HomeMy WebLinkAbout2002-03-18 City Council (3)City of Palo Alto
City Manager’s Report
TO:HONORABLE CITY COUNCIL
FROM:CITY MANAGER DEPARTMENT: PUBLIC WORKS
DATE:MARCH 18, 2002 CMR:184:02
SUBJECT:STATUS REPORT ON PROPOSED CHANGES TO TIDAL
FLOODPLAIN BOUNDARY
This is an information report and no Council action is required.
BACKGROUND
Congress established the National Flood Insurance Program (NFIP) in 1968 to provide
flood insurance to residents and businesses in flood-prone communities that elect to
participate in the program. In return, the Federal Emergency Management Agency
(FEMA) imposes requirements on the participating community, including the codification
of federal floodplain management regulations into local ordinances. Palo Alto initially
elected to take part in the NFIP in 1979.
FEMA has delineated Palo Alto’s Special Flood Hazard Areas (SFHA) on its. Flood
Insurance Rate Maps (FIRM) for those areas subject to flooding in the one percent flood.
The one percent flood has a one percent chance of occurring in any given year. It is
sometimes referred to as the 100-year flood, because it is the flood that would be equaled
or exceeded on an average of once every hundred years, measured over a long time
periodl
There are two basic requirements applicable to properties in a FEMA-designated SFHA:
flood insurance and special building requirements. The flood insurance requirement is
not administered by the City. Federally-backed lending institutions are mandated by law
to require borrowers to obtain flood insurance for all loans issued for structures within an
SFHA. City staff is responsible for enforcing the special building requirements, which
have been incorporated into Chapter 16.52 (Flood Hazard Regulations) of the Palo Alto
Municipal Code.. These requirements apply to new construction ahd ."substantial
improvement" of existing structures within an SFHA. The primary special building
requirements involve constructing the lowest floor of a structure at or above the expected
flood level, installing adequate vents in foundation walls, placing building utilities above
the flood level, and use of water-resistant building materials.
FEMA has identified two distinct flood hazards in Palo Alto: creek flooding and tidal
flooding. Several areas of the City are subject to flooding caused by the overtopping of
CMR:184:02 Page 1 of 3
local creeks in the event of a one percent flood. In addition, a large area on the eastern
side of the city is subject to tidal flooding in the event of failure or overtopping of the
Bayfront levees during a one percent tide on San Francisco Bay. Approximately 2,400
Palo Alto properties are located within the tidal floodplain designated on the FEMA
Flood Insurance Rate Maps (see Attachment A).
DISCUSSION
The tidal floodplain was mapped by a FEMA consultant in 1980. Since the one percent
tide level is expected to reach an elevation of eight feet above sea level, the boundary of
the tidal floodplain should be the eight-foot ground contour. This is where the edge of the
ponded floodwaters would meet the ground (i.e. similar to a bathtub ring). After
receiving several inquiries from the public about the accuracy of the FIRM, staff used
topographic information collected for the City’s Geographic Information System (GIS) to
map the eight-foot ground contour (see Attachment A). The accuracy of the GIS mapping
was verified through a spot check of elevations in the field. Upon comparing the GIS
data with the FIRM, staff has concluded that the floodplain boundary has been drawn
incorrectly on the FIRM. Using staff’s modified floodplain boundary, 290 properties
currently within the floodplain would be excluded and 170 properties outside the current
floodplain would be added.
FEMA has a standard procedure, the Letter of Map Revision (LOMR) process, for
requesting changes to the FIRM. Staff intends to submit a LOMR application to FEMA,
requesting that it change the tidal floodplain boundary to reflect the City’s mapping data.
The proposed map change would result in a net reduction of 120 in the number of
properties located within the floodplain. Prior to sending the LOMR application,
however, staff will conduct outreach to the affected property owners. First, staff will
send a letter to all the property owners informing them of the proposed mapping change
and inviting them to a public meeting to learn more about the issue (see Attachment B).
At the public meeting, the floodplain maps will be displayed and explained, and staff will
answer questions about the proposed mapping changes and the implications of having a
property within a designated floodplain. Following the meeting, there will be a 30-day
appeal period, during which time property owners will have the opportunity to challenge
the City’s data using site-specific elevation data provided by a licensed surveyor.
Following the appeal period and the resolution of any appeals, staff will submit the
LOMR application to FEMA. It is expected that FEMA will respond to the City’s
application within approximately 60 days. Once the City receives the approved LOMR
from FEMA, staff will notify the affected property owners through individual letters. In
addition, the map changes will be publicized through news releases, an item in the City
Manager’s Weekly Memo, and an informational report to Council.
TIMELINE
The process to change the tidal floodplain boundary on the FIRM is expected to follow
the following timeline:
CMR:184:02 Page 2 of 3
March 18, 2002
March 20, 2002
April 2002
May 2002
July 2002
August 2002
ATTACHMENTS
Attachment A:
Attachment B:
PREPARED BY:
DEPARTMENT HEAD:
Informational report to City Council
Letters mailed to affected property owners
Public meeting on proposed mapping changes
Start of 30-day appeal period
End of appeal period
Submittal of LOMR application to FEMA
Expected receipt of approved LOMR from FEMA
Public outreach on mapping changes
Map of existing and proposed tidal floodplain boundary
Sample letters to property owners affected by proposed
changes
JOE TERESI
,~ Senior~
GLENN S. ROBERTS
Director of Public Works
CITY MANAGER APPROVAL:
cc:
t~
~II~Y HARRISON
Assistant City Manager
Jennie Micko, Santa Clara Valley Water District
Bonnie Packer, Palo Verde Neighborhood Association
Annette Ashton, Midtown Residents Association
Michael Gagliasso, Middlefield Road Residents Assn.
Jean Wilcox, Charleston Gardens Association
Larry Mitchell, Meadow Park Homeowners Assn.
Charlotte Cagan, Palo Alto Chamber of Commerce
Peninsula-West Valley Realtors Association
mapping
CMR: 184:02 Page 3 of 3
ATTACHMENT A
i! i~
LEGEND
Existing SFHA
Zone AH
Zone AE
Zone AO
Added to SFHA
Removed from SFH/~
Areas Affected by Proposed
Change to Tidal
Floodplain Boundary
March 2002
This map is a product of the
City of Palo Alto GIS
0’1500’
March 11, 2002
ATTACHMENT B
PROPERTIES ADDED TO FLOODPLAIN ¯
<<Assessee>>
<<In Care of Name>>
<<Mailing_Address~}
<<Mailing_City_and_State}> <<Mailing_Zip_Code>}
Subject:Revision to Tidal Floodplain Boundary
Dear Property Owner:
You are invited to attend an informational public meeting on April 2, 2002 regarding
proposed changes to the Federal Emergency. Management Agency’s (FEMA) Flood
Insurance Rate Map (FIRM) that will affect your property at ~Situs Street Address~>.
The meeting will be held at the Cubbedey Theater, 4000 Middlefield Road. A summary
of the proposed map changes is provided below.
As you are probably already aware, your property is currently near a Special Flood
Hazard Area (SFHA) as delineated by FEMA. The nature of this flood hazard is the 100-
year high-tide level that could reach an elevation of eight feet above mean sea level. This
high-tide level could affect a large portion of Pal0 Alto if the levee system around the
Baylands were to fail or overtop.
The tidal floodplain boundary shown on FIRM Panel Number 060348-003E is meant to
correspond to the 8-foot elevation contour of the land. Review by City staffhas revealed
that the surface elevation data used by FEMA to prepare the map had some inaccuracies.
As a result, the tidal flood boundary shown on the FIRM does not accurately represent
the extent of flooding expected to occur in the event of an 8-foot high tide. The City of
Palo Alto has more accurate surface elevation data. The City is.planning to submit this
data to FEMA along with an application for a Letter of Map Revision (LOMR) to change
the boundary of the tidal flood zone on the FIRM.
This proposed map revision will result in the addition, of your property and others to the
Special Flood Hazard Area (see attached map). In addition, some properties that are
currently shown to be within the designated floodplain will be removed from the Special
Flood Hazard Area. We are sending notices to all affected properties. The revised maps
and relevant associated information will be presented at the public meeting and are
available for inspection in the Public Works Engineering office on the 6th. floor of City
Hall, 250 Hamilton Avenue.
We anticipate that the LOMR application will be submitted to FEMA in early May 2002.
Prior to that date, there will be an appeal period during which property owners who
believe that the City’s proposed map revisions are incorrect may submit a protest letter
with supporting land surface elevation data documenting the alleged error. Any elevation
data submitted to the City must be measured and documented by a licensed engineer or
land surveyor. The LOMR application will be adjusted accordingly prior to submittal to
FEMA if errors or omissions are identified. Once the application is submitted, it is
expected that FEMA will take approximately three months to process the application and
issue a Letter of Map Revision.
The City will issue a follow-up letter to all affected property owners to notify them of the
effective date of the map change. Once a property is added to the SFHA, the mortgage
lender for the home on that property must require the borrower to purchase flood.
insurance, and any future construction on the property is subject to special building
requirements enforced by the City. A summary of the requirements applicable to
properties in the SFHA is attached for your information. Further information will be
presented at the community meeting on April 2.
If you have any questions or need further information, please contact me at 329-2469 or
Joe Teresi at 329-2129.
Sincerely,
Matt Raschke
Engineer
Engineering Division
Attachments
March 11, 2002
ATTACHMENT B
PROPERTIES REMOVED FROM FLOODPLAIN
~Assessee~
~dn Care of Name~
~dvl~iling_Address~
~Mailing_City_and_State~ ~Mailing_Zip_Code~
Subject:Revisionto Tidal Floodplain Boundary
Dear Property Owner:
You are invited to attend an informational public meeting on April 2, 2002 regarding
proposed changes to the Federal Emergency Management Agency’s (FEMA) Flood
Insurance Rate Map (FIRM) that will affect your property at ~Situs Street Address~.
The meeting will be held at the Cubbedey Theater, 4000 Middlefield Road. A summary
of the proposed map changes is provided below.
As you are probably already aware, your property is in or partially in a Special Flood
Hazard Area (SFHA) as delineated by FEMA. The. nature of this flood hazard is the 100-
year high-tide level that could reach an elevation of eight feet above mean sea level. This
high-tide level could affect a large portion of Palo Alto if the levee system around the
Baylands were to fail or overtop.
The tidal floodplain boundary shown on FIRM Panel Number 060348-003E is meant to
correspond to the 8-foot elevation contour of the land. Review by City staff has revealed
that the surface elevation data used by FEMA to prepare the map had some inaccuracies.
As a result, the tidal flood boundary shown on the FIRM does not accurately represent
the extent of flooding expected to occur in the event of an 8-foot high tide. The City of
Palo Alto has more accurate surface elevation data. The City is planning to submit this
data to FEMA along with an application for a Letter of Map Revision (LOMR) to change
the boundary of the tidal flood zone on the FIRM.
This proposed map revision should result in the removal of your property and others from
the Special Flood Hazard Area (see attached map). In addition, some properties that are
currently shown to be outside the designated floodplain will be added to the Special
Flood Hazard Area. We are sending notices to all affected properties. The revised maps
and relevant associated information will be presented at the public meeting and are
available for inspection in the Public Works Engineering office on the 6th floor of City
Hall, 250 Hamilton Avenue.
We anticipate that the LOMR application will be submitted to FEMA in early May 2002.
Prior to that date, there will be an appeal period during which property owners who
believe that the City’s proposed map revisions are incorrect may submit a protest letter
with supporting land surface elevation data documenting the alleged error. Any elevation
data submitted to the City must be measured and documented by a licensed engineer or
land surveyor. The LOMR application will be adjusted accordingly prior to submittal to
FEMA if errors or omissions are identified. Once the application is submitted, it is
expected that FEMA will take approximately three months to process the application and
issue a Letter of Map Revision. The City will issue a follow-up letter to all affected
property owners to notify them of the effective date of the map change. Once a property
is removed from the SFHA, the mandatory flood insurance purchase requirement and the
special building requirements are eliminated.
If you have any questions or need further information, please contact me at 329-2469 or
Joe Teresi at 329-2129.
Sincerely,
Matt Raschke
Engineer
Engineering Division
Attachment