HomeMy WebLinkAboutStaff Report 151-05Summary of Bid Process Bid NamelNumber . 2004-05 Sidewalk Replacement Phase 2/ IFB #110004 Proposed Length of Project 210 calendar days Number of Bids Mailed to Contractors 5 Number of Bids Mailed to Builder's 7 Exchanges Total Days to Respond to Bid 22 Pre-Bid Meeting? No Number of Company Attendees at Pre-Bid NA Meeting Number of Bids Received 5* Bid Price Range From a low of$614,612 to a high of$781,992 *BId summary provIded In Attachment C. Staff has reviewed all bids submitted and recommends that the bid of $ 614,612 submitted by Spencon Construction, Inc. be accepted and that Spencon Construction, Inc. be declared the lowest responsible bidder. The bid is eight percent below the staff/engineer's estimate of $669,290. The change order amount of$61,500, which equals ten percent of the total contract, is requested because· of additional, related but unforeseen work which may develop during the construction. Staff checked references supplied by the contractor for previous work performed and found no significant complaints. Staff also checked with the Contractor's State License Board and found that the contractor has an active license On file. RESOURCE IMPACT Funds for this project are included in the FY 2004-2005 Capital Improvement Program Sidewalk Replacement Project, CIP #PO-89003. ENVIRONMENTAL REVIEW This project is categorically exempt from the California Environmental Quality Act (CEQA) as repair, maintenance or minor alteration of the existing facilities and replacement or reconstruction of existing facilities under Sections 15301 (C) and 15302 CEQA Guidelines and no further environmental review is necessary. ATTACHMENTS Attachment A: Attachment B: Attachment C: Attachment D: PREPARED BY: CMR:151:05 Contract Location Maps 1 & 2 Bid Summary Certification of Nondiscrimination ~/hO~~ MICHAEL JACKSON Deputy Director, Public Works/Operations Page 2 of3 FORMAL CONTRACT expiration or earlier termination of this Contract, City shall have the right to audit Contractor's Project-related and Work-related writings. and business records, as such terms are defined in California Evidence Code Sections 250 and 1271, as amended, during the regular business hours of Contractor, or, if Contractor has no such hours, during the regular business hours of City. 16. Notices. All agreements, appointments, approvals, authorizations, claims, demands, Change Orders, consents, designations, notices, offers, requests and statements given by either party to the other shall be in writing and shall be sufficiently given and served upon the other party if (1) personally served, (2) sent by the United States mail, postage prepaid, (3) sent by private express delivery service, or (4) in the case of a facsimile transmission, if sent to the telephone FAX number set forth below during regular business hours of the receiving party and followed within two (2) Days by delivery of a hard copy of the material sent by facsimile transmission, in accordance with (1), (2) or (3) above. Personal service shall include, without limitation, service by delivery and service by facsimile transmission. . To City: Copy t6: To Contractor: City of Palo Alto City Clerk 250 Hamilton Avenue P.O. Box 10250 Palo Alto, CA 94303 City of Palo Alto Public Works Department Operations Division 250 Hamilton Avenue Palo Alto, CA 94303 Attn: Phung Hoang, Project Mariager Spencon Construction, Inc. 350 Staysail Court Foster City, CA 94404 Attn: Steve Stahl 17. Appropriation of City Funds. This Contract is subject to the fiscal provisions of Article III, Section 12 of the Charter of the City of Palo Alto. Any charges hereunder for labor, services, materials and equipment may accrue only after such expenditures have been approved in advance in writing in accordance with applicable Laws. This Contract shall terminate without penalty (I) at the end of any fiscal year in the event that funds are not appropriated for the following fiscal year, or (ii) at any time within a fiscal year in the event that funds are only appropriated for a portion of the fiscal year and funds for this Contract are no longer available. This Section 16 shall control in the event of a conflict with any other provision of this Contract. 18. Miscellaneous. a. Bailee Disclaimer. The parties understand and agree that City does not purport to be Contractor's bailee, and City is, therefore, not responsible for any damage to the personal property of Contractor. b. Consent. Whenever in this Contract the approval or consent of a party is required, such approval or consent shall be in writing and shall be executed by a person having the express authority to grant such approval or consent. c. Controlling Law. The parties agree thatthis Contract shall be governed and construed by and in accordance with the Laws of the State of California. d. Definitions. The definitions and terms set forth in Section 1 of the Standard Drawings and Specifications (1992) of this Contract are incorporated herein by reference. e. Force Majeure. Neither party shall be deemed to be in default on account of any delay or failure to perform its obligations under this Contract which directly results from an Act of God or an act of a CITY OF PALO ALTO rev. 12100 CONTRACT C0511 0004 PAGE40F7 · , FORMAL CONTRACT r. Recovery of Costs. Each Party shall bear its own costs, including attorney's fees, through the completion of mediation. If the claim or dispute is not resolved through mediation, or if litigation is necessary to enforce a settlement reached at mediation pursuant to California Code of Civil Procedure § 664.6, as amended, then the prevailing party in any subsequent litigation may recover its reasonable costs, including attorney's fees, incurred subsequent to conclusion of the mediation. s. Flow-down. Contractor agrees to include provisions of this Contract relating to Alternative Dispute Resolution, Venue. and Recovery of Costs in any subcontracts or major material purchase agreements which it enters into in connection with this Contract, and to require its subcontractors to include those provisions in any sub-contracts or major material purchase agreements, such that any mediation or litigation of any claim or dispute asserted by a subcontractor or major material supplier will be consolidated with any related claim or dispute between the Contractor and the City. Should the Contractor fail to do so, such that the City is required to defend an action brought by a subcontractor or material supplier inconsistent with the Alternative Dispute and Venue provisions of this Contract, Contractor shall indemnify City for City's costs of defense, including reasonable attorney's fees. IN WITNESS WHEREOF, the parties have by their duly appointed representatives executed this Contract in the city of Palo Alto, County of Santa Clara, State of California on the date first stated above. APPROVED AS TO FORM: Senior Assistant City Attorney APPROVED: Director of Administrative Services Director of Public Works CITY OF PALO ALTO rev. 12100 CITY OF PALO ALTO Assistant City Manager CONTRACTOR: 8y: _________________ _ Name: __________________ _ Title: __________________ _ 8y: _________________ _ Name:, __________________ _ Title: __________________ _ (Compliance with California Corporations Code" 313 is required if the entity on whose behalf this contract is signed is a corporation. In the alternative, a certified corporate resolution attesting to the signatory authority of the individuals signing in their respective capacities is acceptable) CONTRACT C0511 0004 PAGE 6 OF7 BASE BID 1 -SIDEWALK: BID DESCRIPTION ITEM 1A Sidewalk, 4' thick 2A Driveway, 6' thick 3A Integral sidewalk & curb and gutter 4A Integral driveway & curb and gutter 5A Curb ramp 6A Curb 7A Gutter 8A AC pavement 9A Special saw cutting 10A Brick/paver/exposed aggreagte 11A Remove & reconst catch basin top walls 12A Install tree well frame & grate 13A Recycle asphalt and concrete 14A I raTTlc control ADD ALTERNATE NO.1: 18 Sidewalk, 4' thick 28 Driveway, 6' thick 38 Curb ramp 48 Curb 58 Gutter 68 AC pavement 78 Remove & reconst catch basin top walls 88 1 ReCYCle asphalt and concrete ADD ALTERNATE NO.2: 1C Sidewalk, 4" thick 2C Driveway, 6" thick 3C Integral sidewalk & curb and gutter 4C Integral driveway & curb and gutter 5C Curb 6C Gutter 7C AC pavement 8C 1 Kecycle aspnalt ana concrete ADD ALTERNATE NO.3: 10 Sidewalk, 4" thick 20 Driveway, 6" thick 30 Curb 40 Gutter 50 AC pavement 60 I ReCYCle asphalt ana concrete 2004·2005 SIDEWALK REPLACEMENT PHASE 2 PROJECT IFB NO. 110004 BID SUMMARY Engineer's Estimate SPENCON CON ST., INC. J.J.R. CONSTRUCTION BID UNIT BID UNIT BID UNIT BID QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 33,500 SF $7.50 $251,250.00 _$7.60 $254,600.00 $7.90 $264,650.00 14,690 SF $8.50 $124,865.00 $8.25 $121,192.50 $8.90 $130,741.00 495 LF $64.00 $31,680.00 $59.50 $29,452.50 $70.00 $34,650.00 855 LF $70.00 $59,850.00 $60.00 $51,300.00 $75.00 $64,125.00 19 EA $1,300.00 $24,700.00 $1,200.00 $22,800.00 $1,200.00 $22,800.00 525 LF $24.00 $12,600.00 $21.00 $11,025.00 $22.00 $11,550.00 2,105 SF $9.00 $18,945.00 $8.00 $16,840.00 $9.45 $19,892.25 4,925 SF $8.00 $39,400.00 $6.75 $33,243.75 $7.90 $38,907.50 660 LF $4.00 $2,640.00 $4.00 $2,640.00 $3.15 $2,079.00 185 SF $15.00 $2,775.00 $16.00 $2,960.00 $15.00 $2,775.00 3 EA $1,500.00 $4,500.00 $1,200.00 $3,600.00 $1,800.00 $5,400.00 10 EA $700.00 $7,000.00 $500.00 $5,000.00 $600.00 $6,000.00 2,275 TON $10.00 $22,750.00 $0.25 $568.75 $0.01 $22.75 1 LS :jilU,UUU.UU :jilU,UUU.UU .~:JOO.OO :jiB,500.00 :jilU,UUU.UO ~10,U~()~ BASE BID 1 TOTAL. $612,955.00 $563,722.50 $613,592.50 1,050 SF $7.50 $7,875.00 $7.60 $7,980.00 $7.90 $8,295.00 135 SF $8.50 $1,147.50 $8.25 $1,113.75 $8.90 $1,201.50 4 EA $1,300.00 $5,200.00 $1,200.00 $4,800.00 $1,200.00 $4,800.00 155 LF $24.00 $3,720.00 $21.00 $3,255.00 $22.00 $3,410.00 680 SF $9.00 $6,120.00 $8.00 $5,440.00 $9.45 $6,426.00 270 SF $8.00 $2,160.00 $6.75 $1,822.50 $7.90 $2,133.00 1 EA $1,500.00 $1,500.00 $1,200.00 $1,200.00 $1,800.00 $1,800.00 90 SF 'IolU.UU . $900.00 _'IoU.;lO 'IoU.OU 'IoU.Ul :1)U.'='U ........... -_ ........... -.. -..... _ ..... -... ,.. ............. ~" ................. _ ... ... .................. ~,.. 195 SF $7.50 $1,462.50 $7.60 $1,482.00 $7.90 $1,540.50 235 SF $8.50 $1,997.50 $8.25 $1;938.75 $8.90 $2,091.50 45 LF $64.00 $2,880.00 $59.50 $2,677.50 $70.00 $3,150.00 45 LF $70.00 $3,150.00 $60.00 $2,700.00 $75.00 $3,375.00 20 LF $24.00 $480.00 $21.00 $420.00 $22.00 $440.00 65 SF $9.00 $585.00 $8.00 $520.00 $9.45 $614.25 80 SF $8.00 $640.00 $6.75 $540.00 $7.90 $632.00 50 TON $10.uu $500.00 . $0.25 $12.50 $0.01 :1)U."U ADD ALTERNATcNO-:-2 TOTAL. $11,695.00 $fO,290.75 $11,M3.75 1,075 SF $7.50 $8,062.50 7.60 :jiB,170.00 $7.90 $8,492.50 410 SF $8.50 $3,485.00 8.25 $3,382.50 $8.90 $3,649.00 30 LF $24.00 $720.00 21.00 $630.00 $22.00 $660.00 270 SF $9.00 $2,430.00 8.00 $2,160.00 $9.45 $2,551.50 90 SF $8.00 $720.00 6.75 $607.50 $7.90 $711.00 50 TON :jilU.UO :ji5UU.UU 0.25 :ji15.00 :jiU.Ul :jiU.ou ADD ALTERNATE NO.3 TOTAL: :ji16.01f.:JU :ji14.965.00 :ji16.064.60. GRAND TOTAL: $669,290.00 $614.612.00 $669,567.25 ATTACHMENT C SPOSETO ENGINEERING UNIT BID PRICE AMOUNT I $7.90 Ji264,650.00: $8.90 $130,741.00 $73.00 $36,135.001 $73.00 $62,415.00 $1,200.00 $22,800.00 $30.00 $15,750.00, $9.00 $18,945.00: $6.00 $29,550.00 $3.00 $1,980.00 $14.00 $2,590.00! $1,200.00 $3,600.00: $280.00 $2,800.00 $7.00 $15,925.00i :ji~.U(JU.OO _ :ji9,OUU.OOI $616,881.00 $7.90 $8,295.00 $8.90 $1,201.50 $1,200.00 $4,800.00 $30.00 $4,650.00 $9.00 $6,120.00 $6.00 $1,620.00 $1,200.00 $1,200.00 :1)f.UU :1)b;;U.UU .......... ,.... .......... $7.90 $1,540.50 $8.90 $2,091.50 $73.00 $3,285.00 $73.00 $3,285.00 $30.00 . $600.00 $9.00 $585.00 $6.00 $480.00 $7.00 $350.00 $12,217.00 $7.90 $8,492.501 $8.90 $3,649.00i $30.00 $900.00 $9.00 $2,430.00 $6.00 $540.001 '10, .UU _~='J:uul $16.431.50 $674,046.00 ~ ~ ::= ~ ~ Z 1-3 (") BASE BID 1 -SIDEWALK: BID DESCRIPTION ITEM 1A Sidewalk, 4' thick 2A Driveway, 6' thick 3A Integral sidewalk & curb and gutter 4A Integral driveway & curb and gutter 5A Curb ramp 6A Curb 7A Gutter 8A AC pavement 9A Special saw cutting 10A Brick/paver/exposed aggreagte 11A Remove & reconst catch basin top walls 12A Install tree well frame & grate 13A Recycle asphalt and concrete 14A Traffic control ADD ALTERNATE NO.1: 1B, Sidewalk, 4' thick 2B Driveway, 6' thick 3B Curb ramp 4B Curb 5B Gutter 6B AC pavement 7B Remove & reconst catch basin top walls 8B I Kecycle aspnalt ana concrete ADD ALTERNATE NO.2: 1C Sidewalk, 4" thick 2C Driveway, 6" thick 3C Integral sidewalk & curb and gutter 4C Integral driveway & curb and gutter 5C Curb 6C Gutter 7C AC pavement 8C ReCYCle aspnalt ana concrete ADD ALTERNATE NO.3: 10 Sidewalk, 4" thick 20 Driveway, 6" thick 3D Curb 40 Gutter 50 AC pavement 60 I Kecycle aspnalt ana concrete 2004-2005 SIDEWALK REPLACEMENT PHASE 2 PROJECT , IFB NO. 110004 BID SUMMARY Engineer's Estimate VANGUARD CON ST. GOLDEN SAY CONST. BID UNIT BID UNIT BID UNIT BID QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 33,500 SF $7.50 $251,250.00 $8.00 $268,000.00 $9.05 $303,175.00 14,690 SF $8.50 $124,865.00 $9.00 $132,210.00 $10.16 $149,250.40 495 LF $64.00 $31,680.00 $62.00 $30,690.00 $79.15 $39,179.25 855 LF $70.00 $59,850.00 $66.00 $56,430.00 $85.77 $73,333.35 19 EA $1,300.00 $24,700.00 $1,500.00 $28,500.00 $1,100.00 $20,900.00 525 LF $24.00 $12,600.00 $20.00 $10,500.00 $21.00 $11,025.00 2,105 SF $9.00 $18,945.00 $10.00 $21,050.00 $10.00 $21,050.00 4,925 SF $8.00 $39,400.00 $7.00 $34,475.00 $10.22 $50,333.50 660 LF $4.00 $2,640.00 $3.00 $1,980.00 '$5.00 $3,300.00 185 SF $15.00 $2,775.00 $15.00 $2,775.00 $35.00 $6,475.00 3 EA $1,500.00 $4,500.00 $900.00 $2,700.00 $1,174.00 $3,522.00 10 EA $700.00 $7,OOQ.00 $1,500.00 $15,000.00 $875.60 $8,756.00 2,275 TON $10.00 $22,750.00 $10.00 $22,750.00 $0.01 $22.75 1 LS $10,000.00 ~oo-:-O-O-~on $0,000.00 $30,800.00 $30,800.00 .......... -.............. _ ...... -... ,.. ... "" ................. ... ................... ,.. ... ....................... 1,050 SF $7.50 $7,875.00 $9.00 $9,450.00 $9.05 $9,502.50: 135 SF $8.50 $1,147.50 $9.00 $1,215.00 $10.16 $1,371.60: 4 EA $1,300.00 $5,200.00 $1,700.00 $6,800.00 $1,100.00 $4,400.00 155 LF $24.00 $3,720.00 $20.00 $3,100.00 $21.00 $3,255.00 680 SF $9.00 . $6,120.00 $10.00 $6,800.00 $10.00 $6,800.00 270 SF $8.00 $2,160.00 $7.00 $1,890.00 $10.22 $2,759.40 1 EA $1,500.00 $1,500.00 $1,000.00 $1,000.00 $1,174.00 $1,174.00 lIU SF :!)lU.OU :!)900.00 :!)1u.uO :!)9uu.00 :!)0.01 :!)0.90 ADD AL TERNATENO. 1TOTAL. $28,622.50 $31,155.0'0 $29,263.40 195 SF $7.50 $1,462.50 $9.00 $1,755.00 $9.05 $1,764.75 235 SF $8.50 $1,997.50 $9.00 $2,115.00 $10.16 $2,387.60 45 LF $64.00 $2,880.00 $64.00 $2,880.00 $79.15 $3,561.75 45 LF $70.00 $3,150.00 $68.00 $3,060.00 $85.77 $3,859,65 20 LF $24.00 $480.00 $20.00 $400.00 $21.00 $420.00 65 SF $9.00 $585.00 $10.00 $650.00 $10.00 $650.00 80 SF $8.00 $640.00 $7.00 $560.00 $10.22 $817.60 00 TON $1u.uu :!)oOO.UU $1u.uu ' :!)oOO.UU ~U.01 :!)U.oO ADDAL TERNATE NO.2TOTAL. $11,695.00 $11,920.00 $13,461.85 1,075 SF $7.50 $8,062.50 9.00 $9,675.00 $9.05 $9,728.75 410 SF $8.50 $3,485.00 9.00 $3,690.00 $10.16 $4,165.60 30 LF $24.00 $720.00 20.00 $600.00 $21.00 $630.00 270 SF $9.00 $2,430.00 10.00 '$2,700.00 $10.00 $2,700.00 90 SF $8.00 $720.00 7.00 $630.00 $10.22 $919.80 60 TON $10.00 $600.00 10:00 ;JItluu.uul ;JIU.Ul $0.601 Ann AI ..... ~~ .. IATe .. ,n ~ ""'''''''I'''AI • "an .. 7.c:n 47 one: nn 40 ... AA 7t::. GRAND TOTAL: $669.290.00 $693,030.00 $781,992.25 ATTACHMENT C