HomeMy WebLinkAboutStaff Report 150-05CIP projects as of December 31,2004.
As recommended by the City Auditor, this report also provides the Finance Committee and City
Council with preliminary insight into the financial condition ofthe City as of December 31, 2004. It
is worth noting the second quarter totals are unaudited and are subject to change.
DISCUSSION
The following is a summary of major revenue and expenditure adjustments as detailed in Exhibit A.
General Fund
At midyear, General Fund operating revenues and expenditures are at 41 and 54 percent of budget
respectively. The difference between these numbers reflects typical timing issues with the collection
of tax revenues and contract encumbrances. As noted below, the State of California's "triple flip"
agreement with cities in fiscal 2004-05 and 2005-06 is resulting in later-than-normal payments as a
significant portion of sales tax revenue is being paid as property tax. By year-end, total General Fund
expense will be less than total revenues.
In the first half of 2004-05, the City witnessed stabilization in the local economy and a lessening in
the rate of decline in its economically sensitive revenue sources. While this represents a positive
tum for the City, the local job picture has not improved significantly. Consequently, staff does not
f.oresee a major rebound in key revenue sources such as sales and transient occupancy taxes. State
actions to solve its budget problems, however, do require a considerable adjustment to Vehicle
License Fee revenue.
Sales tax revenues for 2004-05 are expected to roughly equal the $18.1 million realized in 2003-04.
This requires a downward adjustment of $0.24 million at midyear. Sales taxes in the second and
third calendar year 2004 quarters (which fall in fiscal year 2004-05) improved over prior year
quarters by 3.0 percent and 4.3 percent, respectively. Due to several significant one-time receipts in
the prior year, softness in automobile sales, and rising consumer debt, sales tax revenue is projected
to remain flat in 2004-05 compared to the prior year.
Property taxes are being adjusted upward at midyear by $2.49 million to $16.09 million. As
mentioned above, the State is paying a large part of the VLF via property tax remittances. Of the
$2.59 million increase, $1.71 million is due to this change. The remaining $0.88 million is due to
the increase in the property tax roll for 2004-05. The long-term lease transaction for the Stanford
Shopping Center results in additional annual property taxes for the City.
Transient Occupancy Taxes (TOT) appear to be firming in 2004-05 with occupancy and room
rates slowly rising. Although July through September results were flat, October and November 2004
occupancy and room rates were 4 percent higher than the prior year. Staff is cautiously optimistic
that this trend will continue and has accordingly adjusted TOT revenue upward by $0.20 million.
Other Taxes and Fines
• Documentary transfer tax revenues are being raised by $0.28 million at midyear. Transfer
taxes were exceptionally strong in 2003-04 as a result of the Stanford Shopping Center
CMR:150:05 Page 2 of9
,.
"
" .. \
transaction. With a steady residential market and a potentially improving commercial
market, staff expects slightly higher 2004-05 revenues than originally budgeted.
• Motor Vehicle License Fee (VLF) revenue is being reduced by $3.3 million as a
consequence of State actions to solve its deficit. As described. in the Long Range Financial
Plan (p. 10), the City is losing $1.5 million in annual VLF revenue in 2004-05 and in 2005-
06; full payment will resume in fiscal 2006-07. Starting in 2004-05, most of the remaining
VLF revenue will be paid via property tax remittances. A small part ofthe VLF will continue
to be paid directly by the State, estimated at $0.3 million for 2004-05.
• Parking citation revenues are bring reduced by $0.1 million (6 percent) due to the opening
of the new publiC garages and the extension of free parking time limits from 2 to 3 hours.
Charges for services revenues are being reduced by $0.2 million (1 percent). Major components of
this reduction include a $0.4 million (31 percent) reduction in Development Center plan check fees
resulting from a dramatic slowdown in development-related activities; a $0.1 million (7 percent)
reduction in paramedic revenues due to delayed implementation of the Basic Life Support (BLS)
program and a revised Medicare reimbursement projection; offset by a $0.3 million increase in 2003-
04 yearend Stanford University billings for fire services.
Permits and licenses revenues are being reduced by $0.3 million (11 percent) due to a reduction in
. Planning and Community Environment's building permit fee revenue. There has been a marked
reduction in Development Center activities, prompting a comprehensive cost recovery analysis as
part of the 2005-06 budget process.
Department expenditures are being reduced by a net $0.7 million (1 percent) as a means of
balancing the midyear revenue reductions and $0.25 million in additional expenditure appropriations
~ mainly from grant-funded spending. Specifically, $1.0 million in salary and benefit savings is being
removed from 8 department budgets related to 37 current vacant positions. Library Department
grants include the State of California's Library Fund allocation ($23,929) and a California State
Library grant purchase of Chinese language books ($10,000). Police Department grants include a
COPS grant for a bar coding system, purchase and upgrade of various public safety equipment
($100,000); an Office of Traffic Sqfety (OTS) grant for a seatbelt compliance campaign ($25,000);
an OTS grant for police sobriety checkpoints ($11,245); and a Department of Alcoholic Beverage
Control (ABC) grant for decoy operations ($10,433).
General Fund Overtime Analysis:
Overtime expense reached 79 percent of budget as of December 31,2004. Specifically the Fire and
Police Departments are exceeding anticipated spending levels in this area for the following reasons:
• Fire Department (111 percent of budget): The two primary factors contributing to this
situation are disability leave and vacancies. There are eight personnel on disability leave
and the general length of time for disability has increased (four on long-term leave). There
are 6 vacancies but the new recruits from the April academy will not be on active duty until
next fiscal year. There will be offset savings in the regular salary budget to fund this
additional expense.
• Police Department (66 percent of budget): The main factors contributing to higher overtime
spending include absences due to disability leave, staff vacancies, and newly hired officers
CMR:150:05 Page 3 of9
contract services is required to assist in regulatory matters. The remaining expenditure increase
includes $53,876 for contract services with PG&E for mandated training.
Capital Improvement Program
Adjustments to the City's 2004-05 Capital Plan are noted in Exhibit A, with specific project
adjustments described in Exhibit B. All of the CIP changes fall into three basic categories: transfer
of project management due to CIP streamlining process, projects requiring additional appropriations,
and other adjustments such as reducing project appropriations.
• Civic Center Infrastructure Project -CIP PF-Ol 002 -Additional funding needed for
construction/design phase (Capital Fund, $630,000 Infrastructure Reserve funding).
• Photovoltaic Design and Installation -CIP PE-OSOOJ-Increase funding by $406,600 and
decrease funding by the same amount to Animal Shelter -CIP PE-04014; funding is
transferred due to elimination of CIP PE-04014 Animal Shelter as a candidate project for
grant funding (No additional funding required).
• Main Library Space Reconfiguration -CIP PE-OS002 (New project) Funding for space
reconfiguration to provide space for youth services collection and program area. (Reduce
funding for Library Automation CIP LB-94018 $140,000; reduce Library Department
operating budget $36,392; Capital Fund $176,000 Infrastructure Reserve funding.) See
informational report in this packet for fuller description.
• University Parking Structure -CIP PE-9S030 -Project already completed. $8,421,237
reduction in project appropriation, as well as a transfer of unused funding to Debt Service
Fund ($3,434,695) and to University Avenue Parking Structure Fund ($425,000).
• Downtown Urban Design Improvements -CIP PE-96008 -Relocation of one Decaux
toilet from Lytton Plaza to the Caltrain Transit Center (Capital Project Fund: $40,000
Infrastructure Reserve FundIng).
• Sidewalk Repairs -CIP PO-89003 -Reduce funding by $500,000 to align budget with
project annual expense. No significant change in project scope (Reduce transfer from
General Fund $500,000).
• Utilities CIS Study -CIP EL-OS002 -(New Project) Study on CIS system integration with
SAP (Electric Fund: $82,000; Transfer project funding from SAP Continuous Improvement
Project CIP-TE-05001 in Technology Fund; no funding from stabilization reserve).
• Wastewater Solids Disposal Project -CIP WQ-97070 -Additional funding needed to
upgrade and rehabilitate two multiple hearth incinerators (Wastewater Treatment ~und:
$72,000 reserve funding).
• Mail Processing System -CIP AS-OSOOO -(New Proj ect) Funding for purchase of mailing
machine in accordance with United States Postal Service standard (Printing and Mailing
Fund: $33,000).
CMR:150:05 Page 5 of9
• Children's Library Improvement -CIP PE-0401 0 -Change in project description. Addition
of 610 square feet (south addition) is planned in partnership with the Palo Alto Library
Foundation (PALF) and Friends of Palo Alto Library (FOPAL). The south wing will have
office and storage space for Children's Library staff.
Other Funds
Special Revenue Funds: Two changes are proposed for the City's Special Revenue Funds: a transfer
from the Parking District Funds to cover the cost of erecting signage for the new downtown parking
garages ($13,000); a correcting entry reversing a transfer from the Community Development Block
Grant (CDBG) Fund to the Capital Fund that is not needed ($628,440).
Business Improvement District (BID): Appropriation offunds to allow the processing of authorized
expenditures from collected fees on BID-related activities through June 30, 2005 (Business
Improvement District Fund, $68,857).
Amendments to the 2004-05 Adopted Municipal Fee Schedule
Staff is proposing to amend the 2004-05 Municipal Fee Schedule (Exhibit C) to include four new
fees and fourteen existing fee adjustments. Future year annual revenue increases are expected to be
$189,500 due to these changes.
The new fees are concentrated in the Fire Department's param.edic services and include: ALS II
which is the highest level of paramedic service; BLS Transport -Single which is for inter-facility
transport; BLS-1 for Special Event Stand By, and ECG 12 Lead which is a new, more advanced
defibrillator. The fee adjustments are in the Administrative Services Department (adjust the
Returned Check Fee), Community Services Department (Mitchell Park Community Center hourly
room rentals: Teen Center, Main Hall, and Mitchell Park Community Center Patio), Fire Department
(increasing the fees for ALS, BLS, BLS Scheduled Transport, 911 ALS Transport Mileage, Inter-
facility BLS Transport Mileage, Night, Oxygen), and the Library Department (eliminating the
Replace Lost Library Card fee, increasing the Test Monitoring Fee).
Table of Organization Changes
The proposed adjustments to the Table of Organization (Exhibit D) include three new items and one
correction to a previously submitted item.
• Administration Services Department: Reclassification of 1.0 Full Time Equivalent (FTE)
Financial Analyst to Senior Financial Analyst in the Real Estate Division due to
restructuring of duties related to the acquisition and disposition of property rights. The
division eliminated a vacant Senior Financial Analyst position in fiscal 2003-04, and now
must upgrade the Financial Analyst position to a Senior Analyst position to match job
duties. The $9,430 in additional annual expense is funded with cost reductions elsewhere
within the division.
• Community Services Department: Correction of an error in the department restructuring
presentation (CMR:427:04 of October 25,2004) requires the elimination of both a 0.5 FTE
Facilities Assistant and 0.5 FTE Program Assistant to add 1.0 FTE Office Specialist as
described in the staff report. Costs associated with this change have been included in Budget
Amendment Ordinance No. 4850.
CMR:150:05 Page 6 of9
In the attached matrix, projects are listed by department for the General Fund and by fund for the
Enterprise and Internal Service Funds. The matrix also includes information on the total budget from
inception for each project, the available budget as of the beginning of the fiscal year, the fiscal year
expenditures through December 2004, including commitments (encumbrances), and the remaining
balance in the project budget as of midyear.
The matrix does not include" continuous" projects. These projects, such as water meter replacement,
have no definitive beginning or end dates and receive ongoing funding to reflect the continuing .
replacement cycles or commitments. During the first half of 2004-05, progress was made on all of
the "continuous" projects (Attachment 3).
RESOURCE IMPACT
Adoption of the attached ordinance will allow for adjustments to the fiscal year 2004-05 budget,
along with amendments to the Table of Organization, the Municipal Fee Schedule and five General
Fund CIP projects. With the approval of this ordinance, the projected ending balance of the General
Fund BSR is $21.2 million, a decrease of $0.7 million (17 .6 percent of General Fund expense). The
Capital Fund Infrastructure Reserve is projected to end with a balance of $30.1 million, a reduction
of $0.6 million. The projected ending Rate Stabilization Reserve total for all Enterprise funds is
decreasing by $0.8 million mainly due to increases in legal and capital expense.
POLICY IMPLICATIONS
These recommendations are consistent with existing City policies.
ENVIRONMENTAL ASSESSMENT
-This is not a project for purposes of the California Environmental Quality Act (CEQA).
ATTACHMENTS
Attachment 1: Budget Amendment Ordinance with the following exhibits:
Exhibit A Fund Summaries and detail changes to the <;Jeneral Fund, Enterprise Funds,
Special Revenue Funds, Internal Service Funds, Debt Service Fund and
Capital Improvement Funds
Exhibit B CIP Project Descriptions
Exhibit C Amendments to the 2004-05 Adopted Municipal Fee Schedule
Exhibit D Amendments to the 2004-05 Table of Organization
Attachment 2: 2004-05 Midyear Capital Improvement Projects Status
Attachment 3: List of Continuous Capital Projects
CMR:150:05 Page 8 of9
SECTION 4. The Supply Rate Stabilization Reserve in the
Electric Fund is hereby decreased by the sum of Four Hundred
Seventy-Five Thousand Dollars ($475,000) as described in Exhibit
A.
SECTION 5. The Distribution Rate Stabilization Reserve in
the Electric Fund is hereby decreased by the sum of Seventy-Five
Thousand One Hundred Forty-Six Dollars ($75,146) as described in
Exhibit A.
SECTION 6. The· Supply Rate Stabilization Reserve in the
Gas Fund is hereby decreased by the sum of One Hundred Thirteen
Thousand Dollars ($113,000) as described in Exhibit A.
SECTION 7. The Distribution Rate Stabilization Reserve in
the Gas Fund is hereby decreased by the sum of Fifty-Five
Thousand Six Hundred Sixty-Five Dollars ($55,665) as described
in Exhibit A.
SECTION 8. The Rate Stabilization Reserve in the Wastewater
Collection Fund is hereby decreased by the sum of Two Thousand
Twenty-Seven Dollars ($2,027) as described in Exhibit A.
SECTION 9. The Rate Stabilization Reserve in the Water Fund
is hereby decreased by the sum of One Thousand Four Hundred
Thirty Dollars ($1,430) as described in Exhibit A.
SECTION 10. The Rate Stabilization Reserve in the Refuse
Fund is hereby decreased by the sum of One Thousand Six Hundred
Sixty-Nine Dollars ($1,669) as described in Exhibit A.
SECTION 11. The Rate Stabilization Reserve in the Storm
Drainage Fund is hereby decreased by the sum of One Thousand
Three Hundred Eleven Dollars ($1,311) as described in Exhibit A.
SECTION 12. The Rate Stabilization Reserve in the
Wastewater Treatment Fund is. hereby decreased by the sum of
Seventy-Two Thousand Two Hundred Thirty-Eight Dollars ($72,238)
as described in Exhibit A.
SECTION 13. Funds in the amount of Four Hundred Forty-
Seven Thousand Seven Hundred Eighty Dollars ($447,780) are
hereby transferred from the General Fund to the Capital
Improvements Fund, as described in Exhibit A.
SECTION 14. Transfer from the General Fund to the
University Avenue Parking District Fund in the amount of Twenty
One Thousand One Hundred Twenty One ($21,121) is hereby reduced,
as described in Exhibit A.
SECTION 15. Funds in the amount of Thirteen Thousand
Dollars ($13,000) are hereby transferred from the Special
Districts Parking Funds and appropriated for non-salary expense
within the Transportation Division of the Planning & Community
Environment Department to provide funding for additional parking
garage signage.
Page 2 of 4
SECTION 24. The Table of Organization is hereby amended to
reflect the changes shown in Exhibit D, which is attached hereto
and incorporated herein by reference. These changes will impact
Reserves and are incorporated with other changes in Exhibit A.
SECTION 25. As specified in Section 2.28.080 of the Palo
Alto Municipal Code, a two-thirds vote of the City Council is
required to adopt this ordinance.
SECTION 26. The Council of the City of Palo Al to hereby
finds that this midyear adjustment is not a project under the
California Environmental 'Quality Act and, therefore, no
environmental impact assessment is necessary. Capital
improvement projects described in this ordinance will be
assessed individually as appropriate.
SECTION 27. As provided in Section 2.04.330 of the Palo
Alto Municipal Code, this ordinance shall become effective upon
adoption; provided that all new or increased Planning Department
fees, more specifically described in Exhibit "C, II shall become
effective sixty (60) days from the date of adoption.
INTRODUCED:
PASSED:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
ATTEST:
City Clerk
APPROVED AS TO FORM:
Asst. City Attorney
Mayor
APPROVED:
City Manager
Director of Administrative
Services
Page 4 of 4
.'
IMPACT AND SUPPORT ANALYSIS
• Environmental: This project is categorically exempt under CEQA Section 15301.
• Design Elements: The exterior changes are subject to ARB review.
• Operating: None
• Telecommunications: None
COMPREHENSIVE PLAN
This project furthers Policy C-24 and Program C-19 of the Comprehensive Plan.
Managing Department: Public Works
2 City of Palo Alto
.r
2004-05 Budget
EXHIBIT C
ADMINISTRATIVE SERVICES DEPARTMENT
Revenue Collections ---
Page 1 of 6
EXHIBITC
PLANNING DEPARTMENT
Planning ---Comprehensive Plan Change Initial deposit of $5,000.00 plus Other Application Initial deposit of $5,000.00 plus Other Application
(outside of Annual Review) Fees on page 6S. 100 percent of processing costs Fees on page 6S. 100 percent of processing costs
will be recovered plus Environmental Impact will be recovered plus Environmental Impact
Assessment any other entitlements necessary to Assessment any other entitlements necessary to
complete the project, whether indicated as 100 complete the project, whether indicated as 100
percent cost re percent cost re
Development Agreement Initial Deposit of $5,SOO.00 plus Other Application Initial Deposit of $5,SOO.00 plus Other Application
Fees on page 6S. 100 percent of processing costs Fees on page 6S. 100 percent of processing costs
will be recovered plus Environmental Impact will be recovered plus Environmental Impact
Assessment plus any other entitlements necessary to Assessment plus any other entitlements necessary to
complete the project, whether indicated as 100 complete the project, whether indicated as 100
percent co percent co
Development Agreement -Annual Initial deposit of $2,000 plus Other Application Initial deposit of $2,000 plus Other Application
Review Fees on page 6S. 100 percent of processing costs Fees on page6S. 100 percent of processing costs
will be recovered. will be recovered.
Development Impact Fees
Additional development impact fees for Traffic and for Housing in-Lieu are specified in the Municipal Code (ChllQter 16).
Parks Residential: Single family! $S,0711residence (or Residential: Single familY! $S,337/residence (or
$12,050/residence larger than 3,000 square feet); $12,44Slresidence larger than 3,000 square feet);
Multi-family $5,2S3/unit (or $2,6711unit smaller Multi-family $5,457/unit (or $2,759/unit smaller
than or equal to 900 square feet). than or egual to 900 gtuare feet).
Nonresidential: Commercial/Industrial $3.43/square Nonresidential: Commercial/Industrial $3.54/square
foot; HotellMotel $1.55/square foot foot; HotellMotel $1.60/square foot
Community Centers Residential: Single family! $2,093/residence (or Residential: Single familY! $2,162/residence (or
$3, I 321residence larger than 3,000 square feet); $3,235/residence larger than 3,000 square feet);
Multi-family $1,377/unit (or $694/unit smaller than Multi-family $1,422/unit (or $717/unit smaller than
or equal to 900 square feet) or equal to 900 square feet)
Nonresidential: Commercial/Industrial $0.19/square Nonresidential: CommerciallIndustrial $0.20/square
foot; HotellMotel $O.09/square foot foot; HoteUMotel $O.09/square foot
Libraries Residential: Single family! $730/residence Residential: Single familY! $754/residence
residence (or $1 ,OS5/residence larger than 3,000 residence (or $1,1211residence larger than 3,000
square feet); Multi-family $477/unit (or $239/unit square feet); Multi-family $493/unit (or $247/unit
smaller than or equal to 900 square feet) smaller than or equal to 900 square feet)
Nonresidential: Commercial/Industrial $0. I S/square Nonresidential: Commercial/Industrial $0.19/square
foot; HotellMotel $O.OS/square foot foot; HotellMotel $O.OS/square foot
1 ;f"Wme:purpose.s9f}I'lIS .t~e;."Sll1gl~JarnnY:I~~~fil1E3d~CiS-cCi··S\ngte.detaCt)ed .. I'l()us~on~a .Ipt In .. anyzOn~"J\lts~l)~eque~tunlt~'.
II atfached.·i;)(detacihed)·cQnstructed on' a·lot.will· bElt:harged .. &I·the·mijiti-family·rate:····;;;,·:.)·::·.;·.·~.·.···· •• ····;,,\·:L~.;·,.;·.::;c:··.· •• ·· ..••
Page 6 of 6
.. '
• 0
ATTACHMENT 2
FY 04-05 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
ADMINISTRATIVE SERVICES DEPARTMENT
I Total I I C"~"' I I I Budget Available Fiscal Year
Projcct Project I~,I From Budget Expenditures Remaining Percent
Number Title Catcgory Iuccption liy 2004·05 & Commitmcnts I Balance I Complcte
~
TE-OlOO6 Entel]lrise Backup Minor $70,000 $0 $0 $0 0%
Solution
TE-OlOO8 Systems Minor $357,180 $5,707 $23,624 ($17,917) 105%
Management
TE-OI012 IT Disaster Minor $390,000 $60,000 $0 $60,000 85%
Recovery Plan
TE-0202S Cable Television Minor $50,000 $34,837 $0 $34,837 30%
Broadcasting
Equipment
TE-OSOOI SAP Continuous Minor $232,000 $232,000 $0 $232,000 0%
Improvement
Project
TE-05002 Document Minor $500,000 $500,000 $0 $500,000 0%
Management
Implementation
TE·05003 Internet Site Minor $240,000 $240.000 $0 $240,000 0%
Upgrade
ASD·1
Project I E.'m",",
SL'Itus Com)}. Date Commcnts
Design Dec 05 Reappropriation requested for
$70,000 pending approval by
Council.
Design Jun05 There was an erroneous charge
of approximately $18,000 that
will be corrected. This charge
was for an SAP related projec~
the cost of which will be
traosferred to TE-0500 I (SAP
Continuous Improvement
Project) that has funds for those
initiatives.
Design Jun06 Reappropriation requested for
$330,000 pending approval by
Council.
Construction Jun05 Continuing with the equipment
upgrades that started in 2002,
staff is currently reviewing RFP
submissions for cable equipment
upgrade and replacement
services.
Pre.Design Jun·05 The CalCard program was rolled
out and there will be further
enhancement made to it.
Additional SAP expertise to
continue the process
improvements within SAP have
been acquired to complete year·
end processes and to continue
HR component refinements.
On-hold lun-05 Due to lack of the ongoing
process improvements needed
for SAP, this CIP is on-hold.
We foresee this project
delayed for at least one year.
Pre·Design Jun·06 An RFP will be issued by the end
of this quarter to solicit bids frorr
consultants/vendors who are
interested in providing services
to upgrade the City's internet
presence. This will include (but
not be limited to) presentation,
applications and accessibility.
FY 04·05 MID·YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
COMMUNITY SERVICES DEPARTMENT
I
Total
I I c. .. " I Budget Available FiSl:alYear
Project Project I h"m I From Budget EXllenditures I
Number Title Category Inception FY 200~·05 & COImnitrucnt~
MYI,:n~YEAR. J>ROJE~#:\?f(~;
OS·OOOOI Park Trails Multi·Year $1,009,000 $237,424 $214,533
OS·00002 Open Space Lakes Multi·Year $153,257 $23,682 $14,750
& Ponds
Maintenaoce
OS·00003 Baylaod Parking Multi ·Year $1,089,163 $70,020 $70,020
aod Site
Improvements
PG·00009 Mediaos, Islaods Multi·Year $651,689 $27,689 $27,689
aod Plaoters
Renovation
Projects
PG·OOOI0 Park Facilities Multi·Year $3,159,059 $330,609 $269,609
Improvements
CA·OI014 Community Multi·Year $424,000 $154,949 $23,920
Services Facilities
Lighting
Enbaocements
PG·02018 Heritage Park (palo Multi·Year $257,257 $257,257 $200,470
Alto SOFA Park)
CSD-2
, ..
1)'.
I I Remaining Percent Project I"-~I Balance I Complete Status Comp, Date Comments
$22,891 98% Ongoing Joo05 Bay Trail is currently under
construction aod will be completed
Feb 05. Foothills Park Vista Hill is in
design phase which will be
completed Apr 05.
$8,932 94% Ongoing Nov 05
$0 100% Ongoing Joo05 Phase 2 • Evaos Parking Lotto be
rebuilt May 05.
$0 100% Ongoing Embarcadero Road mediao is under
construction aod will be completed
Jao 05. San Antonio mediao is in
design phase which will be
completed Joo 05.
$61,000 98% Ongoing Eleaoor aod Hoover Parks are in
construction aod will be completed
Jao 05. Briones Park is in design
phase which will be completed Jao
05. College Terrace Parks are in
design phase aod will be completed
Jun 05.
$131,029 69% Construction Jun05
$56,787 78% Construction Feb 05
FY 04·05 MID·YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
LIBRARY DEPARTMENT
Funding Available Fiscal Yeal'
I I I
Total I I Current I I I I I
Pt'ojt'Ct Project Project From Budget Expcnditul'CS I Remaining Percent Pl'Ojt'Ct Estinmted
Numbel' Title Cntcgor), [ucepUon FY 2004.05\ & Conmlitments \ Balance /comPlete Status Comp, Dllte Comments
~!f~?~. ~~~fi;'~~~4a.i
LB-94018 Library Multi-Year $1,286,751 $668,278 $476,397
Automation
Service
$191,881
Ubrary -1
85% Ongoing Aug 05 $140,000 will be moved to a new
CIP under PWD to reconfigure
space at ~ain LibraJ}',
.'
"
. , FY 04-05 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND NAME: GENERAL FUND/STREET IMPROVEMENT FUND (SIF)
PLANNING DEPARTMENT
FUlidilig Amilable Fiscal Year I I 1-'1 I ",mol I I I I Project Project Project From Budget Expenditures 1 Remaining Percent Project Eslimatl>d
Number Title Category Inception FY 200 .. -051 & Conunitmentsl Balance I Complete Status Comp_ Date Comments
[(f~~~~r::~:";::\:§t~mt:;?~ ~~~~ J'I~_.eT,.;;z';'l,.&2'''S;E;o';a~~~a
PL-9S024 Bikeway System Minor $S I ,200 $39,497 $0 $39,497 23% Design Oct OS Louis/Charleston median island was
Improvement modified to provide improved bike access
(SIF) across intersection. Additional projects will
be implemented including improvements
along Park Blvd.
PL-02005 EI Camino ReaV Minor $61,000 $1 $0 $1 100% Delayed Dee 05 The project balance of $61 ,000 was
Ventura Avenue returned to reserves as of Jun 04. Staff
Traffic Signal will reactivate this project with Just-in-
Time budgeting when Calttans is ready to
proceed with the project. Caltrans is the
lead agency for the project. City is
awaiting receipt of a cooperative
agreement from Caltrans.
PL-02006 Traffic Signal San Minor $280,800 $46,800 $46,800 $0 100% Construction Jun05 Construction complete. Staff awaiting
AntoniolHwy 101 final accounting from Caltrans, the lead
agency for the project before closing
project out.
PL-02023 Master Schematic Minor $288,000 $10,360 $0 $\0,360 96% Pre-Design Jun05 Draft Plan was completed and endorsed
Design by Planning and Transportation
Commission in Mar 03. Caltrans District
4 has applied for grant funds to install
improvements at Stanford Avenue and EI
Camino Real consistent with the 6-I3Oe
option in the Draft Plan.
PL-04003 Middlefield Rd. Minor $55,000 $55,000 $0 $55,000 0% Pre-Design Det05 Evaluation of potential restriping of
Circle Middlefield in Midtown underway.
Improvement Outcome will determine if changes will
(SIF) be recommended.
PL-04010 Bicycle Minor $100,000 $100,000 $0 $100,000 0% Pre-Design Oct 05 Conceptual design of MaybelVDonald
Boulevards bike boulevard will be presented to
Implementation Planning and Transportation Commission
Project in early 2005. Implementation in
SpringlS\ll1lIrer.
PL-05003 College Terrace Minor $150,000 $150,000 $0 $150,000 0% Pre-Design Dec 05 City Council approved traffic calming
Traffic Calming plan in Nov 04. Installation to be
completed by end of 2005.
Planning -1
FY 04-05 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
FUND NAME: GENERAL FUND/STREET IMPROVEMENT FUND (SIF)
PLANNING DEPARTMENT
Funding Available Fiscal Year
I I I
Total I I Current I I I I I
Project Project Project ]<'rom Budget Expenditures 1 Remaining Percent Project Estimated
Number Title Category Inception FY 2004-051 & Commitments 1 Bal~mce I Complete Status Compo Date Comments
"""'~~~'~'1m tMJ{i«<Ai'~J.k1l~,£,~"'1Ji/'ii}Jj,~1!t~'~~~
PL-98013 School Commute Multi-Yeal $300,000 $116,870 $7 $116,863 61% Design Dec 05 Staff is currently working with Caltrans
Safety to develop optimal plan for improvements
Improvements at Stanford Avenue and EI Camino Real.
(SIF)
PL-00026 Local and Multi-Yeal $470,000 $231,555 $180,400 $51,155 89% Ongoing Jun05 During the past year, traffic calming
Neighborhood projects have been implemented on
Collector Street Louis, Chanuing and Waverley. Project
Traffic Calming on Pepper A venue is in final design and
Program (SIF) will be implemented Spring 05.
PL-OI017 EI Camino Multi-Yeal $100,000 $100,000 $0 $100,000 0% Delayed TBD Project has been delayed indefinitely.
Real/Churchill
Avenue
Intersection
PL-04002 South of Forest Multi-Year $25,000 $25,000 $0 $25,000 0% Pre-Design Dee 05 Funds were budgeted for implementation
Avenue Street of bike improvements on Homer A venue
Improvements between Alma and High Street, but bike
circulation was routed along Alma Street
instead with the opening of the Homer
Avenue Undercrossing.
Planning-2
FY 04-05 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
INTERNAL SERVICE FUND
GENERAL FUND
PUBLIC WORKS DEPARTMENT
I I Tm,l I I (~~I I I J }<'unding Available Fiscal Year P~.ct I Project Project }<'rom Budget Expenditures 1 Remaining Percent Project
Number Title Catl'gory Inception FY 2004.051 & Commitments 1 Balance IColllPlet Status
f§ll~'1~Y[:"";f,l ~~ ~~~ill
[VR-uwu~ MSC Fuel Storage [Minor $225,000 $100,000 $0 $100,000 ~,
Tank Replacement
[VR-OlOO2 MSC [Minor $300,000 $241,394 $30,620 $210,774 .~
IWashing Facility I Upgrade
[VR-OlOOO [MSC [Minor $85,000 $48,105 $45,095 $3,010
Facility Mezzanine
Storage Area
(K ... ~I111~ MSC Fuel Storage [Minor $775,000 $665,536 $4,843 $660,693 '"b'
Tank ISvc Island
[VR-03001 New Vehicles [Minor $108,000 $108,000 $107,077 $923 QQ'II IPre.Design
IVK"':lIlll~ Field Service Truck [Minor $125,000 $125,000 $1,875 $123,125 '" ...
'K",,"I111'" oh.. ,n" Pickup i":ck "J
Minor $25,000 $25,000 $15,585 $9;415 62')1
VR-OSOOS Fuel Tank Vapor Minor $50,000 $50,000 $32,875 $17,125 66% '"0'
Recovery System
VR-92006
=gelUpgrade
IIVIUIU-I ear $341,000 $0 $0 $0
'K-:l:lIIII:l Wireless Vehicle IVIUIU-I ear $245,000 $3,327 $0 $3,327
,System
VR-OlOO4 [New Vehicles Multi-Year $208,000 $45,809 $26,343 $19,466 :II 'it ueSlgn
VK"''lUJU [CNG Vehicle IVIUIU-[ear $210,000 $166,773 $40,415 $126,358 'b'
IFacility Upgrades
, K ... 'lUU Compressed Multi-Year $250,000 $250,000 $5,099 $244,901 2'11 -to'
Natural Gas
Refueling Station
Relocation
PWD-ISF-1
"I,"
I '.limruoo I
COllll)' Date Comments
Dec 05 IRp_rl",ig!' work necessary te
Icomplete pennitting process.
Jun06 IProject has been delayed
I~nding completion of new
lfueling station (VR-OOOOI).
,Jun05 lDesign or mezzarune is
[complete, Cun:ently
to plan check
[Dec 05
[Mar 05 IA'."aiting delivery of
Ivehicle.
[Jun05 IProject specifications are
lbeing prepared.
Jun05
Apr 05
Jun05 ~,,,ul'''.~u,, requested
for pending
approval by Council.
[Jun 05 [All vehicles have been
ldelivered, however, one did
Inot the application and
I will need to be re-ordered.
[Jun05
[Jun06
~, FY 04-05 MID·YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMENT
I I I Tom' I IC"-I 1 J Funding Amilable Fiscal Year
PI'oject Project Project From Budget Expenditures 1 Remaining Percent Project
Number Title Category Inception FY 2004.051& Commitments! Ualance ICOmPle! Status
~III
IPF~9H020 Public Safety Building I Minor $840.oz8 $342,456 $269,388 $73,068 9bQ <;e·veslgn
Sand Hill Road Bridge IMinor $\77,011 $160,316 $121,250 $39,066
'~M Roth _~,~ilding Wings IMinor $ 21i5.150 $119,838 $106,226 $\3,612
,Wildhorse Valley' $204,500 $179,890 $\32,204 $47,686 II'
:Bridge Replacement
'Animal Service iMinor $172,000 $160,000 $0 $160,000 7% IClosed
,Protective Holding
:Kennels
1'E-fld91~ , Parking
IStructure Improvements
IMinor $67,720 $2,131 $0 $2,131 '.I
I Fire Stations 3 & 4 IMinor $153,950 $153,950 $123,446 $30,504 .....
Feasibility
IStudy
PF·04011 IJunior Museum Fire IMinor $127,500 $125,000 $80,024 $44,976
ISprinkler Installation
n"u"",,, I'-uu"""oy Building 1 Air IMinor $344,160 $185,922 $158,\30 $27,792 Y.l'1o
,PF.04000 [Security System
Improvements
Minor $200,000 $200,000 $0 $200,000 '.".,
~ivlu,u"oar $6,996,322 $176,020 $3,583 $172,437 98% 'rP-~"6"
i1'E·89004 Harbor Improvements MUlll'leal $2,139,000 $99,278 $46,857 $52,421
IPR.9:1nlO , v Pedestrian ,num"o", $1,819,555 $251,812 $225,054 $26,758
Bike Path
Extension (SII')
IPF~95nl2 Civic Center Plaza mum-,o", $381,510 $165,675 $61,003 $104,672
··"·P" .. • .. 0
,~ •• ~u~u Parking MUlll-leal $40,136,753 $q 1505' $283,762 $9,166,771
,Structure Indirect Cst P
,~ ouuu , Urban Design 1V1U1ll' rear $1,220,349 $0 $0 $0 .. ,
PE-99007 ISan Mateo Drive Bridges IMUlll-real $118,000 $21,023 $780 $20,243 H1'
IPage Mill/Hanover (SII') ,!VIU'U-'0'" $1,068,000 $994,666 $17,874 $976,792 9% !Design
,PR.O~OO· ,Design and Multi-Year $683,970 $683,970 $70,981 $612,989 10% Design
PWD-l
,.
I &t;"M~ I
Comp.Date Comment~
Jun05 IDesign 30% complete.
Feb 05
[Replaced by PE-04014.
!~::'~~::'I;:~se will
lbegin Aug 05.
I Feb 05
IJan05 Bid opening date Nov 04;
phase to be
Icompleted Jan 05.
IJun05 Project Design In-House
IJun 05
On·going monitoring as
required. "
I Feb 05
IJan05
Dec 05
Phase 2 will commence FY
,06-07 .
This project was inherited by
: 1 " .... p •• , ... v .. , and has been
to PL-90023.
Jul05
FY 04-05 MID-YEAR CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMENT
I I I Tmal I I C"n", I I J Funding A~ailable Fiscal Year
Project Pl"Oject PI'oject Fl"Om Budget EXllCnditures I Remaining Percent
Numbcr Title Categol'Y Inception FY 2004.051& Commitments! Balance IcomPlct
~~'J;~ ~~d~214
PF-OOOO6 Roofing Replacement Multi·Year $314,640 $54,821 $26,341 $28,480 91%
PO·OOO15 FIre Station Driveway Multi-Year $235,000 $23,032 $11,336 $11,696 95%
Modification and
[nstallation of OillWater
Separator System
PF-00020 Office Space Renovation Multi-Year $882,934 $30,567 $10,089 $20,478 98%
and Reallocation
PF-OlOO2 CCOB Infrastructure Multi·Year $2,536,096 $2,064,560 $1,685,816 $378,744 85%
Construction
PF·OlOO3 Building Systems Multi·Year $117,000 $45,671 $40,503 $5,168 96%
Improvement
Construction
PF-OlOO4 FIre Station Multi·Year $1,871,070 $1,775,518 $[,091,177 $684,341 63%
Improvements
PF-OlOOS Lucie Stern Community Multi·Year $379,000 $10[,584 $373,307 ($271,723) 172%
Center Improvements
PE-OI021 Homer Avenue Multi-Year $5,232,760 $2,357,592 $2,339,219 $18,373 100%
Undercrossing
PF-02022 FacilIty Interior FInishes Multi-Year $152,400 $38,278 $41,477 ($3,199) 102%
PF-03000 Foothills Park Multi-Year $92,000 $15,783 $700 $15,083 84%
Interpretive Center
Mechanical Upgrades
PE·04010 Children's Library Multi-Year $2,472,540 $2,472,540 $468,158 $2,004,382 19%
Improvements &
Expansion
PE-04012 Mitchell Park Library & Multi·Year $397,280 $397,280 $270,618 $126,662 68%
Community Center
Improvements
PE·04014 Animal Shelter Multi·Year $2,318,050 $2,293,024 $366,831 $1,926,[93 17%
Ex pansion & Renovation
PF·04010 Cubberley Mechanical & Multi-Year $454,120 $442,559 $290,499 $152,060 67%
Electrical Upgrades
1'l"Ojcct
Status
Ongoing
Complete
Complete
Construction
Complete
Construction
Construction
Construction
Ongoing
Complete
Design
Pre-Design
Design
Design
PF-OSOO2 Municipal Service Center Multi·Year $120,800 $120,800 $0 $120,800 0% Design
Renovation
PE·OS300 Arastradero Preserve Multi·Year $625,311 $498,345 $429,304 $69,041 89% Construction
Gateway
PWO-2
< J
I ~;m."11 Compo Date Comments
Greer Park restroom to be
completed by Jun 05.
Aug 05 Construction phase for
elevator upgrade. This
project will be phased over
mu[tiple years.
Sep05 Station I and 2.
Jun05 Mid·year budget adjust-
ment requested for $335,000.
Mar 05
Project to be closed out.
May 05
Mar 05
Apr 06
Feb 05 Gym A & B Boiler
replacement complete.
PavilIon, Multi-Pnrpose
Building and Theatre design
to be completed Feb 05.
Jun05
Apr 05
h •. ,j
Administrative Services
TE-86014
TE-96018
TE-99014
Community Services
AC-86017
PG-9401S
ATTACHMENT 3
LIST OF CONTINUOUS PROJECTS
Financial Database Upgrade
GIS Application
New Computer Acquisitions
Art in Public Places
Park Facilities Improvements
Planning & Community Environment
PL-OS030 (formerly EL-89030) Traffic Signal Upgrades
Public Works
General Fund
PO-89003
PE-86070
PF-90018
PE-91001
PF-93009
PO-OSOS4 (formerly EL-930S4)
Storm Drainage Fund
SD-88070
Wastewater Treatment
WQ-80021
WQ-80022
Utilities
Electric Fund
EL-89028
EL-89031
EL-89038
EL-89044
EL-97003
EL-98001
EL-98002
EL-98003
Gas Fund
GS-80017
GS-80019
GS-92030
GS-03009
GS-OS002
Wastewater Collection
WC-80020·
WC-05003
Water Fund
WS-80013
WS-80014
WS-8001S
WS-02014
WS-05001
Sidewalk Improvements
Street Improvements (Street Improvement Fund)
Cubberley Building Code Modification
Tank Investigation and Removal
ADA Compliance
Street Lights Improvements
Collection System Improvements
RWQCP Plant Equipment Replacement
RWQCP System Flow Metering
Customer Design and Connection Services
Communication System Improvements
Substation Protection Improvements
Substation Facility Improvements
Underground Cable and Equipment Replacement
Fiber Optics Ring System Improvements
Fiber Optics Customer Design and Connection Services
Electric Distribution System Reconstruction and Improvements
Gas System Extensions
Gas Meters and Regulators
Natural Gas Vehicle Conversions and Purchases
System Extensions -Unreimbursed
Gas Main Replacements
Sewer System Extensions
Sewer System Rehabilitation and Augmentation
Water System Extensions
Service and Hydrant Replacements
Water Meters
Water-Gas Wastewater Utilities GIS Data
Water Main Replacements