HomeMy WebLinkAboutStaff Report 190-05Phase IV Removal of all overhead lines and poles. DISCUSSION The work on this project is being performed by contract because the City does not have the st~ff and the equipment to install the substructure required for this project. Invitation for Bids A notice inviting formal bids for proceeding with Phase I was sent to contractors on N <;wember 23, 2004. The bidding period was 21 calendar days. Bids were received from three qualified contractors on December 14, 2004 as listed on the attached bid summary (Attachment B). Bids ranged from $194,565 to $397;795. Staff reviewed an bids submitted and awarded the bid of $194,565 submitted by Columbia Electric, Inc. The bid is about 7% above the engineer's estimate of $180,000, The change order amount of $ 19,500, which equals 10% percent of the total contract, is also included in the contract for related unforeseen work, which may develop during the project. Staff confirmed with the Contractor's State License Board that the contractor has an active license on file, and checked references supplied by the contractor for previous work performed and found no significant complaints. Summary of Bid Process Bid Name Underground District NoAO Proposed Length of Project 3 months Number of Bids Mailed to Contractors 10 Number of Bids Mailed to· Builder's 2 Exchanges Total Days to Respond to Bid 21 Pre-Bid Meeting? No Number of Company Attendees at Pre-Bid N/A Meeting Number of Bids Received: 3 Bid Price Range From a low of$194,565 to a high of $397,795 *Bld summary prOVided In Attachment A. Joint Agreement To take advantage of the economics of joint use of trenches, the City, SBC California and Comcast Corporation executed an Amended Master Agreement in 1990 (originally a master agreement between· City and Pacific Bell executed in 1975 and amended in 1986) for participation in joint underground construction projects. This Amended Master Agreement, however, limits the expenditures to $25,000 per project. Whenever the amount· involved in a project exceeds the $25,000 limit, then a Specific Supplementary Agreement is· required. The Supplementary Agreement references the Amended . CMR:190:05 Page 2 of3 BID SUMMARY . /1.d-(';(fJt{ rJY6f! v -(J J ATTACHMENT B CITY OF PALc'_i.LTO ~~~i~~tJ.5~!1-for Bid Number: 1109799 I Title: UNi>ERGROUND DISTRICT # 40 . .. .... ~------------------+-=-=-=-==-:-=-=-:~~-_,___----_+-----t_----__j__----___j .'-.--' List of Bidders (Company Name) lBase Bid·Total I Alternate #1 Alternate #2 IAlternate #3' 1 Grand Total $/ Lf C;(o:;: 0-0 'b~1 Un~d 6YtstruJ-r~ If'JI3J DZ)(),()1~ ~.----~----------------4-----------~--------+---------~--------~------~ ---- --------:---------t--------j--------j--------t-------+---- .-.----.- Page 2 · , "