Two parking structures are currently under construction downtown. The larger garage is
located at Lot S/L (Bryant/L3cton) and the smaller garage is at Lot R (between High and
Alma Streets, south of University Avenue). Construction began in May 2002. When both
garages are completed by November 2003, they will provide over 700 additional parking
spaces downtown. Construction was funded via an assessment district formed by a majority
vote of downtown property owners.
DISCUSSION
Staff is requesting approval of two contract amendments that would provide for additional
desi~, inspection and staffing services. The additional monies are available in Capital
Improvement Project (CIP) 19530, Downtown Parking Structures, financed by the
Downtown Parking Assessment District.
Since the amount of services required exceeds the remaining contingency budget for both
Turner Construction and Watry Design, contract amendments are being requested to provide
for future work. In addition, the contingency budgets for both the Turner and Watry
contracts have been depleted and staff is requesting additional contingency funding for
potential unforeseen future work. There is approximately $3 million remaining in CIP 19530
available for the amendments and increased contingency.
Contract Amendment with Turner Construction and Watrv Desi,on Group
Turner Construction was hired to provide construction management at the job site to support
City staff, as City staffing levels are not sufficient for a project of this size. The propose_d
Contract Amendment No. 3 for $76,800 with Turner is to provide for:
An extended on-site work period resulting from legal actions and subsequent project
delays at Lot R ($49,900). Legal actions brought by the owner of the Yoga Source
building regarding access issues extended the Lot R construction period. This in turn
will extend the amount of time that Turner staff and its construction trailer would need to
remain on-site.
Stone tiles will be installed on the exterior of the Lot R garage. Installing the tiles
correctly is critical to ensure that they stay secured to the building. To n-take sure that
the contractor secures the tiles correctly, the Building Division requires an inspector be
present during the installation. This requirement, at a cost of $26,900, was not in
Turner’s original subcontract for inspection services.
Watry Design Group is the project’s architect. Amendment No. 4 for $37,400 would pro¥ide
for:
Additional Architect Oversight
An additional $10,350 in fees was requested to provide for a geater involvement by
the architect in the inspection process at both garages. As mentioned previously, legal
CMR:229:03 Page 2 of 5
actions by Yoga Source delayed the work at the Lot R site and impacted the
contractor’s planned work flow by requiring larger crews to work simultaneously on
both garages in order to meet the completion date. This compressed work schedule in
turn impacted the City’s inspectors, who were already involved in several other large
projects throughout the City. The Building Division requested pre-inspections by the
architect, and a geater involvement with the Building Division’s Plan Check engineer
in order to reduce the amount of time it would take to inspect and approve the project.
Review and Archive As-Built Record Drawings
A budget increase of $23,050 is requested for the architect’s review of the ~as-built"
record drawings for both garages. During construction, various changes are made to
the building plans to accommodate field conditions or other concerns. The contractor
then makes hand-marked revisions on the plans in order to track these changes over
the course of a project. The architect will review the 360 sheets for correctness,
transfer field changes to Watry’s Design Group computer drawings as needed, and
finally scan the drawings into a computer format that will allow for future retrieval by
staff.
Additional Design for Leased-Space Restrooms:
An additional $4,000 is requested for Watry Design Group to design toilet spaces,
connections and fixtures for the City’s future commercial/retail tenant space at the
corner of L?cton/Bryant. This two-floor space will be leased by the City in order to
recover construction costs for the commercial space, as well as to provide revenue for
youth activities and other General Fund services. Initially, Watry Design Group had
designed only the stubbed-out plumbing connection points, leaving construction of
walls, fixtures and lighting to the tenant. After recent discussions with the Real Estate
Division and architect, staff feels the space will be more leaseable if the restroom
facilities are already provided as it would allow for faster occupation by a future
tenant. In addition, McCarthy Contractors will have plumbing contractors already on-
site as part of the parking structure construction. This would result in lower plumbing
costs than might be available to a future tenant as they would not incur mobilization
costs and would benefit from McCarthy’s quantity of scale orders on restroom parts
(both garages will have public restrooms). Costs incurred by a tenant in up~’ading
their building are passed on to the owner (in this case the City), usually through some
form of lease reduction.
Contingency Increases for Turner and Watrv Desi~
An increase of $100,000 is being requested in order to replenish the contingency budget for
the Turner contract, which was depleted early in the project due to:
The adjacent building to the south of the site and fronting Alma Street (former home of
Yoga Source) once housed an automobile repair shop and records indicate that at one
time there was an under~ound storage tank on Lot R. Exploratory excavations prior to
CMR:229:03 Page 3 of 5
construction did not locate any tanks in the area. During construction, 5 abandoned oil
storage tanks, 2 hydraulic car lifts and some asbestos pipe were uncovered. The tanks
were removed, the soil tested and clean soil was backfilled into the holes. The physical
removal of the tanks was done by McCarthy Contractors, while the site inspection and
testing was done by Lowney Associates (Geotechnical Engineers) under a subcontract to
Turner Construction. There was sufficient construction contingency to reimburse
McCarthy Contractors for the physical removal of the tanks. However Turner’s
contingency budget was reduced by $71,637 (nearly 50 percent) by costs incurred for
soils testing.
Inspection of the shoring and underpinning process was overlooked by the architect
and staff in Watry Design Group’s construction phase contract. Since Watry’s
remaining contingency was not sufficient to cover this cost, Turner subcontracted
with the geotechnical engineer for this service. The cost for this inspection service
was $27,623.
Turner’s contingency fund at the start of the construction phase was $163,205, of
which $121, 586 remains. There are, however, currently two potentially large change
orders currently being researched by Turner. If these change orders are approved by
the Public Works Director, the remaining contingency would likely be ten percent of
the original contingency budget with more than half of the project remaining to be
built. Replenishing the contingency amount by $100,000 would reduce the potential
for project delaysifstaffneeded to return to Council for additional monies. Staff and
consultants try to anticipate unforeseen construction issues, but in a project of this
size, even minor changes can add up to many thousands of dollars in additional design
fees. If the needed fees exceed the contingency budget, returning to Council for
additional monies can add over a month to the project duration. Both garages have
been on an extremely tight construction schedule and construction delays would
almost certainly extend the pre-holiday season opening date. Any contingency funds
that remain at the end of the project will be used to offset debt service payments and
reduce the annual assessment to District property owners.
On June 4, 2001, Council approved a contract amendment with Watry Design Group that
provided for both the final design and the construction phase for the parking structures
(CMR:263:01), with a contingency of $163,000. The contingency has now been almost
completely expended on various design modifications, such as architectural support during
the Lot R litigation, redesign to avoid under~ound utilities and revisions to the fire alarn~
system as requested by the Fire Department. Since construction is roughly half complete,
staff is requesting additional contingency funds of $80,000, which is nearly half of the
original $163,000.
CMR:229:03 Page 4 of 5
RESOURCE IMPACT
Funding for the garage construction and construction administration services was budgeted
for Capital Improvement Project (CIP) 19530 within the $45.9 million assessment district.
The additional monies requested in the contract amendments for Turner Construction and
Watry Design Group is available within CIP 19530.
POLICY IMPLICATIONS
Approval of the contract and contract amendment are consistent with existing City policies.
TIMELINE
Groundbreaking on both structures was in May 2002. Lot R is expected to be completed in
August _00~ and Lot S/L in November 2003.
ENVIRONMENTAL ASSESSMENT
An Environmental Impact Report was prepared as part of.the PC zoning application and was
certified by Council on December 20, 1999.
ATTACHMENTS
Attachment A: Amendment No. 3 to Contract C8103688 with Turner Construction
Attachment B: Amendment No. 4 to Contract C6076145 with Watry Design, Inc.
PREPARED BY:
~<2AREN BENGARD
Senior Engineer
/ "
GLE~ S. ROBERTS
Dkector of Public Works
CITY ~AGER ~PROV~:~
SON
Assistant City Manager
CMR:229:03 Page 5 of ~
ATTACHMENT A
AMENDMENT NO. THREE TO CONTRACT NO. C8!03688
BETWEEN THE CITY OF PALOALTOAND
TtrP!qER CONSTRUCTION COMPANY
This ~Len~ment No. Three to Contract No. C8!03688
("Contract") is entered into , by and between the
___ ~- ALTO chartered c~tv and a mu~ci~a! cormoration ofCTTY OF ~O , a - _
<he State of California ("CITY"), and TURNER CONSTRUCTION COMPANY,
a New York corporation, !ocated at !0! Park Center Plaza, Suite
!!00, San Jose, CA 95113 ("CONSULTANT").
RECITALS:
WHEREAS, the Contract was enteric into between the
parties ~_o._ the ~rovis~on of n<c{=~iona! con~u’~t’:r,g services
relating to the Downtown Parking Structures; and
wHEREAS, the parties wish to amend the Contract;
NOW, THEREFORE, in consideration of the covenants, terms,
conditions, and provisions of this ~.endment, the parties agree:
SECTION !.
read as follows:
Section 5.1 of Section 5 is hereby &mended to
5. !. ! in consideration of the full
merformance of the Basic Services, including
any authorized reimbursable exm-~nses, CTTY
will pay CONSULTANT a {ee not to exceed Two
~i ] ~ £on Eighty-Four Thousand Five Hundred
Ninety Eight Dollars ($2,084,598) . The total
amount payable per mhase shal! not exceed One
Hundred Sixty-Seven. Thousand Four Hundred
Twelve Dollars ($167,412) {or Phases i & ii;
-"" ~Two Hu .....d Eighty-Five Thousand one Hundred
Th-:~t?--m{g’~ Dollars (5285 ~38) ~or Phase iii;
and One ~0 ~ { n Six _.und~:d...... o._~- ~- Thirty-Two
Thousand ~orry-=~gn~ Dollars (S~,632,048) for
Phase IV (construczion) ¯ The amount of
compensation will be ca!cu!aZed in accordance
with the hourly rate schedule se: forzh in
Exhibits "B" for Phase i and ii, "B-!" for
Phase ~!!, and "B-2" for Phase iV, on a time
....m~x~and mat=r~a~s basis, up to ~b_e -- ~ m amount
’~ ne fe= { theset forth in <his Section. T._~s o
consulzants, who have direct contractua!
relazionships with CONSULTANT,wil! be
approved, in advance, by CITY. CITY reserves
020401 sdl 0100062
the right to refuse pa~.ent of such fees, if
such prior approval is not obtained by
CONSoL±:~NT.
5. !. 2 in consideration of the ful!
performance of Additiona! Services, including
any authorized reimbursable expenses, CITY
will pay CONSULTANT a fee not to exceed Eight
Thousand Three Hundred Seventy-One Dollars
($8,371) . in consideration of ~ ful!
performance of Extra Services as set forth in
Exhibit "A-3", CTTy~ .... wiT1 pay CONSULTANT a fee
not to exceed Seventy-Six Thousand Eight
nun@,_~d Dollars (S76,800) .T~,e amount of
compensation for additional services will be
calculated in accordance with the hourly rate
schedule set forth in Exhibits "B" and "B-3",
according to the time period of when the
services were performed, on a time and
materials bas~s, up to ~:.e maximum amount set
forth in this Section._~_n~ em~!ovee’_ _ s time
wil! be computed at a multiple of one (!.0)
times the employee’s direct personnel expense
described below. The rate schedules may be
updated by CONSULTANT only once each calendar
year, and the rate schedules will not become
~_~_~c~±~-e~’ - for _.~urposes o~ this Contract,
unless and unti~ ...... CONSULTANT g~v~s~--= CITY__ thirty
(30) days’ prior written notice of the
effective date of any revised rate schedule.
5.1.3 The ful! ~a?~.ent of charges for
extra work or changes, or both, in the
execution of the Project wil! be made,
provided such request for payment is initiated
by CONSULTANT and authorized, in writing, by
the project manager. Payment will be made
within thirty (30) days of submission by
CONSULTANT of a statement, in triplicate, of
itemized costs covering such work or changes,
or both. Prior to com_mencing such extra work
or changes, or both, the parties wil! agree
upon an estimated maximum cost for such extra
work or changes. Al! extra work or changes
shall be in writing and approved by the City
Manager or his designee prior to performing
’ ~’~ ~~ will ’ be~ona! services ~S~_~no~
paid for extra work or changes, including,
without limitation, any design work or change
order preparation, which is made necessary on
020401 sdl 0100062
2
account of CONSULTANT’s errors, omissions,
oversights.
5.1.4 Direct personnel expense of
employees assigned to the execution of the
-~ ....theProS~- =ec: by CONSULTANT wi!7_ =nc=ud~ only_
work of project managers, estimators, and
a6ministrazive personnel pertaining to the
Project, and in services rendered during
construction at the site, to the ex:ent such
services are expressly contemplated under this
Contract. included in the cost of direct
personne! expense of these employees are
salaries and mandatory and customary benefits
such as statutory employee benefits,
insurance, sick leave, holidays and vacations,
pensions and similar benefits.
SECTION 2. The fol!owing exhibits are hereby added to
the Contract and are incorporated in ful! by this reference:
Exhibit "A-3", entitled "Revised Extra Services
Request"; and
b. Exhibit "B-3" entitled "2003 Hour%y Rates".
SECTION 3. Except as herein modified, all other
provisions of the Contract, including any exhibits and subsequent
amendments thereto, shall remain in full force and effect..
//
//
//
//
//
//
//
//
/ /
//
//
020401 sdl 0100062
IN WITNESS WHEREOF, the parties hereto have by their duly
authorized remresentat{ves executed this Contract on the date firs<
above written.
ATTEST:_--P’- _~L.OCTTY OF _A~O ~-~
City Clerk
APPROVED AS TO FORM:
Mayor
TURNER CONSTRUCTION COMPANY
Senior Asst. City Attorney By:
Name:
Assistant City Manager
Title:
Director of A6ministrative
Services
By:
Name:
Director of Public Works
Title:
Taxpayer identification No.
Risk Manager 13-1401980
(Compliance wi:h Corp. Code ~ 313 is
r=~u{<=d ~{ the enzity on whose behalf
this ~on~rasz is s~=d ~ a cormoration
in the a!rernative~ a cerzified corporate
reso!u:ion at:es:ing :o zhe signa:ory
au:hority of the individuals signing in
their respec:ive camaci<ies, is ~c=~=b~=)_~ ~: ....
Attachments :
EXHIBIT "~ %"
EXHIBIT "B-3" :
Revised Extra Services Request
2003 Hourly Rates
020401 sdl 0100062
CERTIFICATE OF ACKI~OW’LEDGI~ENT
(Civil Code 6 1189)
~ ,_~_~ ~ OF
COUNTY
On , 2003 before me, the undersigned,
a notary public in and for said County, personally appeared
persona~!y_. _ ~:~own" to me (or proved to me on the basis of
satisfactory evidence) to be the person(s) whose name(s) is!are
subscribed-to the within instrument, and acknowledged to meauuno_!zedhe/she/they executed the same in his!her/their
capacity(ies), and that by his/her/their signature(s) on
instrument the person(s), or ~ne entmtv upon m=n=!~ or which the
person(s) a~ee, executed the instrument.
w±~N~<S hand and official <e=~
Signature of Notary Public
020401 sdl 0100062
CERTIFICATE OF ACKNOWLEDGMENT
(Civi! Code ~ 1189)
STATE OF )
) ss.
COUNTY OF )
On , 2003 before me, the undersigned,
a notary public in and for said County, me<:onal~v aDDeared
personally known to me (or proved to me on the basis of
satisfactory evidence) to be the person(s) whose name(s) is/are
subscribed to the within instrument, and acknowledged to me that
!~=/she/they executed the ~ame in his!he</the~< authorized
capac!ty(ies), and that by hisi~er/rne_< signature(s) on the
instrument the person(s), or the entity upon behalf o{ which the
_person(s) acted, executed the ±nsurumenu ~ ~ ~.
WITNESS my hand and official sea!.
Signature of Notar.y Public
020401 sdl 0100062
Turner
A Century of Excel~nce
Turner Construction Company
Palo Alto Parking Structures Project Office
445 Bryant Street
Palo Alto, CA 94301
Exhibit
Public Works Engineering
Parking Structures Project
March 17, _00a
Karen Bengard
Public Works Engineering
City of Pa!o Alto
250 Hamilton Ave.
Palo Alto, CA 94301
RE: Revised Extra Services Request
Dear K~en
We now project extra construction management services for the Parking Structures Project will
exceed the contingency amounts provided for. Adjustments vdthin the scope of our original
services have been covered by the contingency established. However, there are sQmaificant
increases the scope of services requested that the contingency wouldn’t be able to cover. We
recommend see’king council approval to replenish the contingency and provide for these added
services. Attached is a detail of these added services. They are summarized as follows:
1. Lot R extended completion date
2. Continuous inspection of stone tile installation
Total services added to date
$
$
$
49,900.
26,900.
76,800.
Attached is our 2003 rate schedule with the escalation increase provided for in our contract.
We request council authorization to fund these additional services and a corresponding change
order to our construction management contract.
Cordially
TURNER CONSTRUCITON
Gregory R. Smith, Construction Manager
File 00230, 00300
Project Office Phone: 650-321-2132 Fmx: 650-321-2901 Information Hot Line: 650-321-2372
Palo Alto Par "ldng Structures
Detail of Extra Construction Management Services
March 17, 2003
Lot R extended completion date
The Lot R completion date has been extended 78 calendar days (56 work days). The staffmg plan calls for the
project manager to be half time after completion of Lot R. Retain project manager full time during time extension.
Retain resident inspector 21 workdays.
Consolidated Engineering (168 hours x $65)
Turner Construction
Fee on consultant
Project Manager (224 hours x 169)
Total
$ 10,920.
49,900
Continuous inspection of stone tile installation
During plan check, full time inspection of stone tile installation at Lot R was added to the inspection requirements.
The inspection contract had already been awarded.
Consolidated Engineering
Inspection (360 hours x $65)$23,400.
Testing 1,000.
Turner Construction 2.440.
Total $ 26,900.
Total extra construction management services added $ 76,800.00
Project Office Phone: 650-321-2132 Fax: 650-321-2901 Information Hot Line: 650-321-2372
EXHIBIT "B-3"
Palo Alto Par ~king Structures
Turner Construction Company
2003 Hourly Rates
Position Name Hourlv. Rate Full/PartTime
Project Executive Craig Bj orkman $193 PT
Project Manager Greg Smith $169 FT
Superintendent
Engineer
Administrative
Harmon Roberts $133 FT
Victor Shek $96 FT "
Staff $65 PT
Scheduling Lars Tanner $162 PT
Accounting
Sr. Estin~ator / Purchasing Agent
Estimator / Purchasing Agent
Cindy Carlotta $131 PT
Dave Alexander $162 PT
Bob Murelli
Staff 142 PT
Safety En=4neer Ron Vimng $131 PT
Full time staff will bill hours for a ful! month including vacation, sick time and holiday time.
Part time staff will be billed for actual hours worked.
If City. requests full time staffto work on other City projects, the Parking Structure Project will
be credited.
Rates are subject to 5% increase on January 1, 2004.
Project Office Phone: 650-321-2132 Fax: 650-321-2901 Information Hot Line: 650-321-2372
~T~’~NT NO. FO~r~ TO CONTACT NO. C60~CHMENT B
BE~N THE CITY OF P~O ~TO ~
"~T~Y DESi~, iNC.
This ~:men~ment No.Four to Contract NO. 06076145
("Contract") is into ’, by and between the
CITY OF Pg~O ALTO, a chartered city and a municipal corporation of
the State of ("CITY"), and WATRY DESIGN, iNC., a
corporation, !oca:ed at 815 Hamilton Street, Redwood
City, CA 94063 ("CONSULTANT).
RE C I TAL S:
WHEREAS, the Contract was into between the
marries for the provision of design consul:ant services; and
parties wi~ to amend the Contract"
NOW, P~=R<PORm_~=~.=_ ._, in consideration of the covenants, te~s,
conditions, and provisions of this ~_men~ment, the agree:
SECTION !.Section 6.1 is hereby amended to read as
"in consideration for the full of the
Basic Services and Rei~ursab!e described
in Section 4.1 and 6.1.3 o~ this Agreement, C!TY
-~==- to may cONSUI~T~NT a ~ee not to exceed
Seventy Thousand Dollars (570,000) for ~,ase One;
Six Hundred Eighty-two Thousand One Hundred Thirty-
six Thousand Dollars ($682,i36) for Phase Two; and
One Hi]lion s!x Huncred Thirty-six Thousand Doi~=~
(~!,636,000 {or Phase ±±± and iV final design and
...... ~ ~n a6minis<ration.~m ...........co~:=~:@~:’~-~~Ait~mal fee not
to exceed Thousand Two Hundred Dollars
($69,200) shall be maid by CITY {or fee
costs, additional subconsu!tant design oversight
and construction document rei-~ursables, as
s~ibed in Ex~i~ >’C-~ .... n~ = ..........
to exceed ~i r~v-S~v=n T~-,~sand Four
Dollars (S37,400) shal! be ~aid by CiTYo for
additional design services as described in
"~2" =~------~- . ~ amount of commensation for additlon~ or
extra will be calculated in accordance
WIE~ the nour!v rate set fo~h i~
"C-3", on a ~{._-m~ = and materia~=- ~ bas~- =, um
maxim~mm amount set forth in this Section. =~ior to
~=~{no such extra work or mo~n,
marries wi~ -~"== ~ writinc umon an estimated
maximum cost for such or extra work.
n~ work snail" be authorized ~ym-- the Citv_
Manager or his mrior
addi:ional or ex:ra wor~.
030417 sd! 0100063
SECTTON 2 The {o]]ow~ng =wh~ ~t are hereby added to
the contract to read as set forth in the attachments to this
~.en~ment, which are incorporated in ful! by this reference:
.....".~ _i fora. ~x~ ~ b~ t "C-2" entitled ~em~est
~_menckment ; and
Contract
Rates."
b o Exhibit "C-3"= " ~ " of Hourly Billingentitled Sc~e@ule
<~. ~ -.herein modified, all other~EC~±ON 3 Except as
provisions of the Contract, including any exhibits and subsequent
~ r~ sha~ remain in fu!] force and effectamendments ~ne_~o, -_-¯
iN WITNESS WHEREOF, the parties have by their duly
authorized representatives executed this ~mendment on the date
{irst above written.
ATTEST:CITY OF PAL0 ALTO
City Clerk
APPROVED AS TO FORM:
senior Asst. City Attorney
APPROVED:
Mayor
WATRY ~-GN TNC~m~!,--.
By:
Name:
Title:
Assistant City Manager By:
Director o{ Public Works
Name:
Title:
Director of A~minist~-~i
Services
insurance Review
Taxpayer identification No.
94-2302782
(Compliance wi<h Corp. Code .~ 3i3 is re.aired if
the en~i~v on whose behalf this con~rac: is
signed is a corporation, in the alternative, a
cerzified corporaze re_o_@~on a~zesrinm zo =he
signaLory authority of the individuals si~ning
in their respective capacities is acceptable)
A:tachments:
EXHIBIT "C-2": Request for Contract ~_mendment
EXHIBIT "C-3": Schedule o{ Hourly Billing Rates
030417 sdl 0100063
2
CERTIFICATE OF ACKNOWLEDGMENT
(Civil Code § !189)
STATE OF
COUNTY OF
SS.
On , before me, the undersigned, a
notary public in and for said County, personally
personaq ] y known to me (or mroved to me on the basis of
satisfactory evidence) to be theperson(s) whose name(s) is/are
subscribed to the within instrument, and acknowledged to me that
he/she/they executed the same in his/her/their authorized
capacity(ies), and that by his/her!their signature(s) on the
instrument the person(s), or the entity upon behalf of which the
person(s) acted, executed the instrument.
o{ Notary Public
030417 sdl 0100063
CERTIFICATE OF ACKNOWLEDGMENT
(Civi! Code ~ 1189)
a~ OF
COUN~ OF
)
)
)
SS.
On
notary public in and
before me, the undersigned, a
for said County, personally appeared
personally known to me (or proved to me on the basis of
satisfactory evidence) to be the person(s) whose name(s) is!are
subscribed to the within instr’@ment, and acknowledged to me that
he/she/they executed the same in his/her/their authorized
capacity(ies), and ~_a~ by his/he-/their s£gnature(s) on the
instrument the person(s), or the entit.y upon behalf of which the
person(s) acted, executed the instrument.
WITNESS my hand and officia! sea!.
Signature of Notary Public
030417 sdl 0100063
4
EXHIBIT C-2
March 3, 2003
Ms. Karen Bengard
CiD~ Of Palo ~to
250 Hamilton Ave.
Pa!o Aho, CA 94303
Palo Alto Parking Structures Phase FV
Project #9533A.312
Request for Contract Amendment
Dear Karen,
Per our discussion last week, we are writing to request an amendment to our contract of June 4, 200! for
the Pato Alto Parking Structures Phase IX,". We have identified the following scope changes which
modi~ our corm-act:
Record Drawings
(ref. W-DI Contract Fee Proposa! p.4: Assumptions Item 7)
WDI’s corm-act excludes Record Drawings. CPA has requested that record drawings be
prepared upon completion of the project. The fee sho,am below assumes the Construction
Manager will prepare the drawings. WDI and the sub-consultants will then spend up to 30
minutes per sheet to review. This fee includes an al!owance of $450 of reproduction costs to
scan all the drawings for future retrieval
SUBTOTA_L ITEM 1 $23,050
Additional On-site Meetings
(ref. WDI Contract Fee Proposa! Exhibit A Optional Services Item 4: Assumptions item 61)
W-DI has been requested to attend j obsite meetings in excess of those included in the scope of
services. Additional meetings are anticipated throu~out the course of construction, and this
fee a!!ows for this meeting contingency.
SUBTOTAL ITEM $10,z_0
3. Lot SFL Tenant Layout Studies
(ref. WDI Contract Fee Proposal Exhibit A page 7: Additional Services item !3)
WDI’s basic services did not include additional studies for potentia! locations of tenant toilets
and room layouts of leased spaces. This fee includes va, o tenant layouts and code review.
SU-BTOT.4Jb ITEM 3 S4.000
Total Compensation for this Contract _axnendment:$37,400
Karen Bengard
Palo Aho Par~g Structures 9533A
page 2 of 2
03/31/03
We appreciate your consideration of our request for t~s contract amendment.
Sincerely,
WATRY DESIGN, INC.
Gary- Newgard, _~rchitect
Senior Project Manager
CC: Michelle Wendler, Lisa Blanton, John Purinton, David Lococo, Ray Bligh
C :~,TEMP",030303 KarenB engard.doc
EXHIBIT C-3
_-’kPPEN~I)Eg. A: WATRY DESIGN ~C. SCHEDULE OF HOUP,_LY BILLLNG It, TES
Our current standard hourly rate schedule is:
Nick Warty:$185/fhour Asst. Project M~.$100/hour
Senior Consultant:$165/hour Senior Job Captain:$100/hour
Consultant:$140/hour Job Captain:$95ihour
Principal:$135/hour Senior Designer:$85/hour
St. Project M~:$120/hour Staff Desig-ner:$80/hour
Project Manager:S110/hour Clerical:$50!hour
These rates wi!l be adjusted by 4% per year starting on the f~rst anniversary date of the contract.