Loading...
HomeMy WebLinkAboutStaff Report 1743City of Palo Alto (ID # 1743) City Council Informational Report Report Type: Informational Report Meeting Date: 6/6/2011 June 06, 2011 Page 1 of 1 (ID # 1743) Title: Palo Alto Monthly Library Update Subject: Palo Alto Library Projects April 2011 Report From:City Manager Lead Department: Public Works Executive Summary Attached please find the April 2011 Monthly Update Report prepared for the City of Palo Alto by our Construction Management firm, Turner Construction Company. It can be found on the City's Webpage at www.cityofpaloalto.org/libraryprojects. This is an informational report and no action by Council is required. Attachments: ·Palo Alto Library Monthly Report (PDF) Prepared By:Philip L. Bobel, Manager, Environmental Compliance Department Head:J. Michael Sartor, Interim Director City Manager Approval: James Keene, City Manager       Palo Alto Library Projects    Monthly Progress Report  April 2011    Downtown Library  Mitchell Park Library & Community Center  Main Library      Mitchell Park Main Entry    May 6, 2011  Turner Construction Company        Project Status Reports          April 2011 KEY ACCOMPLISHMENTS Air Conditioning Turned On Tile Work Ceiling Grid Painting UPCOMING ACTIVITIES Landscape Maintenance Flooring Shelving June 2011 Interior Entrance (Ceiling) (650) 329-2295     Progress Photos East Patio (Landscape Maintenance) Women’s Restroom New Book Area (Ceiling) Library Staff Room (Shelving) Exterior Painting April 2011     KEY ACCOMPLSHMENTS Steel Top Out Library Second Floor Concrete Poured Night Sky Cooling Tank Poured UPCOMING ACTIVITIES Pour Community Center Slabs Community Center Steel Complete Pour Roof Decks on Library (650) 329-2295 April 2011 WEB CAM LINK: http://173.164.239.206/view/viewer_index.shtml Structural Steel Topping Out Ceremony    Progress Photos April 2011 Library & Donors Signing the Beam Teen Community Center Steel Library Second Floor Concrete Pour Library Second Floor Installation Night Sky Tank Foundation Night Sky Tank Walls Complete     Table of  Contents    Downtown Library construction started Mitchell Park Library construction started College Terrace Library Re-Opened Downtown Library Re-Opens  Mitchell Park Library re-opens Main Library Closes for construction Main Library Re-opens 20 1 0 20 1 1 20 1 2 Pa l o A l t o L i b r a r i e s C l o s u r e P l a n Ap r i l 2 0 1 1 20 1 3 Main Library CMR contract award to council     The combined projects have an approximate savings reserve of $9,900,000. Savings Reserve is the Estimate for Construction less the current Projected Final Cost.  Temporary Library at Cubberley finished within budget  Downtown Library scope increased during Design Development but bids were $800,000  below the Construction estimate.  Mitchell Park Library & CC bids were approximately $8,000,000  under the construction  estimate  Main Library is still in design.  Final Design estimates will be prepared when construction  documents are completed.  Use the conceptual estimate until then.  Bond costs for the first issuance were significantly less than budgeted.  Projected     Savings  Reserve  from lower projected financing costs are $1,350,000.  Savings reserve has been adjusted down for various unbudgeted expenses.