HomeMy WebLinkAbout2003-03-04 City Council (2)of PaRo Alto
C ty Manager’s Report
TO:HONORABLE CITY COUNCIL
ATTN:
FROM:
FINANCE COMMITTEE
CITY MANAGER DEPARTMENT: ADMINISTRATIVE
SERVICES
DATE:
SUBJECT:
MARCH 4, 2003 CMR:160:03
2002-03 ADJUSTED BUDGET - MIDYEAR AMENDMENTS AND
CAPITAL IMPROVEMENT PROGRAM STATUS
RECOMMENDATION
Staff recommends that the City Council adopt the attached Budget Amendment Ordinance
(BAO) (Attachment 1), which includes:
a. Proposed midyear adjustments to the 2002-03 Budget for the General Fund,
Enterprise Funds, Special Revenue Funds, Internal Service Funds, Debt
Service Fund, and Capital Improvement Fund (Exhibit A).
b. New or amended 2002-03 CIP Project Descriptions (Exhibit B).
c. Amendments to the 2002-03 Adopted Municipal Fee Schedule (Exhibit C).
d. Amendments to the 2002-03 Table of Organization (Exhibit D).
The 2002-03 midyear Capital Improvement Program Projects Status Report is attached as an
informational item (Attachment 2). A list of continuous projects follows this summary
(Attachment3). No action is required on these two items.
BACKGROUND
This report summarizes the changes to the 2002-03 Adopted Budget as part of the normal
course of business from July 2002 through January 2003. Where possible, adjustments are
held until this mid-year report is brought to Council in an effort to streamline the BAO
process year-round. This discussion is categorized by fund with a primary focus on major
changes in the General Fund. Details of these changes, as well as all fund summaries, are
included in Exhibit A. The midyear CIP project status report (Attachment 2) provides the
Finance Committee with information on the status of the City’s CIP projects as of November
30,2002.
CMR:160:03 Page 1 of 9
DISCUSSION
General Fund
The following is a summary of major revenue and expenditure adjustments as detailed in
Exhibit A. All comparisons are made from the 2002-03 Adopted Budget.
Revenues: (reduced $1.1 million)
City revenues continue to show significant weakness. Sales taxes in the second and third
calendar quarters (receipts fall into current fiscal year) compared to prior year quarters, show
declines of 12.0 and 6.2 percent, respectively. Preliminary information from the Stanford
Shopping Center and Downtown merchants indicates a particularly soft fourth quarter with
sales either fiat or down compared to last year. Transient occupancy taxes (TOT) also
continue to be very soft. Negative revenue adjustments in this report are higher than those
initially anticipated. This results from having actual fiscal year data that shows no
improvement and an economy that has not reached bottom. While many economists and
business leaders believe the economy is near bottom and expect conditions to improve, there
is no evidence in the economically-sensitive revenue generators of such a turnaround. Based
on this information, staff believes that the City’ s revenue picture will not improve until fiscal
2004-05.
Sales and Use Tax (reduced $1.5 million, 7%) The projected shortfall in sales tax
revenues results from the continued softening of the Silicon Valley economy. Layoffs in
high technology, the dramatic decline in consumer confidence, and the elimination of dot-
com firms have led to a cutback in new automobile, electronic equipment, computer, and
other retail purchases. Consumers appear reluctant to spend in light ot~ layoffs, declining
equity values, and the uncertain international environment. In addition, staff believes
competition from "big-box" stores on the City’s boundaries, "high-end" malls in San
Jose, and Internet purchases may be eroding the City’s sales tax base.
Property Tax (increased $0.1 million, 1%) Property taxes are expected to exceed budget
based on the continued marginal appreciation of appraised property values. These
receipts are negatively affected only when residential and commercial property owners
successfully appeal the assessed value of the property upon which they are taxed. The
County has reassessed higher-valued properties in Palo Alto downward, but this has been
more than offset by increases in other residential properties. At this time, staff is not
aware of rising commercial property tax appeals, but is aware o.f a high vacancy rate that
could affect values and next fiscal year revenues.
Transient Occupancy Tax (TOT)(reduced $0.4 million, 5.7%) The local business and
tourist downturn has led to low occupancy and reduced average-room-rates. This trend
has seriously eroded hotel tax receipts. Occupancy and room rates this year have fa!len
below the already low averages of 58 percent and $135 seen during the first half of 2001-
02. Adjustments to the current budget are necessary in light of the weak local economy
CMR: 160:03 Page 2 of 9
and poor performance from the TOT. Annual TOT revenues for 2002-03 are expected to
be near previous year levels of $6.6 million.
Other Taxes and Fines (increased $0.5 million, 7%) This increase primarily results from
two main sources: $405,000 in Documentary Transfer Tax revenue and $132,000 in
Motor Vehicle in-lieu Tax revenue. Transfer tax revenues are related to continued high
levels of local property sales activities. While threatened by the State budget crisis, staff
anticipates the State to continue full funding for the Motor Vehicle In-Lieu Tax in the
current year ($3.4 million). This revenue will be adjusted during the 2003-05 budget cycle
if action by the State Legislature warrants it.
Other Revenue (increased $0.2 million, 2%) This increase is made of various one-time
grants and small increases in ongoing revenues as detailed in Exhibit A.
Expenditures: (reduced $1.0 million)
Salaries & Benefits (net reduction $45,522) Savings in the Administrative Services
Department overtime and temporary salary costs ($67,630) is partially offset by gant-
funded temporary salary expense in the Community Services Department (CSD). The
General Fund currently has 38 frozen positions with approximately $0.7 million in
funding already removed from the budget related to 12 of these. This report does not
further adjust this budget category for the additional 26 frozen positions, however this
cost savings should approximate $1.4 million by year-end.
Contract Sen, ices (increased $265,218) Approximately half of this increase is related to
one-time gant revenues; $80,718 is related to start-up costs for the funding the Friends of
the Palo Alto Library modular facility at Cubberley Community Center (CMR:406:02,
10/21/02); $42,500 is a one-time expense related to enacting the new golf-pro ageement.
General Expense (increased $67, 600) Funding for the City’s assessment related to the
new parking structures was inadvertently omitted from the 2002-03 Adopted Budget and
is now added as an ongoing General Fund expense.
Operating Transfers-Out (reduced $1.2 million, 5%) This net savings is comprised of
two main elements: (See the CIP section for more information on these transactions.)
1. $0.9 million net reduction in Capital Fund transfer: This reduction is the result of an
approximate $1.2 million reduction in project spending in two projects: Civic Center
Infrastructure Improvements--CIP 10102, and Roofing Replacement--CIP 10006.
New funding of $0.3 million is also being proposed in four projects.
2. $0.1 million reduction in Debt Service Fund transfers: A one-time reduction in
General Fund transfers to debt service results from closing CIP 19624 Golf Course
Improvements, using proceeds to pay debt service as well as reimburse reserves for
the 2001-02 golf operating shortfall of $0.1 million.
CMR:160:03 Page 3 of 9
Enterprise Funds
Major operating fund issues are discussed below. Please refer to the detail fund summaries
in Exhibit A for more information on these midyear changes and to the CIP section for a
discussion of the changes in Enterprise CIP project funding.
Electric Fund (Net reserve increase of $7.5 million)
Revenues (reduced $0.5 million) The fund experienced a drop in projected wholesale
revenue ($480,000) primarily due to Dynergy and Enron no longer participating in shared
transmission services. A $41,000 decrease in revenue indicates a geater participation in
the Utilities Residential Rate Assistance Progam (RAP) servicing low-income residents.
Expenditures (reduced $7. 9 million) The fund has reductions ($8.2 million) in commodity
purchase expense due to budgeted contract settlement obligations with NCPA being
settled in fiscal 2001-02. This reduction is partially offset by additional expense in capital
projects ($225,000).
Gas Fund (Net reserve reduction of $0.6 million)
Revenues (reduced $0.6 million) The fund experienced a drop in projected net sales
revenues due to a reduction in estimated gas sales to the electric backup generator
(COBUG). An additional $32,000 revenue decrease is due to increased participation in
the RAP for low-income residents.
Water Fund (Net reserve reduction of $28,000)
Revenues (reduced $28,000) Additional revenue reduction of $28,000 indicates increased
participation in the City’s RAP, lowering utility costs for low-income residents.
Wastewater Collection Fund (Net reserve reduction of $70,000)
Expenditures (increased $70,000) Additional equipment funding for necessary sewer
pumps.
Wastewater Treatment Fund (Net reserve reduction of $141,706)
Expenses (increased $I41,706) Increased CIP 9707 Wastewater Solids Disposal Project
funding from restricted bond proceeds to be used in rehabilitation project.
Capital Improvement Program
Adjustments to the City’s-2002-03 Capital Plan are noted in Exhibit A, with two specific
project adjustments described in Exhibit B. All of the CIP changes fall into two basic
categories: projects requiring additional appropriations (including new projects), and other
miscellaneous adjustments such as reducing or transferring project appropriations.
CMR: 160:03 Page 4 of 9
New Projects or Increased Appropriations
MSC Feasibility Study--CIP 19906: Project title change from MSC Permanent Seismic
Retrofit Study along with a change of project scope.
Community Theatre RenovationsJCIP 19910: Change in project scope. Light board
being purchased for the Community Theatre. ($45,708 CIP 19910 and $21,292
transferred from Arts and Culture Functional Area budget.)
Traffic Signal at San Antonio--CIP 10206: Additional appropriation to fund this
Caltrans project. ($46,800 IR funding)
~ Roth Building Wings Demolition--CIP 10304: Additional revenue and appropriation of
that revenue. ($30,350 Summerhill Homes Revenue)
~ Enterprise Resource Planning--CIP 10216: While this multi-year project size and
scope remain unchanged, additional appropriation is necessary for 2002-03 to
accommodate current-year expense for hardware and other associated implementation
costs. This amount will be reduced from future-year expense projections. ($500,000
Technology Fund Reserve transfer)
Projects with Transfers or Budget Reductions
Civic Center Infrastructure Improve~nents--CIP 10102: Project is still in the design
phase and construction funding is being returned to the Infrastructure Reserve (IR) to be
re-funded in 2003-04. ($940,000 returned to IR)
Roofing Replacement--CIP 10006: There is accumulated savings from various roofing
projects and this amount is not being anticipated for spending this year. ($212,500
returned to IR)
~Street Maintenance--CIP 18670: Transfer of budget from CIP 10208 - Miranda
Avenue Street Improvement to CIP 18670 where the Miranda Avenue constructions costs
were encumbered. The Miranda Avenue improvements were completed in December
2001. ($100,000 inter-project transfer)
Golf Course Improvements--CIP 19624: This project is complete and slated for
closure in 2002-03. Of the $336,000 in project financed bond proceeds remaining,
$144,508 is applied to the next debt service payment for 2002-03. As the 2001-02
Golf Course pro-forma indicated a $102,000 General Fund subsidy at year-end, this
transaction reimburses the General Fund by reducing debt service expense as reflected
in Exhibit A. The remaining savings of $42,500 will be appropriated to the
Community Services Department, Golf Services Functional Area to offset additional
expenses associated with the new Golf Professional Management agreement.
CMR: 160:03 Page 5 of 9
Enterprise Resource PlanningJCIP 10216: Consolidation ofvarious technology
project funds is being centralized as part of the RAF-FS implementation plan. These
transactions do not increase the total appropriation approved by Council on July 22,
2002. This amount will be reduced from future-year expense projections. Transfer of
$459,250 in ERP-related budget from the following technology CIP projects to CIP
10216:
1.Financial Applications Development--CIP 19808 ($64,850)
2.Citywide Network Improvements--CIP 19711 ($26,900)
3.Citywide Network Hardware Redundancy--CIP 10107 ($57,500)
4.IT Systems Management--CIP 10108 ($110,000)
5.Permit Tracking--CIP 19516 ($200,000)
Enterprise Fund Capital Projects
Increased Appropriatiom
o Traffic Signal Upgrade - Homer/Alma--CIP 8930: Additional appropriation by the
Electric Fund to this project ($225,000 Electric Fund Rate Stabilization Reserve).
Wastewater Disposal Solids--CIP 9707: Bond funds transferred in to appropriate part of
the Incinerator Rehabilitation project ($141,706 Agency Funds).
Other Funds
~ Special Revenue Fund: Attachment A indicates increased spending ($250,000) for
predevelopment, relocation and acquisition costs of a new Opportunity Center providing
social service and affordable housing as presented to Council on May 13, 2002.
(CMR:253:02). $50,000 additional funding is also proposed to fund professional services
expense related to the City’s Below-Market Rate Ownership Program.
o Internal Service Fund (ISF): The Technology Fund is transferring $500,000 from its
reserve balance to fund CIP 10216 Enterprise Resource Planning. As part of the RAFTS
implementation plan approved by Council on July 22, 2002, staff is drawing down
funding to cover additional implementation, hardware and other associated costs needed
in 2002-03. The reserve was created to fund legacy system and other technology needs
and has an approximate balance of $6.3 million after this transaction.
Amendments to the 2002-03 Adopted Municipal Fee Schedule
Staff is proposing to amend the 2002-03 Municipal Fee Schedule (Exhibit C) to include one
new fee and two existing fee adjustments. These changes have little revenue impact on the
General Fund in 2002-03, due mainly to the 60-day delay in implementing development-
related fee changes. The new fee is a Temporary Discharge Fee in the Storm Drainage
Fund. The fee adjustments affect the tiers for Building Inspection fees and the cost-recovery
abilities of Major Project Architectural Review.
Table of Organization Changes
The three proposed adjustments to the Table of Organization (Exhibit D) inctude: a
reallocation of 0.25 Full Time Equivalent (FTE) Office Specialist within the Community
CMR: 160:03 Page 6 of 9
Services Department to fix an error in the original distribution; an add/drop within Planning
and Community Environment of 1.0 FTE Planner to an Engineering Tech II,.with annual
savings of $27,108, to fill a vacancy for an employee charged with the Zoning Ordinance and
Single-Family Review activities; the removal of 3.0 F-rE within the Public Works
Department due to the November 2002 rejection of Measure D by the voters. These last three
positions were not included in the 2002-03 Adopted Budget, therefore no budget adjustment
is required.
2002-03 Midyear Capital Improvement Program Projects Status Report
This report provides the Finance Committee with information on the status of the City’s
Capital Improvement Progam (CIP) projects as of November 30, 2002. In the attached
matrix (Attachment 2), all City departments have submitted information on their projects and
commented on any issues that might cause a change in the scope or timing of the projects.
Information in this report is intended to keep Council abreast of progress on all CIP projects
that were open at the beginning of the 2002-03 fiscal year and on those projects, which were
added or completed during the current year.
The attached matrix categorizes CIP projects into minor projects (projects which can be
completed within a one-year period) and multi-year projects (projects which have multi-
year budgets and/or complex implementation schedules with identifiable phases). The
projects status portion of the matrix identifies the phase the project was in as of
November 30, 2002. Information on phases is intended to give Council a perspective on
how much progress was made on a project. Three distinct phases are utilized, as follows:
Phase:
Pre-Design
Design
Construction
Activities:
Preparation of a feasibility study
Development of a master plan
Definition of a project scope
Preparation of an Environmental Impact Report
Hiring a design consultant
Completion of project design
Soliciting bids or proposals
Acquisition of major equipment
Installation
Implementation of a project
The comment section of the matrix provides Council with information clarifying the status of
certain projects.
In the attached matrix, projects are listed by department for the General Fund and by fund
for the Enterprise and Internal Service Funds. Within each department or fund, the
projects are ordered by project number, which includes the year of Council approval (year
CMR: 160:03 Page 7 of 9
of approval is shown by the second two digits of the 5-digit project number or the first
two digits of a 4-digit project number). The matrix also includes information on the total
or accumulated budget for projects, the remaining budget as of the beginning of the fiscal
year, the fiscal year expenditures through November 30, 2002, including commitments
(encumbrances), and the remaining balance in the project budget as of midyear.
The matrix does not include "continuous" projects. These projects, such as water meter
replacement, have no definitive beginning or end dates and receive ongoing funding to reflect
the continuing replacement cycles or commitments. During the first half of 2002-03,
progress was made on all of the "continuous" projects (Attachment 3).
RESOURCE IMPACT
Adoption of the attached ordinance will allow for adjustments to the fiscal year 2002-03
budget, along with the establishment of one new and two amended General Fund CIP project
descriptions. With the approval of this ordinance, the projected ending balance of the
General Fund BSR is $21.3 million, a reduction of $1.2 million. The General Fund
Infrastructure Reserve is projected to end with a balance of $28.3 million, an increase of $1.1
million. The projected ending Rate Stabilization Reserve total for all Enterprise funds
combined, increases by $6.7 million mainly due to reduced commodity expense in the
Electric Fund.
POLICY IMPLICATIONS
These recommendations are consistent with existing City policies.
ENVIRONMENTAL ASSESSMENT
This is not a project for purposes of the California Environmental Quality Act (CEQA).
ATTACHMENTS
Attachment 1:
Exhibit A
Exhibit B
Exhibit C
Exhibit D
Attachment 2:
Attachment 3:
Budget Amendment Ordinance with the following exhibits:
Fund Summaries and detail changes to the General Fund, Enterprise
Funds, Special Revenue Funds, Interna! Service Funds, Debt Service
Fund and Capital Improvement Funds
2002-03 CIP Project Descriptions
Amendments to the 2002-03 Adopted Municipal Fee Schedule
Amendments to the 2002-03 Table of Organization
2002-03 Midyear Capital Improvement Projects Status
List of Continuous Capital Projects
CMR: 160:03 Page 8 of 9
PREPARED BY:
CHARLES PERL
Budget Manager
DEPARTMENT HEAD APPROVAL:
Director, ~/dministrative Services
CITY MANAGER APPROVAL:
EMILY HARRISON
Assistant City Manager
CMR: 160:03 Page 9 of 9
Attachment 1
ORDINANCE NO.
ORDINANCE OF THE COUNCIL OF THE CITY OF PAL0 ALTO
AKENDING THE BUDGET FOR THE FISCAL YEAR 2002-03 TO ADJUST
BUDGETED REVENUES AND EXPENDITURES IN ACCORDANCE WITH THE
RECOMMENDATIONS IN THE MIDYEAR REPORT
WHEREAS, pursuant to the provisions of Section 12 of Article
III of the Charter of the City of Palo Alto, the Counci! on June 17,
2002 did adopt a budget for fiscal year 2002-03; and
WHEREAS, after reviewing the current budgeted revenues and
expenditures for fiscal year 2002-03, adjustments to the budget are
recommended to more accurately reflect year-end projections; and
WHEREAS, the 2002-03 Adopted Municipal Fee Schedule needs to be
amended to increase certain fees and to implement other
miscellaneous changes; and
WHEREAS, the 2002-03 Table of Organization needs to be amended
to remove staffing that was contingent upon the passage of the
library bond measure; to add 1 Engineering Tech II and eliminate 1
Planner; and to correct a publication error; and
WHEREAS, adjustments in the Golf Course Improvement Debt
Service Fund im_macting reserve balances are recommended; and
WHEREAS, City Council authorization is needed to amend the
2002-03 budget as hereinafter set forth.
NOW, THEREFORE, the Council of the City of Palo Alto does
ORDAIN as follows:
SECTION i. The General Fund Budget Stabilization Reserve is
hereby reduced by the sum of One Million Two Hundred Three Thousand,
Eight Hundred One Dollars ($1,203,801), as described in Exhibit "A",
which is incorporated herein by this reference. As a result of this
change, the Budget Stabilization Reserve wil! decrease from
$22,527,000 to $21,323,199.
SECTION 2. The General Fund Infrastructure Reserve is hereby
increased by the sum of One Million One Hundred Five Thousand, Seven
Hundred Dollars ($i,i05,700), as described in Exhibit "A". As a
result of this change, the Infrastructure Reserve wil! increase from
$27,162,000 to $28,267,700.
SECTION 3. The City Council hereby authorizes the adjustments
indicated to various Capita! Improvement Projects as shown in
Exhibit A.
SECTION 4. The sum of Four Hundred Fifty-Nine Thousand, Two
Hundred Fifty Dollars ($459,250) is hereby transferred from the
capital projects ~hereinafter described, to the appropriation for
Capita! Improvement Project (CIP) 10216 (Enterprise Resource
Planning). The amounts so transferred are from the following capital
projects, which will be reduced by the amount listed:
Financial Applications Development $64,850
(19808)
Citywide Network Improvements (19711)$26,900
City Network Hardware Redundancy (10107)$57,500
IT Systems Management (10108)$ii0,000
Permit Tracking (19516)$200,000
Total $459,250
SECTION 5. The sum of Five Hundred Thousand Dollars ($500,000)
is hereby appropriated to Capita! Improvement Project Number 10216
(Enterprise Resource Planning). This transfer will reduce the
balance in the Technology Fund Reserve to 6,283,473.
SECTION 6. The sum of Twenty-0ne Thousand, Two Hundred Ninety-
Two Dollars ($21,292) is hereby transferred from the Community
Services Department Arts and Culture Functiona! Area and
appropriated to Capital Improvement Project Number 19910, Community
Theatre Renovations.
SECTION 7. The scope of Capital Improvement Project (CIP)
19910, Community Theatre Renovations, is hereby changed as shown in
Exhibit B.
SECTION 8. The sum of Forty-Six Thousand, Eight Hundred
Dollars ($46,800) is hereby appropriated to Capital Improvement
Project Number 10206, Traffic Signal at San Antonio Road/Highway i01
Off-Ramp, and the Infrastructure Reserve is correspondingly reduced.
SECTION 9. Revenue and expense in the sum of Thirty Thousand,
Three Hundred Fifty Dollars ($30,350) is hereby appropriated to
Capital Improvement Project Number 10304, Roth Building Wings
Demolition, for receipt of funds from Summerhill Homes. This
transaction will have no impact on reserves.
SECTION i0. Capital Improvement Project Number 10102, Civic
Center Infrastructure Improvements, is hereby reduced by the sum of
Nine Hundred Forty Thousand Dollars ($940,000) and the
Infrastructure Reserve is correspondingly increased.
SECTION ii. Capital Improvement Project Number 10006, Roofing
Replacements, is hereby reduced by the sum of TWo Hundred Twelve
Thousand, Five Hundred Dollars ($212,500) and the Infrastructure
Reserve is correspondingly increased.
SECTION 12. The sum of One Hundred Thousand Dollars ($i00,000)
is hereby transferred from Capital Improvement Project (CIP) 10208
(Miranda Avenue Street Improvement) to the appropriation of Capital
Improvement Project~(CIP) 9630 (Street Maintenance).
SECTION 13. The title and scope of Capital Improvement Project
(CIP) 19906, MSC Permanent Seismic Retrofit Study, is hereby changed
to "MSC Feasibility Study" as shown in Exhibit B.
SECTION 14. Capital Improvement Project Number 8930, Traffic
Signa! Upgrade, is hereby increased by the sum of Two Hundred
Twenty-Five Thousand Dollars ($225,000) and the Electric Fund Rate
Stabilization Reserve is correspondingly reduced.
SECTION 15. Capital Improvement Project Number 9707,
Wastewater Solids Disposal Project, is hereby increased by the sum
of One Hundred Forty-One Thousand, Seven Hundred Six Dollars
($141,706) and the Wastewater Treatment balance of Restricted Bond
Proceeds is correspondingly reduced.
SECTION 16. The Municipal Fee Schedule is hereby amended to
reflect the changes shown in Exhibit C, which is attached hereto and
incorporated herein by reference. These changes wil! not impact the
General Fund Budget Stabilization Reserve.
SECTION 17. The Supply Rate Stabilization Reserve in the
Electric Fund is hereby increased by the sum of Seven Million Seven
Hundred Nineteen Thousand Dollars ($7,719,000) to reflect increased
revenues in the Electric Fund as described in Exhibit A.
SECTION 18. The Distribution Rate Stabilization Reserve in the
Electric Fund is hereby reduced by the sum of Two Hundred Fifty-Five
Thousand, Eight Hundred Eighty Dollars ($255,880) to reflect reduced
revenues in the Electric Fund as described in Exhibit A.
SECTION 19. The Supply Rate Stabilization Reserve in the Gas
Fund is hereby reduced by the sum of Six Hundred Thousand Dollars
($600,000) to reflect reduced revenues in the Gas Fund as described
in Exhibit A.
SECTION 20. The Distribution Rate Stabilization Reserve in the
Gas Fund is hereby reduced by the sum of Thirty-Two Thousand Dollars
($32,000) to reflect reduced revenues in the Gas Fund as described
in Exhibit A.
SECTION 21. The Rate Stabilization Reserve in the Water Fund is
hereby reduced by the sum of Twenty Eight Thousand ($28,000) to
reflect reduced revenues in the Water Fund as are described in
Exhibit A.
SECTION 22. The Rate Stabilization Reserve in the Wastewater
Collection Fund is hereby decreased by the sum of Seventy Thousand
Dollars ($70,000) to reflect increased expenditures in the
Wastewater Collection Fund as are described in Exhibit A.
SECTION 23. The Rate Stabilization Reserve in the Wastewater
Treatment Fund is hereby decreased by the sum of One Hundred Forty-
One Thousand, Seven Hundred Six Dollars ($141,706) to reflect
increased expenditures in the Wastewater Treatment Fund as are
described in Exhibit A.
SECTION 24. The Rate Stabilization Reserve in the Storm
Drainage Fund is hereby increased by the sum of One Thousand Seven
Hundred Fifty Dollars ($1,750) to reflect increased revenues in the
Storm Drainage Fund as are described in Exhibit A.
SECTION 25. The Housing In-Lieu Reserve is hereby reduced by
the sum of Fifty Thousand Dollars ($50,000) to reflect increased
expenditures as are described in Exhibit A. This transaction will
reduce the balance in the Housing in Lieu Reserve to $9,801,000.
SECTION 26. The Community Development Block Grant Project
01078, Community Working Group - Opportunity Center, is hereby
increased by the sum of Two Hundred Fifty Thousand Dollars
($250,000) to reflect increased revenues as are described in Exhibit
A. This transaction will have no impact on reserves.
SECTION 27. The Table of Organization as amended to reflect
changes shown in the attached Exhibit D is hereby approved.
SECTION 28. As specified in Section 2.28.080(a) of the Palo
Alto Hunicipal Code, a two-thirds vote of the City Counci! is
required to adopt this ordinance.
SECTION 29. The Council of the City of Palo Alto hereby finds
that this midyear adjustment is not a project under the California
Environmental Quality Act and, therefore, no environmental impact
assessment is necessary. However, projects described in this
ordinance will be assessed individually as appropriate.
SECTION 30. As provided in Section 2.04.375 of the Palo Alto
Hunicipal Code, this ordinance shall become effective upon adoption;
provided that all new Planning Department fees, more specifically
described in Exhibit "C," shall become effective sixty (60) days
from the date of adoption.
/!
!!
!!
!!
!!
!!
!!
INTRODUCED AND PASSED:
AYES:
NOES:
ABSTENTIONS:
~_BSENT:
ATTEST:
City Clerk
APPROVED AS TO FORM:
City Attorney
APPROVED:
Mayor
City Manager
Director of Administrative
Services
Exhibit A
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
GENERAL FUND
(in thousands of dollars)
21,035 21,035
13,536 13,536
7,000 7,000
7,370 7,370
7,903 7,903
17,730 17,730
11,827 11,946
13,008 13,008
9,079 9,217
19,542
3,644
6,600
Revenues & Other Sources
Sales Tax (1,493)
Property Tax 108
Transient Occupancy Tax (400)
Utility Users Tax
Other Taxes, Fines & Penalties
Charges for Services
Charges to Other Funds
Rental Income
Other Revenues
Total Revenues 108,488 108~745 ~ 07,695 !
Operating Transfers-In 14,335 14,335
Encumbrances & Reapprop 3,780 -
From Infrastructure Reserve 3,346 3,346
Total Sources of Funds ........126,169 130,206 ; ~29,156 (1,050)
Expenditures & Other Uses
City Attorney 2,517 3,204
City Auditor 804 927
City Clerk 767 798
City Council 247 249
City Manager 1,647 1,776
Administrative Services 10,974 11,454
Community Services 24,530 25,120
Fire 19,055 19,228
Human Resources 2,344 2,459
Planning and Community Environment 8,359 9,487
Police 21,888 22,251
Public Works 14,327 14,632
i Non-Departmental 6,870 6,870
Total Expenditures 114,329 118,455
Operating Transfers-Out 11,579 11,579
Total Uses o~Funds 125,908 130,034
Net Surplus (Deficit) ....261 172
Adjust intra-fund reserve transfer (3,346)(3,346)
Net To (From) Reserves ....(3,085)(3;174)
129i082
74
(3,2721
64~082
537
198
,050)
(64)
128
12
18
115
(1,229
(962
(98
(98
Beginning Reserves 64,082 64,082
Projected Ending Reserves ....60,997 60,908 60,810 (98
iBudget Stabilization
Infrastructure
Emergencies
Encumbrance & Reappropriation
Notes Receivable
Unrealized Gain on Investment
Inventory of Supplies & Materials
Equity Transfer Stabilization
Total
22,680 22,527
n.a.27,162
n.a.5,665
n.a.1,293
n.a.1,520
n.a.1,985
756
n.a 60,908
756
60,810 ~l
(1,204)
1,106
(98:
Fund Summaries - 1
Exhibit A
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
ENTERPRISE FUNDS
(in thousands of dollars)
Sources of Funds
Net Sales
Interest Income
Bond Proceeds(restricted)
Other Income
Reapprop/Encumbrances
Total Sources
72,766 15,383
7,240 496
31,566 11,299 18,603 18,659 2,124
395 836 678 921 21
14,369 690 656 530 3,040 993 61 1,043
13,896 3,973 6,876 9,187 2,550 581 3,854 3
108,27136,62419,667 28,998 25,170 3,719~ 19,794~1,051
21,382
243,294
8;045
745 27~192
65
54
864 166,271,
12;622!
-10,557
5
Uses of Funds
iUtility Purchases
Treatment Plant Chgs
Refuse Collections Svcs
Salaries & Benefits
Other Expenses
Allocated Charges
Debt Service
Subtotal
44,505 16,721 6,000
-5,682 -
9,342
13,153
6,560
5,880
-8,045
3,039 1,269 2,848 2,754 786 6,409
1,455 758 1,424 7,154 725 6,183
3,073 1,401 2,092 2,009 633 1,495
948 129 775 396 948 816
~79,440!25,236 9,23913,139 20,358 3,092 14,903
Equity Transfer
Rent
Other Transfers
Capital Improvement
Total Uses
7,762 2,626 2,234
3,405 277 183 1,403 5,289
4,947 645 208 439 486 45 158
23,637 8,666 11,257 13,834 1,991 617 4,580
~119,191~i~37,450 20,887~ 31,049 28,124 3,7541!!19,641!!iii869
Net To (From) Reserves (10,920)(826)
iBeginning Reserves 124,580 22,990
Projected Ending Rsrvs 113,660 22,164
(1,220) (2,051) (2,954)(35) ....153 182
5,619 14,160 10,557 484 7,634 33
4,399 12,109 7,603 449 7,787 215
~roiected Endinq Reserves
Emerg Plant Replace 2,393 858
Distrib Rate Stabilization 8,397 6,567
Supply Rate Distribution 33,978 11,139
Rate Stabilization
Calaveras 67,965
=ublic Benefit Program 110
Central Valley O & M 118 -
Undergroung Loan 635 -
Conservation Loan 34
Shasta Rewind Loan 64
518 1,054 1,631
3,881 8,552 7,013 369 6,136
Restricted Bond Proceeds
Water Resources Board
Debt Service
Total
Current Adjusted Budget
Midyr Reserve Changes
2,616 1,725 80 20
590 --
950 778
113,660 22,164 4,399 12,109 7,603 449
106,197 22,796 4,469 12,137 7,603 447
7,463 (632)(70)~ (28)2
RSRs Midyr Adj Budget
RSRs Curr Adi Budget
Midyr Change in RSRs
42,375 17,706 3,881 8,552 7,013 369
34,912 18,338 3,951 8,580 7,013 367
7,463! (632)(70)(28)-2
7,787 215
7,929 215
(142) .....
6,136 215
6,136 215
260,965
(17,671)
186,057
168,386
6,454
4’964
45,117
215 26,166
67,965
-110
-118
-635
-34
64
4,441
-590
1,728
168,386
161,793
6,593
86,247
79,512
6,735
Fund Summaries - 2
Exhibit A
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
ELECTRIC FUND
(in thousands of dollars)
Sources of FundsI"I Net Sales 73,221 73,221
Interest Income 7,240 7,240
Other Income 14,369 14,369
Reapprop/Encumbrances 13,896
Total Sources 94,830 108,726
Uses of Funds
Utility Purchases 52,704 52,704
Treatment Plant Chgs
Refuse Collections Svcs
Salaries & Benefits 9,310 9,342
Other Expenses 10,444 13,097
Allocated Charges 6,560 6,560
Debt Service 5,880 5,880
Equity Transfer 7,762 7,762
Rent 3,405 3,405
Other Transfers 4,947 4,947
Capital Improvement 12,169 23,412
Total Uses 113,181 127;109
I Net To (FrOm) Resewes (18,351)(18,383)
Beginning Reserves 124,580 124,580
(455)
(8,199)
56
225
Emerg Plant Replace
Distrib Rate Stabilization
Supply Rate Distribution
Rate Stabilization
Calaveras
Public Benefit Program
Central Valley O & M
Underground Loan
Conservation loan
Shasta Rewind Loan
Restricted Bond Proceeds
Water Resources Board
4,850
4,509-9,018
20122-40,244
67,779
2,393
8,653
26,259
67,965
110
118
635
64
67,965
1~8
(256)
7,719
Fund Summaries - 3
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
GAS FUND
(in thousands of dollars)
Sources of Funds
Net Sales
Interest Income
Bond Proceeds(restricted)
Other Income
Reapprop/Encumbrances
32,198 32,198
395 395
690
3,973
31,566
Uses of Funds
Utility Purchases 16,721 16,721
Treatment Plant Chgs
Refuse Collections Svcs
Salaries & Benefits 3,052 3,039
Other Expenses 1,210 1,455
Allocated Charges 3,073 3,073
Debt Service 948 948
(632)
Equity Transfer 2,626 2,626
Rent 277 277
Other Transfers 645 645
Capital Improvement 4,938 8,666
Tota! Uses 33,490 37,450
Net To (From) Reserves;;;(207) ........(194)
Beginning Reserves 22,990 22,990
Projected Ending Reserves 22,783 22,796
Emerg Plant Replace
Distrib Rate Stabilization
Supply Rate Distribution
Rate Stabilization
Calaveras
Public Benefit Program
Central Valley O & M
Underground Loan
Conservation loan
Shasta Rewind Loan
:~estricted Bond Proceeds
Water Resources Board
Debt Service
1,838 858
2,191-4,382 6,599
3,344-6,688 11,739
34
2,616
950
2,616
(32)
(600)
(632)
Fund Summaries - 4
Sources of Funds
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
WASTEWATER COLLECTION FUND
(in thousands of dollars)
Net Sales 11,299 11,299
Interest Income 836 836
Other Income 656 656
Reapprop/Encumbrances 6,876
Total Sources 12,791 19,667 19;667,
Uses of Funds
Utility Purchases
Treatment Plant Chgs 5,682 5,682
Refuse Collections Svcs
Salaries & Benefits 1,269 1,269
Other Expenses 408 688
Allocated Charges 1,401 1,401
Debt Service 129 129
Subtotal 8,889;:9,169
70
Equity Transfer
Rent 183 183
Other Transfers 208 208
Capital Improvement 4,661 11,257
Total Uses 13,941 20,817
Beginning Reserves 5,619 5,619
Emerg Plant Replace -518
Distrib Rate Stabilization -
iSupply Rate Distribution -
Rate Stabilization 3,458-6,916 3,951
Calaveras
Public Benefit Program
Central Valley O & M
Underground Loan
Conservation loan
Shasta Rewind Loan
Restricted Bond Proceeds
Water Resources Board -
Total n.a 4,469 4,399
(70)i
(70)
Fund Summaries - 5
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
WATER FUND
(in thousands of dollars)
Sources of Funds
Net Sales 18,631 18,631
Interest Income 678 678
Bond Proceeds (restricted)
Other Income 530 530
I Reapprop/Encumbrances 9,187
Total Sources 19,839 29,026
Uses of Funds
Utility Purchases 6,000
Treatment Plant Chgs
Refuse Collections Svcs
Salaries & Benefits 2,858
Other Expenses 1,145
Allocated Charges 2,092
Debt Service 775
6,000
2,848
1,424
2,092
775
12,870 13,139
Equity Transfer 2,234 2,234
Rent 1,403 1,403
Other Transfers 439 439
Capital Improvement 4,926 13,834
Total Uses 21,872 31 ~049
iNet To (From) Reserves:(2,033)(2,023)
Beginning Reserves 14,160 14,160
(28)
(28)
2,305 1,054Emerg Plant Replace
Distrib Rate Stabilization
Supply Rate Distribution
Rate Stabilization
Calaveras
Public Benefit Program
Central Valley O & M
Underground Loan
Conservation loan
Shasta Rewind Loan
Restricted Bond Proceeds
Water Resources Board
Debt Service
Total
5,866-11,733
n.a
8,580
_
1,725 1,725
778
12,137 12,109
(28)
(28)
Fund Summaries - 6
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
REFUSE FUND
(in thousands of dollars)
Sources of Funds
Net Sales 18,659
Interest Income 921
Other Income 3,040
Reapprop/Encumbrances
Total Sources 22,620
Uses of Funds
Utility Purchases
’Treatment Plant Chgs
Refuse Collections Svcs 8,033 8,045
Salaries & Benefits 2,754 2,754
Other Expenses 6,607 7,154
Allocated Charges 2,009 2,009
Debt Service 396 396
Subtotal ....19,799 20,358
Equity Transfer
Rent
Other Transfers
18,659
921
3,040
2,550
25,170 25,170
i
5,289 5,289
486 486
Capital Improvement 1,991
Total Uses::25,574 28i124
20,358
=
Beginning Reserves 10,557 10,557
Projected Ending Reserves 7,6037,603;
Emerg Plant Replace
,Distrib Rate Stabilization
Supply Rate Distribution
Rate Stabilization
Calaveras
Public Benefit Program
Central Valley 0 & M
Underground Loan
Conservation loan
Shasta Rewind Loan
Restricted Bond Proceeds
Water Resources Board
Total
1,862-3,725 7,013
!
590
n.a 7,603 7,603
Fund Summaries - 7
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
STORM DRAINAGE FUND
(in thousands of dollars)
Interest Income 21
Other Income 991
Reapprop/Encumbrances
Total Sources .....3,136
Uses of Funds
Utility Purchases
Treatment Plant Chgs
:{efuse Collections Svcs
Salaries & Benefits 786
Other Expenses 595
Allocated Charges 633
Debt Service 948
Subtotal 2,962
Equity Transfer
Rent
Other Transfers 45
Capital Improvement 166
Total Uses 3,173
581
3,717 3,719
786
725
633 633
948
&092 3,092
2
Net To (From) Reserves (37) .......(37)
Emerg Plant Replace
Distrib Rate Stabilization
Supply Rate Distribution
Rate Stabilization
Calaveras
Public Benefit Program
Central Valley O & M
Underground Loan
Conservation loan
Shasta Rewind Loan
Restricted Bond Proceeds
Water Resources Board
Total n~a
367 369
-I =
80
447 449
Fund Summaries - 8
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
WASTEWATER TREATMENT FUND
(in thousands of dollars)
Interest Income
Other Income
Reapprop/Encumbrances
Total Sources
15,383 15,383
496 496
61 61
3,854
19,794
Uses of Funds
Utility Purchases
Treatment Plant Chgs
Refuse Collections Svcs
Salaries & Benefits
Other Expenses
Allocated Charges
Debt Service
Subtotal
Equity Transfer
Rent
6,409 6,409
4,887 6,183
1,495 1,495
816 816
Other Transfers 158 158
iCapital Improvement 1,880 4,438 142
19,641 142
Net To (From) Reserves 295:295
Beginning Reserves 7,634 7,634
Projected Ending Reserves 7,929 7~929 !(142~
Emerg Plant Replace
Distrib Rate Stabilization
Supply Rate Distribution
iRate Stabilization
Calaveras
Public Benefit Program
Central Valley O & M
Underground Loan
Conservation loan
Shasta Rewind Loan
Restricted Bond Proceeds
Water Resources Board
1,421 1,631
2,094-4,188 6,136
162 20 (142)
Total n.a 7,929 7,787 (142)
Fund Summaries - 9
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
EXTERNAL SERVICES FUND
(in thousands of dollars)
Sources of Funds
Net Sales
Interest Income 5 5
Other Income 1,043 1,043
Reapprop/Encumbrances 3
Total Sources 1,048 1,051 1,051
Uses of Funds
Utility Purchases
Treatment Plant Chgs
Refuse Collections Svcs
Salaries & Benefits
Other Expenses
Allocated Charges
Debt Service
Subtotal
745 745
62 65
54 54
Equity Transfer
Rent
Other Transfers 5 5
Capital Improvement
Total Uses 866 869
Beginning Reserves 33
Rate Stabilization
Calaveras
Public Benefit Program
Central Valley O & M
Underground loan
Conservation loan
Shasta Rewind Loan
Restricted Bond Proceeds
Water Resources Board
215
-!-’
" I
Fund Summaries-10
Exhibit A
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
DETAIL CHANGES TO THE ADJUSTED BUDGET
I Key I°bi I 2002 3 II coae; ICode I iid~/earAdi I Description
GENERALFUND
02000000 1180 405,000
02000000 1183 132,000
02000000 1181 (1,493,000)
02000000 1185 (400,000)
Source Changes (1,248,000)
increase in Property Tax Revenue
Increase in Documentary Transfer Tax Revenue
ncrease in Motor Vehicle In Ueu Tax Revenue
Decrease in Sales Tax Revenue
Decrease in Transient Occupancy Tax Revenue
02000000 3342 67,600 Increase in the City’s Assessment for the new Downtown Parking Structures
02000000 4031 (144,508) Decrease in debt service funding
02000000 4041 (1,084,408) Decrease transfer to capital fund
Use Changes (1,161,316)
Net Changes To (From) Reserves (86,684)
02432100 3908 820 Increase in vehicle equipment maintenance service
02432100 3977 3,300 Increase in vehicle equipment replacement allocation
02413180 3003 (43,354) Decrease in Overtime Salaries
02413180 3004 (24,276) Decrease in Temporary Salaries
Use Changes (63,509)
Net Changes To (From) Reserves 63,5019 .....
02811115 1399 20,000 Increase in grant revenue associated with Arts and Culture
02811110 1527
02811110 1528
02811115 1801
Source ChangeS ! ! !:
10,278 Increase in grant revenue associated with Arts and Culture
4,330 Increase in grant revenue associated with Arts and Culture
18 000 ncrease in grant revenue associated with Arts and Culture
52i608
02811114 3003 4,108
02811115 3003 18,000
02810010 3107 3,950
02811112 3108 500
02811114 3120 6,000
02813000 3199 42,500
02813180 3977 (10,000)
02812170 3199 79,768
02811112 3305 4,000
Increase in temporary salary expense (offset by grant revenue)
Increase in temporary salary expense (offset by grant revenue)
Increase for lease and installation of modular building for Finds of the Lib. (CMR406:02)
Increase in Cultural Presentations (offset by grant revenue)
Increase in Advertising and Publishing (offset by grant revenue)
Increase in Cntrct. Srvcs. for additional expenses associated with the new Golf Pro
agreement
Decrease in vehicle equipment replacement allocation
Increase for lease and installation of modular building for Frnds of the Lib. (CMR406:02
Increase in Transportation (offset by grant revenue)
02811152 3599 (21 292) Decrease in Other Facility and Equipment Purchases
Use Changes 127,534’
Net Changes To IFrom) Reserves (74~926) ................... .....
0275113o 1537
02750010 1801
02752100 1801
Source Changes ~ ~,
50,000 tncrease in Stanford Fire and Communications Revenue
9,009 Increase in State of California revenue
2,500 Increase in Donations
954 Increase in Donations
62,463
~;f.~ ~,~i ’/~ ~!!:i~i ~!i ~i’. 027521003200
02752210 3200
02751130 3505
Ise Changes
Net Changes To (From) Reserves
954 Increase in Supplies and Materials (offset by revenue)
2,500 Increase in Supplies and Materials (offset by revenue)
9,009 Increase in Tools and Equipment (offset by revenue)
12,463
50,000 .... .......
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
DETAIL CHANGES TO THE ADJUSTED BUDGET
Key
Code
Source Changes
lObjCode I 2002-03Mid,/ear Adi !Description
1599 17,500 Increase in Other Revenue From Other Agencies
17,500
Use Changes
Net Changes To (From) Reserves
3199 17.500 !ncreasein Contract Services
17,500
0
Source Changes
1537 115.000 Increasein State of Californiarevenue
115,000
Jse Changes 115,000
Net Changes To (From) Reserves 0
Source Changes (50,000)
Decrease in VTA contract revenues due inadvedent inclusion in 2002-03 budget
Net Changes To (From) Reserves (50~000) ......; ......
Total Source Changes (1,050~429)
Total Use Changes (952~328) .....
Total Net Changes To(From) Reserves (98,101)
Balancing Entries:02000000 3822 (1,203,801) Budget Stabilization Reserve Funding
02000000 3849 1,105,700 Infrastructure Reserve Funding of IMP CIP projects
Total Reserve Funding for Midyear (98~101)
rehicle Replacement 81533750 1977 (10,000) Decrease in vehicle equipment replacement allocation
~ource Changes {10,000):
Technology Fund 82000000 4041
Vehicle Replacement 81533750 3550
Use Changes
Balancing Entries: 82000000
Total ISF Reserve Funding for Midyear
38O9
500,000 Operating Transfer to CIP 10216 (Enterprise Resource Planning)
(10,000) Decrease in vehicle equipment replacement allocation
490,000
(500,000) Technology Fund Reserve
(500,000)
54000000 2011
54000000 2065
Subtotal
(144,508) Decrease Operating Transfer From General Fund
144,508 Increase Transfer from Agency
0
32000000 1502 250,000 Increase in Community Development Block Grant
250,000Source Changes
33615280 3107 50,000 Increase in Program and Project Consultants for Below Market Rate Ownership
Program
32000000 3879 250,000 Increase in Job Ledger project expenditure for CDBG Opportunity Center
Jse Changes 300,000
3alancing Entries:33000000 3850 (50,000) Decrease in Residential In-Lieu Fund Reserve
Net Special Revenue Adjustments (50,000) ........
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
DETAIL CHANGES TO THE ADJUSTED BUDGET
Key I°bi I 200243 I
Code ~ Description
71514281 1329 39,350
71000000 2011 ,940,000)
71000000 2011 (212,500)
71000000 2011 21,292
71000000 2011 46.800
71000000 2060 500 000
Net CIP Revenue Adjustments (554.058)
CIP 10304 (Roth Building Wings demolition) - Increase revenue from Summerhill
Homes
Decrease ~ransfer from General Fund
Decrease transfer from General Fund
Increase transfer from General Fund
Increase transfer from General Fund
Increas=~ transfer from Technolog? Fund
71000000 3879 30,350 CIP 10304 (Roth Building Wings demolition} - Additional expense offset by revenue
71000000 3879 (940,000) CIP 10102 [Civic Center Infrastructure Improvements) - Decrease in pro!ect
71000000 3879 (212,500) CIP 10006 [Roofing Replacement) - Decrease in project
71000000 3879 21,292 CIP 19910 (Community Theatre Renovations) - Addl. exp for lights, offset w~ operating
funds
71000000 3879 46,800 ClP 10206 (Traffic Signal at San Antonio) - Additional expense
71000000 3879 500,000 CtP 10216 (Enterprise Resource Planning) - Additional expense
Net ClP Expenditure Adjustments (554,058)
Exhibit A
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMARY
DETAIL CHANGES TO THE ADJUSTED BUDGET
CodeKey II ObJc°de !1 Midyear2002"03Adj IDescripti~n
13000000 1722 (480,000) Decrease in wholesale revenue that did not materialize.
23000000 1719 (41,000) Decrease in utility billing discount revenue
23260280 1735 66,000 Increase in fiber optical revenue
-~ource Changes (455,000)
13231160 3611
(6,949,000)
13231160 3611 (1,250,000)
23220230 3908 (820)
23220230 3977 (3,300)
23260280 3100 60,000
23220760 3879 225,000
Decrease to transf, budget for contract obligation settlements with NCPA to FY 01-02
Decrease in transmission cost
Decrease estimated vehicle equipment maintenance
Decrease estimated vehicle replacement maintenance
Increase contract expenses assoc, with the FTTH (offset by revenues)
CIP 8930 (Traffic Signal Upgrade) - Increase project expense
Use Changes ......(7,918,120)
Net Changes To {From) Reserves 7,463,120
Fund Balancing Entries
13000000 3817 7,719,000
23000000 3804 (255,880)
Total Electric Fund ~;7,463,120
Electric Supply Rate Stabilization Reserve
Electric Distribution Rate Stabilization Reserve
14000000 1962 (600,000)
24000000 1719 (32,000)
iource Changes (632,000)
Net Changes To (From) Reserves {632,000)
Decrease gas sales to COBUG
Decrease utility billing discounts due to Rate Assistance Program
Fund Balancing Entries .............
14000000 3817 (600,000)
24000000 3804 (32,000)
Total Gas Fund ~ .....(632,000)
Gas Supply Rate Stabilization Reserve
Gas Distribution Rate Stabilization Reserve
22000000 1719 (28,000) Decrease utility billing discounts due to Rate Assistance Program
Source Changes (28,000)
4et Changes To (From) Reserves (28,ooo)
Fund Balancing Entries
22000000 3804
Total Water Fund
(28,000) Water Distribution Rate Stabilization Reserve
(28,000)
28000000 1399
Source Changes :
Net Changes To (From) Reserves
Fund Balancing Entries ...........
38000000 3804
Total Storm Drainage Fund
1,750 Increase revenue from temporary construction dewatedng fees
1,750
1,750 Storm Drain Rate Stabilization Reserve
1,750
1,750
CITY OF PALO ALTO
2002-03 MIDYEAR BUDGET SUMMAR~
DETAIL CHANGES TO THE ADJUSTED BUDGE.l
CodeKey I CodeObj IMidyear2002"03Adj IDescription
26561790 3879
Use Changes
Net Changes To (From) Reserves
=und Balancing Entries
26000000 3805
Total WWT Fund
141,706 CIP 9707 (Wastewater Solids Disposal Project) - Increase expense
141,706
(141,706)
(141,706)
(141,706)
Wastewater Treatment Rate Stabilization Reserve
27250290 3500 70,000 Increase Facility and Equipment Purchases
Use Changes 70,000
Net Changes To (From) Reserves (70,000)
Fund Balancing Entries
27000000 3804 (70,000)
Total WWC Fund (70,000)
Wastewater Collection Rate Stabilization Reserve
°Exhibit B
MSC Feasibility Study (19906)
Continuing --Infrastructure
PROJECT DESCRIPTION
This project, formally titled the MSC Permanent Seismic Retrofit Study, funds a feasibility study of the Municipal Ser-
vice Center (MSC) site. The study, currently in progress, includes analyzing many issues and needs that exist at the
MSC including seismic requirements, ADA compliance, future pro~ammatic and space needs and FEMA floodplain
requirements. Upon completion of the study, the findings and associated recommendations will be presented to Council
for consideration and direction.
PROd ECT JUSTIFICATION
The MSC Buildings A, B and C were constructed in 1965 and were designed to meet the standards of the 1961 Uniform
Building Code. In 1997, it was determined that the buildings were seismically deficient. Construction of seismic brac-
ing was determined to be the most timely and cost effective m, ethod to address the deficiency. The bracing was com-
pleted in 1998.
Along with structural issues, the buildings require ADA compliant renovations. Lighting, mechanical, and electrical
equipment at the MSC is outdated and inefficient. Due to progressive changes in activities performed by staff and
changes in the functionality at the facility, work and shop areas are not adequately equipped nor efficient in their design.
The MSC while not required to meet essential building standards, houses equipment and staff that would be crucial dur-
ing and after a major emergency or disaster event. It is important that this facility and it’s condition be maintained and
in good functioning order to provide the support and response that would be necessary during such a time.
FUTURE FINANCIAL REQUIREMENTS
FISCAL YEAR AMOUNT
PY Budget $200,000
2002-03
2003-04
2004-05
2005 -06
2006-07
Sources of Funding: General Fund
COMPONENTS
CiP
MSC Feasibility Study (19906)
continued
IMPACT AND SUPPORT ANALYSIS
Environmental:
Design Elements:
Operating:
Telecommunications:
An environmental analysis may be required based on the results of the study.
May be subject to review by the ARB.
None
None
COMPREHENSIVE PLAN
This project furthers Policy C-24 and Program C-19 of the Comprehensive Plan.
Exh[M
Community Theatre Renovations (19910)
Continuing --Infrastructure: Buildings and Facilities
PROJECT DESCRIPTION
This project will replace an existing, but malfunctioning light board at the Community Theatre. Funding for this project
will come from the $45,708 balance in CIP 19910 Community Theatre Renovations to help with the cost of replace-
ment for the failing light board. The new light board will cost approximately $67,000. The Arts Division will make up
the difference with operating dollars identified in their budget for equipment replacement. The original scope of ser-
vices for CIP project 19910 was to refurbish the auditorium seats at the Lucie Stem Community Theatre and to add air
conditioning to the theatre. Both of those projects are complete leaving a $45,708 balance in this CIP.
PROJECT JUSTIFICATION
The light board at the Lucie Stem Community Theatre has failed and cannot be repaired. As an interim measure we are
renting a temporary light board in order to continue providing scheduled performances at the theatre. The permanent
light board, an analog system, was installed in 1980. Since then light board technology has advanced and all new sys-
tems are digital. As a result replacement parts to repair the existing permanent light board are not available. Amending
the scope of services of CIP 19910 to include the purchase and installation of a new permanent light board is in keeping
with the intent of the original CIP. This is to provide a satisfactory and comfortable theatre experience for the users of
the Community Theatre.
FUTURE FINANCIAL REQUIREMENTS
COMPONENTSFISCAL YEAR AMOUNT
PY Budget
2002-03 $67,000
2003-04
2004-05
2005-06
2006-07
Sources of Funding: Genera! Fund and Infrastructure Reserve
(Consists of $21,292 from Arts and Culture Functional Area budget and a
$45,708 balance from this CIP 19910.)
Community Theatre Renovations (199!0)
continued
IMPACT AND SUPPORT ANALYSIS
Environmental:None
Design Elements:None
Operating:None
Telecommunications:None
COMPREHENSIVE PLAN
This project furthers Policy C-24 and Program C-9 of the Comprehensive Plan.
Exhibit C
n
0
0
Exhibit D
2002:03 TABLE OF ORGANIZATION :
2002-03
2000-01 2001-02 Adopted-in-2001-02 2002-03 2002-03 2002-03
Actual Adjusted Concept BAO Adopted BAO Adjusted
Budget Budget Budget Changes Changes Changes Budget
Public Works Department
Accounting Specialist 1.00 1.00 1.00
Administrator, Public Works 1.00 1.00 1.00
Administrative Assistant 1.00 1.00 1.00
Assistant Engineer 1.50 1.50 1.50
Assistant Director Public Works 0.75 0.75 0.75
Building Serviceperson 5.00 5.00 5.00
Building Serviceperson-Lead 2.00 2.00 2.00
Cement Finisher 2.00 2.00 2.00
Cement Finisher- Lead 1.00 1.00 1.00
Coordinator, Public Works Projects 3.00 1.00 1.00
Deputy Director, Public Works Operations 0.40 0.40 0.40
Director, Public Works/City Engineer 1.00 1.00 1.00
Electrician 1.00 1.00 1.00
Engineer 6.90 2.90 2.90
Engineering Technician III (1)4.53 4.60 5.60
Equipment Operator 2.55 2.55 2.55
Facilities Carpenter 1.00 1.00 1.00
Facilities Maintenance-Lead 2.00 2.00 2.00
Facilities Mechanic 5.00 6.00 6.00
Facilities Painter "2.00 2.00 2.00
Heavy Equipment Operator-Lead 1.05 1.05 1.05
Heavy Equipment Operator 1.90 1.90 1.90
Inspector, Field Services 1.00 1.00 1.00
Manager, Facilities Maintenance and Project 1.00 1.00 1.00
Managing Arborist 1.00 1.00 1.00
Manager, Maintenance Operations 0.50 0.50 0.50
Office Assistant 1.00 0.00 0.00
Office Specialist ( 1 )2.50 3.50 3.50
Program Assistant 1.00 1.00 1.00
Project Engineer 0.00 5.00 4.00
Project Manager 1.00 2.00 2.00
Senior Project Manager (1)1.00 1.00 1.00
Senior Engineer 3.55 3.55 3.55
Staff Secretary 2.00 2.00 2.00
Superintendent, Public Works Operations 0.80 0.80 0.80
Supervisor, Building Services 1.00 1.00 1.00
Supervisor, Facilities Management 0.00 1.00 1.00
Supervisor, Facilities Project 1.00 1.00 1.00
Supervisor, Inspection/Surveying, P.W.0.90 0.90 0.90
Supervisor, Public Works 1.00 1.00 1.00
Surveying Assistant 0.80 0.80 0.80
Surveyor, Public Works 0.80 0.80 0.80
Traffic Control Maintenance I 1.70 1.70 1.70
Traffic Control Maintenance II 2.00 2.00 3.00
Traffic Control Maintainer- Lead 1.00 1.00 1.00
Tree Maintenance Person 1.00 1.00 2.00
Tree Trimmer/Line Clearer 9.00 9.00 9.00
Tree Trimmer!Line Clearer-Lead 1.00 1.00 1.00
Truck Driver 0.85 0.85 0.85
2.00 - 1.00
1.00
1.00
1.00
1.50
0.75
5.00
2.00
2.00
1.00 -l.00
1.00
1.00
0.40
1.00
1.00
2.90
5.60
2.55
1.00
2.00
6.00
2.00
1.05
1.90
1.00
t .00
1.00
0.50
0.00
3~50
1.00
5.00
2.00
1.00 -1.00 1.00
3.55
2.00
0.80
1.00
1.00
1.00
0.90
1.00
0.80
0.80
1.70
1.00 3.00
1.00
1.00
9.00
1.00
0.85
[TOTAL PUBLIC WORKS 85.98 88,05 90.05 0.00 5.00 -3.001 90.05I
(I) Remov’ed of position as placeholder pending November 2002 voter approval of community facility bond measure.
I
2002-03
2000-01 2001-02 Adopted-in-2001-02 2002-03 2002-03 2002-03
Actual Adjusted Concept BAO Adopted BAO Adjusted
Budget Budget Budget Changes Changes Changes Budget
Planning
Administrator, Zoning
Administrator. Planning & Community Environment
Administrative Assistant
Assistant Building Official
Assistant Planning Official
Building Inspector
Building Inspector Specialist
Building/Planning Technician
Chief Building Official
Chief Planning Official
Chief Transportation Officer
City Traffic Engineer
Code Enforcement Officer
Coordinator, Transportation System Management
Director, Planning and Community Environment
Engineer
Engineering Tech II (1)
Executive Secretary
Manager, Planning
Managing Arborist
Office Specialist
Planner (1)
Plans Checking Engineer
Senior Planner
Staff Secretary
Supervisor, Building Inspection
Transportation Projects Manager
1.00 1.00 1.00 - 1.00 0.00
1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00
1.00 1.00 1.00 - 1.00 0.00
3.00 4.00 4.00 4.00
3.00 3.00 3.00 3.00
4.00 4.00 4.00 4.00
1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00
2.00 2.00 2.00 2.00
0.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00
2.00 2.00 2.00 2.00
0.00 0.00 0.00 1.00 1.00
1.00 1.00 1.00 1.00
1.00 1.00 1.00 3.00
1.00 t .00 1.00 1.00
6.00 6.00 6.00 4.00
7.50 8.00 6.50 7.00
3.00 3.00 3.00 3.00
8.00 9.00 9.00 8.00
2.00 2.00 2.00 5.00
1.00 1.00 1.00 1.00
0.00 0.00 0.00 1.00
59.001
2.00
-2.00
1.50 -1.00
-1.00
3.00
1.00
[TOTAL PLANNING AND COMMUNITY ENVIRONMENT 54.50 58.00 56.50 1.50 1.00 0.00
(1) Removal from 2002-03 Adopted Budget of 1.0 Planner and Addition of 1.0 Engineering Tech II
2002-03 TABLE OF ORGANIZATION
2000-01 2001-02 2002-03 Adopted-2002-03 2002-03
Actual Adjusted in-Concept 2001-02 BA0 Adopted 2002-03 BA0 Adjusted
Budget Budget Budget Changes Changes Changes Budget
Community Services Department
Administrative Assistant
Administrator, Human Services
Administrator Special Events
Building Serviceperson
Building Serviceperson-Lead
Coordinator, Child Care
Coordinator, Libra-D’ Circulation
Coordinator, Library Programs
Coordinator, Recreation Programs
Deputy Director, Community Services
Director, Arts and Culture
Director, Community Services
Director, Human Services
Director. Libraries
Director, Parks and Golf Course
Director, Recreation and Open Space
Executive Assistant
Facilities Assistant
Golf Course Equipment Mechanic
Golf Course Maintenance Person
Inspector, Field Services
Librarian
LibraD’ Associate
LibraD’ Assistant
Library Specialist
Management Assistant
Manager, Arts
Manager, Main LibraD’ Services
Manager, Community Services Facilities
Office Specialist (1)
Park Maintenance Person
Park Ranger
Parks Crew-Lead
Parks and Open Space Assistant
Park Planner, Architect
Producer ArtslScience Programs
Pro~am Assistant (1)
Project Manager
Sprinkler System Repairer
Senior Librarian
Senior Ranger
Staff Secretary
Superintendent, Golf Course
Superintendent, Parks
Superintendent, Recreation
Superintendent, Open Space and Sciences
Supe~’isor, Golf Course
Supervisor, Junior Museum
Supervisor, Open Space
Supervisor, Recreation Program
Supervisor, Librarian
¯ Supervisor, Parks
Theater Specialist
Volunteer Coordinator
1.00
1.00
1.00
4.00
2.00
1.00
1.00
2.00
5.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
0.50
2.00
7.00
2.00
8.75
3.00
3.00
6.50
1.00
2.00
t .00
1.00
8.75
12.50
5.00
2.00
0.75
1.00
10.50
7.00
1.00
5.00
11.00
2.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
5.00
4.00
2.00
1.00
0.75
1.00 1.00 1.00
0.00 0.00 0.00
1.00 1.00 1.00
4.00 4.00 4.00
2.00 2.00 2.00
t .00 1.00 1.00
1.00 1.00 1.00
2.00 2.00 2.00
4.00 4.00 4.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1,00 1.00 1.00
1.00 1.00 t .00
0.50 0.50 0.50
2.00 2.00 2.00
7.00 7.00 7.00
2.00 2.00 2.00
8.75 8.75 8.75
3.00 3.00 3.00
4.00 5.00 4.00
6.50 6.50 6.50
1.00 1.00 1.00
2.00 2.00 2.00
1.00 1.00 1.00
1.00 1.00 1.00
7.75 7.75 0.25 8.00
12.50 12.50 12.50
5.00 5.00 5.00
2.00 2.00 2.00
0.75 0.75 0.75
1.00 1.00 1.00
10.50 10.50 10.50
7.00 7.00 -0.25 6.75
1.00 1.00 1.00
5.00 5.00 5.00
11.00 11.00 11.00
2.00 1.00 - 1.00 1.00
5.00 5.00 5.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
0.00 1.00 1.00 1.00
6.00 6.00 6.00
4.00 4.00 4.00
2.00 2.00 2.00
1.00 1.00 1.00
0.75 0.75 0.75
tTOTAL COMMUNITY SERVICES 152.00 153.00 154.00 0.00 0.00 0.00 153.00
(1) Reclassification of 0.75 Office Specialist to 0.75 Program Assistant.
Attachment 2
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
ADMINISTRATIVE SERVICES DEPARTMENT
As of November 30, 2002
10106 Enterprise Backup Minor
Solution
$70,000 $70,000 50 570,000
City Network
Hardware
Redundancy
10107 Minor $57,500
Pre-design Dec 03
$0 Complete
10108 Systems Minor $320,000 5149,294 539,949 $109,346 Construction Dec 03
Management
10109 Acquisition Crime Minor $75,000 $45,173 S45,150 $23 Complete
Analysis Software
10110 Map Printing Plotter Minor $50.000 $2,414 $2,200 S214 Complete
10111 Vehicle Routing Minor 550,000 $26,050 $26,050 $0 Complete
Application
10112 IT Disaster Minor 5270.000 $270,000 $0 $270.000 ~ Desi~n~Jun 04
Recover’ Plan
Minor $50,000 $36,014 52.346 $33,668 Construction Jun 0310225Cable Television
Broadcasting
Equipment
Evaluating vendor solutions
and awaiting the
completion of the
Computer Room
remodelling.
Total budget of $57,500
wil! be transferred to CIP
#10216 thru a FY 02-03
BAO that will be presented
to Counci! in Feb 03.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
ADMINISTRATIVE SERVICES DEPARTMENT
As of November 30, 2002
19711
Permit Information Multi-Year
Tracking System
Citywide Network Multi-Year
Improvements
$410,000 S01
S187,315i Construction
$O $0 Complete
Jun 05
Adjusted budget of $26,901
will be transferred to CIP
#10216 thru a FY 02-03
BAO that will be presented
to Council in Feb 03.
10021 / New Phone System Multi-Year S730,000 $728,968 S2,285 S726,683 Pre-desQma Jun 04
82201
10027 Renovations and Multi-Year $800,000 $754,004 $7’44,629 $9 376 Construction Feb 03
Upgrades to Data
Mana~_ement
10212 Desktop Multi-Year S55,000 $55,000 $0 S55,000 Ongoing Jun 03
Automation
10213 Institutional Multi-Year $!,000,000 $1.000,000 $0 S1,000,000 Construction
Network (I-Net)
10214 eGov - Web Multi-Year
Infrastructure and
10215
Application
Citywide GIS Data, Multi-Year
Infrastructure and
Applications
10216 Enterprise Resource Multi-Year
Planning
82200 ,kcquisition of New Multi-Year
Computers
S400,000 $354,166 SO
S768,530i $625,248!$54,662i
$3.059,726 $2,966,908 $2.941,842
$150,000 5150,000 $95,363
.
5354,166 Design
5570,586 Ongoing
S25 066 Construction
S54 637 Pre-design
Apr 05
Jun 06
Jun 04
Jun 04
Feb 03
A number of the City’s
remote facilities have been
connected via fiber connect-
ions and will continue to
connect remote facilities
via fiber. The City
connection to the I-Net will
begin once the I-Net is
completed by AT&T in
2003.
Currently laying the
foundation for eGov with
ERP and some other relatec
projects.
There wil! be a mid-year
adjustment to the budget
involving transfers from
other related CIPs which
will be presented to
Council in Feb 03.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
COMMUNITY SERVICES DEPARTMENT
As of November 30, 2002
19901 Robles Park Minor
Irrigation
Improvements
19905 Cubberley Athletic Minor
Field Irrigation
10113 iEl CaminoMedian!Minor
iLandscape
10224 Children’s Theatre Minor
Ligd-lt & Sound
Systems Upgrade
10301 Wildhorse Valley Minor
Vehicle Bridge
Replacement
10305 Lucie Stem Minor
Community
Theatre Stage
Floor Replacement [
$10,000 ;
S30,000
$1.527.000
S210,000
S160,000
S45.000
$649~
S16.267~
5tA49,000
$210,000
S160,000~
$45,000
S649 !
Sll,993 ~
$1,099
S1,500
so
so
$o
$4,275
S1 ’447901
i $208,500!
!$!60,0001
$45.000
Complete
Complete
Design
Design
Desi~ma
Design
Dec 03
Jun 03
Aug 03
Jul 03
Phase 1 median
landscaping.
19414
19418
19801
19803
19812
19910
19911
Park Imgauon and iMulu-Year
Backflow
Improvements
Library Multi-Year
Automation
Service
S1,708,000
S1,286,751
School Site
Irrigation
Mitchell Park
Facilities
Arastradero
Preserve Gateway
Multi-Year S691.000,
Multi-Year $2,382,644
Multi-Year S339,800
Community Multi-Year S891,000
Theater
Renovation
Cubberley Theater Multi-Year
Improvement
S t 20,000
Sl12,43ti
S712,5t9!
S203,491~
i S1,350,141 :
i $261,897~
$48,642~
S3,280 ~
S102,871 i
$3,153
$44,704
S487,974
St9,8tl
S2,934!
$3,279’
S9,560
$709,366
S158,787i
S862,1671
$242,086i
S45,708
S1
Construction
Construction
Design
Design
Construction
Complete ’
Dec 03
Dec 04
i Sep 03
Dec 03
Dec 03
Jun 03
Jordan Elementary School
Phase 2
Final construction drawing
are being prepared.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
COMMUNITY SERVICES DEPARTMENT
As of November 30, 2002
i 0001 Park Trails Multi-Year
10002 Open Space Lakes Multi-Year
& Ponds
Maintenance
10003
and Site
Improvements
$881,000
Bayland Parking Multi -Year
$648,433
S110,000 $21,739
$328,191 i S320,241 Constructlon ,aa-astradero Creek Trail and
Arastradero Preserve de
Anza Bridge were
completed Oct 02;
Arastradero Trails will be
completed Jul 03; Bay Trail
will be completed Nov 02
and Foothills Park amenities
will be completed May 03.
S897,000
10009 Medians, Islands Multi-Year $468,000
and Planters
Renovation
Projects
10010 Park Facilities Muhi-Year
Improvements
Community
Services Facilities
Lighting
Enhancements
Muhi-Year
10218 [Palo Alto SOFA Multi-Year
Park
S1,755,450
$334,000
$500,255~
S439,466
$646,989
S319,217
S0i $21,739
$32,198i $468,058
$5.732 $433,734i
S132.468} $514,521
$217 $319,000
Construction
Construction
Design
Design
Desi~
Dec 02
City of Palo Alto Site and
Design Review ongoing.
Byxbee Park Lot and
Sa ling Station Lot will be
completed May 03; Harbor
Road widening and Nature
Center Parking Lot will be
completed Jul 04.
Jul 03 [New play~ounds at three
parks and design of
Baylands Athletic Center
electricals.
Nov 03 Main Library and Art
Center construction
expected to take place
S236,000 S221,616 S550 $221,066 Pre-design Apr05 Designer proposals are
being accepted.
Summer 03. Lucie Stem or
hold until new parking lot
confizuration is determined
Dec 04 Re-landscaping all medians
and island on San Antonio
Road.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
FIRE DEPARTMENT
As of November 30, 2002
9821 Emergency Minor
Notification System
S172,000 $73,194 $0 S73,194 Construction Jun 03
10211 New Air Minor
Compressor for
SCBA
10302 Apparatus Floor
Lockers for Fire
Stations #1,3,4,5,7
&s
10303 Additional Fire
Frequency
Minor
Minor
$40,000
$40,000
S95,000
S40,000
$40,000
$95,000
$40,000
SO
S0
SO
$40,000
S95,000
Complete
Design
Design
Jul 03
Jul 03
19312 Fire Multi-Year
Communications
Computer Systems
Fire Station Multi-Year
Driveway
Modification and,
Installation of
Oil/Water Separator
System
S485,050
S171,000
St96,383
$3,975
S185,223
$3,857
S11,161
S119
Construction
Construction
Jun 03
Jun 04 Project deferred until FY
03-04 due to the bottom
line expenditure
reduction plan.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND NAME: GENERAL FUND/STREET IMPROVEMENT FUND (SIF)
PLANNING DEPARTMENT
As of November 30, 2002
Bikeway System Minor
Improvement (SIF)
19524
10116 Sheridan Sidewalks Minor
10205 E1 Camino Real/ Minor
Ventura Avenue
Traffic Signal
]Traffic Signal San Minor
Antonio/Hwy 101
10206
Master Schematic Minor
Design
10223
S51,200
$31.000
s~l,ooo
$234.000
$288,000
$600
$31,000 SO
$0
S234,000 SO
S150,333
$49,000
$150,333
$31,000
S61,000
Design
S234.000
Desig-n
Pre-design
Design
Pre-design
Mar 04
TBD
Dec 05
Dec 03
Mar 03
Reappropriation in the mount of
$49,000 was approved by Counci
on January 13, 2003. Projects
wil!~ be implemented in
conjunction with Bicycle Plan
recommendations.
Project is being implemented by
Public Works.
Calwans is the lead agency for
this project. Caltrans indicated
that they will fund the project in
FY 04-05. Staffhas requested
that Caltrans move the project
forward and fund it in FY 03-04.
City is awaiting Caltran’s
response.
Cattrans is the lead agency for
this project. City’s share for thi!
project is estimated to be
$280,800. Staff will be
requesting an additional $46,80(
as mid-year budget adjustment.
Following Council approval of
the additional funds, City will
execute cooperative agreement
with Caltrans in 4th Quarter for
FY 02-03 who will implement
t i-t is project.
Memorandum of Understandin~.
with Caltrans is being prepared.
Schematic Design will be
presented to the Planning &
Transportation Commission an~
City Council in the first quarter
2003.
19310
19523
Embarcadero Multi-Year
Pedestrian Bike
Bridge Path
Extension (SIF)
E1 Camino Real Multi-Year
Intersection
Improvements (SIF)
St,526.770 $1 243,606
$212.750 [S17,745
$104,385 $1,139,221
S17.504 $241
Design
Pre-design
Dec 03
Jun 03
Staff will bid the project in earl
2003 and will commence
construction in Spring 03.
Project is being implemented b
CSD. Construction bids recelv
Oct 02. Project will be comple
by Spring 03.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND NAME: GENERAL FUND/STREET IMPROVEMENT FUND (SIF)
PLANNING DEPARTMENT
As of November 30, 2002
19813
19814
10026
10117
SchooICommute. Multi-Year $300,000
Safety
lmprovemems (SIF)
Residential .amerial Multi-Year
Traffic Calming
(SIF)
Local and Multi-Year
Neighborhood
Collector Street
Traffic Calming
Program
El Camino
Real/Churchill
Avenue
Multi-Year
S125,000
$320,000
$ 100,000
S141,364
$!6.029
$287,451i
S 100,000
$74,415
$16,029
$172,491i
$66,949!
$114,960i
Design
SlO0.O00
Complete
Ongoing
Design
! Jun 04
TBD
TBD
The remaining projects include
intersection modifications at
Stanford Avenue and El Camino
Real which must be coordinated
with Caltrans. Project pending
response from Caltrans.
Since the formal start of the --
Neighborhood Traffic Calming
Program in Apr 0t, six projects
have been started. The Louis
Road project was implemented
for a trial period but was remove~
[and a design for a second trial is
being pursued. The Churchill
Avenue project ended with no
action. The IndiardMoreno trial
will be implemented Jan 03. The
Ross Road
education/enforcement trial has
concluded and is awaiting
evaluation. The Moreno Avenue
proposed trial project is awaiting
the outcome of the resident
survey. A trial plan for the
Waverley Street project is still
under development. A seventh
project will be started in January’
or February. Several other
qualified projects are on the
waiting list to start.
Project has been postponed
indefinitely’ due to the bottom lit
expenditure reduction plan.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
POLICE DEPARTMENT
As of November 30, 2002
10217 Public Safer?,Minor $75,000 $75,000 $0 $75,000 Design Mar 03
Mobile Data
Computer
9109 Police Computer Multi-Year $1 133,762 $34,004 $0 $34.004 Complete
Systems ’,
19913 Police Records Multi-Year $526,435 $375,518 $334,944 $40,574 Construction Mar 03
Management
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMENT
As of November 30, 2002
19820 Public Safety Minor $765,028 $343,158 5341,910 $1,249 Design Jun 03 Continuing site, seismic and
environmental assessments forBuildingpreferred option.
10004 Downtown Library Minor SI03,000 $24.680 $0 $24,680 Complete
Roof Replacement
and Exterior
~005 MSC Building A,Minor $100,000 $89.803 S74.935 $14.868 Complete
Emergency
Generator
Replacement
10007 ,-M-t Center Plumbing Minor $32,000 $31,966 $5,150 $26,8t5 Complete
Replacements
10008 Mezzanine Heating -Minor S 100,000 S84,494 SO $84,494 Complete
Ventilation-Air
Condition (HVAC)
~017 Minor S100,000 S93,446 $0 S93,446 Complete
System
Improvements
Adobe Creek
Pedestrian/Bike
Undercrossing and
Highway 101
Pedestrian/Bike
Overpass Lighting
Improvements
Sand Hilt Road
Bridge
10018 Minor S83,000 S75,981 $2,000 $73,981 Planning Feb 03 Caltran reviewing plans and
once approved ",,,’ill go out to
bid.
10101 Children Theater Minor S45,000 $44,931 $21,426 S23,505 Complete
Exterior
10119 Baylands Bike Trail Minor $t00,000 S100,000 $0 $100,000 Construction Jan 03 Bike trail currently under
Replacement construction.
10204 Libra,’ Master Plan Minor $977.550 $157,162 $152,909 $4.253 Pre-design Project failed bond measure,
staff is proposing individualProject Definition projects durin,, 03-05 bud,,etStudy~~
process.
10208 Miranda Avenue Minor $100,000 $100,000 $0 $100,000 Complete ;There will be a mid-year
¯adjustment to the budget toStreet Improvements move it to CIP #18670.
102"19 Fire Station Seismic Minor $125,000 $105.818 $46,619 S59,!99 Pre-design Mar03 Seismic study being finalized.
Evaluation
10220 Golf Course Minor $60,000 $58,559 $53.350 $5,209 Construction Jun 03
Maintenance Shop
Improvements
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMENT
As of November 30, 2002
Minor0226 Mitchell Park
Library Expansion
0304 Roth Building Minor
Win,,s Demolition
10306 Animal Service Minor
Protective Holding
Kennels
S85,000
~ $930,0001
S160,000i
$83,2501
$930.000:
S160,000
S76,789i $6,461
$5,225i $924,775i
S160,000
Planning
Pre-design
Jan 03
Dec 04
The City is currently negotiatin8
an agreement with Summerhill
Homes whereby Surnmerhill
will take the lead in the design
and potentially demolition of
the Roth Building wings.
18508 / Public Buildings
19906 Structural: Current
Projects are College
Terrace and
Children’s Librar3’,
MSC Study
Multi-Year 56.958.297
Harbor
Improvements
Amstradero Lake
Rinconada Pool Site
Improvements
Revenue Collection
Civic Center Plaza
Waterproofing
S563.992 $23,592 $540,400 Ongoing Staff has requested that CIP
#18508 be closed and has
requested a new project be
opened for College Terrace in
03-05 budget process to begin
design phase. Children’s Librar
to begin design phase pending
approval of FY 02-03 mid-year
BAO. CIP #19906 is in pre-
design phase with an estimated
completion date Dec 03.
Feasibility study is in progress
and once the study is complete,
findings and recommendations
will be presented to Council.
18918 Multi-Year $2,t39,000 $115.093 $43,758 571,335 Complete Mandatory monitoring required.
19102 Multi-YeA S280,000 S35,313 S514 S34,799 Complete
19406 Multi-Year $1,755,000 S44,599 $35,004 $9,595 Complete
-~-505 Multi-Year $85.000 $57,470 $56,727 $743 Jan 03
19512 Multi-Year S250.000 $178,084 $24.667 $153,417 Jun 03
$174,299 S0 $174.299Multi-Year S1,128.000
Construction
Design
Complete19514Facilities Roof
Replacements:
Mitchell Park
Comm. Cm &
Librars,, Station 5
Staff will hire additional
consultant to conduct further
investigation and analysis in
order to make recommendations
for future repair and seek
alternatives to a costly
replacement.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMENT
As of November 30, 2002
19608
19624
19704
Garage and Non-
Parking
Downtown Urban
Design
Improvements
Golf Course
Improvements
Traffic Control
Safety Devices
Multi-Year $1.220,349
Multi-Year 56.284.228
Multi-Year 5320,000
19707 Fire Station Multi-Year
Emergency
Generator
Replacement
19815 Arastradero Rd. Bike Multi-Year
Lane Improvements
(SIF) i
19907
19922
iSanMateo Drive iMulti-Year
iBddges ,
3rd Fir - Civic
Center
Multi-Year
i S415,000
! $455,000
5118,000
S481,934
! $105.149
$105,257
$284,161
$369,148
S353.349
S104,567
$65,413}
530,654
50
S356.480
5351,740
50
$1,000
S74.495
5105.257
i 5284,161
i s12,668
S 1.609
S104.567
¯Ongoing
Complete
Design
Complete
Construction
Design
S64,413 Complete
Dec 04
Apt 03
i JunO3
i TBD
Staff has requested funding for
Phase 2 design in FY 03-04.
Reappropriation of S284,161
approved by’ Council on Januar
13, 2003
Reappropriation of S 1 04,567
approved by Council on Januar
13.2003.
F’Y 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMENT
As of November 30, 2002
Jun 04
10006 Roofing Multi-Year $392,500 $296,067 $0 $296,067 Ongoing Multiple projects.
Replacement
10019 Inspection and Multi-Year S75,000 $10,377 $0 $10,377 Complete
Testing for
Hazardous Materials
10020 Office Space Multi-Year S882,934 S143.052 $74.542 $68,510 Construction Jun 03
Renovation
Realtocation
10102 Civic Center Multi-Year $2.312,000 S2,257,986 $188.442 S2,069,544 Design Dec 04
Infrastructure
Improvements
~-~Elec~cal Systerr~ Multi-Year $115,000 $114.697 $105,668 59,030 Construction Ongoing projects.
Improvements
"~104 Fire Station "Multi-Year S174.000 $174,000 54,000 5170,000 Design Jun 04
Improvements
10105 Lucie Stern Multi-Year $51,000 $50,975 $0 $50,975 Design Jun 03 RFP will go out in Feb 03,
design to begin in Mar 03.
Com_munity Center
Improvements
10121 Homer Avenue Multi-Year 52,800,000 $2,396.958 $2,085,185 Design Mar03 Staff is currently finalizing
100% design.
Undercrossing
10210 New VebAcles Multi-Year $190,000 S29,823 $12,942 Complete
On~_oing projects.
10222 Facility Interior Multi-Year $ t 00,000 599,100 $64.400 Design
Finishes
10300 Multi-Year $20.O00 520,000 $20,000 Design Jun 05Foott~ills Park
Interpretive Center
Mechanical
Upgrades
$311,773
S16.881
$34,700
$0
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
INTERNAL SERVICE FUND
GENERAL FUND
PUBLIC WORKS DEPARTMENT
As of November 30, 2002
10o22 /
81101
10023 /
81102
81100
81105
81106
MSC Fuel Minor
Storage/Svc Island {
Replacement
MSC Equipment Minor
Washing Facility
Upgrade
MSC Equipment Minor
Maintenance Facility
Mezzanine Storage
Area
Wireless Vehicle Minor
Management System
Fuel Storage Tanks Minor
Upgrade
i $900,000
S300,O00i
$85,000i
$25,000i
S25,000 ~
S740,350i $14,668i
S274,214i S35,4621
S78,000 ~S65.740i
S25,000
$25,000
$565
S725,682 Desizn Jun 03
S238,752 Design Jun 03
S 12,260 Desi-°n Jun03
S24,435 Construction ;;J~n 03
S25,000 Design Jun 03
Design 90% complete. Will
bid for construction Jan 03.
Desizn 50% complete. Will
bid for construction Jan 03.
Construction will commence
Feb 03.
Stationary infrastructure will
be in place by Feb 03.
Vehicle outfitting is
ongoing.
Design for Foothills Park
facility complete.
Construction will commence
Mar 03.
19205
19521
81104
Fuel Tank Multi-Year
Storage/Upgrade
[Wireless Vehicle Multi-Year
Management System
$291,000
$205,000
$50,062
$27,711
S50,000
$20,734
$62 Design Jun 03
$6,978 Construction Jun 03
Golf Course Multi-Year
Equipment
Replacement
New Vehicles Multi-Year
5145,000
$208.000
$81,849
$208.000
S401
$32.746
S81,448 Ongoing Jun 03
$175.254 Construction Jun 03
Design for Foothills Park
facility complete.
Construction will commence
Mar 03.
Stationary infrastructure will
be in place by Feb 03.
Vehicle outfitting is
on,,oin,,.
Bids will be issued by Feb
03.
Two vehicles have been
delivered, and two more are
on order. Final unit will be
ordered by Feb 03.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: ELECTRIC FUND
DEPARTMENT NAME: UTILITIES DEPARTMENT
As of November 30, 2002
0008 Adobe Crk Subst Minor
Cable Replacement
0125 Nexv Vehicles Minor
0121 Natural Gas Back- Minor
Up Generator
0216 New Vehicles Minor
S350.000 $20,761 SO
$149.600 S521 $3
54.982.739 $605,431 S342.730
$30,000 S1,080 S0
$20,761 Complete
$518 Complete
$262.701 Complete
$1,080 Construction Jul 03
9250 Alma St 12KV Multi-Year $1.640.000
Addition
9904 East Meadow UG Multi-Year 5400 000
Systems Rebuild
9916 Fiber to Home Trial Multi-Year 51.005,000
9611 Embarcadero/Middle Multi-Year 55,360.000
field UG Conversion
District #37
9804 OregordColorado/Co Multi-Year $2,790.000
wper UG Conversio~
District #38
9901 Stanford West
Underground
Extension
Multi-Year
9902 Stanford Shopping Multi-Year
Ctr 4-12kV
Conversion
$1.700.000
$500.00~
549,376 $298[
S6,933 $0
$19,537 S1,260
S582.180 S8.836
S2,554,677 S302,35~-
5214.336
$93,105
549.078 Desi~
S6,933 Complete
$18.277 Complete
$573,3~44 Construction
$...b~,319 Construction
5120 $2t4.216 Construction
$0 $93,105 Complete
TBD
IVlar 03
Dec. 04
Jul 03
Project is on hold.
Waiting for pole removal
from Pac Bell.
Design complete.
Construction complete
except for the senior
housing complex.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: ELECTRIC FUND
DEPARTMENT NAME: UTILITIES DEPARTMENT
As of November 30, 2002
9903
0006
Stanford Park UG Multi-Year $4’.075,000 $1.695,552
Cable Rebuild
$75,676 $1.619.876 Construction Jul 04
Park Boulevard Multi-Year
Substation Bus Re-
arrangement
$2.755,000 $2.618,083 $148.620 S2,469.463 Design Dec 03
First two phases are
complete. Third phase
begins construction Jul 02.
Design complete.
Construction bidding will
occur in Jan 03.
0010 CitylFacs/Svst Multi-Year S 190,000 $163.748 S0 $163,748 Complete
Upgrade Electric 1
Vehicles
0103 Under_qround Multi-Year S1 000.000 S975.486 S142.299 S833,187 Design Mar 03 Contract out to bid.~Construction will be
Cable/Equipment complete by Mar 03.Replacement
0115 West Bayshore UG Multi-Year 5450.000 S109.336 $105.’447 Construction Jul 03
System Rebuild
0116 S579.000 S94,676 Construction Mar 03Downtown Street Multi-Year
Light System
Upgrade
Upgrade Traffic Multi-Year
Signal Control
System
North/South Multi-Year
Hampton UG
System Rebuild
Baylands Multi-Year
Underground
~Multi-YearSCACA System
Upgrades
Electric Utility GIS Multi-Year
S214,783~
S511,233[
$1,878,9541
S416,5571
$199.7191 S1,679.235 Construction
S1,560.422 Construction
Jun040117
Data
ShermardE1
Camino/Page
MillfPark UG
Conversion District
#39
S1.905,000
Construction complete by
Jul 03.
Design complete.
Construction beginning in
Nov 02.
{Construction complete by
Jun 04.
Edgewood Drive Multi-Year
Underground
Conversion District
#40
0313 Utilities Estimating Multi-Year S250.000 S250,000 SO S250,000 Design Jut 03 Bid packageis being
System prepared.
0314 S50,000 S50,000 S0 S50.000 Design Dec 03 Design will start in Jan 03.
0102 S1 700.000 S1 578,491[S18,069 Jul 03 Test construction complete.
Final design in progress.
0209 S500.000 S499.866 S13,855 $486.011 Design Jul 03 Design in progress.
0210 $400.000 S200,370 S44.539 S155.831 Design Jul 03 Installation complete.
0211 S162.500 $146.625 S43,903 S102.722 Design Jut 03 Contract has to be signed to
create layering standards.
0305 Multi-Year $95,000 S95.000 S0 $95.000 Design Dec 05 Formation of the District
will start in Apr 03.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: GAS FUND
DEPARTMENT NAME : UTILITIES DEPARTMENT
As of November 30, 2002
0118 All Weather Minor
Arastradero I
0120 Gas Main Minor
Directional
0213 Directional Boring Minor
Machine
0310 CNG Sequential
Fuel System
0311 New VebScle
Minor
Nlinor
$70,000
S275,000
$47,500
S126,000
$75,000
$27,000
S55,548 S42,012
S251,575 $237,979
S2,725 $2,699
$47,094 S700
$75,000
S27,000
$0
$22,706
$13,536
$13,596 Construction Jun 03
$26 Complete
S46,394 Construction Jun 03
$75,000 Design Oct 03
S4,294 Constraction Jun 03
Contract work will be completed
after the rainy season is over.
Equipment delivered, specifying
auxillary parts and conducting
training.
Planning permits approved,
preliminary plans completed.
Project to bid in Mar 03.
0011 Compress Natural 1Multi-Year S440,000
Gas Station {
0119 -Global Positioning Multi-Year S381.000
System
$379,929
S320,157
$0
$80,132
5379,929
$240.025
Desi~mn Oct 03
Construction Jun 03
Project integrated with MSC
liquid fuel station project.
Project will go out for bids in
Mar 03. Construction starts Jul
03.
GPS Base Station installed on
top of City Hall. Roving data
0307 Directional Boring
Equipment
0308 Polyethylene
Fusion Equipment
vlulti-Year
Multi-Year
S47,500 $47,500
S25,000 S25,000
so
so
$47,500
$25,000
Pre-Design Jun 03
Pre-Design Jun 03
collection unit purchased. Three
more on order. Staff training in
{ FeblMar 03.
Settin_o up blanket order with
local equipment supplier.
Setting up blanket order with
local equipment supplier.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: WATER FUND
DEPARTMENT NAME : UTILITIES DEPARTMENT
As of November 30, 2002
0109 Mayfield Reser-,’oir Minor
Roof Repairs
0113 Irrigation Meter Minor
Installation Program
0114
0217
0312
Land Acquistion for Minor
a resetstit, a well
and pump station.
Water Botding Equip Minor
5290,000 $16,908 S0
S60,000 $59,335 S0
$2.000,000 S1,999,055 S1.466.948
$25,000 S24,430 S0
$16,908 Complete
$59,335 Pre-Design
$532,t07 Pre-Design
$24,430 Pre-Design ;
TBD
Jan 05
Jun 04
Havin~ difficulty with customers
taking advantage of pro=m-am
benefits.
The Carollo contract
encumbered under this MPN
should be encumbered under
MPN 0205.
MinorNew Vehicles ,S50,000 $50,000 $43 855[$6,145 Construction Jun 03 Vehicles purchased. Final
vehicle configuration in
progress.
8749
9704
0108
0110
0111
Water Reser’,’oir Multi-Year
lmpmv.
Water System Study Multi-Year
Foothills PRV [Multi-Year
Installation
Reservoir Booster Multi-Year
Improvements
Distribution System Multi-Year
Water Quality
Enhancement
Noti $63.294i $49.453i
Available
$275,0001 $40,5981 $39,705i
S236.0001 S235,150
$1.360.000 $1.359.055 5407.210
$457.000 S456.055 S121.041~
S13,841 Complete
$893 Complete
$235,150 Design
S951,845 Design
5335,014 Design
i Sep 03
Sep 03
Sep 03
Carollo is designing the PRV
station improvements. Four
additional receiving station
PRV installations were added.
Design contract awarded to
Carollo En~ineerinz. Desi-n of
booster station improvements
has started.
}Design contract awarded to
Carollo Engineering. Design of
reservoir water mixing systems
has started.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: WATER FUND
DEPARTMENT NAME : UTILITIES DEPARTMENT
As of November 30, 2002
0112
O2O4
0205
0206
;Booster Station Multi-Year
Existing Well Rehab Multi-Year
E1Camino Park Multi-Year
Resep,oir and Pump
Station
E1 Camino Park Well Multi-Year
0207 Middlefield Road
Well Site
0208 Eleanor Pardee Park
Well
Multi-Year
Multi-Year
S205,000{
S950,000
S 1,700.000
$280,000~
S280,000
$280.000
S2040551
S949,400!
S1 699,810
S279,737i
$279,737
$279,452!
S628!6!
SO
$0~
$266,622i
S141,239 Desi=ma
$949.400 Pre-Design
S 1 699 810 Design
$13,115 Design
S0 S279,737i Pre-Design
S0 S279,452 Pre-Design
Oct 03
Jan 04
Jan 04
Jan04
Jan 04
Jan 04
Design contract awarded to
Carollo Engineering. Design of
booster station pump systems
has started.
Contract awarded to Carollo
Engineering for Phase II Water
Study Design.
Design contact awarded to
Carollo Engineering. Siting of
new reserwoir and pump station
systems has started.
Design contract awardedto --
Carollo Engineering. Design of
new wel! will start after the new
resep,,oir is sited.
Contract awarded to Carollo
Engineering for Phase II Water
Study Design.
Contract awarded to Carollo
Engineering for Phase II Water
Study Design.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: WASTEWATER COLLECTION FUND
DEPARTMENT NAME : UTILITIES DEPARTMENT
As of November 30, 2002
0122 Wastewater Minor
Collection System
Master Plan
9173 Wastewater
Rehab/Augment
$400.000 $233,755i $233.533!$222 Desi~ma Aug 03
iMulti-Year i$2.119,390 $541.688i $146.806 $394,882 Construction Jun 03
Hydraulic Model
calibration is in pro~ess.
Contractor working on
punch list items to finish
out project.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: MULTI FUNDS
DEPARTMENT NAME: UTILITIES/PUBLIC WORKS
As of November 30, 2002
9905 Ut lities Bill Print Minor
DesLma
S4,666,553 $900,029 $36,228 S863,801 Construction Jun 07
DOC1 application, eBPP
functionality is now being
researched.
9357 Utilities Customer Multi-Year
Info. System
Major upgrade of software was
completed in Apr 02. The TCP
contract is being upgraded to a
7x24 support contract, This will
be completed before the end of
02-03. New server upgrades are
in the plan for 03-04. The CWA
project is underway and will
completed in 02-03. Further
Banner upgrades are being
planned.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: REFUSE FUND
DEPARTMENT NAME: PUBLIC WORKS DEPARTMENT
As of November 30, 2002
0219 FuelTruck Minor $115,000 $115,000
9701 Multi-Year $2,287,722 $1,876,t72 $381.661 $1,494,511Pre-Design May 10Environmental
Sen, ices Center
Project delayed until
completion of study to
discover all existing
Baylands Policies.
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: STORM DRAINAGE FUND
DEPARTMENT NAME: PUBLIC WORKS DEPARTMENT
As of November 30, 2002
FY 02-03 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND TYPE: ENTERPRISE
FUND NAME: WASTEWATER TREATMENT FUND
DEPARTMENT NAME: PUBLIC WORKS DEPARTMENT
As of November 30, 2002
9805 Effluent Line Minor $150.000 $43,784 $0
Modification
0215 500 KW Minor $150,000 $41,181
Emergency
Generator
$43,784 Complete
$4t,181 Complete
9504 Interceptor Multi-Year S1.750,000 $105,796 $48,913 S56,883 Construction Sep 03 F nal contract is planned for
Maintenance Apr 03.
Cleanin~ and
Repair
9707 Wastewater Solids Multi-Year S7 500,000 $136,246 $151,793 ($15,547) Construction}Jun 03
Disposal Project
Checklist items and
warranty work still needs to
be done. Mid-year BAO
submitted for $141.706.
Attachment 3
ADMINISTRATIVE SERVICES
18614
19618
19808
19914
Financial Database Upgrade
GIS Application
Financial Applications Development
New Computer Acquisitions
COMMUNITY SERVlCES
18617
19415
Art in Public Places
Park Facilities Improvements
PUBLIC WORKS
General Fund
18903
18971
18670
19018
19101
19309
8870
8021
8022
Sidewalk Improvements
Street Improvements (Utility Users Tax)
Street Improvements (Street Improvement Fund)
Cubberley Building Code Modification
Tank Investigation and Removal
ADA Compliance
Storm Drainage Fund
Collection System Improvements
Wastewater Treatment Fund
RWQCP Plant Equipment Replacement
RWQCP System Flow tvletering
UTILITIES
8928
8930
8931
8938
8944
9354
9703
9801
9802
9803
Electric Fund
Customer Design and Connection Sere’ices
Traffic Signals Upgrade
Communication System Improvements
Substation Protection Improvements
Substation Facility Improvements
Street Light Replacements
Underground Cable and Equipment Replacement
Fiber Optics Ring System Improvements
Fiber Optics Customer Design and Connection Services
Electric Distribution System Reconstruction and Improvements
Gas Fund
8017
8019
9230
8018/9912/0002/0104/0201/0302
0309
Gas System Extensions
Gas Meters and Regulators
Natural Gas Vehicle Conversions and Purchases
Gas Main Replacements
Unreimbursed System Extensions
Wastewater Collection Fund
8020 Sewer System Extensions
9913/9914/0003/0105/0202/0303Sewer System Rehabilitation and Augmentation
Water Fund
8013
8014
8015
8016/9915/0004/0106/0203
0214/0304
Water System Extensions
Sere’ice and Hydrant Replacements
Water Meters
Water Main Replacements
Water-Gas-Wastewater Utilities GIS Data