Loading...
HomeMy WebLinkAboutStaff Report 1420City of Palo Alto (ID # 1420) City Council Staff Report Report Type: Consent Calendar Meeting Date: 4/11/2011 April 11, 2011 Page 1 of 4 (ID # 1420) Summary Title: Approval of Hazmat Removal Contract for Art Center Title: Approval of a Contract with Tradestaff Contracting Services in a Total Amount Not to Exceed $167,500 for Hazardous Material Removal at the Palo Alto Art Center (PF-07000, Art Center Electrical and Mechanical Upgrades) From:City Manager Lead Department: Public Works RECOMMENDATION Staff recommends that Council: 1. Approve and authorize the City Manager or his designee to execute a general services agreement between the City of Palo Alto and Tradestaff Contracting Services, Inc. (Attachment A), in the amount of $139,500 for the hazardous materials abatement at the Palo Alto Art Center. 2. Authorize the City Manager or his designee to negotiate and execute one or more change orders to the contract with Tradestaff Contracting Services, Inc., for related, additional but unforeseen work which may develop during the project, the total value of which shall not exceed $28,000 (20%). BACKGROUND The 28,000 square foot Art Center facility and its building infrastructure and systems have not been significantly upgraded since the facility was constructed in 1951 as Palo Alto’s City Hall. The only major repairs made to the facility have been seismic improvements in 1987. In 1999, the Palo Alto Art Center Foundation (the Foundation) began to address the need for renovations proactively by focusing on two programmatic concerns and facility challenges: 1) the need for upgrades to the gallery spaces of the Art Center to support the popular exhibition program, and 2) the need for additional children’s art classrooms and program space to meet the demand in the community. In March, 1999, the Palo Alto City Council approved a proposal from the Palo Alto Art Center Foundation to explore the development of a public/private partnership that would make possible a capital campaign to expand and renovate the Art Center. The City and the Foundation jointly developed a Design Agreement. When the Agreement was initiated, the Foundation had intended to manage the project through all phases of design and April 11, 2011 Page 2 of 4 (ID # 1420) construction, however, during design development, the City’s portion of the project scope became a larger percentage of the overall project, and more technically involved. As a result of this change, the Foundation and City staff recommended that, and received Council approval for the City managing the bid and construction phases (CMR:168:09). The City’s scope of work includes mechanical, electrical, and accessibility upgrades to the facility, while the Foundation’s scope of work includes the creation of a Children’s Wing and an upgrade of the exhibition galleries. While the scope of City-sponsored work differs from the Foundation-sponsored work, both parties agree that it will be more efficient, cost-effective, and less disruptive to the community to have the work completed concurrently. In addition to the above-mentioned electrical, mechanical and Children’s Wing improvements, the City has added deferred-maintenance items to the project such as a new roof, new gutters, new downspouts, seismic upgrade to roofing envelope, exterior painting, new carpets, additional interior painting, termite treatment and dry rot repairs, new window safety glazing, exterior lighting improvements, and repair to damaged tile planters in the courtyard area. The City will also be adding a 1% for public art as part of the overall Art Center renovation project. In addition, the Art Center auditorium was identified as the preferred location for a temporary library during the renovation of the adjacent Main Library (CMR:435:10). The auditorium was not part of the Art Center improvement project, but will have improved lighting, carpeting and other amenities to make it suitable as a temporary library. Discussion Hazardous materials such as asbestos and lead must be removed from the Art Center prior to the main construction effort that will begin this summer. Given the age of the facility, the hazardous material is located throughout the building, including the roofing underlayment. Removal of this material by means of a contract with Tradestaff Contracting Services will save time on the Art Center construction schedule by not waiting until a general contractor is under contract to begin the removal. It will also save money in that the general contractor will not mark-up the fees of a hazardous material subcontractor. A formal Request for Quotations (RFQ) for the Art Center hazardous materials abatement was advertised on February 28, 2011. The bidding period was 23 days. Bids were received from 13 contractors on March 22, 2011, as listed on the attached bid summary (Attachment B). Bids ranged from a low of $139,500 to a high of $767,190. Summary of Bid Process Bid Name/Number RFQ 140517 Palo Alto Art Center Hazardous Materials Abatement Project Proposed Length of Project 30 calendar days Number of Bids Mailed to Contractors 22 Number of Bids Mailed to Builder’s Exchanges 0 April 11, 2011 Page 3 of 4 (ID # 1420) Total Days to Respond to Bid 23 Pre-Bid Meeting?Yes Number of Company Attendees at Pre-Bid Meeting 15 Number of Bids Received 13 Bid Price Range*Low of $139,500 to a high of $767,190 *Bid summary provided in Attachment B Staff has reviewed all bids submitted and recommends that the bid of $139,500 submitted by Tradestaff Contracting Services, Inc., be accepted and that Tradestaff Contracting Services, Inc., be declared the lowest responsible bidder. The bid is 43 percent below the engineer’s estimate of $245,000. The low bids for this project can be attributed to the current depressed economic conditions,which are highly conducive to competitive bidding. Staff confirmed with the Contractor’s State License Board that the contractor has an active license on file. Staff checked references supplied by the contractor for previous work performed and found no major complaints. A contingency amount of 20 percent is requested because of the age of the building and the large areas undergoing remediation, which increases the potential for unforeseen building conditions such as additional termites or dry rot areas. RESOURCE IMPACT Funds for the hazardous material removal are available in the Capital Improvement Program Project PF-07000, Art Center Electrical and Mechanical Upgrades. Per the funding agreement with the Foundation, the cost of this work will be borne only by the City as it is deferred maintenance. Staff may return to Council at the time of the award of the larger construction contract in order to cover any increased costs due to the inclusion of deferred maintenance items into the project. POLICY IMPLICATIONS Removing hazardous materials is consistent with the City’s goal to reduce the infrastructure backlog. Hazardous material removal and other deferred maintenance items that are part of the Art Center renovation project will be removed from the City’s backlog list by the Infrastructure Task Force. TIMELINE Staff relocation to the Lucie Stern Center lower office level and other locations throughout the City is in progress and once completed will be followed shortly thereafter by the removal of any hazardous materials. Construction on the primary major renovations, including the temporary Main Library in the auditorium, is expected to begin in the summer of 2011 and be completed April 11, 2011 Page 4 of 4 (ID # 1420) in the summer of 2012. Construction on the Main Library is expected to begin at the end of 2012, shortly after the opening of the new Mitchell Park Library and Community Center. ENVIRONMENTAL REVIEW This removal of hazardous materials was determined to be exempt from the California Environmental Quality Act (CEQA) review pursuant to Section 15301, “existing facilities.” Attachments: ·Attachment A-Contract (PDF) ·Attachment B-Bid Summary (PDF) Prepared By:Karen Bengard, Senior Engineer Department Head:J. Michael Sartor, Interim Director City Manager Approval: James Keene, City Manager CITY OF PALO ALTO CONTRACT NO.: C11140517 1 Rev. January 11, 2010 E:\Files from H DRIVE\RFQ Files\RFQ140517 Palo Alto Art Center Hazardous Materials Abatement Project\Docs related to contract\Contract C11140517 Tradestaff Contracting Services.doc GENERAL SERVICES AGREEMENT THIS AGREEMENT made and entered into on the ________ day of April, 2011, by and between the CITY OF PALO ALTO, a California Chartered Municipal Corporation (“CITY”), and TRADESTAFF CONTRACTING SERVICES, a California corporation, with offices located at Route 2 Box 347, La Honda, CA 94020, Telephone Number: 650-851-6969 (“CONTRACTOR”). In consideration of their mutual covenants, the parties hereto agree as follows: 1. SERVICES. CONTRACTOR shall provide or furnish the services (“Services”) described in the Scope of Services, attached as Exhibit A. 2. EXHIBITS. The following exhibits are attached to and made a part of this Agreement: “A” - Scope of Services “B” - Schedule of Performance “C” - Compensation “D” - Insurance Requirements “E” - Performance and/or Payment Bond (Not applicable) “F” - Liquidated Damages (Not applicable) CONTRACT IS NOT COMPLETE UNLESS ALL EXHIBITS ARE ATTACHED. 3. TERM. The term of this Agreement shall be from the date of its full execution through the completion of the services in accordance with the Schedule of Performance attached as Exhibit “B”, subject to the provisions of Section Q and V of the General Terms and Conditions. 4. SCHEDULE OF PERFORMANCE. CONTRACTOR shall complete the Services within the term of this Agreement in a reasonably prompt and timely manner based upon the circumstances and direction communicated to CONTRACTOR, and if applicable, in accordance with the schedule set forth in the Schedule of Performance, attached as Exhibit B. Time is of the essence in this Agreement. 5. COMPENSATION FOR ORIGINAL TERM. CITY shall pay and CONTRACTOR agrees to accept as not to exceed compensation for the full performance of the Services and reimbursable expenses, if any: The total maximum lump sum compensation of dollars ($ ); OR The sum of dollars ($ ) per hour, not to exceed a total maximum compensation amount of dollars ($ ); OR A sum calculated in accordance with the fee schedule set forth in Exhibit C, not to exceed a total maximum compensation amount of one hundred thirty-nine thousand five hundred dollars ($139,500.00). CONTRACTOR agrees that it can perform the Services for an amount not to exceed the total maximum compensation set forth above. Any hours worked or services performed by CONTRACTOR for which payment would result in a total exceeding the maximum amount of compensation set forth above for performance of the Services shall be at no cost to CITY. The City has set aside the sum of twenty-eight thousand ($28,000.00) for Additional Services. CONTRACTOR shall provide Additional Services only by advanced, written authorization from the City Manager or designee. CONTRACTOR, at the CITY’s request, shall submit a detailed written proposal including a description of the scope of services, schedule, CITY OF PALO ALTO CONTRACT NO.: C11140517 Rev. January 11, 2010 E:\Files from H DRIVE\RFQ Files\RFQ140517 Palo Alto Art Center Hazardous Materials Abatement Project\Docs related to contract\Contract C11140517 Tradestaff Contracting Services.doc 2 level of effort, and CONTRACTOR’s proposed maximum compensation, including reimbursable expense, for such services. Compensation shall be based on the hourly rates set forth above or in Exhibit C (whichever is applicable), or if such rates are not applicable, a negotiated lump sum. CITY shall not authorize and CONTRACTOR shall not perform any Additional Services for which payment would exceed the amount set forth above for Additional Services. Payment for Additional Services is subject to all requirements and restrictions in this Agreement. 6. COMPENSATION DURING ADDITIONAL TERMS. CONTRACTOR’S compensation rates for each additional term shall be the same as the original term; OR CONTRACTOR’s compensation rates shall be adjusted effective on the commencement of each Additional Term. The lump sum compensation amount, hourly rates, or fees, whichever is applicable as set forth in section 5 above, shall be adjusted by a percentage equal to the change in the Consumer Price Index for Urban Wage Earners and Clerical Workers for the San Francisco- Oakland- San Jose area, published by the United States Department of Labor Statistics (CPI) which is published most immediately preceding the commencement of the applicable Additional Term, which shall be compared with the CPI published most immediately preceding the commencement date of the then expiring term. Notwithstanding the foregoing, in no event shall CONTRACTOR’s compensation rates be increased by an amount exceeding five percent of the rates effective during the immediately preceding term. Any adjustment to CONTRACTOR’s compensation rates shall be reflected in a written amendment to this Agreement. 7. INVOICING. Send all invoices to the CITY, Attention: Project Manager. The Project Manager is: Karen Bengard, Public Works Department, P.O. Box 10250, Palo Alto, CA 94303, Telephone: 650-329-2636. Invoices shall be submitted in arrears for Services performed. Invoices shall not be submitted more frequently than monthly. Invoices shall provide a detailed statement of Services performed during the invoice period and are subject to verification by CITY. CITY shall pay the undisputed amount of invoices within 30 days of receipt. GENERAL TERMS AND CONDITIONS A. ACCEPTANCE. CONTRACTOR accepts and agrees to all terms and conditions of this Agreement. This Agreement includes and is limited to the terms and conditions set forth in sections 1 through 6 above, these general terms and conditions and the attached exhibits. B. QUALIFICATIONS. CONTRACTOR represents and warrants that it has the expertise and qualifications to complete the services described in Section 1 of this Agreement, entitled “SERVICES,” and that every individual charged with the performance of the services under this Agreement has sufficient skill and experience and is duly licensed or certified, to the extent such licensing or certification is required by law, to perform the Services. CITY expressly relies on CONTRACTOR’s representations regarding its skills, knowledge, and certifications. CONTRACTOR shall perform all work in accordance with generally accepted business practices and performance standards of the industry, including all federal, state, and local operation and safety regulations. C. INDEPENDENT CONTRACTOR. It is understood and agreed that in the performance of this Agreement, CONTRACTOR and any person employed by CONTRACTOR shall at all times be considered an independent CONTRACTOR and not an agent or employee of CITY. CONTRACTOR shall be responsible for employing or engaging all persons necessary to complete the work required under this Agreement. D. SUBCONTRACTORS. CONTRACTOR may not use subcontractors to perform any Services under this Agreement unless CONTRACTOR obtains prior written consent of CITY. CONTRACTOR shall be solely responsible for directing the work of approved subcontractors and for any compensation due to subcontractors. CITY OF PALO ALTO CONTRACT NO.: C11140517 Rev. January 11, 2010 E:\Files from H DRIVE\RFQ Files\RFQ140517 Palo Alto Art Center Hazardous Materials Abatement Project\Docs related to contract\Contract C11140517 Tradestaff Contracting Services.doc 3 E. TAXES AND CHARGES. CONTRACTOR shall be responsible for payment of all taxes, fees, contributions or charges applicable to the conduct of CONTRACTOR’s business. F. COMPLIANCE WITH LAWS. CONTRACTOR shall in the performance of the Services comply with all applicable federal, state and local laws, ordinances, regulations, and orders. G. DAMAGE TO PUBLIC OR PRIVATE PROPERTY. CONTRACTOR shall, at its sole expense, repair in kind, or as the City Manager or designee shall direct, any damage to public or private property that occurs in connection with CONTRACTOR’s performance of the Services. CITY may decline to approve and may withhold payment in whole or in part to such extent as may be necessary to protect CITY from loss because of defective work not remedied or other damage to the CITY occurring in connection with CONTRACTOR’s performance of the Services. CITY shall submit written documentation in support of such withholding upon CONTRACTOR’s request. When the grounds described above are removed, payment shall be made for amounts withheld because of them. H. WARRANTIES. CONTRACTOR expressly warrants that all services provided under this Agreement shall be performed in a professional and workmanlike manner in accordance with generally accepted business practices and performance standards of the industry and the requirements of this Agreement. CONTRACTOR expressly warrants that all materials, goods and equipment provided by CONTRACTOR under this Agreement shall be fit for the particular purpose intended, shall be free from defects, and shall conform to the requirements of this Agreement. CONTRACTOR agrees to promptly replace or correct any material or service not in compliance with these warranties, including incomplete, inaccurate, or defective material or service, at no further cost to CITY. The warranties set forth in this section shall be in effect for a period of one year from completion of the Services and shall survive the completion of the Services or termination of this Agreement. I. MONITORING OF SERVICES. CITY may monitor the Services performed under this Agreement to determine whether CONTRACTOR’s work is completed in a satisfactory manner and complies with the provisions of this Agreement. J. CITY’S PROPERTY. Any reports, information, data or other material (including copyright interests) developed, collected, assembled, prepared, or caused to be prepared under this Agreement will become the property of CITY without restriction or limitation upon their use and will not be made available to any individual or organization by CONTRACTOR or its subcontractors, if any, without the prior written approval of the City Manager. K. AUDITS. CONTRACTOR agrees to permit CITY and its authorized representatives to audit, at any reasonable time during the term of this Agreement and for three (3) years from the date of final payment, CONTRACTOR’s records pertaining to matters covered by this Agreement. CONTRACTOR agrees to maintain accurate books and records in accordance with generally accepted accounting principles for at least three (3) following the terms of this Agreement. L. NO IMPLIED WAIVER. No payment, partial payment, acceptance, or partial acceptance by CITY shall operate as a waiver on the part of CITY of any of its rights under this Agreement. M. INSURANCE. CONTRACTOR, at its sole cost, shall purchase and maintain in full force during the term of this Agreement, the insurance coverage described in Exhibit D. Insurance must be provided by companies with a Best’s Key rating of A-:VII or higher and which are otherwise acceptable to the City’s Risk Manager. The City’s Risk Manager must approve deductibles and self-insured retentions. In addition, all policies, endorsements, certificates and/or binders are subject to approval by the Risk Manager as to form and content. CONTRACTOR shall obtain a policy endorsement naming the City of Palo Alto as an additional insured under any general liability or automobile policy. CONTRACTOR shall obtain an endorsement stating that the insurance is primary coverage and will not be canceled or materially reduced in coverage or limits until after providing 30 days prior written notice of the cancellation or modification to the City’s Risk Manager. CONTRACTOR shall provide certificates of such policies or other evidence of coverage satisfactory to CITY’s Risk Manager, together with the required endorsements and evidence of payment of premiums, to CITY concurrently with the execution of this Agreement and shall throughout the term of this Agreement provide current certificates evidencing the required insurance coverages and CITY OF PALO ALTO CONTRACT NO.: C11140517 Rev. January 11, 2010 E:\Files from H DRIVE\RFQ Files\RFQ140517 Palo Alto Art Center Hazardous Materials Abatement Project\Docs related to contract\Contract C11140517 Tradestaff Contracting Services.doc 4 endorsements to the CITY’s Risk Manager. CONTRACTOR shall include all subcontractors as insured under its policies or shall obtain and provide to CITY separate certificates and endorsements for each subcontractor that meet all the requirements of this section. The procuring of such required policies of insurance shall not operate to limit CONTRACTOR’s liability or obligation to indemnify CITY under this Agreement. N. HOLD HARMLESS. To the fullest extent permitted by law and without limitation by the provisions of section M relating to insurance, CONTRACTOR shall indemnify, defend and hold harmless CITY, its Council members, officers, employees and agents from and against any and all demands, claims, injuries, losses, or liabilities of any nature, including death or injury to any person, property damage or any other loss and including without limitation all damages, penalties, fines and judgments, associated investigation and administrative expenses and defense costs, including, but not limited to reasonable attorney’s fees, courts costs and costs of alternative dispute resolution), arising out of, or resulting in any way from or in connection with the performance of this Agreement. The CONTRACTOR’s obligations under this Section apply regardless of whether or not a liability is caused or contributed to by any negligent (passive or active) act or omission of CITY, except that the CONTRACTOR shall not be obligated to indemnify for liability arising from the sole negligence or willful misconduct of the CITY. The acceptance of the Services by CITY shall not operate as a waiver of the right of indemnification. The provisions of this Section survive the completion of the Services or termination of this Contract. O. NON-DISCRIMINATION. As set forth in Palo Alto Municipal Code section 2.30.510, CONTRACTOR certifies that in the performance of this Agreement, it shall not discriminate in the employment of any person because of the race, skin color, gender, age, religion, disability, national origin, ancestry, sexual orientation, housing status, marital status, familial status, weight or height of such person. CONTRACTOR acknowledges that it has read and understands the provisions of Section 2.30.510 of the Palo Alto Municipal Code relating to Nondiscrimination Requirements and the penalties for violation thereof, and agrees to meet all requirements of Section 2.30.510 pertaining to nondiscrimination in employment. P. WORKERS' COMPENSATION. CONTRACTOR, by executing this Agreement, certifies that it is aware of the provisions of the Labor Code of the State of California which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and certifies that it will comply with such provisions, as applicable, before commencing and during the performance of the Services. Q. TERMINATION. The City Manager may terminate this Agreement without cause by giving ten (10) days’ prior written notice thereof to CONTRACTOR. If CONTRACTOR fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided by law, the City Manager may terminate this Agreement immediately upon written notice of termination. Upon receipt of such notice of termination, CONTRACTOR shall immediately discontinue performance. CITY, CITY shall pay CONTRACTOR for services satisfactorily performed up to the effective date of termination. If the termination if for cause, CITY may deduct from such payment the amount of actual damage, if any, sustained by CITY due to Contractor’s failure to perform its material obligations under this Agreement. Upon termination, CONTRACTOR shall immediately deliver to the City Manager any and all copies of studies, sketches, drawings, computations, and other material or products, whether or not completed, prepared by CONTRACTOR or given to CONTRACTOR, in connection with this Agreement. Such materials shall become the property of CITY. R. ASSIGNMENTS/CHANGES. This Agreement binds the parties and their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred without the prior written consent of the CITY. No amendments, changes or variations of any kind are authorized without the written consent of the CITY. S. CONFLICT OF INTEREST. In accepting this Agreement, CONTRACTOR covenants that it presently has no interest, and will not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of this Contract. CONTRACTOR further covenants that, in the performance of this Contract, it will not employ any person having such an interest. CONTRACTOR certifies that no City Officer, employee, or authorized representative has any financial interest in the business of CONTRACTOR and that no person associated with contractor has any interest, CITY OF PALO ALTO CONTRACT NO.: C11140517 Rev. January 11, 2010 E:\Files from H DRIVE\RFQ Files\RFQ140517 Palo Alto Art Center Hazardous Materials Abatement Project\Docs related to contract\Contract C11140517 Tradestaff Contracting Services.doc 5 direct or indirect, which could conflict with the faithful performance of this Contract. CONTRACTOR agrees to advise CITY if any conflict arises. T. GOVERNING LAW. This contract shall be governed and interpreted by the laws of the State of California. U. ENTIRE AGREEMENT. This Agreement, including all exhibits, represents the entire agreement between the parties with respect to the services that may be the subject of this Agreement. Any variance in the exhibits does not affect the validity of the Agreement and the Agreement itself controls over any conflicting provisions in the exhibits. This Agreement supersedes all prior agreements, representations, statements, negotiations and undertakings whether oral or written. V. NON-APPROPRIATION. This Agreement is subject to the fiscal provisions of the Charter of the City of Palo Alto and the Palo Alto Municipal Code. This Agreement will terminate without any penalty (a) at the end of any fiscal year in the event that funds are not appropriated for the following fiscal year, or (b) at any time within a fiscal year in the event that funds are only appropriated for a portion of the fiscal year and funds for this Contract are no longer available. This Section shall take precedence in the event of a conflict with any other covenant, term, condition, or provision of this Contract. W. ENVIRONMENTALLY PREFERRED PURCHASING AND ZERO WASTE REQUIREMENTS. CONTRACTOR shall comply with the City’s Environmentally Preferred Purchasing policies which are available at the City’s Purchasing Department which are incorporated by reference and may be amended from time to time. CONTRACTOR shall comply with waste reduction, reuse, recycling and disposal requirements of the City’s Zero Waste Program. Zero Waste best practices include first minimizing and reducing waste; second, reusing waste and third, recycling or composting waste. In particular, Contractor shall comply with the following zero waste requirements: • All printed materials provided by Contractor to City generated from a personal computer and printer including but not limited to, proposals, quotes, invoices, reports, and public education materials, shall be double-sided and printed on a minimum of 30% or greater post-consumer content paper, unless otherwise approved by the City’s Project Manager. Any submitted materials printed by a professional printing company shall be a minimum of 30% or greater post-consumer material and printed with vegetable based inks. • Goods purchased by Contractor on behalf of the City shall be purchased in accordance with the City’s Environmental Purchasing Policy including but not limited to Extended Producer Responsibility requirements for products and packaging. A copy of this policy is on file at the Purchasing Office. • Reusable/returnable pallets shall be taken back by the Contractor, at no additional cost to the City, for reuse or recycling. Contractor shall provide documentation from the facility accepting the pallets to verify that pallets are not being disposed. X. AUTHORITY. The individual(s) executing this Agreement represent and warrant that they have the legal capacity and authority to do so on behalf of their respective legal entities. Y. CONTRACT TERMS: All unchecked boxes do not apply to this Contract. EXHIBIT A Rev. 01/15/04 PALO ALTO ART CENTER HAZARDOUS MATERIALS ABATEMENT PROJECT CONTRACT C11140517 Contractor shall perform the hazardous materials abatement at the Palo Alto Art Center located at 1313 Newell Road, Palo Alto, CA. Contractors to furnish all labor, material, facilities, equipment, transportation, services, employee training and testing as required to perform the work at the Palo Alto Art Center for mold and asbestos removal and lead related construction work, encapsulation, decontamination, disposal, and all other work per the latest regulations from the US. Environmental Protections Agency (EPA); Cal-EPA; the Occupational Safety and Health Administration (OSHA); the State of California Department of Industrial Relations (Cal/OSHA); the recommendations of the National Institute of Occupations Safety and Health (NIOSH); and any other applicable federal state and local government regulations, including all incidental and related work as required by the scope of services and general requirements detailed on the specifications in Exhibit A herein. The Asbestos Survey and Evaluation, and the Lead Survey and Evaluation included in the Request for Quotations (RFQ) 140517 are incorporated here by reference. CITY OF PALO ALTO CONTRACT NO.: C11140517 Rev. January 11, 2010 E:\Files from H DRIVE\RFQ Files\RFQ140517 Palo Alto Art Center Hazardous Materials Abatement Project\Docs related to contract\Contract C11140517 Tradestaff Contracting Services.doc EXHIBIT B SCHEDULE OF PERFORMANCE CONTRACTOR shall perform the Services so as to complete the task within the time period specified below. The time to complete the task may be increased or decreased by mutual written agreement of the project managers for CONTRACTOR and CITY so long as all work is completed within the term of the Agreement. Upon request CONTRACTOR shall provide a detailed schedule of work consistent with the schedule below. Task Complete _X_ Days or ___ Weeks From NTP 1. Perform all hazardous materials abatement at the Palo Alto Art Center facility in accordance with the Scope listed in Exhibit A. 30 Calendar days Art Center Haz Mat Abatement Project Attachment D - Bid Summary RFQ# 140517 # BASE BID A DESCRIPTION QUANTITY UNITS 1 Wall/Ceiling sheetrock, joint tape and compound 60,000 SF 0.73$ 43,800.00$ 0.94$ 56,400.00$ 1.00$ 60,000.00$ 2 Tan 12 x 12 vinyl floor tile w/black mastic 40 SF 3.00$ 120.00$ 7.93$ 317.20$ 3.00$ 120.00$ 3 Gray 9 x 9 vinyl floor tile w/non-asbestos mastic 40 SF 2.00$ 80.00$ 5.92$ 236.80$ 3.00$ 120.00$ 4 Tan 12 x 12 vinyl floor tile (w/fissures) w/black mastic 3,500 SF 1.60$ 5,600.00$ 1.44$ 5,040.00$ 2.50$ 8,750.00$ 5 Gray 9 x 9 vinyl floor tile w/black mastic 1,500 SF 1.50$ 2,250.00$ 1.44$ 2,160.00$ 2.50$ 3,750.00$ 6 Black mastic below black 12 x 12 vinyl floor tile 2,000 SF 1.00$ 2,000.00$ 1.45$ 2,900.00$ 2.50$ 5,000.00$ 7 Beige 12 x 12 vinyl floor tile and black mastic 7,500 SF 1.50$ 11,250.00$ 1.21$ 9,075.00$ 2.25$ 16,875.00$ 8 White TSI on water pipes 3,000 SF 2.00$ 6,000.00$ 5.08$ 15,240.00$ 4.00$ 12,000.00$ 9 White pipe hanger insulation paper 100 SF 1.50$ 150.00$ 6.62$ 662.00$ 5.00$ 500.00$ 10 Gray/black roof felt below roof shake 32,000 SF 0.90$ 28,800.00$ 1.56$ 49,920.00$ 1.70$ 54,400.00$ 11 Gray mastic for roof mounted mechanical 10 SF 30.00$ 300.00$ 67.20$ 672.00$ 15.00$ 150.00$ 12 Roof covering 1 LS 19,520.00$ 19,520.00$ 11,204.70$ 11,204.70$ 17,000.00$ 17,000.00$ 13 Mold remediation 1 SF 370.00$ 370.00$ 361.73$ 361.73$ 5.00$ 5.00$ 14 Lights removal 1 LS 2,810.00$ 2,810.00$ 3,134.99$ 3,134.99$ 1,800.00$ 1,800.00$ 15 Dry rot allowance 1 LS 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 16 Tree protection 1 LS 1,800.00$ 1,800.00$ 1,231.15$ 1,231.15$ 1,500.00$ 1,500.00$ 17 Art protection 1 LS 2,650.00$ 2,650.00$ 1,427.98$ 1,427.98$ 5,000.00$ 5,000.00$ 18 Fencing 1 LS 2,500.00$ 2,500.00$ 3,725.00$ 3,725.00$ 4,800.00$ 4,800.00$ 19 Drywall ceiling allowance 1 LS 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ BASE BID A TOTAL 139,500.00$ 173,208.55$ 201,270.00$ Tradestaff Contracting Asbestos ManagementMidwest Env. 1 of 5 Art Center Haz Mat Abatement Project Attachment D - Bid Summary RFQ# 140517 # BASE BID A DESCRIPTION QUANTITY UNITS 1 Wall/Ceiling sheetrock, joint tape and compound 60,000 SF 2 Tan 12 x 12 vinyl floor tile w/black mastic 40 SF 3 Gray 9 x 9 vinyl floor tile w/non-asbestos mastic 40 SF 4 Tan 12 x 12 vinyl floor tile (w/fissures) w/black mastic 3,500 SF 5 Gray 9 x 9 vinyl floor tile w/black mastic 1,500 SF 6 Black mastic below black 12 x 12 vinyl floor tile 2,000 SF 7 Beige 12 x 12 vinyl floor tile and black mastic 7,500 SF 8 White TSI on water pipes 3,000 SF 9 White pipe hanger insulation paper 100 SF 10 Gray/black roof felt below roof shake 32,000 SF 11 Gray mastic for roof mounted mechanical 10 SF 12 Roof covering 1 LS 13 Mold remediation 1 SF 14 Lights removal 1 LS 15 Dry rot allowance 1 LS 16 Tree protection 1 LS 17 Art protection 1 LS 18 Fencing 1 LS 19 Drywall ceiling allowance 1 LS BASE BID A TOTAL 0.95$ 57,000.00$ 2.01$ 120,600.00$ 1.00$ 60,000.00$ 10.00$ 400.00$ 1.85$ 74.00$ 2.75$ 110.00$ 10.00$ 400.00$ 1.85$ 74.00$ 2.75$ 110.00$ 1.75$ 6,125.00$ 1.85$ 6,475.00$ 2.25$ 7,875.00$ 1.75$ 2,625.00$ 1.85$ 2,775.00$ 2.25$ 3,375.00$ 1.75$ 3,500.00$ 1.85$ 3,700.00$ 2.25$ 4,500.00$ 1.75$ 13,125.00$ 1.85$ 13,875.00$ 2.00$ 15,000.00$ 8.00$ 24,000.00$ 2.00$ 6,000.00$ 4.00$ 12,000.00$ 10.00$ 1,000.00$ 3.00$ 300.00$ 5.00$ 500.00$ 1.75$ 56,000.00$ 1.85$ 59,200.00$ 3.00$ 96,000.00$ 75.00$ 750.00$ 1.85$ 18.50$ 2.75$ 27.50$ 25,500.00$ 25,500.00$ 2,904.00$ 2,904.00$ 25,000.00$ 25,000.00$ 1,000.00$ 1,000.00$ 5.00$ 5.00$ 5.00$ 5.00$ 4,800.00$ 4,800.00$ 4,000.00$ 4,000.00$ 4,614.00$ 4,614.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 8,000.00$ 8,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 7,500.00$ 7,500.00$ 5,000.00$ 5,000.00$ 4,000.00$ 4,000.00$ 5,000.00$ 5,000.00$ 15,000.00$ 15,000.00$ 2,200.00$ 2,200.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 226,225.00$ 254,500.50$ 249,816.50$ Flores SierraProfessional Asbestos Urban Metro Env. 2 of 5 Art Center Haz Mat Abatement Project Attachment D - Bid Summary RFQ# 140517 # BASE BID A DESCRIPTION QUANTITY UNITS 1 Wall/Ceiling sheetrock, joint tape and compound 60,000 SF 2 Tan 12 x 12 vinyl floor tile w/black mastic 40 SF 3 Gray 9 x 9 vinyl floor tile w/non-asbestos mastic 40 SF 4 Tan 12 x 12 vinyl floor tile (w/fissures) w/black mastic 3,500 SF 5 Gray 9 x 9 vinyl floor tile w/black mastic 1,500 SF 6 Black mastic below black 12 x 12 vinyl floor tile 2,000 SF 7 Beige 12 x 12 vinyl floor tile and black mastic 7,500 SF 8 White TSI on water pipes 3,000 SF 9 White pipe hanger insulation paper 100 SF 10 Gray/black roof felt below roof shake 32,000 SF 11 Gray mastic for roof mounted mechanical 10 SF 12 Roof covering 1 LS 13 Mold remediation 1 SF 14 Lights removal 1 LS 15 Dry rot allowance 1 LS 16 Tree protection 1 LS 17 Art protection 1 LS 18 Fencing 1 LS 19 Drywall ceiling allowance 1 LS BASE BID A TOTAL 0.80$ 48,000.00$ 1.80$ 108,000.00$ 1.35$ 81,000.00$ 1.8000$ 72.00$ 2.00$ 80.00$ 4.30$ 172.00$ 0.90$ 36.00$ 2.00$ 80.00$ 4.30$ 172.00$ 1.80$ 6,300.00$ 2.00$ 7,000.00$ 4.30$ 15,050.00$ 1.80$ 2,700.00$ 2.00$ 3,000.00$ 4.30$ 6,450.00$ 1.50$ 3,000.00$ 2.00$ 4,000.00$ 4.30$ 8,600.00$ 1.80$ 13,500.00$ 2.00$ 15,000.00$ 4.30$ 32,250.00$ 12.00$ 36,000.00$ 7.00$ 21,000.00$ 24.80$ 74,400.00$ 25.00$ 2,500.00$ 10.00$ 1,000.00$ 45.00$ 4,500.00$ 2.90$ 92,800.00$ 2.00$ 64,000.00$ 1.88$ 60,160.00$ 4.00$ 40.00$ 80.00$ 800.00$ 6.00$ 60.00$ 15,500.00$ 15,500.00$ 14,000.00$ 14,000.00$ 11,000.00$ 11,000.00$ 5.00$ 5.00$ 200.00$ 200.00$ 330.00$ 330.00$ 1,608.00$ 1,608.00$ 15,000.00$ 15,000.00$ 1,700.00$ 1,700.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 9,000.00$ 9,000.00$ 2,000.00$ 2,000.00$ 1,500.00$ 1,500.00$ 9,000.00$ 9,000.00$ 1,500.00$ 1,500.00$ 1,000.00$ 1,000.00$ 6,000.00$ 6,000.00$ 4,000.00$ 4,000.00$ 6,200.00$ 6,200.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 255,561.00$ 270,160.00$ 314,044.00$ Reliance Construction PARCRestec Contractors 3 of 5 Art Center Haz Mat Abatement Project Attachment D - Bid Summary RFQ# 140517 # BASE BID A DESCRIPTION QUANTITY UNITS 1 Wall/Ceiling sheetrock, joint tape and compound 60,000 SF 2 Tan 12 x 12 vinyl floor tile w/black mastic 40 SF 3 Gray 9 x 9 vinyl floor tile w/non-asbestos mastic 40 SF 4 Tan 12 x 12 vinyl floor tile (w/fissures) w/black mastic 3,500 SF 5 Gray 9 x 9 vinyl floor tile w/black mastic 1,500 SF 6 Black mastic below black 12 x 12 vinyl floor tile 2,000 SF 7 Beige 12 x 12 vinyl floor tile and black mastic 7,500 SF 8 White TSI on water pipes 3,000 SF 9 White pipe hanger insulation paper 100 SF 10 Gray/black roof felt below roof shake 32,000 SF 11 Gray mastic for roof mounted mechanical 10 SF 12 Roof covering 1 LS 13 Mold remediation 1 SF 14 Lights removal 1 LS 15 Dry rot allowance 1 LS 16 Tree protection 1 LS 17 Art protection 1 LS 18 Fencing 1 LS 19 Drywall ceiling allowance 1 LS BASE BID A TOTAL 2.00$ 120,000.00$ 2.00$ 120,000.00$ 3.00$ 180,000.00$ 8.00$ 320.00$ 2.00$ 80.00$ 3.00$ 120.00$ 8.00$ 320.00$ 2.00$ 80.00$ 3.00$ 120.00$ 2.00$ 7,000.00$ 2.00$ 7,000.00$ 3.00$ 10,500.00$ 2.00$ 3,000.00$ 2.00$ 3,000.00$ 3.00$ 4,500.00$ 2.00$ 4,000.00$ 2.00$ 4,000.00$ 3.00$ 6,000.00$ 2.00$ 15,000.00$ 2.00$ 15,000.00$ 3.00$ 22,500.00$ 7.00$ 21,000.00$ 15.00$ 45,000.00$ 20.00$ 60,000.00$ 40.00$ 4,000.00$ 50.00$ 5,000.00$ 20.00$ 2,000.00$ 2.50$ 80,000.00$ 3.24$ 103,680.00$ 3.00$ 96,000.00$ 60.00$ 600.00$ 10.00$ 100.00$ 10.00$ 100.00$ 38,000.00$ 38,000.00$ 16,000.00$ 16,000.00$ 44,000.00$ 44,000.00$ 500.00$ 500.00$ 100.00$ 100.00$ 10.00$ 10.00$ 4,300.00$ 4,300.00$ 5,000.00$ 5,000.00$ 5,000.00$ 5,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,500.00$ 2,500.00$ 2,000.00$ 2,000.00$ 20,000.00$ 20,000.00$ 2,500.00$ 2,500.00$ 3,000.00$ 3,000.00$ 10,000.00$ 10,000.00$ 7,500.00$ 7,500.00$ 1,500.00$ 1,500.00$ 10,000.00$ 10,000.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$ 75,000.00$ 75,000.00$ 320,040.00$ 340,040.00$ 547,850.00$ American TechBayview Env. Janus Corp 4 of 5 Art Center Haz Mat Abatement Project Attachment D - Bid Summary RFQ# 140517 # BASE BID A DESCRIPTION QUANTITY UNITS 1 Wall/Ceiling sheetrock, joint tape and compound 60,000 SF 2 Tan 12 x 12 vinyl floor tile w/black mastic 40 SF 3 Gray 9 x 9 vinyl floor tile w/non-asbestos mastic 40 SF 4 Tan 12 x 12 vinyl floor tile (w/fissures) w/black mastic 3,500 SF 5 Gray 9 x 9 vinyl floor tile w/black mastic 1,500 SF 6 Black mastic below black 12 x 12 vinyl floor tile 2,000 SF 7 Beige 12 x 12 vinyl floor tile and black mastic 7,500 SF 8 White TSI on water pipes 3,000 SF 9 White pipe hanger insulation paper 100 SF 10 Gray/black roof felt below roof shake 32,000 SF 11 Gray mastic for roof mounted mechanical 10 SF 12 Roof covering 1 LS 13 Mold remediation 1 SF 14 Lights removal 1 LS 15 Dry rot allowance 1 LS 16 Tree protection 1 LS 17 Art protection 1 LS 18 Fencing 1 LS 19 Drywall ceiling allowance 1 LS BASE BID A TOTAL 2.50$ 150,000.00$ 2.2500$ 90.00$ 2.25$ 90.00$ 2.25$ 7,875.00$ 2.25$ 3,375.00$ 2.25$ 4,500.00$ 2.25$ 16,875.00$ 20.00$ 60,000.00$ 20.00$ 2,000.00$ 14.50$ 464,000.00$ 50.00$ 500.00$ 27,000.00$ 27,000.00$ 100.00$ 100.00$ 3,760.00$ 3,760.00$ 2,000.00$ 2,000.00$ 4,000.00$ 4,000.00$ 6,000.00$ 6,000.00$ 78,000.00$ 78,000.00$ 7,500.00$ 7,500.00$ 837,665.00$ Meza Env. 5 of 5