subcontractors to submit the certified payroll records at the end of each week during the Project. Invitation for Bid (IFB163851) Package 21 Rev. April 20, 2015 CONSTRUCTION CONTRACT (iv) If the certified payroll records are not produced to the project manager within the 10‐day period, then Contractor and its listed subcontractors shall be subject to a penalty of one hundred dollars ($100.00) per calendar day, or portion thereof, for each worker, and City shall withhold the sum total of penalties from the progress payment(s) then due and payable to Contractor. This provision supplements the provisions of Section 15 hereof. (v) Inform the project manager of the location of contractor’s and its listed subcontractors’ payroll records (street address, city and county) at the commencement of the Project, and also provide notice to the project manager within five (5) business days of any change of location of those payroll records. IN WITNESS WHEREOF, the parties have caused this Construction Contract to be executed the date and year first above written. CITY OF PALO ALTO ____________________________ Purchasing Manager City Manager APPROVED AS TO FORM: ____________________________ Senior Asst. City Attorney APPROVED: ____________________________ Public Works Director CONTRACTOR By:___________________________ Name:________________________ Title:__________________________ Date: _________________________ PUBLIC WORKS DEPARTMENT ENGINEERING SERVICES DIVISION (CIP: PE-86070) PROJECT TITLE: FY17 PREVENTIVE MAINTENANCE PROJECT PART 8 PROJECT MAPS 4000 600 4000 700 600 3700 3800 3900 3800 300 3100 3300 4000 600 500 500 4200 4200 200 500 4100 41004100 4000 400 4100 3600 0 4100 4300 400 4200 200 0 4000 4200 300 200 300 200 4100 3800 100 3700 3700 3900 300 300 500 400400 600 3900 300 4100 4000 3800 700 200 200 3500 100 3400 3300 300 500 3800 500 700 700 2700 400 3100 200 3000 2800 2900 2600 100 2500 500 3200 300 400 3000 3100 600 31003000 3200 2900 3300 35003400 700 3400 3800 3900 900 800 3600 900 4000 900 3600 3700 3800800 700 3300 3100 3200 700 3200 3400 900 3600 3400 3500 1100 3700 1000 1000 2900 800 800 2800 700 2700 2800 2900 3000 900 700 800 2600 800 800 3100 900 3100 3300 3400 3200 1000 1000 3200 3000 3300 3400 3000 1600 3300 1800 2300 1200 2200 1400 2000 2000 2200 2000 2200 2200 23002100 1600 1400 1500 1600 2000 2600 900 600 900 900 4200 700 4100 3700800 700 1000 800 600 3500 3800 3600 600 800 4000 4000 39003800 700 700 800 900 4000 1000 600 600 4100 7003800 3900 3200 3300 3600 3700 200 3400 1200 600 800 1900 1800 400 600 2000 2100 2000 2200 2000 2100 2000 800 2200 2000 1000 2300 2000 2000 1700 400 1500 1600 16001500 0 1800 1800 200 1800 300 1700 1900 2500 400 2400 2700 500 200 2800 3400 3500 300 400 2900 3000 2800 100 3000 200 3300 3000 400 300 2400 2300 300 2200 2200 100 2300 200 2000 100 1800 20001900 2100 2000 200 300 1900 2600 100 2400 300 200 2700 100 2500 2500 2100 2100 200 2300 300 200 1900 400 400 500 200 400 300 2400 2600 2400 300 500 24002300 500 23002200 600 700 22002200 800 2400 1900 1900 2100 900 900 1700 500 500 1900 1000 2500 700 2200 800 2200 2400 2300 900 25002400 2800 1000 27002600 2600 1000 3000 31002900 2400 1000 1100 1100 1100 2000 1900 2300 2000 1800 2400 2400 300 700 900 700 0 600 800 800 600 500 400300200 100 100 200 100 400 300 300 200 700 300 600 200 100 600 200 100 500 500 300 500 400 300 300 400 200 400 500400 600 200 400 500 100 100 300 200 300 200100 300 1200 1300 200 1600 1700 1600 500 1800 2100 1400 100 1700 400 1700 1800 1500 1500 1400 600 2000 600 700 700 700 400 1000 1300 500 1500 400 100 1100 1100 200 14001300 400 1400 100 200 1200 1200 900 800 600 1000 300 900800 1000 900 800 700600 700 400 500 700 500 400 600 800 700700 500 900 400 1200 600 1100 400 1100 500 1000 700 600 900800 800 600 1000 800 1000 1000 1100 1000900 1000 1200 13001200 700 1100 800 900 1200 1200 1100 1000 1100 1500 1400 1300 1700 700 1900 600 1600 500 1600 2100 1700 600 1800 800 1300 1200 800 1200 1200 1400 1100 1100 600 700 1100 1300 1300 1800 0 500 800 1500 900 700 1400 1000 1300 1100 1200 800 900 800 1700 1600 1700 1800 500 700 1400 1500 1400 600 1500 1600 1600 500 500 1400 2000 2400 2500 2000 2100 1800 2000 400 35003400 3200 2200 2200 2500 2800 1100 3200 3400 3700 3700 600 4100 2000 1900 600 2500 3900 300 400 3600 3600 27002600 3900 3200 1700 3300 2600 2700 2800 3100 3200 2200 2200 2000 2200 2000 2200 200 400 600 800 2900 2900 3700 800 3300 1200 2400 900 1000 1100 2600 1800 3800 700 600 2200 2000 400 3100 800 900 700 3000 1500 400 2300 1000 1300 600 800 700 2700 3000 2800 3200 4100 2100 3400 3700 3100 37001000 10001100 400 4200400 400 400 400 42004200 4200 1100 3100 31003200 3200 3100 31003200 3200 1100 1100 11001100 1100 800 800 1100 800 3300 3400 4300400 400 400 35003400 2400 2500 2600 2400 2500 2600 2400 2500 2600 1500 1400 1400 4000 600 4000 700 600 3700 3800 3900 3800 300 3100 3300 4000 600 500 500 4200 4200 200 500 4100 41004100 4000 400 4100 3600 0 4100 4300 400 4200 200 0 4000 4200 300 200 300 200 4100 3800 100 3700 3700 3900 300 300 500 400400 600 3900 300 4100 4000 3800 700 200 200 3500 100 3400 3300 300 500 3800 500 700 700 2700 400 3100 200 3000 2800 2900 2600 100 2500 500 3200 300 400 3000 3100 600 31003000 3200 2900 3300 35003400 700 3400 3800 3900 900 800 3600 900 4000 900 3600 3700 3800800 700 3300 3100 3200 700 3200 3400 900 3600 3400 3500 1100 3700 1000 1000 2900 800 800 2800 700 2700 2800 2900 3000 900 700 800 2600 800 800 3100 900 3100 3300 3400 3200 1000 1000 3200 3000 3300 3400 3000 1600 3300 1800 2300 1200 2200 1400 2000 2000 2200 2000 2200 2200 23002100 1600 1400 1500 1600 2000 2600 900 600 900 900 4200 700 4100 3700800 700 1000 800 600 3500 3800 3600 600 800 4000 4000 39003800 700 700 800 900 4000 1000 600 600 4100 7003800 3900 3200 3300 3600 3700 200 3400 1200 600 800 1900 1800 400 600 2000 2100 2000 2200 2000 2100 2000 800 2200 2000 1000 2300 2000 2000 1700 400 1500 1600 16001500 0 1800 1800 200 1800 300 1700 1900 2500 400 2400 2700 500 200 2800 3400 3500 300 400 2900 3000 2800 100 3000 200 3300 3000 400 300 2400 2300 300 2200 2200 100 2300 200 2000 100 1800 20001900 2100 2000 200 300 1900 2600 100 2400 300 200 2700 100 2500 2500 2100 2100 200 2300 300 200 1900 400 400 500 200 400 300 2400 2600 2400 300 500 24002300 500 23002200 600 700 22002200 800 2400 1900 1900 2100 900 900 1700 500 500 1900 1000 2500 700 2200 800 2200 2400 2300 900 25002400 2800 1000 27002600 2600 1000 3000 31002900 2400 1000 1100 1100 1100 2000 1900 2300 2000 1800 2400 2400 300 700 900 700 0 600 800 800 600 500 400300200 100 100 200 100 400 300 300 200 700 300 600 200 100 600 200 100 500 500 300 500 400 300 300 400 200 400 500400 600 200 400 500 100 100 300 200 300 200100 300 1200 1300 200 1600 1700 1600 500 1800 2100 1400 100 1700 400 1700 1800 1500 1500 1400 600 2000 600 700 700 700 400 1000 1300 500 1500 400 100 1100 1100 200 14001300 400 1400 100 200 1200 1200 900 800 600 1000 300 900800 1000 900 800 700600 700 400 500 700 500 400 600 800 700700 500 900 400 1200 600 1100 400 1100 500 1000 700 600 900800 800 600 1000 800 1000 1000 1100 1000900 1000 1200 13001200 700 1100 800 900 1200 1200 1100 1000 1100 1500 1400 1300 1700 700 1900 600 1600 500 1600 2100 1700 600 1800 800 1300 1200 800 1200 1200 1400 1100 1100 600 700 1100 1300 1300 1800 0 500 800 1500 900 700 1400 1000 1300 1100 1200 800 900 800 1700 1600 1700 1800 500 700 1400 1500 1400 600 1500 1600 1600 500 500 1400 2000 2400 2500 2000 2100 1800 2000 400 35003400 3200 2200 2200 2500 2800 1100 3200 3400 3700 3700 600 4100 2000 1900 600 2500 3900 300 400 3600 3600 27002600 3900 3200 1700 3300 2600 2700 2800 3100 3200 2200 2200 2000 2200 2000 2200 200 400 600 800 2900 2900 3700 800 3300 1200 2400 900 1000 1100 2600 1800 3800 700 600 2200 2000 400 3100 800 900 700 3000 1500 400 2300 1000 1300 600 800 700 2700 3000 2800 3200 4100 2100 3400 3700 3100 37001000 10001100 400 4200400 400 400 400 42004200 4200 1100 3100 31003200 3200 3100 31003200 3200 1100 1100 11001100 1100 800 800 1100 800 3300 3400 4300400 400 400 35003400 2400 2500 2600 2400 2500 2600 2400 2500 2600 1500 1400 1400 MoanaCourt Wallis Ct Donald Drive Encina Grande Drive Cereza Drive Los Robles Avenue Villa Vera Verdosa Drive Campana Drive Solana Drive Georgia Ave Ynigo Way Driscoll Ct ngArthur'Maybell Way Maybell Avenue Frandon Ct Florales Drive Georgia Avenue Amaranta Avenue Amaranta Ct MirandaGreen Foothill Expressway Ki sCourt Terman Drive Baker Avenue Vista Avenue Wisteria Ln Pena Ct Coulombe Drive Cherry Oaks Pl Pomona Avenue Arastradero Road Abel Avenue Clemo Avenue Villa Real El Camino Way Curtner Avenue Ventura Avenue Maclane Emerson Street Ventura Ct Park Boulevard Magnolia Dr South El Camino Real Cypress Lane GlenbrookD Fairmede Avenue Arastradero RoadIrven Court Los Palos Cir LosPalosPl Maybell Avenue Alta Mesa Ave Kelly Way Los Palos Avenue Suzanne Drive Suzanne Drive rive El Camino Real Suzanne CtLorabelle Ct McKellar Lane El Camino Way James Road Maclane Second Street Wilkie Way Camino CtWest Meadow Drive Thain Way Barclay Ct Victoria Place Interdale Way West Charleston Road Tennessee LaneWilkie Way Carolina Lane Tennessee Lane Park Boulevard Wilkie Ct Davenport Way Alma Street Roosev Monroe Drive Wilkie Way Whitclem PlWhitclem Drive Duluth Circle Edlee Avenue Dinah's Court Cesano Court Monroe DriveMiller Avenue Whitclem Wy Whitclem Ct Ferne Avenue Ben Lomond Drive Fairfield Court Ferne Avenue Ponce Drive HemlockCourt Ferne Court Alma Street Monroe Drive San Antonio Avenue NitaAvenue Ruthelma Avenue Darlington Ct Charleston Road LundyLane Newberry Ct Park Boulevard George Hood Ln Alma Street eltCircle LinderoDrive Wright Place StarrKingCircle Shasta Drive Mackay DriveDiablo Court Scripps Avenue Scrip p s C o u r t Nelson Drive Tioga C o u rt Creekside Drive Gree n m e a d o w W a y Ben L o m o n d D r i v e Par k s i d e D r i v e Dixon Place Ely Place Dake Avenue Ferne Avenue San Antonio Court (Private) ChristopherCourt CalcaterraPlace Ely Place Ely Place Adobe PlaceNelson Court ByronStreetKeats CourtMiddlefield Road Duncan Place Carlson Court Duncan Place Mumford Place Charleston Road San Antonio Avenue East Meadow Drive Emerson Street Court BryantStreet RooseveltCircle RamonaStreet CarlsonCircleRedwoodCircleSouth Leghorn Street Montrose AvenueMaplewood Charleston Ct Charleston Road Seminole Way Sutherland Drive Nelson Drive El Capitan Place Fabian Street Loma Verde Avenue Bryson Avenue Midtown Court Cowper Street Gary Court Waverley Street South Court Bryant Street Ramona Street Alma Street Coastland Drive Colorado Avenue Byron Street Middlefield Road Gaspar Court Moreno Avenue Coastland Drive El Carmelo Avenue RosewoodD Campesino Avenue Dymond Ct Martinsen Ct Ramona Street Bryant Street Towle Way Towle Place Wellsbury Ct AvalonCourt FlowersLane Mackall Way Loma Verde Avenue KiplingStreet Cowper Street South Court Waverley Street El Verano Avenue Wellsbury Way La Middlefield Road St Claire Drive Alger Drive Ashton Avenu e St Michael Drive St Michael Drive Maureen Avenue Cowper Court Rambow Drive East Meadow Drive Ashton Court Murdoch Drive CowperStreet Murdoch Ct St Michael Court MayCourt Mayview Avenue Middlefield Road Ensign Way Bibbits DriveGailen Ct Gailen Avenue Grove Avenue San Antonio Avenue Commercial Street Industrial Avenue Bibbits Drive Charleston Road Fabian Way T East Meadow Drive Grove Avenue Christine Drive Corina Way Ross RoadCorina Way Louis Road Nathan Way Transport Street Ortega CourtEast Meadow Drive yneCourt alisman Loma Verde Avenue Allen Court Ross Court Loma Verde Pl Ames Avenue Richardson Court Holly Oak Drive Ames Avenue CorkOakWay Middlefield Road Ames Ct Ames Avenue Ross Road Rorke Way RorkeWay Stone Lane Toyon Place Torreya Court Lupine Avenue Thornwood Drive DriftwoodDrive Talisman Drive Arbutus Avenue Ross Road Louis Road Aspen Way Evergreen Drive East Meadow Drive Corporation Way Elwell Court Janice Way East Meadow Circle East Meadow Circle GreerRoad Bayshore Freeway rive Ellsworth Place San Carlos Court Wintergreen Way SutterAvenue Sutter Avenue Clara Drive Price CourtStern Avenue Colorado Avenue Randers Ct Ross Road Sycamore Drive Sevyson Ct Stelling Drive Ross Road David Avenue MurrayWay Stelling Drive Stelling Ct ManchesterCourt Kenneth Drive ThomasDrive GreerRoad Stockton Place Vernon Terrace Louis Road Janice Way Thomas Drive Kenneth Drive Loma Verde Avenue CliftonCourt ElbridgeWay Clara Drive BautistaCourtStockton Place Morris Drive Maddux Drive Piers Ct Louis Road Moraga Ct Coyote HillRoad Hillview Avenue Porter Drive Hillview Avenue Hanover Street Foothill Expressway Arastradero Road Miranda Avenue Stanford Avenue Amherst Street Columbia Street Bowdoin Street Dartmouth Street Hanover StreetCollege Avenue California Avenue Hanover Street Ramos Way (Private) Page Mill Road Hansen Way Hanover Street Old Adobe Road Old Trace Court Arastradero Road Miranda Avenue MockingbirdLane OldTraceRoad Manuela Way RobbRoad Manuela Court Mesa Avenue Oak Hill Avenue Manuela Avenue Miranda Avenue Laguna Ct Barron Avenue Josina Avenue Kendall Avenue Tippawingo St Julie CtMatadero Avenue Ilima Way Ilima Court Laguna Oaks Pl Carlitos Ct La Calle Laguna Avenue ElCerrit Paradise Way Roble Ridge (Private) LaMataWay Chimalus Drive Matadero Avenue oRoad Paul AvenueKendall AvenueWhitsell Avenue Barron Avenue Los Robles Avenue Laguna Way ShaunaLane La Para Avenue San Jude Avenue El Centro Street Timlott La Jennifer Way Magnolia Dr North La Donna Avenue LosRoblesAvenue Rinc Manzana Lane onCircle MesaCourt Crosby Pl Georgia Avenue Hubbartt Drive Willmar Drive Donald Drive Arastradero Road Foothill Expressway Miranda Avenue La Para AvenueSan Jude Avenue Magnolia Drive Military Way Arbol Drive Orme Street Fernando Avenue Matadero Avenue Lambert Avenue Hansen Way El Camino Real Margarita Avenue Matadero Avenue Wilton Avenue Oxford Avenue Harvard Street California Avenue Wellesley Street Princeton Street Oberlin Street Cornell Street Cambridge Avenue College Avenue Williams Street Yale Street Staunton Court Oxford AvenueEl Camino Real Churchill Avenue Park Boulevard Park Avenue Escobita Avenue Churchill Avenue Sequoia Avenue Mariposa Avenue Castilleja Avenue Miramonte Avenue Madrono Avenue Portola Avenue Manzanita Avenue Coleridge Avenue Leland Avenue Stanford Avenue Birch Street Ash Street Lowell Avenue Alma StreetTennyson Avenue Grant Avenue Sheridan Avenue Jacaranda Lane El Camino Real Sherman Avenue Ash Street Page Mill Road Mimosa Lane Chestnut Avenue Portage Avenue Pepper Avenue Olive Avenue Acacia Avenue Emerson Street Park Boulevard Orinda StreetBirch Street Ash Street Page Mill Road Ash Street Park Boulevard College Avenue Cambridge Avenue New Mayfield LaneBirch Street California Avenue Park BoulevardNogal Lane Rinconada Avenue Santa Rita Avenue Park Boulevard Seale Avenue Washington Avenue Santa Rita Avenue WaverleyStree Bryant Street High Street Emerson Street Colorado Avenue Street Emerson Street Ramona Street Bryant Street South Court El Dorado Avenue Alma Street Alma Street HighStreet t Emerson Waverley Oaks Washington Avenue Bryant Street South Court Waverley Street Emerson Street Nevada Avenue North California Avenue Santa Rita Avenue Ramona Street High Street North California Avenue Oregon Expressway Marion Avenue Ramona Street Colorado Avenue Waverley Street Kipling Street South Court Cowper Street Anton Court Nevada Avenue Tasso StreetTasso Street Oregon Avenue Marion Pl Webster Street Middlefield Road Ross Road Warren Way El Cajon Way Embarcadero Road Primrose Way Iris Way Tulip LaneTulip Lane Garland Drive Louis Road Greer Road Morton Street Greer Road Hamilton Avenue Hilbar Lane Alannah Ct Edge Rhodes Drive Marshall Drive Fieldin Moreno Avenue MarshallDrive Dennis Drive Agnes Way Oregon AvenueBlair Court Santa Ana Street Elsinore DriveElsinore Court El Cajon Way Greer Road North California Avenue gDrive Colorado Avenue Sycamore Drive Amarillo Avenue VanAukenCircle Bruce Drive Colonial Lane Moreno Avenue Celia Drive Burnham Way Greer Road Indian Drive Elmdale Pl C Tanland Drive Moreno Avenue Amarillo Avenue West Bayshore Road Sandra Place Clara Drive Colorado Avenue Greer Road Colorado Avenue Simkins Court Otterson Ct Higgins Place Lawrence Lane Maddux Drive Genevieve Ct MetroCircle MoffettCircle Greer Road East Bayshore Road ardinalWay Santa Catalina Street ArrowheadWayAztec Way Chabot TerraceOregon Avenue Carmel Drive SierraCourt StFrancisDrive West Bayshore Road Tanland Drive East Bayshore Road woodDrive Edgewood Drive WildwoodLane Ivy Lane East Bayshore Road St Francis Drive Wildwood Lane Watson Court Laura Lane Sandalwood Ct O'Brine Lane (Private) Embarcadero Road FaberPlace Embarcadero Road Geng Road Embarcadero Way Sand Hill Road Quarry Road Welch Road Arboretum Road Quarry Road Sand Hill Road Homer Avenue Lane 8 West Medical Foundation Way Lane 7 West Lane 7 East Embarcadero Road Encina Avenue El Camino Real Urban Lane Wells Avenue Forest Avenue High Street Emerson Street Channing Avenue Alma StreetAlma Street PaloAltoA El Camino Real venue Mitchell Lane Hawthorne Avenue Everett Avenue Lytton Avenue Lane 15 E High Street Alma Street Bryant Street Lane 6 E Lane 11 W Lane 21 High Street Gilman Street Hamilton Avenue University Avenue Bryant Court Lane 30 Florence Street Kipling Street Tasso Street Cowper Street Ruthven Avenue Hawthorne Avenue Lane 33 PaloAltoAvenue Everett Avenue Poe Street Waverley Street Tasso Street Cowper Street Palo Alto Avenue Webster Street Everett Court Lytton Avenue Byron Street Fulton Street Middlefield Road Churchill Avenue Lowell Avenue Seale Avenue Tennyson Avenue Melville Avenue Cowper Street Tasso Street Webster Street Byron Street North California Avenue Coleridge AvenueWaverley Street Bryant Street Emerson Street Kellogg Avenue Kingsley Avenue Portal Place Ross Road Oregon Avenue Garland Drive Lane A West Lane B West Lane B East Lane D West Lane 59 East Whitman Court Kellogg Avenue Embarcadero Road Kingsley Avenue Lincoln Avenue Addison Avenue Lincoln Avenue Forest Avenue Downing Lane Homer Avenue Lane D East Lane 39 Lane 56 Hamilton Avenue Webster Street Waverley Street Kipling Street Bryant Street Ramona Street Addison Avenue Scott Street Byron Street Palo Hale Street Seneca Street Lytton Avenue Guinda StreetPaloAltoAvenue Fulton Street Middlefield Road Forest Avenue Webster Street Kellogg Avenue Middlefield Road Byron Street Webster Street Cowper Street Tasso Street Cowper Street Addison Avenue Lincoln Avenue Boyce Avenue Forest Avenue Hamilton Avenue Homer Avenue Guinda Street Middlefield Road Channing Avenue AltoAvenue Chaucer Street Chaucer Street University Avenue Channing Avenue Addison Avenue Lincoln Avenue Regent Pl Guinda Street Lincoln Avenue Fulton Street Melville Avenue Byron Street Kingsley Avenue Melville Avenue Hamilton Avenue Hamilton Court Forest Avenue Forest Ct Marlowe Street Maple Street Palm Street Somerset Pl Pitman Avenue Fife Avenue Forest AvenueDana Avenue Lincoln AvenueUniversity Avenue Coleridge Avenue Lowell Avenue Fulton Street Cowper Street Tennyson Avenue Seale Avenue Northampton Drive West Greenwich Pl Middlefield Road Newell Road Guinda Street East Greenwich Pl Southampton Drive Webster Street Kirby Pl Kent PlaceTevis Pl Martin Avenue Center Drive Harriet Street Wilson Street Cedar Street Harker AvenueGreenwood Avenue Hutchinson Avenue Channing Avenue Hopkins Avenue Embarcadero Road Ashby Drive Dana AvenueHamilton Avenue Pitman Avenue Southwood Drive WestCrescentDrive CrescentDrive University Avenue Center Drive EastCrescen Arcadia Place Louisa Court Newell Pl Sharon Ct Erstwild Court Walter Hays Drive Walnut DriveNe well Road Parkinson Avenue Pine Street Mark Twain Street Louis Road Barbara Drive Primrose Way Iris Way Embarcadero Road Walter Hays Drive Lois LaneJordan Pl Lois Lane Heather Lane Bret Harte Street Stanley Way De Soto Drive De Soto Drive Alester Avenue Walter Hays Drive Channing Avenue Iris Way tDrive Dana Avenue Hamilton Avenue Newell Road Kings Lane EdgewoodDrive Island Drive Jefferson Drive JacksonDrive Patricia Lane Madison Way EdgewoodDrive Ramona Street Addison Avenue Channing Avenue Waverley Street Tennyson Avenue Seale Avenue Middlefield Road Byron Street Webster Street Marion Avenue Welch Road Sedro Lane Peral Lane McGregor Way Monroe Drive Silva Avenue Silva Court Miller Court Briarwood Way Driscoll Place Paulsen Ln Community Lane Lane 15 E Court Madeline Ct Arroyo Ct David Ct Green Ct Oregon Expressway Oregon Expressway Sheridan Avenue Page Mill Road Page Mill Road Foothill Expressway Miranda Avenue Foothill Expressway Miranda AvenueFoothill Expressway Cerrito Way Emerson Street Miranda Avenue Lane 20 WLane 20 E Oregon Expressway University Avenue Jacob's Ct CalTrain ROW CalTrain ROW CalTrain ROW CalTrain ROW Emerson Street Waverley Street Kipling Street Clark Way Durand Way Sand Hill RoadSwain Way Clark Way Mosher Way Charles Marx Way Orchard Lane Vineyard Lane Oak Road Sand Hill Road Sand Hill Road Sand Hill Road Hillview Avenue Lane 66 Bryant Street Ramona Street Blake Wilbur Drive West Charleston Road Bayshore Freeway Bayshore Freeway Bayshore FreewayWest Bayshore Road East Bayshore Road East Bayshore Road East Bayshore RoadWest Bayshore Road East Bayshore RoadBayshore FreewayBayshore FreewayFabian Way Bayshore Freeway Bayshore Freeway Palo Road Shopping Center Way Shopping Center Way Shopping Center Way London Plane Way Plum Lane Sweet Olive Way Pear Lane Lane 66 La Selva Drive Grove Ct Miranda Court Stanford Avenue Lane 12 W Lane 5 E Lasuen Street Serra Mall Escondido Road Olmsted Road Phillips Road Pistache Place Santa Ynez Street Lane B Lane C El Dorado Avenue Oak Creek Drive Clara Drive Bellview Dr Everett Avenue Homer Avenue La Calle SAN ANTONIO AVENUE Matadero Ave Colorado Pl Los Robles Avenue Timlott Ct Vista Villa PaloAltoAvenue Lane La Donna Avenue Cass Way Kenneth Drive Fabian Way Page Mill Road Middlefield RoadChristine Drive Louis Road Charleston Road Bayshore FreewayBayshore Freeway Chimalus Drive Hanover Street Community Lane Greenwood Avenue Harker Avenue Parkinson Avenue AvenueMaplewood Pl Mackay Drive Santa Teresa Lane Byron Street Varian Way Quail Dr Quail Dr Paloma Dr Paloma Dr Trinity Ln Heron Wy Feather LnStanislaus Ln Tuolumne Ln Plover Ln Sandpiper Ln Curlew Ln Mallard LnEgret Ln Klamath Ln Deodar StAlder LnSpruce Ln Rickey's Ln Juniper Way Rickey's Wy Rickey's Wy Rickey's Wy Juniper Lane Emerson Street Boronda Lane Tahoe Lane Lake Avenue Donner Lane Almanor Lane Fallen Leaf Street Berryessa Street Cashel St Noble StHettinger Ln Pratt Ln Emma Court Galvez Mall Federation Way Abrams Court Allardice Way Alta Road Alvarado Ct Alvarado Row Angell Court Arguello Way Arguello Way Avery Mall Ayrshire Farm Lane Barnes Court Bonair Siding Bowdoin Street Cabrillo Avenue Cabrillo Avenue Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Campus Drive Capistrano Way Casanueva Place Cathcart Way Cedro Way Cedro Way Churchill Mall Comstock Circle Aboretum Road Aboretum Road Blackwelder Court Campus Drive Cathcart Way Constanzo Street Cooksey Lane Coronado Avenue Cottrell Way Cottrell Way Cowell Ln Crothers Way Dolores Street Dolores Street Dudley Lane Duena Street Electioneer Road Escondido Mall Escondido Mall Escondido Road Escondido Road Escondido Road Esplanada Way Estudillo Road Fremont Road Frenchmans Road Frenchmans Road Galvez Mall Alvarado Row Galvez Street Galvez Street Galvez Street Gerona Road Gerona RoadEl Escarpado Gerona Road Hoskins Court Hulme Court Jenkins Court d Junipero Serra Boulevard Junipero Serra Boulevard Junipero Serra Boulevard Knight Way Lagunita Drive Lane L Lane W Lasuen Mall Lasuen Mall Lasuen Mall Lasuen Street Lathrop Drive Lathrop Drive Lathrop Place Lathrop Drive Links Road Links Road Lomita Drive Lomita Drive Lomita Drive Lomita Drive Lomita Drive Lomita Court Lomita Mall Los Arboles Avenue Masters Mall Mayfield Avenue Mayfield Avenue Mayfield Avenue Mayfield Avenue Mayfield Avenue Mayfield Avenue McFarland Court Mears Court Mears Court Memorial Way Mirada AvenueMirada Avenue Museum Way N Service Road N Tolman Ln Nelson MallNelson Road North-South Axis Oberlin StComstock Circle Escondido Mall Olmsted Road Olmsted Road Olmsted Road Olmsted Road Olmsted Road Palm Drive Palm Drive Pampas Lane Panama Mall Panama Mall Panama Street Panama Street Pearce Mitchell Pl Peter Coutts Circle Peter Coutts Road Peter Coutts Road Pine Hill Court Pine Hill Road Quarry Extension Quarry Road Quillen Ct Raimundo Way Raimund o Way Raimundo Way Roble Drive Rosse Lane Roth Way Roth Way Roth Way Running Farm Lane Ryan Court S Service Road S Tolman Ln Salvatierra Street Salvatierra St Salvatierra Walk Samuel Morris Wy San Francisco Terrace San Francisco Court San Juan St San Juan St San Rafael Pl Santa Fe Avenue Santa Maria Avenue Santa Teresa Street Santa Teresa Street Santa Ynez Street Searsville Road Sequoia Wy Serra Mall Serra Street Serra Street Serra Street Sonoma Terrace Stanford Avenue Stanford Avenue Stock Farm Road Thoburn Court Tolman Drive Valdez Place Valparaiso Street Vernier Place Via Ortega Via PalouVia Pueblo Mall Welch Road Wellesley St Wilbur Way Wing Place Yale St Alma Street Alma Street Alma Street Alma Street Alma Street Hawthorne Avenue Lytton Avenue Nathan Abbott Way Sam McDonald Road Sam McDonald Mall Bowdoin Lane Arguello Way Governors Avenue Governors Avenue Governors Avenue S Governors Lane Pasteur Drive Lagunita Drive Alma Village Lane Alma Village Circle Reservoir Road ad Ryan Lane O'Connor Lane Gene Ct Brassinga Ct Cole Ct Birch Street Arboretum Road Welch Road Pasteur Drive Pasteur Drive Campus Drive South Court Parking LotStanford Palo AltoPlaying Fields Greer Road Greer Road Louis Road Middlefield Road Cowper Street Colorado Avenue Greer Road Waverly Street Embarcadero Road Bryant Street Ramona Street Colorado Avenue Emerson Street High Street Lot O Lot F North California Avenue Ilima Way Miranda Green Street Miranda Court Miranda Avenue Park BoulevardPark Boulevard McGregor Way Manzana Lane Greer Road Parking LotFire Station 2 Miranda Avenue Ilima Court Hansen Way Hansen Way Elmdale Place Louis Road Cowper Street Cowper Street Los Robles Avenue This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'3152' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 17:00:11 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) 700 600 600 500 400 300 200 100 100 200 100 400 300 300 200 700 300 600 200 100 600 200 100 500 300 500 400 300 300 400 200 400 500400 200 400 100 100 300 200 300 80 700600 700 400 700 700 600 600 500 400 300 200 100 100 200 100 400 300 300 200 700 300 600 200 100 600 200 100 500 300 500 400 300 300 400 200 400 500400 200 400 100 100 300 200 300 80 700600 700 400 700 Qua r ry R oad Homer Avenue Lane Medical Foundation Way Lane 7 West Lane 7 East El Camino Real Urban Wells Avenue Forest Avenue High Emers Alma Pa l o A l t o A El Camino Real venue Mitchell Lane Hawthorne Avenue Everett Avenue Lytton Avenue Lane 15 E High Street Alma Street Bryant Street Lane 6 E Lane 11 W La n e 21 High Street Gilman Street Hamilt on Avenue U Br yant Court Lane 30 Florence Street Kipling Street Cowper Street Ru t h v e n A v e n u e Ha Lane 33 Pal o Al t o A v e n ue Poe Street Waverley Street Cowper Street Palo Alto Avenue Downing Lane HH Waverl Kiplin Bryan Ramo Cowper Ramona Street Paul sen Ln Lane 15 E Lane 20 W Lane 20 E University Avenue Emerson Street Waverley Street Kipling Street Sand Hill Road Bryant Street Ramona Street Shopping Center Way Lane 12 W Lane 5 E Pista c he P lac e Everett Avenue Hom er Aven u e Emerson Street Alma Street Hawthorne Avenue Lytton Avenue Lot O Lot F This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'463' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 16:46:55 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) 900 900 4200 700 4100 600 4100 600 900 900 4200 700 4100 600 4100 600 Moana Cour t Wallis Ct G e o rgia A v e Yng Miranda Green Foothill Expressway oad Old Adobe Ro ad Old Trace Court Arastradero Road Mockingbird Lane Old Trace Ro ad M a nu ela W a y R o b b Ro ad M an u ela C ourt M esa Avenue O a k Hill A ve n u e M a n uela A ven u e Mira n da A venu e Me saCourt C ros by Pl Georgia Av enue H u b b artt Driv e r Drive Arastradero R oad Foothill Expressway Miranda Avenue A rroy o Ct Miranda Avenue Foothill Expressway Mira n da A ve nue Miranda Court Miranda Avenue Miranda Green Street Miranda Cou rt Miranda Avenue This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'708' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 16:48:36 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) 30001200 2200 1400 2000 2000 2200 2000 2200 2200 1400 2600 900 600 600 3200 3300 3400 1200 600 800 2000 2100 2000 2200 2000 2100 2000 800 2200 2000 1000 2300 2000 2000 2500 400 2400 2700 500 300 400 3000 400 300 300 200 2200 2200 2000 2200 400 600 800 1200 2400 2200 3100 800 900 700 3000 600 800 700 3100 2400 2500 2600 1500 1400 1400 30001200 2200 1400 2000 2000 2200 2000 2200 2200 1400 2600 900 600 600 3200 3300 3400 1200 600 800 2000 2100 2000 2200 2000 2100 2000 800 2200 2000 1000 2300 2000 2000 2500 400 2400 2700 500 300 400 3000 400 300 300 200 2200 2200 2000 2200 400 600 800 1200 2400 2200 3100 800 900 700 3000 600 800 700 3100 2400 2500 2600 1500 1400 1400 Columbia Street Dartmouth Street Hanover Street College Avenue Californ ia Avenue Hanover Street Ramos Way (Private) Page Mill Road Hansen Way Hanover Street Tippawingo Chimalus Dr ive Fe rnando Ave nue Lambert Avenue Han sen Way El Camino Real Marga rit a Avenue Oxfor d Av en ue Harvard Street Calif orn ia Avenue Wellesley Street Princeton Street Oberlin Street Cornell Street Cam br idg e Av en u e Col le ge Avenue Williams Street Yale Street Staunton Court Oxfor d Av en u e El Camino Real Street h Street Gran t Avenu e Sheri d an Aven ue Jacaranda Lane El Camino Real Sherman Avenue Ash Street Page Mill Ro ad Mimosa Lane Portage Avenu e Pepper Avenue Olive Avenue Acacia Avenue Ash Street Pag Ash Street College Avenue Cambridge Avenue New Mayfield Lane Birch Street California Avenue Sedro Lane Peral Lane Lane 66 Stanford Avenue Mata Page Mill Road Ch imalus Drive Ha nover Street Road berlin St d Roa y St Birch Street Parking Lot Fire Station 2 Hansen Way Hansen Way Parking Lot Stanford Palo Alto Playing Fields This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'613' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 16:50:53 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) 4000 600 4000 700 600 3700 3800 3900 3800 300 3100 3300 4000 600 500 500 4200 4200 200 500 4100 41004100 4000 400 4100 3600 4100 400 4200 4000 300 200 4100 3800 100 3700 39003500 100 3400 3700800 700 1000 800 600 3500 3800 3600 600 800 4000 4000 3900 3800 700 700 800 900 4000 1000 600 600 700 3800 3900 3300 3600 3700 200 3400 3400 3500 3000 500 500 3200 600 4100 3900 200 400 600 800 700 4100 400 4200 400 400 400 400 4200 4200 4200 330 0 430 4000 600 4000 700 600 3700 3800 3900 3800 300 3100 3300 4000 600 500 500 4200 4200 200 500 4100 41004100 4000 400 4100 3600 4100 400 4200 4000 300 200 4100 3800 100 3700 39003500 100 3400 3700800 700 1000 800 600 3500 3800 3600 600 800 4000 4000 3900 3800 700 700 800 900 4000 1000 600 600 700 3800 3900 3300 3600 3700 200 3400 3400 3500 3000 500 500 3200 600 4100 3900 200 400 600 800 700 4100 400 4200 400 400 400 400 4200 4200 4200 330 0 430 Wallis Ct D o n ald Driv e Encina Grande Drive Cereza Drive Los Robles Avenue Villa Vera Verdosa Drive Campana Drive Solana Drive G e orgia A v e Ynigo Way Driscoll Ct ng Ar t hur'Maybell Way Mayb ell Ave nue Frandon Ct Florales Drive Georgia A v enue Amaranta Avenue Amaranta Ct Ki s Cour t Terman Drive Baker Avenue Vista Ave nue Wisteria Ln Pena Ct Coulombe Drive Cherry Oaks Pl Pomona Avenue Arastradero Ro ad Abel Avenue Clemo Avenue Villa Re al El Camino Way Cu rtner Avenue Ventura Avenue Maclane Ventura Ct Park Boulevard Magnolia Dr South El Camino Real Cypress Lane GlenbrookD Fairmede Avenue Aras trade r o Ro adIrve n Court Los Palos Cir LosPalosPl Ma ybell Avenue Alta Mesa Ave Kelly Way Los Palos Avenue Suzanne Drive Suzanne Drive rive El Camino Real Suzanne Ct Lorabelle Ct McKellar Lane El Camino Way James Road Maclane Second Street Wilkie Way Camino CtWest Meadow Drive Thain Way Barclay Ct Victoria Place Interdale Way West Charleston Road Te nnessee Lane Wilkie Way Carolin a Lane Ten ne s see La n e Park Boulevard Wilkie Ct Davenport Way Alma Street Roose v Monroe Driv e Wilkie Way Whitclem Pl Whitclem Drive Duluth Circle Edlee Avenue Din ah's Court Whitclem Wy Whitclem Ct Alma Street Ruthelma Avenue Darlington Ct Lundy Newberry Ct Park Boulevard George Hood Ln Alma Street elt C LinderoD Starr Ki n g Ci Greenme Ely Plac Alma Street et Laguna Ct Barr on Av enue Jo sina Ave nue Kendall Avenue Tippawingo St Julie Ct Matadero A venue Ilima Way Ilima Court Laguna Oaks Pl Carlitos Ct La Calle Laguna Avenue El Cerrit Paradise Way Roble Ridge (Private) L a MataWay Chima lus D rive Matadero Avenue o Road Paul AvenueKendall AvenueWhitsell Avenue Barron Avenue Los Robles Avenue Laguna Way Shauna Lane La Para Avenue San Jude Avenue El Centro Street Timlott La Jennifer Way Magnolia Dr North La Donna Avenue LosRobles Avenue Rinc Manzana Lane on Circle C rosby Pl Georgia Avenue Hub bartt Driv e Willmar Drive Donald Drive La Para Avenue San Jude Avenue Magnolia Drive Military Way Arbol Drive Orme Street Fernando Avenue Matadero Avenue eal Margarita Avenue Matadero Avenue Wilton Avenue Chestnut Avenue Park Boulevard Orinda Street Birch Street McGregor Way Monroe Drive Driscoll Place Madeline Ct Cerrito Wa y Jacob's Ct CalTrain ROW CalTrain ROW Lane 66 West Charle ston Road Lane 66 La Selva Drive La Calle Matadero Ave Los Robles Avenue Timlott Ct Vista Villa Lane La Donna Avenue Cass Way Chimalus Drive Deodar StAlder Ln Spruce Ln Rickey's Ln Juniper Way Ricke y's Wy Rickey's Wy Rickey's Wy Juniper Lane Cashel St Noble StHettin ger Ln Pratt Ln Emma Court Alma Street Alma Village Circle Park BoulevardPark Boulevard McGregor Way Manzana Lane Los Ro bles Av enue Ilima Way Ilima Court This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'847' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 16:52:56 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) 3800 300 3100 3300 200 4000 4100 3600 0 4100 4100 3700 37003500 100 3400 300 2700 400 3100 200 3000 2800 2900 2600 100 2500 3200 300 400 3000 3100 600 31003000 3200 2900 3300 35003400 3400 3600 3600 800 700 3200 700 3200 3400 900 3400 3500 1100 3700 1000 1000 2900 800 800 2800 700 2700 2800 2900 3000 900 700 800 2600 800 800 900 3100 3300 3400 3200 1000 1000 3200 3000 3300 00 200 300 1900 200 2800 3400 3500 300 2900 3000 2800 100 3000 3300 400 300 2300 300 2200 2200 100 2300 200 2000 100 20001900 2100 2000 200 1900 2600 100 2400 300 200 2700 100 2500 2100 2100 200 2300 300 200 1900 400 400 500 200 400 300 2400 2600 2400 300 500 24002300 500 2300 600 700 2200 800 2400 1900 1900 2100 900 1000 700 2200 800 2200 2400 2300 25002400 2800 1000 27002600 1000 3000 3100 1000 1100 500 21002000 600 700 700 700 700 1900 2100 800 900 800 1 2000 2100 1800 2000 400 35003400 3200 2200 2200 2500 2800 1100 3200 3400 3700 1900 600 2500 3600 3600 27002600 2600 2700 2800 3100 200 400 2900 3700 3300 1800 2300 3400 3700 3700 1000 10001100 3100 3100 3200 3200 3100 3100 3200 3200 1100 1100 11001100 1100 3300 3400 35003400 3700 200 3300 500 500 700 3300 3100 36003100 2002002400 300 2500 2200 2200 900 2500 900 2600 2900 400 600 2000 3200 2900 2700 1100 1100 3800 300 3100 3300 200 4000 4100 3600 0 4100 4100 3700 37003500 100 3400 300 2700 400 3100 200 3000 2800 2900 2600 100 2500 3200 300 400 3000 3100 600 31003000 3200 2900 3300 35003400 3400 3600 3600 800 700 3200 700 3200 3400 900 3400 3500 1100 3700 1000 1000 2900 800 800 2800 700 2700 2800 2900 3000 900 700 800 2600 800 800 900 3100 3300 3400 3200 1000 1000 3200 3000 3300 00 200 300 1900 200 2800 3400 3500 300 2900 3000 2800 100 3000 3300 400 300 2300 300 2200 2200 100 2300 200 2000 100 20001900 2100 2000 200 1900 2600 100 2400 300 200 2700 100 2500 2100 2100 200 2300 300 200 1900 400 400 500 200 400 300 2400 2600 2400 300 500 24002300 500 2300 600 700 2200 800 2400 1900 1900 2100 900 1000 700 2200 800 2200 2400 2300 25002400 2800 1000 27002600 1000 3000 3100 1000 1100 500 21002000 600 700 700 700 700 1900 2100 800 900 800 1 2000 2100 1800 2000 400 35003400 3200 2200 2200 2500 2800 1100 3200 3400 3700 1900 600 2500 3600 3600 27002600 2600 2700 2800 3100 200 400 2900 3700 3300 1800 2300 3400 3700 3700 1000 10001100 3100 3100 3200 3200 3100 3100 3200 3200 1100 1100 11001100 1100 3300 3400 35003400 3700 200 3300 500 500 700 3300 3100 36003100 2002002400 300 2500 2200 2200 900 2500 900 2600 2900 400 600 2000 3200 2900 2700 1100 1100 Cu rtner Avenue entura Aven ue Maclane Emerson Street Ventura Ct Park Boulevard mes Road Maclane Second Street Wilkie Way mino CtWest Meadow Drive Barclay Ct Victoria Place essee Lane Wilkie Way Carolina Lane Tennessee Lane Park Boulevard Wilkie Ct Davenport Way Alma Street RooseveltCircle LinderoDrive Wright Pla Starr King Ci East Meadow Driv e Emerson Street Cour t Brya nt St reet Roosevelt Circle Ramona Street CarlsonCircle Redwoo d C ircle S o u th Loma Verde Avenue Bryson Avenue Midtown Court Cowper Street Gary Court Waverley Street South Court Bryant Street Ramona Street Alma Street Coastland Drive Colorado Avenue Byron Street Middlefield Road Gaspar Court Moreno Avenue Coastland Drive El Carmelo Avenue Rosewood D Campesino Avenue Dymond Ct Martinsen Ct Ramona Street Bryant Street Towle Way Towle Place Wellsbury Ct AvalonCourt FlowersLane Mackall Way Loma Verde Avenue Kipling Street Cowper Street South Court Waverley Street El Verano A venue Wellsbury Way La Middlefield Road St Claire Drive Alger Drive Ashton Avenue St Michael Drive St Michael Drive Maureen Avenue Cowper Court Rambow Drive East Meadow Drive Ashton Court Murdoch Drive Cow pe r Street Murdoch Ct St Michael Court MayC Mayview Avenue Middlefi T East Meadow Drive Grove Avenue Chr i s t i n e D r i v e Ortega CourtEast Meadow Drive yneCourt alisman Loma Verde A venue Allen Court Ross Court Loma Verde Pl Am e s A v e nue Ric h a r d s o n C o u r t Holly Oak Drive Ame s A v en u e CorkOakWay Middlefield Road Ames Ct Am e s A v e nu e Ross Road Rorke Way Rorke Way Sto n e L a n e Toyon Place To r r e y a C o u r t Lupine Avenue Thornwood Drive DriftwoodDrive Talisman Drive Arbutus Avenue Ross Road Louis Road Aspe n W ay Evergreen Drive East Me ad Elwell Court Janice Way East Meadow Circle East Meadow Circle GreerRoad Bayshore Freeway rive Ellsworth Place San Carlos Court Wintergreen Way SutterAvenue Sutter Avenue Clara Drive Price Court Stern Avenue Colorado Avenue Randers Ct Ross Road Sycamore Drive Sevyson Ct Stelling Drive Ross Road David Avenue Murray Way Stelling Drive Stelling Ct ManchesterCourt Ken n eth D rive ThomasDrive Greer Road Stockton Place Vernon Terrace Louis Road Janice Way Thomas Drive Kenneth Drive Loma Verde Avenue CliftonCourt Elbri dge Way Clara Drive BautistaCourtStockton Place Morris Drive Maddux Drive Piers Ct Louis Road Moraga Ct ndo Avenue enue garita Avenue atadero Avenue Wilt on Avenue Oxford Avenue Leland Avenue Stanford Avenue Birch Street Alma Street Grant Avenue Sheridan Avenue Jacaranda Lane Sherman Avenue AshStreet Chestnut Avenue e Emerson Street Park Boulevard Orinda Street Birch Street Ash Street Page Mill Road Ash Street Park Boulevard ege Avenue dge Avenue Mayfield LaneBirch Street nue Park Boulevard Nogal Lane Rinconada Avenue Santa Rita Avenue Park Boulevard Seale Avenue Washington Avenue Santa Rita Avenue Waverley Stree Bryant Street High Street Emerson Street Colorado Avenue Street Emerson Street Ramona Street Bryant Street South Court El Dorado Avenue Alma Street Alma Street High Street t Emerson Waverley Oaks Washington Avenue Bryant Street South Court Waverley Street Emerson Street Nevada Avenue North California Avenue Santa Rita Avenue Ramona Street High Street North California Avenue Oregon Expressway Marion Avenue Ramona Street Colorado Avenue Waverley Street Kipling Street South Court Cowper Street Anton Court Nevada Avenue Tasso StreetTasso Street Oregon Avenue Marion Pl Webster Street Middlefield Road Ross Road Warren Way El Cajon Way Embarcadero Road Primr ose Way Iris W ay Tulip Lane Tulip Lane Garland Drive Louis Road Greer Road Morton Street nue Marshall Drive Fieldin Moreno Avenue Marshal l Drive Dennis Drive Agnes Way Oregon Avenue Blair Court Santa Ana Street Elsinore Drive Elsinore Court El Cajon Way Greer Road North California Avenue gDrive Colorado Avenue Sycamore Drive Amarillo Avenue Van Auken Ci r cle Bruce Drive Colonial Lane Moreno Avenue Celia Drive Burnham Way Greer Road Indian Drive Elmdale Pl C Tanland Drive Moreno Avenue Amarillo Sandra Place Clara Drive Colorado Avenue Greer Road Colorado Avenu Simkins Court Otterson Ct Higgins Place Lawrence Lane Maddux Drive Genevieve Ct Metro Circle MoffettCircle Greer Road ardinalWay Santa Catalina Street ArrowheadWayAztec Way O Carmel DriveSt Fr St F Wildw ood Lane Seale Avenue Cowper Street Tasso Street Webster Street Byron Street North California Avenue Portal Place Ross Road Oregon Avenue Garland Drive Seale Avenue Northampton Drive West Greenwich Pl East Greenwich Pl Southampton Drive reet Louis Road Barbara Drive Primrose W ay Iris Way cadero Road H treet enue ris Way Seale Avenue Middlefield Road Byron Street Webster Street Marion Avenue Court Madeline Ct David Ct Green Ct Oregon Expressway Sheridan Avenue Oregon Expressway Jacob's Ct CalTrain ROW CalTrain ROW Bayshore Freeway Bayshore Freeway Bayshore FreewayWest Bayshore Road d East Bayshore Road West Bayshore Road East Bayshore RoaBayshore FreewayBayshore FreewayFabian Way El Dorado Avenue Clara Drive Bellview Dr Colorado Pl Kenneth Drive Middlefield RoadChristine Drive Quail Dr Q uail Dr Palo ma Dr Palo ma Dr Trinity Ln Heron Wy Feather LnStanislaus Ln Tuolumne Ln Plover Ln S an dpiper Ln M allard LnEgret L Kla math L n Boronda Lane Tahoe Lane Lake Avenue Donner Lane Almanor Lane Fallen Leaf Street Berryessa Street Alma Street Alma Street Alma Village Lane Alma Village Circle Birch Street G reer R oad High Street Emerson Street Colorado Avenu e Ramona Street Bryant Street South Court Waverly Street North Cal ifornia Ave nue Colorado Avenu e Cowper Street Middlefield Road Louis Road Greer Road Park Boulevard Greer Road Cowper StreetCowper Street Louis Road Elmdale Place Park Boulevard Greer Road This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'1219' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 16:54:31 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) 2700 400 280 26002500 400 1800 200 1800 1700 1900 200 2900 3000 100 2400 23002200 2200 100 2300 00 2000 100 1800 20001900 2100 2000 200 300 1900 2600 100 2400 300 200 2700 100 2500 2500 2100 2100 200 2300 300 200 1900 400 400 500 200 400 300 2400 2600 2400 300 500 24002300 500 23002200 600 1700 500 1800 2100 1700 400 1700 1800 600 2000 600 70 1700 1800 2200 2200 2000 1900 600 2500 27002600 2600 2700 2800 3100 2700 400 280 26002500 400 1800 200 1800 1700 1900 200 2900 3000 100 2400 23002200 2200 100 2300 00 2000 100 1800 20001900 2100 2000 200 300 1900 2600 100 2400 300 200 2700 100 2500 2500 2100 2100 200 2300 300 200 1900 400 400 500 200 400 300 2400 2600 2400 300 500 24002300 500 23002200 600 1700 500 1800 2100 1700 400 1700 1800 600 2000 600 70 1700 1800 2200 2200 2000 1900 600 2500 27002600 2600 2700 2800 3100 Bryson Avenue Midtown Court Cowper Street Coastla Colorado Avenue Byron Street Middlefield Road Gaspar Court Moreno Avenue San Carlo s Court Colorado Avenue Mariposa Avenue astilleja Avenue Lowell Avenue Alma Street Tennyson Avenue Page Mill Road Park Boulevar Park Boulevard Nogal Lane Rinconada Avenue Santa Rita Avenue Park Boulevard Seale Avenue Washington Avenue Santa Rita Avenue Waverley Stree Bryant Street High Street Emerson Street Colorado Avenue Street Em Ramona Street Bryant Street South Court El Dorado Avenue Alma Street Alma Street High Street t Emerson Waverley Oaks Washington Avenue Bryant Street South Court Waverley Street Emerson Street Nevada Avenue North California Avenue Santa Rita Avenue Ramona Street High Street No rth Ca lifornia Avenue Oregon Expressway Marion Avenue Ramona Street Colorado Avenu e Waverley Street Kipling Street South Court Cowper Street Anton Court Nevada Avenue Tasso StreetTasso Street Oregon Avenue Marion Pl Webster Stre et Middlefield Road Lowell Avenue Seale Avenue Tennyson Avenue Cowper Street Tasso Street Webster Street Byron Street Portal Place Garland Drive Lowell Avenue Fulton Street Tennyson Avenue Seale Avenu Te nnyson Avenue Seale Avenue Middlefield Road Byron Street Webster Street Marion Green Ct Oregon Expressway S h erid a n A v e n u e CalTrain ROW El Dorado Avenue Street Alma Street CowCowper Street Colo r a d Nor th C ali f or ni a A venu e Waverly Street South Court Bryant Street Ramona Street Colo r a do A venu e Emerson Street High Street This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'624' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 16:55:53 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) 2700 2800 2900 2600 400 3100 31003000 3200 2900 3300 35003400 3400 3600 800 700 3200 700 3200 3400 900 3400 3500 110 3700 2900 800 800 2800 700 2700 2800 3000 900 700 800 2600 800 800 900 3100 3300 3200 1000 3200 3000 3300 21001900 400 500 400 2400 500 24002300 2300 600 700 2200 800 1900 1900 2100 500 500 1900 1000 700 2200 800 2200 2400 2300 2400 2800 1000 27002600 3000 3100 1000 1100 1100 1100 1900 2000 2400 500 1800 1800 2000 600 700 700 1700 700 2100 1800 800 700 800 900 800 1800 2000 2000 1800 2000 400 2200 2500 1100 3200 3400 3700 1900 2500 3300 2600 1800 2000 2300 3000 3200 3400 3700 1000 1100 3100 3100 3200 3200 3100 3100 3200 3200 1100 1100 11001100 500 500 700 3300 3100 36003100 2200 2200 900 2500 900 2600 2900 2400 2000 400 1700 600 1700 1700 2400 2000 2700 2100 1100 1100 400 2500 3000 600 3600 1000 1000 2900 3400 1000 400 2600 500 2400 900 2500 1000 2300 1700 2100 700 1900 1700 2100 2800 600 3700 2800 1000 1100 2700 2800 2900 2600 400 3100 31003000 3200 2900 3300 35003400 3400 3600 800 700 3200 700 3200 3400 900 3400 3500 110 3700 2900 800 800 2800 700 2700 2800 3000 900 700 800 2600 800 800 900 3100 3300 3200 1000 3200 3000 3300 21001900 400 500 400 2400 500 24002300 2300 600 700 2200 800 1900 1900 2100 500 500 1900 1000 700 2200 800 2200 2400 2300 2400 2800 1000 27002600 3000 3100 1000 1100 1100 1100 1900 2000 2400 500 1800 1800 2000 600 700 700 1700 700 2100 1800 800 700 800 900 800 1800 2000 2000 1800 2000 400 2200 2500 1100 3200 3400 3700 1900 2500 3300 2600 1800 2000 2300 3000 3200 3400 3700 1000 1100 3100 3100 3200 3200 3100 3100 3200 3200 1100 1100 11001100 500 500 700 3300 3100 36003100 2200 2200 900 2500 900 2600 2900 2400 2000 400 1700 600 1700 1700 2400 2000 2700 2100 1100 1100 400 2500 3000 600 3600 1000 1000 2900 3400 1000 400 2600 500 2400 900 2500 1000 2300 1700 2100 700 1900 1700 2100 2800 600 3700 2800 1000 1100 Bryson Avenue Midtown Court Cowper Street Gary Court Waverley Street Coastland Drive Colorado Avenue Byron Street Middlefield Road Gaspar Court Moreno A venue Coastland Drive Rosewood D Dymond Ct Martinsen Ct Towle Way Towle Place Wellsbury Ct AvalonCourt FlowersLane Mackall Way Loma Verde Avenue KiplingStreet Cowper Street Waverley Street Wellsbury Way La Middlefield Road St Claire Drive Alger Drive Ashton Avenue St Michael Drive St Michael Drive Maureen Avenue Cowper Court Rambow Drive East Meadow Drive Ashton Court Murdoch Drive Cow pe r St reet Murdoch Ct St Michael Court Mayview Avenue T East Meadow Drive Grove Avenue Ch r i s t i n e D r i v e Orte East Meadow Drive yneCourt alisman Loma Verde Avenue Allen Court Ross Court Loma Verde Pl Am e s A v e nue Ric h a r d s o n C o u r t Holly Oak Drive Am e s A v e nue CorkOakWay Middlefield Road Ames Ct Am es A v e n ue Ross Road Rorke Way RorkeWay Stone Lane Toyon Place Torreya C ourt Lupine Avenue Thornwood Drive DriftwoodDrive Talisman Drive Arbutus Avenue Ross Road Louis Road Aspen Way Evergreen Drive Ea Elwell Court Janice Way East Meadow Circle East Meadow Circle GreerRoad Bayshore Freeway rive Ellsworth Place San Carlos Court Wintergreen W ay SutterAvenue Sutter Avenue Clara Drive Price Court Stern Avenue Colorado Avenue Randers Ct Ross Road Sycamore Drive Sevyson Ct Stelling Drive Ross Road David Avenue Mur ray Way Stelling Drive Stelling Ct ManchesterCourt Kenn eth Drive ThomasD rive GreerRoad Stockton Place Vernon Terrace Louis Road Janice Way Thomas Drive Kenneth Drive Loma Verde Avenue CliftonCourt Elbridge Way Clara Drive BautistaCourt Stockton Place Morris Drive Maddux Drive Piers Ct Louis Road Moraga Ct nue WaverleyStree nue t erley Oaks Washington Avenue Waverley Street Santa Rita Avenue Ave nue Marion Avenue Colorado Avenue Waverley Street Kipling Street Cowper Street Anton Court Nevada Avenue Tasso StreetTasso Street Oregon Avenue Marion Pl Webster Street Middlefield Road Ross Road Warren Way El Cajon Way Embarcadero Road Primrose Way Iris W ay Tulip Lane Tulip Lane Garland Drive Louis Road Greer Road Morton Street Greer Road Hamilton Avenue Hilba r L an e Alannah Ct Edge Rhodes Drive Marshall Drive Fieldin Moreno Avenue Marshall Drive Dennis Drive Agnes Way Oregon Avenue Blair Court Santa Ana Street Elsinore Drive Elsinore Court El Cajon Way Greer Road North California Avenue gDrive Colorado Avenue Sycamore Drive Amarillo Avenue Van AukenCi rcle Bruce Drive Colonial Lane Moreno Avenue Celia Drive Burnham Way Greer Road Indian Drive Elmdale Pl C Tanland Drive Moreno Avenue Amarillo Avenue West Bayshore Road Sandra Place Clara Drive Colorado Avenue Greer Road Colorado Avenue Simkins Court Otterson Ct Higgins Place Lawrence Lane Maddux Drive Genevieve Ct Metro Circle MoffettCircle Greer Road East Bayshore Road ardinal Way Santa Catalina Street ArrowheadWayAztec Way Chabot TerraceOregon Avenue Carmel Drive SierraCourt St Francis Drive West Bayshore Road Tanland Drive East Bayshore Road wood D rive Edgewood Drive WildwoodLane Ivy Lane East Bayshore Road St Francis Driv e Wildw ood Lane Watson Court Laura Lane Sa ndalwood Ct O'Brine Lane (Private) FaberPlace Embarcadero Road Geng Road ue enue Cowper Street Tasso Street Webster Street Byron Street North California Avenue Portal Place Ross Road Oregon Avenue Garland Drive Lowell Avenue Fulton Street Tennyson Avenue Seale Avenue Northampton Drive West Greenwich Pl Newell Road Guinda Street East Greenwich Pl Southampton Drive Mark Twain Street Louis Road Barbara Drive Primrose Way Iris Way Embarcadero Road Walter Hays Drive Lois Laneordan Pl a ne Heather Lane Bret Harte Street ys Drive C hanning Avenue Iris Way Tennyson Avenue Seale Avenue Middlefield Road Byron Street Webster Street Marion Avenue Court David Ct Green Ct Oregon Expressway ssway Oregon Expressway Bayshore Freeway Bayshore Freeway Bayshore FreewayWest Bayshore Road East Bayshore Road East Bayshore Road East Bayshore Road West Bayshore Road East BayshoBayshore FreBayshore FreFabian Way Clara Drive Bellview Dr Colorado Pl Kenneth Drive Middlefield RoadChristine Drive Quail ma Dr Palo ma Dr Trinity Ln H eron Feather LStanislaus Ln Tuolumne Ln Plover Ln S and pi per Ln Klamath Ln Boronda Lane Tahoe Lane Lake Avenue Donner Lane Almanor Lane Fallen Leaf Street Berryessa Street Greer Road ueWaverly Street Nor th Califor nia Avenu e Co lorado Avenue Cowper Street Louis Road Greer Road G reer R oad Greer Road Embarcad e Cowper StreetCowper Street Louis Road Elmdale Place Middlefield Road This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'1295' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 16:57:40 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) 500 2400 00 1900 2300 2000 1800 2400 2400 2000 2400 2500 2600 2000 2800 2100 500 2400 00 1900 2300 2000 1800 2400 2400 2000 2400 2500 2600 2000 2800 2100 eer Road ne Edge des Drive East Bayshore Road ierra Court West Bayshore Road East Bayshore Road woo d D r iv e Edgewood Drive Wildwoo d Lane East Bayshore Road Watson Court Laura Lane San dalw oo d Ct O'Brine Lane (Private) E m barca d ero R oa d Faber Place Em barcadero Road Geng Road Embarcadero Way Embarcadero on Expressway Embarcadero Road This map is a product of the City of Palo Alto GIS This document is a graphic representation only of best available sources. Legend abc Microsurface 1 abc Microsurface 2 0'829' FY 1 7 P R E V E N T MA I N T E N A N C E M A P CITY O F PALO A L TO I N C O R P O R ATE D C ALIFOR N IA P a l o A l t oT h e C i t y o f A P RIL 16 1894 The City of Palo Alto assumes no responsibility for any errors. ©1989 to 2016 City of Palo Alto jhay, 2016-04-27 16:58:21 (\\cc-maps\gis$\gis\admin\Personal\jhay.mdb) PE-86070 FY 17 PREVENTIVE MAINTENANCE PROJECT BID SUMMARY ATTACHMENT C # BID ITEM QNTY UNITS 1 Type I Microsurfacing 51,000 SY 1.50$ 76,500.00$ 1.35$ 68,850.00$ 1.30$ 66,300.00$ 1.65$ 84,150.00$ 1.09$ 55,590.00$ 2Type II Microsurfacing 185,650 SY 1.70$ 315,605.00$ 1.60$ 297,040.00$ 1.53$ 284,044.50$ 1.65$ 306,322.50$ 1.37$ 254,340.50$ 3 AC Base Repair 2,221 TON 190.00$ 421,990.00$ 205.00$ 455,305.00$ 202.65$ 450,085.65$ 205.00$ 455,305.00$ 293.00$ 650,753.00$ 4 Crack Seal 190,833 LF 0.40$ 76,333.20$ 0.45$ 85,874.85$ 0.38$ 72,516.54$ 0.36$ 68,699.88$ 0.50$ 95,416.50$ 5 Inert Recycling 2,221 TON 10.00$ 22,210.00$ 2.00$ 4,442.00$ 3.26$ 7,240.46$ 3.10$ 6,885.10$ 2.00$ 4,442.00$ 6 Reset Valves 20 EA 600.00$ 12,000.00$ 800.00$ 16,000.00$ 787.50$ 15,750.00$ 1,200.00$ 24,000.00$ 880.00$ 17,600.00$ 7 Blue Markers 100 EA 25.00$ 2,500.00$ 8.00$ 800.00$ 8.40$ 840.00$ 8.00$ 800.00$ 9.00$ 900.00$ 8 Thermo 12" White 14,265 LF 2.00$ 28,530.00$ 4.35$ 62,052.75$ 4.57$ 65,191.05$ 4.35$ 62,052.75$ 4.80$ 68,472.00$ 9 Thermo 12" Yellow 3,850 LF 2.50$ 9,625.00$ 5.00$ 19,250.00$ 5.25$ 20,212.50$ 5.00$ 19,250.00$ 5.50$ 21,175.00$ 10 Thermo 4" White 11236 LF 1.00$ 11,236.00$ 0.60$ 6,741.60$ 0.63$ 7,078.68$ 0.60$ 6,741.60$ 0.70$ 7,865.20$ 11 Caltrans Det. 2 11790 LF 0.55$ 6,484.50$ 0.45$ 5,305.50$ 0.48$ 5,659.20$ 0.45$ 5,305.50$ 0.50$ 5,895.00$ 12 Caltrans Det. 4 3800 LF 0.80$ 3,040.00$ 0.60$ 2,280.00$ 0.63$ 2,394.00$ 0.60$ 2,280.00$ 0.66$ 2,508.00$ 13 Caltrans Det. 9 19,015 LF 1.00$ 19,015.00$ 0.45$ 8,556.75$ 0.48$ 9,127.20$ 0.45$ 8,556.75$ 0.50$ 9,507.50$ 14 Caltrans Det. 10 25 LF 1.20$ 30.00$ 2.00$ 50.00$ 2.10$ 52.50$ 2.00$ 50.00$ 3.00$ 75.00$ 15 Caltrans Det. 21 5,630 LF 1.50$ 8,445.00$ 1.40$ 7,882.00$ 1.47$ 8,276.10$ 1.40$ 7,882.00$ 1.60$ 9,008.00$ 16 Caltrans Det. 22 9,375 LF 1.50$ 14,062.50$ 1.60$ 15,000.00$ 1.68$ 15,750.00$ 1.60$ 15,000.00$ 1.80$ 16,875.00$ 17 Caltrans Det. 23 1500 LF 1.50$ 2,250.00$ 3.00$ 4,500.00$ 3.15$ 4,725.00$ 3.00$ 4,500.00$ 3.30$ 4,950.00$ 18 Caltrans Det. 27B 20,230 LF 0.50$ 10,115.00$ 0.55$ 11,126.50$ 0.58$ 11,733.40$ 0.55$ 11,126.50$ 0.60$ 12,138.00$ 19 Caltrans Det. 29 380 LF 2.50$ 950.00$ 3.50$ 1,330.00$ 3.68$ 1,398.40$ 3.50$ 1,330.00$ 4.00$ 1,520.00$ 20 Caltrans Det. 38 1,000 LF 1.20$ 1,200.00$ 1.15$ 1,150.00$ 1.21$ 1,210.00$ 1.15$ 1,150.00$ 1.30$ 1,300.00$ 21 Caltrans Det. 38A 250 LF 1.20$ 300.00$ 1.00$ 250.00$ 1.05$ 262.50$ 1.00$ 250.00$ 1.10$ 275.00$ 22 Caltrans Det. 38BC 250 LF 1.80$ 450.00$ 2.00$ 500.00$ 2.10$ 525.00$ 2.00$ 500.00$ 3.00$ 750.00$ 23 Caltrans Det. 39/39A 55,306 LF 0.90$ 49,775.40$ 0.75$ 41,479.50$ 0.79$ 43,691.74$ 0.75$ 41,479.50$ 0.80$ 44,244.80$ 24 Thermo Legends 850 EA 30.00$ 25,500.00$ 50.00$ 42,500.00$ 52.50$ 44,625.00$ 50.00$ 42,500.00$ 55.00$ 46,750.00$ 25 Green Bike Lane 1,750 SF 10.00$ 17,500.00$ 8.75$ 15,312.50$ 9.19$ 16,082.50$ 8.75$ 15,312.50$ 9.60$ 16,800.00$ 26 Misc. Transportation 1 LS 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 27 Traffic Control 1 LS 80,000.00$ 80,000.00$ 65,000.00$ 65,000.00$ 81,566.73$ 81,566.73$ 140,000.00$ 140,000.00$ 22,505.00$ 22,505.00$ 28 Tree Trimming 1 LS 10,000.00$ 10,000.00$ 5,000.00$ 5,000.00$ 11,000.00$ 11,000.00$ 25,000.00$ 25,000.00$ 13,000.00$ 13,000.00$ 29 Pavement fabric dispo 2221 TON 10.00$ 22,210.00$ 3.00$ 6,663.00$ 7.35$ 16,324.35$ 7.00$ 15,547.00$ 2.50$ 5,552.50$ 30 CMS Boards 10 EA 650.00$ 6,500.00$ 500.00$ 5,000.00$ 486.00$ 4,860.00$ 3,650.00$ 36,500.00$ 1,200.00$ 12,000.00$ 31 New Signs 8 EA 300.00$ 2,400.00$ 275.00$ 2,200.00$ 288.75$ 2,310.00$ 275.00$ 2,200.00$ 303.00$ 2,424.00$ 32 New Signs 36 EA 300.00$ 10,800.00$ 275.00$ 9,900.00$ 288.75$ 10,395.00$ 36.00$ 1,296.00$ 303.00$ 10,908.00$ 33 Green Sharrows 1 TON 750.00$ 750.00$ 750.00$ 750.00$ 588.00$ 588.00$ 560.00$ 560.00$ 615.00$ 615.00$ 34 Yield Limit Line 8 EA 150.00$ 1,200.00$ 110.00$ 880.00$ 115.50$ 924.00$ 560.00$ 4,480.00$ 120.00$ 960.00$ 35 Marker Post White 12 EA 200.00$ 2,400.00$ 500.00$ 6,000.00$ 105.00$ 1,260.00$ 250.00$ 3,000.00$ 110.00$ 1,320.00$ BASE BID TOTAL:1,301,906.60$ 1,304,971.95$ 1,314,000.00$ 1,450,012.58$ 1,448,435.00$ # ADD BID ITEM QNTY UNITS 1 Black Aggregate 236,650 SY 0.15$ 35,497.50$ 0.15$ 35,497.50$ 0.12$ 28,398.00$ 0.20$ 47,330.00$ 0.12$ 28,398.00$ PAVEMENT COATINGS ENGINEER'S ESTIMATE GRAHAM CONTRACTORS VSS INTERNATIONAL TELFER HIGHWAY PAVEMENT COATINGSENGINEER'S ESTIMATE GRAHAM CONTRACTORS VALLEY SLURRY TELFER HIGHWAY