TO:HONORABLE CITY COUNCIL
Palo Alto
Report
FROM:CITY MANAGER DEPARTMENT: COMMUNITY SERVICES
DATE:
SUBJECT:
SEPTEMBER 29, 2003 CMR: 446:03
LIBRARY ADVISORY COMMISSION’S PALO ALTO LIBRARY
PLAN STATUS REPORT & RECOMMENDATIONS
RECOMMENDATION "
The Library Advisory Commission (LAC) recommends that Council review and discuss
the attached Palo Alto Library Plan Status Report. Staff has no recommendations at this
time.
BACKGROUND
In May 2000, the LAC released its New Library Plan (NLP), outlining the status of the
Palo Alto Libraries and recommending improvements in collections, facilities, services
and staffing. Council conceptually approved the plan in October 2000, and directed staff
to develop a bond measure to fund capital improvements to the library system.
Following the narrow defeat of Measure D in November 2002 and the downturn in the
economy, the LAC revisited the principal goals of the NLP and alternatives to achieving
them. The attached report, adopted on July 28, 2003 by a 6-1 vote of the Commissioners,
provides an update on the status of the NLP and recommends a series of short and long-
term improvements in light of current and anticipated fiscal limitations.
BOARD/COMMISSION REVIEW AND RECOMMENDATIONS
A brief summary of the recommendations in the report is provided in the attached
transmittal letter from Commission Chair, Lenore Jones.
ATTACHMENTS
Attachment 1: Memo to City Council from LAC Chair, Lenore Jones
Attachment 2: Palo Alto Library Plan Status Report & Recommendations
CMR:446:03 Page 1 of 2
PREPARED BY:
Acting Director of Libraries
REVIEWED BY:
CITY
CARL
Acting City
:tor, Community Services
CMR:446:03 Page 2 of 2
Attachment A
September 2, 2003
TO:Members of the Palo Alto City Council
FROM:Lenore Jones, Chair
Attached is a report from the Library Advisory Commission, Palo Alto Library_
Plan Status Report and Recommendations. This report is a follow-up to the New
Library Plan (NLP) that we released in May 2000.
This report was endorsed by a 6-1 vote of the commission, Tom Wyman
dissenting.
Starting from the NLP, we detail the status of the various recommendations, and
in the context of the current economic situation, we make specific
recommendations that we believe will get us on the path of improving library
services for Palo Alto. In brief these recommendations are:
¯maximize hours and services at Resource Libraries
¯improve operational efficiency at Main and Mitchell
¯maximize available floor space at Main for additional computer stations
¯rearrange Main Library to develop space for Teen programs
¯support private funding goals for Children’s Library
¯implement infrastructure improvements at Children’s and Mitchell Park
¯over the longer term, pursue a new Libraries-only bond to fund capital
improvements
Although the media and public have been focusing on the proposal to "close" the
Downtown branch, this is not the focus of the report. We are proposing to move
Technical Services from Main to Downtown to free up space at Main for public
services and to reallocate public service staff working at Downtown Library to
ease staff scheduling problems at the Resource Libraries. We believe this needs
to be evaluated in context of the other recommendations, and taking into account
the current state of the libraries, current economic realities, and the continuing
need for increased library services in the city.
We are looking forward to being able to discuss this report with you on
September 29, and will be happy to answerany of your questions at that time.
PALO ALTO LIBRARY ADVISORY COMMISSION
A~achmen[ B
Palo Alto Ubrary Plan
Status Report &
July 28, 2003
Executive Summary.: ......................................................................................................................................................................1
Background ......................................................................................................................................................................................1
Status .......................................................................................................... ......................................................................................2
Programs & Services ...............................................................................................................................................................2
Capital Improvements .............................................................................................................................................................4
Personnel ..................................................................................................................................................................................5
Summary ..................................................................................................................................................................................9
Recommendations .........................................................................................................................................................................t 0
Recommended Improvements - Short Term .......................................................................................................................10
Recommended Improvements -Longer Term ....................................................................................................................15
Conclusion .....................................................................................................................................................................................16
The Palo Alto Library compares unfavorably with adjacent communities and with cities similar to Palo Alto in
Califomia on a number of key indicators, including staffing, facilities and size and diversity of programs and
services. These deficiencies were identified in the New Library Plan (NLP) published in May 2000 by the
Library Advisory Commission and were accompanied by a series of recommendations for improvements of Palo
Alto’s library resources. This document provides a status r~port on the progress made to date in implementing
improvements to the Palo Alto Libraries. In summary, despite the support of the City Council for the
recommendations outlined in the NLP, the operating condition of the Palo Alto Libraries has further degraded.
The City of Palo Alto is still in need of the improvements in facilities and stuffing outlined in the NLP. This
document provides an updated set of recommendations from the Library Advisory Commission (LAC) on actions
that need to be taken in the short and long term to realize Palo Alto’s vision for its Libraries.
The May 2000 New Library Plan (NLP) identified a mission and vision for Palo Alto’s libraries that includes
the following:
a resource program embodied in attractive, comfortable and welcoming spaces where residents can gain
access to the world’s ~knowledge and culture for learning and enjoyment
excellent and multifaceted collections of print and multimedia materials
¯access to the world of electronic resources
¯staffsufficient in number and expertise to achieve these ends.
The NLP outlined a series of recommendations for accomplishing the mission for Palo Alto libraries that
covered:
°Programs & Services
°Physical Plant and Capital Improvements
°Personnel Changes
The response of the City Council and staffto the LAC’s recommendations was to focus initially on
developing facilities that would house the library program described in the NLP. These capital improvements
were planned and designed with the intention that funding would be provided by a bond measure approved by
Palo Alto residents. The expectation was that Council and staffwould then identify a source of funds for
operating expenses for the new facilities.
In November 2002, Measure D, a bond measure to fund capital improvements to the Palo Alto Library
system, was narrowly defeated. In the wake of the defeat of Measure D the task now facing the Palo Alto
City Council and the LAC is to determine ways to accomplish the goals of the NLP mission under tight fiscal
conditions and with no currently approved funding for new or extensively expanded facilities that the NLP
required.
In this section a review is provided of the status of each of the recommendations made in the NLP.
Many of the recommendations for new or expanded programs and services were dependent on the
availability of expanded facilities. Since facilities have not been expanded, it has not been possible to
implement many of the recommendations for expanded programming and services.
Programs & Services
The NLP recommended the following improvements to programs and services. Many of these
recommendations are dependent on the availability of expanded facilities as noted below.
¯Increase in the size of the collection by 56%, and expansion of the character and formats represented by
the collection with an immediate revised budget request for $59,000 in new base dollars for books and
periodicals.
¯Expansion of system-wide hours by 31%;
¯Creation of substantially expanded children’s programs and collections at the Main/Children’s and
Mitchell Park sites and expansion of existing children’s services in neighborhood libraries;
¯Creation of teen programs, spaces and services at the Main and Mitchell Park sites;
¯Creation of group study and meeting spaces at the Main and Mitchell Park sites;
¯Creation of computer clusters for elec~’ortic access at the Main and Mitchell Park sites;
¯Expansion of services for persons with disabilities or special needs;
¯Creation of a coordinated volunteer program;
¯Expansion of school ou~-each programs;
¯Improvements in technical processing resulting in materials becoming available sooner;
¯Integration of the program of the Palo Alto Historical Association, including its collections and the
services ofa Palo Alto Historian;
¯Integration of the program and services of the Friends of the Palo Alto Library, including its book sales
to the public.
Increase in Size of Collections by 56%
The Libraries did receive a 22% ($107,000) increase in base dollars for collection purchases which has
been used to expand the character and format of the collection. Even thou~h the collection budget has
increased the overall collection size has actually decreased by 2% due to increased efforts to discard
outdated materials. With the currently approved budget and the limitation of housing the current
collection size in the existing facilities it will not be possible to meet the stated goal of increasing the
collection size by 56%.
Expansion of System-wide Hours by 31%
The Library hours have shrunk due to a citywide hiring freeze 2002-03. Compared with budget year
2002-03 the new 2003-04 budget has resulted in a 17% decrease in system-wide hours see Figure 1.
With the currently approved budget it will not be possible to meet the stated goal of increasing the
system-wide hours by 31% since there are insufficient persormel.
Figure 1: Library Service Hours Comparison 7/1/02 - 7/1/03
70
60
=. 50
,= 40
o 30
¯20,__~ 10
0
o
7/1/2002
7/1/2003
Creation of Expanded Children’s Programs and Collections
Children’s services have been expanded with a new lapsit progam, begun in 2003 for infants at
Children’s and Mitchell Park Libraries. The existing children’s programs are over subscribed but
without additional facilities and staffing the Palo Alto Library is restricted in expanding its children’s
programs.
Creation of Teen Programs, Space and Services
Some progress has been made on the development of Teen Services. A summer reading program for
teens was started in 2002. Library and Recreation staff at the Mitchell Park Library and Community
Center have collaborated in offering joint programs. The Friends of the Palo Alto Library has funded
the hiring of a homework helper to work with the middle school students coming to Mitchell Park after
school. Staff at the Mitchell Park and Main libraries have been assigned responsibility for enhancing
support for teen programs and service, however, the lack of dedicated spaces for programs and
collections limit these efforts. Teen services currently have no space allocation in the Libraries,
except for limited collection space.
Creation of Group Study and Meeting Areas
No progress has been made on the creation of group study and meeting areas. If passed, Measure D
would have provided for additiona! square footage for study and meeting areas. With the current
Library configuration there are no defined areas for small group study and, with the closing of Terman
Park Library, there are no public meeting rooms in any of the branches.
Creation of Computer Clusters
The number of Internet computers for public use has doubled from 15 to 3 0, and capital funds have
been secured to substantially increase this total. In addition without expansion or reconfiguration of
the buildings, there is no space to establish training rooms with computer clusters at either Main or
Mitchell Park
Expansion of Services for Persons with Disabilities
New color text enlargers have been purchased for Main and Mitchell Park. New browser software for
people with visual impairments is being tested.
Creation of Coordinated Volunteer Program
Volunteer coordination continues to be shared among designated staff at each library who have this
responsibility added to their many other job duties. While the Library continues to use volunteers, an
active recruitment and training progam is not possible until there is sufficient staff to focus in this
area. There is no single dedicated volunteer coordinator.
Expansion of School Outreach
Outreach to schools by class visits has been reduced so that staff are available at the libraries to meet
increasing service demands.
Improvements in Technical Processing - Improving Material Availability
Due to use of vendor-provided processing of new materials, internal adjustments in cataloging and
processing, and cross-training there has been significant improvement in the time it takes to catalog
and process new items for circulation- from 58.5% of all items out in 45 days to 91% of all items out
within 35 days.
Integration of Palo Alto Historical Association
Staff has been assisting the Palo Alto Historical Association in planning their project to make historic
photogaphs available through the Internet. Some library capital funds have supported this effort.
Integration of Friends of the Library
City staff continues to support the work of the Friends, most notably by acquiring book sale space at
Cubberley Community Center to replace the space at Terman Park reclaimed by the school district.
Capital Improvements
The NLP recommended the following physical plant and capital improvements:
¯Substantial facilities improvements in the form of new construction or additions to the square footage of
the Resource Libraries at the Main and Mitchell Park sites;
¯New construction or renovation of a site to maintain a neighborhood library in southwest Palo Alto;
¯Renovation of the Downtown Library to reclaim space currently being used by another City Department
or relocation to an alternate site in the downtown area;
¯Pending architectural review, renovation and possible expansion of the Children’s Library;
¯Completion of structural repairs at College Terrace and internal reorganization of shelving capacity;
¯Upgrade facilities to accommodate evolving technology..
New Construction/Additions to Resource Libraries
No progress has been made in terms of substantial facilities improvements through new construction
to the square footage of the Resource Libraries at Main and Mitchell Park sites. Measure D would
have funded construction of a new library building at the Mitchell Park site but was defeated in
November 2002, Main Library was not included in the measure.
The square footage of the Mitchell Park Library was increased by 1340 ft" in January 2003, when the
Parking Violations Office moved out of the building, and space was reclaimed for library usage. This
space is being used for quiet study and to house media collections. No additional square footage has
been added to Main Library.
In CMR:I 11:03 dated Februaryl 0, 2003, staffrecommended that City Council proceed "with critical
infrastructure repairs at Children’s Library., Mitchell Park Library and Mitchell Park Community
Center to correct structural and accessibility deficiencies to bring those buildings up to current codes."
In addition the following work was also recommended renovation, repair or replacement of electrical,
mechanical, plumbing and architectural systems. Also, air conditioning is recommended at each
facility." Funding of these critical infrastructure repairs would be secured from the Infrastructure
Reserve. In the 2003-05 proposed City budget, capital funds will be allocated to renovate the Mitchell
Park Library and Children’s Library in 2004-05. The City infrastructure plan currently recommends
upgrades of existing systems at Main Library in 2007-08.
Renovation and Possible Expansion of Children’s Library
The Library Foundation has been established and efforts are underway by a coalition of the
Foundation, Friends of the Library, LAC and City Staffto raise money to meet a challenge grant for a
more modest expansion of the Children’s Library than was planned as part of Measure D. The City
has allocated infrastructure money to renovate the existing building and will contribute to the cost of
the addition of a single-story 1,640 ft2 wing if sufficient private funds are secured.
New Construction/Renovation of Southwest Palo Alto Neighborhood Library-
Rather than constructing or renovating a neighborhood library in Southwest Palo Alto, the Terman
Park Library was targeted in the current budget for closure as a cost cutting measure - leaving
Southwest Palo Alto without a neighborhood library.
Renovation of Downtown Library to reclaim library space or relocate library
There has been no change.
Completion of Structural Repairs at College Terrace and Internal Reorganization
The City’s infrastructure plans currently propose a seismic retrofit, mechanical upgrades, re-roofing,
and painting of College Terrace in 2005-06.
Upgrade facilities to accommodate evolving technology
Network cables have been added in all libraries to accommodate more public use computers. Wireless
networks have been installed at Main and Mitchell Park libraries for public access to the Internet via
personal laptop computers. The Main, Mitchell Park, and Children’s Library were moved onto the
City’s fiber ring for improved wide area network access.
Personnel
The NLP recommended the following required personnel changes to carry out the Library programs
and services:
¯Immediate remedial actions in staffing to include 8.0 new FTE and an additional 9.0 FTE to be added
over the short term to bring the total new FTE to 17.0.
¯Additions to regular Library staffover a period of 5 years resulting in a net expansion of up to 35.5 FTE.
¯Immediate conversion of 6 FTE from hourly part-time to regular benefited status.
¯Reconfi=mLration ofsta~ using only paraprofessional staffat the neighborhood h’braries.
A detailed Library Staffing Plan was completed January 24, 2002 by Beverly Simmons and Associates.
The Simmons report reinforced the recommendations of the NLP, finding that the City ofPalo Alto’s libraries
are significantly understaffed to meet current library service demands and compare unfavorably in terms of
staffing to its neighbor city libraries and similar libraries around the state. Figaare 2 shows how the Palo Alto
Library compares with other nearby or similar libraries in terms of staffing. The average number of full-time
equivalent employees (FTE) for the 10 communities is 75.53 while Palo Alto currently has an authorized FTE
level of 58.58 employees.
Figure 2:
Comparison of Staff Levels in Comparable Communities
2001-2002
140-
t" 120"
r~ 100-
C~" 80-
~60-
I’-40-
U.20-
0
Source: California Library Statistics 2003, California State Library, Library Development Services Bureau
[Note: Staffing statistics are reported differently in the California Library Statistics, displaying actual
FTE rather than budgeted FTE for hourly.]
As shown in Table 1, and Fi~m3re 3, Palo Alto has the lowest ratio of staffing in terms of FTE to annual hours
open, with only 4.2 FTE available per 1000 hours that the libraries are open each year, compared to similar
libraries (Table 2). The average number of FTEs available in 10 other communities is 12.1 per 1000 hours.
--6--
Table 1: StaffAvailable to Keep Libraries Open, 2001-02. FTEs per 1000 Hours Libraries are Open
Per Year
City Annual ’FTE FTE per
Hours Open 1000 Hours
Palo Alto 13,935 58.58 4.20*
Berkeley..’ ........16, 822 125.84 7.48 .....’ ....
.. Bevedey Hills 3,262 89.00 ... 27.28
Cadsbad 8,268 115.30 13.95
Menlo Park 3,269 2.2.62 ....6.92
Mountain View 4,019 54.00 13.44
.Newpgrt .Beach ...................12,272 58.68 ............4..78
Redwood City 8,424 .......67’.9"1 ....8.06 ..
Santa Clara .6,657 .....66.25 9.95
Sunnyvale 4,675 64.76 13.85
Thousand Oaks 6,065 90.90 14.99
Source: California Library Statistics 2003, Cafifomia State Library, Library Development Services Bureau
* Hours and FTE have been reduced for 03-04, resulting in 4.82 FTE per 1000 hours effective July 2003.
Figure 3: Comparison of Equivalent Staffing Level
Comparable Communities 2001-2002
30-
25-
._.
2o-
~ 10-
5.
0-
Paio Alto LibrarT staffing remains a critical issue that has not yet been adequately resolved.
Overall staffing has decreased for 2003-04 from previous years despite the recommendations of
the NLP and the independent Simmons Staffing Report. Even with an emphasis on self-service
check-outs and other innovations, staffing at Palo Alto libraries need to be revisited in order to realize
Pato Alto’s vision for its Library.
Remedial Staffing Actions
The NLP called for remedial staffing actions for the Palo Alto Library. While there was an initial
increase of 4 regular FTE staff in the 2000-01 this has been offset by the freeze of 1.0 FTE Librarian
position in 2002-03, continuing into the 2003-05 budget, the loss of.75 FTE in technical services staff,
and the loss of 1.81 hourly FTE starting in July 2003 resulting from the closure of Terman Park
Library and reductions in hours at College Terrace and Downtown libraries. The net effect on
Library staffing has been a decrease in overall staffing hours allocated to the Palo Alto Library
for FY 03-04 from previous years as shown in Figure 4.
Figure 4: City Authorized Staffing Levels
o 52.
51
5O
49
FY 99-00 FY 00.01 FY 01-02 FY 02-03 FY 03-04
Notes:
a.FTE counts reflect budgeted dollars, and not actual working hours
b.In 02-03, 2.0 FTE (Librarian and Director) were frozen and unfilled for 10 months
c.In 03-04, 1.0 FTE (Librarian) will remain frozen, and another 1.0 FTE (Director) will remain
frozen approximately 6 months
Conversion of 6 FTE from hourly part-time to regular benefited status
The equivalent of 1.0 FTE (two 0.5 FTE positions) were converted from hourly to regular, benefited,
status.
Reconfiguration of staff, using only paraprofessionals at neighborhood libraries
Some progress has been made in reconfiguring the staffto have only paraprofessionals at
nei~dhborhood libraries. Following two vacancies in the Librarian classification at Downtown and
College Terrace libraries, the positions were filled with Library Specialists. Staff has proposed
upwardly reclassifying these positions to Library Associates in order to take the lead role at these
facilities when they are converted to the neighborhood concept in FY 2003-04. It has not been possible
to move to the full concept of the Resource Library/Neighborhood Library system as envisioned in the
NLP because of the lack of facilities improvements/construction and the lack of appropriate staffing
levels.
Implementation of Library Communication Programs
In 2001 the library staff commissioned a review of its communication programs by Library Communication
Strategies, an independent consulting ~oup. In their fmdin~ it was noted that in Palo Alto, communication
--8--
has taken a back seat, not because of tack of understanding or effort on the part of library staff., but simply
because they lack the time and skills to do the job. As a result few people outside the library’s "family" tmow
about its services, its plight- or understand how much better it could be.
The Library Communication Strategies Report recommended increasing outreach to media and community
through new and expanded communication programs such as contributed articles, opinion prices, newsletters,
photo oppommities, development of a speaker’s bureau, and expansion of online Library resources.
Although the library staff maintains a minimum level of communication from the Libraries, in the form of a
monthly press release and publicity flyers (distributed primarily at the libraries), there has been little progress
made in implementing the recommendation of the Library Communication Strategies Report due to lack of
budget and qualified staff.
Summary
With no growth in operating budget and no approved funding for expanded facilities, there has been
very limited progress in implementing the NLP since its publication in May 2000.
The 15 year City record of consistently under-funding the Palo Alto Library continues. As a
consequence staffing levels are far below where they should be, resulting in the libraries being open
fewer hours than previous years. Palo Alto was dead last in having 4.2 FTEs per 1,000 hours its
libraries are open compared with 10 other comparable communities. Despite the fact that Palo Alto’s
Library circulation is 16% greater than the average of the other 10 libraries, the Palo Alto library
budget is 24% lower than the average of the libraries in 10 comparable communities.
The single word that best reflects the condition of the Palo Alto libraries is "neglect" - neglect of
facilities, staff and collections. The future of the Palo Alto Library depends entirely on the level that it
is funded. For years, our libraries have faced the growing challenge posed by cramped and aging
facilities and inadequate funding, they now face the challenge of accommodating new budgetary
restrictions.
--9--
In light of the current and foreseeable tight fiscal conditions within the City of Palo Alto, and the State
of California, it is imperative that the City Council adopt an implementation plan for making
improvements to the Library system that will enable the City to harness limited resources to improve
the level of programs and services provided by the Libraries. As a community, Libraries were ranked
right after emergency services in a recent residents’ survey. The status quo is not acceptable when
Palo Alto Libraries are already falling below the standards of neighboring communities and other cities
similar to Palo Alto.
Included in this section are a series of recommendations provided by the LAC as a roadmap of
recommended short, and longer term improvements to the Palo Alto Libraries consistent with the goals
and mission of the NLP.
The following time periods are assumed:
¯Short Term Improvements - achievable within 2003-2005 budget years
¯Longer Term Improvements - achievable 2005+
Recommended Improvements - Short Term
Introduction
The current Library budget will drastically reduce the level of library service in Palo Alto on any measure if
the Libraries continue business as usual. In order to meet the 2003-2004 budget and maintain the current
libraries the library staff is faced with reducing 47 service hours/week, a 17% reduction in library hours, to a
total of 231 hours (see Table 2).
It is essential that the Palo Alto Libraries make some adjustments in how they operate in order to better
serve the community. Unless the Council and City Manager are prepared to substantially increase the
library budget in the future, the status quo is not a realistic possibility for our libraries. Existing
staffing levels cannot support the operation of the current multiple-branch library facilities and
programs, much less expanded facilities and programs.
Table 2: Reduced Service Hours Palo Alto Libraries
Library Hours/Week 7/1/2002 Hours/Week 7/1i2003
Main 67 62
Mitchell 56 58
Children’s 48 48
College Terrace 42 35
Downtown 42 28
Terman 23 0
Total 278 231
Recommendation: Maximize Hours & Services at Resource Libraries
In ~;rder to improve library services, the LAC recommends reallocafion of existing resources to maximize
hours and services at the Palo Alto Resource Libraries:
¯North Resource Library-Main!Children’s
¯South Resource Library - Mitchell
As an initial step the following recommendation is made regarding reallocation of resources:
Step 1:
¯Eliminate public services/collections at Downtown Library and move Technical Services
from Main to Downtown, to free up additional staff for use at Main/Mitchell and open up
program space at Main.
This recommendation is predicated on increased hours and services at the Resource Libraries and retaining
the Downtown Library for library purposes. Equally important this recommendation offers the ability to open
up program space at Main for new library programs including teen library services, even without facility
expansion. In addition this recommendation enables hours and services to be focused at the Resource
L~raries while still keeping open College Terrace, the most heavily used neighborhood library.
The available FTE and budget created by Step #1 would address critical staffing shortages by moving staff
from Downtown to the Resource Libraries enabling:
°Increased hours at Mitchell Park, Main & Children’s Libraries (Table 3)~ - reallocation of service hours
from Downtown would result in an increase of 10 service hours at the Resource Libraries.
¯Improved collections at Resource Libraries- items from the collection at Downtown would be
reassigned to Resource Libraries providing additional materials and extra copies &popular items.
°Expanded purchasing of materials at Resource Libraries -Approximately $30K is spent annually for
collections at Downtown and could be reallocated to Resource libraries.
¯Additional program space at Main by moving Technical Services to Downtown - resulting in
approximately 1400 square feet that could be reallocated to public use space, an increase of about 9% for
expanded library programs and services.
Table 3: Realiocated Service Hours Palo Alto Libraries
Library .......
Hours/Week 7/!,,12003,’
Hours/Week Reailoeated ......
Main 62 64
Mitchell 58 64
Children’s 48 50
,College Terrage ......35 ...........35 ...............
Downtown 28 0
Total .............231 .........................213
i T~e elimination of 28 service hours at Dm~aatown enables an increase of 10 public service hours at ~he Resource Libraries since the
Resource Libraries require more smffper hour (approx. 3:1) than the neighborhood libraries.
--11 --
If further reductions are made to the Palo Alto Libraries operating budget then the following step will
need to be taken to preserve a reasonable level of service at the Resource Libraries.
Step 2
¯In addition to implementing Step t it will be necessary to eliminate public
services/collections at College Terrace Library.
This additional step will be needed if the Library operating budget is further reduced necessitating the
reduction of the current multi-branch Library system to the three branches constituting the Resource
Libraries. This is contrary to the premise of the NLP where neighborhood hqgraries constituted an inte_mal
part of the New Library Plan, providing neighborhood-based reading libraries Downtown, in College Terrace
and in the southwest area of Palo Alto.
Recommendation: Improve operational efficiency at Main/Mitchell
The LAC recommends that the Library staff focns on improving operational efficiency at Main and Mitchell.
With a growing demand for library services (see Table 4) and no corresponding increase in operating budget,
the Palo Alto Libraries must re-engineer their operations to maintain and improve service levels for the
community.
Table 4: Library Circulation Compared to Staffing FY99-00 to FY02-03
Fiscal Year FTE Circulation
1999-00 52.13 926,128
2000-01 55.88 975,611
2001-02 56.58 1,117,795
2002-03 56.58 1,240,099
Source: FTE counts from City’s adopted budget documents.
Note: In January 2001, the loan period was changed from 4 to 3 weeks
The LAC supports the staff initafive to develop a program focused on meeting customer demand by
encouraging self-service by its patrons and improved marketing oflNrary collections. San Jose Public
Library is also operating under tight fiscal conditions and has recently implemented a similar program aimed
at satisfying the communities’ need for longer hours, better service and programs for children. The Palo Alto
program will include elements of the San Jose Public Library program including:
¯Focus on self-checkout with the objective of moving from 10% to 85% self checkout. Provide
attractive cabinetry and individualized checkout areas to encourage self checkout.
¯Convert the libraries to present an "exciting bookstore look" where collections are attractively
displayed and signage is important in helping patrons find what they are looking for. The Dewey
Decimal system should be augmented by signs highlighting subject area.
¯Encourage face-to-face personalized service by fleeing librarians from the traditional, bulky,
circulation and reference desks, enabling patrons to more easily find help when they need it while
still encouraging self-service.
¯Reduce backroom processing and materials handling through the installation of newer inventory
technology systems.
Currently Main and Mitchell Libraries have a sinNe self-service check out booth. The circulation desk
functions at both libraries should be redesigned to increase self-service and provide a more efficient and
welcoming operation.
The circulation desk at Main Library covers a massive area with inefficient use of space. By redesigning the
circulation desk area the LNrary will not only open up more available space for patrons but will also have the
oppommity to create a more welcoming entrance.
A redesign of the circulation desk at Mitchell and installation of an updated inventory system offers
opportunities for reducing materials handling and backroom processing.
Funding: The re-design of the circulation desk at Main wilt incur one-time costs for furniture removal and
area refurbishment and redesign. Currently infi-astmcture improvements for Main are not scheduled for design
and construction until 2006-2007. Alternative or re-prioritized one-time funding would be needed to advance
this initiative.
It is recommended that the circulation desk redesign at Mitchell be incorporated into the infrastructure
u. p~ade design improvements outlined in the C~ PE04012 - Mitchell Park Library and Community Center
Improvements for the 2003-2005 budget year. This may require additional funding.
Recommendation: Maximize available floor space at Main Library for additional
~omputer stations
To open up floor space at Main Library the archival and historical collections of the Palo Alto Historical
Association currently stored in locked filing cabinets on the main library floor at Main Library should be
moved and housed With the existing historical periodical collections currently stored in the Main Library
Basement. This will allow Library staffand volunteers from the Palo Alto Historical Association to continue
to access the materials in conjunction with other items in the collection while at the same time freeing up floor
space for other uses such as additional computer stations or study areas. The installation of compact shelving
in the basement will be necessary to free up space to accommodate the cabinets.
Fundinz: This recommendation will incur one time costs for installing the compact shelving and moving
cabinets from the ground floor of the Main Library to the basement.
Recommendation: Rearran~le Main Library to develop space for Teen library
services and proflrams
In conjunction with re-allocation ofstaffto the Resource Libraries and the reallocation of Technical Services
from Main to Downtown the LAC recommends that Main Library be rearranged to open up space for new
programs, specifically the launch of Teen library services and programs at Main Library.
Funding;." This recommendation will incur one time costs for moving staff from Main to Downtown and
office refurbishment at Downtown and also one-time costs for space refurbishment at Main to accommodate
new services. Currently infrastructure improvements for Main are not scheduled for design and construction
until 2006-2007. Alternative or re-prioritized one-time funding would be needed to advance this initiative.
Recommendation: Support private fundin.c! _qoals for Children’s Library
Under the public-private partnership approved by the City Council February 10, 2003, the Council
gave a private fund-raising effort until December 31; 2003 to raise $1.2 million for the addition of a
1,600 ft-~north wing at Children’s Library. The LAC appreciates and endorses this fund raising
initiative.
13
Recommendation: Implement infrastructure improvements at Children’s and add
North Win~
Under the public-private partnership approved by the City Council February 10,2003, construction is
planned (CIP PE0401 O) for 2004-2005 enabling seismic retrofit, roof replacement and building system
upgrades at Children’s Library and a 1,600 fla north wing addition funded through private-public
matching fimds.
Recommendation: Implement infrastructure improvements at Mitchell Park
Infraslructure improvements are scheduled for construction at Mitchell during 2004-05 under CIP
PE04012. The LAC recommends that these improvements should include not only the seismic
retrofits and electrical and mechanical system upgrades as already outlined but in addition flooring,
painting and room layout improvements to enable delivery of enhanced services and programs and
more efficient operations.
--14--
Recommended Improvements- Longer Term
Recommendation: Pursue a new Libraries-oniy bond to fund capita!,,improvements
It is necessary to improve facilities in order to fulfill the mission of the library. The LAC recommends a
libraries-only bond measure to pay for building improvements and/or expansions that will result in adequate
functional, social and aesthetic space for residents to enjoy a rich set of Library programs and services. Such
a measure will support improvements for the Main and Mitchell Park Resource Libraries. It assumes that
current efforts to raise private funds for the North Wing expansion of Children’s Librar3, will be successful.
The LAC recommends that this new bond measure be different in two key ways ~om the one proposed in the
November 2002 Measure D. This bond measure will be for expansion of Main and Mitchell Library facilities
only. In addition the LAC recommends setting a ceiling on capital expenditures at the start, with the goal that
construction fit the budget. These recommen~tions are intended to avoid aspects of the Measure D
campaign that proved detrimental to its success i.e. the extension of the Measure D to include an expansion
for the Art Center and new construction for the Mitchell Park Community Center increased the total cost
significantly; in addition City Council, LAC and city staff discussions leading up to the November ballot
focused on building plans that defined an "ideal" library system rather than building plans that met a defined
cost constraint.
The recommended new bond measure will be used to fund expansion of Library facilities at both Main and
Mitchell Resource Libraries to house expanded programs and services that will bring the standard and scope
of service of the Palo Alto Library up to the level enjoyed by similar communities in the Bay Area and
California.
The LAC recommends that an initiative b%dn early in 2004 to develop the list of proposed features for the
new Library Bond Measure working in conjunction with staff~ the community and architectural and
construction advisors.
Examples of Expanded Library Programs and Services
Examples of expanded Library programs and services that the funding effort could provide are listed
below.
Main Library
¯Provide space for expanded fiction and non-fiction adult library collections;
¯Provide more reading room space and space for quiet study;
¯Expand program space for adult programming;
¯Provide an area where homework assistance is available to students;
°Provide an area for a technology lab for scheduled training and education as well as overflow for
individual computer use;
¯Provide an area designated for teens, including improved teen collections and space;
¯Provide primary public entrance vestibule and lobby to serve the library and the public meeting
room, including an area to display local art from galleries, area school, preschools, etc.
° Provide a functional meeting space for library and community use.
The following infrastructure improvements are already planned and scheduled and will not be part of a bond
measure:
¯Seismic upgrading as necessary; (scheduled for funding throu~h CIP PF07010)
¯Upgrading of electrica!, plumbing, HVAC systems; (scheduled for funding through C~ PF07010)
¯Improvements to technology infrastructure, including wiring throughout the building. (scheduled for
funding through CIP PF07010)
Mitchell Park Library
¯Expand fiction and non-fiction adult library collections;
¯Provide more reading room space and space for quiet study;
¯Improve program space for children’s programming, such as story times and puppet shows;
¯Provide an area where homework assistance is available to students
¯Provide an area desi~maated for teens, including improved teen collections and space;
¯Provide a functional meeting space for library and community use.
The following infrastructure improvements are already planned and will not be part of a bond measure:
¯Seismic upgrading of existing building as necessary; (scheduled for funding through PE04012)
¯Up~m~ading of electrical, plumbing, HVAC system; (scheduled for funding through PE04012)
¯Improvements to technolo_Ey infrastructure, including wiring throughout the building. (scheduled for
funding through PEIM012)
Children’s Library
¯Review need for further expansion of Children’s Library upon completion of addition of North
Wing.
The Palo Alto Library is suffering fi-om a 15-year City record of consistently under-funding its library system
to the point where services and collections have been seriously eroded. With no major capital improvements
undertaken by the City for the Palo Alto Library in the past 15 years and an under-funded operating budget the
Palo Alto Library is falling well below the standards of neighboring communities. This is despite the fact that the
Palo Alto community continues to value its libraries hio~hly, most recently ranking in importance libraries ri~t
after emergency services. With the communities of Mountain View, San Jose, Berkeley, and Los Altos all
opening new expanded library facilities over recent years the City Council needs to take action to raise the level of
service offered by the Palo Alto Libraries to the level warranted by this community. The LAC strongly urges the
City Council to adopt the recommendations documented here to put in motion short and long term improvements
necessary to realize Palo Alto’s vision for its Libraries.