Loading...
HomeMy WebLinkAbout070912-2800-Lot-J City of Palo Alto (ID # 2800) City Council Staff Report Report Type: Consent Calendar Meeting Date: 7/9/2012 July 09, 2012 Page 1 of 5 (ID # 2800) Summary Title: Cowper/Webster (Lot J) Garage Structure Repairs Contract Title: Approval of Contract with Green Earth Engineering & Construction Inc. in the Amount of $388,000 for Demolition and Construction Work for the Cowper/Webster (Lot J) Parking Garage Structure Repair Project (CIP PF-10002) From: City Manager Lead Department: Public Works Recommendation Staff recommends that Council: 1. Approve and authorize the City Manager or designee to execute the attached contract (Attachment A) with Green Earth Engineering & Construction Inc. in the amount of $388,000 for demolition and construction work for the Cowper/Webster (Lot J) Structure Repair Project (CIP PF-10002); and 2. Authorize the City Manager or designee to negotiate and execute one or more change orders to the contract with Green Earth Engineering & Construction Inc. for related additional, but unforeseen work which may develop during the project, the total value of which shall not exceed $38,800. Background Site Information The Cowper-Webster, Lot J, public parking garage is located on a 60,000 square foot parcel in Downtown Palo Alto in the center of a commercial block and can be accessed from Cowper and Webster Streets. The existing parking garage was originally constructed in 1984 with four floors above grade and one floor below grade. Two additional levels were constructed in 1990. The site is surrounded on July 09, 2012 Page 2 of 5 (ID # 2800) four sides by various commercial uses and building types. The proposed project is primarily a maintenance project that brings the railings up to the current Building Code and removes deteriorating wood trellis elements on the garage facades. The wood trellis and railing systems cantilevering from the structure have deteriorated as a result of exposure to the elements. A structural engineering firm, Hohback-Lewin Inc., was retained to evaluate the existing conditions and make recommendations for repair. Hohbach-Lewin, in turn, teamed with Stoecker and Northway Architects, Inc., to develop an architecturally pleasing solution. Project Description Based upon the problems inherent in the cantilevered design of the trellises, the team agreed that it would be prudent to eliminate these elements. In recognition of the challenges associated with maintaining wood trim suspended several stories above the ground and related safety issues, it was also determined that the existing dimensional lumber elements of the guardrails should be removed. The design proposed for the new railing system is a traffic cable, similar to the cable railing system used for the garage on High/Alma Streets (Parking Lot R). On September 15, 2011, the Architectural Review Board (ARB) reviewed the proposed project in a Study Session forum. The ARB was generally very supportive of the project and there was minimal discussion on the project with little to no issues raised by the individual board members. On February 2, 2012 the ARB recommended approval of the proposed design, and the Director of Planning and Community Environment approved the project on February 2, 2012. Typically costs associated with maintenance of University Avenue parking structures are paid from the University Avenue Parking Permit Fund. However, because this particular structure was added to the parking district in part to enhance the City’s Downtown economic development opportunities and the fact that the current façade structure had unique City approved design elements (wooden trellis) that now need to be removed staff recommends that the General Fund bear 50% of the costs with 50% reimbursement from the University Avenue Parking Permit Fund. Due to the total of the costs it has been determined that July 09, 2012 Page 3 of 5 (ID # 2800) the City can spread the reimbursement over two years to not burden Parking Permit reserves and allow a sufficient fund balance. Discussion The work to be performed under this contract is the demolition of the deteriorated cantilevered wood trellis system on all four sides. The rain gutter system shall be cleaned and repainted to match the existing steel railing. A new traffic cable railing system will be installed to comply with the current Building Code requirement. This new railing system will increase the natural light into the parking garage and improve safety. The parking garage will remain in operation during the construction project. July 09, 2012 Page 4 of 5 (ID # 2800) Summary of Bid Process Bid Name IFB Number 145807 Lot J Cowper-Webster Street Parking Garage Structure Repairs Proposed Length of Project 90 calendar days Number of Bids Mailed to Contractors 15 Number of Bids Mailed to Builder’s Exchanges 1 Total Days to Respond to Bid 21 Pre-Bid Meeting? 04/23/2012 Number of Company Attendees at Pre-Bid Meeting 5 Number of Bids Received: 7 Bid Price Range From a low of $388,000 to a high of $577,000 *Bid summary provided in Attachment B. Staff has reviewed all bids submitted and recommends that the bid of $388,000 submitted by Green Earth Engineering & Construction, Inc., be accepted and that Green Earth Engineering & Construction, Inc., be declared the lowest responsible bidder. Staff confirmed with the Contractor's State License Board that the contractor has an active license on file. Resource Impact Funding for this work is available in Capital Improvement Program projects PF- 10002, Lot J Structure Repair with a 50% reimbursement to the Infrastructure Reserve to be allocated over fiscal years 2013 and 2014 from the University Avenue Parking Permit Fund. Policy Implications This recommendation does not represent any change to existing City policies. Timeline The project is scheduled to start in August 2012 and be completed in November 2012. Environmental Review Pursuant to the requirements of the California Environmental Quality Act (CEQA), July 09, 2012 Page 5 of 5 (ID # 2800) the project is categorically exempt from CEQA, per Section 15301. Attachments:  A: Construction Contract C13145807 Green Earth Engineering (PDF)  B: Bid Summary Lot J Cowper Webster Street Parking Garage Structure Repairs (XLS) Prepared By: Dennis Huebner, Manager Maintenance Operations Department Head: J. Michael Sartor, Director City Manager Approval: ____________________________________ James Keene, City Manager    1                              Rev. May 1, 2012                CONSTRUCTION CONTRACT    Contract No. C13145807        City of Palo Alto    and    Green Earth Engineering & Construction       PROJECT    “Lot J Cowper Webster Street Parking Garage Structure  Repairs”     2                              Rev. May 1, 2012           CONSTRUCTION CONTRACT                 TABLE OF CONTENTS      SECTION 1. INCORPORATION OF RECITALS AND DEFINITIONS……………………………….. ....................5  1.1 Recitals ................................................................................................................ 5  1.2 Definitions ........................................................................................................... 5  SECTION 2. THE PROJECT………………………………………………………………………………..............................5  SECTION 3. THE CONTRACT DOCUMENTS…………………………………………………………. .........................5            3.1           List of Documents …………………………………………………………………………………………. .....5            3.2           Order of Precedence ……………………………………………………………………………................6  SECTION 4. THE WORK …………………………………………………………………………………..............................6  SECTION 5. PROJECT TEAM ………………………………………………………………………….. .............................7  SECTION 6. TIME OF COMPLETION …………………………………………………………………............................7  6.1 Time Is of Essence ........................................................................................ ……… 7  6.2 Commencement of Work ..................................................................................... 7  6.3 Contract Time....................................................................................................... 7  6.4 Liquidated Damages............................................................................................. 7  6.4.1 Entitlement…………………………………………………………………………………………….   7 6.4.2 Daily Amount………………………………………………………………………………………….   8 6.4.3 Exclusive Remedy…………………………………………………………………………………..   8 6.4.4 Other Remedies…………………………………………………………………………………...     8 6.5 Adjustments to Contract Time........................................................................... … 8  SECTION 7. COMPENSATION TO CONTRACTOR………………………………………………………………………...  8  7.1 Contract Sum ………………………………………………………………………………………………………8  7.2 Full Compensation …………………………………………………………………………………………….. 9  7.3 Compensation for Extra or Deleted Work …………………………………………………………….9  7.3.1 Self Performed Work…………………………………………………………………………………9 7.3.2 Subcontractors………………………………………………………………………………………….9 SECTION 8. STANDARD OF CARE ...................................................................................................9  SECTION 9. INDEMNIFICATION......................................................................................................10  9.1 Hold Harmless ……………………………………………………………………………………………………..10  9.2 Survival ……………………………………………………………………………………………………………….10  SECTION 10. NONDISCRIMINATION ..............................................................................................10  SECTION 11. INSURANCE AND BONDS ..........................................................................................10  SECTION 12. PROHIBITION AGAINST TRANSFERS ..........................................................................11     3                              Rev. May 1, 2012  SECTION 13. NOTICES....................................................................................................................11  13.1 Method of Notice ………………………………………………………………………………………………..11  13.2 Notice Recipients .................................................................................................  11  13.3 Change of Address ............................................................................................... 12  14.1 Resolution of Contract Disputes........................................................................... 12  14.2 Resolution of Other Disputes ............................................................................... 12  14.2.1 Non‐Contract Disputes …………………………………………………………………………………….12  14.2.2 Litigation, City Election …………………………………………………………...........................13  14.3 Submission of Contract Dispute …………………………………………………………………………..13  14.3.1 By Contractor …………………………………………………………………………………………. 13  14.3.2 By City ……………………………………………………………………………………………………. 13  14.4 Contract Dispute Resolution Process...............................................................…… 13  14.4.1 Direct Negotiation…………………………………………………………………………………….13  14.4.2 Deferral of Contract Disputes …………………………………………………………………   14  14.4.3 Mediation …………………………………………………………………………..14 14.4.4 Binding Arbitration ………………………………………………………………..15 14.5 Non‐Waiver …………………………………………………………………………………………………………16  SECTION 15. DEFAULT...................................................................................................................16  15.1 Notice of Default.................................................................................................. 16  15.2 Opportunity to Cure Default ................................................................................ 16  SECTION 16. CITY'S RIGHTS AND REMEDIES ..................................................................................16  16.1 Remedies Upon Default ....................................................................................... 16  16.1.1 Delete Certain Services …………………………………………………………...........................16 16.1.2 Perform and Withhold ……………………………………………………………………………. 16  16.1.3 Suspend The Construction Contract ………………………………………………………….16  16.1.4 Terminate the Construction Contract for Default ……………………………………..17  16.1.5 Invoke the Performance Bond ………………………………………………………………….17  16.1.6 Additional Provisions ……………………………………………………………………………….17  16.2 Delays by Sureties................................................................................................ 17  16.3 Damages to City ................................................................................................... 17  16.3.1 For Contractor's Default …………………………………………………………………………..17  16.3.2 Compensation for Losses ………………………………………………………………………….17 16.5 Suspension by City for Convenience..................................................................... 18  16.6 Termination Without Cause ................................................................................. 18  16.6.1 Compensation ………………………………………………………………………………………….18 16.6.2 Subcontractors …………………………………………………………………………………………18 16.7 Contractor’s Duties Upon Termination................................................................. 19  SECTION 17. CONTRACTOR'S RIGHTS AND REMEDIES ...................................................................19  17.1 Contractor’s Remedies ......................................................................................... 19     4                              Rev. May 1, 2012  17.1.1 For Work Stoppage …………………………………………………………………………………..19 17.1.2 For City's Non‐Payment …………………………………………………………………………… 19  17.2 Damages to Contractor ........................................................................................ 19  SECTION 18. ACCOUNTING RECORDS............................................................................................19  18.1 Financial Management and City Access..........................................................……. 19  18.2 Compliance with City Requests ........................................................................ …. 20  SECTION 19. INDEPENDENT PARTIES.............................................................................................20  SECTION 20. NUISANCE.................................................................................................................20  SECTION 21. PERMITS AND LICENSES............................................................................................20  SECTION 22. WAIVER ....................................................................................................................20  SECTION 23. GOVERNING LAW .....................................................................................................20  SECTION 24. COMPLETE AGREEMENT ...........................................................................................21  SECTION 25. SURVIVAL OF CONTRACT ..........................................................................................21  SECTION 26. PREVAILING WAGES..................................................................................................21  SECTION 27. NON APPROPRIATION ..............................................................................................21  SECTION 28. GOVERNMENTAL POWERS........................................................................................21  SECTION 29. ATTORNEY FEES ........................................................................................................21  SECTION 30. COUNTERPARTS........................................................................................................21  SECTION 31. SEVERABILITY ...........................................................................................................21               5                  Rev. May 1, 2012      CONSTRUCTION CONTRACT    THIS CONSTRUCTION CONTRACT entered into on July 2, 2012 (“Execution Date”) by and between the CITY  OF PALO ALTO, a California chartered municipal corporation ("City"), and Green Earth Engineering &  Construction ("Contractor"), is made with reference to the following:    R E C I T A L S:    A. City is a municipal corporation duly organized and validly existing under the laws of the State of  California with the power to carry on its business as it is now being conducted under the statutes of the  State of California and the Charter of City.    B. Contractor is a corporation  duly organized and in good standing in the State of California,  Contractor’s License Number 657129. Contractor represents that it is duly licensed by the State of  California and has the background, knowledge, experience and expertise to perform the obligations set  forth in this Construction Contract.    C. On May 16, 2012, City issued an Invitation for Bids (IFB) to contractors for the “Lot J Cowper  Webster Street Parking Garage Structure Repairs” (“Project”).  In response to the IFB, Contractor submitted  a bid.    D. City and Contractor desire to enter into this Construction Contract for the Project, and other  services as identified in the Bid Documents for the Project upon the following terms and conditions.    NOW THEREFORE, in consideration of the mutual promises and undertakings hereinafter set forth  and for other good and valuable consideration, the receipt and sufficiency of which are hereby  acknowledged, it is mutually agreed by and between the undersigned parties as follows:    SECTION 1 INCORPORATION OF RECITALS AND DEFINITIONS.    1.1 Recitals.    All of the recitals are incorporated herein by reference.    1.2 Definitions.    Capitalized terms shall have the meanings set forth in this Construction Contract and/or in the  General Conditions.  If there is a conflict between the definitions in this Construction Contract and  in the General Conditions, the definitions in this Construction Contract shall prevail.  SECTION 2 THE PROJECT.    The Project is the construction of the “Lot J Cowper Webster Street Parking Garage Structure Repairs “.    SECTION 3 THE CONTRACT DOCUMENTS.    3.1  List of Documents.  The Contract Documents (sometimes collectively referred to as “Agreement” or “Bid Documents”) consist  of the following documents which are on file with the Purchasing Division and are hereby incorporated by  reference.        1) Change Orders    2) Field Change Orders           6                  Rev. May 1, 2012        3) Contract    4) Project Plans and Drawings  5) Technical Specifications  6) Special Provisions  7)    Notice Inviting Bids  8)    Instructions to Bidders  9)    General Conditions  10) Bidding Addenda    11) Invitation for Bids    12) Contractor's Bid/Non‐Collusion Affidavit    13)   Reports listed in the Bidding Documents    14)   Public Works Department’s Standard Drawings and Specifications dated 2007 and                updated from time to time    15) Utilities Department’s Water, Gas, Wastewater, Electric Utilities Standards dated 2005  and updated from time to time    16)  City of Palo Alto Traffic Control Requirements    17)  City of Palo Alto Truck Route Map and Regulations    18)  Notice Inviting Pre‐Qualification Statements, Pre‐Qualification Statement, and Pre‐  Qualification Checklist (if applicable)    19)  Performance and Payment Bonds    20)  Insurance Forms      3.2  Order of Precedence.    For the purposes of construing, interpreting and resolving inconsistencies between and among the  provisions of this Contract, the Contract Documents shall have the order of precedence as set forth in the  preceding section.  If a claimed inconsistency cannot be resolved through the order of precedence, the City  shall have the sole power to decide which document or provision shall govern as may be in the best  interests of the City.  SECTION 4 THE WORK.    The Work includes all labor, materials, equipment, services, permits, fees, licenses and taxes, and all other  things necessary for Contractor to perform its obligations and complete the Project, including, without           7                  Rev. May 1, 2012      limitation, any Changes approved by City, in accordance with the Contract Documents and all Applicable  Code Requirements.    SECTION 5 PROJECT TEAM.    In addition to Contractor, City has retained, or may retain, consultants and contractors to provide  professional and technical consultation for the design and construction of the Project.  The Project requires  that Contractor operate efficiently, effectively and cooperatively with City as well as all other members of  the Project Team and other contractors retained by City to construct other portions of the Project.    SECTION 6 TIME OF COMPLETION.  6.1 Time Is of Essence.    Time is of the essence with respect to all time limits set forth in the Contract Documents.    6.2 Commencement of Work.    Contractor shall commence the Work on the date specified in City’s Notice to Proceed.          6.3 Contract Time.    Work hereunder shall begin on the date specified on the City’s Notice to Proceed and shall be  completed within ninety calendar days (90) after the commencement date specified in City’s  Notice to Proceed.    6.4 Liquidated Damages.    6.4.1 Entitlement.    City and Contractor acknowledge and agree that if Contractor fails to fully and  satisfactorily complete the Work within the Contract Time, City will suffer, as a result of  Contractor’s failure, substantial damages which are both extremely difficult and  impracticable to ascertain.  Such damages may include, but are not limited to:  (i) Loss of public confidence in City and its contractors and consultants.  (ii) Loss of public use of public facilities.  (iii) Extended disruption to public.             8                  Rev. May 1, 2012      6.4.2 Daily Amount.    City and Contractor have reasonably endeavored, but failed, to ascertain the actual  damage that City will incur if Contractor fails to achieve Substantial Completion of the  entire Work within the Contract Time.  Therefore, the parties agree that in addition to all  other damages to which City may be entitled other than delay damages, in the event  Contractor shall fail to achieve Substantial Completion of the entire Work within the  Contract Time, Contractor shall pay City as liquidated damages the amount of $500 per  day for each Day occurring after the expiration of the Contract Time until Contractor  achieves Substantial Completion of the entire Work.  The liquidated damages amount is  not a penalty but considered to be a reasonable estimate of the amount of damages City  will suffer by delay in completion of the Work.    6.4.3 Exclusive Remedy.    City and Contractor acknowledge and agree that this liquidated damages provision shall  be City’s only remedy for delay damages caused by Contractor’s failure to achieve  Substantial Completion of the entire Work within the Contract Time.    6.4.4 Other Remedies.    City is entitled to any and all available legal and equitable remedies City may have where  City’s Losses are caused by any reason other than Contractor’s failure to achieve  Substantial Completion of the entire Work within the Contract Time.    6.5 Adjustments to Contract Time.    The Contract Time may only be adjusted for time extensions approved by City and agreed to by  Change Order executed by City and Contractor in accordance with the requirements of the  Contract Documents.  SECTION 7 COMPENSATION TO CONTRACTOR.    7.1 Contract Sum.    Contractor shall be compensated for satisfactory completion of the Work in compliance with the  Contract Documents the Contract Sum of Three Hundred Eighty Eight Thousand Dollars  ($388,000).                 9                  Rev. May 1, 2012      7.2 Full Compensation.    The Contract Sum shall be full compensation to Contractor for all Work provided by Contractor  and, except as otherwise expressly permitted by the terms of the Contract Documents, shall cover  all Losses arising out of the nature of the Work or from the acts of the elements or any unforeseen  difficulties or obstructions which may arise or be encountered in performance of the Work until  its Acceptance by City, all risks connected with the Work, and any and all expenses incurred due to  suspension or discontinuance of the Work.  The Contract Sum may only be adjusted for Change  Orders issued, executed and satisfactorily performed in accordance with the requirements of the  Contract Documents.    7.3 Compensation for Extra or Deleted Work.    The Contract Sum shall be adjusted (either by addition or credit) for Changes in the Work involving  Extra Work or Deleted Work based on one or more of the following methods to be selected by  City:  1. Unit prices stated in the Contract Documents or agreed upon by City and Contractor,   which unit prices shall be deemed to include Contractor Markup and   Subcontractor/Sub‐subcontractor Markups permitted by this Section.    2. A lump sum agreed upon by City and Contractor, based on the estimated Allowable   Costs and Contractor Markup and Subcontractor Markup computed in accordance   with this Section.    3. Contractor’s Allowable Costs, plus Contractor Markup and Subcontractor Markups   applicable to such Extra Work computed in accordance with this Section.    Contractor Markup and Subcontractor/Sub‐subcontractor Markups set forth herein are the full  amount of compensation to be added for Extra Work or to be subtracted for Deleted Work that is  attributable to overhead (direct and indirect) and profit of Contractor and of its Subcontractors  and Sub‐subcontractors, of every Tier.   When using this payment methodology, Contractor  Markup and Subcontractor/Sub‐subcontractor Markups, which shall not be compounded, shall be  computed as follows:    7.3.1 Markup Self‐Performed Work.    10% of the Allowable Costs for that portion of the Extra Work or Deleted Work to be  performed by Contractor with its own forces.    7.3.2 Markup for Work Performed by Subcontractors.    15% of the Allowable Costs for that portion of the Extra Work or Deleted Work to be  performed by a first Tier Subcontractor.        SECTION 8 STANDARD OF CARE.    Contractor agrees that the Work shall be performed by qualified, experienced and well‐supervised  personnel.  All services performed in connection with this Construction Contract shall be performed in a  manner consistent with the standard of care under California law applicable to those who specialize in  providing such services for projects of the type, scope and complexity of the Project.              10                  Rev. May 1, 2012      SECTION 9 INDEMNIFICATION.    9.1 Hold Harmless.    To the fullest extent allowed by law, Contractor will defend, indemnify, and hold harmless City, its  City Council, boards and commissions, officers, agents, employees, representatives and volunteers  (hereinafter collectively referred to as "Indemnitees"), through legal counsel acceptable to City,  from and against any and all Losses arising directly or indirectly from, or in any manner relating to  any of, the following:  (i) Performance or nonperformance of the Work by Contractor or its Subcontractors or Sub‐ subcontractors, of any tier;  (ii) Performance or nonperformance by Contractor or its Subcontractors or Sub‐ subcontractors of any tier, of any of the obligations under the Contract Documents;  (iii) The construction activities of Contractor or its Subcontractors or Sub‐subcontractors, of  any tier, either on the Site or on other properties;  (iv) The payment or nonpayment by Contractor to any of its employees, Subcontractors or  Sub‐subcontractors of any tier, for Work performed on or off the Site for the Project; and  (v) Any personal injury, property damage or economic loss to third persons associated with  the performance or nonperformance by Contractor or its Subcontractors or Sub‐ subcontractors of any tier, of the Work.    However, nothing herein shall obligate Contractor to indemnify any Indemnitee for Losses  resulting from the sole or active negligence or willful misconduct of the Indemnitee.  Contractor  shall pay City for any costs City incurs to enforce this provision.   Nothing in the Contract  Documents shall be construed to give rise to any implied right of indemnity in favor of Contractor  against City or any other Indemnitee.    9.2 Survival.    The provisions of Section 9 shall survive the termination of this Construction Contract.    SECTION 10 NONDISCRIMINATION.    As set forth in Palo Alto Municipal Code section 2.30.510, Contractor certifies that in the performance of  this Agreement, it shall not discriminate in the employment of any person because of the race, skin color,  gender, age, religion, disability, national origin, ancestry, sexual orientation, housing status, marital status,  familial status, weight or height of such person. Contractor acknowledges that it has read and understands  the provisions of Section 2.30.510 of the Palo Alto Municipal Code relating to Nondiscrimination  Requirements and the penalties for violation thereof, and will comply with all requirements of Section  2.30.510 pertaining to nondiscrimination in employment.    SECTION 11 INSURANCE AND BONDS.    On or before the Execution Date, Contractor shall provide City with evidence that it has obtained insurance  and Performance and Payment Bonds satisfying all requirements in Article 11 of the General Conditions.   Failure to do so shall be deemed a material breach of this Construction Contract.             11                  Rev. May 1, 2012      SECTION 12 PROHIBITION AGAINST TRANSFERS.    City is entering into this Construction Contract based upon the stated experience and qualifications of the  Contractor and its subcontractors set forth in Contractor’s Bid.  Accordingly, Contractor shall not assign,  hypothecate or transfer this Construction Contract or any interest therein directly or indirectly, by  operation of law or otherwise without the prior written consent of City. Any assignment, hypothecation or  transfer without said consent shall be null and void.    The sale, assignment, transfer or other disposition of any of the issued and outstanding capital stock of  Contractor or of any general partner or joint venturer or syndicate member of Contractor, if the Contractor  is a partnership or joint venture or syndicate or co‐tenancy shall result in changing the control of  Contractor, shall be construed as an assignment of this Construction Contract. Control means more than  fifty percent (50%) of the voting power of the corporation or other entity.     SECTION 13 NOTICES.    13.1 Method of Notice.    All notices, demands, requests or approvals to be given under this Construction Contract shall be given in  writing and shall be deemed served on the earlier of the following:  (i) On the date delivered if delivered personally;  (ii) On the third business day after the deposit thereof in the United States mail, postage prepaid, and   addressed as hereinafter provided;   (iii) On the date sent if sent by facsimile transmission;   (iv) On the date sent if delivered by electronic mail; or   (v) On the date it is accepted or rejected if sent by certified mail.     13.2 Notice Recipients.    All notices, demands or requests (including, without limitation, Claims) from Contractor to City   shall include the Project name and the number of this Construction Contract and shall be   addressed to City at:      To City:   City of Palo Alto       City Clerk       250 Hamilton Avenue       P.O. Box 10250       Palo Alto, CA 94303     Copy to:  City of Palo Alto       Public Works Administration       250 Hamilton Avenue       Palo Alto, CA 94301       Attn: Dennis Huebner                      12                  Rev. May 1, 2012              In addition, copies of all Claims by Contractor under this Construction Contract shall be provided  to the following:    Palo Alto City Attorney’s Office  250 Hamilton Avenue  P.O. Box 10250  Palo Alto, California 94303        All Claims shall be delivered personally or sent by certified mail.    All notices, demands, requests or approvals from City to Contractor shall be addressed to:    Raymond Leung  Green Earth Engineering & Construction  968 Hanson Court  Milpitas, CA  95055       13.3 Change of Address.    In the event of any change of address, the moving party shall notify the other party of the change  of address in writing.   Each party may, by written notice only, add, delete or replace any  individuals to whom and addresses to which notice shall be provided.    SECTION 14 DISPUTE RESOLUTION.     14.1 Resolution of Contract Disputes.     Contract Disputes shall be resolved by the parties in accordance with the provisions of this   Section 14, in lieu of any and all rights under the law that either party have its rights  adjudged  by a trial court or jury.  All Contract Disputes shall be subject to the Contract  Dispute Resolution Process  set forth in this Section 14, which shall be the exclusive  recourse of Contractor and City for such  Contract Disputes.    14.2 Resolution of Other Disputes.     14.2.1 Non‐Contract Disputes.    Contract Disputes shall not include any of the following:  (i) Penalties or forfeitures prescribed by statute or regulation imposed by a  governmental agency;  (ii) Third party tort claims for personal injury, property damage or death relating to  any Work performed by Contractor or its Subcontractors or Sub‐subcontractors  of any tier;  (iii) False claims liability under California Government Code Section 12650, et. seq.;  (iv) Defects in the Work first discovered by City after Final Payment by City to  Contractor;  (v) Stop notices; or  (vi) The right of City to specific performance or injunctive relief to compel  performance of any provision of the Contract Documents.             13                  Rev. May 1, 2012      14.2.2 Litigation, City Election.    Matters that do not constitute Contract Disputes shall be resolved by way of an action  filed in the Superior Court of the State of California, County of Santa Clara, and shall not  be subject to the Contract Dispute Resolution Process. However, the City reserves the  right, in its sole and absolute discretion, to treat such disputes as Contract Disputes.  Upon written notice by City of its election as provided in the preceding sentence, such  dispute shall be submitted by the parties and finally decided pursuant to the Contract  Dispute Resolution Process in the manner as required for Contract Disputes, including,  without limitation, City’s right under Paragraph 14.4.2 to defer resolution and final  determination until after Final Completion of the Work.    14.3 Submission of Contract Dispute.    14.3.1 By Contractor.    Contractors may commence the Contract Dispute Resolution Process upon City's written  response denying all or part of a Claim pursuant to Paragraph 4.2.9 or 4.2.10 of the  General Conditions.  Contractor shall submit a written Statement of Contract Dispute (as  set forth below) to City within seven (7) Days after City rejects all or a portion of  Contractor's Claim.  Failure by Contractor to submit its Statement of Contract Dispute in a  timely manner shall result in City’s decision by City on the Claim becoming final and  binding.   Contractor’s Statement of Contract Dispute shall be signed under penalty of  perjury and shall state with specificity the events or circumstances giving rise to the  Contract Dispute, the dates of their occurrence and the asserted effect on the Contract  Sum and the Contract Time.  The Statement of Contract Dispute shall include adequate  supporting data to substantiate the disputed Claim.   Adequate supporting data for a  Contract Dispute relating to an adjustment of the Contract Time shall include both of the  following:  (i) All of the scheduling data required to be submitted by Contractor under the  Contract Documents to obtain extensions of time and adjustments to the  Contract Time and  (ii) A detailed, event‐by‐event description of the impact of each event on  completion of Work.  Adequate data to support a Statement of Contract Dispute  involving an adjustment of the Contract Sum must include both of the following:   (a) A detailed cost breakdown and   (b) Supporting cost data in such form and including such information and   other supporting data as required under the Contract Documents for   submission of Change Order Requests and Claims.  14.3.2 By City.    City's right to commence the Contract Dispute Resolution Process shall arise at any time  following City's actual discovery of the circumstances giving rise to the Contract Dispute.   City asserts Contract Disputes in response to a Contract Dispute asserted by Contractor.   A Statement of Contract Dispute submitted by City shall state the events or  circumstances giving rise to the Contract Dispute, the dates of their occurrence and the  damages or other relief claimed by City as a result of such events.    14.4 Contract Dispute Resolution Process.    The parties shall utilize each of the following steps in the Contract Dispute Resolution  Process in the sequence they appear below.  Each party shall participate fully and in good  faith in each step in the Contract Dispute Resolution Process, and good faith effort shall  be a condition precedent to the right of each party to proceed to the next step in the  process.    14.4.1 Direct Negotiations.    Designated representatives of City and Contractor shall meet as soon as possible (but not  later than ten (10) Days after receipt of the Statement of Contract Dispute) in a good           14                  Rev. May 1, 2012      faith effort to negotiate a resolution to the Contract Dispute.   Each party shall be  represented in such negotiations by an authorized representative with full knowledge of  the details of the Claims or defenses being asserted by such party in the negotiations,  and with full authority to resolve such Contract Dispute then and there, subject only to  City’s obligation to obtain administrative and/or City Council approval of any agreed  settlement or resolution.  If the Contract Dispute involves the assertion of a right or claim  by a Subcontractor or Sub‐subcontractor, of any tier, against Contractor that is in turn  being asserted by Contractor against City (“Pass‐Through Claim”), then the Subcontractor  or Sub‐Subcontractor shall also have a  representative attend the negotiations, with the same authority and knowledge as  described above.   Upon completion of the meeting, if the Contract Dispute is not  resolved, the parties may either continue the negotiations or any party may declare  negotiations ended.   All discussions that occur during such negotiations and all  documents prepared solely for the purpose of such negotiations shall be confidential and  privileged pursuant to California Evidence Code Sections 1119 and 1152.    14.4.2 Deferral of Contract Disputes.    Following the completion of the negotiations required by Paragraph 14.4.1, all  unresolved Contract Disputes shall be deferred pending Final Completion of the Project,  subject to City’s right, in its sole and absolute discretion, to require that the Contract  Dispute Resolution Process proceed prior to Final Completion.  All Contract Disputes that  have been deferred until Final Completion shall be consolidated within a reasonable time  after Final Completion and thereafter pursued to resolution pursuant to this Contract  Dispute Resolution Process. The parties can continue informal negotiations of Contract  Disputes; provided, however, that such informal negotiations shall not be alter the  provisions of the Agreement deferring final determination and resolution of unresolved  Contract Disputes until after Final Completion.    14.4.3 Mediation.    If the Contract Dispute remains unresolved after negotiations pursuant to Paragraph  14.4.1, the parties shall submit the Contract Dispute to non‐binding mediation before a  mutually acceptable third party mediator.    .1 Qualifications of Mediator.  The parties shall endeavor to select a mediator who  is a retired judge or an attorney with at least five (5) years of experience in  public works construction contract law and in mediating public works  construction disputes.  In addition, the mediator shall have at least twenty (20)  hours of formal training in mediation skills.    .2 Submission to Mediation and Selection of Mediator.   The party initiating  mediation of a Contract Dispute shall provide written notice to the other party  of its decision to mediate.  In the event the parties are unable to agree upon a  mediator within fifteen (15) Days after the receipt of such written notice, then  the parties shall submit the matter to the American Arbitration Association  (AAA) at its San Francisco Regional Office for selection of a mediator in  accordance with the AAA Construction Industry Mediation Rules.    .3 Mediation Process.  The location of the mediation shall be at the offices of City.   The costs of mediation shall be shared equally by both parties.  The mediator  shall provide an independent assessment on the merits of the Contract Dispute  and recommendations for resolution.   All discussions that occur during the  mediation and all documents prepared solely for the purpose of the mediation  shall be confidential and privileged pursuant to California Evidence Code  Sections 1119 and 1152.             15                  Rev. May 1, 2012      14.4.4 Binding Arbitration.    If the Contract Dispute is not resolved by mediation, then any party may submit the  Contract Dispute for final and binding arbitration pursuant to the provisions of California  Public Contract Code Sections 10240, et seq.  The award of the arbitrator therein shall be  final and may be entered as a judgment by any court of competent jurisdiction.  Such  arbitration shall be conducted in accordance with the following:    .1 Arbitration Initiation.  The arbitration shall be initiated by filing a complaint in  arbitration in accordance with the regulations promulgated pursuant to  California Public Contract Code Section 10240.5.    .2 Qualifications of the Arbitrator.  The arbitrator shall be approved by all parties.  The arbitrator shall be a retired judge or an attorney with at least five (5) years  of experience in public works construction contract law and in arbitrating public  works construction disputes.   In addition, the arbitrator shall have at least  twenty (20) hours of formal training in arbitration skills.  In the event the parties  cannot agree upon an arbitrator, the provisions of California Public Contract  Code Section 10240.3 shall be followed in selecting an arbitrator possessing the  qualifications required herein.    .3 Hearing Days and Location.  Arbitration hearings shall be held at the offices of  City and shall, except for good cause shown to and determined by the arbitrator,  be conducted on consecutive business days, without interruption or  continuance.    .4 Hearing Delays.   Arbitration hearings shall not be delayed except upon good  cause shown.    .5 Recording Hearings.   All hearings to receive evidence shall be recorded by a  certified stenographic reporter, with the costs thereof borne equally by City and  Contractor and allocated by the arbitrator in the final award.    .6 Limitation of Depositions.   The parties may conduct discovery in accordance  with the provisions of section 10240.11 of the Public Contract Code; provided,  however, that depositions shall be limited to both of the following:    (i) Ten (10) percipient witnesses for each party and 5 expert witnesses per  party.      Upon a showing of good cause, the arbitrator may increase the number of  permitted depositions.  An individual who is both percipient and expert shall, for  purposes of applying the foregoing numerical limitation only, be deemed an  expert.   Expert reports shall be exchanged prior to receipt of evidence, in  accordance with the direction of the arbitrator, and expert reports (including  initial and rebuttal reports) not so submitted shall not be admissible as  evidence.    .7 Authority of the Arbitrator.   The arbitrator shall have the authority to hear  dispositive motions and issue interim orders and interim or executory awards.             16                  Rev. May 1, 2012      .8 Waiver of Jury Trial.  Contractor and City each voluntarily waives its right to a  jury trial with respect to any Contract Dispute that is subject to binding  arbitration in accordance with the provisions of this Paragraph 14.4.4.   Contractor shall include this provision in its contracts with its Subcontractors  who provide any portion of the Work.    14.5 Non‐Waiver.    Participation in the Contract Dispute Resolution Process shall not waive, release or compromise  any defense of City, including, without limitation, any defense based on the assertion that the  rights or Claims of Contractor that are the basis of a Contract Dispute were previously waived by  Contractor due to Contractor’s failure to comply with the Contract Documents, including, without  limitation, Contractor’s failure to comply with any time periods for providing notice of requests  for adjustments of the Contract Sum or Contract Time or for submission of Claims or supporting  documentation of Claims.    SECTION 15 DEFAULT.    15.1 Notice of Default.    In the event that City determines, in its sole discretion, that Contractor has failed or refused to  perform any of the obligations set forth in the Contract Documents, or is in breach of any  provision of the Contract Documents, City may give written notice of default to Contractor in the  manner specified for the giving of notices in the Construction Contract.    15.2 Opportunity to Cure Default.  Except for emergencies, Contractor shall cure any default in performance of its obligations under  the Contract Documents within two (2) Days (or such shorter time as City may reasonably require)  after receipt of written notice.  However, if the breach cannot be reasonably cured within such  time, Contractor will commence to cure the breach within two (2) Days (or such shorter time as  City may reasonably require) and will diligently and continuously prosecute such cure to  completion within a reasonable time, which shall in no event be later than ten (10) Days after  receipt of such written notice.    SECTION 16 CITY'S RIGHTS AND REMEDIES.    16.1 Remedies Upon Default.    If Contractor fails to cure any default of this Construction Contract within the time period set forth  above in Section 15, then City may pursue any remedies available under law or equity, including,  without limitation, the following:    16.1.1 Delete Certain Services.    City may, without terminating the Construction Contract, delete certain portions of the  Work, reserving to itself all rights to Losses related thereto.    16.1.2 Perform and Withhold.     City may, without terminating the Construction Contract, engage others to perform the  Work or portion of the Work that has not been adequately performed by Contractor and  withhold the cost thereof to City from future payments to Contractor, reserving to itself  all rights to Losses related thereto.    16.1.3 Suspend The Construction Contract.     City may, without terminating the Construction Contract and reserving to itself all rights  to Losses related thereto, suspend all or any portion of this Construction Contract for as           17                  Rev. May 1, 2012      long a period of time as City determines, in its sole discretion, appropriate, in which  event City shall have no obligation to adjust the Contract Sum or Contract Time, and shall  have no liability to Contractor for damages if City directs Contractor to resume Work.    16.1.4 Terminate the Construction Contract for Default.    City shall have the right to terminate this Construction Contract, in whole or in part, upon  the failure of Contractor to promptly cure any default as required by Section 15.  City’s  election to terminate the Construction Contract for default shall be communicated by  giving Contractor a written notice of termination in the manner specified for the giving of  notices in the Construction Contract.  Any notice of termination given to Contractor by  City shall be effective immediately, unless otherwise provided therein.    16.1.5 Invoke the Performance Bond.    City may, with or without terminating the Construction Contract and reserving to itself all  rights to Losses related thereto, exercise its rights under the Performance Bond.    16.1.6 Additional Provisions.    All of City’s rights and remedies under this Construction Contract are cumulative, and  shall be in addition to those rights and remedies available in law or in equity.   Designation in the Contract Documents of certain breaches as material shall not waive  the City’s authority to designate other breaches as material nor limit City’s right to  terminate the Construction Contract, or prevent the City from terminating the  Agreement for breaches that are not material.  City’s determination of whether there has  been noncompliance with the Construction Contract so as to warrant exercise by City of  its rights and remedies for default under the Construction Contract, shall be binding on  all parties.  No termination or action taken by City after such termination shall prejudice  any other rights or remedies of City provided by law or equity or by the Contract  Documents upon such termination; and City may proceed against Contractor to recover  all liquidated damages and Losses suffered by City.    16.2 Delays by Sureties.    Without limiting to any of City’s other rights or remedies, City has the right to suspend the  performance of the Work by Contractor’s sureties in the event of any of the following:  (i) The sureties’ failure to begin Work within a reasonable time in such manner as to insure  full compliance with the Construction Contract within the Contract Time;  (ii) The sureties’ abandonment of the Work;  (iii) If at any time City is of the opinion the sureties’ Work is unnecessarily or unreasonably  delaying the Work;  (iv) The sureties’ violation of any terms of the Construction Contract;  (v) The sureties’ failure to perform according to the Contract Documents; or  (vi) The sureties’ failure to follow City’s instructions for completion of the Work within the  Contract Time.    16.3 Damages to City.    16.3.1 For Contractor's Default.    City will be entitled to recovery of all Losses under law or equity in the event of  Contractor’s default under the Contract Documents.     16.3.2 Compensation for Losses.    In the event that City's Losses arise from Contractor’s default under the Contract  Documents, City shall be entitled to withhold monies otherwise payable to Contractor  until Final Completion of the Project.  If City incurs Losses due to Contractor’s default,  then the amount of Losses shall be deducted from the amounts withheld.  Should the  amount withheld exceed the amount deducted, the balance will be paid to Contractor or           18                  Rev. May 1, 2012      its designee upon Final Completion of the Project.  If the Losses incurred by City exceed  the amount withheld, Contractor shall be liable to City for the difference and shall  promptly remit same to City.    16.4 Suspension by City for Convenience.    City may, at any time and from time to time, without cause, order Contractor, in writing, to  suspend, delay, or interrupt the Work in whole or in part for such period of time, up to an  aggregate of fifty percent (50%) of the Contract Time.  The order shall be specifically identified as  a Suspension Order by City.   Upon receipt of a Suspension Order, Contractor shall, at City’s  expense, comply with the order and take all reasonable steps to minimize costs allocable to the  Work covered by the Suspension Order.  During the Suspension or extension of the Suspension, if  any, City shall either cancel the Suspension Order or, by Change Order, delete the Work covered  by the Suspension Order.  If a Suspension Order is canceled or expires, Contractor shall resume  and continue with the Work.   A Change Order will be issued to cover any adjustments of the  Contract Sum or the Contract Time necessarily caused by such suspension.    A Suspension Order  shall not be the exclusive method for City to stop the Work.    16.5 Termination Without Cause.    City may, at its sole discretion and without cause, terminate this Construction Contract in part or  in whole by giving thirty (30) Days written notice to Contractor. The compensation allowed under  this Paragraph 16.5 shall be the Contractor’s sole and exclusive compensation for such  termination and Contractor waives any claim for other compensation or Losses, including, but not  limited to, loss of anticipated profits, loss of revenue, lost opportunity, or other consequential,  direct, indirect or incidental damages of any kind resulting from termination without cause.      16.5.1 Compensation.    Following such termination and within forty‐five (45) Days after receipt of a billing from  Contractor seeking payment of sums authorized by this Paragraph 16.5, City shall pay the  following to Contractor as Contractor’s sole compensation for performance of the Work :    .1 For Work Performed.  The amount of the Contract Sum allocable to the portion  of the Work properly performed by Contractor as of the date of termination,  less sums previously paid to Contractor.    .2 For Close‐out Costs.  Reasonable costs of Contractor and its Subcontractors and  Sub‐subcontractors for:  (i) Demobilizing and  (ii) Administering the close‐out of its participation in the Project (including,  without limitation, all billing and accounting functions, not including  attorney or expert fees) for a period of no longer than thirty (30) Days  after receipt of the notice of termination.    .3 For Fabricated Items.   Previously unpaid cost of any items delivered to the  Project Site which were fabricated for subsequent incorporation in the Work.    16.5.2 Subcontractors.      Contractor shall include provisions in all of its subcontracts, purchase orders and other  contracts permitting termination for convenience by Contractor on terms that are  consistent with this Construction Contract and that afford no greater rights of recovery  against Contractor than are afforded to Contractor against City under this Section.             19                  Rev. May 1, 2012      16.6 Contractor’s Duties Upon Termination.    Upon receipt of a notice of termination for default or for convenience, Contractor shall, unless the  notice directs otherwise, do the following:  (i) Immediately discontinue the Work to the extent specified in the notice;  (ii) Place no further orders or subcontracts for materials, equipment, services or facilities,  except as may be necessary for completion of such portion of the Work that is not  discontinued;  (iii) Provide to City a description, in writing no later than fifteen (15) days after receipt of the  notice of termination, of all subcontracts, purchase orders and contracts that are  outstanding, including, without limitation, the terms of the original price, any changes,  payments, balance owing, the status of the portion of the Work covered and a copy of  the subcontract, purchase order or contract and any written changes, amendments or  modifications thereto, together with such other information as City may determine  necessary in order to decide whether to accept assignment of or request Contractor to  terminate the subcontract, purchase order or contract;  (iv) Promptly assign to City those subcontracts, purchase orders or contracts, or portions  thereof, that City elects to accept by assignment and cancel, on the most favorable terms  reasonably possible, all subcontracts, purchase orders or contracts, or portions thereof,  that City does not elect to accept by assignment; and  (iii) Thereafter do only such Work as may be necessary to preserve and protect Work already  in progress and to protect materials, plants, and equipment on the Project Site or in  transit thereto.  SECTION 17 CONTRACTOR'S RIGHTS AND REMEDIES.    17.1 Contractor’s Remedies.    Contractor may terminate this Construction Contract only upon the occurrence of one of the  following:    17.1.1 For Work Stoppage.    The Work is stopped for sixty (60) consecutive Days, through no act or fault of Contractor, any  Subcontractor, or any employee or agent of Contractor or any Subcontractor, due to issuance of  an order of a court or other public authority other than City having jurisdiction or due to an act of  government, such as a declaration of a national emergency making material unavailable.   This  provision shall not apply to any work stoppage resulting from the City’s issuance of a suspension  notice issued either for cause or for convenience.    17.1.2 For City's Non‐Payment.    If City does not make pay Contractor undisputed sums within ninety (90) Days after receipt of  notice from Contractor, Contractor may terminate the Construction Contract (30) days following a  second notice to City of Contractor’s intention to terminate the Construction Contract.    17.2 Damages to Contractor.   In the event of termination for cause by Contractor, City shall pay Contractor the sums provided  for in Paragraph 16.5.1 above.  Contractor agrees to accept such sums as its sole and exclusive  compensation and agrees to waive any claim for other compensation or Losses, including, but not  limited to, loss of anticipated profits, loss of revenue, lost opportunity, or other consequential,  direct, indirect and incidental damages, of any kind.  SECTION 18 ACCOUNTING RECORDS.    18.1 Financial Management and City Access.    Contractor shall keep full and detailed accounts and exercise such controls as may be necessary  for proper financial management under this Construction Contract in accordance with generally           20                  Rev. May 1, 2012      accepted accounting principles and practices. City and City's accountants  during normal business  hours, may  inspect, audit and copy Contractor's records, books, estimates, take‐offs, cost reports,  ledgers, schedules, correspondence, instructions, drawings, receipts, subcontracts, purchase  orders, vouchers, memoranda and other data relating to this Project. Contractor shall retain these  documents for a period of three (3) years after the later of (i) final payment or (ii) final resolution  of all Contract Disputes and other disputes, or (iii) for such longer period as may be required by  law.    18.2 Compliance with City Requests.    Contractor's compliance with any request by City pursuant to this Section 18 shall be a condition  precedent to filing or maintenance of any legal action or proceeding by Contractor against City  and to Contractor's right to receive further payments under the Contract Documents.  City many  enforce Contractor’s obligation to provide access to City of its business and other records referred  to in Section 18.1 for inspection or copying by  issuance of a writ or a provisional or permanent  mandatory injunction by a court of competent jurisdiction based on affidavits submitted to such  court, without the necessity of oral testimony.    SECTION 19 INDEPENDENT PARTIES.    Each party is acting in its independent capacity and not as agents, employees, partners, or joint ventures’  of the other party.  City, its officers or employees shall have no control over the conduct of Contractor or  its respective agents, employees, subconsultants, or subcontractors, except as herein set forth.    SECTION 20 NUISANCE.    Contractor shall not maintain, commit, nor permit the maintenance or commission of any nuisance in  connection in the performance of services under this Construction Contract.    SECTION 21 PERMITS AND LICENSES.    Except as otherwise provided in the Special Provisions and Technical Specifications, The Contractor shall  provide, procure and pay for all licenses, permits, and fees, required by the City or other government  jurisdictions or agencies necessary to carry out and complete the Work.  Payment of all costs and expenses  for such licenses, permits, and fees shall be included in one or more Bid items. No other compensation  shall be paid to the Contractor for these items or for delays caused by non‐City inspectors or conditions set  forth in the licenses or permits issued by other agencies.    SECTION 22 WAIVER.    A waiver by either party of any breach of any term, covenant, or condition contained herein shall not be  deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition  contained herein, whether of the same or a different character.    SECTION 23 GOVERNING LAW.    This Construction Contract shall be construed in accordance with and governed by the laws of the State of  California.             21                  Rev. May 1, 2012      SECTION 24 COMPLETE AGREEMENT.    This Agreement represents the entire and integrated agreement between the parties and supersedes all  prior negotiations, representations, and contracts, either written or oral. This Agreement may be amended  only by a written instrument, which is signed by the parties.  SECTION 25 SURVIVAL OF CONTRACT.    The provisions of the Construction Contract which by their nature survive termination of the Construction  Contract or Final Completion, including, without limitation, all warranties, indemnities, payment  obligations, and City’s right to audit Contractor’s books and records, shall remain in full force and effect  after Final Completion or any termination of the Construction Contract.  SECTION 26 PREVAILING WAGES.              This Project is not subject to prevailing wages. The Contractor is not required to pay prevailing wages in the  performance and implementation of the Project, because the City, pursuant to its authority as a chartered  city, has adopted Resolution No. 5981 exempting the City from prevailing wages.  The City invokes the  exemption from the state prevailing wage requirement for this Project and declares that the Project is  funded one hundred percent (100%) by the City of Palo Alto.  SECTION 27 NON APPROPRIATION.    This Agreement is subject to the fiscal provisions of the Charter of the City of Palo Alto and the Palo Alto  Municipal Code. This Agreement will terminate without any penalty (a) at the end of any fiscal year in the  event that the City does not appropriate funds for the following fiscal year for this event, or (b) at any time  within a fiscal year in the event that funds are only appropriated for a portion of the fiscal year and funds  for this Construction Contract are no longer available.  This section shall take precedence in the event of a  conflict with any other covenant, term, condition, or provision of this Agreement.   SECTION 28 AUTHORITY.    The individuals executing this Agreement represent and warrant that they have the legal capacity and  authority to do so on behalf of their respective legal entities.  SECTION 29 ATTORNEY FEES.    Each Party shall bear its own costs, including attorney’s fees through the completion of mediation. If the  claim or dispute is not resolved through mediation and in any dispute described in Paragraph 14.2, the prevailing party in any action brought to enforce the provision of this Agreement may recover its  reasonable costs and attorney’s fees expended in connection with that action.  The prevailing party shall be  entitled to recover an amount equal to the fair market value of legal services provided by attorneys  employed by it as well as any attorney’s’ fees paid to third parties.  SECTION 30 COUNTERPARTS  This Agreement may be signed in multiple counterparts, which shall, when executed by all the parties,  constitute a single binding agreement.  SECTION 31 SEVERABILITY.    In case a provision of this Construction Contract is held to be invalid, illegal or unenforceable, the validity,  legality and enforceability of the remaining provisions shall not be affected.             22                  Rev. May 1, 2012           IN WITNESS WHEREOF, the parties have caused this Construction Contract to be executed the   date and year first above written.             CITY OF PALO ALTO    ____________________________  City Manager      APPROVED AS TO FORM:    ___________________________  Senior Asst. City Attorney    APPROVED:    ___________________________  Public Works Director        GREEN EARTH ENGINEERING & CONSTRUCTION    By:___________________________    Name:_________________________    Title:________________________      Attachment B Lot J Cowper Webster Street Parking Garage Structure Repairs IFB NO. 145807 BID SUMMARY Gonsalves &Omni Romkin Ashron Rodan Kuehne Green BASE BID:Stronck Earth BID DESCRIPTION BID Bid BID UNIT BID UNIT BID UNIT ITEM QTY UNIT PRICE PRICE PRICE PRICE PRICE PRICE PRICE 1 Removing Wood Trellis 1 LS $391,000 $133,000 $55,000 $195,796 $180,000 $208,550 $120,000 2 Install New Cable Railing System 1 LS $127,000 $325,000 $305,000 $190,686 $247,000 $214,420 $238,000 3 Rain Gutters and Downspouts 1 LS $49,000 $30,000 $68,000 $22,406 $40,000 $20,080 $20,000 4 Allowance for Cabling and Hardware 1 LS $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 Total $577,000 $498,000 $438,000 $418,888 $477,000 $453,050 $388,000