Loading...
HomeMy WebLinkAbout2005-01-18 City Council (14)Bid Process A notice inviting formal bids for the Lucie Stern Center Improvements project was posted at City Hall and sent to four contractors and six builder's exchanges on October 25, 2004. The bidding period was 21 days. A pre-bid meeting was held on November 4, 2004; four bidders attended the meeting. Bids were received from four qualified contractors on November 16,2004, as listed on the attached bid summary (Attachment D). Bids ranged from a high of $421 ,600 to a low bid of$304,011. Summary of Bid Process Bid NamelNumber Lucie Stern Community Center Improvements IFB 109422 Proposed Length of Project 4 months Number of Bids Mailed to 4 Contractors Number of Bids Mailed to Builder's 6 Exchanges Total Days to Respond to Bid 21 Pre-Bid Meeting? Yes Number of Company Attendees at 5 Pre-Bid Meeting Number of Bids Received: 4 Bid Price Range $304,011 to $421,600 *Bld summary provIded m Attachment D. Staff has reviewed all bids submitted and recommends that the base bid of $304,011 plus Add Alternate #1 of $2,964, to provide and service two temporary toilets, submitted by Coast Side Associates be accepted and that Coast Side Associates be declared the lowest responsible bidder. The bid is 34 percent below the engineer's estimate of $408,000. The change order amount of $46,025 which equals fifteen percent of the total contract is requested due to the age of the facility and lack of adequate documentation of existing conditions which may be discovered during construction and impact the project. Staff confirmed with the Contractor's State License Board that the contractor has an active license on file. Staff checked references supplied by the contractor for previous work performed and found no significant complaints. The Certification of Non Discrimination is Attachment E. RESOURCE IMPACT On May 18,2004, Council approved a BAO for City Manager Report (273:04) in the amount of $4,170,957. This BAO returned unspent CIP balances to the Infrastructure Reserve. This eIP project PF -01005 was one of the CIP projects with a balance returned to the Infrastructure Reserve (Attachment F). The attached BAO will transfer $335,000 from the Infrastructure Reserve to this project. This is a one-time expense and no future year resource needs are anticipated as a result of this BAO. CMR:128:05 Page 2 of3 ,!..-t~ --: , ~> Item No. 1 2 3 4 5 6· 7 8 Bid Analysis-LSCC Improvements ATTACHMENT D CIP No. PF-01005 , IFB No.1 09422 Date: October 16,2004 Prepared by P.C.Chokkalingam Description of Work Labor and materials to construct Transformer pad, Switch pad, landscaping, main breaker panel, new breaker panels, install duct and wiring and all electrical work to complete the project. Labor and Materials to remodel Fireside Room (Room 128) including lighting and electrical Labor and Materials to demolish and construct the Men's and Women's restrooms complete with all fixtrues and electrical work, including water fountains and janitor's closet Labor and materials to provi~e and install handrails, lower front desk, and provide and instil handicap access automatic door-closers to front door. Labor and materials to provide and install carpets in all designated rooms and hallway. Labor and materials to demolish and construct new wall for Electrical Room in basement, including demo and construct air duct adjacent to wall. Labor and materials to perform patch and paint walls, paint repaired walls, remodel front counter, and perform all items of work required to complete the project.· Labor and materials for Miscellaneous items, icluding temporary power during switchover to new system. Total Base' Bid Ifems 1 through 8 Add Alt#1 Provide two temporary toilets during the duration of the project, including servicing both daily Engr's Estimate $224,000 $23,000 $81,000 $23,600 $30,000 $11,000 $6,500 $9,000 $408,100 $3,000 Coastside JMA Novo .ESR Associates Const. Const. Const. $54,242 $95,000 $102,614 $48,000 $49,025 $9,500 $41,179 $45,000 $132,100 $135,000 $139,496 $135,000 $11,401 $10,500 $14,378 $20,000 $12,824 $12,000 $15,194 $18,000 $11,013 $38,000 $7,397 $22,000 $12,082 $15,000 $27,744 $40,000 $21,324 $21,800 $5,000 $93,600 $304,011 $336,800 $353,002 $421,600 $2,964 $8,000 $6,055 $14,000 .,