Loading...
HomeMy WebLinkAbout2003-04-14 City Council (5)City of Palo Alto Manager’s Rep r TO: FROM: DATE: SUBJECT: HONORABLE CITY COUNCIL CITY MANAGER APRIL 14, 2003 REJECTION OF BIDS PAGE MILL, RECEIVED ON ARASTRADERO AND DEPARTMENT: UTILITIES CMR:211:03 MARCH 18, 2003 FOR LYTTON STATION PRESSURE REELIEF VALVES REPLACEMENTS PROJECT RECOMMENDATION Staff recommends that Council reject all bids received on March 18, Mill, Arastradero and Lytton Station PRV replacements. 2003 for the Page BACKGROUND Staff prepared a nd bid a contract for t he replacement of pressure relief v alves (PRV), flow meters and other piping equipment, all of which have exceeded their useful lives, at three of the pressure regulating stations serving the City’s water distribution system. Replacement of the equipment will save the City operation and maintenance costs, as well as increase system reliability and accuracy. A notice inviting formal bids for the project was sent to eight builders exchanges and 5 contractors. The bidding period was 21 calendar days. A mandatory pre-bid conference was held on March 4, 2003, with six prospective bidders attending. Two bids were received. One contractor, who was present at the pre-bid meeting, did not submit a bid because the project was outside their expertise. Attachment A shows the engineer’s estimate as well as the two bids received. The estimated ~’and total of bid items, including base bid and add additional bid items, was $135,000. CMR:211:03 Page 1 of 2 DISCUSSION Staff recommends that the Council reject the bids for the following reasons: The low bid significantly exceeded the $135,000 engineer’s estimate. Award of the project was to be based on the wand total of bid items (base bid plus all alternates). The high bid was $270,200 and the low bid was $208,475. The low bid significantly exceeded the engineer’s estinaate of $135,000, by over 50% The bid response of two bidders is too small to assure that the bids represent current market prices. It is staff’s opinion that the bid prices are very high for the project work. Staff will revise the project specifications and rebid the project. NATTACHME~ TS A:Bid Summary B:Project Location Map PREPARED BY: DEPARTMENT HEAD: CITY MANAGER APPROVAL: Jim Flanigan, Roger Cwiak Romel Antonio, Scott Bradshaw --- EMILY HARRISON Assistant City Manager CMR:211:03 Page 2 of 2 ATTACHMENT A BII) SUMMARY Item 1.Page Mill 2.Arastradero 3.L3~on BASE BtI) TOTAL Add Alternates: A1 Paint Page Mill piping A2 30" line stop A3 24" line stop A4 16" line stop ADD ALTERNATE TOTAL GRAND TOTAL Engineers Estimate of Cons~uction Cost 37,000 35,000 18,000 90,000 T~net(low bidder)63,75ol 63,750I 40,0001 167,500I 2,000 2,000 20.000I 18,450 151000 13,650 8,OO0 6,875 45,0001 135,000t 208,475 DWNicholson 60,000 53,900 14,800 129,300 18,700 45,700 41,400 35,100 270,200 ATTACHMENT "B" PROJECT LOCATION MAP FOOTHILL