HomeMy WebLinkAbout2003-09-16 City CouncilTO:HONORABLE CITY COUNCIL ATTN:FINANCE COMMITTEE City of Palo Alto City Manager’s Report FROM:CITY MANAGER DEPARTMENT: CITY MANAGER DATE:SEPTEMBER 16, 2003 CMR: 417:03 SUBJECT: STATUS OF THE INFRASTRUCTURE MANAGEMENT PLAN This is an informational report and no Finance Committee or Council action is required. BACKGROUND In 1998 staff, proposed a $100 million, ten-year General Fund Inf:rastmcture Management Plan (IMP) for maintenance and improvement of the City’s existing infxastructure based on an infrastructure, management study by Adamson Associates (Adamson Study) completed in January of that year. Staff’s IMP proposal identified a program that addressed the infrastructure backlog identified in the Adamson Study and established a goal to bring infrastructure maintenance up to a sustainable, on-going level. At that time the City Council adopted a $78 million IMP conceptually and directed staff to identify options to fund the $22 million shortfall to get to the proposed $100 million, ten-year goal. In 2001, staff presented a solution to fully fund the $100 million, ten-year IMP and the City Council adopted the IMP and its implementation plan. The Council also adopted a policy that existing resources (i.e. the $100 million plan) would be used to rehabilitate existing infrastructure; new infrastructure projects would be approved only if new resources could be identified. Over the past three years (FY 2001-2004) the City Council has budgeted over $35 million for IMP projects. As part of this budgeting process the City Council added projects that were not included in the original IMP such as: ¯E1 Camino Real Median Landscape Improvements: $1,527,000 ¯Library Master Plan (Main, Mitchell Park, Children’s): $978,000 ¯Roth Building Wings Demolition: $1,205,000 ¯Public Safety (Police) Building: $343,000 ¯Community Theater Renovations (HVAC)’. $912,000 ¯San Antonio Road at Hwy 101 Traffic Signal for $281,000 ¯SOFA Park for $236,000 CMR:417:03 Page 1 of 5 On December 2, 2002 the City Auditor released an analysis of the City’s Long Range Financial Plan (LRFP). The LRFP, prepared by the Administrative Services Department, was intended to identify long-term oppommities, problems and strategies for addressing the City’s budget crisis. The Auditor’s analysis pointed out that the infrastructure backlog identified in the late 1990’s (Adamson Study) resulted in staff proposing $100 million in funding over ten years for the IMP starting in FY 1999-2000 and theoretically ending in FY 2008-09. The LRFP assumes that the IMP w~l be required through the entire term of the LRFP (through 2012-13) because of inflation and the addition of new IMP projects. The Auditor mentioned that other new infrastructure projects continue to be discussed without identifying new funding (e.g.: new athletic fields and the possible expansion of Children’s Library). As a result, the Auditor recommended that, to facilitate City Council discussion of long-term infrastructure priorities, staff provide the Council with a list of identified IMP projects, including estimated, budgeted and actual costs for each project. When the City Council adopted the 2003-04 budget on June 16, 2003, staff proposed to return to the Finance Committee to discuss IMP progress and priorities and how to implement the City’s Auditor’s recommendations related to the IMP described above (CMR 316:03, page 4 of 12). DISCUSSION IMP Progress to Date Attachment 1 is an IMP Budget Summary that provides a view of the IMP program in terms of current and furore budget and expenditures. Included with the attachment are separate lists of "original" and "new" IMP projects with estimated, budgeted, and actual costs for each project as, recommended in the City Auditor’s LRFP analysis. Column 1 of the summary lists the three IMP categories (and sub-categories) currently in place while column 2 shows the budget amounts for the first three years (FY 2001-04) of IMP implementation for each category. It should be noted that the budgeted amounts include both original IMP projects identified in the Adamson Study and new projects that were added. Column 3 of the summary shows expended and encumbered amounts for IMP projects through June 30, 2003; column 4 shows the remaining balances for these projects at the beginning of FY 2003-04. A review of the data shown in the budget summary for the first three years of the IMP (columns 2 - 4) leads to the following observations: ¯$6.8 million in new projects were added in the first three IMP years, which amounts to almost 20% of the total IMP budget for these years ($35.3 million). ¯In the Buildings and Facilities category, the expenditures and encumbrances for new projects ($2.6 million) is more than twice that expended on original IMP projects in this category ($1.1 million). CMR:417:03 Page 2 of 5 Also in the Buildings and Facilities category, the remaining balance for original IMP projects ($5.5 million) is about 85% of the budgeted amount ($6.6 million) which is primarily due to staff vacancies in the Public Works Facilities Division as the IMP program ramped-up. Work in the Streets and Traffic category has been progressing well, with the balance shown reflecting the major street maintenance and sidewalk replacement projects currently under design that will be constructed in 2004. ¯Work in the Parks and Open Space category is also progressing well, with the balance remaining primarily reflecting projects to be constructed in FY 2003-04. Staff is in the third year of IMP implementation and while much progress has been made on the projects included in the original program, a significant amount of staff time has been devoted to new projects. Even though the City Council approved additional staffing for the IMP (5.5 FTE), new projects have impacted both the IMP program budget and schedule as discussed below. IMP Program Cost Increases Column 5 of the IMP Budget Summary (attachment 1) shows the planned IMP projects identified in the Adamson Study for FY 2004-08. These projects are included in the City’s Adopted 2003-08 Budget and the budget amounts shown have been increased to account for inflation and in some instances added scope (e.g.: need to seismically retrofit some buildings and add air conditioning to City facilities where not existing).The planned projects also include two new projects not included in the Adamson Study: ¯Foothills Park Maintenance Building Rehabilitation $250,000 ¯Additional SOFA Park funding of $125,000. and Insulation for Column 6 shows the remaining future IMP projects identified in the Adamson Study. The project budgets for these projects are the cost estimates identified in the Adamson Study in 1996 dollars and do not reflect any potential scope increases. As these projects are brought into the IMP in furore budget cycles, the budgets will need to be increased to account for inflation and potentially scope increases if buildings need seismic work or projects have added scope requirements not included in the Adamson Study. Cohmm 7 of the IMP Budget Summary totals the IMP budget for all three categories, with separate sub-totals for the original IMP projects identified in the Adamson Study ($97.9 million), and new IMP projects ($7.2 million), for a current IMP program total of $105.1 million. The original IMP program was estimated to cost $95 million plus $5 million for staffing for a total of $100 million. The current IMP total represents an IMP CMR:417:03 Page 3 of 5 budget increase of over 10% for the first three years of the program. The program’s cost will continue to rise as new projects are added and the original projects included in the Adamson Study are brought forward with their budgets increased for the cost of inflation and potential added scope. In addition to the above IMP cost increases, a fourth dategory of IMP projects needs to be added to the IMP program in next year’s budget cycle (FY 2004-05) to address ongoing maintenance and improvement of City bridges, parking lots and pedestrian!bicycle pathways. These facilities were not evaluated in the Adamson Study and staff is completing an inventory of these facilities, with cost estimates and proposed priorities. This inventory will be completed by the end of this year. This category of IMP projects will require an additional IMP budget commitment of as much as $1 million per year or more for the remaining duration of the IMP program. Impacts of Adding New Projects to the IMP The projects included in the original $100 million ten-year IMP were prioritized with the most critical time-sensitive maintenance/repair projects included in the first years of the program. As new projects were added, work on other priority projects was deferred due to workload constraints. Consequently at least one year has been added to the program to make up this time. In the future, as the City Council considers adding more projects to the IMP, staff will provide information on potential impacts to the IMP budget and schedule for Council’s use in its deliberations. The City Council may choose to defer or eliminate lower priority IMP projects as new projects are prioritized and added to the program. Alternatively, the Council may choose to re-commit to its prior policy of using only new resources to fund new projects. More new projects are on the horizon for City Council’s consideration, including new athletic fields, renovation of the Public Safety (Police) Building, replacement of Fire Stations 3 and 4, and possible expansion of Children’s Library. Future Reporting In addition to the IMP budget summaries presented in this report, a new reporting method has been developed by the staff IMP Cdmmittee to present Council with pertinent up-to- date IMP project information. The "IMP Project Snapshot" (Attachment 2) will provide Council with a quarterly update on all ongoing projects, as well as projects that have been completed during the reporting period. The IMP Project Snapshot provides information on specific projects for each module of the IMP and displays project progress (from pre- design to post-construction), start date, anticipated completion date, and dollars budgeted vs. dollars spent on each project. Conclusion The IMP program design and construction budget has expanded almost 11% over the last three years for new total of $105.1 million and it appears this budget will increase to account for inflation (cost Of money) and to accommodate new projects including those CMR:417:03 Page 4 of 5 on the horizon, as well as the addition of a new category of projects (bridges, parking lots and pathways). The 5.5 FTE staffing budget of $5 million for 10 years for IMP implementation remains in place for a total IMP budget of $110.1 million. Because the City’s ilffrastmcture is a top City Council priority, staff will continue to closely monitor the IMP and report back to the Finance Committee and City Council with IMP status on a quarterly basis. As the IMP program expands, staff will provide options for Council consideration including budget and schedule impacts along with recommendations for possible project deferrals or elimination. ENVIRONMENTAL REVIEW Finance Committee review of the IMP program status does not represent a project under the California Environmental Quality Act (CEQA). ATTACHMENTS Attachment A: Infrastructure Management Plan Budget Summary Attachment B: City of Palo Alto CityWorks Project Snapshop PREPARED BY J. M_I~t~EI~ S~TOI~ Assistant Public Works Director DEPARTMENT HEAD: ~LENN S. ROBERTS Director of Public Works CITY MANAGER APPROVAL: EMILY HARRISON Assistant City Manager CMR:417:03 Page 5 of 5 ATTACHMENT A INFRASTRUCTURE BUDGET MANAGEMENT SUMMARY PLAN 1 IMP CATEGORIES BUILDINGS & FACILITIES Original Projects New Projects TOTAL STREETS & TRAFFIC Streets Sidewalks Bike & Pedestrian Facilities Original Projects Total New Projects TOTAL PARKS & OPEN SPACE Parks Open Space School Sites Bldg Perimeter Landscaping Medians, Islands, Planters Original Projects Total New Projects TOTAL ORIGINAL IMP PROJECTS NEW IMP PROJECTS TOTAL IMP PROJECTS 2 BUDGETED FY 2001-04 $6,598,457 $4 705.745 $11,304,202 $7,916,305 $5,318,000 so $13,234,305 $341.800 $13,576,105i $5,371,094 $2,393,327 $250,000 $0 $624.000 $8,638,421 $1.763.000 $10,401,421 $28,471,183 $6.810,545 $35,281,728 EXPENDED & ENCUMBERED thru 6/30/03 4 BALANCE FY 2003-04 $1,052,478 $5,545,979 $2.582.342 $2.123.403 $3,634,820 $7,669,382 $5,263,466 $2,652,839 $3,221,575 $2,096,425 s__O_0 s~ $8,485,041 $4,749,264 $__~0 $341.80C $8,485,041 $5,091,064 $2,924,348 $2,446,746 $I,183,842 $1,209,485 $46,063 $203,937 $0 $0 $38.521 $585.479 $4,192,774 $4,445,647 $123,559 $1.639.441 $4,316,333 $6,085,088 $13,730,293 $14,740,890 $2,705,901 $4,104,644 $16,436,194 $18,845,534 PLANNED FUTURE FY 2004-08 FY 2008-ON $8,760,000 $18,986,000 $250.000 $___0.0 $9,010,000 $18,986,000 $7,705,000 $5,835,000 $7,480,000 $5,610,000 $0 $1.000.000 $15,185,000 $12,445,000 so s~ $15,185,000 $12,445,000 $5,443,000 $4,090,000 $1,161,000 $40,000 $375,000 $0 $0 $1,900,000 $624.000 $468.000 $7,603,000 $6,498,000 $125.000 $0 $7,728,000 $6,498,000 $31,548,000 S37,929,000 $375,00~0 $...~_0 $31,923,000 $37,929,000 7 TOTAL $34,344,457 $4,955.745 $39,300,2O2 $21,456,305 $18,408,000 $1.000.000 $40,864,305 $341.800 $41,206,105 $14,904,094 $3,594,327 $625,000 $t,900,000 $1.716.00G $22,739,421 $1.888.00G $24,627,421 $97,948,183 $7.185.545 $105,133,728i 8 ORIGINAL $34,000,000 $22,000,000 $18,000,000 $1.000.000 $41,000,000 $11,300,000 $4,400,000 $400,000 $1,900,000 $2.000.000 $20,000,000 $95,000,000 NOTE: The original project estimates are from the 1997 Infrastructure Management Study by Adamson, and used 1996 dollars without factoring in inflation. S:Morris\lnfrastructure\lMP (Sheet 10), Last updated 9/3/03 INFRASTRUCTURE MANAGEMENT PLAN Old ClP# SAP #ProJ,ect Title BUILDINGS & FACILITIES - MODULE 1 10004 Completed 10005 Completed 10101 Completed 10120 Completed 10219 Completed 10220 Completed ’1"9309 PF93009 10006 PF00006 10102 PF01002 10103 PF01003 10104 PF01004 10105 PF01005 10222 PF02022 10300 PF03000 PE04014 PE04013 PE04012 PE04011 PF04010 PF04012 PE04010 10401 PF04001 10502 PF05002 10503 PF05003 10600 PF06000 Downtown Library Roof Repairs MSC Bldg. A Emergency Generator Children’s Th~’ater Exterior Improvements Cubberley Theater A/C Replacement Fire Station S~ismic Evaluation Study Golf Course Maintenance Shop ’Improvements Americans With Disabilities Act Compliance Roofing Replacemeni .... Civic Center Infrastructure Improvements Building (was Electrical) Systems Improvements Fire Station Improvements (Stations 1, 2, 5, 8) Lucie Stern C~mmunity Center Improvements Facility Interior Finishes Replacement Foothills Park Interpretive Center Mech. Upgrades Animal Shelter Expan’~ion & Renovation (City’s share) Fire Stations 3 & 4 Replacement: Feasibility Study Mitchell Park Library & CC Improvements Cambridge Parking Structure Improvements Cubberley Mechanical & Electrical Upgrades Cubberley Bu"i’i’ding 1 AJC Replacement Children’s Lib Improvements & Expansion (City’s share) General Buildings Study (update Adamson report) Municipal Services Center Renovation (Bldgs A, B, C) Foothills Park Interpretive Center Improvements Baylands Athletic Center Roof & Bleachers ORIGINAL PROJECTS as of 7/1/03 Budgeted Total Exp Balance Planned Future FY2001-04 & Encumb FY2003-04 FY2004-08 FY2008-ON $78,320 $86,232 $23,595 $235,000 $125,000 $60,000 $428,310 $280,000 $2,492,000 $115,000 $822,000 $379,000 $150,000 $80,000 $64,000 $100,000 $290,000 $40,000 $425,000 $175,000 $150,000 $78,320 $86,232 $23,595 $207,662 $65,183 $6O,OOO $13,757 $96,756 $363,959 $12,389 $4,000 $25 $35,600 $5,oooi $~ $0 $0 $0 $0 $0 $0 $27,338 $59,817 $o $414,553 $183,244 $2,128,041 $102,611 $818,000 $378,975 $114,400 $75,000 $64,000 $100,000 $290,000 $40,000 $425,000 $175,000 $150,000 $0 $o $0 $0 $0 SO $300,00Q $300,000 $0 $200,000! $416,000 $0 $200,000 $0 $256,000 $0 $1,160,000 $0 $985,000 $o $1,050,000 $175,000 $941,000 $320,000 $67,000 $0 $450,000 $300,000 SO $300,000 $0 SO $150,000 SO $0 $o $0 $286,000 $0 $0 $0 $0 $0 $0 $0 IMP Total $78,320 $86,232 $23,595 $235,000 $125,000 $60,000 $1,178,310 $880,000 $2,492,000 $615,000 $1,238,000 $379,000 $500,000 $80,000 $320,00~ $100,00C $!,450,00C $326,00~ $1,410,00C $t75,00~ $1,200,00~ $175,00~ $941,00C $320,00~ $67,00C Original IMP Amt $103,00C $100,00C $45,00C $101,00C $125,00C $50,00C $1,500,00£ $1,000,00C $2,467,000 $1,000,000 $1,040,000 $323,000 $700,00O $65,000 $308,000 $100,000 $1,099,000 $286,000 $1,237,000 $136,000 $585,000 $190,000 $1,100,000 $212,000 $66,000 S:Morris\lnfrastructure\lMP (Sheet 11), Last updated 9/3/03 ClP Number 10601 PF06001 PE05010 PF07010 Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future Future INFRASTRUCTURE MANAGEMENT PLAN Project Title Ted Thompson Garage Improvements College Terrace Library Improvements Main Library Improvements Art Center Electrical & Mech Upgrades Art Center Improvements Downtown Library Mech & Electrical Upgrades Downtown Library Improvements Civic Center Infrastructure Improvements - Phase 2 Community Theater Improvements ADA Compliance Cubberley Wing I Elevator Children’s Theater Improvements Baylands Interpretive Center Improvements MSC, SCADA Ventura Buildings Improvements Senior Center Exterior Cubberley Community Center Pavillion Floors Cubberley Comm Center Rms A- H Improvements Cubberley Comm Center Gym Improvements iCubberley Comm Center Room Improvements Cubberley Comm Center Rooms J-L Improvements Cubberley Comm Center Rooms M-P Improvements Cubberley Comm Center Rooms I S-W Improvements Cubberley Comm Center Theater Improvements Cubberley Comm Center Campus Fire Alarm System Foothills Park Intrepretive Center Improvements Budgeted FY2001-04 ORIGINAL as of 7/1/03 Total Exp & Encumb PROJECTS I Balance Planned Future FY2003-04 FY2004-08 FY2OO8-ON $67,000 $0 $1,250,000 $0 $1,073,000 $0 $500,000 $319,000 $106,000 $95,000 $1,725,000 $434,000 $75,000 $308,000 $267,000 $70,000 $607,000 $35,000 $280,000 $1,056,000 $902,000 $398,000 $973,000 $472,000 $649,000 $248,000 $300,000 $215,000 IMP Total $67,0001 $1,250,00C $1,073,00C $500,00~ $319,00¢ $106,00C $95,00C $1,725,00C $434,00C $75,00C $308,00C $267,00C $70,00C $607,00C $35,00C $280,00C $1,056,00C $902,00~ $398,00C $973,00C $472,00£ $649,00C $248,00C $300,00C $215,00C Original IMP Amt $53,000 $936,o0o $1,o69,oo0 $50o,00o $319,0o0 $106,ooo $95,oo0 $1,725,ooo $434,ooo $75,ooo $308,000 $267,000 $70,000 $607,000 $35,000 $280,000! $1,056,000 $902,000 $398,000 $973,000 $472,000 $649,000 $248,000 $300,000 $215,000 S:Mords\lnfrastructure\lMP (Sheet 11), Last updated 9/3/03 INFRASTRUCTURE MANAGEMENT PLAN ClP Number Future Future Future Future Future Future Delete? Deleted 18670 PE86070 18903 PO89003 Future Project Title Jr. Museum Improvements Lawn Bow! Roofing Parking Lots B & Q Paint MSC Building A, B & C Improvements Park Restrooms/ADA ~enovations Building Replacement Sea Scouts Building Demolish (bldg to be kept?) Terman Library & Wing 30 Improvements TOTAL STREETS & SIDEWALKS - MODULE 2 Street Maintenance (was C P#9630) Sidewalk Repairs Bike & Pedestrian Facilities TOTAL PARKS & OPEN SPACE - MODULE 3 ORIGINAL PROJECTS as of 7/1/03 Budgeted Total Exp Balance Planned FY2001-04 & Encumb F¥2003-04 FY2004-08 $6,598,457 $1,052,478 $5,545,979 $8,760,000 $7,916,305 $5,318,000 $13,234,305 $5,263,466 $3,221,575 $8,485,041 $2,652,839 $2,096,425 $4,749,264 $7,705,000 $7,480,000 $15,185,000 Future FY2008-ON $733,000! $14,0001 $68,000 $665,000 $1,056,000 $4,900,000 $30,000 $0 $18,986,000 $5,835,000 $5,610,000 $1,000,000 $12,445,000 19801 PG98001 19803 PG98003 10001 OS00001 10002 OS00002 10003 OSO0003 10009 PG00009 10010 PG00010 10702 OS07002 Future Future PAUSD School Site Irrigation Renovations Mitchell Park Facilities Improvements Park Trails Open Space Lakes and Ponds Maintenance Baylands Parking Improvements Medians, Islands, Planters Renovations Projects Parks Facilities Improvements Foothills Park Intrepretive Cntr &i Yd Parking Lots Imp. Perimeter Landscaping @ Buildings Parks & Open Space Study TOTAL $250,000 $2,382,644 $1,049,000 $128,261 $1,2!6,066 $624,000 $2,988,450 $8,638,421 $46,063 $1,511,076 $638,760 $88,261 $456,821 $38,521 $1,413,272 $4,192,774 $203,937 $871,568 $410,240 $40,000 $759,245 $585,479 $1,575,178 $4,445,647 $375,000 $908,000 $584,O00 $80,000 $80,000 $624,000 $4,535,000 $417,000 $7,603,000 $0 $0 S0 $40,000 $0 $468,000 $4,000,000 So $1,900,000 $90,000 $6,498,000 IMP Total $733,000 $14,000 $68,000 $665,000 $1,056,000 $4,900,000 $30,000 $0 $34,344,457 Original IMP Amt $733,oo0 $14,000 $68,000 $665,000 $1,056,000 $4,900,000 $30,000 $494,000 $34,000,000 $21,456,305 $18,408,000 $1,000,000 $40,864,305 $22,000,000 $18,000,000 $1,000,000 $41,000,000 $625,000 $3,29O,644 $1,633,000 $248,261 $1,296,066 $1,716,000 $11,523,450 $417,0001 $1,900,000 $90,000 $22,739,421! $400,000 $1,698,000 $1,251,000 $200,000 $625,000 $2,000,000 $11,626,000 $210,000 $1,900,000 $90,000 $20,000,000 TOTAL ORIGINALIMPPROJECTS $28,471,183 $13,730,293 $14,740,890 $31,548,000 $37,929,000 $97,948,183 $95,000,000 S:Morris\lnfrastructure\lMP (Sheet 11), Last updated 9/3/03 INFRASTRUCTURE MANAGEMENT PLAN NEW PROJECTS ClP Number 19512 19707 19820 19910 Completed 10007 Completed 10008 Completed 10204 Completed 10224 10226 10304 10305 Proposed Mid-year PF04011 AC04010 PG04010 10703 OS07003 Project Title Civic Center Waterproofing 10113 10218 PG02018 (Fire Stations) Emergency Generator Replacement Public Safety (Police) Building Community Theater Renovations (HVAC) Art Center Plumbing Replacement Vlezzanine HVAC System Improvements Library Master Plan (Main, Mitchell Park, Children’s) Children’s Theatre Light & Sound Systems Upgrade Mitchell Park Library Expansion Roth Building Wings Demolition Lucie Stern Comm Theater Stage Floor Replacement Community Theater (Stage) Lighting Improvements Junior Museum Fire Sprinkler Installation Cubberley & Children’s Theaters Stage Fir Replace Athletic Field Artificial Turf & Lighting Projects Foothills Park Maintenance Building Rehab & Insulation TOTAL STREETS & TRAFFIC - MODULE 2 10205 El Camino RealNentura Avenue Signal 10206 Traffic Signal @ San Antonio Road & Hwy 101 Off-Ramp TOTAL PARKS & OPEN SPACE - MODULE 3 El Camino Real Median Landscape Improvements SOFA Park TOTAL as of 7/1/03 Budgeted Total Exp FY2001-04 & Encumb $250,000 $210,000 $343,158 $912,192 $5,588 $15,506 $977,550 $210,000 $84,901 $1,205,350 $45,00O $65,0OO $125,000 $101,500 $155,000 $4,705,745 $72,084 $196,952 $342,258 $9O9,584 $5,588 $15,506 $946,475 $2,504 $84,901 $6,490 SO $0 $0 $0 $0 $2,582,342 $61,000 $0 $280,800 $0 $341,800 $0 $1,527,000 $108,380 $236,000 $15,179 $1,763,000 $123,559 Balance FY2003-04 $177,916 $13,048 $9O0 $2,608 $0 $0 $31,075 $207,496 $0 $1,198,860 $45,000 $65,000 $125,000 $101,500 $155,000 $2,123,403 $61,0001 $280,800 $341,800 $1,418,620 $220,821 $1,639,441i Planned Future FY2004-08 FY2008-ON $0 $0 $0 $o $0 $o $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 SO SO S0 S0 $0 $0 SO SO S0 S0 TBD $0 $250,000 $0 $25o,ooo $o $o $o $o $o $o $o $0 $0 $125,000 $0 $125,000 $0 Original IMP Total IMP Amt $250,00C $0 $210,00C $0 $343,15e $0 $912,192 $0 S5,58e $o $15,50~$0 $977,55C $0 $210,00C $0 $84,901 $0 $1,205,350 $0 $45,00C $0 $65,00C $0 $125,000 $0 $101,50C $0 $155,00C $0 $250,00C $0 $4,955,745 $0 $61,000 $0 $280,80C $0 $341,80~$0 $1,527,00C $0 $361,00C $0 $1,888,00~$0 TOTAL NEW IMP PROJECTS $6,810,545 $2,705,901 $4,104,644 $375,000 $0. $7,185,545 $0 S:Morris\lnfrastructure~lMP (Sheet 12), Last updated 9/3/03 ATTACHMENT B I-wu_l- w < Iz I- ~ n,"’li Ow Oz C C 0 c ¢