Loading...
HomeMy WebLinkAboutStaff Report 8519City of Palo Alto (ID # 8519) City Council Staff Report Report Type: Consent Calendar Meeting Date: 10/16/2017 City of Palo Alto Page 1 Summary Title: Approval of Blanket PO for Asphalt Concrete Products Title: Approval of a Blanket Purchase Order With Granite Rock Company for $380,760 Each Year and Granite Construction Company for $90,000 Each Year, both for a Three-Year Term, From October 17, 2017 Through June 30, 2020 for Asphalt Concrete Products From: City Manager Lead Department: Public Works Recommendation Staff recommends that Council: 1)Approve and authorize the City Manager or his designee to execute a blanket purchase order with Granite Rock Company as a primary supplier of asphalt concrete products in an amount not to exceed $380,760 each year for a period of three years;and 2)Approve and authorize the City Manager or his designee to execute a blanket purchase order with Granite Construction as a secondary supplier of asphalt concrete products in an amount not to exceed $90,000 each year for a period of three years. Background Between Public Works and Utilities Departments, three work groups use asphalt concrete. Public Works uses asphalt concrete to repair damaged sections of roadway, sidewalk, and bicycle paths, while Utilities uses asphalt concrete to repair streets following underground services work. The projects related to roadway repair contribute significantly to the City’s Pavement Condition Index (PCI) score. Suppliers chiefly utilize batch plant or drum plant equipment to produce asphalt City of Palo Alto Page 2 concrete. A batch plant has the ability to mix asphalt on demand, as specified, and in small quantities. A drum plant does not have the same flexibility; consequently whatever mix is being produced that day is all that is available. The City requires primary suppliers of asphalt concrete to produce their product in a batch plant, as this allows staff to order on short notice, control quality and manage schedule modifications to efficiently complete jobs. In addition, suppliers must be located within 10 miles of the Municipal Services Center (MSC) as staff utilize City vehicles to pick up and deliver asphalt concrete to job sites and have to consider known traffic patterns and unexpected events that may impact the quality of asphalt being delivered if waylaid. Discussion Staff recommends approval of purchase orders for a primary supplier as well as a secondary supplier of asphalt concrete to ensure a job is not jeopardized in the unlikely event the primary supplier is down for scheduled maintenance or unforeseen equipment failure. Bid Process On August 30, 2017, a notice inviting formal quotations (RFQ)for Asphalt Concrete Materials was posted at City Hall and sent to 10 builder’s exchanges through the City’s eProcurement system.The bidding period was 14 calendar days.Bids were received from two qualified contractors on September 13,2017 as listed on the attached Bid Summary (Attachment A). Summary of Bid Process Bid Name/Number Asphalt Concrete Materials RFQ #169813 Proposed Length of Project Three years Total Days to Respond to Bid 14 Pre-Bid Meeting No Number of Bids Received:2 Base Bid Price Range $770,000.00 to $1,142,280.00 The criteria used to determine the primary supplier were the distance from the MSC, the supplier’s ability to produce asphalt concrete in a batch plant, and their ability to supply all necessary asphalt concrete products. City of Palo Alto Page 3 Since Granite Rock is the only supplier able to meet all of the requirements to be the primary supplier of asphalt, staff is recommending that Council approve and authorize a blanket purchase order for asphalt concrete with Granite Rock as a primary supplier. The City has previously had a blanket purchase order with Granite Rock, and staff has consistently received product that met both state and the City’s standards for consistent temperature and aggregate size. Staff is recommending that Council approve and authorize a blanket purchase order for asphalt concrete with Granite Construction as a secondary supplier. Resource Impact Funding for the purchase of material under this purchase order is available in the Fiscal Year 2018 operating budgets of Public Works and Utility Departments. Funding for contract years two and three are contingent upon Council approval of subsequent year’s operating budgets for each department. Policy Implications Authorization of the blanket order does not represent any change to the existing policy. Environmental Review The blanket order being supplied is in conformance with all applicable emissions laws and regulations. This purchase is exempt from the California Environmental Quality Act under the CEQA guidelines (Sections 15061 and 15301(c)). Attachments: ·Attachment A -RFQ #169813 Bid Tables RFQ #169813 Results Company Bidding Meets Criteria to be Primary Supplier of Asphalt Meets Criteria to be Secondary Supplier of Asphalt Cost – Year 1 Year 2 Year 3 Granite Rock Yes Yes $380,760.00 $380,760.00 $380,760.00 Granite Construction No Yes $253,000.00 $259,000.00 $265,000.00 A detailed bid breakdown is available here: Bid Results by Line Item - Graniterock Bid Item QTY Description Item Price Year 1 Total Year 1 Total Year 2 Total Year 2 01 1,000 Tons Asphalt Concrete, 3/4” medium $93.40 $93,400.00 $93,400.00 $93,400.00 02 2,000 Tons Asphalt Concrete, 1/2” fine $95.90 $191,800.00 $191,800.00 $191,800.00 03 100 Tons Asphalt Concrete 3/8” fine $96.90 $9,690.00 $9,690.00 $9,690.00 04 700 Tons Asphalt Concrete 1/4” fine $97.90 $68,530.00 $68,530.00 $68,530.00 05 100 Tons Asphalt Concrete, Sheet Asphalt $98.90 $9,890.00 $9,890.00 $9,890.00 06 1,000 Tack Coat $7.45 $7,450.00 $7,450.00 $7,450.00 Gallo ns SS-1H Yearly Total $380,760.00 $380,760.00 $380,760.00 Three-Year Total $1,142,280 Bid Results by Line Item – Granite Construction Bid Item Quantity Description Item Price Year 1 Total Year 1 Total Year 2 Total Year 2 01 1,000 Tons Asphalt Concrete, 3/4” medium $83.00 $83,000.00 $85,000.00 $87,000.00 02 2,000 Tons Asphalt Concrete, 1/2” fine $85.00 $170,000.00 $174,000.00 $178,000.00 03 100 Tons Asphalt Concrete 3/8” fine No Bid $0 $0 $0 04 700 Tons Asphalt Concrete 1/4” fine No Bid $0 $0 $0 05 100 Tons Asphalt Concrete, Sheet Asphalt No Bid $0 $0 $0 06 1,000 Gallons Tack Coat SS-1H No Bid $0 $0 $0 Yearly Total $253,000.00 $259,000.00 $265,000.00 Three-Year Total $770,000.00