Loading...
HomeMy WebLinkAboutStaff Report 6847 City of Palo Alto (ID # 6847) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/20/2016 City of Palo Alto Page 1 Summary Title: Approval of Community Theatre Partnership Agreements Title: Approval of the Renewal of a Public-Private Partnership Agreement Between the City of Palo Alto and TheatreWorks, Palo Alto Players and West Bay Opera for the use of the Lucie Stern Community Theatre From: City Manager Lead Department: Community Services Recommendation Staff recommends that Council approve the renewal of the public-private partnership agreements between the City of Palo Alto and TheatreWorks, Palo Alto Players, and West Bay Opera for cooperative use of the Lucie Stern Community Theatre (Attachments B, C, D) for the period July 1, 2016 – June 30, 2017. Background The Lucie Stern Community Theatre is used by three local companies: TheatreWorks, Palo Alto Players, and West Bay Opera, which produce approximately 15 productions annually. These partnerships provide the companies with an artistic home, an essential component of their ongoing existence, offering stability through the up and downs of the economy during times when cutbacks in government, foundation and corporate funding for the arts are the national norm. In return, the companies collectively provide culturally enriching theatrical experiences for more than 45,000 audience members annually. TheatreWorks was founded by San Francisco Bay Area native Robert Kelley in 1970 as a theatre arts workshop for teenage and college students. Chartered by the City to produce work that would reflect the concerns of the community during an unsettled period in American life, the company produced thirteen wholly original works for the stage in its first three years. Although company actors initially performed in a variety of venues, a tradition was established of staging several shows each season at the Lucie Stern Theatre. When the Mountain View Center for the Performing Arts opened in 1991, the company began producing five main stage productions there each season, along with three productions each season at the Lucie Stern Theatre in Palo Alto. City of Palo Alto Page 2 Palo Alto Players became the Peninsula’s first theatre company in 1931 when a group of 100 like-minded citizens gathered together to create a theatre dedicated to its community. Initially, productions were held at a makeshift performance space in the Palo Alto Community House adjacent to the train station (now MacArthur Park Restaurant). Soon after, Lucie Stern invited the Players to be the resident theatre company at the Community Theatre. In 1974, the Community Players dissolved their ties with the Parks and Recreation Department, becoming an independent company. Since that time, the City of Palo Alto has continued to support the Palo Alto Players with performance, rehearsal and shop space. West Bay Opera was founded by Henry Holt in 1955. Originally called the Little Opera Guild, the company began presenting fully staged operatic performances. Under the leadership of Mr. Holt, who was succeeded by his wife, Maria Holt, and then by the present director, José Luis Moscovich, West Bay Opera has grown steadily. In 1974, the West Bay Orchestra was established. In 1982, the company acquired space for rehearsals, offices, a costume shop and storage on Lambert Avenue in Palo Alto. Annually, West Bay Opera (WBO) presents three fully staged productions at the Lucie Stern Theatre. City of Palo Alto Page 3 Discussion Theatre Works, Palo Alto Players and West Bay Opera’s usage of the Lucie Stern Community Theatre is covered by a public-private partnership agreement. Given the long history of the partnership and the cultural benefits of providing the Palo Alto community with a diverse range of artistic events, staff recommends that the City Council approve the modification of the existing public-private partnership. The key terms of this agreement are discussed below: Term: This agreement is effective July 1, 2016 and terminates on June 30, 2017. Similar agreement extensions are intended for subsequent years. Revenue: In accordance with the Municipal Fee Schedule and in exchange for providing pro- bono facility usage, the companies shall remit to the City a surcharge in the amount of $2.00 for each ticket sold. This fee is effectively passed down to patrons and is applied to all subscription, group, individual, promotional, and other tickets sold. Complimentary tickets are excluded, and the sum of the surcharge revenue for each production is due to the City within 30 calendar days after the closing of the production. In fiscal year 2015, the City received $51,018 from TheatreWorks (25,509 tickets sold), $25,060 from Palo Alto Players (12,785 tickets sold), and $7,664 from West Bay Opera (3,832 tickets sold) from this ticket surcharge. Among other functions, the proposed agreement acts as a revenue contract which governs the application, collection, and accounting of associated revenue. Responsibilities of City: The contract outlines the responsibilities of the City, using the standard terms of public-private and “joint-venture” partnerships (Attachment A, Policy 1-25: Public Private Partnerships), including specifying notice requirements for contract termination, and affirming non-discrimination, insurance, and property guidelines. The City is also responsible for allowing and providing access to the Lucie Stern Community Theatre during designated hours, providing basic maintenance of capital equipment, monitoring production safety, and providing information regarding other scheduled facility uses (such as City-sponsored events or private rentals). Responsibilities of Company: Additionally, the agreement stipulates the responsibilities of the theatre company, including their duty to abide by City and department policies and procedures (specifically including and as related to, without limitation, conduct in community centers, injury and illness prevention, sale of alcoholic beverages, operations, building emergency procedures, zero waste, and facility use). Other responsibilities include timely remittance of fees and surcharges, requirements for sufficient building supervision/staffing, recordkeeping of ticket sales and surcharge remittance for compliance with audits, and adherence to standard practices for facility security. RESOURCE IMPACT City of Palo Alto Page 4 No additional City resources are required and it is anticipated that this partnership will lead to enhanced programs over the life of the agreement. POLICY IMPLICATIONS This partnership would be categorized as a public/private partnership under the City’s Public- Private Partnership Policy (Policy 1-25: Public/Private Partnerships). Attachments:  Attachment A - Public Private Partnership Policy (PDF)  Signed Scanned TheatreWorks Agreement FY17 (PDF)  Signed Scanned Palo Alto Players Agreement FY17 (PDF)  FY17 West Bay Opera Agreement (PDF) POLICY AND PROCEDURES 1-25/MGR REVISED: AUGUST 2007 1 PUBLIC/PRIVATE PARTNERSHIPS POLICY STATEMENT The City of Palo Alto encourages the formation of public/private partnerships for the benefits the community receives. For the purposes of this policy, “public/private” also encompasses “public/nonprofit” partnerships. Definitions Public/private partnership:A public/private partnership is an agreement between the City and a nonprofit or private organization to provide services or to assist in funding of public facilities and programs. Such partnerships may take various forms, including: Acceptance of or solicitation of service or facility proposals Facilitation of such proposals through the City's regulatory process Waiver of City General Fund fees to help reduce project costs. Contributions of City matching funds for construction of facilities to be owned and controlled or operated by the City. Provision of facilities to the private partner at no charge or at a subsidized rent. Public/private partnerships typically fall into one of three categories: co-sponsorship, alliances or joint ventures. Co-Sponsorships:This is the most common type of public/private partnership. An organization furthers the mission of the City by supporting a City activity or program in conjunction with pursuit of that organization’s own mission or program. Co-sponsorships can take the form of one-time events or annual agreements. Some examples of co-sponsorships include the Palo Alto Tennis Club use of City courts to provide a youth tennis program and American Youth Soccer Organization’s use of space in a City facility to train referees. Co- sponsorships are entered into by staff and normally have no or minimal financial impact. Alliances:This type of public/private partnership involves organizations that have been created for the sole purpose of supporting a City program or an array of City programs. The organization does not expect to receive any direct financial benefit or to alter City policy and/or operations, but undertakes to work closely and cooperatively with staff to implement City goals. Alliance organizations include the Recreation Foundation, the Art Center Foundation (Project Look or Cultural Kaleidoscope), the Friends of the Children’s Theatre (the Magic Castle), the Library Foundation and the Friends of the Palo Alto Library (financial assistance with the renovation and expansion of the Children’s Library). Alliances are approved by the Council if there are any staffing or budgetary implications to the partnership. POLICY AND PROCEDURES 1-25/MGR REVISED: AUGUST 2007 2 Joint Ventures: This type of partnership involves organizations which have programs or missions independent of the City and involve the City entering into a contractual relationship with the public or nonprofit organization with both parties contributing to the partnership for their mutual benefit. Each joint venture is uniquely negotiated by the staff and approved by the City Council. Examples of Joint Ventures include TheatreWorks, Palo Alto Players and West Bay Opera’s use of the Community Theatre and use of the former police station by older adult service provider, Avenidas. PROCEDURES Initiation of partnerships:Public/private partnerships may be initiated in one of three ways: By staff: Staff identifies an opportunity for such a partnership and undertakes an informal or formal request for proposal process to identify partners. By Council: The City Council directs staff to work with a private or nonprofit organization to develop such a partnership. By a private or nonprofit organization:An organization makes a partnership proposal to the staff or City. City Manager Review:If the partnership proposal involves more than one City department, the City Manager’s Office will appoint a team with representatives of all City departments who are stakeholders in the partnership proposal. The team will analyze the proposal and inform the City Manager of the resource implications of the proposal, including staffing and monetary commitments. This would include proposed fee waivers. If the proposal will require a re-ordering of department priorities that have already been approved by the Council in setting its annual priorities or in the budget process, Council approval will be required prior to commitment to the partnership. Council approval will also be required if the partnership requires a new or adjusted allocation of operating or capital funding. Note: Co-sponsorships usually only involve a single department and do not necessitate the formation of an interdepartmental committee, the involvement of the City Manager’s Office or the approval of the City Council. City-Initiated Partnerships:Such partnerships will be guided by existing policies and procedures governing purchasing and outsourcing, using “requests for proposals” and/or bid processes as the method of initiating a partnership. A City-initiated partnership may incorporate incentives including naming rights, waiver of non-enterprise fund building and planning fees, reduced lease rates, free use of space, subsidies, and staff resources. All incentives may be negotiated on a case-by-case basis. POLICY AND PROCEDURES 1-25/MGR REVISED: AUGUST 2007 3 Evaluation of Viability of Partnering Organization:Staff will provide the City Manager and/or City Council with its assessment of the viability of the proposed partnership, based on the partnering organization’s possession of sound organizational, administrative and fiscal management, and its demonstrated experience to achieve and sustain project tasks, such as fundraising and building community support. For proposed facility improvement or expansion initiatives, the nonprofit or private organization should have the ability and commitment to make a substantial pledge to the project’s cost. Facilities Proposals: If a City facility is to be renovated, expanded or otherwise be directly affected by the partnership, the Infrastructure Management Plan will have to be adjusted appropriately. Long-term staffing, operational and maintenance costs must be identified in the proposal.The project’s applicable costs and funding sources for furnishings, fixtures and equipment will be identified. The parties will negotiate the joint or separate financial responsibility for any project cost overruns on a project-by-project basis. Staff may recommend that any standard City processing or use fee authorized under the Municipal Fee Schedule, excluding fees and charges levied by City of Palo Alto Utilities or other City enterprise fund programs, should be waived as a condition of the City's participation. Waiver of fees may be granted by the Council and limited to those fees associated with a construction or capital improvement project which, upon its completion, results in a new or improved public facility, building or park, or some portion thereof, that will be solely owned or controlled by the City. In the event that only a portion of a construction or capital improvement project will result in a new or improved City facility, building or park, or portion thereof, then the Council may waive only that portion of any associated fee directly relating to the construction, improvement or enhancement of the City facility, building or park.As appropriate, the summary and recommendation in the report to the Council will include a staff recommendation on waiving fees which the Council can approve or reject. The City will determine whether the nonprofit or private organization shall use or may forego a formal or informal competitive selection process in the hiring of professionals who will perform the management, design and/or construction phases of the project. The City shall review and approve the requirements for and the performance of all phases of design, planning and construction work for the project. Page 1 AGREEMENT FOR PERFORMING ARTS SERVICES THIS AGREEMENT FOR PERFORMING ARTS SERVICES (“Agreement”) is made and entered into as of the 1st day of July, 2016 by and between THE CITY OF PALO ALTO, a California chartered municipal corporation (“City”) and (Organization Name), a California nonprofit public benefit corporation, located at (Address) (telephone: ) (“Contractor”) (individually, a “Party” and, collectively, the “Parties”). 1. SERVICES: During the Term of this Agreement, as defined in Section 5 below, Contractor shall present that portion of Contractor’s 2016 - 2017 theatrical performances (the “Services”) that are produced at City’s Lucie Stern Community Center. 2. FACILITY: For purposes of this Agreement, the defined term “Facility” is deemed to mean those portions of the Lucie Stern Community Center comprising the theatre, lobby, green room, dressing rooms, scene shop, paint shop, light and sound booth, flat storage, rehearsal hall and costume shop. 3. FEE: Pursuant to the Municipal Fee Schedule (Exhibit G), the services to be performed under this Agreement constitute a “Class I” use of the Facility. 4. EXHIBITS: The Exhibits listed below, Appendices A through E and Attachments 1 through 4 are attached hereto and are incorporated herein by this reference. The Parties acknowledge that this Agreement shall have no force or effect unless all such Exhibits, Appendices and Attachments are attached hereto. Exhibit A: Responsibilities of Contractor Exhibit B: Responsibilities of City Exhibit C: General Conditions Exhibit D: Hearing-Impaired Device Addendum Exhibit E: Insurance Requirements Exhibit F: Municipal Fee Schedule Exhibit G: Contractor Injury and Prevention Policy 5. TERM: The services under this Agreement shall commence as of July 1, 2016 and shall terminate on June 30, 2017 (the “Term”). 6. COMPENSATION: During the Term, Contractor shall pay City: (a) Two Dollars ($2.00) for each ticket sold and (b) compensation for the Facilities Attendant present at each performance, at prevailing rates as set forth in the Municipal Fee Schedule, a copy of which is attached hereto as Exhibit G. Contractor shall send payment in accordance with Exhibit C to City, Attn: Project Manager. Page 2 7. HOLD HARMLESS: Contractor shall indemnify, defend and hold harmless City, its Council Members, officers, employees and agents from and against any and all demands, claims or liability of any nature, including wrongful death, caused by or arising from the acts, errors, omissions, willful misconduct, or gross negligence during the Term by Contractor, its officers, directors, employees, subcontractors or agents, except to the extent such demands, claims or liability of any nature arise from the acts, errors, omissions, willful misconduct, or gross negligence of City, its Council Members, officers, employees, contractors or agents. 8. ENTIRE AGREEMENT: This Agreement and the terms and conditions set forth in the attached Exhibits, Appendices and Attachments represent the entire agreement between the Parties with respect to the Services. All prior agreements, representations, statements, negotiations and undertakings whether oral or written are superseded hereby. 9. QUIET ENJOYMENT: Contractor, upon payment of the consideration required hereunder and Contractor’s performance of all obligations of Contractor hereunder and Contractor’s observance of City’s policies referenced herein, shall and may peacefully and quietly have, hold and enjoy the Premises during the Term. IN WITNESS WHEREOF, THE PARTIES HAVE EXECUTED THIS AGREEMENT THE DAY, MONTH, AND YEAR FIRST WRITTEN ABOVE THE City OF PALO ALTO, a municipality chartered under the laws of the State of California __________________________________ (Organization Name) a California non-profit public benefit corporation By: __________________________________ By: __________________________________ Judge Luckey __________________________________ (Print Full Name) Its: PROJECT MANAGER AND REPRESENTATIVE FOR City __________________________________ (Print Full Title) I.R.S. Number: __________________________________ Address: __________________________________ __________________________________ Telephone: __________________________________ Page 3 City OF PALO ALTO APPROVALS: (ROUTE FOR SIGNATURES ACCORDING TO NUMBERS IN APPROVAL BOXES BELOW) City DEPARTMENT  Funds Have Been Budgeted (1) PURCHASING & CONTRACT ADMINISTRATION INSURANCE REVIEW (2) APPROVAL OVER $25,000 (3) PURCHASING MANAGER APPROVAL OVER $25,000 APPROVAL OVER $85,000 City OF PALO ALTO BY:_____________________________________ City ATTORNEY ATTEST: BY:________________________ _______________________ MAYOR City CLERK Page 4 EXHIBIT A RESPONSIBILITIES OF CONTRACTOR During the Term, Contractor shall: Abide by the policies/procedures established by City and City’s Arts and Sciences Division and the Department of Community Services for the use of City facilities, equipment, costumes, props, furniture, scenery and other production elements. These shall include, but are not limited to, (1) Building Safety Responsibility (Appendix A), Conduct in City Facilities (Appendix B), City of Palo Alto Safety Policy (Appendix C), Zero Waste Plan (Appendix D), and City Report of Accident/Property Damage (Appendix E). . Follow safety procedures for the use of power and hand tools, mechanical lifts, etc. including the use of safety goggles, ear protection, face shields, safety cables, outriggers, and all other safety provisions, as described in Contractor’s Injury and Prevention Policy (Exhibit G). (2) Reserved (3) Reserved (4) Bear sole responsibility for the control and supervision of all production activities and personnel connected therewith, and notify all personnel of their obligations and responsibilities pertaining to their respective responsibilities, having primary responsibility for building security when Contractor is occupying City facilities. (5) Provide Project Manager or his/her designee with a list of all pyrotechnic effects (including the use of open flames), all hydro technical effects, all use of fog or haze, all loud noises (e.g., gunshots), and all use of strobe lights at least twenty-one (21) days prior to first use on stage. No flames shall be permitted on stage without the required fire permits from City. Smoking by any of the actors on stage as an integral part of the Production is deemed a pyrotechnic effect. Safety precautions approved by a City Fire Inspector and Project Manager or his/her designee will be taken when smoking is occurring on stage, and the audience shall be notified beforehand that smoking, loud noises (e.g., gunshots) or use of strobe lights will occur on the stage. All Fire Department fees for “Open Flame Permits” and “Candles and Open Flames in Assembly Areas Permits” shall be the responsibility of Contractor. (6) Provide Project Manager with the rehearsal schedule, performance schedule, and shops schedule. Space reservations for the Facility are specified in Attachment 1. No performance shall begin earlier than 9:00 a.m. nor end later than midnight. In no event shall Contractor conduct rehearsals or other activities, or otherwise occupy City facilities from 12 midnight to 8:00 a.m. unless prior written permission is obtained from Project Manager or a designated employee of City is on site. Contractor shall observe all facility security rules and regulations as established by City (Appendix A, Appendix B and Page 5 Appendix C). (7) Designate as Project Director for the length of this Agreement an employee or sub- contractor to manage or supervise all areas, Contractor personnel and Contractor property in this Agreement, including production, technical, house personnel and any and all support groups and to be Contractor’s liaison with Project Manager or his/her designee in all matters relating to the City in any way. (8) Reserved. (9) Reserved. (10) Contractor shall provide City with a copy of their Injury and Illness Prevention Policies (Exhibit L), which shall ensure that Contractor: shall exercise safe practices in the use of City facilities and equipment, maintain and clear work areas, and, within twenty-four (24) hours, report, on a form provided by City (Appendix E), information regarding accidents. Immediately report to Project Manager or his/her designee on a form provided by City any breakage, malfunction, deterioration or loss of any of the City’s resources (including musical instruments, tools, lights, sound equipment, props, curtains, etc.).. Contractor shall immediately discontinue any activity in which an unsafe or dangerous condition exists. Contractor shall train and supervise Contractor’s staff and volunteers on safe theatre practices and adhere to City’s safety procedures and guidelines. . Contractor shall be solely responsible for the control and supervision of such participants. All such personnel shall be deemed the sole agents and employees of Contractor and shall be notified by Contractor of this circumstance. If, in the opinion of any City or Contractor employee, Contractor is conducting an activity in an unsafe manner, Contractor or its agents shall be informed and shall immediately discontinue such activity until such activity is able to be conducted in a safe manner approved by City staff. (11) Bear responsibility for providing appropriate auxiliary aids, interpretive services and accommodations where they are necessary to achieve an equal opportunity for patrons to participate in and enjoy the benefits of public performances produced under the Agreement, in conformance with the Americans with Disabilities Act (ADA) of 1990 guidelines and requirements. Printed programs shall include the following statement required by the Americans with Disabilities Act: "Persons with disabilities who require information on auxiliary aids or services in using City facilities, services, or programs or who would like information on the City's compliance with the Americans with Disabilities Act (ADA) of 1990, may contact: ADA Coordinator, City of Palo Alto, 650- 463-4952 (Voice) or ada@Cityofpaloalto.org (Internet). (12) Maintain its existence as an independent, non-profit corporation under the laws of the State of California. (13) Submit all signs or displays to be located on or in the Facility to Project Manager or his/her designee for approval at the first production meeting. All displays may be put up at load-in and must be removed during strike. Inside the Facility, no display materials may be placed upon stucco walls. Lobby displays may be placed only on the lobby Page 6 display boards, and all fasteners must be removed at the time display is taken down. Nothing may be posted on the exterior walls or doors of the Facility or in the Stern courtyard, except for items in the display case and an approved production name sign hung from the theatre balcony. Marquee signs must be constructed of light weight material, and shall be secured in such a way that the sign is unlikely to become dislodged by normal vibration or seismic activity. Signs shall be of a standard size no larger than ten feet in length and eight feet in height. All marquee signage must be attached to the theatre balcony with rigging so that the sign may be easily removed for limited periods during photography shoots, special events, or building maintenance. (14) Clean and clear the auditorium, stage, paint shop, scene shop, flat dock, and costume shop, green room, dressing rooms, rehearsal hall, hallways and outdoor areas adjacent to theatre and shop. Disassemble and store, to Project Manager’s or his/her designee’s reasonable satisfaction, scenery, properties, and other production elements, within six hours after the final performance or on such other time schedule mutually agreed upon between Contractor and Project Manager or his/her designee and the incoming authorized user of the facilities, if any. The stage shall always be returned to its basic set-up as established by Project Manager or his/her designee unless there is a mutual agreement with the incoming group that has been approved by Project Manager or his/her designee. All items on the STRIKE CHECKLIST are to be performed unless there is a mutual agreement with the incoming group that has been approved by the Project Manager or his/her designee. The Project Manager or his/her designee will sign a copy of the STRIKE CHECKLIST form at the completion of the strike to signify acceptance of clean and neat facilities. (15) Leave storage, paint, scene, and costume spaces clean and clear of Contractor’s materials other than those materials necessary for the ongoing maintenance and repair of the sets and costumes by the Monday following opening performance. (16) Leave all spaces clear, clean and orderly at the end of each use. Rehearsal Hall is to be cleared of all materials, except major set pieces and any rehearsal props, after each daily use. Rehearsal Hall is to be completely cleared within twenty-four (24) hours of final use. Kitchen, restrooms and dressing rooms are to be cleaned and cleared after each daily use. Trash, recycling and compostable materials are to be removed from all areas daily. Recyclables and compostable materials are to be placed in the recycling and composting carts near the trash dumpster and garbage and trash are to be placed into the dumpster. Contractor is required to reduce waste, reuse and recycle per the City’s Zero Waste Plan (Appendix D). Office space and hallways are to be kept continually clear, clean and orderly and neither space shall be used for the purpose of set, prop, or costume storage. Materials may not be left or stored any place out-of-doors overnight or when unattended by Contractor’s personnel. (17) Enforce current regulations as established by City with regard to smoking, food and drink in City facilities. Contractor shall provide ushers at all previews and performances to enforce such regulations. Smoking is not permitted inside any City facility. No person shall bring any animal into the theatre. This regulation shall not apply to service animals assisting individuals with disabilities or to animals in training to become service animals. Page 7 Use of animals on the stage is subject to approval by Project Manager or his/her designee. Food and drink are not permitted in the auditorium, light/sound booth or on stage, unless used as part of a production scene. Food and drink shall be permitted only in approved areas such as the green room and lobby. Contractor shall clean up all food and drink containers daily after use. (18) Be responsible for cleaning the Lucie Stern hallway restrooms for weekend performances. (19) Comply with City TB test requirement for employees and volunteers of Contractor at any time the City Risk Manager deems it necessary. (20) Comply with City sound ordinance levels for any outdoor activities, including load-in, strike, dismantling, or disposal. Shop doors facing Hopkins and Harriet Streets shall be closed between 8:00 p.m. and 8:00 a.m. (21) Pay any additional Attendant according to prevailing rates as set forth in the Municipal Fee Schedule attached as Exhibit G, pursuant to the following (a) For a period of one (1) hour prior to until at least one half (1/2) hour after the completion of each Performance listed in Contractor Production and Exclusive Use Schedule, 2016 - 2017 (Attachment 1). (b) For any Performance not included in Attachment 1, Contractor may add additional performances of the Productions listed in Attachment 1 upon thirty (30) days’ advance notice to City. (c) When using other City facilities at the same time as a Performance listed in ATTACHMENT 1. (22) Provide house manager and ushers for every Performance or event whenever the public is in attendance. Contractor shall only engage the services of ushers have been trained in theatre emergency, safety and use procedures usher. Contractor shall submit a list of its trained personnel to Project Manager prior to public performances for each Production. Ushers must be available to assist patrons under all circumstances and must be aware of and able to assist disabled persons. Contractor’s House Manager and ushers must also be available to assist in emergency situations throughout the entire Performance until the audience has left the theatre. Ushers must ensure that wheelchairs, walkers, etc. are not blocking any of the aisles or exits. Ushers shall return seats to the upright position and remove litter from the auditorium and restrooms at the conclusion of each performance. (23) Install and/or remove the removable auditorium seats in designated areas to accommodate wheelchair patrons and as required due to the needs of the Production. (24) Remove from the Facility, at the conclusion of each Production, costumes, properties and sets created by Contractor with Contractor-owned materials, which costumes, properties and sets will remain the property of Contractor. All office equipment, construction tools, special effects and lighting equipment purchased and owned by Contractor will remain Page 8 the private property of Contractor and City assumes no responsibility or liability for the loss or maintenance of such materials. All equipment, instruments, costumes and any other materials rented, borrowed or owned by any subcontractor, agent or person for Contractor is the responsibility of Contractor and/or its subcontractors, and City assumes no responsibility or liability for their maintenance or loss. Contractor assumes all liability and responsibility for any default on Production expenses. (25) Replace or repair or cause to be replaced or repaired by factory authorized technicians City-owned equipment, instruments or materials identified by Project Manager or his/her designee as having been lost, damaged or destroyed by Contractor or its agents. A written report must be made on a City form whenever City equipment is lost, damaged, or destroyed by Contractor. (26) Reserved. (27) Request approval to use the Facility for classes, camps or workshops by submitting written application to Project Manager or his/her designee at least sixty (60) days prior to the applicable date. No later than thirty (30) days prior to the applicable date, the Project Manager or his/her designee shall deliver to Contractor in writing his/her approval or disapproval. Failure to respond shall be deemed approval. In the event of disapproval, then he/she shall briefly explain the reasons therefore. No such activity will be advertised or promoted until it has been approved by the Project Manager or the time for review has passed, whichever occurs first. (28) Comply with all State and City laws relating to the sale and consumption of alcoholic beverages. Alcohol is permitted at the Facility if approved by Project Manager, whose approval will not be unreasonably withheld. Unless otherwise specifically permitted and pursuant to City policy, the only alcoholic beverages that may be sold or served at City facilities are wines, including champagne and sparkling wine. If alcoholic beverages are to be sold or distributed free of charge, Contractor must possess a valid On-Sale General Theatre License for the Facility. A copy of Contractor’s permit for the sale or distribution of alcoholic beverages shall be provided to Project Manager. Proof of liquor liability insurance where City is named as co-insured with liability of at least One Million Dollars ($l,000,000.00) shall be required. Permits are to be displayed as required by law. It is the responsibility of Contractor to ensure that no alcoholic beverage is served to a minor. Identification must be checked if the person appears to be under thirty (30) years of age. After each performance, Contractor shall remove all items, including cups, glasses, bottles, napkins and food from the lobby and other areas within the Facility as well as the courtyard. Contractor is required to adhere to City’s Recycling and Zero Waste Program (Appendix D). (29) Cause to have present at the Facility at all times when Contractor or any of its employees, subcontractors or volunteers is in the Facility one of Contractor’s designated and City- approved key and/or proximity card holders. Any exceptions to the foregoing requirement must be approved, in writing, by Project Manager or his/her designee. Any exceptions must be approved by Project Manager or his/her designee in writing. Page 9 (30) Prevent any modifications of a permanent or disfiguring nature of or to the Facility. Contractor may not install or attach anything in or on the Facility without having first submitted a written request to Project Manager and having received written permission from Project Manager or his/her designee. The approval of Project Manager does not relieve Contractor from any responsibility to obtain necessary City permits or Building Department approvals for the modification. Should Contractor violate the provisions of this Paragraph (30), Contractor shall be charged for all repairs necessary to restore the Facility to its original condition and for any additional costs arising from such violation. (31) Immediately report to the police any incidents of a criminal or suspicious nature occurring on City property, and notify Project Manager or his/her designee within twelve hours. If initial notification is verbal, Contractor must subsequently submit the information in writing to Project Manager or his/her designee on a form provided by City. (32) Ensure that the doors to the Scene Shop, Rehearsal Hall, and Costume Shop, as well as any other exterior access doors to any area of the Facility, are not left open, unlocked or left with the locking mechanism disabled, even if only briefly, at any time when the immediate area secured by the door is unoccupied by Contractor. Failure to do this may result in the imposition of greater restrictions imposed on Contractor for access to the Facility, including the possible forfeiture of keys/proximity cards by Contractor and/or restricted access times. (33) Complete a City Report of Accident/Property Damage report (Appendix E) for any and all accidents, injuries or property damage if a City employee is not present to fill out the report. (34) Operate and conduct business in compliance with City’s Zero Waste Plan (Appendix D) for all activities including, but not limited to, set construction and strike, food and beverage service, and office activities. The City Recycling Program department can assist with resources for achieving this goal. The goal is to send as little waste to landfill as possible through waste reduction, reuse and recycling. To achieve this goal Contractor must first reduce waste whenever possible. (35) Avoid the use for food/beverage service of disposables, including, but not limited to, Styrofoam and other plastics. Reusable food/beverage service ware should be utilized to the maximum extent possible. Where a reusable food/beverage service option is not available, Contractor shall choose items that are recyclable. For concessions, choose product packaging that is recyclable. (36) Practice reuse before, during and after Production. City shall provide a list of reuse resources to avoid the disposal of construction materials, sets and props. Contractor must recycle construction debris from set materials (e.g. wood, metal). (37) Recycle all materials included in the City’s Recycling Program including paper (all types), plastic containers #1-#7, cardboard, glass bottles and jars, and metal cans. Compostable materials will be disposed of in designated compost waste receptacles. Page 10 (38) Include on the title page of all production and event programs the following credit: “Use of this facility is made possible through support from The City of Palo Alto, Community Services Department, Division of Arts and Sciences,” and include the official City of Palo Alto logo on the title page or prominent placement within event programs; print in all publicity for the Productions, including, but not limited to, mailings, flyers, posters, brochures, and paid or public service advertising, the statement: “In cooperation with the City of Palo Alto Community Services Department, Division of Arts and Sciences.” The City of Palo Alto, Community Services Department, Division of Arts and Sciences shall also be credited in the Contractor’s list of funders as a “Civic Sponsor.” (39) Reserved. (40) Have the right to borrow available Community Theatre-owned properties, sets, costumes and scenery for productions scheduled in this Agreement. Costumes, properties and sets created by Contractor with Contractor-owned materials will remain the property of Contractor, and shall be removed from the Facility at the conclusion of the production in which the materials are used. The Project Manager or his/her designee may, on a case-by-case basis, authorize exceptions. All office equipment, construction tools, special effects and lighting equipment purchased and owned by Contractor will remain the private property of Contractor and the City assumes no responsibility or liability for the loss or maintenance of such materials. All equipment, instruments, costumes and any other materials rented, borrowed or owned by any subcontractor, agent or person for the Contractor is the responsibility of the Contractor and/or its subcontractors, and the City assumes no responsibility or liability for its maintenance or loss. (41) If minors are involved in the Production, comply with all of the State of California’s rules and regulations regarding Child Labor. (42) Reserved. (43) EXHIBIT B RESPONSIBILITIES OF CITY During the Term, City shall: (1) Allow Contractor the exclusive use of the Facility, as defined in Article 2, as scheduled in Attachment 1 for the preparation and presentation of Productions performed under this agreement provided that Contractor submits specific rehearsal schedules, performance schedules and shop use schedules. Any use of City facilities and equipment other than those listed in the Agreement and the Exhibits thereto, which facilities and/equipment are Page 11 nonetheless required to allow Contractor to perform its Services hereunder are subject to a different contract between City and Contractor. (2) Allow the use of the auditorium and the stage for performances and brush-up rehearsals within the period described in Exhibit A, Paragraph 6. (3) Allow the use of the exclusive use of the stage and the auditorium prior to the opening night of the Productions , with the exception of necessary maintenance procedures that may require access to the stage and auditorium during this period, according to the production schedule set forth in Attachment 1. Allow the use of the rehearsal hall, box office, scene shop, paint shop and costume shop according to the schedule as set forth in Attachment 1. Additional facility use may be provided as specified in item (Exhibit B (1); Exhibit A (27)) above; however, priority use of the room will always be given to actual rehearsals of productions covered by a contract with City. City reserves the right to allow other uses of space within the Facility when not in actual, scheduled use by Contractor on a non-interference basis and with at least seventy-two (72) hours’ prior notice to Contractor. (4) Allow Contractor to use all operational production equipment in City’s inventory as requested by Contractor and approved in writing by City. Contractor shall take such equipment "as is" and is responsible for ensuring that such equipment is in a safe condition prior to use and is returned in working condition at the conclusion of its use or of the Production. (5) Monitor all aspects of production with respect to safety issues (Appendix A, Appendix B and Appendix C). If Project Manager or any designee(s) deem(s) that any procedure followed by Contractor is unsafe, he or she has the authority to require the immediate suspension of such procedure. City and Contractor will work together to prevent or quickly mitigate any fire hazards or any items identified by the Fire Department during facility inspections. (6) Provide a Facilities Attendant for a period of one and one half (1 1/2) hour prior to until at least one half (1/2) hour after the complete of each Performance listed in Attachment 1. (7) Provide persons designated by Contractor and approved by Project Manager or his/her designee with keys, proximity cards (up to a maximum of six), and alarm codes for access to the Facility for the sole purpose of carrying out the requirements of the Agreement. Keys, proximity cards, and alarm codes shall not be loaned or transferred and shall be used only by the designated persons. In the event that Contractor fails to properly open or lock and secure City facilities leading to a false alarm call-out or leaves areas of the facility unlocked and unattended, a Two Hundred Dollar ($200.00) penalty shall be paid to City on each such occasion. In the event that a designated key holder loses any key or proximity card issued by City, Contractor shall be assessed a Seventy- Five Dollar ($75.00) replacement charge for each key or proximity card or pay for the cost of rekeying or reprogramming the locks of the facility if circumstances indicate it as determined in City’s reasonable judgment. Contractor will be responsible and held accountable for all personnel, properties and activities of Contractor. Page 12 (8) Have the right, with no notice, to suspend the Agreement if the Facility should be declared uninhabitable for reasons of safety by the proper authorities (e.g., if the building should be damaged in an earthquake and be declared unsafe for occupancy). If there is an outbreak of pandemic flu or other medical emergency and places of public gatherings are closed, City will not assume any financial responsibility for loss of revenue by Contractor. If the Facility is not available due to earthquake, other disaster, or safety related issues, City will not assume any financial responsibility for loss of revenue by Contractor. Page 13 EXHIBIT C GENERAL CONDITIONS (1) City. The Manager Arts-Children’s Theatre is hereby designated Project Manager for City, who shall render overall supervision of the progress and performance of this Agreement by City. All City services set forth in this Agreement shall be performed by City under the overall supervision of Project Manager or his/her designee. Contractor shall go through Project Manager or his/her designee in all matters dealing with City policies, funding, facilities, equipment and other City departments outside the Facility. (2) Contractor. Contractor shall assign a single Project Director who shall have overall responsibility for the compliance of Contractor with the Agreement. Should circumstances or conditions subsequent to the execution of this Agreement require a different Project Director, Contractor shall notify City immediately of same. The Project Director shall be responsible for all actions of Contractor. The Project Director shall also be responsible for disseminating to appropriate personnel all communication and information from City. (3) Access. Contractor shall not prevent Project Manager, facility maintenance personnel, and/or others specifically designated by Project Manager from access to the Facility; provided, however, that City shall use its best efforts not to disrupt the activities of Contractor as permitted by the Agreement. The Project Manager and others specifically designated by Project Manager shall attempt to coordinate such access if possible. Notwithstanding the foregoing, except in the case of emergency or if they are present on the premises as members of the audience or specifically invited into the backstage areas of the theatre, Project Manager, facility maintenance personnel and/or others specifically designated by the Project Manager shall not enter the auditorium or backstage areas during public performances of a production. (4) Days Defined. The term "days" shall mean calendar days. (5) Qualifications. Contractor represents that it is qualified to furnish the Services described under the Agreement. (10) Ticket Sales: (a) Contractor’s budget for the Term of the Agreement is attached hereto, marked “Attachment 2” and incorporated herein by reference as though fully set forth herein. (b) Contractor shall be responsible for sale of season tickets and single tickets, depositing of revenue and reporting of revenue and expenditures, and shall place available tickets for each Production for sale at the theatre box office one hour prior to each performance. Until one (1) hour prior to the beginning of a Performance, Contractor shall not sell (a) seat numbers C1, C2, D1, D2, D3, and D4; (b) either (i) the block of seats T2, T4, T6, T8, T10, U2, U4, U6, U8 and U10 Page 14 or (ii) the block of seats T1, T3, T5, T7, T9, U1, U3, U5, U7 and U9 for the purpose of making such seats available for the disabled; provided, however, that this Section 10(b) shall not apply to the sale of tickets for such seats to persons who identify themselves as disabled when they purchase their ticket. (c) Contractor agrees the price of admission for the season shall be as set forth in Attachment 3. (d) Contractor shall remit to City a surcharge in the amount of Two Dollars ($2.00) for each and every ticket sold either through subscription, group, individual, promotional or any other means. The foregoing surcharge is due within thirty (30) calendar days the closing date of the Production. The word “sold” as used in this Paragraph (10)(d) is to include any tickets given in exchange for monetary consideration, including donations. City may, in its discretion, add a three percent (3%) surcharge levied for payments received between 31 days and 60 days after the closing date of the Production, a four percent (4%) surcharge levied for payments received between 61 days and 90 days after the closing date of the Production, and a five percent (5%) surcharge levied for payments received in excess of 90 days of the closing date of the Production. Payment must be accompanied by the production report specified in section C(13), “PRODUCTION REPORTS AND RECORDS,” item (a) before payment will be considered to have been made. (e) Contractor shall provide City, when requested by Project Manager or his/her designee, with at least six (6) complimentary tickets for each Production on the date(s) requested. Best available seating will be provided to City if any seats are available at the time of the request. (f) Contractor may operate an intermission snack concession during each Performance under this Agreement. Contractor shall conduct such operation in a safe, clean manner and shall hold City harmless from any claim or demand or liability of any nature whatsoever which may arise out of such operation. If alcoholic beverages are to be sold or distributed free of charge, Contractor shall have on display a California State A.B.C. Permit and provide Project Manager with proof of liquor liability where City is named as co-insured with liability of at least one million dollars ($l,000,000.00) (See Exhibit A (29) above). It is the responsibility of Contractor to ensure that no alcoholic beverage is served to a minor by checking I.D.’s if the person appears to be under thirty years of age. Food and drink may not be taken into the Auditorium or the Light/Sound Booth at any time. Contractor shall remove all cups, glasses, bottles, napkins and food from the lobby, green room, and any other affected areas, including the courtyard, after each performance. Contractor is required to adhere to City’s Zero Waste Plan (Appendix D). (11) Composition of Contractor. Throughout the term of this Agreement, Contractor shall remain an independent, non-profit public benefit corporation under the laws of California and be governed by a Board of Trustees. Any changes in Contractor’s Articles of Page 15 Incorporation, By-Laws, or tax-exempt status shall be reported by Contractor immediately to Project Manager. Not more than twenty-five percent (25%) of the persons serving on the governing board of Contractor may be interested persons. "Interested persons" means any person currently being compensated by Contractor for services rendered to it, whether as a full or part-time employee, independent or otherwise, but excluding any reasonable compensation paid to a director as director. (12) Fiscal Responsibilities of Contractor. (a) Fiscal Agent. Contractor shall appoint a fiscal agent who shall be responsible for the financial and accounting activities of Contractor, including the receipt and disbursement of Contractor funds. Contractor shall provide City with the name of a fiscal agent (Attachment 4) and notify Project Manager within five (5) business days of any changes occurring during the Term. Contractor shall have sole responsibility for the safekeeping of Contractor tickets and monies. (b) System of Accounts. Contractor and its fiscal agent shall establish and maintain a system of accounts that shall be in conformance with generally accepted principles of accounting for budgeted funds. Such system of accounts shall be subject to the review and approval of City staff. (c) Financial Records. In support of its system of accounts, Contractor shall maintain complete and accurate records of all financial transactions, including, but not limited to, contracts, invoices, time cards, cash receipts, vouchers, canceled checks, and bank statements. City may inspect these records at Contractor’s office upon reasonable advance notice and during normal business hours upon request. NOTE: Contractor’s cash receipts are not to be stored on the Premises between Productions. (d) Audit of surcharge payments. Contractor shall retain for a period of at least three (3) years bar-coded electronic records of tickets sold, sales records, and a verified report of sold and unsold tickets which must be made available to City of Palo Alto Auditor upon request. (13) PRODUCTION REPORTS AND RECORDS. (a) Reports. On reasonable notice and with reasons specified, Contractor shall grant Project Manager and/or City’s Auditor access to all Contractor records relating to this Agreement, including performance records, data, statements, and reports. (b) Tax Form 199. A copy of Contractor’s most recently filed California State Tax Form 199, "California Exempt Organizations Annual Information Return" must be filed with Project Manager or his/her designee within fifteen (15) days of when it is due to the State of California and shall also be attached to this agreement prior to its final approval (Attachment 5). (14) CORRECTIVE ACTION REQUIREMENT. Notwithstanding the requirements of this Agreement, in the event City should determine from any source, including but not limited Page 16 to reports submitted by Contractor under this Agreement or any evaluation report from any source, that Contractor may not be in compliance with any provision of the Agreement, City may forward to Contractor written notice of same. Such notice shall specify with particularity the nature of the condition(s) or issue(s) that require(s) corrective action and may include a recommendation as to appropriate corrective action. Within fifteen (15) days of City’s request, Contractor shall submit its written response to the notice, which response shall set forth its view of the alleged violation and its proposed plan, if any, for corrective action. Upon request of either Party, the Parties shall meet within five (5) days thereafter to discuss the alleged violation and proposed corrective action. (15) CONTRACTS WITH OTHER AGENCIES. Contractor agrees not to enter into any contract or agreement with another person or agency that will materially interfere with or inhibit the full performance of the Services to be provided by Contractor under this Agreement. Contractor agrees to terminate as soon as legally possible any contract or agreement which will materially interfere with or inhibit the full performance of the services to be provided by Contractor to City under this Agreement. Nothing herein is intended to prohibit Contractor from applying for, and receiving, supplementary funding from other than City sources so long as any agreement required for such funding does not materially interfere with or inhibit the full performance of the services to be provided by Contractor under this Agreement. Contractor is specifically encouraged to seek such supplementary funding. Any agreement between Contractor and the Mountain View Center for the Performing Arts or any other theatrical venue shall not be deemed to violate this Section (15). (16) INTEREST OF CONTRACTOR. Contractor covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of its Services hereunder. Contractor further covenants that, to the best of Contractor’s knowledge and belief, in the performance of its Services under the Agreement, no subcontractor or person having such an interest shall be employed by Contractor. It is expressly agreed that, in the performance of the Services hereunder, Contractor shall at all times be deemed an independent contractor and not an agent or employee of City. (17) ASSIGNMENT. Both Parties shall give their personal attention to the faithful performance of this Agreement and shall not assign, transfer, or convey the Agreement or any right, title, or interest in or to the same or any part thereof without the prior written consent of the other Party, and then only subject to such terms and conditions as the other Party may require. Consent to one assignment shall not be deemed to be consent to any subsequent assignment. Any assignment without such approval shall be void and, at the option of the other Party, shall terminate this Agreement and any license or privilege granted herein. This Agreement and the Parties’ respective interests herein shall not be assignable by operation of law without the prior written consent of the other Party. (18) SUBCONTRACTORS. Contractor shall be responsible for employing or engaging all persons necessary to perform the Services of Contractor hereunder. All subcontractors are deemed to be employees of Contractor and Contractor agrees to be responsible for Page 17 their performance. Contractor shall give its personal attention to the fulfillment of the provisions of the Agreement by all of its employees, participants, volunteers, and subcontractors. (19) INDEMNITY. Except to the extent the same arise from the negligence or willful misconduct of City, its officers, contractors, agents, employees, or persons brought onto the Premises by or through City, Contractor shall defend, indemnify and hold harmless City, its officers, contractors, agents, and employees and the Premises from and against (a) any injury or death or property damage arising from the use or occupancy of the Premises by Tenant, its officers, agents, employees or any persons brought onto the Premises by or through Contractor, (b) any claims or demands made against City, its officers, agents or employees by reason of any infringement or alleged infringement of any copyright or trademark caused by or alleged to have been caused by Contractor or any subcontractor under this Agreement, (c) any penalties imposed on account of the violation of any law or regulation or of any term or condition of any permit in connection with this Agreement, or (d) any damage arising under this Agreement from any loss or damage to materials and equipment owned, rented or borrowed by Contractor, its employees, subcontractors, participants, volunteers, sponsors or any others engaged in connection with the Services rendered by Contractor under the Agreement. (20) INTOXICATION. Contractor agrees to be responsible for injuries or damage caused by any of its directors, officers, employees, agents, subcontractors, or volunteers who are under the influence of alcohol, drugs, hallucinogens or narcotics, whether or not legally prescribed. Neither Contractor nor City shall permit any of Contractor’s employees or volunteers discovered to be under the influence of any of the foregoing substances from remaining in any facility used under the terms of this Agreement and City reserves the right of denying such persons further participation in the Productions. Consumption of alcoholic beverages or use of illegal drugs at the Facility is expressly forbidden by any person working for Contractor, paid or volunteer. This includes all staff, actors, crew and musicians. (21) WORKER'S COMPENSATION. Contractor certifies that it is aware of the provisions of the Labor Code of the State of California, which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of the Code, and it certifies that it will comply with such provisions during the Term of the Agreement. (22) INSURANCE. Contractor, at its sole cost and expense, shall obtain and maintain in full force and effect throughout the Term of the Agreement insurance coverage insuring not only Contractor and its subcontractors, if any, but also, with the exception of workers' compensation and employer's liability insurance, City, its officers, agents, and employees and each of them. City is to be named as Additional Insured with liability coverage of at least One Million Dollars ($1,000,000.00). A copy of the certificate(s) of insurance shall be attached to the Agreement and shall be filed with City concurrently with the execution of this Agreement. Said certificate shall be subject to the approval of City Attorney and shall contain an endorsement stating that Page 18 said insurance is primary coverage and will not be canceled or altered by the insurer except after filing with City Clerk thirty (30) days' written notice of such cancellation or alteration. Current certificates of such insurance shall be kept on file at all times during the Term of the Agreement. (23) WEAPONS. No firearms or other weapons, whether loaded or not, shall be allowed in the Facility or any other City property. Stage weapons and firearms designed solely for the use of blank cartridges will be allowed if they are being used as a prop in the current Production, but must be stored, when not being used, in a secure manner by Contractor’s stage manager or his/her designee. (24) LEGAL COMPLIANCE. Contractor and all its paid employees, subcontractors, and volunteer participants are required to abide by all applicable federal, state and local laws and ordinances. Page 19 EXHIBIT D HEARING-IMPAIRED DEVICEADDENDUMContractor’s personnel shall be permitted to manage, distribute and collect the hearing-impaired devices (“headsets”) that City owns for use by hearing-impaired persons at all Performances at the Facility, subject to the following restrictions: (a) Contractor shall verify that all headsets and batteries are present and functioning normally and shall report to Project Manager or his/her designee any missing or broken items before taking control of them for the run of the Production. (b) For any damage or loss of any headset while under Contractor’s control, Contractor shall promptly, upon request, pay City the fair market price for any necessary replacement or repair of any component of the headsets, as such replacement or repair is reasonably determined by Project Manager or his/her designee. (c) Contractor will diligently ensure the security of the headsets, in a manner approved by Project Manager or his/her designee, when the headsets are not in use. When the headsets are not so secured, Contractor will not leave the headsets unattended. (d) Contractor will provide at least one (1) person in the Facility lobby, whose sole responsibility will be to distribute and collect the headsets, as the case may be, pursuant to the following: (i) Beginning one-half (1/2) hour before each Performance until ten (10) minutes after the Performance begins; (ii) At all times during any and all intermissions; and (iii) From the end of the Performance until all of the headsets have been returned. (e) Contractor shall collect a Driver’s License or credit card as security for the loan of a headset, which Driver’s License or credit card will be returned to its owner upon return of the headset. Contractor will implement procedures for the safe handling of the Driver’s Licenses and credit cards and their return to their owners. (f) Contractor’s responsibility at the end of each performance will include the following: (i) Clean and otherwise sanitize all the earpieces by swabbing them with isopropyl alcohol swabs. (ii) Turn off the on/off/volume switches on all returned headsets and remove the batteries, placing the batteries into the battery charger. (iii) Return all headsets and batteries to their storage case. (iv) Verify the presence of all twenty (20) headsets and batteries. Page 20 (v) Return the headset storage case to its place in the rolling cart. (vi) Return the rolling cart to the House Manager’s Closet. (vii) Be sure the rolling cart is plugged into an electrical outlet. (viii) Make sure the battery charger is getting power, as indicated by the red light on the top of the case. (ix) Padlock the rolling cart’s doors shut, using either the padlock provided by City or a padlock supplied by Contractor, provided that Project Manager or his/her designee has been given a copy of the key or the combination. (x) Immediately report to City’s attendant at the Facility any missing headsets, and turn over to the attendant any malfunctioning headsets. The provisions of this Exhibit D may be terminated upon reasonable notice at any time by Project Manager or his/her designee, and may be terminated upon thirty (30) days’ prior written notice by Contractor. Page 21 EXHIBIT E INSURANCE REQUIREMENTS CONTRACTORS TO THE CITY OF PALO ALTO (City), AT THEIR SOLE EXPENSE, SHALL, FOR THE TERM OF THE CONTRACT. OBTAIN AND MAINTAIN INSURANCE IN THE AMOUNTS FOR THE COVERAGE SPECIFIED BELOW AND AFFORDED BY COMPANIES WITH AM BEST’S KEY RATING OF A-:VII, OR HIGHER, LICENSED OR AUTHORIZED TO TRANSACT INSURANCE BUSINESS IN THE STATE OF CALIFORNIA. AWARD IS CONTINGENT ON COMPLIANCE WITH CITY’S INSURANCE REQUIREMENTS, AS SPECIFIED, BELOW: REQUIRED TYPE OF COVERAGE REQUIREMENT MINIMUM LIMITS EACH OCCURRENCE AGGREGATE YES YES WORKER’S COMPENSATION EMPLOYER’S LIABILITY STATUTORY STATUTORY YES GENERAL LIABILITY, INCLUDING PERSONAL INJURY, BROAD FORM PROPERTY DAMAGE BLANKET CONTRACTUAL, AND FIRE LEGAL LIABILITY BODILY INJURY PROPERTY DAMAGE BODILY INJURY & PROPERTY DAMAGE COMBINED. $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 YES AUTOMOBILE LIABILITY, INCLUDING ALL OWNED, HIRED, NON-OWNED BODILY INJURY - EACH PERSON - EACH OCCURRENCE PROPERTY DAMAGE BODILY INJURY AND PROPERTY DAMAGE, COMBINED $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 NO PROFESSIONAL LIABILITY, INCLUDING, ERRORS AND OMISSIONS, MALPRACTICE (WHEN APPLICABLE), AND NEGLIGENT PERFORMANCE ALL DAMAGES $1,000,000 YES THE City OF PALO ALTO IS TO BE NAMED AS AN ADDITIONAL INSURED: CONTRACTOR, AT ITS SOLE COST AND EXPENSE, SHALL OBTAIN AND MAINTAIN, IN FULL FORCE AND EFFECT THROUGHOUT THE ENTIRE TERM OF ANY RESULTANT AGREEMENT, THE INSURANCE COVERAGE HEREIN DESCRIBED, INSURING NOT ONLY CONTRACTORAND ITS SUBCONSULTANTS, IF ANY, BUT ALSO, WITH THE EXCEPTION OF WORKERS’ COMPENSATION, EMPLOYER’S LIABILITY AND PROFESSIONAL INSURANCE, NAMING AS ADDITIONAL INSUREDS CITY, ITS COUNCIL MEMBERS, OFFICERS, AGENTS, AND EMPLOYEES. I. INSURANCE COVERAGE MUST INCLUDE: A. A PROVISION FOR A WRITTEN THIRTY (30) DAY ADVANCE NOTICE TO CITY OF CHANGE IN COVERAGE OR OF COVERAGE CANCELLATION; AND B. A CONTRACTUAL LIABILITY ENDORSEMENT PROVIDING INSURANCE COVERAGE FOR CONTRACTOR’S AGREEMENT TO INDEMNIFY CITY. C. DEDUCTIBLE AMOUNTS IN EXCESS OF $5,000 REQUIRE CITY’S PRIOR APPROVAL. II. CONTACTOR MUST SUBMIT CERTIFICATES(S) OF INSURANCE EVIDENCING REQUIRED COVERAGE. III. ENDORSEMENT PROVISIONS, WITH RESPECT TO THE INSURANCE AFFORDED TO “ADDITIONAL Page 22 INSUREDS” A. PRIMARY COVERAGE WITH RESPECT TO CLAIMS ARISING OUT OF THE OPERATIONS OF THE NAMED INSURED, INSURANCE AS AFFORDED BY THIS POLICY IS PRIMARY AND IS NOT ADDITIONAL TO OR CONTRIBUTING WITH ANY OTHER INSURANCE CARRIED BY OR FOR THE BENEFIT OF THE ADDITIONAL INSUREDS. B. CROSS LIABILITY THE NAMING OF MORE THAN ONE PERSON, FIRM, OR CONTRACTOR AS INSUREDS UNDER THE POLICY SHALL NOT, FOR THAT REASON ALONE, EXTINGUISH ANY RIGHTS OF THE INSURED AGAINST ANOTHER, BUT THIS ENDORSEMENT, AND THE NAMING OF MULTIPLE INSUREDS, SHALL NOT INCREASE THE TOTAL LIABILITY OF THE COMPANY UNDER THIS POLICY. C. NOTICE OF CANCELLATION 1. IF THE POLICY IS CANCELED BEFORE ITS EXPIRATION DATE FOR ANY REASON OTHER THAN THE NON-PAYMENT OF PREMIUM, THE ISSUING COMPANY SHALL PROVIDE CITY AT LEAST A THIRTY (30) DAY WRITTEN NOTICE BEFORE THE EFFECTIVE DATE OF CANCELLATION. 2.IF THE POLICY IS CANCELED BEFORE ITS EXPIRATION DATE FOR THE NON-PAYMENT OF PREMIUM, THE ISSUING COMPANY SHALL PROVIDE CITY AT LEAST A TEN (10) DAY WRITTEN NOTICE BEFORE THE EFFECTIVE DATE OF CANCELLATION. NOTICES SHALL BE MAILED TO: PURCHASING AND CONTRACT ADMINISTRATION City OF PALO ALTO P.O. BOX 10250 PALO ALTO, CA 94303 Page 23 EXHIBIT F CITY OF PALO ALTO MUNICIPAL FEE SCHEDULE Page 24 EXHIBIT G CONTRACTOR INJURY AND PREVENTION POLICY I. INTRODUCTION AND PURPOSE It is the policy of (Organization) to maintain a safe and healthy work environment for each employee and to comply with all applicable occupational health and safety regulations. This Injury and Illness Prevention Program (IIPP) is intended to establish a framework for identifying and correcting workplace hazards within the organization. II. RESPONSIBILITIES General Manager The General Manager has primary authority and responsibility to ensure the implementation of the IIPP and to ensure the health and safety of the department's staff. This is accomplished by communicating (Organization) ’ emphasis on health and safety, analyzing work procedures for hazard identification and correction, ensuring regular workplace inspections, providing health and safety training, and encouraging prompt employee reporting of health and safety concerns without fear of reprisal. Safety Committee The Safety Committee has the ongoing responsibility to maintain and update this IIPP, to assess compliance with applicable regulations and policies, to evaluate reports of unsafe conditions, and to coordinate any necessary corrective actions. The Safety Committee meets at least quarterly and includes representatives from various departments. The Safety Committee membership may rotate periodically. Unsafe conditions that cannot be immediately corrected by an employee or his/her supervisor should be reported to the General Manager or any Safety Committee member by filling out a "Report of Unsafe Condition or Hazard" form. Timely correction of workplace hazards will be tracked by the Safety Committee which will receive and review reports of unsafe conditions, workplace inspection reports, and injury reports. Specifically, the Safety Committee will: • Review the results of periodic, scheduled workplace inspections to identify any needed safety procedures or programs and to track specific corrective actions. • Review supervisors’ investigations of accidents and injuries to ensure that all causes have been identified and corrected. • Where appropriate, submit suggestions to department managers for the prevention of future incidents. Page 25 • Review alleged hazardous conditions brought to the attention of any committee member, determine necessary corrective actions, and assign responsible parties and correction deadlines. • When determined necessary by the Committee, the Committee may conduct its own investigation of accidents and/or alleged hazards to assist in establishing corrective actions. • Submit recommendations to assist department managers in the evaluation of employee safety suggestions. The Safety Committee must prepare and make available to all department personnel written minutes of issues discussed at the meetings. These minutes must be posted or made available in a convenient location and must be maintained on file for at least one year. Supervisors Supervisors play a key role in the implementation of the IIPP. They are responsible for: • Communicating to their staff (Organization) ’s emphasis on health and safety. • Ensuring periodic, documented inspection of workspaces under their authority. • Ensuring that the Safety Committee is aware of all accidents which have occurred, and all hazards which have been observed since the last meeting. • Working with the Operations Manager to address facility-related safety concerns. • Promptly correcting identified hazards. • Modeling and enforcing safe and healthful work practices. • Providing appropriate safety training and personal protective equipment. • Implementing measures to eliminate or control workplace hazards. • Stopping any employee’s work that poses an imminent hazard to either the employee or any other individual. • Encouraging employees to report health and safety issues to the Safety Committee without fear of reprisal. All Employees Page 26 It is the responsibility of all employees to comply with all applicable health and safety regulations and established work practices. This includes, but is not limited to: • Observing health and safety-related signs, posters, warning signals and directions. • Reviewing the building emergency plans and assembly areas. • Learning about the potential hazards of assigned tasks and work areas. • Taking part in appropriate health and safety training. • Following all safe operating procedures and precautions. • Using proper personal protective equipment. • Warning coworkers about defective equipment and other hazards. • Reporting unsafe conditions immediately to a supervisor, and stopping work if an imminent hazard is presented. • Participating in workplace safety inspections. III. IDENTIFYING WORKPLACE HAZARDS Regular, annual workplace safety inspections of all departments must be conducted. By law, the first of these inspections must take place when the department first adopts the IIPP. The inspections should be noted and the department should maintain copies of this documentation. These regular inspections will be supplemented with additional inspections whenever new substances, processes, procedures, or equipment introduced into the workplace represent a new occupational safety and health hazard or whenever supervisors are made aware of a new or previously unrecognized hazard. Generally, supervisors are responsible for identification and correction of hazards that their staff face and should ensure that work areas they exercise control over are inspected at least annually. Supervisors should check for safe work practices with each visit to the workplace and should provide immediate verbal feedback where hazards are observed. The "Report of Unsafe Condition" form should be filled out when a referral is made to the Safety Committee as a result of a condition discovered during an inspection for which the responsible supervisor could not determine an immediate remedy. The "Report of Unsafe Condition" form can also be obtained by any employee, filled out and turned in anonymously. IV. COMMUNICATING WORKPLACE HAZARDS Page 27 Supervisors are responsible for communicating with all workers about safety and health issues in a form readily understandable by all workers. All department personnel are encouraged to communicate safety concerns to their supervisor without fear of reprisal. The Safety Committee is another resource for communication regarding health and safety issues for employees. Additionally, Safety Committee minutes and other safety-related items are posted or made available at a convenient location. Employees will also be informed about safety matters by e-mail, voice mail, or by distribution of written memoranda. Occasionally, the Safety Committee may also sponsor seminars or speakers or coordinate other means to communicate with employees regarding health and safety matters. Supervisors are responsible for ensuring that employees are supplied access to hazard information pertinent to their work assignments. Information concerning the health and safety hazards of tasks performed by department staff is available from a number of sources. These sources include, but are not limited to, Material Safety Data Sheets (MSDSs, see below), equipment operating manuals, container labels and work area postings. Material Safety Data Sheets Material Safety Data Sheets (MSDSs) provide information on the potential hazards of products or chemicals. Hard copies of MSDSs for the chemicals used in the department are available to all employees in a convenient location. If an MSDS is found to be missing, a new one can be obtained by faxing a written request to the manufacturer. A copy of this request should be kept until the MSDS arrives. MSDSs are also available over the Internet from a variety of sources. Equipment Operating Manuals All equipment is to be operated in accordance with the manufacturer’s instructions, as specified in the equipment’s operating manual. Copies of operating manuals should be kept with each piece of equipment in the department. Persons who are unfamiliar with the operation of a piece of equipment and its potential hazards must at least read the operating manual before using the equipment. Training should also be sought from an experienced operator or supervisor. V. CORRECTING WORKPLACE HAZARDS Hazards discovered either as a result of a scheduled periodic inspection or during normal operations must be corrected by the supervisor in control of the work area, or by cooperation between the department in control of the work area and the supervisor of the employees working in that area. Supervisors of affected employees are expected to correct unsafe conditions as quickly as possible after discovery of a hazard, based on the severity of the hazard. Specific procedures that can be used to correct hazards include, but are not limited to, the following: Page 28 • Tagging unsafe equipment “Do Not Use Until Repaired,” and providing a list of alternatives for employees to use until the item is repaired. • Stopping unsafe work practices and providing retraining on proper procedures before work resumes. • Reinforcing and explaining the need for proper personal protective equipment and ensuring its availability. • Barricading areas that have chemical spills or other hazards and reporting the hazardous conditions to a supervisor or. If an imminent hazard exists, work in the area should cease, and the appropriate supervisor must be contacted immediately. If the hazard cannot be immediately corrected without endangering employees or property, all personnel need to be removed from the area except those qualified and necessary to correct the condition. These qualified individuals will be equipped with necessary safeguards before addressing the situation. VI. INVESTIGATING INJURIES AND ILLNESSES Injury Reporting Employees who are injured at work must report the injury immediately to their supervisor. If immediate medical treatment beyond first aid is needed, call 911. The injured party will be taken to the appropriate hospital or medical center. The supervisor of the injured employee must work with a designated department personnel to ensure that the "Employer's Report of Occupational Injury or Illness" and a "Workers' Compensation Claim Form" are completed properly and submitted to the General Manager. If the injured employee saw a physician, the supervisor should obtain a medical release form before allowing the employee to return to work. The health care provider may stipulate work tasks that must be avoided or work conditions that must be altered before the employee resumes his or her full duties. Injury Investigation The employee’s supervisor is responsible for performing an investigation to determine and correct the cause(s) of the incident. Specific procedures that can be used to investigate workplace accidents and hazardous substance exposures include: • Interviewing injured personnel and witnesses. Page 29 • Examining the injured employee’s workstation for causative factors. • Reviewing established procedures to ensure they are adequate and were followed. • Reviewing training records of affected employees. • Determining all contributing causes to the accident. • Taking corrective actions to prevent the accident/exposure from reoccurring. • Recording all findings and actions taken. The supervisor’s findings and corrective actions should be documented and presented to the Safety Committee using the "Accident Report Form". If the supervisor is unable to determine the cause(s) and appropriate corrective actions, other resources, such as the Safety Committee, should be sought. The Safety Committee will review each accident or injury report to ensure that the investigation was thorough and that all corrective actions are completed. Investigations and/or corrective actions that are found to be incomplete will be routed back to the supervisor for further follow- up, with specific recommendations noted by the committee. The General Manager will bring corrective actions that are not implemented in a reasonable period of time to the attention of the Department head. VII. EMPLOYEE HEALTH AND SAFETY TRAINING Employee safety training is provided at no cost to the employee and is conducted during the employee’s normal working hours. Safety training may be presented by a knowledgeable supervisor, other department personnel, or by representatives from other relevant departments. Regardless of the instructor, all safety training should be documented using the “Safety Training Attendance Record”. Initial IIPP Training When the IIPP is first implemented, all personnel will be trained on the structure of the IIPP, including individual responsibilities under the program, and the availability of the written program. Training will also be provided on how to report unsafe conditions, how to access the Safety Committee, and where to obtain information on workplace safety and health issues. Personnel hired after the initial training session will be oriented on this material as soon as possible by the appropriate supervisor. These individual training sessions should be documented using the “Employee Safety Training Record”. Training on Specific Hazards Page 30 Supervisors are required to be trained on the hazards to which the employees under their immediate control may be exposed. This training aids a supervisor in understanding and enforcing proper protective measures. All supervisors must ensure that the personnel they supervise receive appropriate training on the specific hazards of work they perform, and the proper precautions for protection against those hazards. Training is particularly important for new employees and whenever a new hazard is introduced into the workplace. Such hazards may include new equipment, hazardous materials, or procedures. Health and Safety training is also required when employees are given new job assignments on which they have not previously been trained and whenever a supervisor is made aware of a new or previously unrecognized hazard. Specific topics which may be appropriate to department personnel include, but are not limited to, the following: • Fire prevention techniques and fire extinguisher use. • Obtaining emergency medical assistance and first aid. • Disaster preparedness and response, including building evacuation procedures. • Health and safety for computer users. • Back care, body mechanics, and proper lifting techniques. • Hazard communication, including training on MSDSs, chemical hazards and container labeling. • Proper housekeeping. • Chemical spill reporting procedures. VIII. ENSURING COMPLIANCE All department personnel have the responsibility for complying with safe and healthful work practices, including applicable regulations and departmental safety procedures. Overall performance in maintenance of a safe and healthy work environment should be recognized by the supervisor and noted in performance evaluations. Employees will not be discriminated against for work-related injuries, and injuries will not be included in performance evaluations, unless the injuries were a result of an unsafe act on the part of the employee. Standard progressive disciplinary measures in accordance with the applicable personnel policy will result when employees fail to comply with applicable regulations and/or departmental safety procedures. All personnel will be given instruction and an opportunity to correct unsafe behavior. Repeated failure to comply or willful and intentional noncompliance may result in Page 31 disciplinary measures up to and including termination. IX. RECORD KEEPING Documents related to the IIPP are maintained in a safe and convenient location for record keeping. Documents that should be kept on file include: • Records of scheduled and periodic workplace inspections, including the persons conducting the inspection, any identified unsafe conditions or work practices, and corrective actions. • Employee safety training records, including the names of all attendees and instructors, the training date, and material covered. • Reports of Unsafe Conditions or Hazards. • Safety Committee Meeting Documentation. • Hazard Correction Reports. • Accident, Injury or Illness Investigation Reports. Page 32 LIST OF APPENDICES Building Safety Responsibility (Appendix A) Conduct in City Facilities (Appendix B) City of Palo Alto Safety Policy (Appendix C) Zero Waste Plan (Appendix D) Online: http://cityconnect/depts/pw/zero_waste_palo_alto.asp#Recycling & Composting City Report of Accident/Property Damage (Appendix E). Page 33 LIST OF ATTACHMENTS ATTACHMENT 1 Contractor Production and Exclusive Use Schedule, 2016 - 2017 ATTACHMENT 2 Contractor’s Pricing Policy ATTACHMENT 3 Name of Contractor’s Fiscal Agent ATTACHMENT 4 Contractor’s Most Recently Filed California State Tax Form 199