Loading...
HomeMy WebLinkAbout2003-06-23 City Council (10)C ty Manager’s Reper| 3 HONORABLE CITY COUNCIL FROM:CITY MANAGER DEPARTMENT:POLICE DATE:JUNE 23, 2003 CMR:314:03 SUBJECT:APPROVAL OF AMENDMENTS EXTENDING AG~EMENTS WITH THE CITIES OF MOUNTAIN VIEW AND LOS ALTOS AND THE TOWN OF LOS ALTOS HILLS FOR ANIMAL CONTROL AND SHELTERING SERVICES FROM JULY 1 TO DECEMBER 31, 2003 RECOMMENDATION Staff recommends that the City Council approve the attached amendments extending agreements with the cities of Mountain View and Los Altos and the town of Los Altos Hills for animal control and sheltering services from July I to December 31, 2003. DISCUSSION The City of Pato Alto has provided animal control and sheltering services to the cities of Mountain View, Los Altos, and Los Altos Hills since August 1993. The current a~eements expire on June 30, 2003. Staff has also initiated contract negotiations with the cities of Sunnyvale and Cupertino for animal sheltering services, which would require an expansion of the existing Palo Alto Animal Shelter (CMR:471:02). Because Palo Alto has reached its capacity for kenneling and housing for dogs and cats, in order to provide services to Sunnyvale and Cupertino, additional kennel space, cat rooms, and veterinary treatment rooms would be necessary. In addition, various physical improvements detailed in the Palo Alto’s Infrastructure Management Plan (IMP) for the Animal Shelter would be required. Each of the contract cities will share in the capital costs for facility improvements. Before detailed space needs can be determined, Palo Alto requires a commitment from the current client cities as to their intentions of continuing to contract on a long-term basis with Palo Alto for animal control and sheltering services. Staff has been in contact with representatives from each of the cities and they have expressed a strong desire to continue contracting for services with the City of Palo Alto. CMR:314:03 Page ! of 3 The additional animals that will be handled at the shelter will also affect the operational costs to the three current client cities. As a result, staff has initiated discussions with a!! five cities for long-term a~eements. Additional time is needed to finalize the long-term a~eements because of the complexity associated with allocation of capital improvement costs. By amending the current operational contracts, staff will have the additional time required. Staff anticipates bringing the long-term contracts to Council in early September. RESOURCE IMPACT Under the current a~eements with Mountain View, Los Altos and Los Altos Hills, costs for services are based upon the actual number of animals handled for each city. Fiscal year 2003-04, operational revenues are being increased by $21,138 to accommodate the increase in costs to provide services to the contract cities. POLICY IMPLICATION This plan is consistent with current City policies. ENVIRONMENTAL REVIEW This is not a project under CEQA. ATTACHMENTS Attachment A: Attachment B: Agreement Amendments CMR:471:02 CMR:314:03 Page 2 of 3 PREPARED BY: DEPARTMENT HEAD REVIEW: Sandra Stadler Superi,n~endent Agimal/8-’erv, q ces Lynne Jbhnson Police Chief CITY MANAGER APPROVAL: Emily Harrison Assistant City Manager CMR:314:03 Page 3 of 3 P, 06 ~ AMENDM~I~T TO AGREEM~T FOR EMY-!%GENCY CONTROL AND S~ELTER~NG SERVIC~.S RRTWREN THE C~TY OF PALO ALTO AND CITY OF MOUNTAL~ VIE~ This Amendment to the Agreement for ~nergency Animal Control and Sheltering Services is made this __ day of , 2003, by and between the City of Palo Alto ("Palo Alto~) and the City of Mountain View ("Agency-). RECITALS W~EREAS, the parties entered into an Agreement dated September 26, 2000, for Palo Alto to provide animal control and sheltering services, and particularly those associated with dogs running at large and with rabies prevention, to Agency commencing on October !, 2000, and terminating on June 30, 2003; and WHEKEAS, the parties now wish to extend ~he term of that Agreement for an additional six months in order to complete negot±ation for a new long term agreement; NOW, THEREFORE, in consideration of the following covenants, terms, and conditions, the parties agree: SECTION i.Term. The term of ~he Agreement is e~tended for an additional six (6) months commencing on July I, 2003, and terminating on December 31, 2003. .SECTIQN 2.Compens a t i on. Agency shall pay to Palo Alto for all services pxovided under this Amendment to the Agreement for the six months additional term in two equal payments due and payable on or before August I, 2003 and November i, 2003, an estimated amount for the six month period equivalent to Agency’s projected share computed on the basis of Palo Alto’s FY 03-04 budget for annual services. The first quarterly payment shall be due and payable on August I, 2003. The second quarterly payment shall be payable on November i, 2003. Palo Alto shall submit quarterly billing statements to Agency, as a courtesy reminder, but inadvertent failure or lateness of such billing shall not alter Agency’s obligation to make any payment in a timelymanner. 0044320 1 SECTION 3.Terms and Conditions Unaffected. Excep~ as expressly amended herein or as necessar~!y amended by implication, al! terms and conditions of the Agreement, including all r~ghts and obligations of the pa~ties, shall ~emain in £ull force a~d eff.ec~ under.this~Amendment to the ~g~eemento IN WITNESS WHEREOF, the parties have executed this Agreement ~n Palo Alto, County of Santa Clara, California, on the date .first above stated. ~PALO ALTO" CITY OF PALO ALTO "AGENCY" CITY OF EOLrNTAIN VIEW Mayor Mayor ATTEST:ATTEST: City Clerk APPROVED AS TO FORM: City Clerk APPROVED AS TO FORM: Senior Asst. City Attorney APPROVED: City Attorney Assistant City Manager Police Chief Director of Administrative Services ~~T TO AGREEME~ FOR A~IMAL CONTROL AND SHELTERING SERVICES BET~EN THE CITY OF 9ALO ALTO AND THE CITY OF LOS ALTOS This Amendment to the Agreement for Animal Control and Sheltering Services is made this __ day of _, 2003, by and between the City of Paio Alto ("Paio Alto") and the City of Los Altos ("Agency"). RECITALS WHEREAS, the parties entered into an Agreement dated September 27, 2000, for Palo Alto to provide animal control and sheltering services, and particularly those associated with dogs running at large and with rabies prevention, to Agency commencing on October i, 2000, and terminating on June 30, 2003; and WHEREAS, the parties now wish to extend the term of that Agreement for an additiona! six months in order to complete negotiation for a new agreement; NOW, THEREFORE, in consideration of the following covenants, terms, and conditions, the parties agree: SECTION I.Term. The term of the Agreement is extended for an additional six (6) months commencing on July i, 2003, and terminating on December 31, 2003. SECTION 2.Compensation. Agency shall pay to Paio Alto for all services provided under this Amendment to the Agreement for the six months additional term in two equal payments due and payable on or before August !, 2003 and November i, 2003, an estimate amount for the six month period equivalent to Agency’s projected share computed on the basis of Palo Alto’s FY 03-04 budget for animal services. The first quarterly payment shal! be due and payable on August !, 2003. The second quarterly payment shall be payable on November i, 2003. Pa!o Alto shall submit quarterly billing statements to Agency, as a courtesy reminder, but inadvertent failure or lateness of such billing shall not alter Agency’s obligation to make any payment in a timely manner. 030424 cl 004432 SECTION 3.Terms and Conditions Unaffected. Except as expressly amended herein or as necessarily amended by implication, all terms and conditions of the Agreement, including all rights and obligations of the parties, shall remain in full force and effect under this Amendment to the Agreement. IN WITNESS WHEREOF, the parties have executed this Agreement in Palo Alto, County of Santa Clara, California, on the date first above stated. "PALO ALTO" CITY OF PALO ALTO Mayor ATTEST: City Clerk APPROVED AS TO FORM: Senior Asst. City Attorney APPROVED: "AGENCY City Manager ATTEST : ~ttorney Assistant City Manager Police Chief Director of Administrative Services 03042,~ cl 0044321 2 APR-29-2003 TUE I0:51 AM NO,P, 04~ AME.~IDMENT TO AG~ FOR EMERGENCY ANIMAL CONTROL AND SHELTERING SERVICES BETWEEN THE CITY OF PALO ALTO AND THE TOWN OF LOS ALTOS HILLS This Amendment to the Agreement for Emergency Animal Contro! and Sheltering Services is made this __ day of , 2003, by and between the City of Palo Alto ("Palo Alto") and the Town of Lo~ Altos Hills (~Agency"). R~CITALS WHEREAS, the parties entered into an Agreement dated September 26, 2000, for Palo Alto to provide animal control and sheltering services, and particularly those associated with dogs running at large and with rabies prevention, to Agency commencing on October i, 2000, and terminating on June 30, 2003; and WHEREAS, the parties now wish to extend the term of that Agreement for an additiona! six months in order to complete negotiation for a new long term.agreement; NOW, THEREFORE, in consideration of the following covenants, terms, and conditions, the parties agree: SECTION i.Term. The term of the Agreement is extended for an additional six (6) months commencing on Ju!y i, 2003, and terminating on December 31, 2003. ,SECTION Compensation.. Agency shall pay to Palo Alto for all services provided under this Amendment to the Agreement for the six months additional term in two equal payments due and payable on or before August i, 2003 and November i, 2003, an estimated amount for the six month period equivalent to Agency’s project share computed on the basis of Palo Alto’s FY 03-04 budget for animal services. The first quarterly payment shall be due and payable on August i, 2003. The second quarterly payment shall be payable on November I, 2003. Palo Alto shall submit quarterly billing statements to Agency, as a courtesy reminder, but inadvertent failure or lateness of such billing shall not alter .Agency’s obligation Lo make any payment in a timely manner. flPR-29-2003 TUE 10~52 fin FAX NO,P, 05 SECTION Terms and Conditions Unaffected. Except as expressly amended herein or as necessarily amended by implication, all terms and conditions of the A~reement, including al! rights and obligations of the parties, shall remain in. f~!l force a.nd.-effect under-.this Amendmen~ ~o.the Agreement. IN WITNESS WHEREOF, the pamties have executed this Agreement in Palo Alto, County of Santa Clara, California, on the date first above stated. "PALOALTO" CITY OF PALO ALTO ~AGENCY~ TOWN OF LOS ALTOS HILLS Mayor Mayor ATTEST:’ATTEST: City Clerk APPROVED AS TO FOR~: City Clerk APPROVED AS TO FORM: Senior Asst. City Ahtorney APPROVED: City Attorney Assistant City Managex Police Chief Director of Administrative Services City City of Palo Alto Manager’s Report TO:HONOtLkBLE CITY COUNCIL FROM:CITY MANAGER DEPA_RTN~ENT: POLICE DATE: SUBJECT: DECE~BER 9, 2002 CM2R:471:02 7CONCEPTUA-L A_PPRO~, AL FOR C ONTtL4CT ~’~TH TI~ CITY OF SU~ZALE TO PRO~rIDE ;~N~xL SI-IELTER1-NG ASSOCL4TED SERVICES REC O.,L’~END A TI O N S Staffreconm~ends that Council conceptually approve a.contract with the CiV of Sum~)a~ale to C1 ~,dt~provide animal sheltering and associated sen;ices. Sta~ beheves that tiffs pam~ership will .....~ efficiencies and oppo~5ties for ~proved se~-ices at lower overa!l costs to all users of fl~e Palo Alto ~imal Shelter (P,~kS), as well as provide ongoing General Fund 5come. BACKGROU~ Since 1993, the Cit-y of Palo Alto has provided regional animal control services to the cities of Mountain View, Los Altos, and Los ,~dtos Hills. Under the a~eements with the tl~ee cities, Palo Alto Animal Control Officers (ACOs) respond to al! sick and injured, dead, agN’essive and dangerous animal cal!s-for-service and transpo~ the animals to the PA_AS where they are housed, and if necessary, receive medical attention. Recently, representatives from the City of Suma3~’ale approached Palo Alto staff regarding the possibilib’ of Palo Alto providing sheltering and associated services. Smm3,~’ale is currently a member of a Joint Powers Authority (JPA) with six other cities that was developed to fom~ the Silicon Valley AnimaI Control Authority’ (SVACA), with the goal of providing anima! control, shelter, and related services to the seven cities. Under the YPA, SVACA secured an a~eement with the Hmnane Socieb, for sheltering services until such time a new SVACA shelter can be built. Unlike the other cities, Sumq)wale elected to retain its existing animal control services that are administered by the Smm3wale Departmen~ of Public Safety..After receiving information about significantly increased operational costs, together with its very large share for the construction of a new shelter, Sunn?wale requested a proposal from Palo Alto as a potential alternative. This report provides haz%nnation related to a proposa! provided to Sunn?~ale, C5~R:471:02 Page i of 5 including costireYenue estimates and Capital Improvement Pro~am (CIP) cost pr0j ections. The Cib. of Sum~yvale has requested a similar proposal from SVACA. Sum~)~ale must detemin~ which proposal to accept prior to December 31, 2002, so that it can notifh, SVACA of its decision. DISCUSSION Discussions with the City of Surmyvale were initiated in Sepfember 2002. Staff from the Sunn)~;ale Ci~’ Manager and City Attorney’s Offices, and the Finance and Public Safeb, Departments met with representatis,es of the Palo Alto Police Depamnent. The purpose of these meetings was to obtain specific information about services required by Sm~ny~,ale and the potential of Palo Alto providing those services. Staff from Palo Alto’s Administrative Sera,ices. Public Works, Planning, and Police Departments developed a proposal that was submitted to Sunny~ale on November 19, outlining the sen, ices Palo Alto would be able to provide for a minimum of 20 years. The proposal (Attactmaent 1).details the spec.iilc sen~ices Palo Alto would provide, estimated ongoing operational costs, and projected capital costs that would be needed in order to house Sunn.~’ale’s anhnals, along with an estinaated thneline for implementation. This business plan has been reviewed by the City Auditor, and the Auditor’s memo is included in the Council packet. Cun’ently, under the a~eements with Los Altos, Los ,adtos Hills, and Mountain View, costs for sen~ices are based upon the actual number of animals handled for each cib~. A percentage is ¯ calculated by dividing the total number of animals handled by PAAS bythe number of animals that ori~nated from each cib’. Staff would use the same formula for charging Sum~)~,ale. However, because Sunnyvale would continue to provide its own animal control sen’ices and would only need sheltering and associated services, Sunn?a~ale would onlybe charged for those specific services. Staff has contacted the other partner cities and all are supportive of tNs proposal since all cities, including Palo Alto, would realize a reduction in ongoing operational costs. Because the three other cities’ contracts expire h~ July 2003, staff has already had preliminary, discussions with them regarding their ageements. While they are unable to make any conm~im~ents at this time, they have indicated that they would be amenable to discussing possible longer-term a~eements, especially with lower ongoing operational costs. Staff believes the residents of Palo Alto would benefit from tlzis a~angement bott’~ tMough operational efficiencies, an expanded P.’~_S, and additional income to the General Fund. StaI%in~ - The increase in the number of animals associated with Surm?,~,ale will require !.5 additional FTEs for the Police Department Specifically. a .5 Veterinary ~ ~ ~’¯I ec,ma~c~an,. 5 ~Q-imal Attendant, and a .5 Animal Services Specialist would be needed. Under the proposalpresented to Sunn?~ale, the first year salary and benefit costs for these staff would be the responsibility of Surmyvale. In subsequent years, because Palo Alto and the other contract cities would receiYe the benefit of the additional staff, the salary and benefit costs would be shared by the five ci~ies. Because of the addition of only 1.5 FTEs, staff believes that there will not be any impact to supervisory span of control. Capital Improvements - Because Palo Alto has reached its cap’acity for kenneling and housing for dogs and cats, in order to provide services to Sunn)~ale, additional kennel space, cat roonts, and veterinary treatment rooms would be required. Specifically, the cat rooms would have to be enlarged, eight new dog kennels with an adjoining storage area would have to be added, and additional space for a small animal room and veterinary receiving/treatment area would be required. The increased kennel space need is estimated to be about 2,448 square-feet and the additional shelter space is estimated to be about 2,023 square feet. Planning staff has reviewed the proposed addition to the current PAAS to determine whether it is consistent with the Palo Alto Munic.ipal Ser~;ices Center (MSC) Master Plan (A~achment 2). Three components to the PAAS complex were included in the plan that was adopted by the Cib~ Council in 1987:500 square feet of additional office space, 2,000 square feet of wildlife achatinistrative functions, and a wildlife rehabilitation area. ~[.’~le the wildlife rehabilitation area is not quantified in the nmTative poilion of the Master Plan, based upon the schematic portion of the plan, about 5,000 square feet was designated for that area. The orig-inal intent for the use of the rehabilitation area at the time the Plan was adopted was for the use by Wildlife Rescue, the organization that the Cib~ contracts with for handling live wildlife. In 1997, Wildlife Rescue initiated a capital campaig-n in efforts to raise money to help fund a wildlife facility adjacent to P,~L~S. However, it detemained that it was not feasible to direct its resources for a new facilib~. Planning staff has concluded that the additional kennels needed for expansion are comparable to the cages, shelters and aviaries that would have been built if the wildlife facilib~ had been located on the site. As a result, the 2,448 square z%et needed for the new kennels would be consistent with the MSC Master Plan and is considerably tess square footage than the 5,000 square feet planned for the wild life rehabilitation area. The 2,023 square feet needed for additional cat rooms, veterinary exan~_nation and small aninaat rooms results in a total expansion of P;Q~kS of 2,48~ square ~eo, which is less than the 5,000 square feet of additional office/administration space aIlowed by the MSC Master Plan. As a result, staffbelieves that the proposed expansion is consistent with the current MSC Master Plan. C3i~t,t:471:02 Page 3 of 5 Smmyvale has indicated it would not have a challenge in meeting its share of capital costs. In Palo Alto’s Infrastructure Management Plan (IMP), two major projects are scheduled to be completed at PAAS, one in 2004-05 and the other between 2008-2011. These projects would need to be completed regardless of providing services to Surmyvale. Palo .Alto and the three other contract cities would pay for the costs related to Americans with Disabilities Act (ADA) modifications, seismic up~ades, and other renovations. In order to expedite this project, SunnyYale would be willing to work with the other contract cities to potentially front their share of the capital costs. Staff believes that the services can be provided to the Cib. of Sunn)~ale without any adverse impact to the residents of Palo Alto or the three cmTent contract cities. Staff" would return to Council with the finalized a~eement for approval. RESOURCE IMPACT The proposed agreement with Smmyvale would be for a minimum of 20 years, with an option for an additional 10 ),ears. Included in the attached proposal are operational cost breakdowns based upon 2001-2002 actual costs. Using 2002 dollars; Palo Alto’s anticipated revenue with the addition of Sunnyvale would be approximately S80,000 for the first year of ser~4ce. As stated earlier, because Palo Alto and the three other contract cities would begin paying a share for the additional 1.5 FTEs in the second m~d subsequent years, Palo Alto’s net annual revenue would be approxhnately S40,000 in 2002 dollars from that point forward. Based upon the experience with fl~e other contract cities, additional revenue may be expected for PaIo Alto as Sunn?~,ale residents utilize the services of the Spay/Neuter, impound and vaccination fees, and retail sales. Staff anticipates that approximately $17,000 in additional annual revenue, all of which would belong to Palo Alto, would be expected. Staff has also had com’ersations with Surm)~’ale regarding a potential annua! surcharge or ~host fee’; in the amount Of $15,000 to $20,000 that Palo Alto would receive from Sunnb~,ale. The specific amount of" this surcharge would be determined at the time of actual contract negotiations. Palo Alto’s estimated share of e\nansion costs are about $480,000. As noted above, in the 10- year IMP approximately $526,000 had been identified for various physica! improvements to the P;%~_S. They inciude CIP 10500 for mechanical and electrical renovations in the amount of $193,000 that had been proposed for 2004-2005 and $163,000 for a new roo( flooring and painting that would have been proposed within the next five to seven years. Approxin~ately $10,000 is included in PuNic Works budget for ADA modifications for PA_4$. Included in the 2002-03 Capital Improvement Plan (CIP) is a $160,000 project (10306) for isolation kennels. This project was identified as a safety issue and because it has no relationship to the possible C5’fR:471:02 Page 4 of 5 provision of services for Sunn?~vale, Sunn?~ale would not be charged for this project. Attachir~ent 3 reflects Palo Alto’s estimated capita! costs. POLICY L~([PLICATIONS Approval of the a~eement is consistent with existing City policies. EN~’~RO NM~NT,~L ASSESSMENT An environmental review would be completed at the time of final design. The proposed P~%~S facility expansion is consistent with the Baylands Master Plan. ATTACHMENTS Attachment 1" Attactmaent~.’" Attachinent 3: PREPARED BY: Anima! Sheltering Services Proposal for the City of Smm?~’ale Municipal Services Center Master Plan po~ion related to Animal Sep¢ices Complex Matrix Reflecting Palo’Tklto’s CIP~.osts L~ ~’-N.~-Et JOHNS ON Assistant Police Chief DEPARTMENT HE,~d): PATRICK DX~J~R Chief of Police HARRISON Assistant CitV Manager CM_R:471:02 ~ ~~ a~,e 5 of 5 Proposal To Provide the CiUT of Sunn3~’ale Animal Sheltering and Associated. Services The City of Smmyvate has requested the City of Palo Alto to provide a proposal for sheltering and associated set,rices for domestic animals belon~g to Sunn)~’ale residents for a minimum of twenty (20) years. Tl~is document includes a detailed list of the services to be provided, estimated ongoing costs, estimated capital improvement estimated costs, and a tin~eline for implementation. The City., of Palo A_Ito believes that it can provide professional, cost-efficient, and effective sheltering and associated services to the Cib; of Smmyvale without any adverse impact to the level of service provided to the residents of PaIo ,adto and the other contract cities. Background From 1934 to 1972, the Palo Alto’s .Qfimal Control Progrmn consisted of Animal Control Of Scers who ei~orced the City’s Mmficipal Code sections regarding the care and keeping of animals. The City of Palo Alto opened the Animal Services and Placement Center on East Bayshore Road in 1972. The Low-Cost Spay and Neuter Clinic opened approximately one year later in August 1973. In mid-1993, the City of PaIo Alto entered into a~-eements with the cities of Mountain View, Los Altos and Los Altos Hills for regonal animal control services. The current contracts with these cities include emergency a~aI control services and sheltering and enforcement of State and local laws and dog licensing. Pato Alto Animal Control Officers (ACOs) respond to all sick and injured, dead, ag~essive and dangerous animals. Anhnals are transported to Pato Alto Anin:tal Se~ices (P,QkS), where they are housed, and if necessary, receive medical treatment. Palo Alto employs a full-time veterinarian who provides required medical care. After hours, Palo ,adto has a contract with South Peninsula Emergency Veterinary Clinic and several other locaI veterinarians to care for sheltered animals during times when the Cib’ veterinarian is not available. Attempts to rcmzite lost pets with their owners are a priority. Cu~entiy, PAAS return-to-owner rate for dogs is about 65 percent. Those aninaals tha are not redeemed are evaluated to determine their adoptability. Of those dogs and cats tha are put up for adoption, about 95 percent are successfuIIy placed in new homes. P~&kS staff members who are certified as euthanasia teclmicians hmnanely cuthanize animals that are deemed unadoptable due to their medical condition or behavioral 275 Forest Avenue Palo/-alto, CA 94301 650.329.2406 650.329.2565 fax 650.6t7.3120 Ad~rdms~a.Vion fax problems. Euthanasia is done by an injection of sodium pentobarbital. Animals that are approved for adoption are held for an indeterminate amount of time (average of ~vo to four weeks) with the hopes of fmding an appropriate new home. Pa]o Alto operates a Spay/Ncuter Clinic and provides vaccination and microchipping ser~,ices for animals. These services would be available to Smm)aTale residents. Because the costs to provide these services are not shared by contract cities, all revenue associated with them are retained by the City ofPalo A_lto. Disposal of dead animals is currently done by Koefran Industries. Koefran offers both communal and private cremation and the cost is charged to the anhnal owner. Proposed Sendces for the City of Sum~wale Based upon Su~my~.’ale’s 1,829 average tota! of dogs, cats and others, the Cib; of Palo ,~dto offers the following sen,ices that would be the responsibitib* of Palo Alto staff: 1)Genera! care of all anhnals arriving at P,~_~S including: daily feeding, sheltering, cleaning and requfred medical care. 2)Hotdh~g of all stray animaIs for seven days for owner redemption. 3)Attempts would be made to match lost m~imals with their owners. 4)Evaluation of al! animals for adoption. 5)Maintenance of records on each animal. 6)Perfoma spayineuter surgeries and microchip all adoptable animals. 7)Hmnanely euthanize anhnals maavailabte for adoption because of health or behavior. S) Disposal of all dead domestic and wiid animals (except adult deer). 9) Provide intake services for any surrendered animal from residents of Sm~y~ate. 10) Provide witness testimony as to the temperament of annuals being sheltered at 1!)Provide training to Surmyvale’s ACOs regarding P.~_&S policies and procedures. Sunnywale’s ACOs would be required to become State certified euthanasia tectmicians. 12) License all mtlicensed dogs. Smm?~ale ACOs would be responsible for the following tasks: 1) s) 4) Transportation and delivery of animals to P~S. At the time of arrival at P,Q&S, complete the intake process for each animal, dead or alive, via the Chameleon soft-ware pro~am. )fitial ke~zneling of each anhnat and provide the animal with food, water and bedding. Additional information on an_hnals being housed at P,%zkS must be provided innnediately upon discovery. Vaccinate incoming dogs for canine distemper "D~,~,PP) and cats for feline distemper (FVRCP). 6)If an animal requires medical evaluation or treatment upon arrival at P~QiS, veterinary staff must be notified. 7)Scan al! arriving domestic animals, including dead animals, for a microchip prior to placement. 8) Euthalffze unweaned animals, upon arrival to shelter; according to P,~4_S veterinarian" s criteria. 9) Monitor m~d release quarantined animals quaraa~tined at PA_AS Chameleon at the end of the quarantine period. 10)Decapitate and provide transportation to the Count), Health Department an), suspect rabid animal. The Sunnb~a!e Depm-tment of Public Safety would assume all responsibility for the investigation of animal cruelty in the City of Sunn?wale and for conducting all the dangerous/vicious animal hearings as required by law, unless other arrangements are made. The costs for long-term housing and/or medical tTeatment for animals in these categories will be accrued and in~,oiced based on actual costs and would be the responsibilib~ of Sum~b~’ale. Hours of Operation: The P,Q&S is open to the public fiom 11:00 a.m. to 5:30 p.m., Monday through Saturday and is closed Sundays, holidays and eyeD other Friday. Sum~)~.,ate ACOs would be provided access to P,Q&S during nighttime and other off- hours. Feral cats: P~,Q4_S currently rents humane traps to the residents of Palo Alto and the regional cities it services for the purpose of trapping feral cats. The City of Sum~yvale has humane box traps available to its residems at no charge. P_£~S will not duplicate tiffs service unless other arrangements are made. Feral cats wil! be accepted ixore Sm~nyvale residents either o~er the counter at PAAS or from Surm~-,,ale;s _field officers. Feral cats are held for a minh~:mm of 72 horns. It" P_~zkS s~aff ascertains a cat is truly feral, it will be euthanized. The Spa); and Neuter Clinic participates in a number of pro~ams desi~ed to control the number of feral cats through a trap and release policy. Stukn)~;ale residents would be encouraged to participate in these pro~ams. Wildlife: Live wildlife of any tdnd will not be sheltered at PAA_S. PaD Alto cunentty contracts with Wildlife Rescue for the handling of live wildlife. It is our understandin~ that Sunn)~ale contracts with Silicon VaLley Wildlife Rescue for these sen~ices. Palo .&lto wil! dispose of dead wildlife. Palo A_lto contracts with a disposal sen,ices vendor who picks up the dead animals once a week. The dead animals are rendered at the vendor"s site. ONGOING SERVICE COST ESTIf’L4TES Fomaula for .%maual Costs Palo ,~lto determh~es the costs for contract cities based upon the actua! number of mzimals handled for each cib~. As an exmnple, if !,000 ax*~imals are processed at 3 PA_&_S during a year, they are broken down by the cib, of origin. A percentage is calculated by dividing the total number of animals handled by the number that came in from the specific city (e.g., if500 of the 1,000 animals came from Palo Alto, then 50 percent of the total pro~am costs would be Palo Alto’s responsibility. If 250 of the 1,000 came from Surm)~vale, then Suun?~’ale would be responsible for 25 percent of the total prodam costs. Based on this calculation, costs may increase/decrease each year depending upon the actual nma~ber of animals handled and the associated percentages. The previous year’s actual cost detenines tt~e estimated cost for the subsequent year..At the end of each fiscal year, an accounting is done to determine the actual number of animals handled and the associated costs of the pro~am, At that time, the city is either billed or issued a refund depending upon its pa),~nents and the difference between the pa?~r~ents and actual cost. Re~onal contracts are billed on a quarterly basis. Surm)~’ale has requested only sheltering mad associated sera~ices, therefore costs specific to field service operations and/or animal control would not be charged to the City of Surm)~,ale and are not included ha the cost estimates. All fees collected for the inapounding and boarding of Sunn?,wale a~fin~als and licensing of Surmyvale dogs will be refunded to the Cib~ of Surm),-vale on a quarterly basis, separate from contract payments. Fees will be determined by the City of Palo Alto and will be included in the City of Palo Alto Municipal Fee Schedule. Staffin~ Reauirements PAAS would need to add !.5 staff to acconmaodate the additional animals flom Smm?~’ale. Specifically, a .5 ,~inal Attendant, .5 Anhr~al Services Specialist, and a .5 Veterinary Tectmician would be added. For the first year of the contract, Surm?,wale would be responsible for the total cost of salary and benefits for the additional 1.5 positions. The second year and each year thereafter, the costs associated with that 1.5 FTE would be spread anaongst the five cities. The staffing additions of 1.5 FTE are a direct result of the provision of services for Smm)a;ale and are calculated based upon Surm)a:ale’s ACOs perfomaing all of the requirements listed above. If the City of Surm)a~’ale does not choose to have its perso~mel perform these tasks, additional staff over and above the !.5 FTEs ~,’ould be required and charged to Surmyvale. Determination of specific staff additions would be calculated by the additional number of tasks P,Q&S would have to undertake according tO the a~eement with Smm?~ale. Associated cost increases would be calcutated during actual contract negotiations. SSould an actual a~eement be N~alized with Sum~),a, ale, Pa]o Alto would anticipate conve~ing the P_A_&S operation into an enterprise fund. Attactmaent 1 shows acmaI costs for Palo Alto and the if’see contract cities frona July I, 2001 tt~rough June 30, 2002. Attactvaaent 2 reflects the estimated costs for Palo Alto, the three contract cities and fine City of Surv~)~:ale for the san~e time period. In addition to the costs reflected in *i~ese aKacimaents, Palo Alto would want to rssen;e 4 the right to charge a reasonable and appropriate surcharge or ~host fee" that would be calculated during actual contract negotiatidns.. CAPITA_L LMPROVEMENTS The P,~.~_S stract~are was built in 197! and has a wood frame with stucco. The existing roof is tar and ~ave!. Radiant floor heaters heat the kennel house. The office, cat rooms mad S/N clinic ha-~,e two small t-aWAC units, as wet1 as radiant floor heating in the office area. There is a separate isolation building with an independent HVAC unit. In late 1996, an infrastructure management study was completed for the CiU’ of Pale Alto. Several items were noted for replacement at P.<&S in future years. P.<~.S is scheduled for tkree major capital improvements over the next two to ten years; including the up~ade of existing restrooms to ,zLDA specifications; the installation of new heating units for the kennels, office area, cat rooms and Spay,~euter Clinic; and the up~ade of the electrical service. Other areas that were identified include new floors, exterior work, a new roof, and interim interior work such as painting and floors. Because this work would need to be included at the time of expansion instead of two to ten years from now, SumD~;ale Would be required to share in these costs. Because Pale Alto is currently at capacib~ for ke~mels, cat cages, and -,~eterinary exanaination space, in order to accommodate Sunn2a’ale’s additional animals, some other capital improvements will be required at PA~,~S. The proposal for the capita! improvements is based upon Surmywale’s estinaated 1,600 lh, e anhr~als (out of the total !,829 total animals). This includes an increase of approxin~ately 96 percent cats, 30 percent dogs and 11. percent small/other animals. Additional ke~znels, cat rooms, lobby and administration areas, small animal room, and veterinary exan~nation room would be added. Specificaliy, the fol!owing additions/changes would be made to P,~AS: Cat Room _Area - Cats are currently housed in three areas: the stray cm room, the available for adoption cat room, and the isolation area. With the anticipated number of cats from Surm)~’ale, the cat rooms wilI need to be be enlarge, d in order to acconvaodate them. The available cat room and the stray cat room will each doubie in square footage to acconnaodate 25 extra stray cat and 24 more adoption cages. The addition to the stray cat room wi!l atso act as feral cat housing. ~ Dog KemaeIs - Eight new dog kennels will be required to house Surm)aaie dogs. The new stray kennels wili be separated from the protective custodyilong- tenm hold kem~els by a con~on kennel house. Veterinary Receiving/Treatment Room - Additional space wi!! be needed for veterinary receiving and treatment. The increase of live animais wilI require the creation of a small treatment room where the veterinary staff cm~ p~rfonn exanas and treat shelter animats as p~;esc~-ibed by State law. 5 Small ,Q~na! Room - SmM1 animals such as hamsters, parakeets, i~anas, etc. are appearing with regularity at PAAS. These animals have specific housing needs. Noise, activity and temperature must be controlled to ensure a safe and stress free envirortment. Sunnh~’ale’s smal! anima! numbers represent an increase of 11 percent (avg. 167) of these assorted small pets. A specific room to house these animals is required. Costs associated with this addition will be shared by all involved cities. These additions, together ~dth some limited remodeling would also require some ADA changes as required by law. The Cib~ of Palo Alto currently has a $!60,000 CIP budgeted for the new protective custody kennels. Surm)~;ale would not be expected to share these expenses. Additionally, portions of some of the remodeling costs wouid be shared by Palo ,Qto and the three other cities. However, that space that is being added as a direct result of the inclusion of Surm)~;ale:s animals would be the responsibilib’ of the Cib~ of Surmyvale. It should be noted that based upon PAAS experience with other contract cities, once the residents of Surm)a~ale become accustomed to the services provided by Palo . Alto, it is probable that they will utilize the seradces of PAAS to a ~eater de~ee and as a result, the number of incoming animals may increase. It is Palo Alto’s "understanding that Sunn?~aIe woutd be able to cover its share of capital costs. Additionally, in order to expedite the project, Surm?wale would be willing to assist the three other contract cities with theh share of capital inprovement fmanch~g. Attactmaent 3 reflects the esthnated CIP cost breakdowns for each city. Because of the relatively short time frame for the development of this proposal, the CIP costs are estimates only. The estimates are conservative and may be Iess after a more detailed desig-n is completed. The estimate in 2002 dollars for SumDwale:s portion is about $.t,093,500. Attachment 4 provides an estimate of potential CP costs that may be expected around 2015. These include exterior work such as painting and associated trim work as wel! as a new roof on the current -kitchergkemael building. Interior work such as floors, paint and ceiling work is also included in the plan. Using !996 dollars, the estimated total costs associated with these improvements are approximately S81,000. These costs would be shared by all contracts. T~mehn~ Pend~g approval by the Cib~ Councils of Palo Alto and Sunny~.’ale to proceed with actual contract negotiations, Palo ,Qto staff anticipates the foliowing time would ensue prior to actua! initiation of set,rices: February ~00~: February-October October-Decengoer 2003" Final a~eement presented to Cib’ Councils of Smmp,’ale and Palo Alto for ~proval Desig-n of facility, enviromaaental assessment P-~RB and Pluming Conmission Review 6 January-March 2004: April-November 2004: December 2004: Bid and contract award process Construction Initiation of Services Attachments Attachrnen~ 1: Attactnnent 2: Attachment 3: Attachment 4: 200!-2002 actual costs for Palo _Alto and tl~ree cm-rent contrac~ cities through June 30, 2002 and estimated costs for serYices by contract ci:y, including Smmy-,,ale, for FY 2001/2002 Estimated cost for serYices by contract city including Sunnyvale for subsequent services Capital Lrnprovement Cost Estimates Capital Improvement Cost Estimates past 2015 Animal Services Actual Costs - Report Date: 9/16!02 Cost Share Percentage Animal Admin Pet Recovery Animal Care Animal Health Regional Animal Volunteer Program Request for Service Cost Plan Spread Dept. Admin. TOTAL Fiscal Year 2001-02 Los Altos Palo Alto Mountain View Los Altos Hills 58.5%23.2%13.3%5.0% $I 14,104 $ .~5,252 $25,942 $9,753 $106,158 $42, t 00 $24,135 $9,073 $139,317 $55,250 $31,674 $11,907 $0 $0 $0 $0 $66,353 $26,314 $15,085 $5,671 $0 $0 $0 $0 $104,913 $41,607 $23,852 $&967 $111,626 $44,269 $25,378 $9,541 $60,711 $24,077 $13,803 $5,189 $703,182 $278,869 $159,869 $60,101 TOTAL ;~ 100% $181,467: ’ " $103;779 $1,202,020 ’YEAR 1: Estimate Of Costs with the Inclusion of Sunnyvale Additional non-salary costs spread across all contract cities TOTAL !Number of Animals Cost Share Percentage IAnima! Admin Pet Recovery Animal Care Animal Health Regional Animal Volunteer Program Request for Service Cost Plan Spread Dept. Admin. TOTAL Plus Salary Expense Total Sunnyvale Los Altos Palo Alto Mountain View Los Altos Hills 3,615 1,434 822 313 45.1%17.9%10.3%3.9% $95,223 $37,773 $21,652 $8,245 $87,056 $34,534 $19,795 $7,538 $121,771 $48,304 $27,689 $10,543 $0 $0 $0 $0 $55,353 $26,314 $15,085 $5,671 $0 $o $0 $0 $1 04,913 $41,607 $23,852 $8,967 $96,064 $38,107 $21,844 $8,318 $52,247 $20,725 $11,880 ,$4,524 Sunnyvale 1,829 22.8% $48,178 $ .~.,0~t6 $61,610 $0 $0 $0 $0 $48,603 $26,434 " ~ 8.013 $2tl.072 . $269,917 Not Included FTE Sal Ben 0.5 44,449 16,002 0.5 46,924 16,893 0.5 46,609 17,499 $179;339 $2i2,~35: 95,188 324,059 Additional Salary and Benefit Costs IAnimal Attendant " tAnlmai Services Spec 1IVe~ Tech ~Total Salary and Benefit Costs @ 1.SFTE Total Expens._.___e} 30,225 31,908 33,05495,1~ Sunnyvale Proposa! (final 11-19-02)1 t/19/2002, 1:14 PM 1 ATTACHMENT 2 YEARS 2+ : Estimate of Costs with the Inclusion of Sunnyvale Salary and non-salary costs spread across all contract cities Palo Alto Mountain View Number of Animals 3,615 1,434" Cost Share Percentage 45.1%17.9% Animal Admin $95,223 $37,773 Pet Recovery $87,056 $34,534 Animal Care $121,771 $48,304 Animal Health $0 $0 Regional Animal $66,353 $26,314 Volunteer Program $0 $0 Request for Service $104,913 $41,607 Cost Plan Spread $96,064 $38,107 Dept. Admin.$52,247 $20,725 SUBTOTAL $623,628 $247,364 Plus Salary Expense 42,943 17,035 ’TOTAL $666,571 $264,:399 Los Altos Los Altos Hills 10.3%3.9% $21,652 $8,245 $19,795 $7,536 $27,689 $10,543 $0 $0 $15;085 $5,671 $0 $0 $23,852 $8,967 $21,844 $6,318 $11,880 $4,5~4 $141,798 $53,805 9,765 3,718 $151,563 $57,523 Sunnyvale 1,829 22-8% $48,178 $61,61 0 $0 $0 $0 $48,6O3 $228,871 2i ,727 $250,598 TOTAL 013 Sunnwale Proposal (fina! 11 -I 9-02)11/! 9/2002, 1:14 PM 2 ATTACHMENT CITY OF PALO ALTO ANIMAL SHELTER EXPANSION PROJECTCOST ESTIMATE COSTS PER SQUARE FOOT CONSTRUCTION COSTS Cost per square foot (national aver#ge) Bay Area cost index SUBTOTAL Premium to keep existing facility open during construction Design!scope/sustainability contingency Construction contingency TOTAL PROJECT DEVELOPMENT COSTS UNIT COST ! 50/sf 1.2 15% 15% 10% 4O% 15% 1% 1% 2% 10% 29% Design Testing & inspection Environmental Permits and fees Project management! TOTAL j 150.00 30.00 $180.00 27.00 27.00 18.00 $252.00 37.80 2.52 2.52 5.04 25.20 $73.08 TOTAL COST PER SQUARE FOOT $325 COST PER SQUARE FOOT (Kennels)$I 60 SF ! COST/SFPROJECT COSTS Building Kennels Larqe Animal Housing Parking lot expansion Landscape Sitework (drainaae, paths, etc.) & utilities Renovations to existing buildinc Allowance for seismic upgrades Figures, furniture & equipment Subtotal Escalation TOTAL 2,023 2,448 256 1,800 2,000 $325 $!60 $30 $20 $t5 2,023 $30 5% TOTAL $657,475 $391,680 $7,680 .$36,000 $3O,OOO $100,000 $400,000 $50,000 $60,690 $! ,733,525 $86,67~ $!,820,20! S:Morris\~,nimat ~n~l~, \,.,o~: estimates; Last updated 11119/2002 ANIMAL SHELTER EXPANSION BREAKDOWN OF PROJECT COSTS BY CITY DESCRIPT!ON/SPACE New vet exam room New administration New lobby ..... New cat room #1 New cat room #2 New small animal room Subtotal !nterior spaces New dog kennels New large animal housing ,Shift parking lot ~New landscape New site work & utility service Renovations to existing bldgs .... Allowance for seismic upgrades Fixtures, furniture & equipment Escalation (5%) TOTAL ROUNDED OFF Note: %’s for shared improvements PALO ALTO!SUNNYVALEI MT. VIEW $19.006is17,68o, s19.3381 $16o,oooi $224.000 22.e42i $481,7831 $48o,oooi S177,125{ $78,2601 $72.800i $67,600. $83.200t $79.625! $231,680 ! $7,68oi $36,0001 s3o,ooo{ $100.000! S35,oool $42,483{ 0~’.073! $1,093,526I I LOS ALTos LOS AL~OSI ....,,H,!,,LL$ ............ $8,944 .......... $3~354i $2,236.’I .... $8,320.! $3 120{ $2,080 $9,100!$3,413I$26,364i $9,887! $1o8,oooi $4,000 is4,855! 7,161i $t5o,38o! $2,275 $6,591 S44,0001 $1,5ooi $! ,8211 2.86oi $so,o681 $24,000 $1,000~ Sl 1.640! $34,445! $1 ;100,000 .......St50,000{ $60,000 ~ $35,000, FOG 81 3!21 TOTAL $177,125 $111,800 $104,000 $67,600 $83,200 $113,750 $657,475 $391,680 $7,680 $36,000 $30,000’ s! oo,o0o $400,000 $50,000 $60,690 86.676 $1,820,201 s!,sz~,ooo 100 AI-I’ACHMENT 4 ATTACHMENT 2 2.MUNICIPAL SERVICES CENTER SITE AND BUILDING DESCRIPTION The 15.6 acre* City of Palo Alto Municipal Services Center i~ located on the east side of East Bayshore Road, approximately one m~le south of Embarcadero Road. The site lies within the Palo Alto Baylands, directly~ the south of the Matadero Creek, and is bounded to the east and south by preserved marsh land. Access into. the site.occurs along the East Bayshore Frontage Road. Due to the potential for periodic flooding within the Baylands, the Santa Clara Valley Water District has constructed a levee directly to the north, east, and soul;h of the site. This flood wall prevents flooding from the adjacent marsh and from Matadero Creek from entering the MSC s.iteo The Municipal services center functions primarily as an operational quarters for Public Works Department and utility operations in the City, Approximately thirteen percent of. the site is utilized for uncovered ~torage** and ten percent of th~ site is designated auto, truck, and equip- ment parking space, The Finance Department purchasing division provides warehousing for City operations, Police Department Communications repair ~ctivity also occurs ~t the site, but ha~ only minimal impact on the day to day MSC functioning. O~her facilities include interior hazardous waste storage, afuel station, and a proposed vehicle.wash facility. The existing MSC site has three main buildings: Building A, with !5,730 square feet; B, with ~23,935 square feet; and C, with 32,720 square feet. The bui.ldings are low, one and two story structures with preca~t concrete wall panels and some stucco. These bui]dinBs house the maintenance opera- tions for the City along with some support office space. There is also an A~ni_mal Shelter~complex on :he MSO s~te, consisting of fivesmall buildings wit~;-~--to-’t~-l’~o--~ 5,950_~i~eeto ~he bui.ldings are low, one .story s~ructures w.ith exte~fio~ood si~ing,"’~"~h~se buil~ings house the animal services and care operations for the City al6~g withkennels and some suDpor.t offic,e space. Finally, there is a new UtilityControl Center(S~ADA) with m,415 square feet, This bu!lding, is. a l~w,. single .story struc- ture witch a s.~ucco finish, and houses the monitors for the City’s computer systems along with so~ sqpport.office space. Refer to Existing Conditions plan. *IB.6 acres includes the area within the existing security fence and the are~. of landscapingan~ p:rking between the fence and East Bayshore Road, **Uncovered storage includes ~he fenced purchasing yard, materials storage areas, and material bins. Hazardous waste s~orage is not included in this total, DIVISION: Police DmparBraent, Animal Shelter Buildings This group is presently located at the Animal Shelter complex and ha’s 5~950 square feet, The group needs approximately 2,500 square f.ee~,in which to e×p~nd its The new of~ ce space s the new wildlife administrative building should b~ in close proximity to the Animal Shelter complex, Site Storage and Exterior Work Area !. Number of volunteers fluctuates, .No larme increaseanticipate~,.. 2: Access to MSC adequa~e~ 3,Facility staffed from 4:30 am to 9:00 pm, There is constant public access to the neuter clinic, 4o._~.A"wildli~e refuge" fac!].!ty for the wildlife rescue program is pro- 5.Security lighting is needed, 6o Location sign i~ inadequate, The f~cility c~nnot be seen by public due to ~ tmrge hedg6, 7. Outdoor lunch facility, Parking ? CURRENT ’- QUANT I TY A~D i T ~ O NAL TOTAL EMPLOYEE PARKING 13 .....0 ..!3 DEPARTMENT AUTO/VAN DEPARTMENT TRUCK VOLUNTEEK AUTO PARKING PUBLIC PARKING SHELTERAND /’ ...... BAYLANDS V~SITOR O ,7 !.A number of gaylands visitors presently park ~n an~ma~ shelter parkin~ lot. -14- ifiNNNNN ’NtJ In the Animal Shelter complex, the additional area requirements can met by adding a new 500 squ~re_Ee~o~.e.~rea tothe existing office building, A new, s~-a’Fat’e 2,000 squ~re foot build~~nt to th~ " ~::-"""~exi st~ ng bui ~~’~~~~~I ex to ~-~~d~’te .A new 4,900 square foot building is needed on the MSC site for Parks and Open Space to accommodate the 3~080 square feet moved from Building C along with !,800 square feet additional storage requested, A new 7,200 square f~ot canopy is needed to protect the various groups’, heavy equipment from the weather. ~:: .....ommodat. Light andA new 2~250 square foot canopyis ....dad ~ :-~~ Power’s relocated storage and work space, Any new construction at the MSC site should respond to the existingbuildings there, New building modules and fenestration patterns should .relate to the existing buildings with an i~creased use of glass to bene- fit the users. The build4ng entrances should be protected and well- defined. The buildings should have low profile roof structures with all roof equipment screened. The finish materials for new buildings at the main site should be concrete or stucco, The finish materials for new building~ of the Animal Shelter complex should be wood. The new roof canopies should be steel or concrete, With low profile roof structures. ~n overall color scheme should be developed, setting guidelines for .F~p~inting and new construction. BUILDING iMPROVEN£NT~ R .emodel ed Space New Space. Under Existing Roof 3,630 SF New 2rid Floor in. Existing Building 2,565 SF ADDITIONAL STRUCTURES New Addition to Existing Building New Buildings New Roof Canopies 550 SF 6,900 SE 9,450 SF parking for certain specialize~ equipment and vehicles. Personne~ parking needs %o be increased to accommodate both present employee bets and anticipated expansion, i~ is recommended that small vehicles: autos, vans, pickups, and sma-ller trucks continue to be loca%ed adjacent to. the division bu%Iding headquarters. Large trucks and specialized e~uipme~t should be IDcated at a central parking.area, The grouping of larger vehicles saves space and allows for the clustering of specialized trucks and equipment under ¯ the proposed canopy, Expanded employee parking can be accommodated by reorganizing the present northern parking area in order to gain space and by expansion of the parking lot located between the animal shelter and the SCADA building, The 11 car visi$orlemployee parking area located at the entrance should be abandoned to facilitate a safer bicycle trail, reOistribution of employee parking to its proper location within the two e×p~nded person- n~l parking lots, a large landscaped buff~Jr at %he entrance ~nd to simplffy vehicle circulation at the entry, Visitor and vendor parking spaces are proposed a~jacent to ~ach division building space, Visitors and vendors would be required to check in at the front gate where they would be directed to the ~ppropriate divi- sional, office parking area., The.entry to the animal shelter shouldbe moved to the south to allow/°" development of the southern employee, parking lot and also to create a more identifiable~and clearentry to the shelter, The animal shelter parking ~s expanded to accommodate public use and the occasional visi- tor to the baylands. .~ Twelve-covered bicycle parking spaces are’ proposed adjacent to each of the two employee parking areas, The combined t~tal of 24 covered bicycle spaces is considered a~equate, based on current use and anticipateO a~dit~on~l employees. (See Buil¢!ngs, Parking,.~nd..Storage Plan,) Parking Summary: PARK!NG EXISTING PROPOS~.D ~mployee (Separ~te lots)!94 224 + 6 insi~=. Fleet Parking Within MSC Security Fence ’Yi slier Parking 2Z Large Truck 33 50 Light Truck 39 55 Cars, Y~s, Pickups 69 84 Parking Summary, Continued PARKING EXISTING PROPOSED Construction Equipment ¯ and Small Trailer 97 " ""100 Permit Parking TOTAL Notes: .432 546 Proposed covered parking will accommodate twelve.., ,~t~) large trucks or combination of larger trucks and smaller equip- ment.// The above totals do not include the Animal Shel.ter. A~imal I// .Shelter parking spaces increased from 18 to 30. to accom- modate users, volunteers, and Bayl ands visitors. Proposed ~4 covered bicycle parking spa.ces located adjacent t~ employee parking lots. Site Expansion ExpansiOn is recommended in order to permit maximum use of the site. This ~xpansi~n would allow f~r a more organized a~d manageable placement of materials, parking, and.additional l.andscape ~uffering,Sufficient expansion can be achieved by accomplishing the #ollowing. Move theeastern fence approximateiy,L15 feet ~o ~he east, which loca~es it 30 feet from the ~oe of t~ adj~pent flood wall. This allows for eRpansion of the materi~l bins a~d ~mp~oved circulation around the propose~ large truck parking zone, 3 Approximately 30 feetshould be 1 :~.,e,~ between the perimeter security fence and the toe of the flood wall to develop a significant, landscaped buffer between the Bay~ands and the project si~e, Ci rcul ation The present one way circul ~;,a~on system, with minor modificatiDn ATTACH~IENT 3 Estimated Palo Mto Capital Improvement Costs $160,000 193;000 163,000 10.000 $526,000 -480.000 $ 46,000 02-03 CIP 10306 IMP Proposed 04-02 CIP LMP Proposed CLP ~ad)A Modifications (included in Public Works current budget) Palo Alto"s Estimated Share Cost savings to Palo Alto