HomeMy WebLinkAboutStaff Report 451-10TO:
ATTN:
FROM:
DATE:
HONORABLE CITY COUNCIL
FINANCE CQMMITTEE
CITY MANAGER
DECEMBER 21, 2010
DEPARTMENT: ADMINISTRATIVE
SERVICES
CMR:451:10
SUBJECT: Fiscal Year 2010 Year-End Capital Improvement Program Projects Status
Report
This is an informational report and no Council action is required.
BACKGROUND
This report provides information on the status of the City's Capital Improvement Program (CIP)
projects as of the end of Fiscal Year (FY) 2010. The attached graphs and matrix (Attachments 1
through 4 and Exhibit A) list all CIP projects and their cun-ent status, and include any issues that
might cause a change in the scope or timing of the projects. The repOli is intended to update Council
on the progress of all CIP projects opened at the beginning ofFY 20 1 0, and on those that were added
or completed during the fiscal year. The report also provides an update on the General Fund
infrastructure backlog.
DISCUSSION
The attached graphs provide detail for General Fund projects:
o General Fund Capital Improvement Program ExpenditlU'es Summarized by
Project Category for Fiscal Years 2006-2010 (Attachment 1)
o General Fund Capital Improvement Program Project Expenditures for Fiscal
Years 2006-2010 (Exhibit A)
o General Fund Transfers to Infrastructure Reserve for Fiscal Years 2006-2015
(Attachment 2)
o General Fund Infi'astructure Backlog Summary (Attachment 5)
The attached matrix provides detail for all funds:
CMR:45L10
o Fiscal Year 2010 Year-End Capital Improvement Program Projects Status
(Attachment 3)
o Continuous Capital Projects Expenditures for Fiscal Years 2006-20 10
(Attachment 4)
Page 1 of 4
In the attached matrix (Attachment 3), the city departments have submitted infonnation on their
projects and commented on any issues that might cause a change in the scope or timing of the
projects, The matrix categotizes CIP projects into minor projects (projects that can be completed
within a one-year period) and multi-year projects (projects that have multi-year budgets and/or
complex implementation schedules with identifiable phases), The project status portion of the matrix
identifies the phase ofthc project at fiscal year-end, and illustrates how much progress was made.
Preparation of a feasibility study
• Development of a master plan
• Definition of a project scope
• of an Environmental
• Hiring a design consultant
• Completion of project design
• bids or
Construction • Acquisition of major equipment
• Instaiiation
In the ,attached matrix, projects are listed by department for the General Fund and by fund for the
Enterprise and Internal ServiccFunds. The matrix also includes information on the total budget of
the project from inception, available budget as of the beginning of the fiscal year, fiscal year
expenditures, fiscal year contingencies, fiscal year encumbrances, remaining balance in the project
budget as of year-end, and the budget percent complete for the project. The matrix does not include
"continuous" projects. These projects, such as water meter replacement, have no definitive
beginning or end dates and receive ongoing funding to reflect continuing replacement cycles or
commitments. Continuous projects are listed by responsible department and fund and include five
years of actual expenditures including the current fiscal year through June 30, 2010 (Attachment 4).
Attachments 3 and 4 together represent all open CIP projects in the City,
RESOURCE IMPACT
Below is a summary of the General Fund CIP budget through June 30, 2010,
Total Adjusted Budget fol' FY 20 I 0 $93,648,347.95 (I)
Less: Total Expenditures for FY 2010 21,277,064.43
Less: Total Encumbered Balance as of June 30, 2010 6,677,616.00 (2)
Remaining balance of the budget carried over to FY 2011 $65,693,667,52 (2)
(I) Adjusted budget represents budget approved in FY 2010 find remaining unused budge! from prior years that carried
oyer to FY 2010, Adjusted budget for FY 2010 includes $54,757.473 in bond proceeds.
(2) The encumbered balanee of $6,7 million and the remaining balanee of $65, 7 million· • " total of $72.4 million in FY
2010 --will be added to the adopted CIP budget in FY 2011 of $21,1 !Oillion, This will brillg the total appropriations in
FY 2011 to $93.5 million for the General Fund elP projects.
CMR:451:10 PageZ of4
---........ ~-
The status of projects that were carried over to FY 20 II are as follows:
Pre-Design stage
Design stage
Construction stage
Complete
Ongoing
Total
$1,350,630.29
3,252,979.02
56,752,495.96
1,379,245.76
2,958,316.49
$65,693,667.52
Projects that were completed but still had remaining appropriations as of FY 20 I 0 were closed at the
beginning ofFY 2011 and the balances will be returned to appropriate reserves. 'These projects are
included in the Comprehensive Annual Financial Report (CAFR) CMR since Council approval is
necessary.
GENERAL FUND INFRASTRUCTURE BACKLOG UPDATE
In April 2008, staff provided Conncil with an initial update of the General Fund infrastructure
backlog for the next twenty years (CMR: 167 :08). The infrastructure backlog report was subsequently
updated in May, 2009 as palt of the CIP budget process. In May 20 I 0, staff added the Public Safety
Building with an estimated cost of$60 million to the backlog list. The updated report is incorporated
in the FY 2011 Adopted Capital Budget document (pages 297-298), and is also attached to this
·report as the General Fund Infrasb'ucture Backlog Summary (Attachment 5). The updated report
indicated that $302 million (in 2009 dollars) is needed to address infrastructure repairs and
renovations in the areas of streets, sidewalks, bridges, parks and open space, City buildings and
facilities. Another $208 million (in 2009 dollars), which includes $60 million for the Public Safety
Building, is needed to address future infrastructure needs at major City facilities such as building
replacements at the Municipal Service Center (MSC), Fire Stations 3 and 4, the Animal Shelter,
replacement of the Civic Cepter plaza deck, and completion of the Charleston Arastradero Corridor
and Byxbee Park Phase IT projects. Estimatcd infrastructure costs cited above total $510 million (in
2009 dollars). Of the $510 million, $70 million has been identified in the City's FY 2011-2015
Capital Improvement Plan, Note that the library project and library bond proceeds are not included
in the backlog or the funding sourccs. Funds for the first year of thc Plan, FY 2011, have been
appropriated by the Council, whi Ie funds for the remaining years are approved in concept and will be
reviewed each year as part of the CIP budget process.
To address the infrastructure backlog, the City Council created a new Infrastructure Blue Ribbon
Commission (IBRC). This Commission is tasked by Council to identify and prioritize thc City's
infrastructurc needs and to determine funding sources and financing mechanisms to address the
City's backlog and/or new needs. At present, there is a significant funding gap between available
General Fund rcsources and those needed to address the $51 0 million determined thus far: Staff met
with the IBRC on November 18,2010 and December 2,2010 to begin its work. The IBRC has a
substantial challenge ahead and staffwiu continue to support the IRBC in developing its finail'eport
or recommendation to Council.
CMR:451:10 Page 3 of4
--..... _-
ATTACHMENTS
Attachment 1: General Fund Capital Improvement Program Expenditures Summarized by Project
Category for Fiscal Years 2006-2010
Exhibit A: General Fund Capital Improvement Program Project Expenditures for Fiscal
Years 2006-2010
Attachment 2: General Fund Transfers to Infrastructure Reserve for Fiscal Years 2006-2015
Attachment 3: Fiscal Year 2010 Year-End Capital Improvement Program Projects Status
Attachment 4: Continuous Capital Projects Expenditures fur Fiscal Years 2006-2010
Attachment 5: General Fund Infrastructure BacklogSummary
PREPARED BY:
F. JAOiCIE AGUSTIN
Senior Accountant
DEPARTMENT HEAD APPROVAL:
LALOPERE
Director, Administrative Services
CITY MANAGER APPROVAL:
CMR:451:IO Page 4 of4
Attachment 1
General Fund Capital Improvement Program Expenditues Summarized
by Project Category for Fiscal Years 2006-2010
(in thousands)
$12,000 .-------,-,---------------------------,
$10,000
$8,000
$6,000
$4,000
$2,000 '
$0
BUildings & Facilities
i!1lFY 2006 $3,941
ill FY 2007 $5,924 r" ,._-. -,----- --------------.~-".
'0 FY 2008 $5,797
-------_. __ .. -
:I:lFY 2009 $10,082
----------~--
III FY 2010 $9,312
Totals $35,056
-------. ----
.. -.-~ ;g -M-------
-'" '" '" -'" ~ ~ N~ ..,.
Improvements
$112 $272
$30 $612
.... :_-'"at
:l
Non-Infrastructure
Management Plan _._-_._-----,_.--
~
"'-
:;; . ---1 ----"-~
Parks & Open Space Streets & Sidewalks
$743 $1,587 $5,743
$1,$67 $7,926
---------------~--,,_.' ---------,.-_ ..
:j2,107
$3,630
$1,733
$2,658 $453 $2,977 $5,859 -----,-_.-
$2,504 $110 $440 $6,227
$2,353 $291 $6 $3,460 $5,855
$7,654 L $1,738 $5,553 $12,517 i $31,610
-------~~-~----... --------------------_.'
Page 1 of1 1112912010
Exhibit A
Children's Theatre Light & Buildings $4,978
Sound Systems Upgrade and
Facilities
AC-04010 Cubberley & Children's theatre Buildings
Stage Floor Replacement and
Facilities
AC-09001 Children's Theatre Buildings
Replacement and Expansion and
Facilities
CA-OIOI4 Community Services Facilities Buildings 37,474 $30,760 $3,663
Lighting Enhancements and
Facilities
CC-09001 Dimmer Replacement and Buildings $995
Lighting System and
Facilities
CC-IOOOO Replacement of Cubberley Buildings 6,739
Gym B Bleachers and
Facilities
FD-08001 Fire Station #6 Improvements Buildings 8,061
and
Facilities
Page 1 of22 11129/2010
Exhibit A
Building Rehabilitation
Facilities
PD-04011 Civic Center Parking Buildings $74,581
and
Facilities
PE-03004 Roth Building Wings Buildings 12,613 86,745
Demolition and
Facilities
PE-040l0 Children's Library Buildings 770,608 2,369,589 813,189 58,561
Improvements & Expansion and
Facilities
PE-04011 Cambridge Parking Structure Buildings 58,201 59,105 287,034
Improvements and
Facilities
PE-04012 Mitchell Park Library & Buildings 91,354 15,018 1,162,429 179,071 123
Community Center and
Improvements Facilities
PE-04013 Fire Stations 3 & 4 Buildings 16
Replacement: Feasibility Study and
Facilities
Page 2 of 22 1112912010
Exhibit A
Renovation and
Facilities
PE-05002 Main Library Space Buildings 433,031 34,838
Reconfiguration and
Facilities
PE-0500J Foothills Park Interpretive Buildings
Center Improvements and
Facilities
PE-05010 College Terrace Library Buildings 12,077 39,277 273,077 337,154 1,545,763
Improvements and
Facilities
PE-06001 San Antonio Bridge Structural Buildings 2,702 2,338 494
Repairs & Maintenance and
Facilities
PE-08005 Municipal Service Center Buildings 11,323 752,021 326,898
Resurfacing and
Facilities
PE-09003 City Facility Parking Lot Buildings
Maintenance and
Facilities
Page 30122 1112912010
Exhibit A
78,162 562,707
and
Facilities
PE-09006 Mitchell Park Library & Buildings 509,024 3,278,486
Communily Center and
(New Construction) Facilities
PE-09010 Library & Communily Center Buildings 28,866 518,623
Temporary Facilities and
Facilities
PE-IOOO2 Ventura Communily Center Buildings 13,283
and Park and
Facilities
PE-89004 Yacht Harbor Improvements Buildings 1,698 11,949 7,080 21,584
and
Facilities
PE-95012 Civic Center Plaza Buildings 12p8
Waterproofing and
Facilities
PE-98020 Public Safely Building Buildings 205,790 623,270 1,093,208 1,000,414 175,289
and
Facilities
Page4of22 1112912010
Exhibit A
MSC Fel!Sibility Study Buildings 4,640 542
and
Facilities
PF-00006 Roofing Replacement Buildings 37,914 76,769 256,831 21,073 251,344 .
and
Facilities
PF"OOO20 Office space renovation and Buildings 85 19,647
Reallocation and
Facilities
PF-OIOO2 Civic Center Infrastructure Buildings 1,065,297 438,192 106,643 4,915,782 1,344,006
Improvements. and
Facilities
PF-OI003 Building Systems Buildings 54,902 64,312 34,304 114,152 36,098
Improvements and
Facilities
PF-OlOO4 Fire Station Improvements Buildings 48,981 50,514 232,168 575,700 237,018
and
Facilities
PF-OIOOS Lucie Stern Community Center Buildings 459,885 1,010 980
Improvements and
Facilities
Page 50122 1112912010
Exhibit A
65,797 47,116 11,076
IlId
Facilities
PF-04000 Security System Improvements Buildings 193,637 618 5,983 8,903
and
Facilities
PF-04001 General Building Study Buildings 4,825 170,312
and
Facilities
PF-04010 Cubberley Mechanical & Buildings 79,779 960,596 165,456 5,218 9,369
Electrical Upgrades and
Facilities
PF-05002 Municipal Service Center Buildings 29,435 115,025 18,316 12,057 3,530
Renovation and
Facilities
PF-05003 Foothills Park Interpretive Buildings 36,865 82,626 1,290
Center Improvements and
Facilities
PF-06000 Baylands Athletic Center Roof Buildings
and Bleachers and
Facilities
Page 6 of22 11/2912010
Exhibit A
Improvements and
Facilities
PF-06003 Cubberley Community Center Buildings 25,054 643,988 70,949
Fire Alarm System and
Facilities
PF-07000 Art Center Electrical & Buildings 52,063 132,737 234,143
Mechanical Upgrades and
Facilities
PF-07001 ADA Compliance -Cubberley Buildings 37,815 13,512 205,388
Community Center and
Facilities
PF-07003 Children's Theatre FirelLife Buildings 247 32,980 7,592
Safety Upgrade and
Facilities
PF-07011 Roth BuIlding Maintenance Buildings 141,0% 17,909 1,931 3,729
and
Facilities
PF-08000 Art Center Kiln Hood Buildings 10,076 60,654 14,570
Replacement and
Facilities
Page 7 of 22 1112912010
PF-lOOOO
PF-lOOOl
PF-I0002
PF-93009
AC-86017
Lucie Stem Community Center
and Theatre Exterior Paint
Civic Center Chiller Drive
Replacement
Rinccnada Pool Plaster
Lot "J" CowperfWebster
Structural Repairs
ADA Compliance
Art in Public Places
Buildings
and
Facilities
Buildings
and
Facilities
Buildings
and
Facilities
Buildings
and
Facilities
Buildings
and
Facilities
Total Buildings and
Facilities
Land
and
Land
Improvements
ExhibitA
204,495
$3,807,642
$1l2,256
Page 8 0122
,
4,510
72,380
117,756
23,682
96,587 49,955 121,617 235,410 ..
$5,924,093 $5,796,904 $10,081,911 $9,31\,891
$29,545 $64,410 $21,556 $17,256
1112912010
Exhibit A
AS-08000 Acquisition of Los Altos Land 2,590,061 2,306,958 2,252,250
Treatment Plant and
Land
Improvements
A5-69000 City of Palo Alto Municipal Land 39,075 67,775
Airport Transition Project and
Land
Improvements
PE-09004 Los Altos Treatment Plant Land 135,905 15,468
Master Plan Study and
Land
Improvements
Tojal Land and Land $112,256 $29,545 $2,654,471 $2,503,494 $2,352,749
Improvements
FD-09001 Fire Apparatus Equipment Miscellaneous $48,352 $261,283
Replacement
FD-09002 Jaws of Life Hurst Tool Miscellaneous 60,905
ReplllJOernent
LB-94018 Library Automation Service Miscellaneous $85,563 $5,026 732
Page 90f22 1112912010
PD-04OlO
PD-05010
PD-07001
PD-08000
PD-93012
PD-99013
Fire Portable Radio
Replacement
Police Vehicle Mounted
Video Rocording
SWAT Van Replacement
Crime Scene Evidence
Collection Vehicle
Fire Communications
Computer Systems
Police Records
Management
System
Exhibit A
Miscellaneous $1,695 112,526
Miscellaneous 1,607 194,462
Miscellaneous 203,193
Miscellaneous
Miscellaneous 2,705 6,812
Miscellaneous 31,307
Page 10 of:!:! 1112912010
PE-96008
PL-02023
PO-lOO02
FD-OSOOO
PD-07000
Downtown Parking Structure
Industrial Cost Pool
Downtown Urban Design
improvements
Master Schematic Design
Downtown Tree Grates
Sixteen (16) ALS Monitors
Mobile Command Vehicle
Miscellaneous
Miscellaneous
Miscellaneous
Miscellaneous
Total Miscellaneous
Non-Infrastructure
Management
Plan
Non-Infrastructure
Management
Plan
Exhibit A
146,192 405,213 91,576 155
19,537
8,270 2,090
29,879
$272,402 $612,345 $452,530 $110,144 $291,162
$192,815 $214,734 $62,650
Page 11 of22 1112912010
ExbibitA
Non-Infrastructure 282,376 $578,740 2,184,597 325,978 $6,448
Management
Plan
PE-07011 Library Service Model Non-Infrastructure 266,912 1,478
Analysis Management
Plan
PF-06005 Golf Course Maintenance Yard Non-Infrastructure 36,200
Sewer Line Replacement Management
Plan
PG-08001 Golf Course Driving Range Non-Infrastructure 511,921
Turf & Netting Management
Plan
PL-05002 Charleston! Arastradero Non-Infrastructure 218,819 529,889 32,076
Corridor Plan Management
Plan
PL-06001 Adobe Creek Bicycle Bridge Non-Infrastructure 4,184
Replacement Management
Plan
PL-06002 Comprehensive Parking Non-Infrastructure 4,000 43,470
Signage Plan Management
Plan
Page 120122 11/2912010
Exhibit A
7,416 33,994 2,250
Management
Plan
PL-07001 lntermodal Transit Center Non-Infrastructure
Management
Plan
PL-07003 Palo Alto Caltrain Station Non-Infrastructure
Connectivity Improvements Management
Plan
Total Non-Infrastructure $742,872 $1,386,957 $2,977,322 $440,010 $6,448
Management Plan
AC10000 Junior Museum & Zoo New Parks $101,790
Bobcat Habitat and
Open Space
08-00001 Open Space TmiIs and Parks 582,716 $184,333 $257,594 $123,193 97,766
Amenities and
Open Space
OS-00002 Open Space Lakes & Ponds Parks 24,063 42,399 41,462 35,909 63,263
Maintenance and
Open Space
Page 130122 11/2912010
Exhibit A
Bayland Parking and Site Parks 83,761 83,605
Improvements and
Open Space
08-07000 Foothills Park Road Parks 225,000 25,000
Improvements and
Open Space
08-07002 Foothills Park Interpretive Parks 26,120 258,253 2,302
Center & Open Space and
Maintenance Yard Parking Open Space
08-09001 Off-Road Pathway Resurfacing Parks 25,4<53 24,719
and Repair and
Open Space
08-09002 Baylands Emergency Access Parks
Levee Repair and
Open Space
PE-OOIOI Foothills Park Vista Hill Parks 30,852 18,720
and
Open Space
PE-OOI06 EleanorlHoover Park Parks 3,136
Improvements and
Open Space
Page 140122 1112912010
Exhibit A
I !
!
709,361 760
and
Open Space
PE-OOI08 Baylands Lighting Parks 62,535
Improvements and
Open Space
PE-OOllO College Terrace Patk Parks 18,524 32,914 97,998 154,927 522
Improvements and
Open Space
PE-05300 Arastradero Preserve Gateway Parks 230,051 89,118 1,519 9,156
and
Open Space
PE-06004 Bowden Patk Improvements Parks 20,864 161,395 876
and
Open Space
PE-0600S University Avenue Gateway Parks 17,521 16,624 27,324 166,612 6,709
Landscaping Improvements and
Open Space
PE-06007 Park Restroom Installation Parks 13,042 41,134 100,096
and
Open Space
Page 15 of 22 1112912010
Exhibit A
and
Open Space
PE-07002 Hoover Park Improvements Parks 20,020 696,240 67,053
and
Open Space
PE..(l7003 Ramos Park Improvements Parks 37,554 458,628
and
Open Space
PE..(l7005 California Avenue Parks 64,985 49,900 465,324
Improvements and
Open Space
PE-07006 Boulware Park Improvements Parks 25,520 298,717 3,799
and
Open Space
PE-07007 Cubberley Turf Renovation Parks 190,950 969,963
and
Open Space
PE-07009 Baylands Athletic Center Parks 241,891 46,164.
Fencing, Dugout & Trailhead and
Parking Open Space
Page 16 of 22 11129/2010
Exhibit A
and
Open Space
PE-OS004 Lytton Plaza Renovation Parks 23,530 725,733
and
Open Space
PE-09002 Greer Park Phase IV Parks 1,134 168,231 515,091
and
Open Space
PE-98003 Mitchell Park Facilities Parks 173,Q45 214,148 196,655 24,962
and
Open Space
PG-OOOlO Park Facilities Improvements Parks 43,024 1,361
and
Open Space
PG-040l0 StanfordIPalo Alto Community Parks 8,635 843,591 2,050 869
Playing Field and
Open Space
PG-OliOOl Tennis and Basketball Court Parks 8,766 130,069 46,881 107,117 100,159
Resurfacing and
Open Space
Page 17 0122 1112912010
Exhibit A
Benches, Signage, Fencing,
Walkways, and Perimeter
Landscaping Open Space
PG-{l7000 Heritage Park Playground Parks 243,546
and
Open Space
PG-07700 Golf Course lnigation Pump, Parks 63,315
Motors & Control Panel and
Replacement Open Space
PG-09002 Park and Open Space Parks 73,190 50,883
Emergency Repairs and
Open Space
J'G-{l9003 Park Maintenance Shop Parks 402 2,858
Remodel and
Open Space
PG-98001 School Site lnigation Parks 70,328 154 57,268 4,596 161,399
and
Open Space
Total Parks and Open $1,587,328 $2, 1 06,881 $3,630,436 $1,732,969 $3,459,755
Spa ••
Page 18 of 22 11129/2010
Exhibit A
$2,970
and
Sidewalks
PE-OOI03 Lucie Evans Center parking Streets 235,179 $217
Lot Improvements and
Sidewalks
PE-OOI04 San Antonio Road Median Streets 32,552 146,212 $153,112 $743,106 $239,404
Improvements and
Sidewalks
PE-OOI05 Embarcadero Road Median Streets 178 1,191
Improvements and
Sidewalks
PE-OIOI3 El Camino Median Landscape Streets 292,402 53,826 73,655 4,525
and
Sidewalks
PE-OI021 Homer Avenue Undercrossing Streets 450,060 125,963
and
Sidewalks
PE-030OS Wildhorse Valley Vehicle Streets
Bridge Replacemerrt and
Sidewalks
Page 19 of 22 . 11/29/2010
Exhibit A
Alma Street Landscape Streets 11,253 17,992 16,576 40,901 26,371
Improvements
Sidewalks
PE-tOOO6 Bridge Rai~ Abutment, and Streets 167,062
Deck Repair and
Sidewalks
PE-1l01l Highway 101 Pedestrian / Streets 36,385
Bicycle Overcrossing and
Sidewalks
PE-8l)070 Street Improvements (Street Streets 2,304,729 4,987,364 3,368,496 3,702,381 3,658,566
Improvement Fund) and
Sidewalks
PE-93010 Embarcadero Pedestrian Bike Streets 18,1%
Bridge Path Extension (SIF) and
Sidewalks
PL-00026 Safe Routes to School Streets 35,251 4,472 105,802 30,000
and
Sidewalks
PL-0200S EI Camino Reali Ventura Streets 116,000
Avenue Traffic Signal and
Sidewalks
Page 20 0122 1112912010
Exhibit A
Streets
and
Sidewalks
PL-04010 Bicycle Trnnsportation Plan Streets 8,520 5,480 44,483 30,000
lmplemenlll!ion Project and
Sidewalks
PL-05003 College Terrace Traffic Streets 425 125,372 17,088 545
Calming and
Sidewalks
PL-05030 Traffic Signa! Upgrades Streets 60,142 30,524 35,908 39,983 279,590
and
Sidewalks
PL-07000 Downtown North Traffic Streets
Circle Hardscape and
Sidewalks
PL-07002 EI Camino Reali Stanford Streets 2,490 4,790
Intersection and
Sidewalks
PL-llOOO Highway 101 Pedestrian I Streets
Bicycle OVer<:Tossing and
Sidewalks
Page 21 0122 1112912010
Exhibit A
School Commute Safety Streets 5,721 2,490
Improvements (SIF) and
Sidewalks
Plr99023 Page MilllHanover Streets 3,330 200
and
Sidewalks
PO-05054 Street lights Improvements Streets 84,785 19,077 11,814 15,970 40,430
and
Sidewalks
PO-89003 Sidewalk Improvements Streets 2,197,218 2,299,543 2,030,796 1,675,527 1,341,916
and
Sidewalks
Total Streets and Sidewalks $5,742,733 $7,926,420 $5,858,921 $6,227,373 $5,855,059
Grand Total $12,2U5,233 $17,980,241 $21,370,584 $21,095,901 $21,277,064
Page 22 of 22 1112912010
c c c
~
Attachment 2
General Fund Transfers to Infrastructure Reserve
for Fiscal Years 2006·2015
$15,000
$13,000
$11,000
$9,000
$7,000
$5,000
$6,162
2006 2007 2008 2009 2010 2011
Fiscal Year
Amount Amount
Transferred Returned
to to General Net
Infrastructure Fund Amount
Fiscal Year $(000) $(000) $(000)
2006 $6,212 $50 $6,162
2007 $8,736 $75 a $8,661
2008 $11,807 $117 $11,690
2009 $14,648 b $14,648
2010 $9,900 $3,243 $6,657
2011 $9,802 $9,802
2012 $10,438 $10,438
2013 $10,852 $10,852
2014 $11,294 $11,294
2015 $11,747 $11,747
Total $105,436 $3,485 $101,951
$11,747
::;,::-;;:.:..o.+!j;--;;;"~-'~-$H;294
10,438 $10,852
2012 2013 2014 2015
Notes: a, Funds transferred to cover GF engineering costs for structures and grounds,
b, Includes funding for the Public Safety Building $3,437K
Sources:
FY 2006 through 2010 are actual amounts
FY 2011 Is based on adopted budget
FY 2012 through 2015 based on Long Range Financial Forecast
Page 1 of 1 11/2912010
FY 2010 YEAR-END eAPIT AL IMPROVEMENT PROGRAM PROJECTS STATlIS
GENERAL FUND
ADMINISTRATNE SERVICES DEPARTMENT
$2,252,250
Attachment 3
$01 $0 I $4,935 I $18,215 I 86%IDeSig;; mTMru:l1
$0 $0 $0
Page 1 cf28
wiL't a plan for early
jtennination of the Lease wirb.
balance to be
Infrastructure
Re$eNe.
11flS1201C
FY2010 YEAR-E."'D CAPITAL IMPROVEME.'\'T PROGRAM PROJECTs STATUS
GENERAL FUlI;D
COMMUNITY SERVICES DEPARTMENT
Open Space
Attachment 3
$530 I $465
and
Facilities
p
am!
Open Space
51,325 $0
Page2of2$
IOCCUpaocy permi!..
expenditures are anticipated,
and remaining balance will be
returned to Infrastrucrure
cOnServation
for Baylands.
11130l2{i10
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
COMMUNITY SERVICES DEPARTMENT
$398,544
and
Open Space
-
Attachment 3
$0
so $0
Ter=
FY
asphalt
lrepalr at l:jnones schooL
Playground repair at Bol Park
post repair), Eleanor
(water circuit), Rinconadal
(tunnel slide}, Mitcllcll
(rope climber),~;j
I Parks (slide instaHarionSj.
-wtu---w\ $2'7841 $41 loo%\comPlete IAgreementwi!h PAUSD ........ 1 ~~ I Alto Union School District)
has cllanged where City is no
longer in a COSt share ror
Site i .. "rigation en>
Page 3 of 28 llt3Cl2Ill0
Attachment 3
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
FIRE DEPARTMENT
Facilities
Page 40128
I
comPleting the project.
Currently final painting and
cabinet refinishing is under
1112212010
FV 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FIJND
PLANNING AND ENVIRONME1'iTAL SERVICES DEPARTMENT
Streot..
"'" Sidews.lks
Non
Inn.."""""
"""""", ...
Plm
Noo·
~
"-="" PI",
$94.900 m.S7S
$0
$0
Attachment 3
$0 r
so so
so $I)
SJ) $0;
1-so
Page S of2S
~ml ~6i%)c~ttUctioo 'D~ iti
I
S384,169J)O 1
$74,054.00 I 6"+""""""0" IJ~ II ..
. ! I
I i
I I I i
I I
I I
't'"1
$1
so $45,816.00
I
so $38.,S"lS.OO 59%IOng"';" 1 11>D
. I
S1:1,030 j SJ26.690.i:io
I
1S"/Qr~~Junll
I ;
J ._[------L-_
1i119Q010
FY 2010 YEAR-El'iD CAPITAL IMPROVEMllNT PROGRAM PROJECTS STATUS
GENERAl FUND
PLANNING AND ENVIRONMENTAL SERVICES DEPARTMENT
Sidewalks
s""'"
wl
s;_
j infrasuucture
M=.s=
".,.
and
Sidewilks
m1,014
$0
so
so
so
Attachment 3
$0
II
10
Page 6 Of 28
Avenue traffic ~ trial in Ian 08.
lk PTe ~;mdlhe
approved the trail
th Califomi, Av_
~ooI pro; 'Ojt:<lt.Piam:t.itlz
aoo ~study focSafeRo\MS to
Schoo! ptI',lject on Or=-Road and
. Lil'Icom
1111912010
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJEctS STATUS
GENERAL FUND
POLICE DEPARTMENT
Attachment 3
Page? 0128
is now in service.
lOlogy irrnaIlati<ln:
11119J2010
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMENT
University
Landscaping Improvements
and I
and Deck I
PedestrianlBicycle !
Facilities
and
Open Space
Buildings
~d
Facilities
Streets
and
Sidewalks
Street>
""d
Sidewalks
$211,913 $211.913
$320,132 $320,132
Attachment 3
View.
re=ve.
$127,233 11
$11,138 $28.151 $15,728
$307.144 $1,247 $18,507 $2 $567,759
$990,541 $291,116 Pump and
$0
(Public Works Ops).
Page 8 of 28 11{19J'2.010
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMENT
Facilities
Attachment 3
Buildings
and
Facilities
IPF-lOOOO \chicCenterChil1erDriVe I Suildings I $127,4231 $127A2:3In~ $67,941\ $1,133~1 $3,300 I ~ --$3,345
Ir" $51.698 t --iOO%\Complete I n~---tR~ini~ibalanootoberetume41
IStrucrural Repoit>
and
Facilities
and
Facilities
$206,126
$81,182
$300.000
{
Page9of2S 11/19t2010
FY 2010 YEAR· END CAPITAL IMPROVEMENT 'PROGRAM PROJEL'TS STATIIS
GENERAL F'l!'ND
PUBLIC WORKS DEPARTMENT
Sidewalks
and
Facilities
S=
and
d~
Parks
Md
Facilities
and
Facilities
Sl3I,934 $45,211 1
$651,382 $597,207
14,4271
$26.035 1
$948,778 1
Buildings
and
S50,122,868 I S50,213.844 I 1>3.031,392
facililies
and
Facilities
Attachment 3
S2.057
$90,6221
$3361 SO 1
sl,ml ,,_L
$19,406
$142,721 $104.373
Page10of2S
$936,717 I 5510,536 I 86o/oiConstruaion INov 10
SlJ 518,839 1 86%/Construction 1
$558;516 J 546.376,842
11 remQV;l.l. street
Ilights oondllit replacement
lnfia.structute ReseIVe,
lConstructionbenri FY 2010,
! Replanting of plants in progress.
I~~~~~ in late FY 20 II.
11119/2010
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
GENERAL FUND
PUBLIC WORKS DEPARTMEI't.
$2.580,317 I $283,325
",d
Facilities
~.-----
Mecl;a.nicai & Buildings
Upgrndes ",d
Facilities
.~.
F~ ~ J Streets ---$150,000 --$250:000 --
ond
Sidewalks
I
sol
Attachment 3
$1,651 SO SO
$18.22$ $16,513 $}01.136 $I.UO.ISS 30'% Design Deell ron dooumenlS phase.
COnstrueti:SCheduled for fY
SO 1-iDee II
_ 2(J~L ____ $oT SO $250,000 0% Oem
Page 11 of:W 11/191'2010
FY 20 10 YEAR-END eAPIT AL IMPROVEMENT PROGRAM PROJECTS ST A !liS
INTERNAL SERVICE FUND
TECHNOLOGY FUND
ADMINISTRATIVE SERVICES OEPARTMEN'T
__ ,I ~~~~~~~U
$186
$(j
Attacl1ment 3
$(j
so
$(j
Page 12 of2B
so $,
$0
recovery plan hres
been completed.
C[P -will be closed.
mdwillbe
1111912010
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
INTERNAL SERVICE FUND
TECHNOLOGY FUND
ADMINISTRATIVE SERVICES DEPARTMENT
S2S0,OOO $70,702 $1,408
Attachment 3
Page i3 cf28
install
cities oftos Altos and
Mountain View. A vendor Me;
been seleered and negotiations are
11119flO'10
fl! 2010 YEAR-END CAPITAL lMFROVEMEI'iT PROGR"M PROJECTS STATUS
INTERNAL SER"lCE FUND
TECHNOLOGY FUND
ADMINISTRATIVE SERVICES DEPARTMENT
$1,
Attachment 3
Page 1401'26 1111912.010
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
INTERNAL SERVICE FUND
TECHNOLOGY FUND
ADMINlSTRA TIVE SERVICES DEPARTMENT
Attachment 3
Page 15of28 111i9J2010
FY l<il0 YEAR~END CAPfl'AL IMPRO'''"EMENT PROGRAM PROJECTS STAres
lNT[RNAL S£RVICE FUND
VEHICLE REPtAC~'T A..'II!D MAJN1'ENANCE FUND
PUBLIC WORKS DEPARTlIIENT
InVl::\tory
Attachment 3
SSO,2SS
Iv ....... IV"'cl"';';'l~ I;..~ $2,500,000 I·-C:;·~';;;;cj --"" .. ,"":-1-----
'"
p~1eo12.6
'"
IWng!lO\ll'Ce,lltmiC-
$I) $0
so $1
so $0 $24,03:5
11/1!il2C10
FY 21)10 YEAR-END CAPITAL IMPROVEMEJ\'Y PROGRAM PROJU.'"l'S STATlJS
IN'Il':RNAL SERVICE FUND
VEIDCLE REPlACEMENT AND MA[!>':'TENANCE fUND
PUBLIC WORKS DEPARTMENT
Attachment 3
PilQIlntlf28
so
l1NW2()1C
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
ENTERPRISE FUND
ELECTRIC FUND
l'TILITIES DEPARTMENT
lr_s,,-
----
$376,510
$2.;6'"
Attachment 3
--SOli_ ---,tT---'''Ar~--
I . . ----c"'~1 ---$i6.71)9[ ._-StOO.s<izr~soe;':;De<Jign -jA;n" 11
lUI'J II
$140.00(1 $67,567 W'JolDesi,gn JUll 11
"
Page 18ot28
d¢fined, preliminary Qeslgtl - - -
This proj«;t is being
and collS'tIuCted in
with me Pm 81vd 4,I12};v
;t...06OO0) and Et Cmnino
Rebuild (tL-05000)
" wiJh City
and pro¢¢du:tes.
oomplo:k_
11/1912010
FY 2010 YEAR· 'END CAPITAL IMPROVEMENT PROGRAM PROJECTS SfATlJS
ENTERPRISE Ft7(D
ELECTIUCFUND
UTILITIES DEPARTMENT
E1MOOO
EIMOOt
MultjMYear
Conversion
Attachment 3
Page 19 of 2S
It
ibctween Charleston and San Arrtonio
'rMds. Prel.im.in:uy desi,gn has been I completed and. eonstrl.lCtioo dtawing,s are
phases efthe ~
loJanlL
10_
11/1'912010
FY 2010 YEAR-END CAPrr AL lMPROVEMENT PROGRAM PROJECTS Sf ATUS
ENTERPRISE FUND
ELECTRIC FUND
UTILITIES DEPARTMENT
EL-lOOO6
EL-lOOO9
17
Business
Rebuild (District 22)
$1,116,153
Attachment 3
Line
10 to lun II.
Page 20 of 28
11/19/2010
fY 2010 YEAR-ElI<1l CAPITAL lMPROVEMEl>. PROGRAM PROJECTS STATUS
ENTERPRISE FUND
GAS Ft'ND
UTILITIES DEPARTMENT
G5-IJ8OOO
Minor
Attachment 3
page21 at 28
lO$WtinFY201L
tostm inFY 201 1.
Il
to start inFY 201 L
electric power wiring,
II
«Jujprrumt.
11119'2010
IT 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECt'S STATUS
ENTERPRISE FUND
GASFlr.'4D
L'TILmES DEPARTMENT
Gs-.oBOU 18
Attachment :3
page 22 of 28
13 ---linclude portions "fGMR 19to
acombin¢dprojeetGMR 19and 10.
10 bid Dec 11.
111i9l.2010
FY 20\0 YEAR-END eAPIT AL IMPROVEMENT PROGRAM PROJECTS STATUS
ENTERPRISE FUND
WATERfllND
UTILITIES DEPARTMENT
Atlachment 3
wr I Construction to stmt May 11
Page 23 Of2S 11/1912010
IT 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM. PROJECTS STATlJS
ENTERPRISE FUND
WATER FUND
UTILITIES DEPARTMENT
W~8001
Attachment 3
Page 24 af 2S
Feb It.
I Report (EIR) to address water
-" issues.
genera:tQ'rs.
11.
in Dec 09.
to start Mar 1 L
ofWGW Jl&pping and
systems ,,"th estimated
lcompletion date of Jan II.
Construction to start 1st quarter FY
Project combined with WMRI
I completion date of Jan 11.
Construction to start 1st quarter FY
. Project combined with
11/19/2010
,.~
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
ENTERPRISE FUND
WASTEWATER COLLECTION FUND
UTILITIES DEPARTMENT
Attachment 3
Page 25 of 28
I
11/18/2010
FY 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
Er.TERPRISE FUND
REFUSEFl.JND
PUBLIC WORKS DEPARTMENT
RF-'l9OO4
RF-lOOO2
~~+YaR"fi~i'~j;~l~~:!::i;::;':
Attachment 3
of site,
approvals for
Approval has been
for Area C.
and pennitrittg of the oew flare.
is 95% complete.
RF-07001 Relocation of Landfill Facilities ---si i 95 .462 I H miO%r D~~i~~~~~~~ I $ep 11 I The rekl(:atiotl (If the Recycling C£nter
5125.000 585.913
Page 26 of 28
rrt Household H:az.ardous
facil.ity will be plaoed at
the end cfEtnbarcadero Way on the
~ tre3ttnent pbln property.
F:!nai design and California
Environmental QualilY AGt (CEQA)
reviewfot the projea is now in progress.
in <arly
«mStructlon are I budgeted lor IT 20]2.
11/18/2010
IT 2010 YEAR-END CAPITAL IMPROVEMENT PROGRAM PROJECTS STATUS
ENTERPRISE FUND
STORM DRAL'IAGE FUl'iD
PUBLIC WORKS DEPARTMENT
Drive Sronn Drains
Attachment 3
PageZ7 cf28
May 11 e~ to begin JUt
2011
"11812010
FY 2010 YEAR~END CAPITAL I:MPROVEMENT PROGRAM PROJECTS STATUS
ENTERPRISE FUND
WASTEWATER TREATMENT FUND
PUBLIC WORKS DEPARTMENT
WQ-04010
WQ-04011 Assessmem
WQ-06014
$1,119,6
$1,879,047
$20,395,091
Attachment 3
$404,243
Page 28 of 28
loan; -waiting on
XVI """'"
United St:ttes Bureau of
SBR) for addition.al $4.9
Im11hon gr.mt for City of Pal 0 Alto and City
of Mountain View.
11/1812010
Attachment 4
Continuous Capital Projects
Expenditures for Fiscal Years 2006·2010
Pr21ect Cateao!X De~artmentlFund Prolect TUle FY Z006 FYZOO1 FY zoos FY 2009 FY 2010
Community Services:
Land &: Land Improvements AC·86017 Art in Public Places $112.256 $29,545 $64,410 321,556 $11,266
Planning & Community Environment:
Siree1s & Sidewalks Pl·05030 Traffic Signal Upgrades 80,142 30,524 35,90B 3S,9B3 276,187
Public Works· General Fuod :
S1reellmptovernemts (Street Improvemenl
Streets & Sidewalks PE,SBOrO Fund) 2,304,729 4,987,364 3,368,496 $,702.381 3,323,063
Building & Facilities PF-OOOO6 Roofing Replacement 31,914 76,789 256,831 21,073 227,495
Building & Facilities PF·Ol003 Building Systems Improvements 54,902 64,312 34,304 114,152 36,053
Building & Facilities PF·02022 facility Interior Finishes 47,029 10,579 65,191 41,118 11,016
BuildIng 3; Facilities PF·93009 ADA Compliance 204,495 ge,587 49,955 121.617 216,133
Streets & Sidewalks PO·05054 S1reet lights Improvements 84,165 19,077 11,814 15,910 32,976
Stres!s, & Sidewalks PO·69003 Sidewalk Improvements 2,197,216 2,299,$43 2.030,798 1,615,527 952,503
Public Works· Storm Dralnego Fund:
$D·08101 Storm Drain System Replacement 190,315 202,852 615,632 44M82 81,678
Public Works ~ Wast8wat~rTreatm!}nt Fund:
WQ·80021 RWQCP Plant Equipment RePlacement 261,356 238-,260 1.156,156 2,544,'81 403,293
WQ·6002' RWQCP System Flow Metering 363,538 160,000 0 56,245 0
Electric F,:,nd ;
EL-02011 Electric Utility OIS 0 0 83.546 39,414 166,231
El-06005 FJber Optics Ring Syslem Improvements 22,294 36,145 112.435 58,124 5,531
Aber Optics Customer Design and
El·06006 Connecllon Ser'\'lces 42,721 131,930 134,49B 19M08 17,203
El·69026 Electric Customer Connections 1,661.10B 3,402,213 1,962,607 1,467,233 1,102,232
EL·B9031 Communications System Improvements $2,392 $2,610 $50,456 $21,184 $0
E:l-B9038 Substa1ion Protection Improv()ments 0 46,161 423,904 94.411 133,1~Hi
aw89044 Substation facility Improvements 20,B70 no130 1,141 93,735 3,133
Electric Dlsiribution System Recoosiruction
Elw9B003 and Improvements 1,129,804 2,761,605 2,200,973 1,265,456 1,330,082
Fiber OpUcs Fund i
fO-10000 FIber Optic Customer Con~ections 0 0 0 0 66,373
FO·10001 fiber Optic Network System Improvements 0 0 0 0 34,614
pagEt 1 of2
11129/2010
I
Prolect Catog0!I
Attachment 4
Continuous Capital Projects
Expenditures for Fiscal Years 2006·2010
Dt:leartmentIFund project Title
Gas Fund;
GS-02013
GS-03007 Directional Boring Equipment
08-03002
OS"04003
OS-00002 Gas Main Repla<;oments
Polyethylene Fusion Equipment
0$.00008 Replacement
GS-03000 System Extensions-Unrolmoorsed
0$.08001 Gas Main Replacements, GMR»Project 16
OS-07002 Gas. Main Replacements, GMR·Ptoject 17
GS-80019 Gas Mal(;fS and RegUlators
GS-00017 Gas System Extensions
Wastewater Collection fund:
WC-02002
WC-03003
WC-04002
WC-05003
WC-OOOO3
WC-07OO4
WC·00012
WC-OooOl
WC·l0002
WC-OOO'O
we·90013
Water Fund:
WS-02OO3
WS-02014
WS·08002
WS·07003
WS-00014
WS-00015
WS·00013
Sewer System Rehabilitation and
Augmontatlon. Project 15,16 and 17
Sewer System Rehabilitation and
Augmentation, Project 18,19 and 20
Sewer System RehabiHiaiion and
Augmentation. Pfoject 21 ,22 and 23
Sewer Syslem Extensions
Sewer Manhole Rehabilitation
Waler Main Replacements, Projecl18
Wa(er~Gas Wastewater uillities GIS Dala
Waler Main Replacements, project 20
Waler Main Rep!acemenls, Project 21
Service and Hydrant Replacements
Water Meters
Water System Extenstons
Page 2 of2
FY Z006 FYZOOT FY 2008 FY 2009 FY 2010
0 0 63 59,410 0
2,075.261 1,Osa,052 433,894 36,121 87,706
0 9,153 0 35,650 0
n6,603 82,515 115 12,000 4,005
229,370 344,176 2,256,296 2,423,677 89,180
0 143,767 814,465 012,018 3,681,252
194,432 2~,764 272,306 244,129 313,598
535.622 075,674 809,586 356,666 347,412
1,395,355 3,374,976 1,394,506 8,840 27,141
168,026 3,048,500 1,378,862 2,154,931 1,161.125
o 0 126 265,656 543,313
214,613 493,663 561,620 370,253 251,152
551,646 441,105 116,173 46,227 IS6,722
31,050 61,310 4,629 19,695 0
0 216 0 33 204,563
32 595,117 1,630,359 93,554 34_
0 3,326 51,923 226,559 1,363,427
75,768 39,079 58,212 104,951 43,536
163,633 140,891 121,109 14.712 2,290
328,524 116,660 400,152 295,194 285,945
11129/2010
Attachment 5
. General Fund Infrastructure Backlog Summary
Adopted
General Projected Future Backlog FY 2014
Current FundCIP Unfunded through FY 2028
Backlog Budget Backlog
FY 2008-FY2008 -FY2008 -FY 2014-FY 2019· FY 2024-
FY 2013 FY 2013 FY 2013 FY 2018 FY 2023 FY2028
Streets
Annual Program $24,682,259 $10,975,000 $13,707,259 $16,201,988 $12,123,019 $10,832,987
Transportation $850,000 $850,000 $0 $2,867,934 $1,190,000 $1,763,720
Traffic Signals $1,115,000 $1,115,000 $0 $1,225,000 $1,400,000 $1,557,500
Medians $468,000 $468,000 $0 $25,200 $0 j $0
Street lights $650,000 $650,000 $0 $910,000 $910,000 $910,000
Street Furniture $0 $0 $0 $175,000 $0 1 $175,000
Sidewalks
Annual Maintenance $5,100,000 $3,189,686 $1,910,334 $5,432,925 $5,644,691 $5,846,777
District Repairs $9,240,106 $4,910,334 $4,329,772 $2,687,075 $2,255,109 $2,251,223
Bridges/Culverts $2,625,490 $0 $2,625,490 $912,100 1 $2,220,575 $1,273,650
Parks $6,890,591 $5,838,000 $1,052,591 $3,697,005 $7,743,820 $4,354,700
Open Space $5,066,412 $1,773,000 $3,313,412 $4,624,026 $3,766,527 $2,050,156
City Buildings
Structures $93,100,667 $32,074,584 2 $61,026,063 $10,911,139 $7,183,667 $6,851,169
Parking Lots $2,014,299 $910,000 $1,104,299 $4,704,935 $3,401,469 $1,768,206
Site Improvements $550,000 $550,000 $0 $294,700 1 $1,168,460 $1,460,609
PA USD Facilities $860,000 $860,000 $O! $334,712 $150,500 $956,900
Subtotals $153,232,824 $64,163,584 $89,069,240 $54,983,739 $49,376,057 $44,074,597
Total Backlog $153,232,824 $54,963,739 $49,378,057 $44,074,597
Total $301,669,21 B
Costs = construction cost x 1.4 for project development (excluding annual street program and sidewalks)
Costs are in 2009 dollars, inflation not included
I No major work is needed due to life cycle analysis
2 This number includes Budget Amendment Ordinance In the amount of $10,754,564 for the Public Safety Building,
Mitchell Park Library and Community Center, and Civic Center Infraslructure Improvement Projects
SOURCE: CMR:167:08 updated on May 13, 2009
Page 1 of 2
11/29/2010
Attachment 5
Infrastructure Future Needs -Backlog
Other Major Infrastructure Projects
MSC Building Replacement
Public Safety Building
Fire Station 3
Fire Station 4
Animal Shelter
Junior Museum
Charleston Road Corridor
Arastradero Road Corridor
Glvic Center Plaza Deck
Bxybee Park Phase II
Los Altos Treatment Plant Clean-up & Preparation 2
San Antonio Road Median & Roadway Improvements Phase II
Roth Building Restrooms
1 2009 Dollars
2 This is the general fund portion only
Notes:
Project Cost1
$93,000,000
$60,000,000
$6,700,000
$7,500,000
$6,930,000
$735,000
$5,700,000
$4,300,000
$16,000,000
$3,625,000
$2,040,000
$1,500,000
$250,000
$208,280,000
This Infrastructure backlog summary was last updated in May 2009, Since its last update, certain projects
identified above have been funded and are either already completed or are currently in progress. These
projects include the Lytlon Plaza and the San Antonio Road Median & Roadway Improvement Phase II.
The Charleston Arastradero Corridor is planned In FY 2013 through FY 2015 with planned funding of $4
million, while the Public Safety Building is added to Ihe list due to the lack of funding source. This list
does not Include future infrastructure such as an intermodal transit center and Caltraln grade separations
for pedestrians.
Source: CMR:167:08 updated on May 13, 2009
Page 2 012 11/29/2010